IR 05000338/2015006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for North Anna Power Station Units 1 and 2 - NRC Inspection Report 05000338/2015006 and 05000339/2015006
ML16062A228
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/02/2016
From: Steven Rose
NRC/RGN-II/DRP/RPB5
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
IR 2015006
Download: ML16062A228 (6)


Text

UNITED STATES rch 2, 2016

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000338/2015006 AND 05000339/2015006

Dear Mr. Heacock:

On February 11, 2016, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of North Anna Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, North Anna Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at North Anna Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2017.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, the NRC plans on conducting two non-ROP baseline inspections which include an Operating Licensing Initial Exam and North Anna Unit 1 Post Approval License Renewal Phase 1. The NRC staff received the North Anna Power Station Final Compliance letter for Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC staff issued the North Anna Power Station Final Safety Evaluation on January 15, 2016, and will confirm full implementation of the orders mentioned above by performing TI 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading/rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4609 with any questions you may have regarding this letter.

Sincerely,

/RA/

Steven D. Rose, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-338, 50-339 License Nos.: NPF-4, NPF-7 Enclosure:

North Anna Inspection/Activity Plan (03/01/2016 - 12/31/2017)

cc Distribution via ListServ

________________

ML16062A228 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE DRP:RII DRP:RII DRP:RII SIGNATURE BDB SON SDR2 NAME B. Bishop S. Ninh S. Rose DATE 2/22/2016 2/29/2016 2/29/2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO Letter to David from Steven D. Rose dated March 2, 2016 SUBJECT: ANNUAL ASSESSMENT LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000338/2015006 AND 05000339/2015006 DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMNorthAnna Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

Page 1 of 2 North Anna 03/02/2016 08:09:52 Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 03/14/2016 03/18/2016 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 03/14/2016 03/18/2016 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 1 2 1, 2 03/21/2016 03/25/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/21/2016 03/25/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/21/2016 03/25/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/21/2016 03/25/2016 IP 71124.04 Occupational Dose Assessment 1, 2 03/21/2016 03/25/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/21/2016 03/25/2016 IP 71151 Performance Indicator Verification RP - RP OCCUPATIONAL INSPECTION WEEK 2 3 1, 2 04/04/2016 04/08/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/04/2016 04/08/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/04/2016 04/08/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/04/2016 04/08/2016 IP 71124.04 Occupational Dose Assessment 1, 2 04/04/2016 04/08/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 04/04/2016 04/08/2016 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 05/23/2016 05/27/2016 V23472 NORTH ANNA JUNE 2016 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM 3 1 06/20/2016 07/01/2016 V23472 NORTH ANNA JUNE 2016 INITIAL EXAM AT POWER FACILITIES ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 09/19/2016 09/23/2016 IP 7111108P Inservice Inspection Activities - PWR LR - UNIT 1 POST APPROVAL LR PHASE 1 2 1 09/19/2016 09/23/2016 IP 71003 Post-Approval Site Inspection for License Renewal PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 01/30/2017 02/03/2017 IP 71152B Problem Identification and Resolution 1, 2 02/13/2017 02/17/2017 IP 71152B Problem Identification and Resolution MODS - PLANT MODIFICATIONS INSPECTION 3 1, 2 04/17/2017 04/21/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 05/01/2017 05/05/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 North Anna 03/02/2016 08:09:52 Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 4 1, 2 06/12/2017 06/16/2017 IP 7111402 Alert and Notification System Testing 1, 2 06/12/2017 06/16/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/12/2017 06/16/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/12/2017 06/16/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/12/2017 06/16/2017 IP 71151 Performance Indicator Verification RP - RP PUBLIC RAD SAFETY BASELINE 2 1, 2 07/31/2017 08/04/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/31/2017 08/04/2017 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/31/2017 08/04/2017 IP 71151 Performance Indicator Verification HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 08/28/2017 09/01/2017 IP 7111107T Heat Sink Performance ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 09/18/2017 09/22/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS AND TRANSPORTATION 2 1, 2 09/18/2017 09/22/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/18/2017 09/22/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.