September 1, 2015

SUBJECT:

MID-CYCLE LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 --

NRC ASSESSMENT REPORT 05000338/2015005 AND 05000339/2015005

Dear Mr. Heacock:

On August 13, 2015, the NRC completed its mid-cycle performance review of North Anna Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, North Anna, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at North Anna Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection schedule of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, an initial operator license examination, and Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (404) 997-4609 with any questions you may have regarding this letter.

Sincerely,

/RA/

Steven D. Rose, Chief Reactor Projects Branch 5 Division of Reactor Projects

Docket Nos.: 50-338, 50-339 License Nos.: NPF-4, NPF-7

Enclosure:

North Anna Inspection/Activity Plan (07/01/2015 - 06/30/2017)

cc: Distribution via ListServ

_________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP

SIGNATURE SON SDR2

NAME SNinh SRose

DATE 8/25/2015 8/31/2015

E-MAIL COPY?

YES NO YES NO Letter to David Heacock from Steven D. Rose dated September 1, 2015.

SUBJECT: MID-CYCLE LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 --

NRC ASSESSMENT REPORT 05000338/2015005 AND 05000339/2015005

DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMNorthAnna Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 09/01/2015 10:23:44 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna Inspection / Activity Plan 09/01/2015 - 06/30/2017 TFPI

- TRIENNIAL FIRE PROTECTION

1, 2 IP Fire Protection [Triennial]

7111105T 10/19/2015 10/23/2015 1, 2 IP Fire Protection [Triennial]

7111105T 11/02/2015 11/06/2015 OL RQ

- REQUAL INSP

1, 2 IP Licensed Operator Requalification Program 7111111B 01/25/2016 01/29/2016 EP

- EP EXERCISE INSPECTION

1, 2 IP Exercise Evaluation 7111401 02/08/2016 02/12/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 02/08/2016 02/12/2016 1, 2 IP Exercise Evaluation - Scenario Review 7111408 02/08/2016 02/12/2016 1, 2 IP Performance Indicator Verification 71151 02/08/2016 02/12/2016 DRP/RPB7

- TI-191:MITIGATING STRATEGIES

1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 02/22/2016 02/26/2016 ISI

- UNIT 2 IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 03/14/2016 03/18/2016 SGISI

- UNIT 2 SG IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 03/14/2016 03/18/2016 RP

- RP OCCUPATIONAL INSPECTION WEEK 1

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/21/2016 03/25/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/21/2016 03/25/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/21/2016 03/25/2016 1, 2 IP Occupational Dose Assessment 71124.04 03/21/2016 03/25/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/21/2016 03/25/2016 1, 2 IP Performance Indicator Verification 71151 03/21/2016 03/25/2016 RP

- RP OCCUPATIONAL INSPECTION WEEK 2

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/04/2016 04/08/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/04/2016 04/08/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/04/2016 04/08/2016 1, 2 IP Occupational Dose Assessment 71124.04 04/04/2016 04/08/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 04/04/2016 04/08/2016 1, 2 IP Performance Indicator Verification 71151 04/04/2016 04/08/2016 OL EXAM

- INITIAL LICENSE EXAM PREP

1 NORTH ANNA JUNE 2016 INITIAL EXAM AT POWER FACILITIES V23472 05/23/2016 05/27/2016 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 09/01/2015 10:23:44 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna Inspection / Activity Plan 09/01/2015 - 06/30/2017 OL EXAM

- INITIAL LICENSE EXAM

1 NORTH ANNA JUNE 2016 INITIAL EXAM AT POWER FACILITIES V23472 06/20/2016 07/01/2016 ISI

- UNIT 1 IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 09/19/2016 09/23/2016 LR

- UNIT 1 POST APPROVAL LR PHASE 1

1 IP Post-Approval Site Inspection for License Renewal 71003 09/19/2016 09/23/2016 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1, 2 IP Problem Identification and Resolution 71152B 01/30/2017 02/03/2017 1, 2 IP Problem Identification and Resolution 71152B 02/13/2017 02/17/2017 MODS

- PLANT MODIFICATIONS INSPECTION

1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 04/17/2017 04/21/2017 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 05/01/2017 05/05/2017 EP

- EP PROGRAM INSPECTION

1, 2 IP Alert and Notification System Testing 7111402 06/12/2017 06/16/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/12/2017 06/16/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/12/2017 06/16/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/12/2017 06/16/2017 1, 2 IP Performance Indicator Verification 71151 06/12/2017 06/16/2017 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure