=Text=
=Text=
{{#Wiki_filter:A p p e n d i x D S c e n a r i o O u t l i n e F o r m E S-D-1   
{{#Wiki_filter:Appendix D                                   Scenario Outline                            Form ES-D-1 Facility:    PRAIRIE ISLAND                Scenario No.: 1              Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________                      Operators: __________________________
Initial Conditions:
                                    -8 Reactor Power at 1 x 10 amps, Boron Concentration at 1369 ppm, RCS temperature at 547°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 144 steps, Generator Power at 0 MW.
No equipment is out of service.
Turnover:
Raise reactor power to the point of adding heat.
Event      Malf. Event Type*                                    Event No.        No.                                                Description R (ATC) 1                                    RAISE POWER TO THE POAH N (SRO)
I (ATC, SRO)      PRZR PRESSURE CHANNEL FAILS LOW 2
TS (SRO)        (CONTROLLING CHANNEL)
C (ATC, SRO) 3                                    22 GPM RCS LEAK INTO CONTAINMENT TS (SRO) 4                      M (ALL)        SMALL BREAK LOCA 5                      C (BOP)        11 & 12 SI PUMPS FAIL TO AUTO START 6                      C (BOP)        11 & 12 CC PUMPS FAIL TO AUTO START
*        (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor


F a c i l i t y:     P R A I R I E I S L A N D                 S c e n a r i o N o.: 1                        O p-T e s t N o.: P I-I L T-N R C-1 4 E x a m i n e r s: ______________________                   O p e r a t o r s: __________________________      ______________________                          __________________________                    ______________________                          __________________________
Appendix D                                      Scenario Outline                              Form ES-D-1 Facility:   PRAIRIE ISLAND                 Scenario No.: 2                Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________                         Operators: __________________________
I n i t i a l C o n d i t i o n s:   R e a c t o r P o w e r a t 1 x 1 0-8 a m p s , B o r o n C o n c e n t r a t i o n a t 1 3 6 9 p p m , R C S t e m p e r a t u r e a t 5 4 7°F , R C S p r e s s u r e a t 2 2 3 5 p s i g , X e n o n a t e q u i l i b r i u m , B a n k D r o d s a t 1 4 4 s t e p s , G e n e r a t o r P o w e r a t 0 M W. N o e q u i p m e n t i s o u t o f s e r v i c e.
Initial Conditions:
T u r n o v e r: R a i s e r e a c t o r p o w e r t o t h e p o i n t o f a d d i n g h e a t. E v e n t N o. M a l f. N o. E v e n t T y p e* E v e n t D e s c r i p t i o n 1   R (A T C) N (S R O) R A I S E P O W E R T O T H E P O A H 2  I (A T C , S R O) T S (S R O) P R Z R P R E S S U R E C H A N N E L F A I L S L O W (C O N T R O L L I N G C H A N N E L) 3  C (A T C , S R O) T S (S R O) 2 2 G P M R C S L E A K I N T O C O N T A I N M E N T 4  M (A L L) S M A L L B R E A K L O C A  5  C (B O P) 1 1 & 1 2 S I P U M P S F A I L T O A U T O S T A R T 6  C (B O P1 1 & 1 2 C C P U M P S F A I L T O A U T O S T A R T * (N)o r m a l ,   (R)e a c t i v i t y ,   (I)n s t r u m e n t ,   (C)o m p o n e n t ,   (M)a j o r A p p e n d i x D S c e n a r i o O u t l i n e F o r m E S-D-1 
Reactor Power at 100%, Boron Concentration at 1299 ppm, RCS temperature at 560°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 218 steps, Generator Power at 581 MW.
12 RHR Pump is out of service. T.S. LCO 3.5.2 Condition A was entered with 48 hours remaining. D1, 11 TD AFW Pump, 11 RHR Pump, 11 SI Pump, 11 CC Pump, and 12 CLW Pump are PROTECTED. BKR 16-10 is out of service.
Turnover:
nd Place a 2    Letdown Orifice in service in preparation of SP 1047, Control Rod Quarterly Exercise.
Event      Malf.     Event Type*                                      Event No.         No.                                                   Description ND 1                       N (BOP)       PLACE 2    LETDOWN ORIFICE IN SERVICE 2                      TS (SRO)       CONTAINMENT PRESSURE CHANNEL FAILS HIGH I (ATC, SRO) 3                                      PRESSURIZER LEVEL FAILS HIGH TS (SRO) 4                  C (BOP, SRO)       TURBINE MALFUNCTION (10 MW LOAD CYCLING)
R (ATC) 5                                      RAPID DOWNPOWER (100% TO 95%)
N (SRO) 6                        M (ALL)       LARGE BREAK LOCA 7                        C (BOP)        MAIN TURBINE FAILS TO AUTO TRIP 8                        C (ATC)       BOTH SAFEGUARD TRAINS FAIL TO AUTO ACTUATE 9                  C (BOP, SRO)       11 & 12 AFW PUMPS FAIL TO AUTO START
  *         (N)ormal,   (R)eactivity, (I)nstrument, (C)omponent,   (M)ajor


F a c i l i t y:     P R A I R I E I S L A N D                  S c e n a r i o N o.: 2                        O p-T e s t N o.: P I-I L T-N R C-1 4 E x a m i n e r s: ______________________                   O p e r a t o r s: __________________________      ______________________                          __________________________                    ______________________                          __________________________
Appendix D                                    Scenario Outline                              Form ES-D-1 Facility:   PRAIRIE ISLAND                Scenario No.: 3              Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________                       Operators: __________________________
I n i t i a l C o n d i t i o n s:   R e a c t o r P o w e r a t 1 0 0%, B o r o n C o n c e n t r a t i o n a t 1 2 9 9 p p m , R C S t e m p e r a t u r e a t 5 6 0°F , R C S p r e s s u r e a t 2 2 3 5 p s i g , X e n o n a t e q u i l i b r i u m , B a n k D r o d s a t 2 1 8 s t e p s , G e n e r a t o r P o w e r a t 5 8 1 M W.
Initial Conditions:
1 2 R H R P u m p i s o u t o f s e r v i c e. T.S. L C O 3.5.2 C o n d i t i o n A w a s e n t e r e d w i t h 4 8 h o u r s r e m a i n i n g. D 1 , 1 1 T D A F W P u m p , 1 1 R H R P u m p , 1 1 S I P u m p , 1 1 C C P u m p , a n d 1 2 C L W P u m p a r e P R O T E C T E D. B K R 1 6-1 0 i s o u t o f s e r v i c e.
Reactor Power at 50%, Boron Concentration at 1482 ppm, RCS temperature at 556°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 181 steps, Generator Power at 272 MW.
T u r n o v e r:   P l a c e a 2 n d L e t d o w n O r i f i c e i n s e r v i c e i n p r e p a r a t i o n o f S P 1 0 4 7 , C o n t r o l R o d Q u a r t e r l y E x e r c i s e. E v e n t N o. M a l f. N o. E v e n t T y p e* E v e n t D e s c r i p t i o n 1   N (B O P) P L A C E 2 N D L E T D O W N O R I F I C E I N S E R V I C E 2  T S (S R O) C O N T A I N M E N T P R E S S U R E C H A N N E L F A I L S H I G H 3   I (A T C , S R O) T S (S R O) P R E S S U R I Z E R L E V E L F A I L S H I G H 4  C (B O P , S R O) T U R B I N E M A L F U N C T I O N (1 0 M W L O A D C Y C L I N G) 5   R (A T C) N (S R O) R A P I D D O W N P O W E R (1 0 0% T O 9 5%) 6   M (A L L) L A R G E B R E A K L O C A 7   C (B O P)  M A I N T U R B I N E F A I L S T O A U T O T R I P 8  C (A T C)  B O T H S A F E G U A R D T R A I N S F A I L T O A U T O A C T U A T E 9  C (B O P , S R O1 1 & 1 2 A F W P U M P S F A I L T O A U T O S T A R T * (N)o r m a l ,   (R)e a c t i v i t y ,   (I)n s t r u m e n t ,   (C)o m p o n e n t ,   (M)a j o r A p p e n d i x D S c e n a r i o O u t l i n e F o r m E S-D-1 
PT-485, Turbine First Stage Pressure, is failed HIGH. Rod Control is in MANUAL. T.S. LCO 3.3.1 Condition A and R entered. P7 was verified to be in required state for existing unit conditions. TRM 3.3.4 Condition A was entered. A Work Request was initiated to repair PT-485. 123 Air Compressor is out of service. 13 Charging Pump Suction Stabilizer PM is complete are ready to be re-started.
Turnover:
Restore RCS Average Coolant Temperature to program temperature.
Swap charging pumps to 11 and 13 running and 12 is secured per 1C12.1.
Event      Malf.     Event Type*                                    Event No.         No.                                                 Description R (ATC) 1                                     RESTORE TAVE TO TREF N (SRO) 2                     N (BOP)         SWAP CHARGING PUMPS 3                     TS (SRO)         11 SI PUMP PLACED IN LOCAL I (BOP, SRO) 4                                      N43 PR NUCLEAR INSTRUMENT FAILS HIGH TS (SRO) 5                     C (ATC)         PRESSURIZER SPRAY VALVE DRIFTS OPEN LOOP A RCS LOSS OF FLOW & REACTOR FAILS TO 6                 C (ATC, SRO)
AUTOMATICALLY TRIP 7                     M (ALL)         FAULT IN 12 SG
  *         (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor


F a c i l i t y:     P R A I R I E I S L A N D                  S c e n a r i o N o.: 3                        O p-T e s t N o.: P I-I L T-N R C-1 4 E x a m i n e r s: ______________________                   O p e r a t o r s: __________________________      ______________________                          __________________________                    ______________________                          __________________________
Appendix D                                    Scenario Outline                              Form ES-D-1 Facility:   PRAIRIE ISLAND                Scenario No.: 4                Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________                       Operators: __________________________
I n i t i a l C o n d i t i o n s:   R e a c t o r P o w e r a t 5 0%, B o r o n C o n c e n t r a t i o n a t 1 4 8 2 p p m , R C S t e m p e r a t u r e a t 5 5 6°F , R C S p r e s s u r e a t 2 2 3 5 p s i g , X e n o n a t e q u i l i b r i u m , B a n k D r o d s a t 1 8 1 s t e p s , G e n e r a t o r P o w e r a t 2 7 2 M W.
Initial Conditions:
P T-4 8 5 , T u r b i n e F i r s t S t a g e P r e s s u r e , i s f a i l e d H I G H. R o d C o n t r o l i s i n M A N U A L. T.S. L C O 3.3.1 C o n d i t i o n A a n d R e n t e r e d. P 7 w a s v e r i f i e d t o b e i n r e q u i r e d s t a t e f o r e x i s t i n g u n i t c o n d i t i o n s. T R M 3.3.4 C o n d i t i o n A w a s e n t e r e d. A W o r k R e q u e s t w a s i n i t i a t e d t o r e p a i r P T-4 8 5. 1 2 3 A i r C o m p r e s s o r i s o u t o f s e r v i c e. 1 3 C h a r g i n g P u m p S u c t i o n S t a b i l i z e r P M i s c o m p l e t e a r e r e a d y t o b e r e-s t a r t e d.
Reactor Power at 50%, Boron Concentration at 1480 ppm, RCS temperature at 553°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 175 steps, Generator Power at 265 MW.
T u r n o v e r:   R e s t o r e R C S A v e r a g e C o o l a n t T e m p e r a t u r e t o p r o g r a m t e m p e r a t u r e.
13 Charging Pump is out of service. Two 40 GPM letdown orifices are in service. Pressurizer heaters are on. 11 and 12 Condensate Pumps are running. 11 and 12 Main Feed Pumps are running. 11 MFP recirculation valve is still open. 11 and 12 HDT Pumps are running.
S w a p c h a r g i n g p u m p s t o 1 1 a n d 1 3 r u n n i n g a n d 1 2 i s s e c u r e d p e r 1 C 1 2.1. E v e n t N o. M a l f. N o. E v e n t T y p e* E v e n t D e s c r i p t i o n 1  R (A T C) N (S R O) R E S T O R E T A V E T O T R E F 2   N (B O P) S W A P C H A R G I N G P U M P S 3  T S (S R O) 1 1 S I P U M P P L A C E D I N L O C A L 4  I (B O P , S R O) T S (S R O) N 4 3 P R N U C L E A R I N S T R U M E N T F A I L S H I G H 5   C (A T C) P R E S S U R I Z E R S P R A Y V A L V E D R I F T S O P E N 6   C (A T C , S R O) L O O P A R C S L O S S O F F L O W & R E A C T O R F A I L S T O A U T O M A T I C A L L Y T R I P 7  M (A L LF A U L T I N 1 2 S G * (N)o r m a l ,   (R)e a c t i v i t y ,   (I)n s t r u m e n t ,   (C)o m p o n e n t ,   (M)a j o r A p p e n d i x D S c e n a r i o O u t l i n e F o r m E S-D-1 
Turnover:
Alternate CFCUs and discharge dampers such that 11 and 13 CFCUs are running in slow to the dome and 12 and 14 CFCUs are running in fast to support/gap.
When directed by the Shift Manager, perform a load increase from 50% to 60%.
Event      Malf. Event Type*                                      Event No.         No.                                                   Description ALTERNATE CONTAINMENT FAN COIL UNITS AND 1                      N (BOP)
DISCHARGE DAMPERS I (BOP, SRO)       11 SG PRESS CHANNEL FAILS HIGH 2
TS (SRO)       CAUSING 11 SG PORV TO OPEN R (ATC) 3                                      UNIT 1 LOAD INCREASE FROM 50% TO 60%
N (SRO)
DROPPED ROD (B-8) AND REACTOR FAILS TO 4                 C (ATC, SRO)
AUTOMATICALLY TRIP 5                     C (BOP)         TURBINE FAILS TO AUTOMATICALLY TRIP 6                       M (ALL)        LOSS OF ALL AC (OCCURS 10 SECS AFTER TURB TRIP) 7                  C (ATC, SRO)       11 TD AFW PUMP FAILS TO AUTO START
  *         (N)ormal, (R)eactivity, (I)nstrument, (C)omponent,   (M)ajor


F a c i l i t y:    P R A I R I E I S L A N D                  S c e n a r i o N o.:  4                        O p-T e s t N o.: P I-I L T-N R C-1 4 E x a m i n e r s:  ______________________                    O p e r a t o r s: __________________________      ______________________                          __________________________                    ______________________                          __________________________
Appendix D                                       Scenario Outline                             Form ES-D-1 Facility:    PRAIRIE ISLAND                 Scenario No.: 5               Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________                         Operators: __________________________
I n i t i a l C o n d i t i o n s:  R e a c t o r P o w e r a t 5 0%, B o r o n C o n c e n t r a t i o n a t 1 4 8 0 p p m , R C S t e m p e r a t u r e a t 5 5 3°F , R C S p r e s s u r e a t 2 2 3 5 p s i g , X e n o n a t e q u i l i b r i u m , B a n k D r o d s a t 1 7 5 s t e p s , G e n e r a t o r P o w e r a t 2 6 5 M W.
Initial Conditions:
1 3 C h a r g i n g P u m p i s o u t o f s e r v i c e. T w o 4 0 G P M l e t d o w n o r i f i c e s a r e i n s e r v i c e. P r e s s u r i z e r h e a t e r s a r e o n. 1 1 a n d 1 2 C o n d e n s a t e P u m p s a r e r u n n i n g. 1 1 a n d 1 2 M a i n F e e d P u m p s a r e r u n n i n g. 1 1 M F P r e c i r c u l a t i o n v a l v e i s s t i l l o p e n. 1 1 a n d 1 2 H D T P u m p s a r e r u n n i n g.
Reactor Power at 100%, Boron Concentration at 853 ppm, RCS temperature at 560°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 218 steps, Generator Power at 581 MW.
T u r n o v e r:    A l t e r n a t e C F C U s a n d d i s c h a r g e d a m p e r s s u c h t h a t 1 1 a n d 1 3 C F C U s a r e r u n n i n g i n s l o w t o t h e d o m e a n d 1 2 a n d 1 4 C F C U s a r e r u n n i n g i n f a s t t o s u p p o r t/g a p.
11 SI Pump is out of service. T.S. LCO 3.5.2 Condition A was entered with 48 hours remaining. D2, 12 MD AFW Pump, 12 RHR Pump, 12 SI Pump, 12 CC Pump, and 22 CLW Pump are PROTECTED. PT-485, Turbine First Stage Pressure, is failed LOW. Rod Control is in MANUAL. T.S. LCO 3.3.1 Condition A and R entered. P7 was verified to be in required state for existing unit conditions. TRM 3.3.4 Condition A was entered. A Work Request was initiated to repair PT-485. B/S 1PC-485A is tripped. Bus 15 and 16 are powered from CT11.
W h e n d i r e c t e d b y t h e S h i f t M a n a g e r , p e r f o r m a l o a d i n c r e a s e f r o m 5 0% t o 6 0%. E v e n t N o. M a l f. N o. E v e n t T y p e* E v e n t D e s c r i p t i o n 1  N (B O P)  A L T E R N A T E C O N T A I N M E N T F A N C O I L U N I T S A N D D I S C H A R G E D A M P E R S 2  I (B O P , S R O) T S (S R O)  1 1 S G P R E S S C H A N N E L F A I L S H I G H  C A U S I N G 1 1 S G P O R V T O O P E N 3  R (A T C) N (S R O)  U N I T 1 L O A D I N C R E A S E F R O M 5 0% T O 6 0% 4  C (A T C , S R O)  D R O P P E D R O D (B-8) A N D R E A C T O R F A I L S T O A U T O M A T I C A L L Y T R I P 5  C (B O P)  T U R B I N E F A I L S T O A U T O M A T I C A L L Y T R I P 6  M (A L L)  L O S S O F A L L A C (O C C U R S 1 0 S E C S A F T E R T U R B T R I P) 7  C (A T C , S R O)  1 1 T D A F W P U M P F A I L S T O A U T O S T A R T * (N)o r m a l ,    (R)e a c t i v i t y ,    (I)n s t r u m e n t ,    (C)o m p o n e n t ,    (M)a j o r Appendix D Scenario Outline Form ES-D-1 Facility:    PRAIRIE ISLAND Scenario No.: 5 Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________ Operators: __________________________     ______________________        __________________________        ______________________        __________________________ Initial Conditions: Reactor Power at 100%, Boron Concentration at 853 ppm, RCS temperature at 560°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 218 steps, Generator Power at 581 MW. 11 SI Pump is out of service. T.S. LCO 3.5.2 Condition A was entered with 48 hours remaining. D2, 12 MD AFW Pump, 12 RHR Pump, 12 SI Pump, 12 CC Pump, and 22 CLW Pump are PROTECTED. PT-485, Turbine First Stage Pressure, is failed LOW. Rod Control is in MANUAL. T.S. LCO 3.3.1 Condition A and R entered. P7 was verified to be in required state for existing unit conditions. TRM 3.3.4 Condition A was entered. A Work Request was initiated to repair PT-485. B/S 1PC-485A is tripped. Bus 15 and 16 are powered from CT11. A dedicated operator is monitoring phase currents at the G-Panel. Turnover: Transfer power on Bus 15 to 1RY after turnover is complete. Event No. Malf. No. Event Type*
A dedicated operator is monitoring phase currents at the G-Panel.
Event Description 1 N (BOP) TRANSFER POWER ON BUS 15 FROM CT11 TO 1RY 2 I (ATC, SRO) TS (SRO) ROD E-3 POSITION INDICATION FAILS LOW 3 I (ATC, SRO) TS (SRO) RCS THOT CHANNEL FAILS HIGH 4 C (BOP, SRO) LOSS OF BUS DUCT COOLING 5 R (ATC) N (SRO) RAPID DOWNPOWER (100% to 50%) 6 M (ALL) 12 SG TUBE RUPTURE 7 C (BOP) SI TO CHILLED WATER SIGNAL FAILURE *(N)ormal,    (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 1 of 22   SIMULATOR EXERCISE GUIDE (SEG)
Turnover:
SITE: PRAIRIE ISLAND SEG # PI-ILT-NRC-14 0 1 S  SEG TITLE:
Transfer power on Bus 15 to 1RY after turnover is complete.
2014 ILT NRC SIMULATOR EVALUATION #
Event         Malf.       Event Type*                                   Event No.          No.                                                    Description 1                         N (BOP)         TRANSFER POWER ON BUS 15 FROM CT11 TO 1RY I (ATC, SRO) 2                                          ROD E-3 POSITION INDICATION FAILS LOW TS (SRO)
1 REV. # 0   PROGRAM: INITIAL LICENSE OPERATOR TRAINING
I (ATC, SRO) 3                                          RCS THOT CHANNEL FAILS HIGH TS (SRO) 4                     C (BOP, SRO)         LOSS OF BUS DUCT COOLING R (ATC) 5                                          RAPID DOWNPOWER (100% to 50%)
#: FL-ILT     COURSE: INITIAL LICENSE OPERATOR TRAINING
N (SRO) 6                         M (ALL)         12 SG TUBE RUPTURE 7                         C (BOP)         SI TO CHILLED WATER SIGNAL FAILURE
#: FL-ILT   TOTAL TIME:
*         (N)ormal,    (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
2.0 HOUR   Developed by:
 
Shawn Sarrasin 2/9/201 4  Instructor Date   Reviewed by:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 1 of 22 SIMULATOR EXERCISE GUIDE (SEG)
Fredrick Collins 2/28/2014 Instructor (Simulator Scenario Development Checklist.)
SITE: PRAIRIE ISLAND                               SEG #     PI-ILT-NRC-1401S SEG TITLE:       2014 ILT NRC SIMULATOR EVALUATION #1                       REV. #   0 PROGRAM:         INITIAL LICENSE OPERATOR TRAINING                 #:   FL-ILT COURSE:           INITIAL LICENSE OPERATOR TRAINING                 #:   FL-ILT TOTAL TIME: 2.0 HOUR Developed by:                         Shawn Sarrasin                               2/9/2014 Instructor                                 Date Reviewed by:                           Fredrick Collins                           2/28/2014 Instructor                                 Date (Simulator Scenario Development Checklist.)
Date    Validated by:
Validated by:                         Shawn Sarrasin                             4/21/2014 Validation Lead Instructor                           Date (Simulator Scenario Validation Checklist.)
Shawn Sarrasin 4/2 1/2014 Validation Lead Instructor (Simulator Scenario Validation Checklist.)
Approved by:
Date    Approved by:
Training Supervision                             Date Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Training Supervision Date   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 2 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Guide Requirements
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 2 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Guide Requirements Goal of Training: 1. During all plant operating conditions, the crew will demonstrate the ability to monitor and operate the plant within the limits of the Operations Manuals and Technical Specifications.
: 1. During all plant operating conditions, the crew will demonstrate Goal of                  the ability to monitor and operate the plant within the limits of the Training:                Operations Manuals and Technical Specifications.
: 2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
: 2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
Learning Objectives:
: 1. Raise power to the Point of Adding Heat per 1C1.2.
: 1. Raise power to the Point of Adding Heat per 1C1.2. 2. Diagnose and perform corrective actions for a Pressurizer Pressure Instrument failing low per 1C51.3. 3. Diagnose and respond to a RCS Leak per 1C4 AOP 1. 4. Diagnose and respond to a Small Break LOCA per 1E-0 and 1E-1. 5. Diagnose and respond to a failure of the SI Pumps to automatically start per 1E
Learning              2. Diagnose and perform corrective actions for a Pressurizer Objectives:                Pressure Instrument failing low per 1C51.3.
-0 Attachment L
: 3. Diagnose and respond to a RCS Leak per 1C4 AOP1.
. 6. Diagnose and respond to a failure of the CC Pumps to automatically start per 1E
: 4. Diagnose and respond to a Small Break LOCA per 1E-0 and 1E-1.
-0 Attachment L.
: 5. Diagnose and respond to a failure of the SI Pumps to automatically start per 1E-0 Attachment L.
Training Resources:
: 6. Diagnose and respond to a failure of the CC Pumps to automatically start per 1E-0 Attachment L.
: 1. Full Scope Simulator
: 1. Full Scope Simulator Training              2. NRC Evaluation Team Resources:           3. Booth Operator (Backup Communicator)
: 2. NRC Evaluation Team
: 4. Primary Communicator Initiating Event with Core Damage Frequency:
: 3. Booth Operator (Backup Communicator)
Related PRA          LOCA (5.1%)
: 4. Primary Communicator Related PRA Information:
Information:
Initiating Event with Core Damage Frequency:
Important Components:
LOCA (5.1%)     Important Components:
11 SI PMP 12 SI PMP 11 CC PMP 12 CC PMP Important Operator Actions with Task Number:
11 SI PMP 12 SI PMP 11 CC PMP 12 CC PMP Important Operator Actions with Task Number:
NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 3 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 3 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:
Before EOP Entry:
Before EOP Entry:
: 1. 1 P-431 , Blue Channel Pressurizer Pressure Transmitter, fails low
: 1. 1P-431, Blue Channel Pressurizer Pressure Transmitter, fails low.
. 2. Unidentified RCS Leak at  
: 2. Unidentified RCS Leak at ~21 gpm.
~2 1 gpm. After EOP Entry:
After EOP Entry:
: 1. 11 and 12 SI Pumps fail to start automatically
: 1. 11 and 12 SI Pumps fail to start automatically.
. 2. 11 and 12 CC Pumps fail to start automatically.
: 2. 11 and 12 CC Pumps fail to start automatically.
Abnormal Events:
Abnormal Events:
: 1. Pressurizer Pressure Instrument Failure
: 1. Pressurizer Pressure Instrument Failure.
. 2. RCS Leak. Major Transients:
: 2. RCS Leak.
: 1. Small Break LOCA from the A Loop RTD Bypass Cold Leg Manifold
Major Transients:
. Critical Tasks:
: 1. Small Break LOCA from the A Loop RTD Bypass Cold Leg Manifold.
: 1. E H: Manually start at least one Safety Injection pump before transition out of E-0. 2. E K: Manually start at least one CCW pump before transition out of E
Critical Tasks:
-0. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
: 1. E H: Manually start at least one Safety Injection pump before transition out of E-0.
-G-RM-01.
: 2. E K: Manually start at least one CCW pump before transition out of E-0.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 4 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO OVERVIEW:
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
INITIAL CONDITIONS:
 
EQUIPMENT O OS  Exposure:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 4 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO OVERVIEW:
M OC  NONE Power: 1 x 10-8 amps   Boron (CB):
INITIAL CONDITIONS:                                 EQUIPMENT OOS
13 69 ppm  Temperature:
* Exposure: MOC
5 4 9°F   Pressure: 2235 psig   Xenon: Equilibrium Rods: "D" @
* NONE
14 8  Generator:
* Power: 1 x 10-8 amps
0 MW   SEQUENCE OF EVENTS:
* Boron (CB): 1369 ppm
Event 1: Raise Reactor Power to the Point of Adding Heat Reactor power is at 1 x 10
* Temperature: 549°F
-8 amps. Rods will be stepped out to establish a positive startup rate
* Pressure: 2235 psig
. Power will rise to between 0.5% and 2%
* Xenon: Equilibrium
. Rods will be stepped in to level power out.
* Rods: D @ 148
Event 2: Blue Channel Pressurizer Pressure Instrument Fails LOW   1P-431 pressure instrument will peg low
* Generator: 0 MW SEQUENCE OF EVENTS:
. All pressurizer heaters will turn on.
Event 1: Raise Reactor Power to the Point of Adding Heat
Pressurizer spray valves will close.
* Reactor power is at 1 x 10-8 amps.
Pressurizer pressure will slowly rise.
* Rods will be stepped out to establish a positive startup rate.
The crew will take manual control of pressurizer pressure.
* Power will rise to between 0.5% and 2%.
Pressurizer pressure will be returned to program.
* Rods will be stepped in to level power out.
Pressurizer pressure control will be placed in the 2
Event 2: Blue Channel Pressurizer Pressure Instrument Fails LOW
-1 position.
* 1P-431 pressure instrument will peg low.
Pressurizer pressure control will be returned to automatic.
* All pressurizer heaters will turn on.
The SS will enter T.S. LCO 3.3.1 Conditions A, E, and K.
* Pressurizer spray valves will close.
The SS will enter T.S. LCO 3.3.2 Conditions A and D.
* Pressurizer pressure will slowly rise.
Event 3: RCS Leak   An unidentified approximate 2 1 gpm leak will develop on the RCS.
* The crew will take manual control of pressurizer pressure.
The leak will be un
* Pressurizer pressure will be returned to program.
-isolable. Pressurizer level and pressure will slowly lower.
* Pressurizer pressure control will be placed in the 2-1 position.
The crew will enter 1C4 AOP1.
* Pressurizer pressure control will be returned to automatic.
The Letdown and Charging Line will be isolated.
* The SS will enter T.S. LCO 3.3.1 Conditions A, E, and K.
The Regenerative Heat Exchanger will be isolated.
* The SS will enter T.S. LCO 3.3.2 Conditions A and D.
RCP Seal Injection will be isolated and then restored.
Event 3: RCS Leak
The SS will enter T.S. LCO 3.4.14 Condition A.
* An unidentified approximate 21 gpm leak will develop on the RCS.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* The leak will be un-isolable.
-G-RM-01.
* Pressurizer level and pressure will slowly lower.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 5 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Event s 4, 5, & 6: Small Break Loss of Coolant Accident RCS pressure will rapidly lower. Pressurizer level will rapidly lower. The crew will enter 1E
* The crew will enter 1C4 AOP1.
-0. The crew will manually:
* The Letdown and Charging Line will be isolated.
* The Regenerative Heat Exchanger will be isolated.
* RCP Seal Injection will be isolated and then restored.
* The SS will enter T.S. LCO 3.4.14 Condition A.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 5 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Events 4, 5, & 6: Small Break Loss of Coolant Accident
* RCS pressure will rapidly lower.
* Pressurizer level will rapidly lower.
* The crew will enter 1E-0.
* The crew will manually:
o Trip the reactor and actuate SI.
o Trip the reactor and actuate SI.
o Start SI pump(s) and CC pump(s).
o Start SI pump(s) and CC pump(s).
The crew will transition to 1E
* The crew will transition to 1E-1.
-1. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 6 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Simulator Setup:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 6 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Simulator Setup:
NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.
NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.
CAUTION: A reactivity and temperature transient will occur if 1HC
CAUTION: A reactivity and temperature transient will occur if 1HC-484, MAIN STM HDR PRESS (STM DUMP), is NOT set to 72% when the simulator is taken to RUN.
-484, MAIN STM HDR PRESS (STM DUMP), is NOT set to 7 2% when the simulator is taken to RUN.
: 1. If IC-261 is available, then perform the following:
: 1. If IC-261 is available, then perform the following:
: a. Reset to IC
: a. Reset to IC-261.
-26 1. b. Verify 1HC
: b. Verify 1HC-484, MAIN STM HDR PRESS (STM DUMP), set point is set to 72%.
-484, MAIN STM HDR PRESS (STM DUMP), set point is set to 7 2%. c. Place the simulator in RUN.
: c. Place the simulator in RUN.
: d. Verify RCS Tavg stabilized at 54 9°F. 2. If IC-26 1 is NOT available:
: d. Verify RCS Tavg stabilized at 549°F.
: a. Reset to IC
: 2. If IC-261 is NOT available:
-18. b. Verify 1HC
: a. Reset to IC-18.
-484, MAIN STM HDR PRESS (STM DUMP), set point is set to 7 2%. c. Place the simulator in RUN.
: b. Verify 1HC-484, MAIN STM HDR PRESS (STM DUMP), set point is set to 72%.
: d. Verify RCS Tavg stabilized at 54 9°F. e. Verify RCP Seal Injection at 8 gpm and charging flow balanced with letdown.
: c. Place the simulator in RUN.
: f. Adjust rods as necessary to establish reactor power at 1 x 10
: d. Verify RCS Tavg stabilized at 549°F.
-8 amps and stable.
: e. Verify RCP Seal Injection at 8 gpm and charging flow balanced with letdown.
: f. Adjust rods as necessary to establish reactor power at 1 x 10-8 amps and stable.
: g. Insert Remote SG100 to CW.
: g. Insert Remote SG100 to CW.
: h. Take to the following to PULLOUT
: h. Take to the following to PULLOUT
: i. CS-46362, 4.16KV BUS 11 1M XFMR (BKR 11
: i. CS-46362, 4.16KV BUS 11 1M XFMR (BKR 11-4) ii. CS-46363, 4.16KV BUS 12 1M XFMR (BKR 12-4) iii. CS-46364, 4.16KV BUS 13 1M XFMR (BKR 13-9) iv. CS-46365, 4.16KV BUS 14 1M XFMR (BKR 13-9)
-4) ii. CS-46363, 4.16KV BUS 12 1M XFMR (BKR 12
: 3. Verify the ROD DEVIATION alarm is CLEARED as follows:
-4) iii. CS-46364, 4.16KV BUS 13 1M XFMR (BKR 13
: a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
-9) iv. CS-46365, 4.16KV BUS 14 1M XFMR (BKR 13
: b. Go to ERCS Screen RBU (Rod Bank Update).
-9) 3. Verify the ROD DEVIATION alarm is CLEARED as follows:
: c. Enter 148 as the new value for point 1U0052A, ROD POS BNK D.
: a. Log into the ERCS terminal with user "OVRD" and password "DUTY" (if needed). b. Go to ERCS Screen RBU (Rod Bank Update).
: d. Select Apply.
: c. Enter 14 8 as the new value for point 1U0052A, ROD POS BNK D.
: e. Verify Annunciator 47013-0507, COMPUTER ALARM / ROD DEVIATION /
: d. Select "Apply".
SEQUENCING, has cleared.
: e. Verify Annunciator 47013
-0507, COMPUTER ALARM / ROD DEVIATION / SEQUENCING, has cleared.
: 4. Verify the Pen Recorder for RCS Tavg and Tref are set correctly as follows:
: 4. Verify the Pen Recorder for RCS Tavg and Tref are set correctly as follows:
: a. Log into the ERCS terminal with user "OVRD" and password "DUTY" (if needed). b. Go to ERCS Screen PEN_TREND (Pen Trend Configuration). c. Enter 545 as the new Min EU value for Pen 1U9001A (point 1T0499A).
: a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
: b. Go to ERCS Screen PEN_TREND (Pen Trend Configuration).
: c. Enter 545 as the new Min EU value for Pen 1U9001A (point 1T0499A).
: d. Enter 555 as the new Max EU value for Pen 1U9001A (point 1T0499A).
: d. Enter 555 as the new Max EU value for Pen 1U9001A (point 1T0499A).
: e. Enter 545 as the new Min EU value for Pen 1U9002A (point 1T0496A).
: e. Enter 545 as the new Min EU value for Pen 1U9002A (point 1T0496A).
: f. Enter 555 as the new Max EU value for Pen 1U9002A (point 1T0496A).
: f. Enter 555 as the new Max EU value for Pen 1U9002A (point 1T0496A).
: 5. If available, run schedule file P I-ILT-NRC-14 0 1 S.sch as follows:
: 5. If available, run schedule file PI-ILT-NRC-1401S.sch as follows:
: a. Select open file in the Schedule application.
: a. Select open file in the Schedule application.
: b. Locate schedule file.
: b. Locate schedule file.
: c. Open schedule file by double clicking it.
: c. Open schedule file by double clicking it.
: d. Run the schedule file by pressing the "Stopped" button on the toolbar. e. Verify the schedule file is running.
: d. Run the schedule file by pressing the Stopped button on the toolbar.
: e. Verify the schedule file is running.
: 6. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
: 6. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
: 7. If desired, start Scenario Based Testing Data Collection Program.
: 7. If desired, start Scenario Based Testing Data Collection Program.
: 8. Complete the "Simulator Setup Checklist."
: 8. Complete the "Simulator Setup Checklist.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 7 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                         Page 7 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW               EXPECTED STUDENT RESPONSES POS
: 1. SIMULATOR PRE
: 1. SIMULATOR PRE-BRIEF:
-BRIEF: a. The Simulator Pre
: a. The Simulator Pre-Brief is conducted prior to the crew entering the simulator.
-Brief is conducted prior to the crew entering the simulator.
: b. Review Unit 1 LPEO / PEO Turnover Log.
: b. Review Unit 1 LPEO / PEO Turnover Log.
: c. Perform a pre
: c. Perform a pre-job brief for the following activity:
-job brief for the following activity:
: 1) Raise power to the Point of Adding Heat per steps 5.10.20 - 5.10.23 of 1C1.2.
: 1) Raise power to the Point of Adding Heat per steps 5.10.
(a) Provide Page 71 of 1C1.2 marked up to step 5.10.19.
20 - 5.10.23 of 1C1.2.  
(b) This activity is to be performed after shift turnover is complete.
(a) Provide Page 71 of 1C1.2 marked up to step 5.10.19.
(c) Section 5.6 of 1C1.2 is complete.
(b) This activity is to be performed after shift turnover is complete. (c) Section 5.6 of 1C1.2 is complete.
: 2. COMPLETE TURNOVER:
: 2. COMPLETE TURNOVER:  
: a. Crew performs a walk down of the control boards.
: a. Crew performs a walk down of the control boards
: b. Review PRA Printout.
. b. Review PRA Printout.
: c. Crew takes the duty.
: c. Crew takes the duty.
EVENT 1 3. After the crew has assumed the duty, they will raise power to the Point of Adding Heat
EVENT 1     3. After the crew has assumed the duty, they will raise                       1C1.2, UNIT 1 STARTUP PROCEDURE power to the Point of Adding Heat.
. RO/SS  1C1.2, UNIT 1 STARTUP PROCEDURE Raise reactor power to the point of adding heat using manual rod control or boron concentration change.
* Raise reactor power to the point of adding heat using RO/SS        manual rod control or boron concentration change.
When one or more intermediate range indicates greater than 1 x 10
* When one or more intermediate range indicates greater than 1 x 10-9 amps, then verify ERCS is in Mode 2, STARTUP.
-9 amps, then verify ERCS is in Mode 2, STARTUP.
* Maintain reactor power between 0.5 and 2.0%.
Maintain reactor power between 0.5 and 2.0%.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 8 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 8 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 2     4. After reactor power is stabilized between 0.5 - 2.0%,                 C47012-0408, PRZR HI/LO PRESS CHANNEL ALERT and/or at the discretion of the lead evaluator, enter:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 2 4. After reactor power is stabilized between 0.5  
* Check pressurizer pressure high or low.
- 2.0%, and/or at the discretion of the lead evaluator, enter:
LEAD Trigger 2, Pressurizer Pressure Instrument Fails
Trigger 2, Pressurizer Pressure Instrument Fails LOW. a. If contacted as I&C to trip bistables, inform the crew two I&C Technicians will be available in 1 hour. b. If contacted as the Operations Management, acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station Manager, etc. as asked.
* Restore pressure to normal through use of heaters or LOW.                                                                   sprays.
: c. If contacted as the FIN Team Supervisor, inform the crew that you will write a work order and assign an I&C Supervisor to investigate.
: a. If contacted as I&C to trip bistables, inform the crew
: 5. Plant Response:
* Refer to 1C51.
: a. 1P-431 pressure instrument will peg low. b. Pressurizer Backup Heaters will turn ON.
two I&C Technicians will be available in 1 hour.
: c. Pressurizer Spray Valves will CLOSE. d. Pressurizer pressure will slowly rise.
: b. If contacted as the Operations Management,                       1C51.3, Pressurizer Pressure 1P-431 - Low acknowledge the report of the failure, and agree to
* Place Pressurizer Pressure Controller in MANUAL make other notifications to the NRC, Duty Station                   and stabilize pressure.
Manager, etc. as asked.
* Select position 2-1 (WHITE-RED) on channel
: c. If contacted as the FIN Team Supervisor, inform the                 selector switch.
crew that you will write a work order and assign an
* When pressure returned to normal with no deviation SS I&C Supervisor to investigate.                                     from setpoint, then return pressure control to
: 5. Plant Response:                                                           automatic.
: a. 1P-431 pressure instrument will peg low.
* Verify Pressurizer Pressure Recorder not selected to
: b. Pressurizer Backup Heaters will turn ON.                            Blue Channel.
: c. Pressurizer Spray Valves will CLOSE.
* Enter T.S. LCO 3.3.1 Condition A
: d. Pressurizer pressure will slowly rise.
o Reference Table 3.3.1-1 immediately.
: e. The following annunciator will come in:
: e. The following annunciator will come in:
: 1) 4701 2-0 1 0 8 , PRZR LO PRESS SI CHANNEL ALERT. 2) 47012-0408, PRZR HI/LO PRESS CHANNEL ALERT. 3) 47012-0608, PRZR CONTROL HI PRESS OR BACKUP HTRS ON.
* Enter T.S. LCO 3.3.1 Condition E
LEAD          SS  C4701 2-0 4 0 8 , PRZR HI/LO PRESS CHANNEL ALERT Check pressurizer pressure high or low.
: 1) 47012-0108, PRZR LO PRESS SI CHANNEL o Trip 1P-431 bistables in 6 hours OR ALERT.
Restore pressure to normal through use of heaters or sprays. Refer to 1C51
o Be in Mode 3 in 12 hours.
. 1C51.3 , Pressurizer Pressure 1P
: 2) 47012-0408, PRZR HI/LO PRESS CHANNEL ALERT.
-431 - Low  Place Pressurizer Pressure Controller in "MANUAL" and stabilize pressure.
* Enter T.S. LCO 3.3.1 Condition K
Select position "2
: 3) 47012-0608, PRZR CONTROL HI PRESS OR                                    o Trip 1P-431 bistables in 6 hours OR BACKUP HTRS ON.                                                        o Reduce Thermal Power < P-7 and P-8 (10%).
-1" (WHITE-RED) on channel selector switch.
* Enter T.S. LCO 3.3.2 Condition A o Reference Table 3.3.2-1 immediately.
When pressure returned to normal with no deviation from setpoint, then return pressure control to automatic.
* Enter T.S. LCO 3.3.2 Condition D o Trip 1P-431 bistables in 6 hours OR o Be in Mode 3 in 12 hours and in Mode 4 in 18 hours.
Verify Pressurizer Pressure Recorder not selected to Blue Channel.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Enter T.S. LCO 3.3.
 
1 Condition A o Reference Table 3.3.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 9 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:
1-1 immediately.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW           EXPECTED STUDENT RESPONSES POS EVENT 3     6. After Pressurizer Pressure control is back in automatic,               1C4 AOP1, REACTOR COOLANT LEAK or at the discretion of the Lead Evaluator, enter               RO
Enter T.S. LCO 3.3.
* If, at any time, RCS inventory can not be maintained Trigger 3, Reactor Coolant Leak at ~ 21 gpm.                           by available charging flow, then manually trip the
1 Condition E o Trip 1P-431 bistables in 6 hours OR o Be in Mode 3 in 12 hours.
: a. If contacted as the Operations Management,                           reactor, manually initiate safety injection, and exit this acknowledge the report of the failure, and agree to                 procedure.
Enter T.S. LCO 3.3.
make other notifications to the NRC, Duty Station
1 Condition K o Trip 1P-431 bistables in 6 hours OR o Reduce Thermal Power < P
* Start additional charging pumps as needed to control Manager, etc. as asked.                                            pressurizer level.
-7 and P-8 (10%). Enter T.S. LCO 3.3.2 Condition A o Reference Table 3.3.2
: b. If contacted as a Maintenance or Engineering or               RO
-1 immediately.
* Use ERCS Real-Time RCS Leakage (LEAK 1) display Radiation Protection Department Supervisor, inform                 and/or Control Board indications to determine the crew that you will coordinate making a                         approximate leak rate.
Enter T.S. LCO 3.3.2 Condition D o Trip 1P-431 bistables in 6 hours OR o Be in Mode 3 in 12 hours and in Mode 4 in 18 hours. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
containment entry per F2 to locate the leak.
-G-RM-01.
* Determine the location of the leak using Figure 1 and associated tables, if necessary.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 9 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME
: 7. Plant Response:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 3        
* If unable to identify the source of the leak using tables
: 6. After Pressurizer Pressure control is back in automatic , or at the discretion of the Lead Evaluator, enter Trigger 3, Reactor Coolant Leak at ~ 2 1 gpm. a. If contacted as the Operations Management, acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station Manager, etc. as asked.
: a. RCS pressure lowers.                                                 1, 2, 3, or 4, THEN attempt to locate the leak by
: b. If contacted as a Maintenance or Engineering or Radiation Protection Department Supervisor, inform the crew that you will coordinate making a containment entry per F2 to locate the leak
: b. Pressurizer Level lowers.                                           sequentially isolating service systems from the RCS:
. 7. Plant Response:
: c. Charging pump speed rises.                                              o Remove Letdown from service.
: a. RCS pressure lowers.
: d. R11 and R12 counts rise.                                                o Isolate Charging to the RCS.
: b. Pressurizer Level lowers.
: e. RCS Leak rate rises.                                                   o Close CV-31328, 11 REGEN HX CHG LINE TO
: c. Charging pump speed rises.
: f. Containment humidity rises.                                                RCS.
: d. R11 and R12 counts rise.
o Isolate Charging to the RCP Seals.
: e. RCS Leak rate rises.
EMERGENCY PLAN CLASSIFICATION                             SS
: f. Containment humidity rises.
* Comply with T.S. 3.4.14. Condition A to reduce UNUSUAL EVENT - SU5.1 due to unidentified RCS                               leakage to within limits within 4 hours.
EMERGENCY PLAN CLASSIFICATION UNUSUAL EVENT  
leakage greater than 10 gpm.
- SU5.1 due to unidentified RCS leakage greater than 10 gpm.
* Notify the Operations Manager and Resident Inspector of entry into this AOP per SWI O-28.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


RO      RO            SS      1C4 AOP1, REACTOR COOLANT LEAK If, at any time, RCS inventory can not be maintained by available charging flow, then manually trip the reactor, manually initiate safety injection, and exit this procedure.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 10 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:
Start additional charging pumps as needed to control pressurizer level.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT       8. At the discretion of the Lead Evaluator, enter:                       1E-0, REACTOR TRIP OR SAFETY INJECTION 4, 5, & 6        Trigger 4, Small Break LOCA.
Use ERCS Real
* Verify or manually trip the reactor.
-Time RCS Leakage (LEAK 1) display and/or Control Board indications to determine approximate leak rate.
RO/
Determine the location of the leak using Figure 1 and associated tables, if necessary. If unable to identify the source of the leak using tables 1, 2, 3, or 4, THEN attempt to locate the leak by sequentially isolating service systems from the RCS:
: a. Upon hearing the announcement of Reactor Trip, or
o Remove Letdown from service.
* Verify the Main Turbine is tripped.
o Isolate Charging to the RCS.
LEAD when called as the Turbine Building Operator to
o Close CV-31328, 11 REGEN HX CHG LINE TO  RCS. o Isolate Charging to the RCP Seals.
* Verify both Safeguards buses energized.
Comply with T.S. 3.4.14. Condition A to reduce leakage to within limits within 4 hours.
isolate the Unit 1 MSRs per Attachment J, then open
Notify the Operations Manager and Resident Inspector of entry into this AOP per SWI O
* Determine SI is required.
-28. Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
and run schedule file E-0_Att-J.sch located in                             o Either SG pressure < 530 psig.
-G-RM-01.
X:\\Trex_PI\Lightning\Schedule\EOPs. When the                             o PRZR pressure < 1830 psig.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 10 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME
isolation is complete, inform the crew the MSRs are                       o Containment pressure > 3.5 psig.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 4, 5, & 6     
isolated.
: 8. At the discretion of the Lead Evaluator, enter:
* Manually actuate SI.
Trigger 4, Small Break LOCA. a. Upon hearing the announcement of Reactor Trip, or when called as the Turbine Building Operator to isolate the Unit 1 MSRs per Attachment J, then open and run schedule file E-0_Att-J.sch located in X:\\Trex_PI\Lightning\Schedule\EOPs. When the isolation is complete, inform the crew the MSR's are isolated. b. Upon hearing the announcement of Safety Injection, or when called as the Turbine Building Operator to secure the Turbine Building Roof Exhausters, wait 2 minutes and report the Turbine Building Roof Exhausters are all secured.
: b. Upon hearing the announcement of Safety Injection,
: c. If Control Room personnel ask if Unit 2 personnel are available to perform Attachment L, then inform the Control Room that Unit 2 personnel are NOT available for performing Attachment L.
* Perform Attachment L (see pages 12 & 13).
: d. If contacted as RP or Duty Chemist to sample for primary-to-secondary leakage, then wait 2 minutes and report cation column frisks indicate activity is reading background on 11 and 12 SGs.  
or when called as the Turbine Building Operator to
* Check AFW Status:
secure the Turbine Building Roof Exhausters, wait 2                       o Verify total AFW flow greater than 200 minutes and report the Turbine Building Roof                                   GPM.
Exhausters are all secured.                                               o Verify AFW pumps discharge pressure
: c. If Control Room personnel ask if Unit 2 personnel are                           greater than 1000 psig.
available to perform Attachment L, then inform the                         o Control feed flow to maintain 11 SG Narrow Control Room that Unit 2 personnel are NOT                                     Range greater than 5% [Wide Range available for performing Attachment L.                                        between 50% and 59%].
: d. If contacted as RP or Duty Chemist to sample for
* Check RCS Temperatures trending to 547&deg;F.
primary-to-secondary leakage, then wait 2 minutes
* Check PRZR PORVs and Spray valves closed.
and report cation column frisks indicate activity is reading background on 11 and 12 SGs.
* Determine RCPs should NOT be stopped.
* Determine SGs are NOT faulted.
: 9. Plant Response:
: 9. Plant Response:
* Determine SG Tubes are NOT ruptured.
: a. RCS pressure lowers.
: a. RCS pressure lowers.
: b. Pressurizer Level lowers.
* Determine RCS is NOT intact due to Containment
: c. RCS Leak rate rises.
: b. Pressurizer Level lowers.                                            pressure rising.
: c. RCS Leak rate rises.                                          SS
* Go to 1E-1.
: d. Containment Pressure rises.
: d. Containment Pressure rises.
: e. A RC Bypass Flow lowers.
: e. A RC Bypass Flow lowers.
: f. Annunciator C47012
: f. Annunciator C47012-0503, REACTOR COOLANT RTD B-P LOOPS LO FLOW, is received.
-0503, REACTOR COOLANT RTD B-P LOOPS LO FLOW, is received.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
RO/ LEAD 


SS    1E-0, REACTOR TRIP OR SAFETY INJECTION Verify or manually trip the reactor. Verify the Main Turbine is tripped
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                    Page 11 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:
. Verify both Safeguards buses energized.
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW            EXPECTED STUDENT RESPONSES POS EVENT                                                                                  1E-1, LOSS OF REACTOR OR SECONDARY 4, 5, & 6                                                                              COOLANT (cont)                                                                          RO/SS EMERGENCY PLAN CLASSIFICATION
Determine SI is required.
* Determine RCPs should NOT be stopped.
o Either SG pressure < 530 psig. o PRZR pressure < 1830 psig.
ALERT - FA1 due to a loss of the RCS Fission Product
o Containment pressure > 3.5 psig.
* Determine SGs are NOT faulted.
Manually actuate SI.
Barrier due to RCS leak rate greater than 60 gpm.
Perform Attachment L (see page s 1 2 & 1 3). Check AFW Status:
* Check intact SG levels.
o Verify total AFW flow greater than 200 GPM. o Verify AFW pumps discharge pressure greater than 1000 psig.
* Control feed flow to maintain narrow range level between 5% and 50% [Wide Range 50% and 59%].
o Control feed flow to maintain 11 SG Narrow Range greater than 5% [Wide Range between 50% and 59%
* Check secondary radiation is normal.
]. Check RCS Temperatures trending to 547
* Check power to PRZR PORV block valves available.
&deg;F. Check PRZR PORVs and Spray valves closed.
* Check PRZR PORVs are closed.
Determine RCPs should NOT be stopped.
* Check at least one PRZR PORV block valve is open.
Determine SGs are NOT faulted.
* Reset SI and Containment Isolation.
Determine SG Tubes are NOT ruptured. Determine RCS is NOT intact due to Containment pressure rising.
* Establish Instrument Air to Containment.
Go to 1E-1.       Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* Check power supply to charging pumps are from offsite power.
-G-RM-01.
* Check at least one charging pump is running.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 11 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME
* Establish charging flow as necessary.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 4, 5, & 6  (cont)     
* Determine SI flow should NOT be terminated due to subcooling and RCS pressure.
: 10. If Control Room personnel ask if Unit 2 personnel are
* Stop RHR pumps.
available to secure Diesel Generators and/or Safeguards
* Check RCS and SG pressures Cooling Water Pumps, then inform the Control Room
* Determine Diesel Generators should be stopped.
that Unit 2 personnel WILL secure the Diesel Generators
* Determine Safeguards Cooling Water pumps should and/or Safeguards Cooling Water Pumps.                                  be stopped.
* Initiate Evaluation of Plant Status.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


EMERGENCY PLAN CLASSIFICATION ALERT - F A 1 due to a loss of the RCS Fission Product Barrier due to RCS leak rate greater than 60 gpm.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                  Page 12 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:
: 10. If Control Room personnel ask if Unit 2 personnel are available to secure Diesel Generators and/or Safeguards Cooling Water Pumps, then inform the Control Room that Unit 2 personnel WILL secure the Diesel Generators and/or Safeguards Cooling Water Pumps.
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW          EXPECTED STUDENT RESPONSES POS EVENT                                                                                1E-0 Attachment L: SI Alignment Verification 4, 5, & 6                          CRITICAL TASKS
RO/SS   
* Verify Safeguards Component Alignment:
(cont)                                                                          LEAD
* Manually start at least one Safety Injection pump
* Verify both trains of SI actuated:
before transition out of E-0.                                          o Both RHR pumps - RUNNING
* Manually start at least one CCW pump before                                      -OR-transition out of E-0.                                                  o Both SI pumps - RUNNING o Identify both SI pumps are NOT running and start both SI pumps.
: 11. If Control Room personnel ask for status of Unit 2                   * "SI NOT READY" lights - NOT LIT Cooling Water/Chilled Water lineup, then inform the                 * "SI ACTIVE" lights - LIT FOR PLANT CONDITIONS Control Room that Unit 2 Cooling Water/Chilled Water
* Identify Both CC pumps are NOT running and start valves are in there safeguards positions.                              both CC pumps.
: 12. If Control Room personnel ask for status of Battery                  * "CONTAINMENT ISOLATION" lights - LIT FOR Room Temperatures, then inform the Control Room that                    PLANT CONDITIONS Battery Room temperatures are less than 84&deg;F.
* Check Category 1 Vent Zone Boundary:
: 13. If Control Room personnel ask for status of Spent Fuel
* Close MV-32115, 122 SFP HX INLT HDR MV B Cooling, then inform the Control Room that Spent
* Check Cooling Water Header Pressures - BOTH Fueling level and temperature are normal.                              GREATER THAN 65 PSIG
* Verify Plant Announcements Complete:
* Check If Main Steamlines Are Isolated:
* Determine MSIVs, Bypass Valves, and Containment Instrument Air Valves do NOT need to be closed.
* Verify SI Flow
* Verify RHR Flow
* Verify Containment Spray is actuated (if necessary).
* Check RCP Cooling
* Verify Local Actions Complete
* Verify Generator Breakers - OPEN
* Verify All Heater Drain Pumps - STOPPED
* Check Turbine Valves:
o Turbine reheat and intercept valves - CLOSED o Open turbine drain valves Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


1E-1 , LOSS OF REACTOR OR SECONDARY COOLANT  Determine RCPs should NOT be stopped
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                  Page 13 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:
. Determine SGs are NOT faulted.
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW        EXPECTED STUDENT RESPONSES POS EVENT
Check intact SG levels.
* Verify Main Feedwater Alignment:
Control feed flow to maintain narrow range level between 5% and 50% [Wide Range 50% and 59%].
4, 5, & 6                                                                              o Both main feedwater pumps - STOPPED (cont)                                                                          LEAD o Main and bypass FRVs - CLOSED
Check secondary radiation is normal.
* Verify All Condensate Pumps - STOPPED:
Check power to PRZR PORV block valves available.
* Place Steam Dump in "STM PRESS" Mode
Check PRZR PORVs are closed.
* Verify Unit 1 Cooling Water/Chilled Water Alignment:
Check at least one PRZR PORV block valve is open.
o CFCU control switches - "SLOW".
Reset SI and Containment Isolation.
o CFCU dampers - ALIGNED TO DOME o Unit 1 cooling water/chilled water valves closed o Unit 1 CRDM shroud cooling supply and return valves - CLOSED o CFCU cooling water supply and return valves -
Establish Instrument Air to Containment.
OPEN o CFCU chilled water supply and return valves -
Check power supply to charging pumps are from offsite power.
CLOSED
Check at least one charging pump is running.
* Verify 11 Safeguards Screenhouse Ventilation lineup.
Establish charging flow as necessary.
* Verify Control Room Ventilation Alignment:
Determine SI flow should NOT be terminated due to subcooling and RCS pressure.
o Chillers and fans - RUNNING o Control room chiller suction/discharge tie closed -
Stop RHR pumps.
STATUS LIGHT LIT
Check RCS and SG pressures Determine Diesel Generators should be stopped.
* Verify Unit 2 Cooling/Chilled Water Alignment
Determine Safeguards Cooling Water pumps should be stopped.
* Verify 21 Safeguards Screenhouse Ventilation lineup.
Initiate Evaluation of Plant Status.
* Verify 11 and 12 Battery Charger Operation is normal.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* Verify Battery Room temps less than 84&deg;F.
-G-RM-01.
* Check status of Spent Fuel Cooling.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 12 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME
* Check Status Of Notifications
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 4, 5, & 6  (cont)   
* Notify SS Of Any Discrepancies.
: 14. Once the crew has stopped RHR Pumps and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


CRITICAL TASK S  Manually start at least one Safety Injection pump before transition out of E
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                        Page 14 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SIMULATOR INPUT
-0. Manually start at least one CCW pump before transition out of E
-0. 11. If Control Room personnel ask for status of Unit 2 Cooling Water/Chilled Water lineup, then inform the Control Room that Unit 2 Cooling Water/Chilled Water valves are in there safeguards positions.
: 12. If Control Room personnel ask for status of Battery Room Temperatures, then inform the Control Room that Battery Room temperatures are less than 84&deg;F.
: 13. If Control Room personnel ask for status of Spent Fuel Cooling, then inform the Control Room that Spent Fueling level and temperature are normal.


LEAD   
==SUMMARY==


1E-0 Attachment L: SI Alignment Verification Verify Safeguards Component Alignment:
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Verify both trains of SI actuated:
o Both RHR pumps
- RUNNING -OR- o Both SI pumps
- RUNNING o Identify both SI pumps are NOT running and start both SI pumps.
  "SI NOT READY" lights
- NOT LIT  "SI ACTIVE" lights - LIT FOR PLANT CONDITIONS Identify Both CC pumps are NOT running and start both CC pumps.
  "CONTAINMENT ISOLATION" lights
- LIT FOR PLANT CONDITIONS Check Category 1 Vent Zone Boundary:
Close MV-3211 5, 12 2 SFP HX INLT HDR MV B  Check Cooling Water Header Pressures
- BOTH GREATER THAN 65 PSIG Verify Plant Announcements Complete:
Check If Main Steamlines Are Isolated:
Determine MSIVs, Bypass Valves, and Containment Instrument Air Valves do NOT need to be closed.
Verify SI Flow Verify RHR Flow Verify Containment Spray is actuated (if necessary)
. Check RCP Cooling Verify Local Actions Complete Verify Generator Breakers
- OPEN  Verify All Heater Drain Pumps
- STOPPED  Check Turbine Valves:
o Turbine reheat and intercept valves
- CLOSED o Open turbine drain valves  Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 13 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 4, 5, & 6  (cont)   


LEAD   
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                          Page 15 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario
_____      Simulator Status:
___ 1.          "Training Load"                      ___ 2. Step counters "ON"
___ 3.          Alarm sound "ON"                      ___ 4. Steps 1 - 7 on page 6 complete
___ 5.          Speed: REAL                        ___ 6. IC-261 or IC-18 running
_____      Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructors booth.
_____      Verify Schedule File/Summary matches Simulator Input Summary page in the SEG.
_____      Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.
_____      Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset.
_____      MOC I sheet displayed on C panel.
_____      MOC Reactivity Briefing sheet available at Reactor Operator Desk.
_____      Turnover sheet/PRA sheet available.
_____      If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.
_____      Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).
_____      Electronic PINGP 577 forms closed on LAN connected PCs.
_____      Board-mounted EAL Tables are cleaned.
_____      EOOS running on PC and updated as follows to reflect equipment OOS:
___ 1. NONE
_____      Update Control Board Placards:
___ 1.      NRC Current Authentication Code call date updated to current date.
___ 2.      High Flux At Shutdown Alarm Setpoint placards: 5900 cps.
___ 3.      Feedwater regulating valve position placard set to current values.
___ 4.      Recommended SG Blowdown flow set to current values.
___ 5.      RCS boron on the CVCS panel placard: 1369 ppm.
___ 6.      Turbine reference/setter values on the CVCS panel set to current (Target/Demand on-line positions).
___ 7.      Shift Reactivity Guidance placard: BA: 4.4 gallons, RMU: 67 gallons.
Dilutions @ NONE.
_____      Magnetic placards in place:
___ 1. 11 BA TANK Lined Up For Service
___ 2. 11 BA PUMP Lined Up to 11 BA Tank
___ 3. 12 BA PUMP Lined Up to 11 BA Tank
___ 4. CC to SFP MV-32117 In Service
___ 5. Blowdown 46470 SGB To RIVER
___ 6. HU Flag above 12 RHR HX CC inlet MV-32094 for 1C14 Limitation
___ 7. H 2 IN VCT SPACE at VCT Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Verify Main Feedwater Alignment:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                   Page 16 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0
o Both main feedwater pumps
_____       Pink Status Control Tags in place:
- STOPPED o Main and bypass FRVs
- CLOSED  Verify All Condensate Pumps
- STOPPED:  Place Steam Dump in "STM PRESS" Mode Verify Unit 1 Cooling Water/Chilled Water Alignment:
o CFCU control switches
- "SLOW". o CFCU dampers
- ALIGNED TO DOME o Unit 1 cooling water/chilled water valves closed o Unit 1 CRDM shroud cooling supply and return valves - CLOSED o CFCU cooling water supply and return valves
- OPEN o CFCU chilled water supply and return valves
- CLOSED  Verify 11 Safeguards Screenhouse Ventilation lineup.
Verify Control Room Ventilation Alignment:
o Chillers and fans
- RUNNING o Control room chiller suction/discharge tie closed
- STATUS LIGHT LIT Verify Unit 2 Cooling/Chilled Water Alignment Verify 21 Safeguards Screenhouse Ventilation lineup.
Verify 11 and 12 Battery Charger Operation is normal.
Verify Battery Room temps less than 84&deg;F.
Check status of Spent Fuel Cooling.
Check Status Of Notifications Notify SS Of Any Discrepancies
. 14. Once the crew has stopped RHR Pumps and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty. Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 14 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SIMULATOR INPUT
 
==SUMMARY==
 
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                        Page 15 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario
_____ Simulator Status:
___ 1. "Training Load" ___ 2. Step counters "ON" ___ 3. Alarm sound "ON" ___ 4. Steps 1 - 7 on page 6 complete
___ 5. Speed: "REAL"
___ 6. IC-26 1 or IC-18 running  _____ Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructor's booth. _____ Verify Schedule File/Summary matches Simulator Input Summary page in the SEG
. _____ Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.
_____ Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset
. _____ MOC I sheet displayed on C panel
. _____ MOC Reactivity Briefing sheet available at Reactor Operator Desk
. _____ Turnover sheet/PRA sheet available. _____ If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.
_____ Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).
_____ Electronic PINGP 577 forms closed on LAN connected PC s. _____ Board-mounted EAL Tables are cleaned
. _____ EOOS running on PC and updated as follows to reflect equipment OOS
: ___ 1. NONE  _____ Update Control Board Placards:
___ 1. NRC Current Authentication Code call date updated to current date.
___ 2. High Flux At Shutdown Alarm Setpoint placards: 5900 cps
. ___ 3. Feedwater regulating valve position placard set to current values.
___ 4. Recommended SG Blowdown flow set to current values.
___ 5. RCS boron on the CVCS panel placard:
13 69 ppm. ___ 6. Turbine reference/setter values on the CVCS panel set to current (Target/Demand on
-line positions)
. ___ 7. Shift Reactivity Guidance placard: BA: 4.4 gallons, RMU: 67 gallons
. Dilutions @ NONE. _____ Magnetic placards in place:
___ 1. 11 BA TANK "Lined Up For Service"
___ 2. 11 BA PUMP "Lined Up to 11 BA Tank"
___ 3. 12 BA PUMP "Lined Up to 11 BA Tank"
___ 4. CC to SFP MV
-32117 "In Service"
___ 5. Blowdown 46470 "SGB To RIVER" ___ 6. HU Flag above 12 RHR HX CC inlet MV
-32094 for "1C14 Limitation"
___ 7. "H 2 IN VCT SPACE" at VCT Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 16 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0
_____ Pink Status Control Tags in place:
___ 1. CS-46540, 22 CC WTR PUMP
___ 1. CS-46540, 22 CC WTR PUMP
___ 2. CS-46572, CC TO SFP MV
___ 2. CS-46572, CC TO SFP MV-32117
-32117 _____ Yellow Caution Tags in place: ___ 1. CS-46064, CC TO SFP MV-32115 , in CLOSED ___ 2. CS-46362, 4.16 KV BUS 11 1M XFMR (BKR 11
_____     Yellow Caution Tags in place:
-4), in PULLOUT
___ 1. CS-46064, CC TO SFP MV-32115, in CLOSED
___ 3. CS-46363, 4.16 KV BUS 12 1M XFMR (BKR 12
___ 2. CS-46362, 4.16 KV BUS 11 1M XFMR (BKR 11-4), in PULLOUT
-4), in PULLOUT
___ 3. CS-46363, 4.16 KV BUS 12 1M XFMR (BKR 12-4), in PULLOUT
___ 4. CS-46364, 4.16 KV BUS 13 1M XFMR (BKR 13
___ 4. CS-46364, 4.16 KV BUS 13 1M XFMR (BKR 13-9), in PULLOUT
-9), in PULLOUT
___ 5. CS-46365, 4.16 KV BUS 14 1M XFMR (BKR 14-9), in PULLOUT
___ 5. CS-46365, 4.16 KV BUS 14 1M XFMR (BKR 14
_____     ERCS driven recorders are on-scale (RCS temperature scaled 545&#xba; F to 555&#xba; F).
-9), in PULLOUT
_____     ERCS alarm screen operating and alarms reset.
_____ ERCS driven recorders are on
_____     All ERCS terminals operating and set as follows:
-scale (RCS temperature scaled 545&#xba; F to 5 5 5&#xba; F). _____ ERCS alarm screen operating and alarms reset
CONF             VARS                           R02               Alarm Summary Page CONE1             Group OP31_U1                 R03               AFD CONC             SAS (XS22)                     R04               TPM CONG1             Group QP CCDATA               R05               QP LOADFOLL ERCS-R01         Group RADMON_U1               R06               Alarm Summary Page
. _____ All ERCS terminals operating and set as follows:
_____     ERCS single point displays:           CONB         1T0499A               1U1613A CONE2         1Q0340A               1V4501A
CONF VARS R02 Alarm Summary Page CONE1 Group OP31_U1 R03 AFD CONC SAS (XS 2 2) R04 TPM CONG1 Group QP CCDATA R05 QP LOADFOLL ERCS-R01 Group RADMON_U1 R06 Alarm Summary Page
_____     Verify that copy machine and printers are loaded with paper.
_____ ERCS single point displays:
_____     Pens/Paper/Markers available on the simulator.
CONB 1T0499A 1U1613A CONE2 1Q0340A 1V4501A   _____ Verify that copy machine and printers are loaded with paper. _____ Pens/Paper/Markers available on the simulator
st
. _____ Verify 12 1 IA Compressor is in PREFERRED and 12 2 IA Compressor is in 1 st STANDBY, and   123 IA Compressor is in 2 nd STANDBY. _____ Verify R11/R12 are lined up correctly (at the R11/R12 local panel):
_____     Verify 121 IA Compressor is in PREFERRED and 122 IA Compressor is in 1 STANDBY, and nd 123 IA Compressor is in 2 STANDBY.
_____     Verify R11/R12 are lined up correctly (at the R11/R12 local panel):
___ 1. Sample pump is running.
___ 1. Sample pump is running.
___ 2. Alarms are reset.
___ 2. Alarms are reset.
___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.
___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.
___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.
___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.
_____ Set Turbine Control HMI Displays as follows:
_____     Set Turbine Control HMI Displays as follows:
___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview
___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview.
. ___ 2. U1 Turb Aux Cont (48088) to Turb Overview
___ 2. U1 Turb Aux Cont (48088) to Turb Overview.
. ___ 3. U1 E-H Turb Cont STA 1 (48086) to Off Line Control
___ 3. U1 E-H Turb Cont STA 1 (48086) to Off Line Control.
. _____ DEHC alarms cleared
_____     DEHC alarms cleared.
. _____ N51 & N52 Display Sheet s for current power are in place as necessary
_____     N51 & N52 Display Sheets for current power are in place as necessary.
. _____ Headsets turned on as necessary.
_____     Headsets turned on as necessary.
_____ Procedure checklist completed. See following page.
_____     Procedure checklist completed. See following page.
_____ Peer Check performed for simulator setup
_____     Peer Check performed for simulator setup.
. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 17 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping mark s before starting the session and after the session are complete:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                     Page 17 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:
Before After       1C1.2, UNIT 1 STARTUP PROCEDURE 1C12.1, LETDOWN, CHARGING, AND SEAL WATER INJECTION  
Before           After 1C1.2, UNIT 1 STARTUP PROCEDURE 1C12.1, LETDOWN, CHARGING, AND SEAL WATER INJECTION -
- UNIT 1     1C4 AOP1, REACTOR COOLANT LEAK 1C51.3, Pressurizer Pressure 1P-431 - Low     1E-0, REACTOR TRIP OR SAFETY INJECTION 1E-1, LOSS OF REACTOR OR SECONDARY COOLANT C47012-0108, PRZR LO PRESS SI CHANNEL ALERT C47012-0408, PRZR HI/LO PRESS CHANNEL ALERT C47012-0608, PRZR CONTROL HI PRESS OR BACKUP HTRS ON     C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR     SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.3.1 T.S. LCO 3.3.2 T.S. LCO 3.4.14                                               Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
UNIT 1 1C4 AOP1, REACTOR COOLANT LEAK 1C51.3, Pressurizer Pressure 1P-431 - Low 1E-0, REACTOR TRIP OR SAFETY INJECTION 1E-1, LOSS OF REACTOR OR SECONDARY COOLANT C47012-0108, PRZR LO PRESS SI CHANNEL ALERT C47012-0408, PRZR HI/LO PRESS CHANNEL ALERT C47012-0608, PRZR CONTROL HI PRESS OR BACKUP HTRS ON C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.3.1 T.S. LCO 3.3.2 T.S. LCO 3.4.14 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 18 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Post-Scenario Checklist
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                   Page 18 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Post-Scenario Checklist
_____ LAN connected computers are cleared of information added during the scenario.
_____     LAN connected computers are cleared of information added during the scenario.
_____ Computer generated PINGP 577 cleared.
_____     Computer generated PINGP 577 cleared.
_____ Procedure checklist completed. See previous page. _____ Remove Pink Status Control Tags from the following equipment:
_____     Procedure checklist completed. See previous page.
___ 1. NONE _____ Magnetic placards removed:
_____     Remove Pink Status Control Tags from the following equipment:
___ 1. NONE   _____ Remove Yellow Caution Tags from the following equipment: ___ 1. CS-46362, 4.16 KV BUS 11 1M XFMR (BKR 11
___ 1. NONE
-4) ___ 2. CS-46363, 4.16 KV BUS 12 1M XFMR (BKR 12
_____   Magnetic placards removed:
-4) ___ 3. CS-46364, 4.16 KV BUS 13 1M XFMR (BKR 13
___ 1. NONE
-9) ___ 4. CS-46365, 4.16 KV BUS 14 1M XFMR (BKR 14
_____     Remove Yellow Caution Tags from the following equipment:
-9) _____ Erase marker on RCS temperature ERCS driven recorder.
___ 1. CS-46362, 4.16 KV BUS 11 1M XFMR (BKR 11-4)
_____ Board-mounted EAL Table is cleaned
___ 2. CS-46363, 4.16 KV BUS 12 1M XFMR (BKR 12-4)
. _____ All books, note pads, and calculators put away
___ 3. CS-46364, 4.16 KV BUS 13 1M XFMR (BKR 13-9)
. End Of Day Checklist
___ 4. CS-46365, 4.16 KV BUS 14 1M XFMR (BKR 14-9)
_____ Signs/placards removed and put away unless normal simulator configuration
_____     Erase marker on RCS temperature ERCS driven recorder.
. _____ Floor PCs logged off if simulator will not be used again that day
_____     Board-mounted EAL Table is cleaned.
. _____ Instructor station returned to normal with all books, paper, and etc. put away
_____     All books, note pads, and calculators put away.
. _____ Headsets turned off and put away if simulator will not be used again that day
End Of Day Checklist
. _____ Simulator reset to IC
_____     Signs/placards removed and put away unless normal simulator configuration.
-10 unless another IC will be used for further training
_____     Floor PCs logged off if simulator will not be used again that day.
. _____ Simulator placed in DORT if simulator will not be used again that day
_____     Instructor station returned to normal with all books, paper, and etc. put away.
. _____ Recorder power "OFF" if simulator will not be used again that day
_____     Headsets turned off and put away if simulator will not be used again that day.
. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
_____     Simulator reset to IC-10 unless another IC will be used for further training.
-G-RM-01.
_____     Simulator placed in DORT if simulator will not be used again that day.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 19 of 22   RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG   DATE:           DAY/NIGHT SHIFT: Day         CAT 1 VENT OPENINGS: 0 ft 2  SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS NONE PROTECTED EQUIPMENT 22 CC PUMP 121 SFP HX RAD MONITORS OOS ANNUNCIATORS OOS NONE NONE OUTSTANDING SP'S FIRE DET / PROT EQP IMPAIRMENTS NONE NONE OTHER EQUIPMENT OOS / STATUS Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System
_____     Recorder power "OFF" if simulator will not be used again that day.
. MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE NONE OPERATIONAL PLANS FOR COMING SHIFT Xenon is at equilibrium.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Raise Reactor Power from 1 x 10
 
-8 amps to the POAH
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                             Page 19 of 22 RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE:                                                                                   DAY/NIGHT SHIFT: Day CAT 1 VENT OPENINGS: 0 ft2                                                      SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS NONE PROTECTED EQUIPMENT 22 CC PUMP 121 SFP HX RAD MONITORS OOS                                           ANNUNCIATORS OOS NONE                                                       NONE OUTSTANDING SPS                                            FIRE DET / PROT EQP IMPAIRMENTS NONE                                                       NONE OTHER EQUIPMENT OOS / STATUS Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System.
. Stabilize power between 0.5 - 2%. Section 5.6 of 1C1.2 is complete.
MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE NONE OPERATIONAL PLANS FOR COMING SHIFT
* Xenon is at equilibrium.
* Raise Reactor Power from 1 x 10-8 amps to the POAH.
* Stabilize power between 0.5 - 2%.
* Section 5.6 of 1C1.2 is complete.
NEW PROCEDURES / INSTRUCTIONS Review altered scale on Tavg ERCS Recorder.
NEW PROCEDURES / INSTRUCTIONS Review altered scale on Tavg ERCS Recorder.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                       Page 20 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 20 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.
: 1. The scenario contains objectives for the desired tasks and relevant human performance tools.
: 1. The scenario contains objectives for the desired tasks and relevant human             Yes      No performance tools.                                                                     X
Yes  No X    2. The scenario identifies key parameter response, expected alarms, and automatic actions associated with the induced perturbations
: 2. The scenario identifies key parameter response, expected alarms, and                   Yes      No automatic actions associated with the induced perturbations.                           X
. Yes  No X   3. The scenario content adequately addresses the desired tasks, through simulator performance, instructor
: 3. The scenario content adequately addresses the desired tasks, through                   Yes      No simulator performance, instructor-led training freezes, or both.                       X
-led training freezes, or both.
: 4. Plant PRA initiating events, important equipment, and important tasks are             Yes      No identified.                                                                           X
Yes  No X    4. Plant PRA initiating events, important equipment, and important tasks are identified.
: 5. Turnover information includes a Daily At Power or Shutdown Safety Risk                 Yes      No Assessment.                                                                           X
Yes  No X    5. Turnover information includes a Daily At Power or Shutdown Safety Risk Assessment.
: 6. The scenario contains procedurally driven success paths. Procedural                   Yes      No discrepancies are identified and corrected before training is given.                   X
Yes  No X    6. The scenario contains procedurally driven success paths. Procedural discrepancies are identified and corrected before training is given.
: 7. The scenario guide includes responses for all anticipated communications to           Yes      No simulated personnel outside the Control Room, based on procedural guidance             X and standard operating practices. Include estimated completion times and/or notes for use of time compression.
Yes  No X    7. The scenario guide includes responses for all anticipated communications to simulated personnel outside the Control Room, based on procedural guidance and standard operating practices.
: 8. The scenario includes related industry experience. SOER, SER and similar               Yes      No OE recommendations are clearly identified and fully addressed.*                                 X
Include estimated completion times and/or notes for use of time compression
: 9. The scenario guide incorporates verification of Operator Fundamental                   Yes      No application.*                                                                                   X
. Yes  No X    8. The scenario includes related industry experience. SOER, SER and similar OE recommendations are clearly identified and fully addressed.* Yes  No  X 9. The scenario guide incorporates verification of Operator Fundamental application.
: 10. Training elements and specific human performance elements are addressed               Yes      No in the scenario critique guide to be used by the critique facilitator. The critique             X guide includes standards for expected performance.*
* Yes  No  X 10. Training elements and specific human performance elements are addressed in the scenario critique guide to be used by the critique facilitator. The critique guide includes standards for expected performance.
: 11. For evaluations, it has been verified that without operator action the critical       Yes      No tasks will be failed.                                                                 X Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
* Yes  No  X  11. For evaluations, it has been verified that without operator action the critical tasks will be failed.
Yes  No X   Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
* For evaluations these items may be marked NO without justification.
* For evaluations these items may be marked NO without justification.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                       Page 21 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 21 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.
: 1. The desired initial conditions agreed with the reference plant with respect to reactor status, plant configuration, and system operation.
: 1. The desired initial conditions agreed with the reference plant with               Yes      No respect to reactor status, plant configuration, and system operation.             X
Yes X No  2. The simulator operated in real time during conduct of validation.
: 2. The simulator operated in real time during conduct of validation.                 Yes      No X
Ye s X No  3. The simulator demonstrated expected plant response to operator input and to normal, transient, and accident conditions.
: 3. The simulator demonstrated expected plant response to operator input             Yes      No and to normal, transient, and accident conditions.                               X
Yes X No  4. The simulator permitted use of the reference plant's procedures. The scenario was completed without procedural exceptions, simulator performance exceptions, or deviation from the scenario sequence.
: 4. The simulator permitted use of the reference plants procedures. The             Yes      No scenario was completed without procedural exceptions, simulator                   X performance exceptions, or deviation from the scenario sequence.
Yes X No  5. The simulator did not "fail to cause" or "unexpectedly cause" any first principle alarm or primary automatic action.
: 5. The simulator did not fail to cause or unexpectedly cause any first           Yes      No principle alarm or primary automatic action.                                     X
Yes X No  6. Observable changes in parameters relevant to the scenario corresponded in trend and direction to reference plant's expected response. Yes X No  7. All malfunctions and other instructor interface items were functional and demonstrated the expected reference plant's response to the initiating cause. Yes X No  8. All malfunctions and other instructor interface items were initiated in the same sequence described within the simulator scenario.
: 6. Observable changes in parameters relevant to the scenario                         Yes      No corresponded in trend and direction to reference plants expected                 X response.
Yes X No  9. The scenario satisfies the learning or examination objectives without any significant simulator performance issues, or deviations from the approved scenario sequence.
: 7. All malfunctions and other instructor interface items were functional and         Yes      No demonstrated the expected reference plants response to the initiating           X cause.
Yes X No  10. Simulator fidelity has been demonstrated to be adequate for this scenario.
: 8. All malfunctions and other instructor interface items were initiated in the       Yes      No same sequence described within the simulator scenario.                           X
Yes X No    Discrepancies noted (Check "none" or list items found)
: 9. The scenario satisfies the learning or examination objectives without             Yes      No any significant simulator performance issues, or deviations from the             X approved scenario sequence.
None SMAR = Simulator Action Request SMAR:   SMAR:   SMAR:   S MAR:   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
: 10. Simulator fidelity has been demonstrated to be adequate for this                 Yes      No scenario.                                                                         X Discrepancies noted (Check none or list items found)             None SMAR = Simulator Action Request SMAR:                       SMAR:                     SMAR:                   SMAR:
-G-RM-01.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                       Page 22 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Comments:             Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
 
Validation Personnel Name Job Title / Qualification Validation Position Shawn Sarrasin Operations Instructor Lead Evaluator Fred Collins Operations Instructor Booth Driver Jeff Human Operations SRO Shift Supervisor Mark Haren Operations RO LEAD Rick Martin Operations RO RO                   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 22 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Comments:
-G-RM-01.
Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 1 of 26   SIMULATOR EXERCISE GUIDE (SEG)
Validation Personnel Name                       Job Title / Qualification         Validation Position Shawn Sarrasin                           Operations Instructor             Lead Evaluator Fred Collins                             Operations Instructor             Booth Driver Jeff Human                               Operations SRO                     Shift Supervisor Mark Haren                               Operations RO                     LEAD Rick Martin                               Operations RO                     RO Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SITE: PRAIRIE ISLAND SEG # PI-ILT-NRC-14 0 2 S  SEG TITLE:
 
2014 ILT NRC SIMULATOR EVALUATION #
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 1 of 26 SIMULATOR EXERCISE GUIDE (SEG)
2 REV. # 0   PROGRAM: INITIAL LICENSE OPERATOR TRAINING
SITE: PRAIRIE ISLAND                               SEG #     PI-ILT-NRC-1402S SEG TITLE:       2014 ILT NRC SIMULATOR EVALUATION #2                       REV. #   0 PROGRAM:         INITIAL LICENSE OPERATOR TRAINING                 #:   FL-ILT COURSE:           INITIAL LICENSE OPERATOR TRAINING                 #:   FL-ILT TOTAL TIME: 2.0 HOUR Developed by:                         Shawn Sarrasin                               2/2/2014 Instructor                                 Date Reviewed by:                           Fredrick Collins                           2/26/2014 Instructor                                 Date (Simulator Scenario Development Checklist.)
#: FL-ILT     COURSE: INITIAL LICENSE OPERATOR TRAINING
Validated by:                         Shawn Sarrasin                             4/22/2014 Validation Lead Instructor                           Date (Simulator Scenario Validation Checklist.)
#: FL-ILT   TOTAL TIME:
Approved by:
2.0 HOUR   Developed by:
Training Supervision                             Date Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Shawn Sarrasin 2/2/201 4  Instructor Date   Reviewed by:
 
Fredrick Collins 2/26/2014 Instructor (Simulator Scenario Development Checklist.)
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 2 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Guide Requirements
Date    Validated by:
: 1. During all plant operating conditions, the crew will demonstrate Goal of                  the ability to monitor and operate the plant within the limits of the Training:                Operations Manuals and Technical Specifications.
Shawn Sarrasin 4/22/2014 Validation Lead Instructor (Simulator Scenario Validation Checklist.)
Date    Approved by:
Training Supervision Date   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 2 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Guide Requirements Goal of Training: 1. During all plant operating conditions, the crew will demonstrate the ability to monitor and operate the plant within the limits of the Operations Manuals and Technical Specifications.
: 2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
: 2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
Learning Objectives:
: 1. Place a second letdown orifice in service per 1C12.1.
: 1. Place a second letdown orifice in service per 1C12.1. 2. Diagnose and perform corrective actions for a Containment Pressure Instrument failing high per C4701 8-0 1 0 5. 3. Diagnose and perform corrective actions for a Pressurizer Level Instrument failing high per 1C51.
Learning              2. Diagnose and perform corrective actions for a Containment Objectives:                Pressure Instrument failing high per C47018-0105.
: 3. 4. Diagnose and respond to a Turbine Malfunction per 1C23 AOP2. 5. Perform a rapid power reduction per 1C1.4 AOP1
: 3. Diagnose and perform corrective actions for a Pressurizer Level Instrument failing high per 1C51.3.
. 6. Diagnose and respond to a Large Break LOCA per 1 E-0 and 1E-1. 7. Diagnose and respond to a failure of the Main Turbine to Automatically Trip.
: 4. Diagnose and respond to a Turbine Malfunction per 1C23 AOP2.
: 8. Diagnose and respond to a failure of the Safeguards System to automatically actuate per 1E
: 5. Perform a rapid power reduction per 1C1.4 AOP1.
-0. 9. Diagnose and respond to a failure of the AFW Pumps to automatically start per 1E-0 Attachment L
: 6. Diagnose and respond to a Large Break LOCA per 1E-0 and 1E-1.
. Training Resources:
: 7. Diagnose and respond to a failure of the Main Turbine to Automatically Trip.
: 1. Full Scope Simulator
: 8. Diagnose and respond to a failure of the Safeguards System to automatically actuate per 1E-0.
: 2. NRC Evaluation Team
: 9. Diagnose and respond to a failure of the AFW Pumps to automatically start per 1E-0 Attachment L.
: 3. Booth Operator (Backup Communicator)
: 1. Full Scope Simulator Training              2. NRC Evaluation Team Resources:           3. Booth Operator (Backup Communicator)
: 4. Primary Communicator Related PRA Information:
: 4. Primary Communicator Initiating Event with Core Damage Frequency:
Initiating Event with Core Damage Frequency:
Related PRA          LOCA (5.1%)
LOCA (5.1%)     Important Components
Information:
: 11 TD AFW PMP 12 MD AFW PMP Important Operator Actions with Task Number:
Important Components:
NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
11 TD AFW PMP 12 MD AFW PMP Important Operator Actions with Task Number:
-G-RM-01.
NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 3 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 3 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:
Before EOP Entry:
Before EOP Entry:
: 1. 1 P-950 , Yellow Channel Containment Pressure Instrument, fails high. 2. 1 LT-428 , Blue Channel Pressurizer Level Transmitter , fails high.
: 1. 1P-950, Yellow Channel Containment Pressure Instrument, fails high.
: 3. Turbine Control System cycling output (10 MW Swing)
: 2. 1LT-428, Blue Channel Pressurizer Level Transmitter, fails high.
. After EOP Entry:
: 3. Turbine Control System cycling output (10 MW Swing).
: 1. Main Turbine fails to automatically trip. 2. Failure of safeguards automatic actuation. 3. 11 and 12 AFW Pumps fail to start automatically
After EOP Entry:
. Abnormal Events:
: 1. Main Turbine fails to automatically trip.
: 1. Pressurizer Level Instrument Failure
: 2. Failure of safeguards automatic actuation.
. 2. Turbine Malfunction
: 3. 11 and 12 AFW Pumps fail to start automatically.
. 3. Rapid Power Reduction
Abnormal Events:
. Major Transients:
: 1. Pressurizer Level Instrument Failure.
: 1. Large Break LOCA from the B Loop Hot Leg. Critical Tasks:
: 2. Turbine Malfunction.
: 1. E D: Manually actuate at least one train of SI
: 3. Rapid Power Reduction.
-actuated safeguards equipment before transition out of E
Major Transients:
-0. 2. E Q: Manually trip the main turbine before transition out of E
: 1. Large Break LOCA from the B Loop Hot Leg.
-0. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Critical Tasks:
-G-RM-01.
: 1. E D: Manually actuate at least one train of SI-actuated safeguards equipment before transition out of E-0.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                          Page 4 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO OVERVIEW:
: 2. E Q: Manually trip the main turbine before transition out of E-0.
INITIAL CONDITIONS:
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
EQUIPMENT OOS  Exposure:
B OC  12 RHR Pump Power: 100%  BKR 16-10  Boron (CB):
1299 ppm  Temperature:
5 60&deg;F  Pressure: 2235 psig  Xenon: Equilibrium  Rods: "D" @
218  Generator: 58 1 MW  SEQUENCE OF EVENTS:
Event 1:  Place 2 nd Letdown Orifice in Service    Initially, there is only one 40 gpm letdown orifice in service
. There are already two charging pumps running.
The crew will place a second 40 gpm letdown orifice in service per 1C12.1
. Event 2:  Yellow Channel Containment Pressure WR Instrument Fails HIGH 1 P-950 pressure instrument will peg high. Containment High Pressure alarm will come in
. The SS will enter T.S. LCO 3.3.
2 Condition A , E, and D. Event 3:  Blue Channel Pressurizer Level Instrument Fails HIGH Charging pump speed will lower.
1L-428 level instrument will peg high Actual pressurizer level will lower.
Charging pump speed control will be placed in manual.
Pressurizer heaters will be controlled in manual.
Pressurizer level control will be placed in the 2
-1 position.
Pressurizer level control will be returned to automatic.
Pressurizer heater control will be returned to automatic.
The SS will enter T.S
. LCO 3.3.1 Conditions A an d K. 


Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 4 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO OVERVIEW:
-G-RM-01.
INITIAL CONDITIONS:                                  EQUIPMENT OOS
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 5 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Event 4: Turbine Malfunction A Turbine Control Trouble Alarm will be received.
* Exposure: BOC
An approximately 10 MW load cycle will occur
* 12 RHR Pump
. RCS Tavg will rise and lower as turbine loading changes.
* Power: 100%
Rods will step in and out as necessary to maintain RCS Tav
* BKR 16-10
: g. First Stage Pressure indication on the Turbine Control System will oscillate.
* Boron (CB): 1299 ppm
The crew will place Turbine Control in manual per 1C23 AOP2
* Temperature: 560&deg;F
. Event 5:  Rapid Power Reduction The TSO will call the Control Room requesting Unit 1 power be reduced 5% over
* Pressure: 2235 psig
* Xenon: Equilibrium
* Rods: D @ 218
* Generator: 581 MW SEQUENCE OF EVENTS:
Event 1: Place 2nd Letdown Orifice in Service
* Initially, there is only one 40 gpm letdown orifice in service.
* There are already two charging pumps running.
* The crew will place a second 40 gpm letdown orifice in service per 1C12.1.
Event 2: Yellow Channel Containment Pressure WR Instrument Fails HIGH
* 1P-950 pressure instrument will peg high.
* Containment High Pressure alarm will come in.
* The SS will enter T.S. LCO 3.3.2 Condition A, E, and D.
Event 3: Blue Channel Pressurizer Level Instrument Fails HIGH
* Charging pump speed will lower.
* 1L-428 level instrument will peg high
* Actual pressurizer level will lower.
* Charging pump speed control will be placed in manual.
* Pressurizer heaters will be controlled in manual.
* Pressurizer level control will be placed in the 2-1 position.
* Pressurizer level control will be returned to automatic.
* Pressurizer heater control will be returned to automatic.
* The SS will enter T.S. LCO 3.3.1 Conditions A and K.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


the next 10 minutes due to impending loss of transmission capacity
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                      Page 5 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Event 4: Turbine Malfunction
. The crew will perform a Rapid Power Reduction to 95% per 1C1.4 AOP1.
* A Turbine Control Trouble Alarm will be received.
Event s 6, 7, 8, & 9: Large Break Loss of Coolant Accident RCS pressure will rapidly lower. Pressurizer level will rapidly lower. A reactor trip will automatically actuate.
* An approximately 10 MW load cycle will occur.
The main turbine will fail to automatically trip.
* RCS Tavg will rise and lower as turbine loading changes.
The crew will manually trip the main turbine.
* Rods will step in and out as necessary to maintain RCS Tavg.
Both trains of ECCS will fail to automatically actuate.
* First Stage Pressure indication on the Turbine Control System will oscillate.
The crew will manually actuate ECCS.
* The crew will place Turbine Control in manual per 1C23 AOP2.
11 and 12 AFW pumps will fail to automatically start.
Event 5: Rapid Power Reduction
The crew will manually start AFW pump(s).
* The TSO will call the Control Room requesting Unit 1 power be reduced 5% over the next 10 minutes due to impending loss of transmission capacity.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* The crew will perform a Rapid Power Reduction to 95% per 1C1.4 AOP1.
-G-RM-01.
Events 6, 7, 8, & 9: Large Break Loss of Coolant Accident
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 6 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Simulator Setup:
* RCS pressure will rapidly lower.
NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.
* Pressurizer level will rapidly lower.
: 1. If available, reset the simulator to IC
* A reactor trip will automatically actuate.
-26 2 and place in RUN
* The main turbine will fail to automatically trip.
. 2. If IC-26 2 is NOT available:
* The crew will manually trip the main turbine.
: a. Reset to IC
* Both trains of ECCS will fail to automatically actuate.
-9. b. Place the simulator in RUN.
* The crew will manually actuate ECCS.
* 11 and 12 AFW pumps will fail to automatically start.
* The crew will manually start AFW pump(s).
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 6 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Simulator Setup:
NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.
: 1. If available, reset the simulator to IC-262 and place in RUN.
: 2. If IC-262 is NOT available:
: a. Reset to IC-9.
: b. Place the simulator in RUN.
: c. Place CS-46185, 12 RHR PUMP, in PULLOUT.
: c. Place CS-46185, 12 RHR PUMP, in PULLOUT.
: d. Place CS-46 914 , BUSTIE BUS 16
: d. Place CS-46914, BUSTIE BUS 16 / BUS 26 BKR 16-10, in PULL TO LOCK.
/ BUS 26 BKR 16
: 3. If available, run schedule file PI-ILT-NRC-1402S.sch as follows:
-10, in PULL TO LOCK.
: 3. If available, run schedule file P I-ILT-NRC-14 0 2 S.sch as follows:
: a. Select open file in the Schedule application.
: a. Select open file in the Schedule application.
: b. Locate schedule file.
: b. Locate schedule file.
: c. Open schedule file by double clicking it.
: c. Open schedule file by double clicking it.
: d. Run the schedule file by pressing the "Stopped" button on the toolbar.
: d. Run the schedule file by pressing the Stopped button on the toolbar.
: e. Verify the schedule file is running.
: e. Verify the schedule file is running.
: 4. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
: 4. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
: 5. If desired, start Scenario Based Testing Data Collection Program.
: 5. If desired, start Scenario Based Testing Data Collection Program.
: 6. Complete the "Simulator Setup Checklist."
: 6. Complete the "Simulator Setup Checklist.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 7 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 7 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW             EXPECTED STUDENT RESPONSES POS
: 1. SIMULATOR PRE
: 1. SIMULATOR PRE-BRIEF:
-BRIEF: a. The Simulator Pre
: a. The Simulator Pre-Brief is conducted prior to the crew entering the simulator.
-Brief is conducted prior to the crew entering the simulator.
: b. Review Unit 1 LPEO / PEO Turnover Log.
: b. Review Unit 1 LPEO / PEO Turnover Log.
: c. Perform a pre
: c. Perform a pre-job brief for the following activity:
-job brief for the following activity:
: 1) Place a second 40 GPM Letdown Orifice in service per Section 5.9 of 1C12.1.
: 1) Place a second 40 GPM Letdown Orifice in service per Section 5.9 of 1C12.1
(a) A second letdown orifice is being placed in service in preparation of SP 1047, Control Rod Quarterly Exercise.
. (a) A second letdown orifice is being placed in service in preparation of SP 1047, Control Rod Quarterly Exercise.
(b) SP 1047 is scheduled for the next day.
(b) SP 1047 is scheduled for the next day. (c) The Lead RO will conduct this activity.
(c) The Lead RO will conduct this activity.
(d) This activity is to be performed after shift turnover is complete.
(d) This activity is to be performed after shift turnover is complete.
: 2. COMPLETE TURNOVER:  
: 2. COMPLETE TURNOVER:
: a. Crew performs a walk down of the control boards.
: a. Crew performs a walk down of the control boards.
: b. Review PRA Printout.
: b. Review PRA Printout.
: c. Crew takes the duty.
: c. Crew takes the duty.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 8 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:
-G-RM-01.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 1     3. After the crew has assumed the duty, they will place a                 1C12.1, LETDOWN, CHARGING, AND SEAL WATER second 40 gpm letdown orifice in service per Section 5.9             INJECTION - UNIT 1 of 1C12.1.                                                     LEAD
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 8 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME
* Notify RP Tech that an additional letdown orifice is
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 1 3. After the crew has assumed the duty, they will place a second 40 gpm letdown orifice in service per Section 5.9 of 1C12.1.
: a. If contacted as the RP Tech or Duty Chemist,                         being placed into service.
: a. If contacted as the RP Tech or Duty Chemist , acknowledge a second 40 gpm letdown orifice is being placed in service.
acknowledge a second 40 gpm letdown orifice is
: b. If contacted as the Duty Chemist, acknowledge purification flow has been raised.
* Determine steps 5.9.2 through 5.9.8 are not applicable being placed in service.                                            due to two charging pumps already running.
LEAD  1C12.1 , LETDOWN, CHARGING, AND SEAL WATER INJECTION
: b. If contacted as the Duty Chemist, acknowledge
- UNIT 1  Notify RP Tech that an additional letdown orifice is being placed into service.
* Place 11 Charging Pump in manual speed control.
Determine steps 5.9.2 through 5.9.8 are not applicable due to two charging pumps already running.
purification flow has been raised.
Place 11 Charging Pump in manual speed control.
* Establish approximately 70 gpm charging flow to the Regen HX by:
Establish approximately 70 gpm charging flow to the Regen HX by:
o Increasing charging pump speed.
o Increasing charging pump speed.
o Maintain 8 gpm seal injection to each RCP.
o Maintain 8 gpm seal injection to each RCP.
Place 1HC-135A, LTDN PRESS CONT, in MANUAL.
* Place 1HC-135A, LTDN PRESS CONT, in MANUAL.
Using 1HC-135A, lower letdown heat exchanger outlet pressure to approximately 200 psig.
* Using 1HC-135A, lower letdown heat exchanger outlet pressure to approximately 200 psig.
Open CV-31325, LETDOWN ORIFICE 40 GPM, using CS-46170. Return 1HC
* Open CV-31325, LETDOWN ORIFICE 40 GPM, using CS-46170.
-135A, LTDN PRESS CONT, to AUTO.
* Return 1HC-135A, LTDN PRESS CONT, to AUTO.
Transfer one (1) of the inservice charging pumps from MANUAL to AUTOMATIC speed control per C7.
* Transfer one (1) of the inservice charging pumps from MANUAL to AUTOMATIC speed control per C7.
Notify the Duty Chemist that purification flow has been raised.
* Notify the Duty Chemist that purification flow has been raised.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 9 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 9 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 2 4. After the crew has placed a second letdown orifice in service, and/or at the discretion of the lead evaluator, enter: Trigger 2 , Containment Pressure WR Instrument Fails HIGH. a. If contacted as I&C to trip bistables, inform the crew two I&C Technicians will be available in 1 hour. b. If contacted as the Operations Management, acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station Manager, etc. as asked.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 2     4. After the crew has placed a second letdown orifice in                 C47018-0105, CONTAINMENT HI-HI PRESS CHANNEL service, and/or at the discretion of the lead evaluator,             ALERT LEAD enter:
: c. If contacted as the FIN Team Supervisor, inform the crew that you will write a work order and assign an I&C Supervisor to investigate.
* Check containment pressure channels.
: 5. Plant Response:
Trigger 2, Containment Pressure WR Instrument
: a. 1P-950, will peg high. b. The following annunciator will come in:
* Determine steam line isolation is NOT required.
: c. 4701 8-0 1 0 5 , CONTAINMENT HI
Fails HIGH.
-HI PRESS CHANNEL ALERT
* Determine containment spray actuation is NOT
.
: a. If contacted as I&C to trip bistables, inform the crew               required.
LEAD          SS  C4701 8-0 1 0 5 , CONTAINMENT HI
two I&C Technicians will be available in 1 hour.
-HI PRESS CHANNEL ALERT  Check containment pressure channels.
* Check safeguards bistable status lights on Panel
Determine steam line isolation is NOT required.
: b. If contacted as the Operations Management,                           44179, Columns 13, 14, and 15.
Determine containment spray actuation is NOT required. Check safeguards bistable status lights on Panel 44179, Columns 13, 14, and 15
acknowledge the report of the failure, and agree to
. Refer to 1C51
* Refer to 1C51.
. 1C51.4, Containment Pressure 1P
make other notifications to the NRC, Duty Station Manager, etc. as asked.                                         1C51.4, Containment Pressure 1P-950 - High
-950 - High  Enter T.S. LCO 3.3.2 Condition A o Reference Table 3.3.2
: c. If contacted as the FIN Team Supervisor, inform the
-1 immediatel
* Enter T.S. LCO 3.3.2 Condition A SS crew that you will write a work order and assign an                        o Reference Table 3.3.2-1 immediately.
: y. Enter T.S. LCO 3.3.2 Condition E o Trip 1P-950 bistables in 6 hours AND verify one channel per pair operable in 6 hours.
I&C Supervisor to investigate.
OR o Be in Mode 3 in 12 hours AND be in Mode 4 in 18 hours.
* Enter T.S. LCO 3.3.2 Condition E o Trip 1P-950 bistables in 6 hours AND verify
Enter T.S. LCO 3.3.2 Condition D o Trip 1P-950 bistables in 6 hours or be in Mode 3 in 12 hours AND in Mode 4 in 18 hours.
: 5. Plant Response:                                                                    one channel per pair operable in 6 hours.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
: a. 1P-950, will peg high.                                                                OR
-G-RM-01.
: b. The following annunciator will come in:                                    o Be in Mode 3 in 12 hours AND be in Mode
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 10 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME
: c. 47018-0105, CONTAINMENT HI-HI PRESS                                            4 in 18 hours.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 3         
CHANNEL ALERT.
: 6. After the crew has responded to the Containment Pressure Instrument failing high , and/or at the discretion of the lead evaluator, then enter
* Enter T.S. LCO 3.3.2 Condition D o Trip 1P-950 bistables in 6 hours or be in Mode 3 in 12 hours AND in Mode 4 in 18 hours.
: Trigger 3 , 1LT-428, Blue Channel Pressurizer Level, fails HIGH.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: a. If contacted as I&C to trip bistables, inform the crew two I&C Technicians will be available in 1 hour. b. If contacted as the Operations Management, acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station Manager, etc. as asked.
: c. If contacted as the FIN Team Supervisor, inform the crew that you will write a work order and assign an I&C Supervisor to investigate.
: d. If contacted as an out
-plant operator, acknowledge the order to check Pressurizer Heater Backup Heater Breakers (closing springs charged)
. 7. Plant Response:
: a. Blue Channel Pressurizer Level peg s high. b. 11 Charging Pump speed will lower. c. Pressurizer level will slowly lower. d. The following annunciators will come in:
: 1) 47012-0 307 , PZR HI LVL CHANNEL ALERT
. 2) 47012-0 5 0 7 , PZR LVL DEVIATION
. RO        RO        RO        SS C4701 2-0 307 , PRZR HI LVL CHANNEL ALERT Check pressurizer level.
Control level in manual Reduce level to program level.
Maintain pressurizer pressure Refer to 1C51. C47012-0507, PZR LVL DEVIATION Verify charging pump in automatic and charging flow proper for the level.
Place charging pump speed control in MANUAL.
Control charging pump speed as necessary to restore pressurizer level to program level.
Refer to 1C51
. 1C51.3 , Pressurizer Level 1L
-428 - High  Control pressurizer heaters manually.
Place charging pump speed control in Manual and adjust pressurizer level to setpoint.
Select position "2
-1" (WHITE-RED) on PRZR Level Control Selector switch.
Return pressurizer heaters to AUTO.
Return one charging pump speed control to AUTO.
Ensure pressurizer level recorder not selected to blue channel. Enter T.S. LCO 3.3.
1 Condition A o Reference Table 3.3.
1-1 immediately
. Enter T.S. LCO 3.3.1 Condition K o Trip bistable for 1L
-428 in 6 hours or reduce thermal power to less than P
-7 and P-8 (10%). Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 11 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 4         
: 8. When the plant is stable and/or at the discretion of the lead evaluator, then enter: Trigger 4 , Turbine Malfunction (Cycling Output
). a. If contacted as the out
-plant operator to investigate, wait 2 minutes and report there are no indication of a n EH Oil System problem.
: b. If contacted as the Operations Management, acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station Manager, etc. as asked.
: c. If contacted as the FIN Team Supervisor or Turbine Engineer, inform the crew that you will write a work order and investigate.
: d. After the plant is stable, enter the Control Room as the Turbine Engineer and communicate the following to the crew:
: 1) A 1 HR TIME COMPRESSION is being used
. 2) Both First Stage Pressure inputs to Turbine Control are faulted.
: 3) Turbine Control will operate correctly in VPC or Load Mode.
: 4) Plant Management has performed an ODMI and has decided the following:
: 5) Exit the manual control screen by pressing the "exit" button.
: 6) The crew can acknowledge the Turbine Control alarm, but do NOT reset it.
: 7) Operate the turbine in VPC mode when load changes are NOT in progress
. 8) Operate the turbine in LOAD Mode during load changes. 9) If necessary, restore the plant: (a) 100% power
. LEAD    1C23 AOP2 , MALFUNCTION OF TURBINE EH CONTROL SYSTEM Place the turbine control system in Manual by selecting Manual control using the "On Line Control" screen AND attempt to control load using the CV decrease control
. Notify System Engineer.
1C1.4 , UNIT 1 POWER OPERATION Notify the Duty Chemist of the load change.
If desired, then place CS
-46280, ROD BANK SELECTOR, in "MANUAL".
Using the "On Line Control" screen, select the desired Control Mode (VPC, FSP, or LOAD).
Using the "On Line Control" screen, select the desired demand rate.
Verify the "VPL" control is not Red.
Raise the "VPL" as necessary using the "Valve Limiter" pop
-up screen.
Set the "Target" setting to the desired load by using the "On Line Control" screen "Target" increase/decrease controls.
Select the "Go" control using the "On Line Control" screen. To suspend the load change, select turbine control "Hold" on the "On Line Control" screen.
Verify the load change stops when desired load is obtained. Lower the "VPL" until the "Valve Position Limit" signal is at or close to the "Current Valve Demand" signal.
Verify CS-46280, ROD BANK SELECTOR, in "AUTO".
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 12 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 4 (cont)      (b) Bank D Rods at 218 steps
. (c) Tavg at 560
&deg;F. 9. Plant Response:
: a. Annunciator 47008
-0409, TURBINE CONTROL SYSTEM TROUBLE
: b. SCADA Yellow High Priority Alarm for 1st Stage Pressure Fault.
: c. Unexpected load changes. d. VPL limit red light cycling.
: e. Rods stepping in and then out.
: f. RCS Tavg temperature rising and lowering
. 1C5, CONTROL ROD AND ROD POSITION INDICATION SYSTEMS Verify automatic control rod withdrawal or insertion is NOT required.
Transfer CS
-46280, ROD BANK SELECTOR, to "MAN". Adjust Control Rod Bank to desired position, using CS-46281, DIGITAL ROD CONTROL.
Verify NO rod control demand signals present.
Return CS-46280, ROD BANK SELECTOR, to "AUTO". EVENT 5       


OPTIONAL EVENT Event 5 can be skipped if the Lead Evaluator determines a sufficient reactivity manipulation was performed during Event 4.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 10 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:
: 10. When the plant is stable and/or at the discretion of the lead evaluator, then:
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 3      6. After the crew has responded to the Containment                        C47012-0307, PRZR HI LVL CHANNEL ALERT Pressure Instrument failing high, and/or at the discretion      RO
: a. As the TSO, call the Control Room and communicate the following:
* Check pressurizer level.
: 1) The King Plant has tripped offline. 2) Power needs to be reduced to lower the power factor so a grid transformer break er can be re-closed. 3) Prairie Island Unit 1 power needs to be lowered to 555 MW within the next 10
of the lead evaluator, then enter:
- 15 minutes. 4) This is urgent and needs to be done as soon as possible. NOTE Once the Lead Evaluator is satisfied with the reactivity manipulation, proceed to Event 6. RO / SS 1C1.4 AOP1, RAPID POWER REDUCTION UNIT 1 Determine the predicted Boron addition and final Control Rod Position by obtaining values from the appropriate contingency reactivity plan.
* Control level in manual Trigger 3, 1LT-428, Blue Channel Pressurizer Level,
Borate the RCS as necessary to maintain control rods above the insertion limit and control delta I within limits. Place pressurizer heaters to "ON".
* Reduce level to program level.
Using the "On Line Control" screen, select the "Control Mode" pop-up screen.
fails HIGH.
Select the desired control mode ("VPC", "FSP", or "LOAD"). Using the "On Line Control" screen, select the "Demand Rate" pop
* Maintain pressurizer pressure
-up screen.
: a. If contacted as I&C to trip bistables, inform the crew
Select the desired rate of load change.
* Refer to 1C51.
Set the desired Target setting using the "On Line Control" screen.
two I&C Technicians will be available in 1 hour.
Using the "On Line Control" screen, select the Go control to initiate load reduction. Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
: b. If contacted as the Operations Management,                       C47012-0507, PZR LVL DEVIATION acknowledge the report of the failure, and agree to
-G-RM-01.
* Verify charging pump in automatic and charging flow make other notifications to the NRC, Duty Station            RO    proper for the level.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 13 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME
Manager, etc. as asked.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 5 (cont)    RO / SS 1C12.5, UNIT 1 BORON CONCENTRATION CONTROL Verify the Boric Acid integrator is reset.
* Place charging pump speed control in MANUAL.
Set 1YIC-110, BA TO BLENDER BATCH INTEGRATOR, to quantity desired.
: c. If contacted as the FIN Team Supervisor, inform the
Place CS-46300, MAKE
* Control charging pump speed as necessary to restore crew that you will write a work order and assign an pressurizer level to program level.
-UP MODE SELECTOR, to "BORATE". If desired, then adjust 1HC
I&C Supervisor to investigate.
-110, BA TO BLENDER FLOW CONT, to "MANUAL" and adjust output for desired flow rate.
* Refer to 1C51.
Momentarily place CS
: d. If contacted as an out-plant operator, acknowledge the order to check Pressurizer Heater Backup Heater Breakers (closing springs charged).                              1C51.3, Pressurizer Level 1L-428 - High RO
-46457, BORIC ACID MAKE
* Control pressurizer heaters manually.
-UP CONTROL, to "START", to initiate the boration.
: 7. Plant Response:
When the desired quantity of boric acid has been added, then verify automatic makeup stopped as indicated by CS
* Place charging pump speed control in Manual and
-46457, BORIC ACID MAKE
: a. Blue Channel Pressurizer Level pegs high.                            adjust pressurizer level to setpoint.
-UP CONTROL, green light LIT.
: b. 11 Charging Pump speed will lower.
If additional boration is desired, then return to step 2.
* Select position 2-1 (WHITE-RED) on PRZR Level
When the boration is complete, then verify 1HC
: c. Pressurizer level will slowly lower.                                Control Selector switch.
-110, BA TO BLENDER FLOW CONT, is in "AUTO".
: d. The following annunciators will come in:
Reset the Boric Acid integrator.
* Return pressurizer heaters to AUTO.
Perform a 10 gallon flush.
: 1) 47012-0307, PZR HI LVL CHANNEL ALERT.
* Return one charging pump speed control to AUTO.
: 2) 47012-0507, PZR LVL DEVIATION.
* Ensure pressurizer level recorder not selected to blue channel.
SS
* Enter T.S. LCO 3.3.1 Condition A o Reference Table 3.3.1-1 immediately.
* Enter T.S. LCO 3.3.1 Condition K o Trip bistable for 1L-428 in 6 hours or reduce thermal power to less than P-7 and P-8 (10%).
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 11 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:
-G-RM-01.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW           EXPECTED STUDENT RESPONSES POS EVENT 4      8. When the plant is stable and/or at the discretion of the              1C23 AOP2, MALFUNCTION OF TURBINE EH lead evaluator, then enter:                                         CONTROL SYSTEM LEAD Trigger 4, Turbine Malfunction (Cycling Output).
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 14 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME
* Place the turbine control system in Manual by
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT s 6, 7, 8, &
: a. If contacted as the out-plant operator to investigate,              selecting Manual control using the On Line Control wait 2 minutes and report there are no indication of               screen AND attempt to control load using the CV an EH Oil System problem.                                          decrease control.
9   
: b. If contacted as the Operations Management,
: 11. When the lead evaluator is satisfied with the reactivity manipulation, enter
* Notify System Engineer.
: Trigger 6 , Large Break LOCA from Loop B Hot Leg
acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station                1C1.4, UNIT 1 POWER OPERATION Manager, etc. as asked.
. a. Upon hearing the announcement of Reactor Trip, or when called as the Turbine Building Operator to isolate the Unit 1 MSRs per Attachment J, then open and run schedule file E-0_Att-J.sch located in X:\\Trex_PI\Lightning\Schedule\EOPs. When the isolation is complete, inform the crew the MSRs are isolated. b. Upon hearing the announcement of Safety Injection, or when called as the Turbine Building Operator to secure the Turbine Building Roof Exhausters, wait 2 minutes and report the Turbine Building Roof Exhausters are all secured.
* Notify the Duty Chemist of the load change.
: c. If Control Room personnel ask if Unit 2 personnel are available to perform Attachment L, then inform the Control Room that Unit 2 personnel are NOT available for performing Attachment L.
: c. If contacted as the FIN Team Supervisor or Turbine
: d. If Control Room personnel ask if Unit 2 personnel are available to secure Diesel Generators and/or Safeguards Cooling Water Pumps, then inform the Control Room that Unit 2 personnel WILL secure the Diesel Generators and/or Safeguards Cooling Water Pumps. CRITICAL TASK S  Manually trip the main turbine before transition out of E-0. Manually actuate at least one train of SI
* If desired, then place CS-46280, ROD BANK Engineer, inform the crew that you will write a work                SELECTOR, in MANUAL.
-actuated safeguards equipment before transition out of E-0. RO/ LEAD 
order and investigate.
* Using the On Line Control screen, select the desired
: d. After the plant is stable, enter the Control Room as                Control Mode (VPC, FSP, or LOAD).
the Turbine Engineer and communicate the following
* Using the On Line Control screen, select the desired to the crew:                                                        demand rate.
: 1) A 1 HR TIME COMPRESSION is being used.
* Verify the VPL control is not Red.
: 2) Both First Stage Pressure inputs to Turbine
* Raise the VPL as necessary using the Valve Control are faulted.
Limiter pop-up screen.
: 3) Turbine Control will operate correctly in VPC or
* Set the Target setting to the desired load by using Load Mode.
the On Line Control screen Target
: 4) Plant Management has performed an ODMI and increase/decrease controls.
has decided the following:
: 5) Exit the manual control screen by pressing the
* Select the Go control using the On Line Control exit button.                                                  screen.
: 6) The crew can acknowledge the Turbine Control
* To suspend the load change, select turbine control alarm, but do NOT reset it.                                    Hold on the On Line Control screen.
: 7) Operate the turbine in VPC mode when load
* Verify the load change stops when desired load is changes are NOT in progress.                                    obtained.
: 8) Operate the turbine in LOAD Mode during load
* Lower the VPL until the Valve Position Limit signal changes.                                                       is at or close to the Current Valve Demand signal.
: 9) If necessary, restore the plant:
* Verify CS-46280, ROD BANK SELECTOR, in AUTO.
(a) 100% power.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


SS    1E-0, REACTOR TRIP OR SAFETY INJECTION Verify Reactor Trip.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 12 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:
Manually trip the Main Turbine.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW             EXPECTED STUDENT RESPONSES POS EVENT 4                  (b) Bank D Rods at 218 steps.                                  1C5, CONTROL ROD AND ROD POSITION (cont)                 (c) Tavg at 560&deg;F.                                            INDICATION SYSTEMS
Verify both Safeguards buses energized.
* Verify automatic control rod withdrawal or insertion is
Determine SI is required.
: 9. Plant Response:                                                             NOT required.
o Either SG pressure < 530 psig.
: a. Annunciator 47008-0409, TURBINE CONTROL
o PRZR pressure < 1830 psig.
* Transfer CS-46280, ROD BANK SELECTOR, to SYSTEM TROUBLE                                                        MAN.
o Containment pressure > 3.5 psig.
: b. SCADA Yellow High Priority Alarm for 1st Stage
Manually actuate SI. Perform Attachment L (see page s 1 6 & 1 7). Check AFW Status:
* Adjust Control Rod Bank to desired position, using Pressure Fault.                                                      CS-46281, DIGITAL ROD CONTROL.
o Verify total AFW flow greater than 200 GPM. o Manually start AFW pump(s).
: c. Unexpected load changes.
o Verify AFW pumps discharge pressure greater than 1000 psig.
* Verify NO rod control demand signals present.
o Control feed flow to maintain 11 SG Wide Range between 50%
: d. VPL limit red light cycling.
and 59%. Check RCS Temperatures trending to 547
* Return CS-46280, ROD BANK SELECTOR, to
&deg;F. Check PRZR PORVs and Spray valves closed.
: e. Rods stepping in and then out.                                        AUTO.
Stop RCPs due to RCS pressure below 1250 psig and SI flow. Determine SGs are NOT faulted.
: f. RCS Tavg temperature rising and lowering.
Determine SG Tubes are NOT ruptured. Determine RCS is NOT intact due to Containment pressure rising.
EVENT 5                            OPTIONAL EVENT                                      1C1.4 AOP1, RAPID POWER REDUCTION UNIT 1 Event 5 can be skipped if the Lead Evaluator determines
Go to 1E-1.      Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
* Determine the predicted Boron addition and final RO / SS a sufficient reactivity manipulation was performed                            Control Rod Position by obtaining values from the during Event 4.                                                                appropriate contingency reactivity plan.
-G-RM-01.
* Borate the RCS as necessary to maintain control rods
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 15 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME
: 10. When the plant is stable and/or at the discretion of the                  above the insertion limit and control delta I within lead evaluator, then:                                                    limits.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT s 6, 7, 8, &
: a. As the TSO, call the Control Room and communicate
(cont)    
* Place pressurizer heaters to ON.
: 12. Plant Response:
the following:
: a. RCS and PRZR pressure lowers rapidly. b. The reactor automatically trips on low pressurizer pressure. EMERGENCY PLAN CLASSIFICATION ALERT - F A 1 due to a loss of the RCS Fission Product Barrier due to RCS leak rate greater than 60 gpm or a red path in Integrity.
* Using the On Line Control screen, select the Control
SITE AREA EMERGENCY
: 1) The King Plant has tripped offline.                                Mode pop-up screen.
- FS1 due to a loss of the RCS Fission Product Barrier and potential loss of the Fuel Cladding Fission product barrier. This classification will only be applicable if an orange path in Core Cooling occurs. 13. If Control Room personnel ask if Unit 2 personnel are available to secure Diesel Generators and/or Safeguards Cooling Water Pumps, then inform the Control Room that Unit 2 personnel WILL secure the Diesel Generators and/or Safeguards Cooling Water Pumps.
: 2) Power needs to be reduced to lower the power
RO/SS RO/SS   
* Select the desired control mode (VPC, FSP, or factor so a grid transformer breaker can be re-                  LOAD).
closed.
* Using the On Line Control screen, select the
: 3) Prairie Island Unit 1 power needs to be lowered                    Demand Rate pop-up screen.
to 555 MW within the next 10 - 15 minutes.
* Select the desired rate of load change.
: 4) This is urgent and needs to be done as soon as
* Set the desired Target setting using the On Line possible.
Control screen.
* Using the On Line Control screen, select the Go NOTE control to initiate load reduction.
Once the Lead Evaluator is satisfied with the reactivity manipulation, proceed to Event 6.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION Determine RCS pressure is less than 550 psig and RHR pump flow is greater than 950 gpm.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                        Page 13 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:
Return to procedure and step in effect.
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW            EXPECTED STUDENT RESPONSES POS EVENT 5                                                                                1C12.5, UNIT 1 BORON CONCENTRATION CONTROL (cont)
1E-1 , LOSS OF REACTOR OR SECONDARY COOLANT  Stop RCS if not already done in 1E
* Verify the Boric Acid integrator is reset.
-0. Determine SGs are NOT faulted and SG levels intact
RO / SS
. Control feed flow to maintain narrow range level between 5% and 50% [Wide Range 50% and 59%].
* Set 1YIC-110, BA TO BLENDER BATCH INTEGRATOR, to quantity desired.
Check secondary radiation is normal.
* Place CS-46300, MAKE-UP MODE SELECTOR, to BORATE.
Check power to PRZR PORV block valves available.
* If desired, then adjust 1HC-110, BA TO BLENDER FLOW CONT, to MANUAL and adjust output for desired flow rate.
Check PRZR PORVs are closed.
* Momentarily place CS-46457, BORIC ACID MAKE-UP CONTROL, to START, to initiate the boration.
Check at least one PRZR PORV block valve is open.
* When the desired quantity of boric acid has been added, then verify automatic makeup stopped as indicated by CS-46457, BORIC ACID MAKE-UP CONTROL, green light LIT.
Reset SI and Containment Isolation.
* If additional boration is desired, then return to step 2.
Establish Instrument Air to Containment.
* When the boration is complete, then verify 1HC-110, BA TO BLENDER FLOW CONT, is in AUTO.
Check power supply to charging pumps are from offsite powe
* Reset the Boric Acid integrator.
: r. Check at least one charging pump is running.
* Perform a 10 gallon flush.
Establish charging flow as necessary.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Determine SI flow should NOT be terminated due to subcooling and RCS pressure.
Determine RHR pumps should NOT be stopped due to RCS pressure being too low.
Check RCS and SG pressures Determine Diesel Generators should be stopped.
Determine Safeguards Cooling Water pumps should be stopped.
Initiate Evaluation of Plant Status.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 16 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT s 6, 7, 8, &
9  (cont)   


NOTE There should be NO discrepancies with Attachment L, except for 12 RHR pump being OOS.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                    Page 14 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW          EXPECTED STUDENT RESPONSES POS EVENTs      11. When the lead evaluator is satisfied with the reactivity              1E-0, REACTOR TRIP OR SAFETY INJECTION 6, 7, 8, &      manipulation, enter:
* Verify Reactor Trip.
9                                                                            RO/
Trigger 6, Large Break LOCA from Loop B Hot Leg.
* Manually trip the Main Turbine.
LEAD
: a. Upon hearing the announcement of Reactor Trip, or
* Verify both Safeguards buses energized.
when called as the Turbine Building Operator to
* Determine SI is required.
isolate the Unit 1 MSRs per Attachment J, then open                        o Either SG pressure < 530 psig.
and run schedule file E-0_Att-J.sch located in                              o PRZR pressure < 1830 psig.
X:\\Trex_PI\Lightning\Schedule\EOPs. When the                              o Containment pressure > 3.5 psig.
isolation is complete, inform the crew the MSRs are
* Manually actuate SI.
isolated.
* Perform Attachment L (see pages 16 & 17).
: b. Upon hearing the announcement of Safety Injection,
* Check AFW Status:
or when called as the Turbine Building Operator to                          o Verify total AFW flow greater than 200 secure the Turbine Building Roof Exhausters, wait 2                            GPM.
minutes and report the Turbine Building Roof                                o Manually start AFW pump(s).
Exhausters are all secured.                                                o Verify AFW pumps discharge pressure
: c. If Control Room personnel ask if Unit 2 personnel are                          greater than 1000 psig.
available to perform Attachment L, then inform the                          o Control feed flow to maintain 11 SG Wide Control Room that Unit 2 personnel are NOT                                    Range between 50% and 59%.
available for performing Attachment L.
* Check RCS Temperatures trending to 547&deg;F.
: d. If Control Room personnel ask if Unit 2 personnel are
* Check PRZR PORVs and Spray valves closed.
available to secure Diesel Generators and/or Safeguards Cooling Water Pumps, then inform the
* Stop RCPs due to RCS pressure below 1250 psig and Control Room that Unit 2 personnel WILL secure the                  SI flow.
Diesel Generators and/or Safeguards Cooling Water
* Determine SGs are NOT faulted.
Pumps.
* Determine SG Tubes are NOT ruptured.
* Determine RCS is NOT intact due to Containment CRITICAL TASKS                                SS    pressure rising.
* Manually trip the main turbine before transition out
* Go to 1E-1.
of E-0.
* Manually actuate at least one train of SI-actuated safeguards equipment before transition out of E-0.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


LEAD   
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                    Page 15 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW            EXPECTED STUDENT RESPONSES POS EVENTs      12. Plant Response:                                                        1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED 6, 7, 8, &      a. RCS and PRZR pressure lowers rapidly.                              THERMAL SHOCK CONDITION 9                                                                            RO/SS
: b. The reactor automatically trips on low pressurizer
* Determine RCS pressure is less than 550 psig and (cont)            pressure.                                                            RHR pump flow is greater than 950 gpm.
* Return to procedure and step in effect.
EMERGENCY PLAN CLASSIFICATION ALERT - FA1 due to a loss of the RCS Fission Product                      1E-1, LOSS OF REACTOR OR SECONDARY Barrier due to RCS leak rate greater than 60 gpm or a                      COOLANT red path in Integrity.
* Stop RCS if not already done in 1E-0.
RO/SS
* Determine SGs are NOT faulted and SG levels intact.
SITE AREA EMERGENCY - FS1 due to a loss of the RCS
* Control feed flow to maintain narrow range level Fission Product Barrier and potential loss of the Fuel                        between 5% and 50% [Wide Range 50% and 59%].
Cladding Fission product barrier. This classification will
* Check secondary radiation is normal.
only be applicable if an orange path in Core Cooling
* Check power to PRZR PORV block valves available.
occurs.
* Check PRZR PORVs are closed.
* Check at least one PRZR PORV block valve is open.
: 13. If Control Room personnel ask if Unit 2 personnel are
* Reset SI and Containment Isolation.
available to secure Diesel Generators and/or Safeguards
* Establish Instrument Air to Containment.
Cooling Water Pumps, then inform the Control Room
* Check power supply to charging pumps are from that Unit 2 personnel WILL secure the Diesel Generators                  offsite power.
and/or Safeguards Cooling Water Pumps.
* Check at least one charging pump is running.
* Establish charging flow as necessary.
* Determine SI flow should NOT be terminated due to subcooling and RCS pressure.
* Determine RHR pumps should NOT be stopped due to RCS pressure being too low.
* Check RCS and SG pressures
* Determine Diesel Generators should be stopped.
* Determine Safeguards Cooling Water pumps should be stopped.
* Initiate Evaluation of Plant Status.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


1E-0 Attachment L: SI Alignment Verification Verify Safeguards Component Alignment:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                  Page 16 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:
Verify both trains of SI actuated:
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW          EXPECTED STUDENT RESPONSES POS EVENTs                                                                                1E-0 Attachment L: SI Alignment Verification 6, 7, 8, &                              NOTE
o Both RHR pumps  
* Verify Safeguards Component Alignment:
- RUNNING -OR- o Both SI pumps  
9                                                                            LEAD There should be NO discrepancies with Attachment L,
- RUNNING o 1 2 RHR Pump is OOS and should NOT be started.
* Verify both trains of SI actuated:
  "SI NOT READY" lights  
(cont)    except for 12 RHR pump being OOS.                                            o Both RHR pumps - RUNNING
- NOT LIT "SI ACTIVE" lights  
                                                                                                    -OR-o Both SI pumps - RUNNING o 12 RHR Pump is OOS and should NOT be started.
- LIT FOR PLANT CONDITIONS "CONTAINMENT ISOLATION" lights  
                                                                                      * "SI NOT READY" lights - NOT LIT
- LIT FOR PLANT CONDITION S  Check Category 1 Vent Zone Boundary:
                                                                                      * "SI ACTIVE" lights - LIT FOR PLANT CONDITIONS
Close MV-3211 5, 12 2 SFP HX INLT HDR MV B Check Cooling Water Header Pressures  
                                                                                      * "CONTAINMENT ISOLATION" lights - LIT FOR PLANT CONDITIONS
- BOTH GREATER THAN 65 PSIG Verify Plant Announcements Complete:
* Check Category 1 Vent Zone Boundary:
Check If Main Steamlines Are Isolated:
* Close MV-32115, 122 SFP HX INLT HDR MV B
Determine MSIVs, Bypass Valves, and Containment Instrument Air Valves do NOT need to be closed.
* Check Cooling Water Header Pressures - BOTH GREATER THAN 65 PSIG
Verify SI Flow Verify RHR Flow Verify Containment Spray is actuated (if necessary)
* Verify Plant Announcements Complete:
. Check RCP Cooling Verify Local Actions Complete Verify Generator Breakers  
* Check If Main Steamlines Are Isolated:
- OPEN Verify All Heater Drain Pumps
* Determine MSIVs, Bypass Valves, and Containment Instrument Air Valves do NOT need to be closed.
- STOPPED Check Turbine Valves:
* Verify SI Flow
o Turbine reheat and intercept valves  
* Verify RHR Flow
- CLOSED o Open turbine drain valves Verify Main Feedwater Alignment:
* Verify Containment Spray is actuated (if necessary).
o Both main feedwater pumps  
* Check RCP Cooling
- STOPPED o Main and bypass FRVs  
* Verify Local Actions Complete
- CLOSED Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* Verify Generator Breakers - OPEN
-G-RM-01.
* Verify All Heater Drain Pumps - STOPPED
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 17 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME
* Check Turbine Valves:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT s 6, 7, 8, &
o Turbine reheat and intercept valves - CLOSED o Open turbine drain valves
9  (cont)   
* Verify Main Feedwater Alignment:
: 14. If Control Room personnel ask for status of Unit 2 Cooling Water/Chilled Water lineup, then inform the Control Room that Unit 2 Cooling Water/Chilled Water valves are in there safeguards positions.
o Both main feedwater pumps - STOPPED o Main and bypass FRVs - CLOSED Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 15. If Control Room personnel ask for status of Battery Room Temperatures, then inform the Control Room that Battery Room temperatures are less than 84&deg;F.
: 16. If Control Room personnel ask for status of Spent Fuel Cooling, then inform the Control Room that Spent Fueling level and temperature are normal.


LEAD  
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                  Page 17 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW        EXPECTED STUDENT RESPONSES POS EVENTs      14. If Control Room personnel ask for status of Unit 2
* Verify All Condensate Pumps - STOPPED:
6, 7, 8, &      Cooling Water/Chilled Water lineup, then inform the
* Place Steam Dump in "STM PRESS" Mode 9                                                                            LEAD Control Room that Unit 2 Cooling Water/Chilled Water
* Verify Unit 1 Cooling Water/Chilled Water Alignment:
(cont)        valves are in there safeguards positions.                              o CFCU control switches - "SLOW".
: 15. If Control Room personnel ask for status of Battery                    o CFCU dampers - ALIGNED TO DOME Room Temperatures, then inform the Control Room that                  o Unit 1 cooling water/chilled water valves closed Battery Room temperatures are less than 84&deg;F.                          o Unit 1 CRDM shroud cooling supply and return
: 16. If Control Room personnel ask for status of Spent Fuel                      valves - CLOSED Cooling, then inform the Control Room that Spent                      o CFCU cooling water supply and return valves -
Fueling level and temperature are normal.                                  OPEN o CFCU chilled water supply and return valves -
CLOSED
* Verify 11 Safeguards Screenhouse Ventilation lineup.
* Verify Control Room Ventilation Alignment:
o Chillers and fans - RUNNING o Control room chiller suction/discharge tie closed -
STATUS LIGHT LIT
* Verify Unit 2 Cooling/Chilled Water Alignment
* Verify 21 Safeguards Screenhouse Ventilation lineup.
* Verify 11 and 12 Battery Charger Operation is normal.
* Verify Battery Room temps less than 84&deg;F.
* Check status of Spent Fuel Cooling.
* Check Status Of Notifications
* Notify SS Of Any Discrepancies.
: 17. Once the crew has determined SI Pumps and RHR Pumps should NOT be stopped and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Verify All Condensate Pumps
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                         Page 18 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SIMULATOR INPUT  
- STOPPED:  Place Steam Dump in "STM PRESS" Mode Verify Unit 1 Cooling Water/Chilled Water Alignment:
o CFCU control switches
- "SLOW". o CFCU dampers
- ALIGNED TO DOME o Unit 1 cooling water/chilled water valves closed o Unit 1 CRDM shroud cooling supply and return valves - CLOSED o CFCU cooling water supply and return valves
- OPEN o CFCU chilled water supply and return valves
- CLOSED  Verify 11 Safeguards Screenhouse Ventilation lineup.
Verify Control Room Ventilation Alignment:
o Chillers and fans
- RUNNING o Control room chiller suction/discharge tie closed
- STATUS LIGHT LIT Verify Unit 2 Cooling/Chilled Water Alignment Verify 21 Safeguards Screenhouse Ventilation lineup.
Verify 11 and 12 Battery Charger Operation is normal.
Verify Battery Room temps less than 84&deg;F.
Check status of Spent Fuel Cooling. Check Status Of Notifications Notify SS Of Any Discrepancies
. 17. Once the crew has determined SI Pumps and RHR Pumps should NOT be stopped and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 18 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==


Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 19 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                           Page 19 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario
_____ Simulator Status:
_____     Simulator Status:
___ 1. "Training Load" ___ 2. Step counters "ON" ___ 3. Alarm sound "ON" ___ 4. Steps 1 - 5 on page 6 complete
___ 1.         "Training Load"                       ___ 2. Step counters "ON"
___ 5. Speed: "REAL"
___ 3.         Alarm sound "ON"                     ___ 4. Steps 1 - 5 on page 6 complete
___ 6. IC-262 or IC-9 running
___ 5.         Speed: REAL                         ___ 6. IC-262 or IC-9 running
_____ Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructor's booth
_____     Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructors booth.
. _____ Verify Schedule File/Summary matches Simulator Input Summary page in the SEG
_____     Verify Schedule File/Summary matches Simulator Input Summary page in the SEG.
. _____ Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.
_____     Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.
_____ Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset
_____     Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset.
. _____ BOC I sheet displayed on C panel
_____     BOC I sheet displayed on C panel.
. _____ BOC Reactivity Briefing sheet available at Reactor Operator Desk
_____     BOC Reactivity Briefing sheet available at Reactor Operator Desk.
. _____ Turnover sheet/PRA sheet available. _____ If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.
_____     Turnover sheet/PRA sheet available.
_____ Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID). _____ Electronic PINGP 577 forms closed on LAN connected PC s. _____ Board-mounted EAL Tables are cleaned
_____     If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.
. _____ EOOS running on PC and updated as follows to reflect equipment OOS
_____     Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).
: ___ 1. 12 RHR Pump
_____     Electronic PINGP 577 forms closed on LAN connected PCs.
___ 2. BKR 16-10 (CLOSE) _____ Update Control Board Placards:
_____     Board-mounted EAL Tables are cleaned.
___ 1. NRC Current Authentication Code call date updated to current date.
_____     EOOS running on PC and updated as follows to reflect equipment OOS:
___ 2. High Flux At Shutdown Alarm Setpoint placards: 5900 cps
___ 1. 12 RHR Pump
. ___ 3. Feedwater regulating valve position placard set to current values.
___ 2. BKR 16-10 (CLOSE)
___ 4. Recommended SG Blowdown flow set to current values.
_____     Update Control Board Placards:
___ 5. RCS boron on the CVCS panel placard: 1299 ppm. ___ 6. Turbine reference/setter values on the CVCS panel set to current (Target/Demand on
___ 1.       NRC Current Authentication Code call date updated to current date.
-line positions)
___ 2.       High Flux At Shutdown Alarm Setpoint placards: 5900 cps.
. ___ 7. Shift Reactivity Guidance placard: BA: 4.2 gallons, RMU: 67 gallons
___ 3.       Feedwater regulating valve position placard set to current values.
. Dilutions @ 10 gal RMU, 1
___ 4.       Recommended SG Blowdown flow set to current values.
-2 times per shift
___ 5.       RCS boron on the CVCS panel placard: 1299 ppm.
. _____ Magnetic placards in place:
___ 6.       Turbine reference/setter values on the CVCS panel set to current (Target/Demand on-line positions).
___ 1. 11 BA TANK "Lined Up For Service"
___ 7.       Shift Reactivity Guidance placard: BA: 4.2 gallons, RMU: 67 gallons.
___ 2. 11 BA PUMP "Lined Up to 11 BA Tank"
Dilutions @ 10 gal RMU, 1-2 times per shift.
___ 3. 12 BA PUMP "Lined Up to 11 BA Tank"
_____       Magnetic placards in place:
___ 4. CC to SFP MV
___ 1. 11 BA TANK Lined Up For Service
-32117 "In Service"
___ 2. 11 BA PUMP Lined Up to 11 BA Tank
___ 5. Blowdown 46470 "SGB To CDSR"
___ 3. 12 BA PUMP Lined Up to 11 BA Tank
___ 6. HU Flag above 12 RHR HX CC inlet MV
___ 4. CC to SFP MV-32117 In Service
-32094 for "1C14 Limitation" ___ 7. "H 2 IN VCT SPACE" at VCT Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
___ 5. Blowdown 46470 SGB To CDSR
-G-RM-01.
___ 6. HU Flag above 12 RHR HX CC inlet MV-32094 for 1C14 Limitation
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 20 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0
___ 7. H 2 IN VCT SPACE at VCT Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
_____ Pink Status Control Tags in place:
 
___ 1. CS-46540, 22 CC WTR PUMP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                   Page 20 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0
___ 2. CS-46572, CC TO SFP MV
_____       Pink Status Control Tags in place:
-32117 ___ 3. CS-4693 5 , D 1 DIESEL GENERATOR
___ 1. CS-46540, 22 CC WTR PUMP                ___ 5. CS-46184, 11 RHR PUMP
___ 4. CS-46424, 11 TDAFWP
___ 2. CS-46572, CC TO SFP MV-32117             ___ 6. CS-46178, 11 SI PUMP
___ 5. CS-46184, 11 RHR PUMP
___ 3. CS-46935, D1 DIESEL GENERATOR            ___ 7. CS-46036, 11 CC WTR PUMP
___ 6. CS-4617 8 , 1 1 SI PUMP ___ 7. CS-4603 6 , 1 1 CC WTR PUMP
___ 4. CS-46424, 11 TDAFWP                      ___ 8. CS-46053, 12 CLG WTR PUMP
___ 8. CS-46 053 , 12 CLG WTR PUMP
_____     Yellow Caution Tags in place:
_____ Yellow Caution Tags in place: ___ 1. CS-46064, CC TO SFP MV-32115 , in CLOSED ___ 2. CS-46 185 , 12 RHR PUMP , in PULLOUT ___ 3. CS-46 914 , BUSTIE BUS 16 / BUS 26 BKR 16
___ 1. CS-46064, CC TO SFP MV-32115, in CLOSED
-10, in PULL TO LOCK _____ ERCS driven recorders are on
___ 2. CS-46185, 12 RHR PUMP, in PULLOUT
-scale (RCS temperature scaled 55 5&#xba; F to 56 5&#xba; F). _____ ERCS alarm screen operating and alarms reset
___ 3. CS-46914, BUSTIE BUS 16 / BUS 26 BKR 16-10, in PULL TO LOCK
. _____ All ERCS terminals operating and set as follows:
_____     ERCS driven recorders are on-scale (RCS temperature scaled 555&#xba; F to 565&#xba; F).
CONF VARS R02 Alarm Summary Page CONE1 Group OP31_U1 R03 AFD CONC SAS (XS11)
_____     ERCS alarm screen operating and alarms reset.
R04 TPM CONG1 Group QP CCDATA R05 QP LOADFOLL ERCS-R01 Group RADMON_U1 R06 Alarm Summary Page
_____     All ERCS terminals operating and set as follows:
_____ ERCS single point displays:
CONF             VARS                           R02               Alarm Summary Page CONE1             Group OP31_U1                 R03               AFD CONC             SAS (XS11)                     R04               TPM CONG1             Group QP CCDATA               R05               QP LOADFOLL ERCS-R01         Group RADMON_U1               R06               Alarm Summary Page
CONB 1T0499A 1U1613A CONE2 1Q0340A 1V4501A _____ ERCS TPM set (Calorimetric  
_____     ERCS single point displays:           CONB         1T0499A               1U1613A CONE2         1Q0340A               1V4501A
- Auto Scaling  
_____     ERCS TPM set (Calorimetric - Auto Scaling - LEFM).
- LEFM). _____ Verify that copy machine and printers are loaded with paper. _____ Pens/Paper/Markers available on the simulator
_____     Verify that copy machine and printers are loaded with paper.
. _____ Verify 12 1 IA Compressor is in PREFERRED and 12 2 IA Compressor is in 1 st STANDBY, and   123 IA Compressor is in 2 nd STANDBY. _____ Verify R11/R12 are lined up correctly (at the R11/R12 local panel):
_____     Pens/Paper/Markers available on the simulator.
st
_____     Verify 121 IA Compressor is in PREFERRED and 122 IA Compressor is in 1 STANDBY, and nd 123 IA Compressor is in 2 STANDBY.
_____     Verify R11/R12 are lined up correctly (at the R11/R12 local panel):
___ 1. Sample pump is running.
___ 1. Sample pump is running.
___ 2. Alarms are reset.
___ 2. Alarms are reset.
___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.
___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.
___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.
___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.
_____ Set Turbine Control HMI Displays as follows:
_____     Set Turbine Control HMI Displays as follows:
___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview
___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview.
. ___ 2. U1 Turb Aux Cont (48088) to Turb Overview
___ 2. U1 Turb Aux Cont (48088) to Turb Overview.
. ___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control
___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control.
. _____ DEHC VPL set ~ 0.1 to 0.2 above current valve position (not on limiter).
_____     DEHC VPL set ~ 0.1 to 0.2 above current valve position (not on limiter).
_____ DEHC alarms cleared
_____     DEHC alarms cleared.
. _____ N51 & N52 Display Sheets for 100% power are in place as necessary
_____     N51 & N52 Display Sheets for 100% power are in place as necessary.
. _____ Headsets turned on as necessary.
_____     Headsets turned on as necessary.
_____ Procedure checklist completed. See following page.
_____     Procedure checklist completed. See following page.
_____ Peer Check performed for simulator setup
_____     Peer Check performed for simulator setup.
. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 21 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                     Page 21 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:
Before After       1C1.4 AOP1, RAPID POWER REDUCTION UNIT 1 1C12.1, LETDOWN, CHARGING, AND SEAL WATER INJECTION - UNIT 1     1C12.5, UNIT 1 BORON CONCENTRATION CONTROL 1C23 AOP2, MALFUNCTION OF TURBINE EH CONTROL SYSTEM 1C5 AOP1, UNCONTROLLED ROD MOTION 1C51.3, Pressurizer Level 1L
Before           After 1C1.4 AOP1, RAPID POWER REDUCTION UNIT 1 1C12.1, LETDOWN, CHARGING, AND SEAL WATER INJECTION -
-428 - High     1C51.4, Containment Pressure 1P
UNIT 1 1C12.5, UNIT 1 BORON CONCENTRATION CONTROL 1C23 AOP2, MALFUNCTION OF TURBINE EH CONTROL SYSTEM 1C5 AOP1, UNCONTROLLED ROD MOTION 1C51.3, Pressurizer Level 1L-428 - High 1C51.4, Containment Pressure 1P-950 - High 1E-0, REACTOR TRIP OR SAFETY INJECTION 1E-1, LOSS OF REACTOR OR SECONDARY COOLANT 1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION C47008-0409, TURBINE CONTROL SYSTEM TROUBLE C47012-0307, PRZR HI LVL CHANNEL ALERT C47012-0407, PRZR HI LVL C47012-0507, PZR LVL DEVIATION C47018-0105, CONTAINMENT HI-HI PRESS CHANNEL ALERT C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES REACTIVITY BRIEFING BINDER - BOC SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.3.1 T.S. LCO 3.3.2 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-950 - High     1E-0, REACTOR TRIP OR SAFETY INJECTION 1E-1, LOSS OF REACTOR OR SECONDARY COOLANT 1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION C47008-0409, TURBINE CONTROL SYSTEM TROUBLE C47012-0307, PRZR HI LVL CHANNEL ALERT C47012-0407, PRZR HI LVL C47012-0507, PZR LVL DEVIATION C47018-0105, CONTAINMENT HI
 
-HI PRESS CHANNEL ALERT C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F 3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES REACTIVITY BRIEFING BINDER  
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                   Page 22 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Post-Scenario Checklist
- BOC     SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.3.1 T.S. LCO 3.3.2 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
_____     LAN connected computers are cleared of information added during the scenario.
-G-RM-01.
_____     Computer generated PINGP 577 cleared.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 22 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Post-Scenario Checklist
_____     Procedure checklist completed. See previous page.
_____ LAN connected computers are cleared of information added during the scenario.
_____     Remove Pink Status Control Tags from the following equipment:
_____ Computer generated PINGP 577 cleared.
_____ Procedure checklist completed. See previous page. _____ Remove Pink Status Control Tags from the following equipment:
___ 1. CS-46935, D1 DIESEL GENERATOR
___ 1. CS-46935, D1 DIESEL GENERATOR
___ 2. CS-46424, 11 TDAFWP
___ 2. CS-46424, 11 TDAFWP
Line 992: Line 1,092:
___ 5. CS-46036, 11 CC WTR PUMP
___ 5. CS-46036, 11 CC WTR PUMP
___ 6. CS-46053, 12 CLG WTR PUMP
___ 6. CS-46053, 12 CLG WTR PUMP
_____ Magnetic placards removed:
_____   Magnetic placards removed:
___ 1. NONE   _____ Remove Yellow Caution Tags from the following equipment: ___ 1. CS-46185, 12 RHR PUMP
___ 1. NONE
___ 2. CS-46914, BUSTIE BUS 16 / BUS 26 BKR 16
_____     Remove Yellow Caution Tags from the following equipment:
-10 _____ Board-mounted EAL Table is cleaned
___ 1. CS-46185, 12 RHR PUMP
. _____ All books, note pads, and calculators put away
___ 2. CS-46914, BUSTIE BUS 16 / BUS 26 BKR 16-10
. End Of Day Checklist
_____     Board-mounted EAL Table is cleaned.
_____ Signs/placards removed and put away unless normal simulator configuration
_____     All books, note pads, and calculators put away.
. _____ Floor PCs logged off if simulator will not be used again that day
End Of Day Checklist
. _____ Instructor station returned to normal with all books, paper, and etc. put away
_____     Signs/placards removed and put away unless normal simulator configuration.
. _____ Headsets turned off and put away if simulator will not be used again that day
_____     Floor PCs logged off if simulator will not be used again that day.
. _____ Simulator reset to IC
_____     Instructor station returned to normal with all books, paper, and etc. put away.
-10 unless another IC will be used for further training
_____     Headsets turned off and put away if simulator will not be used again that day.
. _____ Simulator placed in DORT if simulator will not be used again that day
_____     Simulator reset to IC-10 unless another IC will be used for further training.
. _____ Recorder power "OFF" if simulator will not be used again that day
_____     Simulator placed in DORT if simulator will not be used again that day.
. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
_____     Recorder power "OFF" if simulator will not be used again that day.
-G-RM-01.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 23 of 26   RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE:           DAY/NIGHT SHIFT: Day         CAT 1 VENT OPENINGS: 0 ft 2  SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS
 
: 1. 1 2 RHR PUMP is OOS for corrective maintenance.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                             Page 23 of 26 RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE:                                                                                   DAY/NIGHT SHIFT: Day CAT 1 VENT OPENINGS: 0 ft2                                                      SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS
T.S. 3.5.2 Condition A was entered with 48 hours remaining.
: 1. 12 RHR PUMP is OOS for corrective maintenance.
PROTECTED EQUIPMENT D 1 DIESEL GENERATOR 1 1 TDAFWP 1 1 RHR PUMP  1 1 SI PUMP 1 1 CC PUMP 12 CLG WATER PUMP 22 CC PUMP 121 SFP HX RAD MONITORS OOS ANNUNCIATORS OOS NONE NONE OUTSTANDING SP'S FIRE DET / PROT EQP IMPAIRMENTS NONE NONE OTHER EQUIPMENT OOS / STATUS BKR 16-10 is OOS for corrective maintenance.
* T.S. 3.5.2 Condition A was entered with 48 hours remaining.
Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System. MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE NONE OPERATIONAL PLANS FOR COMING SHIFT Xenon is at equilibrium.
PROTECTED EQUIPMENT D1 DIESEL GENERATOR                         11 CC PUMP 11 TDAFWP                                    12 CLG WATER PUMP 11 RHR PUMP                                  22 CC PUMP 11 SI PUMP                                  121 SFP HX RAD MONITORS OOS                                           ANNUNCIATORS OOS NONE                                                       NONE OUTSTANDING SPS                                            FIRE DET / PROT EQP IMPAIRMENTS NONE                                                       NONE OTHER EQUIPMENT OOS / STATUS
Maintain 100% power.
* BKR 16-10 is OOS for corrective maintenance.
Place a 2 nd Letdown Orifice in service in preparation for SP 1047, Control Rod Quarterly Exercise
* Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System.
. Dilute 10 gallons 1-2 times per shift for temperature control.
MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE NONE OPERATIONAL PLANS FOR COMING SHIFT
NEW PROCEDURES / INSTRUCTIONS NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* Xenon is at equilibrium.
-G-RM-01.
* Maintain 100% power.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                       Page 24 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.
* Place a 2nd Letdown Orifice in service in preparation for SP 1047, Control Rod Quarterly Exercise.
: 1. The scenario contains objectives for the desired tasks and relevant human performance tools.
* Dilute 10 gallons 1-2 times per shift for temperature control.
Yes  No X    2. The scenario identifies key parameter response, expected alarms, and automatic actions associated with the induced perturbations
NEW PROCEDURES / INSTRUCTIONS NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
. Yes  No X   3. The scenario content adequately addresses the desired tasks, through simulator performance, instructor
 
-led training freezes, or both.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 24 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.
Yes  No X    4. Plant PRA initiating events, important equipment, and important tasks are identified.
: 1. The scenario contains objectives for the desired tasks and relevant human             Yes      No performance tools.                                                                     X
Yes  No X    5. Turnover information includes a Daily At Power or Shutdown Safety Risk Assessment.
: 2. The scenario identifies key parameter response, expected alarms, and                   Yes      No automatic actions associated with the induced perturbations.                           X
Yes  No X    6. The scenario contains procedurally driven success paths. Procedural discrepancies are identified and corrected before training is given.
: 3. The scenario content adequately addresses the desired tasks, through                   Yes      No simulator performance, instructor-led training freezes, or both.                       X
Yes  No X    7. The scenario guide includes responses for all anticipated communications to simulated personnel outside the Control Room, based on procedural guidance and standard operating practices.
: 4. Plant PRA initiating events, important equipment, and important tasks are             Yes      No identified.                                                                           X
Include estimated completion times and/or notes for use of time compression
: 5. Turnover information includes a Daily At Power or Shutdown Safety Risk                 Yes      No Assessment.                                                                           X
. Yes  No X    8. The scenario includes related industry experience. SOER, SER and similar OE recommendations are clearly identified and fully addressed.
: 6. The scenario contains procedurally driven success paths. Procedural                   Yes      No discrepancies are identified and corrected before training is given.                   X
* Yes  No  X 9. The scenario guide incorporates verification of Operator Fundamental application.
: 7. The scenario guide includes responses for all anticipated communications to           Yes      No simulated personnel outside the Control Room, based on procedural guidance             X and standard operating practices. Include estimated completion times and/or notes for use of time compression.
* Yes  No  X 10. Training elements and specific human performance elements are addressed in the scenario critique guide to be used by the critique facilitator. The critique guide includes standards for expected performance.
: 8. The scenario includes related industry experience. SOER, SER and similar               Yes      No OE recommendations are clearly identified and fully addressed.*                                 X
* Yes  No  X  11. For evaluations, it has been verified that without operator action the critical tasks will be failed.
: 9. The scenario guide incorporates verification of Operator Fundamental                   Yes      No application.*                                                                                   X
Yes  No X   Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
: 10. Training elements and specific human performance elements are addressed               Yes      No in the scenario critique guide to be used by the critique facilitator. The critique             X guide includes standards for expected performance.*
: 11. For evaluations, it has been verified that without operator action the critical       Yes      No tasks will be failed.                                                                 X Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
* For evaluations these items may be marked NO without justification.
* For evaluations these items may be marked NO without justification.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                       Page 25 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 25 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.
: 1. The desired initial conditions agreed with the reference plant with respect to reactor status, plant configuration, and system operation.
: 1. The desired initial conditions agreed with the reference plant with               Yes      No respect to reactor status, plant configuration, and system operation.             X
Yes X No  2. The simulator operated in real time during conduct of validation.
: 2. The simulator operated in real time during conduct of validation.                 Yes       No X
Yes X No  3. The simulator demonstrated expected plant response to operator input and to normal, transient, and accident conditions.
: 3. The simulator demonstrated expected plant response to operator input             Yes      No and to normal, transient, and accident conditions.                               X
Yes X No  4. The simulator permitted use of the reference plant's procedures. The scenario was completed without procedural exceptions, simulator performance exceptions, or deviation from the scenario sequence.
: 4. The simulator permitted use of the reference plants procedures. The             Yes      No scenario was completed without procedural exceptions, simulator                   X performance exceptions, or deviation from the scenario sequence.
Yes X No  5. The simulator did not "fail to cause" or "unexpectedly cause" any first principle alarm or primary automatic action.
: 5. The simulator did not fail to cause or unexpectedly cause any first           Yes      No principle alarm or primary automatic action.                                     X
Yes X No  6. Observable changes in parameters relevant to the scenario corresponded in trend and direction to reference plant's expected response. Yes X No  7. All malfunctions and other instructor interface items were functional and demonstrated the expected reference plant's response to the initiating cause. Yes X No  8. All malfunctions and other instructor interface items were initiated in the same sequence described within the simulator scenario.
: 6. Observable changes in parameters relevant to the scenario                         Yes      No corresponded in trend and direction to reference plants expected                 X response.
Yes X No  9. The scenario satisfies the learning or examination objectives without any significant simulator performance issues, or deviations from the approved scenario sequence.
: 7. All malfunctions and other instructor interface items were functional and         Yes      No demonstrated the expected reference plants response to the initiating           X cause.
Yes X No  10. Simulator fidelity has been demonstrated to be adequate for this scenario.
: 8. All malfunctions and other instructor interface items were initiated in the       Yes      No same sequence described within the simulator scenario.                           X
Yes X No    Discrepancies noted (Check "none" or list items found)
: 9. The scenario satisfies the learning or examination objectives without             Yes      No any significant simulator performance issues, or deviations from the             X approved scenario sequence.
None SMAR = Simulator Action Request SMAR:   SMAR:   SMAR:   S MAR:   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
: 10. Simulator fidelity has been demonstrated to be adequate for this                 Yes      No scenario.                                                                         X Discrepancies noted (Check none or list items found)             None SMAR = Simulator Action Request SMAR:                       SMAR:                     SMAR:                   SMAR:
-G-RM-01.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                       Page 26 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Comments:             Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
 
Validation Personnel Name Job Title / Qualification Validation Position Shawn Sarrasin Operations Instructor Lead Evaluator Nic Abney Operations Instructor Booth Driver Jeff Human Operations SRO Shift Supervisor Mark Haren Operations RO LEAD Rick Martin Operations RO RO                   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 26 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Comments:
-G-RM-01.
Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                          Page 1 of 28  SIMULATOR EXERCISE GUIDE (SEG)
Validation Personnel Name                         Job Title / Qualification         Validation Position Shawn Sarrasin                           Operations Instructor               Lead Evaluator Nic Abney                                 Operations Instructor               Booth Driver Jeff Human                               Operations SRO                       Shift Supervisor Mark Haren                               Operations RO                       LEAD Rick Martin                               Operations RO                       RO Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SITE: PRAIRIE ISLAND SEG # PI-ILT-NRC-14 0 3 S  SEG TITLE:
2014 ILT NRC SIMULATOR EVALUATION #
3  REV. # 0    PROGRAM: INITIAL LICENSE OPERATOR TRAINING
#: FL-ILT    COURSE: INITIAL LICENSE OPERATOR TRAINING
#: FL-ILT    TOTAL TIME:
2.0 HOUR  Developed by:
Shawn Sarrasin 1/18/201 4  Instructor Date    Reviewed  by:
Fredrick Collins 2/26/2014  Instructor (Simulator Scenario Development Checklist.)
Date    Validated  by:
Shawn Sarrasin 4/22/2014  Validation Lead Instructor (Simulator Scenario Validation Checklist.)
Date    Approved by:
Training Supervision Date    Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                          Page 2 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Guide Requirements Goal of Training: 1. During all plant operating conditions, the crew will demonstrate


the ability to monitor and operate the plant within the limits of the Operations Manuals and Technical Specifications.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                        Page 1 of 28 SIMULATOR EXERCISE GUIDE (SEG)
SITE: PRAIRIE ISLAND                              SEG #      PI-ILT-NRC-1403S SEG TITLE:        2014 ILT NRC SIMULATOR EVALUATION #3                        REV. #  0 PROGRAM:          INITIAL LICENSE OPERATOR TRAINING                #:    FL-ILT COURSE:          INITIAL LICENSE OPERATOR TRAINING                #:    FL-ILT TOTAL TIME: 2.0 HOUR Developed by:                          Shawn Sarrasin                              1/18/2014 Instructor                                Date Reviewed by:                          Fredrick Collins                            2/26/2014 Instructor                                Date (Simulator Scenario Development Checklist.)
Validated by:                          Shawn Sarrasin                              4/22/2014 Validation Lead Instructor                          Date (Simulator Scenario Validation Checklist.)
Approved by:
Training Supervision                            Date Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                      Page 2 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Guide Requirements
: 1. During all plant operating conditions, the crew will demonstrate Goal of                  the ability to monitor and operate the plant within the limits of the Training:                Operations Manuals and Technical Specifications.
: 2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
: 2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
Learning Objectives:
: 1. Restore RCS average coolant temperature to program per Learning                    C47013-0305.
: 1. Restore RCS average coolant temperature to program per C47013-0305. 2. Swap running charging pumps per 1C12.1
Objectives:          2. Swap running charging pumps per 1C12.1.
. 3. Diagnose and perform corrective actions for 11 Safety Injection Pump being placed in local control per C47018
: 3. Diagnose and perform corrective actions for 11 Safety Injection Pump being placed in local control per C47018-0301.
-0301. 4. Diagnose and perform corrective actions for N43, Blue Channel Power Range Nuclear Instrument
: 4. Diagnose and perform corrective actions for N43, Blue Channel Power Range Nuclear Instrument, failing high per 1C51.3.
, failing high per 1C51.3.
: 5. Diagnose and respond to a Pressurizer Spray valve failing 75%
: 5. Diagnose and respond to a Pressurizer Spray valve failing 75% open per C470 12-0508. 6. Diagnose and respond to a failure of the Reactor to automatically trip during a RCS Low Flow condition per C47017
open per C47012-0508.
-
: 6. Diagnose and respond to a failure of the Reactor to automatically trip during a RCS Low Flow condition per C47017-0301 and 1E-0.
0301 and 1E-0. 7. Diagnose and respond to 12 SG faulted into containment per  
: 7. Diagnose and respond to 12 SG faulted into containment per 1E-0 and 1E-2.
 
: 1. Full Scope Simulator Training              2. NRC Evaluation Team Resources:           3. Booth Operator (Backup Communicator)
1E-0 and 1E-2. Training Resources:
: 4. Primary Communicator Initiating Event with Core Damage Frequency:
: 1. Full Scope Simulator
Related PRA          MSLB (<1%)
: 2. N RC Evaluation Team
Information:
: 3. Booth Operator (Backup Communicator)
: 4. Primary Communicator Related PRA Information:
Initiating Event with Core Damage Frequency:
MSLB (<1%)
Important Components:
Important Components:
11 SI PUMP Important Operator Actions with Task Number:
11 SI PUMP Important Operator Actions with Task Number:
Operators fail to isolate AFW to affected SG (0.54%)
Operators fail to isolate AFW to affected SG (0.54%)
CRO 301 003 06 01 000  
CRO 301 003 06 01 000 - Faulted Steam Generator Isolation Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
- Faulted Steam Generator Isolation Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 3 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 3 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:
Before EOP Entry:
Before EOP Entry:
: 1. 11 Safety Injection Pump local
: 1. 11 Safety Injection Pump local-remote switch placed in local.
-remote switch placed in local. 2. N43, Blue Channel Power Range Nuclear Instrument, fails high.
: 2. N43, Blue Channel Power Range Nuclear Instrument, fails high.
: 3. Pressurizer Spray valve opens to the 75% position.
: 3. Pressurizer Spray valve opens to the 75% position.
: 4. Loop A RCS low flow due to Bus 11 lockout. After EOP Entry:
: 4. Loop A RCS low flow due to Bus 11 lockout.
After EOP Entry:
: 1. Reactor fails to automatically trip.
: 1. Reactor fails to automatically trip.
Abnormal Events:
Abnormal Events:
Line 1,103: Line 1,193:
: 1. 12 Steam Generator fault inside containment.
: 1. 12 Steam Generator fault inside containment.
Critical Tasks:
Critical Tasks:
: 1. E A: Manually trip the reactor from the control room before transition out of E
: 1. E A: Manually trip the reactor from the control room before transition out of E-0.
-0. 2. E F: Establish and maintain 200 GPM AFW flow to the Steam Generator(s) before transition out of E
: 2. E F: Establish and maintain 200 GPM AFW flow to the Steam Generator(s) before transition out of E-0, unless the transition is to FR-H.1, in which case the task must be initiated before RCPs are manually tripped in accordance with step 2 of FR-H.1.
-0, unless the transition is to FR
NOTE: E F only applies if BOTH AFW pumps trip on low discharge pressure.
-H.1, in which case the task must be initiated before RCPs are manually tripped in accordance with step 2 of FR-H.1. NOTE: E F only applies if BOTH AFW pumps trip on low discharge pressure. This may occur due to the fault in 12 Steam Generator.
This may occur due to the fault in 12 Steam Generator.
: 3. E A: Isolate the faulted STEAM GENERATOR before transition out of E
: 3. E A: Isolate the faulted STEAM GENERATOR before transition out of E-2, unless the transition is to FR-P.1, in which case the task must be completed prior to checking if safety injection should be terminated per step 6 of FR-P.1.
-2, unless the transition is to FR
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-P.1, in which case the task must be completed prior to checking if safety injection should be terminated per step 6 of FR
 
-P.1. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 4 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO OVERVIEW:
-G-RM-01.
INITIAL CONDITIONS:                                 EQUIPMENT OOS
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 4 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO OVERVIEW:
* Exposure: BOC
INITIAL CONDITIONS:
* 1PT-485, Turbine First Stage Pressure, is failed high.
EQUIPMENT OOS Exposure: BOC 1PT-485, Turbine First Stage Pressure, is failed high.
* Power: 50%
Power: 5 0% 123 Air Compressor Boron (CB):
* 123 Air Compressor
14 82 ppm  Temperature:
* Boron (CB): 1482 ppm
5 56&deg;F   Pressure: 2235 psig   Xenon: Equilibrium   Rods: "D" @
* Temperature: 556&deg;F
1 81  Generator:
* Pressure: 2235 psig
2 72 MW   SEQUENCE OF EVENTS:
* Xenon: Equilibrium
Event 1: Restore RCS Average Coolant Temperature to Program Temperature 1PT-485, Turbine First Stage Pressure, failed high prior to shift turnover
* Rods: D @ 181
. The previous crew has already responded per 1C5 AOP1, Uncontrolled Rod Motion, and 1C51.2, Instrument Failure Guide.
* Generator: 272 MW SEQUENCE OF EVENTS:
RCS Tavg is at 556
Event 1: Restore RCS Average Coolant Temperature to Program Temperature
&deg;F and Program Temperature is 553&deg;F. Rods stepped out six steps prior to the previous crew placing Rods in manual.
* 1PT-485, Turbine First Stage Pressure, failed high prior to shift turnover.
The crew will step rods in six steps in increments determined by the RO and SRO
* The previous crew has already responded per 1C5 AOP1, Uncontrolled Rod Motion, and 1C51.2, Instrument Failure Guide.
. Each rod step will change RCS Tavg approximately 0.5&deg;F. Event 2: Swap Running Charging Pumps 11 and 1 2 Charging Pumps are initially running.
* RCS Tavg is at 556&deg;F and Program Temperature is 553&deg;F.
The crew will swap charging pumps to 11 and 1 3 running and 1 2 secured per 1C12.1. Event 3: 11 Safety Injection Pump Local
* Rods stepped out six steps prior to the previous crew placing Rods in manual.
-Remote Switch placed in LOCAL Annunciator 47018
* The crew will step rods in six steps in increments determined by the RO and SRO.
-0301, 11 SI PUMP LOCAL CONTROL SI AUTO START BLOCKED, will alarm.
* Each rod step will change RCS Tavg approximately 0.5&deg;F.
After being dispatched, an out
Event 2: Swap Running Charging Pumps
-plant operator will discover the local
* 11 and 12 Charging Pumps are initially running.
-remote switch for 11 SI Pump in local.
* The crew will swap charging pumps to 11 and 13 running and 12 secured per 1C12.1.
The SS will enter T.S. LCO 3.5.2 Condition A for one train of ECCS inoperable.
Event 3: 11 Safety Injection Pump Local-Remote Switch placed in LOCAL
The crew will direct the out
* Annunciator 47018-0301, 11 SI PUMP LOCAL CONTROL SI AUTO START BLOCKED, will alarm.
-plant operator to place 11 SI Pump in remote.
* After being dispatched, an out-plant operator will discover the local-remote switch for 11 SI Pump in local.
Event 4: N43, Blue Channel Power Range Instrument, fails HIGH Rods will NOT step in because rods are still in manual due to 1st Stage Pressure Instrument failed high.
* The SS will enter T.S. LCO 3.5.2 Condition A for one train of ECCS inoperable.
The SS will enter T.S. LCO 3.3.1 Conditions A, D, E, Q, and R.
* The crew will direct the out-plant operator to place 11 SI Pump in remote.
The crew will remove N43 from service per 1C51.3.
Event 4: N43, Blue Channel Power Range Instrument, fails HIGH
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* Rods will NOT step in because rods are still in manual due to 1st Stage Pressure Instrument failed high.
-G-RM-01.
* The SS will enter T.S. LCO 3.3.1 Conditions A, D, E, Q, and R.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 5 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Event 5: Pressurizer Spray Valve Drifts Open The RCS Loop A Pressurizer Spray valve slowly opens to the 75% position.
* The crew will remove N43 from service per 1C51.3.
The crew will place the Pressurizer Spray valve in manual per C47012
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-0508. The Pressurizer Spray valve will close.
 
Event 6: Loop A RCS Loss of Flow Bus 11 locks out.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 5 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Event 5: Pressurizer Spray Valve Drifts Open
Loop A RCS loss of flow occurs due to loss of power to 11 RCP. The reactor will fail to automatically trip.
* The RCS Loop A Pressurizer Spray valve slowly opens to the 75% position.
The crew will manually trip the reactor.
* The crew will place the Pressurizer Spray valve in manual per C47012-0508.
The crew will enter 1E
* The Pressurizer Spray valve will close.
-0 and then transition to 1ES
Event 6: Loop A RCS Loss of Flow
-0.1, Reactor Trip Recovery.
* Bus 11 locks out.
Event 7: 1 2 Steam Generator Faults into Containment   RCS pressure will lower rapidly.
* Loop A RCS loss of flow occurs due to loss of power to 11 RCP.
12 SG pressure will lower slowly.
* The reactor will fail to automatically trip.
Containment pressure will rise slowly.
* The crew will manually trip the reactor.
Safety Injection will automatically actuate or be manually actuated by the crew.
* The crew will enter 1E-0 and then transition to 1ES-0.1, Reactor Trip Recovery.
The crew will transition to 1E
Event 7: 12 Steam Generator Faults into Containment
-0. The crew will diagnose a Faulted SG and transition to 1E
* RCS pressure will lower rapidly.
-2. The crew will isolate 12 Steam Generator.
* 12 SG pressure will lower slowly.
The crew will transition to 1E
* Containment pressure will rise slowly.
-1. A red or orange path may occur in the Integrity CSF. If this occurs, the crew will transition to 1FR
* Safety Injection will automatically actuate or be manually actuated by the crew.
-P.1.
* The crew will transition to 1E-0.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* The crew will diagnose a Faulted SG and transition to 1E-2.
-G-RM-01.
* The crew will isolate 12 Steam Generator.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 6 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Simulator Setup:
* The crew will transition to 1E-1.
NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.
* A red or orange path may occur in the Integrity CSF. If this occurs, the crew will transition to 1FR-P.1.
: 1. If available, reset the simulator to IC
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-263 and place in RUN.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 6 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Simulator Setup:
NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.
: 1. If available, reset the simulator to IC-263 and place in RUN.
: 2. If IC-263 is NOT available:
: 2. If IC-263 is NOT available:
: a. Reset to IC
: a. Reset to IC-8.
-8. b. Place the simulator in R UN. c. Place CS-46098, 123 AIR COMPRESSOR, in PULLOUT.
: b. Place the simulator in RUN.
: c. Place CS-46098, 123 AIR COMPRESSOR, in PULLOUT.
: d. Place CS-49011, 122 AIR COMPRESSOR, in PREFERRED.
: d. Place CS-49011, 122 AIR COMPRESSOR, in PREFERRED.
: e. Place CS-49012, 123 AIR COMPRESSOR, in 1 st STANDBY. f. Insert Remote IA101 (CP 7) to CLOSED.
: e. Place CS-49012, 123 AIR COMPRESSOR, in 1st STANDBY.
: g. Insert System Override RX226 to 616 (1 st Stage Pressure Fails High).
: f. Insert Remote IA101 (CP-40-7) to CLOSED.
: h. Place CS-46280, ROD BANK SELECTOR, in MANUAL after rods step out 6 steps. i. Place CS-46338, STEAM DUMP MODE, in STM PRESS.
: g. Insert System Override RX226 to 616 (1st Stage Pressure Fails High).
: h. Place CS-46280, ROD BANK SELECTOR, in MANUAL after rods step out 6 steps.
: i. Place CS-46338, STEAM DUMP MODE, in STM PRESS.
: 3. Verify the ROD DEVIATION alarm is CLEARED as follows:
: 3. Verify the ROD DEVIATION alarm is CLEARED as follows:
: a. Log into the ERCS terminal with user "OVRD" and password "DUTY" (if needed). b. Go to ERCS Screen RBU (Rod Bank Update).
: a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
: c. Enter 1 81 as the new value for point 1U0052A, ROD POS BNK D.
: b. Go to ERCS Screen RBU (Rod Bank Update).
: d. Select "Apply".
: c. Enter 181 as the new value for point 1U0052A, ROD POS BNK D.
: e. Verify Annunciator 47013
: d. Select Apply.
-0507, COMPUTER ALARM / ROD DEVIATION / SEQUENCING, has cleared.
: e. Verify Annunciator 47013-0507, COMPUTER ALARM / ROD DEVIATION /
SEQUENCING, has cleared.
: 4. Verify the Pen Recorder for RCS Tavg and Tref are set correctly as follows:
: 4. Verify the Pen Recorder for RCS Tavg and Tref are set correctly as follows:
: a. Log into the ERCS terminal with user "OVRD" and password "DUTY" (if needed). b. Go to ERCS Screen PEN_TREND (Pen Trend Configuration).
: a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
: b. Go to ERCS Screen PEN_TREND (Pen Trend Configuration).
: c. Enter 550 as the new Min EU value for Pen 1U9001A (point 1T0499A).
: c. Enter 550 as the new Min EU value for Pen 1U9001A (point 1T0499A).
: d. Enter 560 as the new Max EU value for Pen 1U9001A (point 1T0499A).
: d. Enter 560 as the new Max EU value for Pen 1U9001A (point 1T0499A).
: e. Enter 550 as the new Min EU value for Pen 1U9002A (point 1T0496A).
: e. Enter 550 as the new Min EU value for Pen 1U9002A (point 1T0496A).
: f. Enter 560 as the new Max EU value for Pen 1U9002A (point 1T0496A).
: f. Enter 560 as the new Max EU value for Pen 1U9002A (point 1T0496A).
: 5. If available, run schedule file P I-ILT-NRC-14 0 3 S.sch as follows:
: 5. If available, run schedule file PI-ILT-NRC-1403S.sch as follows:
: a. Select open file in the Schedule application.
: a. Select open file in the Schedule application.
: b. Locate schedule file.
: b. Locate schedule file.
: c. Open schedule file by double clicking it.
: c. Open schedule file by double clicking it.
: d. Run the schedule file by pressing the "Stopped" button on the toolbar.
: d. Run the schedule file by pressing the Stopped button on the toolbar.
: e. Verify the schedule file is running.
: e. Verify the schedule file is running.
: 6. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
: 6. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
: 7. If desired, start Scenario Based Testing Data Collection Program.
: 7. If desired, start Scenario Based Testing Data Collection Program.
: 8. Complete the "Simulator Setup Checklist."
: 8. Complete the "Simulator Setup Checklist.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 7 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
Page 7 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                             CREW               EXPECTED STUDENT RESPONSES POS
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES
: 1. SIMULATOR PRE-BRIEF:
: 1. SIMULATOR PRE
: a. The Simulator Pre-Brief is conducted prior to the crew entering the simulator.
-BRIEF: a. The Simulator Pre
: b. Review Unit 1 LPEO / PEO Turnover Log.
-Brief is conducted prior to the crew entering the simulator.
: c. Perform a pre-job brief for the following activities:
: b. Review Unit 1 LPEO / PEO Turnover Log
: 1) Restore Tave to program temperature per C47013-0305:
. c. Perform a pre-job brief for the following activities:
(a) 1C51.2 actions are complete for the failed instrument with the exception of restoring Tavg to program temperature.
: 1) Restore Tave to program temperature per C47013
(b) Rods are in MANUAL.
-0305: (a) 1C51.2 actions are complete for the failed instrument with the exception of restoring Tavg to program temperature.
(c) Hand out copy of ERCS trend showing (1) RCS Tavg.
(b) Rods are in MANUAL.
(2) RCS Tref.
(c) Hand out copy of ERCS trend showing (1) RCS Tavg. (2) RCS Tref. (3) Bank D Rod Height
(3) Bank D Rod Height.
. (d) This activity is to be performed after shift turnover is complete.
(d) This activity is to be performed after shift turnover is complete.
(e) If crew questions why Tavg was not restored prior to performing other actions in 1C51.2, then inform crew that Plant Management used the Operational Decision Making Process and determined to restore Tavg on a latter step.
(e) If crew questions why Tavg was not restored prior to performing other actions in 1C51.2, then inform crew that Plant Management used the Operational Decision Making Process and determined to restore Tavg on a latter step.
: 2) After Tavg is restored to program, the crew will swap charging pumps per Section 5.4.1 of 1C12.1
: 2) After Tavg is restored to program, the crew will swap charging pumps per Section 5.4.1 of 1C12.1.
. (a) 11 and 1 2 Charging pumps are currently running. (b) 1 3 Charging Pump Suction Stabilizer PM is complete and ready for PMT.
(a) 11 and 12 Charging pumps are currently running.
(c) 1 3 Charging Pump desurger has already been checked by the out
(b) 13 Charging Pump Suction Stabilizer PM is complete and ready for PMT.
-plant operator.
(c) 13 Charging Pump desurger has already been checked by the out-plant operator.
(d) The crew will start 1 3 Charging Pump and secure 1 2 Charging Pump.
(d) The crew will start 13 Charging Pump and secure 12 Charging Pump.
(e) The Lead RO will perform this evolution.
(e) The Lead RO will perform this evolution.
(f) The crew will also brief this evolution prior to entering the simulator.
(f) The crew will also brief this evolution prior to entering the simulator.
: 2. COMPLETE TURNOVER:  
: 2. COMPLETE TURNOVER:
: a. Crew performs a walk down of the control boards
: a. Crew performs a walk down of the control boards.
. b. Review PRA Printout.
: b. Review PRA Printout.
: c. Crew takes the duty.
: c. Crew takes the duty.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 8 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
Page 8 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 1     3. After the crew has assumed the duty, they will restore                 C47013-0305, AUCTIONEERED TAVG-TREF Tavg to program.                                                     DEVIATION RO/SS
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 1 3. After the crew has assumed the duty, they will restore Tavg to program. RO/SS C4701 3-030 5 , AUCTIONEERED TAVG
* Check Tavg-Tref temperature deviation.
-TREF DEVIATION  Check Tavg
* Recognize Tref is failed high due to instrument failure and use Figure C1-5 to determine program temperature.
-Tref temperature deviation.
* Return Tavg to program using manual rod control.
Recognize Tref is failed high due to instrument failure and use Figure C1
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-5 to determine program temperature
 
. Return Tavg to program using manual rod control.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 9 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 2     4. After the crew has restored Tavg to program                           1C12.1, LETDOWN, CHARGING, AND SEAL WATER temperature, they will swap charging pumps so that 11               INJECTION - UNIT 1 and 13 are running.
-G-RM-01.
* Verify 13 Charging Pump discharge desurger is
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
: a. When contacted as the out-plant operator to verify 13        LEAD    pressurized.
Page 9 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
Charging Pump discharge desurger is pressurized,
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 2 4. After the crew has restored Tavg to program temperature, they will swap charging pumps so that 11 and 1 3 are running.
* Transfer the speed control for 11 Charging Pump to report the 13 Charging Pump discharge desurger is                   Manual per C7.
: a. When contacted as the out-plant operator to verify 1 3 Charging Pump discharge desurger is pressurized, report the 1 3 Charging Pump discharge desurger is pressurized in accordance with Section 5.13.
pressurized in accordance with Section 5.13.
: b. If contacted as the out-plant operator to check 1 3 Charging Pump suction stabilizer, report no issues noted. LEAD  1C12.1, LETDOWN, CHARGING, AND SEAL WATER INJECTION
* Verify 13 Charging Pump speed controller is at
- UNIT 1  Verify 1 3 Charging Pump discharge desurger is pressurized
: b. If contacted as the out-plant operator to check 13                  minimum.
. Transfer the speed control for 11 Charging Pump to Manual per C7.
Charging Pump suction stabilizer, report no issues
Verify 1 3 Charging Pump speed controller is at minimum. Reduce 11 Charging Pump speed until seal injection flow drops to approximately six gpm.
* Reduce 11 Charging Pump speed until seal injection noted.                                                              flow drops to approximately six gpm.
Verify charging pump discharge header pressure 1PI
* Verify charging pump discharge header pressure 1PI-133 is less than 2400 psig.
-133 is less than 2400 psig.
* Verify 13 Charging Pump control switch green light is LIT and white light is OFF.
Verify 1 3 Charging Pump control switch green light is "LIT" and white light is "OFF".
* Start 13 Charging Pump.
Start 1 3 Charging Pump.
* Adjust 11 Charging Pump speed to maintain charging pump discharge pressure, 1PI-133 less than 2500 psig and approximately 9.5 gpm seal injection.
Adjust 11 Charging Pump speed to maintain charging pump discharge pressure, 1PI
* Ensure 12 Charging Pump speed is at minimum and seal injection flow is approximately 9.5 gpm.
-133 less than 2500 psig and approximately 9.5 gpm seal injection.
* Stop 12 Charging Pump.
Ensure 1 2 Charging Pump speed is at minimum and seal injection flow is approximately 9.5 gpm.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Stop 1 2 Charging Pump.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                    Page 10 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW          EXPECTED STUDENT RESPONSES POS EVENT 3      5. When charging pumps have been swapped, and/or at                      C47018-0301, 11 SI PUMP LOCAL CONTROL SI AUTO the discretion of the lead evaluator, then enter:                    START BLOCKED Trigger 3, 11 SI PUMP LCL/REM-START/STOP,                      LEAD
* Dispatch an operator to investigate.
switch to LOCAL.
* Verify CS-46178, 11 SI PUMP, is in desired position,
: a. When contacted as the out-plant operator to                          then return CS-19624, 11 SI PUMP LCL/REM-investigate 11 SI Pump, wait 1 minute and report the                START/STOP, selector switch to REMOTE.
11 SI Pump Local-Remote Switch is in the LOCAL                SS
* Refer to T.S. 3.5.2. and T.S. 3.5.3.
position and it was inadvertently bumped by NPSAs                          o Enter T.S LCO 3.5.2 Condition A - Restore cleaning the area.                                                            11 SI Pump to operable within 72 hours.
: b. When contacted as the out-plant operator to place                            o T.S. LCO 3.5.3 is only applicable in Mode 4 CS-19624 to REMOTE, then wait 1 minute and                                    and Unit 1 is currently in Mode 1.
enter:
Trigger 13, 11 SI PUMP LCL/REM-START/STOP, switch to REMOTE.
: 6. Plant Response:
: a. Annunciator 47018-0301, 11 SI PUMP LOCAL CONTROL SI AUTO START BLOCKED.
: b. 11 SI Pump Green indicating light goes OFF.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 11 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
-G-RM-01.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 4     7. When 11 SI Pump Remote Control is restored, and/or at                 C47013-0101, 0102, 0103, 0203, NIS POWER RANGE the discretion of the lead evaluator, then enter:                   CHANNEL ALERT AND ALARMS Trigger 4, N43 Blue Channel Power Range Nuclear                 RO
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
* Determine N43 is the initiating channel by observing Instrument fails HIGH.                                                  NIS indications.
Page 10 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
: a. If contacted as I&C to trip bistables, inform the crew
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 3 5. When charging pumps have been swapped , and/or at the discretion of the lead evaluator, then enter
* Determine a reactor trip is NOT necessary.
: Trigger 3 , 11 SI PUMP LCL/
two I&C Technicians will be available in 1 hour.
R EM-START/STOP, switch to "LOCAL"
* Determine there is NO dropped, misaligned, or stuck
. a. When contacted as the out
: b. If contacted as the Operations Management,                           rod.
-plant operator to investigate 11 SI Pump, wait 1 minute and report the 11 SI Pump Local
acknowledge the report of the failure, and agree to         LEAD
-Remote Switch is in the LOCAL position and it was inadvertently bumped by NPSAs cleaning the area.
* Refer to 1C51, INSTRUMENT FAILURE GUIDE.
: b. When contacted as the out
make other notifications to the NRC, Duty Station Manager, etc. as asked.
-plant operator to place CS-19624 to REMOTE, then wait 1 minute and enter: Trigger 13 , 11 SI PUMP LCL/REM
1C51.3, Power Range Nuclear Instrument N High
-START/STOP, switch to "REMOTE
: c. If contacted as the FIN Team Supervisor, inform the           RO crew that you will write a work order and assign an
". 6. Plant Response:
* Determine rod control is already in manual.
: a. Annunciator 47018
I&C Supervisor to investigate.                                SS
-0301, 11 SI PUMP LOCAL CONTROL SI AUTO START BLOCKED
* Enter T.S. LCO 3.3.1 Condition A - Reference Table 3.3.1-1 immediately.
. b. 11 SI Pump Green indicating light goes OFF.
LEAD SS  C47018-0301, 11 SI PUMP LOCAL CONTROL SI AUTO START BLOCKED Dispatch an operator to investigate
. Verify CS-46178, 11 SI PUMP, is in desired position, then return CS
-19624, 11 SI PUMP LCL/REM
-START/STOP, selector switch to "REMOTE".
Refer to T.S. 3.5.2. and T.S. 3.5.3.
o Enter T.S LCO 3.5.2 Condition A
- Restore 11 SI Pump to operable within 72 hours.
o T.S. LCO 3.5.3 is only applicable in Mode 4 and Unit 1 is currently in Mode 1.
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
Page 11 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 4        
: 7. When 11 SI Pump Remote Control is restored, and/or at the discretion of the lead evaluator, then enter
: Trigger 4, N43 Blue Channel Power Range Nuclear Instrument fails HIGH.
: a. If contacted as I&C to trip bistables, inform the cre w two I&C Technicians will be available in 1 hour. b. If contacted as the Operations Management, acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station Manager, etc. as asked.
: c. If contacted as the FIN Team Supervisor, inform the crew that you will write a work order and assign an I&C Supervisor to investigate.
: 8. Plant Response:
: 8. Plant Response:
: a. N43 indication will peg high.
* Enter T.S. LCO 3.3.1 Condition D and Condition E -
: b. Rods will NOT move because they are already in manual. c. The following annunciators will be received:
: a. N43 indication will peg high.                                       Place N43 channel in trip within 6 hours or be in Mode
: 1) 47013-0101, NIS POWER RANGE POS FLUX RATE CH ALERT.
: b. Rods will NOT move because they are already in                       3 in 12 hours. SR 3.2.4.2 is NOT required since manual.                                                             thermal power is less than 85%.
: 2) 47013-0102, NIS POWER RANGE HI SETPOINT CH ALERT.
: c. The following annunciators will be received:
: 3) 47013-0103, NIS POWER RANGE OVERPOWER ROD WITHDRAWAL STOP.
* Enter T.S. LCO 3.3.1 Condition Q - Verify interlock is
: 4) 47013-0203, NIS POWER RANGE CHANNEL DEVIATION.
: 1) 47013-0101, NIS POWER RANGE POS FLUX                             in required state for existing conditions (P10 Aqua RATE CH ALERT.                                                  Light LIT) within 1 hour or be in Mode 3 in 7 hours.
RO LEAD  R O  SS LEAD C47013-0101, 0102, 0103, 0203, NIS POWER RANGE CHANNEL ALERT AND ALARMS Determine N43 is the initiating channel by observing NIS indications.
: 2) 47013-0102, NIS POWER RANGE HI
Determine a reactor trip is NOT necessary
* Enter T.S. LCO 3.3.1 Condition R - Verify interlock is SETPOINT CH ALERT.                                             in required state for existing conditions (P7, P8, & P9
. Determine there is NO dropped, misaligned, or stuck rod. Refer to 1C51, INSTRUMENT FAILURE GUIDE.
: 3) 47013-0103, NIS POWER RANGE                                     Aqua Lights NOT LIT) within 1 hour or be in Mode 2 in OVERPOWER ROD WITHDRAWAL STOP.                                  7 hours.
1C51.3, Power Range Nuclear Instrument N High  Determine rod control is already in manual.
: 4) 47013-0203, NIS POWER RANGE CHANNEL                     LEAD
Enter T.S. LCO 3.3.1 Condition A
* Remove N-43 from service as follows:
- Reference Table 3.3.1-1 immediately.
DEVIATION.
Enter T.S. LCO
* Place Rod Stop Bypass switch in the N-43 position.
* Place Power Mismatch Bypass switch in the N-43 position.
* Place Upper Section Current Comparator Defeat switch in the N-43 position and verify the Upper Section channel Defeat Light is LIT.
* Place Lower Section Current Comparator Defeat Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                    Page 12 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW          EXPECTED STUDENT RESPONSES POS EVENT 4                                                                                switch in the N-43 position and verify the Lower (cont)                                                                          LEAD  Section channel Defeat Light is LIT.
* Place Comparator Channel Defeat switch in the N-43 position and verify Comparator Defeat Light is LIT.
* Remove and concurrently verify removal of the N-43 instrument power fuses.
* Remove and concurrently verify removal of the N-43 control power fuses.
* Verify 47013-0101, 0102, 0201, 0202, and 47014-RO    0303 annunciators are received.
* Verify 44178-0306, 0307, and 44205-0304 status lights LIT.
* Determine Tavg is matched to program temperature.
* Determine to NOT place rod control to AUTO due to P-485 Turbine First Stage Pressure instrument failure.
* Call I&C to trip bistables.
* Log Delta I for N41, N42, and N44 at 30 min intervals.
* Verify the NR-45 recorder is selected to an operable channel.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


====3.3.1 Condition====
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 13 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
D and Condition E
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 5     9. When N-43 is removed from service (except for tripping                 C47012-0508, PRZR HI/LO PRESS bistables) and/or at the discretion of the lead evaluator,
- Place N43 channel in trip within 6 hours or be in Mode 3 in 12 hours. SR 3.2.4.2 is NOT required since thermal power is less than 85%.
* Determine pressure is low.
Enter T.S. LCO 3.3.1 Condition Q - Verify interlock is in required state for existing conditions (P10 Aqua Light LIT) within 1 hour or be in Mode 3 in 7 hours. Enter T.S. LCO 3.3.1 Condition R
enter:                                                           RO
- Verify interlock is in required state for existing conditions (P7, P8, & P9 Aqua Lights NOT LIT) within 1 hour or be in Mode 2 in 7 hours. Remov e N-43 from service as follows:
* Verify all pressurizer heaters ON.
Place Rod Stop Bypass switch in the "N
Trigger 5, Pressurizer Spray Valve PCV-431 drifts to
-43" position.
* Verify PORVs, CV-31231 and CV-31232, are closed.
Place Power Mismatch Bypass switch in the "N
75% open.
-43" position. Place Upper Section Current Comparator Defeat switch in the "N-43" position and verify the Upper Section channel Defeat Light is LIT.
* Verify both spray valves CLOSED.
Place Lower Section Current Comparator Defeat Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
: a. If contacted as the Operations Management,
-G-RM-01.
* Verify CV-31329, AUX PRZR SPRAY, is closed.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
acknowledge the report of the failure, and agree to
Page 12 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
* Verify pressurizer pressure control in automatic and make other notifications to the NRC, Duty Station                   functions properly.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 4 (cont)                                  LEAD        RO  switch in the "N
Manager, etc. as asked.
-43" position and verify the Lower Section channel Defeat Light is LIT.
* Refer to T.S. 3.4.1 and ensure required DNB
Place Comparator Channel Defeat switch in the "N
: b. If contacted as the FIN Team Supervisor, inform the           SS parameters are met.
-43" position and verify Comparator Defeat Light is LIT. Remove and concurrently verify removal of the N
crew that you will write a work order and assign a
-43 instrument power fuses.
* If Pressurizer pressure drops below 2175 psig, then Maintenance Supervisor to investigate.
Remove and concurrently verify removal of the N
enter T.S. LCO 3.4.1 Condition A - Restore RCS DNB parameter(s) to within limit in 2 hours (i.e. restore
-43 control power fuses.
Verify 47013
-0101, 0102, 0201, 0202, and 47014
-0303 annunciators are received.
Verify 44178
-0306, 0307, and 44205-0304 status lights LIT.
Determine Tavg is matched to program temperature.
Determine to NOT place rod control to AUTO due to P-485 Turbine First Stage Pressure instrument failure.
Call I&C to trip bistables.
Log Delta I for N41, N42, and N44 at 30 min intervals.
Verify the NR
-45 recorder is selected to an operable channel.
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
Page 13 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 5 9. When N-43 is removed from service (except for tripping bistables) and/or at the discretion of the lead evaluator, enter: Trigger 5, Pressurizer Spray Valve P CV-431 drifts to 75% open. a. If contacted as the Operations Management, acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station Manager, etc. as asked.
: b. If contacted as the FIN Team Supervisor, inform the crew that you will write a work order and assign a Maintenance Supervisor to investigate.
: 10. Plant Response:
: 10. Plant Response:
pressurizer pressure above 2175 psig).
: a. Pressurizer pressure lowers slowly.
: a. Pressurizer pressure lowers slowly.
: b. Pressure will reach 1930 psig in approximately two minutes with NO operator action.
: b. Pressure will reach 1930 psig in approximately two minutes with NO operator action.
: c. Pressurizer Heaters turn ON.
: c. Pressurizer Heaters turn ON.
CONTIGE NCY If the crew trips the reactor due to low pressurizer pressure, then skip Event 6 and proceed to Event 7 after the crew transitions to 1ES
CONTIGENCY If the crew trips the reactor due to low pressurizer pressure, then skip Event 6 and proceed to Event 7 after the crew transitions to 1ES-0.1, Reactor Trip Recovery.
-0.1, Reactor Trip Recovery.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


RO 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 14 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
 
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 6     11. When the plant is stable, and/or at the discretion of the             C47017-0301, ONE LOOP LO FLOW OR RCP BKR lead evaluator, then enter:                                           OPEN REACTOR TRIP Trigger 6, Loss of Loop A RCS flow due to Bus 11                 RO
SS C47012-0508, PRZR HI/LO PRESS Determine pressure is low.
* Perform 1E-0.
Verify all pressurizer heaters ON.
Lockout.
Verify PORVs, CV
: a. Upon hearing the announcement of Reactor Trip, or RO/  1E-0, REACTOR TRIP OR SAFETY INJECTION when called as the Turbine Building Operator to LEAD
-31231 and CV
* Determine the reactor did NOT automatically trip.
-31232, are closed.
isolate the Unit 1 MSRs per Attachment J, then open and run schedule file E-0_Att-J.sch located in
Verify both spray valves CLOSED.
* Manually trip the reactor.
Verify CV-31329, AUX PRZR SPRAY, is closed.
X:\\Trex_PI\Lightning\Schedule\EOPs. When the
Verify pressurizer pressure control in automatic and functions properly.
* Verify turbine trip.
Refer to T.S. 3.4.1 and ensure required DNB parameters are met.
isolation is complete, inform the crew the MSRs are
If Pressurizer pressure drops below 2175 psig, then enter T.S. LCO 3.4.1 Condition A
* Verify both safeguards buses are energized.
- Restore RCS DNB parameter(s) to within limit in 2 hours (i.e. restore pressurizer pressure above 2175 psig).
isolated.                                                     SS
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
* Determine SI is NOT actuated.
-G-RM-01.
* Transition to 1ES-0.1.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
: 12. Plant Response:
Page 14 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
: a. Annunciators for a Bus 11 Lockout.                           RO/  1ES-0.1, REACTOR TRIP RECOVERY
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 6 11. When the plant is stable, and/or at the discretion of the lead evaluator, then enter:
: b. 11 RCP NOT running indication.                               LEAD/
Trigger 6, Loss of Loop A RCS flow due to Bus 11 Lockout. a. Upon hearing the announcement of Reactor Trip, or when called as the Turbine Building Operator to isolate the Unit 1 MSRs per Attachment J, then open and run schedule file E-0_Att-J.sch located in X:\\Trex_PI\Lightning\Schedule\EOPs. When the isolation is complete, inform the crew the MSRs are isolated. 12. Plant Response:
* Announce Unit 1 Reactor Trip.
: a. Annunciators for a Bus 11 Lockout.
: c. Loop A RCS flow lowers rapidly.                                SS
: b. 11 RCP NOT running indication. c. Loop A RCS flow lowers rapidly.
* Determine Steam Dump is already in pressure mode.
: d. Annunciator C47017
: d. Annunciator C47017-0301 (Reactor Trip First Out) is
-0301 (Reactor Trip First Out) is received. e. The reactor fails to automatically trip.
* Check RCS temperatures.
received.
* Check Cooling Water Header Pressures greater than
: e. The reactor fails to automatically trip.
75 psig.
: f. The reactor is capable of a manual trip.
: f. The reactor is capable of a manual trip.
CRITICAL TASK Manually trip the reactor from the control room before transition out of E
* Notify Turbine Building Operator to Isolate Unit 1 MSRs per ATTACHMENT J.
-0. EMERGENCY PLAN CLASSIFICATION ALERT - SA2.1 due to the reactor failing to automatically trip during the RCS Low Flow condition and the crew successfully manually tripping the reactor.
CRITICAL TASK Manually trip the reactor from the control room before
* Check FW Status.
transition out of E-0.
EMERGENCY PLAN CLASSIFICATION ALERT - SA2.1 due to the reactor failing to automatically trip during the RCS Low Flow condition and the crew successfully manually tripping the reactor.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


RO  RO/ LEAD  SS  RO/ LEAD/ SS C4701 7-0 3 0 1 , ONE LOOP LO FLOW OR RCP BKR OPEN REACTOR TRIP Perform 1E
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 15 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
-0. 1E-0, REACTOR TRIP OR SAFETY INJECTION Determine the reactor did NOT automatically trip.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW           EXPECTED STUDENT RESPONSES POS EVENT 7     13. After the crew has transitioned to 1ES-0.1 and/or at the             1ES-0.1, REACTOR TRIP RECOVERY, INFO PAGE discretion of the lead evaluator, then enter:
Manually trip the reactor.
* Actuate SI and go to 1E-0 Step 1 if either condition Trigger 7, 12 Steam Generator Fault inside                       SS listed below occurs:
Verify turbine trip.
Containment.                                                                    o RCS subcooling less than 20&deg;F.
Verify both safeguards buses are energized.
: a. If not completed during Event 6, then open and run                           o PRZR level cannot be maintained >5%.
Determine SI is NOT actuated.
schedule file E-0_Att-J.sch per step 11 above.
Transition to 1ES
: b. Upon hearing the announcement of Safety Injection, 1E-0, REACTOR TRIP OR SAFETY INJECTION or when called as the Turbine Building Operator to RO/
-0.1. 1ES-0.1, REACTOR TRIP RECOVERY Announce "Unit 1 Reactor Trip".
* Verify Reactor Trip.
Determine Steam Dump is already in pressure mode.
secure the Turbine Building Roof Exhausters, wait 2 LEAD
Check RCS temperatures.
* Verify Turbine Trip.
Check Cooling Water Header Pressures greater than 75 psig. Notify Turbine Building Operator to Isolate Unit 1 MSRs per ATTACHMENT J.
minutes and report the Turbine Building Roof Exhausters are all secured.
Check FW Status.
* Verify both Safeguards buses energized.
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
: c. If Control Room personnel ask if Unit 2 personnel are
-G-RM-01.
* Determine SI is required or already actuated.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
available to perform Attachment L, then inform the                         o Either SG pressure < 530 psig.
Page 15 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
Control Room that Unit 2 personnel are NOT                                 o PRZR pressure < 1830 psig.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 7        
available for performing Attachment L.                                      o Containment pressure > 3.5 psig.
: 13. After the crew has transitioned to 1ES
* Manually actuate SI if it did not already actuate.
-0.1 and/or at the discretion of the lead evaluator, then enter:
: 14. Plant Response:                                                 LEAD
Trigger 7, 12 Steam Generator Fault inside Containment.
* Perform Attachment L (see pages 16 & 17).
: a. If not completed during Event 6, then open and run schedule file E-0_Att-J.sch per step 11 above.
: b. Upon hearing the announcement of Safety Injection, or when called as the Turbine Building Operator to secure the Turbine Building Roof Exhausters, wait 2 minutes and report the Turbine Building Roof Exhausters are all secured.
: c. If Control Room personnel ask if Unit 2 personnel are available to perform Attachment L, then inform the Control Room that Unit 2 personnel are NOT available for performing Attachment L.
: 14. Plant Response:
: a. Pressurizer pressure and level rapidly lower.
: a. Pressurizer pressure and level rapidly lower.
: b. SI will automatically actuate when Containment pressure reaches 3.5 psig.
* Check AFW Status:
CRITICAL TASK Establish and maintain 200 GPM AFW flow to the Steam Generator(s) before transition out of E
RO
-0, unless the transition is to FR
: b. SI will automatically actuate when Containment                               o Verify total AFW flow greater than 200 pressure reaches 3.5 psig.                                                      GPM.
-H.1, in which case the task must be initiated before RCPs are manually tripped in accordance with step 2 of FR
o Verify AFW pumps discharge pressure CRITICAL TASK                                                   greater than 1000 psig.
-H.1. NOTE This Critical Task only applies if BOTH AFW pumps trip on low discharge pressure. This may occur due to the fault in 12 Steam Generator.
Establish and maintain 200 GPM AFW flow to the Steam                                 o Stop feed flow to 12 SG.
SS    RO/ LEAD LEAD RO          1ES-0.1, REACTOR TRIP RECOVERY, INFO PAGE Actuate SI and go to 1E
Generator(s) before transition out of E-0, unless the                               o Throttle AFW flow to 11 SG to maintain transition is to FR-H.1, in which case the task must be                                 greater than 1000 psig discharge pressure.
-0 Step 1 if either condition listed below occurs:
initiated before RCPs are manually tripped in                                       o Control feed flow to maintain 11 SG Wide accordance with step 2 of FR-H.1.                                                       Range between 50% and 59%.
o RCS subcooling less than 20
* Check RCS Temperatures trending to 547&deg;F.
&deg;F. o PRZR level cannot be maintained >5%.
NOTE
1E-0, REACTOR TRIP OR SAFETY INJECTION Verify Reactor Trip.
* Check PRZR PORVs and Spray valves closed.
Verify Turbine Trip.
This Critical Task only applies if BOTH AFW pumps trip
Verify both Safeguards buses energized.
* Check if RCPs should be stopped.
Determine SI is required or already actuated.
on low discharge pressure. This may occur due to the                                o At least one SI pump running and flow fault in 12 Steam Generator.                                                            indicated.
o Either SG pressure < 530 psig.
o PRZR pressure < 1830 psig.
o Containment pressure > 3.5 psig.
Manually actuate SI if it did not already actuate.
Perform Attachment L (see page s 16 & 17). Check AFW Status:
o Verify total AFW flow greater than 200 GPM. o Verify AFW pumps discharge pressure greater than 1000 psig.
o Stop feed flow to 12 SG.
o Throttle AFW flow to 11 SG to maintain greater than 100 0 psig discharge pressure.
o Control feed flow to maintain 11 SG Wide Range between 50% and 59%.
Check RCS Temperatures trending to 54 7&deg;F. Check PRZR PORVs and Spray valves closed.
Check if RCPs should be stopped.
o At least one SI pump running and flow indicated.
o RCS pressure less than 1575 psig.
o RCS pressure less than 1575 psig.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
Page 16 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 7 (cont)       


NOTE If a RED or ORANGE path is received on the INTEGRITY CRITICAL SAFETY FUNCTION TREE when the crew transitions to 1 E-2, then the crew will transition to 1FR
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                  Page 16 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
-P.1 instead. CRITICAL TASK Isolate the faulted STEAM GENERATOR before transition out of E
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW          EXPECTED STUDENT RESPONSES POS EVENT 7                                                                                          o   Stop 12 RCP (11 RCP is already secured (cont)                                                                                              from the loss of bus 11).
-2, unless the transition is to FR
* Check if SGs are NOT faulted.
-P.1, in which case the task must be completed prior to checking if safety injection should be terminated per step 6 of FR
* Determine 12 SG pressure is decreasing in an uncontrolled manner.
-P.1.
* Stop feed flow to 12 SG.
SS  RO/ LEAD      SS RO/ LEAD    o Stop 12 RCP (11 RCP is already secured from the loss of bus 11).
SS
Check if SGs are NOT faulted
* Transition to 1E-2.
. Determine 12 SG pressure is decreasing in an uncontrolled manner.
1E-2, FAULTED STEAM GENERATOR ISOLATION NOTE                                    RO/
Stop feed flow to 12 SG.
* Check MSIV and Bypass valve on 12 SG are closed.
Transition to 1E
If a RED or ORANGE path is received on the INTEGRITY                LEAD
-2. 1E-2, FAULTED STEAM GENERATOR ISOLATION Check MSIV and Bypass valve on 12 SG are closed. Determine 11 SG is NOT faulted.
* Determine 11 SG is NOT faulted.
Determine 12 SG is faulted. Isolate 12 SG:
CRITICAL SAFETY FUNCTION TREE when the crew
* Determine 12 SG is faulted.
transitions to 1E-2, then the crew will transition to 1FR-
* Isolate 12 SG:
P.1 instead.
o Isolate main feedline.
o Isolate main feedline.
o Isolate AFW flow.
o Isolate AFW flow.
o Close steam supply valve to TD AFW pump from 12 SG.
CRITICAL TASK o Close steam supply valve to TD AFW pump Isolate the faulted STEAM GENERATOR before from 12 SG.
o Verify 12 SG PORV is closed.
transition out of E-2, unless the transition is to FR-P.1, o Verify 12 SG PORV is closed.
o Verify SGB isolation valve closed.
in which case the task must be completed prior to o Verify SGB isolation valve closed.
Check Secondary Radiation is normal.
checking if safety injection should be terminated per
Transition to 1E
* Check Secondary Radiation is normal.
-1. 1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION Check RCS pressure greater than 550 psig.
step 6 of FR-P.1.                                                      SS
Determine RCS Cold Leg Temperatures lowering.
* Transition to 1E-1.
Verify SG PORVs & Steam dumps closed.
1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION RO/
Control feed flow to 11 SG.
* Check RCS pressure greater than 550 psig.
Verify MSIV and bypass valves closed.
LEAD
Close steam supply from 12 SG to TD AFW Pump.
* Determine RCS Cold Leg Temperatures lowering.
Isolate all FW to 12 SG.
* Verify SG PORVs & Steam dumps closed.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* Control feed flow to 11 SG.
-G-RM-01.
* Verify MSIV and bypass valves closed.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
* Close steam supply from 12 SG to TD AFW Pump.
Page 17 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
* Isolate all FW to 12 SG.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 7 (cont)
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
LEAD    1E-0 Attachment L: SI Alignment Verification Verify Safeguards Component Alignment:
 
Verify both trains of SI actuated:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                 Page 17 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
o Both RHR pumps  
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 7                                                                               1E-0 Attachment L: SI Alignment Verification (cont)
- RUNNING -OR- o Both SI pumps  
* Verify Safeguards Component Alignment:
- RUNNING "SI NOT READY" lights  
LEAD
- NOT LIT "SI ACTIVE" lights  
* Verify both trains of SI actuated:
- LIT FOR PLANT CONDITIONS "CONTAINMENT ISOLATION" lights  
o Both RHR pumps - RUNNING
- LIT FOR PLANT CONDITIONS Check Category 1 Vent Zone Boundary:
                                                                                                    -OR-o Both SI pumps - RUNNING
Close MV-3211 5, 12 2 SFP HX INLT HDR MV B Check Cooling Water Header Pressures  
                                                                                      * "SI NOT READY" lights - NOT LIT
- BOTH GREATER THAN 65 PSIG Verify Plant Announcements Complete:
                                                                                      * "SI ACTIVE" lights - LIT FOR PLANT CONDITIONS
Check If Main Steamlines Are Isolated:
                                                                                      * "CONTAINMENT ISOLATION" lights - LIT FOR PLANT CONDITIONS
MSIVs and bypass valves  
* Check Category 1 Vent Zone Boundary:
- CLOSED Containment instrument air valves  
* Close MV-32115, 122 SFP HX INLT HDR MV B
- CLOSED:   Verify SI Flow:
* Check Cooling Water Header Pressures - BOTH GREATER THAN 65 PSIG
Verify RHR Flow Verify Containment Spray actuated and verify lineup.
* Verify Plant Announcements Complete:
Check RCP Cooling Verify Local Actions Complete Verify Generator Breakers  
* Check If Main Steamlines Are Isolated:
- OPEN Verify All Heater Drain Pumps  
* MSIVs and bypass valves - CLOSED
- STOPPED Check Turbine Valves:
* Containment instrument air valves - CLOSED:
o Turbine reheat and intercept valves  
* Verify SI Flow:
- CLOSED o Open turbine drain valves Verify Main Feedwater Alignment:
* Verify RHR Flow
o Both main feedwater pumps  
* Verify Containment Spray actuated and verify lineup.
- STOPPED o Main and bypass FRVs  
* Check RCP Cooling
- CLOSED Verify All Condensate Pumps  
* Verify Local Actions Complete
- STOPPED: Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* Verify Generator Breakers - OPEN
-G-RM-01.
* Verify All Heater Drain Pumps - STOPPED
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
* Check Turbine Valves:
Page 18 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME
o Turbine reheat and intercept valves - CLOSED o Open turbine drain valves
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 7 (cont) 15. If Control Room personnel ask for status of Unit 2 Cooling Water/Chilled Water lineup, then inform the Control Room that Unit 2 Cooling Water/Chilled Water valves are in there safeguards positions.
* Verify Main Feedwater Alignment:
: 16. If Control Room personnel ask for status of Battery Room Temperatures, then inform the Control Room that Battery Room temperatures are less than 84&deg;F.
o Both main feedwater pumps - STOPPED o Main and bypass FRVs - CLOSED
: 17. If Control Room personnel ask for status of Spent Fuel Cooling, then inform the Control Room that Spent Fueling level and temperature are normal.
* Verify All Condensate Pumps - STOPPED:
Place Steam Dump In "STM PRESS" Mode Verify Unit 1 Cooling Water/Chilled Water Alignment:
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
o CFCU control switches
 
- "SLOW". o CFCU dampers
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                 Page 18 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:
- ALIGNED TO DOME o Unit 1 cooling water/chilled water valves closed o Unit 1 CRDM shroud cooling supply and return valves - CLOSED o CFCU cooling water supply and return valves
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW       EXPECTED STUDENT RESPONSES POS EVENT 7     15. If Control Room personnel ask for status of Unit 2
- OPEN o CFCU chilled water supply and return valves
* Place Steam Dump In "STM PRESS" Mode (cont)          Cooling Water/Chilled Water lineup, then inform the
- CLOSED  Verify 11 Safeguards Screenhouse Ventilation lineup.
* Verify Unit 1 Cooling Water/Chilled Water Alignment:
Verify Control Room Ventilation Alignment:
Control Room that Unit 2 Cooling Water/Chilled Water                 o CFCU control switches - "SLOW".
o Chillers and fans  
valves are in there safeguards positions.                             o CFCU dampers - ALIGNED TO DOME
- RUNNING o Control room chiller suction/discharge tie closed  
: 16. If Control Room personnel ask for status of Battery                   o Unit 1 cooling water/chilled water valves closed Room Temperatures, then inform the Control Room that                 o Unit 1 CRDM shroud cooling supply and return Battery Room temperatures are less than 84&deg;F.                             valves - CLOSED
- STATUS LIGHT LIT Verify Unit 2 Cooling/Chilled Water Alignment Verify 21 Safeguards Screenhouse Ventilation lineup.
: 17. If Control Room personnel ask for status of Spent Fuel                 o CFCU cooling water supply and return valves -
Verify 11 and 12 Battery Charger Operation is normal.
Cooling, then inform the Control Room that Spent                         OPEN Fueling level and temperature are normal.                             o CFCU chilled water supply and return valves -
Verify Battery Room temps less than 84&deg;F.
CLOSED
Check status of Spent Fuel Cooling.
* Verify 11 Safeguards Screenhouse Ventilation lineup.
Check Status Of Notifications Notify SS Of Any Discrepancies
* Verify Control Room Ventilation Alignment:
.
o Chillers and fans - RUNNING o Control room chiller suction/discharge tie closed -
: 18. Once the crew has transitioned to 1E
STATUS LIGHT LIT
-1, or completed step 6 of 1FR
* Verify Unit 2 Cooling/Chilled Water Alignment
-P.1 , and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.
* Verify 21 Safeguards Screenhouse Ventilation lineup.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* Verify 11 and 12 Battery Charger Operation is normal.
-G-RM-01.
* Verify Battery Room temps less than 84&deg;F.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
* Check status of Spent Fuel Cooling.
Page 19 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SIMULATOR INPUT  
* Check Status Of Notifications
* Notify SS Of Any Discrepancies.
: 18. Once the crew has transitioned to 1E-1, or completed step 6 of 1FR-P.1, and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                         Page 19 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==


Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 20 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                           Page 20 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario
_____ Simulator Status:
_____     Simulator Status:
___ 1. "Training Load" ___ 2. Step counters "ON" ___ 3. Alarm sound "ON" ___ 4. Steps 1 - 7 on page 6 complete
___ 1.         "Training Load"                       ___ 2. Step counters "ON"
___ 5. Speed: "REAL"
___ 3.         Alarm sound "ON"                     ___ 4. Steps 1 - 7 on page 6 complete
___ 6. IC-263 or IC-8 running   _____ Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructor's booth
___ 5.         Speed: REAL                         ___ 6. IC-263 or IC-8 running
. _____ Verify Schedule File/Summary matches Simulator Input Summary page in the SEG
_____     Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructors booth.
. _____ Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.
_____     Verify Schedule File/Summary matches Simulator Input Summary page in the SEG.
_____ Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset
_____     Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.
. _____ BOC I sheet displayed on C panel
_____     Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset.
. _____ BOC Reactivity Briefing sheet available at Reactor Operator Desk
_____     BOC I sheet displayed on C panel.
. _____ Turnover sheet/PRA sheet available. _____ If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN. _____ Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).
_____     BOC Reactivity Briefing sheet available at Reactor Operator Desk.
_____ Electronic PINGP 577 forms closed on LAN connected PC s. _____ Board-mounted EAL Tables are cleaned
_____     Turnover sheet/PRA sheet available.
. _____ EOOS running on PC and updated as follows to reflect equipment OOS
_____     If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.
: ___ 1. 123 Air Compressor
_____     Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).
_____ Update Control Board Placards:
_____     Electronic PINGP 577 forms closed on LAN connected PCs.
___ 1. NRC Current Authentication Code call date updated to current date.
_____     Board-mounted EAL Tables are cleaned.
___ 2. High Flux At Shutdown Alarm Setpoint placards: 5900 cps
_____     EOOS running on PC and updated as follows to reflect equipment OOS:
. ___ 3. Feedwater regulating valve position placard set to current values.
___ 1. 123 Air Compressor
___ 4. Recommended SG Blowdown flow set to current values.
_____     Update Control Board Placards:
___ 5. RCS boron on the CVCS panel placard:
___ 1.       NRC Current Authentication Code call date updated to current date.
14 82 ppm. ___ 6. Turbine reference/setter values on the CVCS panel set to current (Target/Demand on
___ 2.       High Flux At Shutdown Alarm Setpoint placards: 5900 cps.
-line positions)
___ 3.       Feedwater regulating valve position placard set to current values.
. ___ 7. Shift Reactivity Guidance placard: BA: 4.8 gallons, RMU: 67 gallons
___ 4.       Recommended SG Blowdown flow set to current values.
. Dilutions @ 10 gal RMU, 1
___ 5.       RCS boron on the CVCS panel placard: 1482 ppm.
-2 times per shift
___ 6.       Turbine reference/setter values on the CVCS panel set to current (Target/Demand on-line positions).
. _____ Magnetic placards in place:
___ 7.       Shift Reactivity Guidance placard: BA: 4.8 gallons, RMU: 67 gallons.
___ 1. 11 BA TANK "Lined Up For Service"
Dilutions @ 10 gal RMU, 1-2 times per shift.
___ 2. 11 BA PUMP "Lined Up to 11 BA Tank"
_____       Magnetic placards in place:
___ 3. 12 BA PUMP "Lined Up to 11 BA Tank"
___ 1. 11 BA TANK Lined Up For Service
___ 4. CC to SFP MV
___ 2. 11 BA PUMP Lined Up to 11 BA Tank
-32117 "In Service"
___ 3. 12 BA PUMP Lined Up to 11 BA Tank
___ 5. Blowdown 46470 "SGB To CDSR"
___ 4. CC to SFP MV-32117 In Service
___ 6. HU Flag above 12 RHR HX CC inlet MV
___ 5. Blowdown 46470 SGB To CDSR
-32094 for "1C14 Limitation"
___ 6. HU Flag above 12 RHR HX CC inlet MV-32094 for 1C14 Limitation
___ 7. "H 2 IN VCT SPACE" at VCT Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
___ 7. H 2 IN VCT SPACE at VCT Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 21 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                   Page 21 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0
_____ Pink Status Control Tags in place:
_____       Pink Status Control Tags in place:
___ 1. CS-46540, 22 CC WTR PUMP
___ 1. CS-46540, 22 CC WTR PUMP
___ 2. CS-46572, CC TO SFP MV
___ 2. CS-46572, CC TO SFP MV-32117
-32117 _____ Yellow Caution Tags in place: ___ 1. CS-46064, CC TO SFP MV-32115 , in CLOSED ___ 2. CS-46098, 123 Air Compressor, in PULLOUT
_____     Yellow Caution Tags in place:
_____ ERCS driven recorders are on
___ 1. CS-46064, CC TO SFP MV-32115, in CLOSED
-scale (RCS temperature scaled 55 0&#xba; F to 56 0&#xba; F). _____ ERCS alarm screen operating and alarms reset
___ 2. CS-46098, 123 Air Compressor, in PULLOUT
. _____ All ERCS terminals operating and set as follows: CONF VARS R02 Alarm Summary Page CONE1 Group OP31_U1 R03 AFD CONC SAS (XS11)
_____     ERCS driven recorders are on-scale (RCS temperature scaled 550&#xba; F to 560&#xba; F).
R04 TPM CONG1 Group QP CCDATA R05 QP LOADFOLL ERCS-R01 Group RADMON_U1 R06 Alarm Summary Page
_____     ERCS alarm screen operating and alarms reset.
_____ ERCS single point displays:
_____     All ERCS terminals operating and set as follows:
CONB 1T0499A 1U1613A CONE2 1Q0340A 1V4501A _____ ERCS TPM set (Calorimetric  
CONF             VARS                           R02               Alarm Summary Page CONE1             Group OP31_U1                 R03               AFD CONC             SAS (XS11)                     R04               TPM CONG1             Group QP CCDATA               R05               QP LOADFOLL ERCS-R01         Group RADMON_U1               R06               Alarm Summary Page
- Auto Scaling  
_____     ERCS single point displays:           CONB         1T0499A               1U1613A CONE2         1Q0340A               1V4501A
- LEFM). _____ Verify that copy machine and printers are loaded with paper
_____     ERCS TPM set (Calorimetric - Auto Scaling - LEFM).
. _____ Pens/Paper/Markers available on the simulator
_____     Verify that copy machine and printers are loaded with paper.
. _____ Verify 12 1 IA Compressor is in PREFERRED and 12 2 IA Compressor is in PREFERRED. _____ Verify R11/R12 are lined up correctly (at the R11/R12 local panel):
_____     Pens/Paper/Markers available on the simulator.
_____     Verify 121 IA Compressor is in PREFERRED and 122 IA Compressor is in PREFERRED.
_____     Verify R11/R12 are lined up correctly (at the R11/R12 local panel):
___ 1. Sample pump is running.
___ 1. Sample pump is running.
___ 2. Alarms are reset.
___ 2. Alarms are reset.
___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.
___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.
___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.
___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.
_____ Set Turbine Control HMI Displays as follows:
_____     Set Turbine Control HMI Displays as follows:
___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview
___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview.
. ___ 2. U1 Turb Aux Cont (48088) to Turb Overview
___ 2. U1 Turb Aux Cont (48088) to Turb Overview.
. ___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control
___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control.
. _____ DEHC VPL set ~
_____     DEHC VPL set ~ 0.1 to 0.2 above current valve position (not on limiter).
0.1 to 0.2 above current valve position (not on limiter).
_____     DEHC alarms cleared.
_____ DEHC alarms cleared
_____     N51 & N52 Display Sheets for 50% power are in place as necessary.
. _____ N51 & N52 Display Sheets for 50% power are in place as necessary
_____     Procedure 1C51 marked up for PT-485 failure.
. _____ Procedure 1C51 marked up for PT
_____     Headsets turned on as necessary.
-485 failure.
_____     Procedure checklist completed. See following page.
_____ Headsets turned on as necessary.
_____     Peer Check performed for simulator setup.
_____ Procedure checklist completed. See following page.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
_____ Peer Check performed for simulator setup
 
. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                     Page 22 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:
-G-RM-01.
Before           After 1C12.1, LETDOWN, CHARGING, AND SEAL WATER INJECTION -
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 22 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:
UNIT 1 1C51.2, First Stage Pressure PT-485 - High 1C51.3, Power Range Nuclear Instrument N High 1E-0, REACTOR TRIP OR SAFETY INJECTION 1E-1, LOSS OF REACTOR OR SECONDARY COOLANT 1E-2, FAULTED STEAM GENERATOR ISOLATION 1ES-0.1, REACTOR TRIP RECOVERY 1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION C47012-0508, PRZR HI/LO PRESS C47013-0101, NIS POWER RANGE POS FLUX RATE CH ALERT.
Before After       1C12.1, LETDOWN, CHARGING, AND SEAL WATER INJECTION  
- UNIT 1     1C51.2, First Stage Pressure PT
-485 - High     1C51.3, Power Range Nuclear Instrument N High     1E-0, REACTOR TRIP OR SAFETY INJECTION     1E-1, LOSS OF REACTOR OR SECONDARY COOLANT 1E-2, FAULTED STEAM GENERATOR ISOLATION 1ES-0.1, REACTOR TRIP RECOVERY 1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION C47012-0508, PRZR HI/LO PRESS C4701 3-0101, NIS POWER RANGE POS FLUX RATE CH ALERT.
C47013-0102, NIS POWER RANGE HI SETPOINT CH ALERT.
C47013-0102, NIS POWER RANGE HI SETPOINT CH ALERT.
C47013-0103, NIS POWER RANGE OVERPOWER ROD WITHDRAWAL STOP.
C47013-0103, NIS POWER RANGE OVERPOWER ROD WITHDRAWAL STOP.
C47013-0203, NIS POWER RANGE CHANNEL DEVIATION.
C47013-0203, NIS POWER RANGE CHANNEL DEVIATION.
C47013-0305, AUCTIONEERED TAV G-TREF DEVIATION C47017-0301, ONE LOOP LO FLOW OR RCP BKR OPEN REACTOR TRIP     C47018-0301, 11 SI PUMP LOCAL CONTROL SI AUTO START BLOCKED     C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES FIGURE C1-5, PROGRAMMED MODERATOR TEMPERATURE FOR POWER SWING SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.2.1 T.S. LCO 3.3.1 T.S. LCO 3.4.1 T.S. LCO 3.5.2 T.S. LCO 3.5.3 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
C47013-0305, AUCTIONEERED TAVG-TREF DEVIATION C47017-0301, ONE LOOP LO FLOW OR RCP BKR OPEN REACTOR TRIP C47018-0301, 11 SI PUMP LOCAL CONTROL SI AUTO START BLOCKED C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES FIGURE C1-5, PROGRAMMED MODERATOR TEMPERATURE FOR POWER SWING SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.2.1 T.S. LCO 3.3.1 T.S. LCO 3.4.1 T.S. LCO 3.5.2 T.S. LCO 3.5.3 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 23 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Post-Scenario Checklist
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                   Page 23 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Post-Scenario Checklist
_____ LAN connected computers are cleared of information added during the scenario.
_____     LAN connected computers are cleared of information added during the scenario.
_____ Computer generated PINGP 577 cleared.
_____     Computer generated PINGP 577 cleared.
_____ Procedure checklist completed. See previous page. _____ Remove Pink Status Control Tags from the following equipment
_____     Procedure checklist completed. See previous page.
: ___ 1. NONE _____ Magnetic placards removed:
_____     Remove Pink Status Control Tags from the following equipment:
___ 1. NONE   _____ Remove Yellow Caution Tags from the following equipment: ___ 1. C S-46098, 123 Air Compressor. _____ Erase marker on RCS temperature ERCS driven recorder.
___ 1. NONE
_____ Board-mounted EAL Table is cleaned
_____   Magnetic placards removed:
. _____ All books, note pads, and calculators put away
___ 1. NONE
. End Of Day Checklist
_____     Remove Yellow Caution Tags from the following equipment:
_____ Signs/placards removed and put away unless normal simulator configuration
___ 1. CS-46098, 123 Air Compressor.
. _____ Floor PCs logged off if simulator will not be used again that day
_____     Erase marker on RCS temperature ERCS driven recorder.
. _____ Instructor station returned to normal with all books, paper, and etc. put away
_____     Board-mounted EAL Table is cleaned.
. _____ Headsets turned off and put away if simulator will not be used again that day
_____     All books, note pads, and calculators put away.
. _____ Simulator reset to IC
End Of Day Checklist
-10 unless another IC will be used for further training
_____     Signs/placards removed and put away unless normal simulator configuration.
. _____ Simulator placed in DORT if simulator will not be used again that day
_____     Floor PCs logged off if simulator will not be used again that day.
. _____ Recorder power "OFF" if simulator will not be used again that day. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
_____     Instructor station returned to normal with all books, paper, and etc. put away.
-G-RM-01.
_____     Headsets turned off and put away if simulator will not be used again that day.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 24 of 28   RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE:           DAY/NIGHT SHIFT: Day         CAT 1 VENT OPENINGS: 0 ft 2  SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS
_____     Simulator reset to IC-10 unless another IC will be used for further training.
: 1. PT-485, Turbine First Stage Pressure, is failed HIGH
_____     Simulator placed in DORT if simulator will not be used again that day.
. T.S. 3.3.1 Condition A and R entered
_____     Recorder power "OFF" if simulator will not be used again that day.
. P7 was verified to be in required state for existing unit conditions
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
. TRM 3.3.4 Condition A was entered.
 
A WR was initiated to repair PT
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                             Page 24 of 28 RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE:                                                                                   DAY/NIGHT SHIFT: Day CAT 1 VENT OPENINGS: 0 ft2                                                      SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS
-485. PROTECTED EQUIPMENT 22 CC PUMP 121 SFP HX RAD MONITORS OOS ANNUNCIATORS OOS NONE NONE OUTSTANDING SP'S FIRE DET / PROT EQP IMPAIRMENTS NONE NONE OTHER EQUIPMENT OOS / STATUS 123 Air Compressor is Out of Service
: 1. PT-485, Turbine First Stage Pressure, is failed HIGH.
. Instrument Air is separated from Station Air due to clam shelling in progress
* T.S. 3.3.1 Condition A and R entered.
. MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE Unit 1 was returned on
* P7 was verified to be in required state for existing unit conditions.
-line two days ago. A 5 1% hold is in effect due to chemistry. 12 Charging Pump Suction Stabilizer PM is complete and ready for PMT. 1 3 Charging Pump desurger has already been checked by the out
* TRM 3.3.4 Condition A was entered.
-plant operator.
* A WR was initiated to repair PT-485.
OPERATIONAL PLANS FOR COMING SHIFT Maintain Rod Control in Manual and Steam Dump in Steam Pressure Mode. 1C51.2 actions are complete for the failed instrument with the exception of restoring Tavg to program temperature.
PROTECTED EQUIPMENT 22 CC PUMP 121 SFP HX RAD MONITORS OOS                                           ANNUNCIATORS OOS NONE                                                       NONE OUTSTANDING SPS                                            FIRE DET / PROT EQP IMPAIRMENTS NONE                                                       NONE OTHER EQUIPMENT OOS / STATUS
Tref is currently pegged high.
* 123 Air Compressor is Out of Service.
Restore RCS Average Coolant Temperature to program temperature.
* Instrument Air is separated from Station Air due to clam shelling in progress.
Swap charging pumps to 11 and 1 3 are running and 1 2 secured per per Section 5.4.1 of 1C12.1. Xenon is at equilibrium.
MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE
Maintain 50% - 5 1% power for the next 24 hours
* Unit 1 was returned on-line two days ago. A 51% hold is in effect due to chemistry.
. Dilute 10 gallons 1
* 12 Charging Pump Suction Stabilizer PM is complete and ready for PMT. 13 Charging Pump desurger has already been checked by the out-plant operator.
-2 times per shift for temperature control.
OPERATIONAL PLANS FOR COMING SHIFT
* Maintain Rod Control in Manual and Steam Dump in Steam Pressure Mode.
* 1C51.2 actions are complete for the failed instrument with the exception of restoring Tavg to program temperature. Tref is currently pegged high.
* Restore RCS Average Coolant Temperature to program temperature.
* Swap charging pumps to 11 and 13 are running and 12 secured per per Section 5.4.1 of 1C12.1.
* Xenon is at equilibrium. Maintain 50% - 51% power for the next 24 hours.
* Dilute 10 gallons 1-2 times per shift for temperature control.
NEW PROCEDURES / INSTRUCTIONS Review altered scale on Tavg ERCS Recorder.
NEW PROCEDURES / INSTRUCTIONS Review altered scale on Tavg ERCS Recorder.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 25 of 28   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 25 of 28 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 26 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.
Page 26 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.
: 1. The scenario contains objectives for the desired tasks and relevant human             Yes      No performance tools.                                                                     X
: 1. The scenario contains objectives for the desired tasks and relevant human performance tools.
: 2. The scenario identifies key parameter response, expected alarms, and                   Yes      No automatic actions associated with the induced perturbations.                           X
Yes  No X    2. The scenario identifies key parameter response, expected alarms, and automatic actions associated with the induced perturbations
: 3. The scenario content adequately addresses the desired tasks, through                   Yes      No simulator performance, instructor-led training freezes, or both.                       X
. Yes  No X   3. The scenario content adequately addresses the desired tasks, through simulator performance, instructor
: 4. Plant PRA initiating events, important equipment, and important tasks are             Yes      No identified.                                                                           X
-led training freezes, or both.
: 5. Turnover information includes a Daily At Power or Shutdown Safety Risk                 Yes      No Assessment.                                                                           X
Yes  No X    4. Plant PRA initiating events, important equipment, and important tasks are identified.
: 6. The scenario contains procedurally driven success paths. Procedural                   Yes      No discrepancies are identified and corrected before training is given.                   X
Yes  No X    5. Turnover information includes a Daily At Power or Shutdown Safety Risk Assessment.
: 7. The scenario guide includes responses for all anticipated communications to           Yes      No simulated personnel outside the Control Room, based on procedural guidance             X and standard operating practices. Include estimated completion times and/or notes for use of time compression.
Yes  No X    6. The scenario contains procedurally driven success paths. Procedural discrepancies are identified and corrected before training is given.
: 8. The scenario includes related industry experience. SOER, SER and similar               Yes      No OE recommendations are clearly identified and fully addressed.*                                 X
Yes  No X    7. The scenario guide includes responses for all anticipated communications to simulated personnel outside the Control Room, based on procedural guidance and standard operating practices.
: 9. The scenario guide incorporates verification of Operator Fundamental                   Yes      No application.*                                                                                   X
Include estimated completion times and/or notes for use of time compression
: 10. Training elements and specific human performance elements are addressed               Yes      No in the scenario critique guide to be used by the critique facilitator. The critique             X guide includes standards for expected performance.*
. Yes  No X    8. The scenario includes related industry experience. SOER, SER and similar OE recommendations are clearly identified and fully addressed.
: 11. For evaluations, it has been verified that without operator action the critical       Yes      No tasks will be failed.                                                                 X Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
* Yes  No  X 9. The scenario guide incorporates verification of Operator Fundamental application.
* Y es  No  X 10. Training elements and specific human performance elements are addressed in the scenario critique guide to be used by the critique facilitator. The critique guide includes standards for expected performance.
* Yes  No  X  11. For evaluation s, it has been verified that without operator action the critical tasks will be failed.
Yes  No X   Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
* For evaluations these items may be marked NO without justification.
* For evaluations these items may be marked NO without justification.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 27 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.
Page 27 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.
: 1. The desired initial conditions agreed with the reference plant with               Yes      No respect to reactor status, plant configuration, and system operation.             X
: 1. The desired initial conditions agreed with the reference plant with respect to reactor status, plant configuration, and system operation.
: 2. The simulator operated in real time during conduct of validation.                 Yes       No X
Yes X No  2. The simulator operated in real time during conduct of validation.
: 3. The simulator demonstrated expected plant response to operator input             Yes      No and to normal, transient, and accident conditions.                               X
Yes X No  3. The simulator demonstrated expected plant response to operator input and to normal, transient, and accident conditions.
: 4. The simulator permitted use of the reference plants procedures. The             Yes      No scenario was completed without procedural exceptions, simulator                   X performance exceptions, or deviation from the scenario sequence.
Yes X No  4. The simulator permitted use of the reference plant's procedures. The scenario was completed without procedural exceptions, simulator performance exceptions, or deviation from the scenario sequence.
: 5. The simulator did not fail to cause or unexpectedly cause any first           Yes      No principle alarm or primary automatic action.                                     X
Yes X No  5. The simulator did not "fail to cause" or "unexpectedly cause" any first principle alarm or primary automatic action.
: 6. Observable changes in parameters relevant to the scenario                         Yes      No corresponded in trend and direction to reference plants expected                 X response.
Yes X No  6. Observable changes in parameters relevant to the scenario corresponded in trend and direction to reference plant's expected response. Yes X No  7. All malfunctions and other instructor interface items were functional and demonstrated the expected reference plant's response to the initiating cause. Yes X No  8. All malfunctions and other instructor interface items were initiated in the same sequence described within the simulator scenario.
: 7. All malfunctions and other instructor interface items were functional and         Yes      No demonstrated the expected reference plants response to the initiating           X cause.
Yes X No  9. The scenario satisfies the learning or examination objectives without any significant simulator performance issues, or deviations from the approved scenario sequence.
: 8. All malfunctions and other instructor interface items were initiated in the       Yes      No same sequence described within the simulator scenario.                           X
Yes X No  10. Simulator fidelity has been demonstrated to be adequate for this scenario.
: 9. The scenario satisfies the learning or examination objectives without             Yes      No any significant simulator performance issues, or deviations from the             X approved scenario sequence.
Yes X No    Discrepancies noted (Check "none" or list items found)
: 10. Simulator fidelity has been demonstrated to be adequate for this                 Yes      No scenario.                                                                         X Discrepancies noted (Check none or list items found)             None SMAR = Simulator Action Request SMAR:                       SMAR:                     SMAR:                   SMAR:
None SMAR = Simulator Action Request SMAR:   SMAR:   SMAR:   S MAR:   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 28 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Comments:
Page 28 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Comments:             Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
Validation Personnel Name Job Title / Qualification Validation Position Fred Collins Operations Instructor Lead Evaluator Nic Abney Operations Instructor Booth Driver Jeff Human Operations SRO Shift Supervisor Rick Martin Operations RO RO Mark Haren Operations RO LEAD                   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Validation Personnel Name                         Job Title / Qualification         Validation Position Fred Collins                             Operations Instructor               Lead Evaluator Nic Abney                                 Operations Instructor               Booth Driver Jeff Human                               Operations SRO                       Shift Supervisor Rick Martin                               Operations RO                       RO Mark Haren                               Operations RO                       LEAD Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 1 of 24   SIMULATOR EXERCISE GUIDE (SEG)
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 1 of 24 SIMULATOR EXERCISE GUIDE (SEG)
SITE: PRAIRIE ISLAND SEG # PI-ILT-NRC-14 0 4 S  SEG TITLE:
SITE: PRAIRIE ISLAND                               SEG #     PI-ILT-NRC-1404S SEG TITLE:       2014 ILT NRC SIMULATOR EVALUATION #4                       REV. # 0 PROGRAM:         INITIAL LICENSE OPERATOR TRAINING                 #:   FL-ILT COURSE:           INITIAL LICENSE OPERATOR TRAINING                 #:   FL-ILT TOTAL TIME: 2.0 HOUR Developed by:                         Shawn Sarrasin                             1/25/2014 Instructor                                 Date Reviewed by:                           Fredrick Collins                           2/26/2014 Instructor                                 Date (Simulator Scenario Development Checklist.)
2014 ILT NRC SIMULATOR EVALUATION #
Validated by:                         Shawn Sarrasin                             4/22/2014 Validation Lead Instructor                         Date (Simulator Scenario Validation Checklist.)
4 REV. # 0   PROGRAM: INITIAL LICENSE OPERATOR TRAINING
Approved by:
#: FL-ILT     COURSE: INITIAL LICENSE OPERATOR TRAINING
Training Supervision                             Date Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
#: FL-ILT   TOTAL TIME:
2.0 HOUR   Developed by:
Shawn Sarrasin 1/2 5/201 4  Instructor Date   Reviewed by:
Fredrick Collins 2/26/2014 Instructor (Simulator Scenario Development Checklist.)
Date    Validated by:
Shawn Sarrasin 4/22/2014 Validation Lead Instructor (Simulator Scenario Validation Checklist.)
Date    Approved by:
Training Supervision Date   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                          Page 2 of 2 4 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Guide Requirements Goal of Training: 1. During all plant operating conditions, the crew will demonstrate


the ability to monitor and operate the plant within the limits of the Operations Manuals and Technical Specifications.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                      Page 2 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Guide Requirements
: 1. During all plant operating conditions, the crew will demonstrate Goal of                  the ability to monitor and operate the plant within the limits of the Training:                Operations Manuals and Technical Specifications.
: 2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
: 2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
Learning Objectives:
: 1. Alternate Containment Fan Coil Units and discharge dampers Learning                    per 1C19.2.
: 1. Alternate Containment Fan Coil Units and discharge dampers per 1C19.2
Objectives:          2. Diagnose and perform corrective actions for 1PT-468, Red Channel A Steam Generator Steam Pressure, failing high per 1C51.1.
. 2. Diagnose and perform corrective actions for 1PT-468, Red Channel A Steam Generator Steam Pressure , failing high per 1C51.1. 3. Perform a load increase per 1C1.4.
: 3. Perform a load increase per 1C1.4.
: 4. Diagnose and respond to a Dropped Rod per 1C5 AOP4.
: 4. Diagnose and respond to a Dropped Rod per 1C5 AOP4.
: 5. Diagnose and respond to a failure of the Main Turbine to automatically trip per 1E
: 5. Diagnose and respond to a failure of the Main Turbine to automatically trip per 1E-0.
-0. 6. Diagnose and respond to a Station Blackout per 1EC A-0.0. 7. Diagnose and respond to the TD AFW Pump failing to automatically start per 1ECA
: 6. Diagnose and respond to a Station Blackout per 1ECA-0.0.
-0.0. Training Resources:
: 7. Diagnose and respond to the TD AFW Pump failing to automatically start per 1ECA-0.0.
: 1. Full Scope Simulator
: 1. Full Scope Simulator Training              2. NRC Evaluation Team Resources:           3. Booth Operator (Backup Communicator)
: 2. NRC Evaluation Team
: 4. Primary Communicator Initiating Event with Core Damage Frequency:
: 3. Booth Operator (Backup Communicator)
Related PRA          LOOP (1.5%)
: 4. Primary Communicator Related PRA Information:
Information:
Initiating Event with Core Damage Frequency:
Important Components:
LOOP (1.5%)     Important Components:
11 TD AFW PMP Important Operator Actions with Task Number:
11 TD AFW PMP Important Operator Actions with Task Number:
NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 3 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 3 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:
Before EOP Entry:
Before EOP Entry:
: 1. 1PT-468 , Red Channel A Steam Generator Pressure Instrument, fails high. 2. Dropped Rod (Control Bank A Group 1 Rod B8
: 1. 1PT-468, Red Channel A Steam Generator Pressure Instrument, fails high.
). After EOP Entry:
: 2. Dropped Rod (Control Bank A Group 1 Rod B8).
After EOP Entry:
: 1. Reactor fails to automatically trip.
: 1. Reactor fails to automatically trip.
: 2. Main Turbine fails to automatically trip.
: 2. Main Turbine fails to automatically trip.
Line 1,713: Line 1,798:
Abnormal Events:
Abnormal Events:
: 1. SG Pressure Instrument Failure.
: 1. SG Pressure Instrument Failure.
: 2. Dropped RCCA. Major Transients:
: 2. Dropped RCCA.
: 1. Loss of All AC
Major Transients:
. Critical Tasks:
: 1. Loss of All AC.
: 1. E A: Manually trip the reactor from the control room before transition out of E
Critical Tasks:
-0. 2. E Q: Manually trip the main turbine before transition out of E
: 1. E A: Manually trip the reactor from the control room before transition out of E-0.
-0. 3. ECA-0.0 - B: Establish and maintain 200 GPM AFW flow to the Steam Generators prior to Step 3 of ECA
: 2. E Q: Manually trip the main turbine before transition out of E-0.
-0.0. 4. ECA-0.0 - H: Isolate RCP seal injection before a charging pump is started.
: 3. ECA-0.0 - B: Establish and maintain 200 GPM AFW flow to the Steam Generators prior to Step 3 of ECA-0.0.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
: 4. ECA-0.0 - H: Isolate RCP seal injection before a charging pump is started.
-G-RM-01.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 4 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO OVERVIEW:
 
INITIAL CONDITIONS:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 4 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO OVERVIEW:
EQUIPMENT OOS Exposure: BOC 1 3 Charging Pump Power: 5 0%   Boron (CB):
INITIAL CONDITIONS:                                 EQUIPMENT OOS
14 80 ppm  Temperature:
* Exposure: BOC
5 5 3&deg;F   Pressure: 2235 psig   Xenon: Equilibrium Rods: "D" @
* 13 Charging Pump
17 5  Generator:
* Power: 50%
26 5 MW   SEQUENCE OF EVENTS:
* Boron (CB): 1480 ppm
Event 1: Alternate Containment Fan Coil Units and Discharge Dampers 11 and 13 CFCUs are initially in fast speed and aligned to SUP/GAP.
* Temperature: 553&deg;F
12 and 14 CFCUs are initially in slow speed and aligned to the DOME.
* Pressure: 2235 psig
The crew will perform section 5.6.4.A of 1C19.2.
* Xenon: Equilibrium
11 and 13 CFCUs will then be in slow speed and aligned to DOME.
* Rods: D @ 175
12 and 14 CFCUs will then be in fast speed and aligned to the SUP/GAP.
* Generator: 265 MW SEQUENCE OF EVENTS:
Event 2: Red Channel A Steam Generator Pressure Instrument fails HIGH FW Control System Trouble alarm will be received
Event 1: Alternate Containment Fan Coil Units and Discharge Dampers
. 1PT-46 8, A Steam Generator Pressure, rises until pegged high.
* 11 and 13 CFCUs are initially in fast speed and aligned to SUP/GAP.
A Steam Generator PORV will open
* 12 and 14 CFCUs are initially in slow speed and aligned to the DOME.
. The crew will place A SG PORV in manual and close it
* The crew will perform section 5.6.4.A of 1C19.2.
. The SS will enter T.S. LCO 3.3.2 Condition A and D.
* 11 and 13 CFCUs will then be in slow speed and aligned to DOME.
Event 3: Unit 1 Load Increase from 50% to 60% Power   The crew briefed the load increase prior to taking the duty.
* 12 and 14 CFCUs will then be in fast speed and aligned to the SUP/GAP.
Shift Management will direct the crew to raise power to 60% when the 50% chemistry hold is lifted
Event 2: Red Channel A Steam Generator Pressure Instrument fails HIGH
. The crew will increase load per 1C1.4.
* FW Control System Trouble alarm will be received.
Event 4: Control Bank A Group 1 Dropped Rod (B
* 1PT-468, A Steam Generator Pressure, rises until pegged high.
-8)   Control Bank A Group 1 Rod B
* A Steam Generator PORV will open.
-8 will indicate zero steps
* The crew will place A SG PORV in manual and close it.
. RCS Tavg will lower
* The SS will enter T.S. LCO 3.3.2 Condition A and D.
. NI Power will lower
Event 3: Unit 1 Load Increase from 50% to 60% Power
. A negative flux rate reactor trip will be received.
* The crew briefed the load increase prior to taking the duty.
The reactor will fail to automatically trip.
* Shift Management will direct the crew to raise power to 60% when the 50%
The crew will diagnose a dropped rod and manually trip the reactor per 1C5 AOP4.
chemistry hold is lifted.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* The crew will increase load per 1C1.4.
-G-RM-01.
Event 4: Control Bank A Group 1 Dropped Rod (B-8)
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 5 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Event 5: Main Turbine Fails to Automatically Trip The crew will enter 1E
* Control Bank A Group 1 Rod B-8 will indicate zero steps.
-0, Reactor Trip or Safety Injection
* RCS Tavg will lower.
. The Main Turbine will fail to automatically trip.
* NI Power will lower.
The Lead will manually trip the turbine from the Control Room.
* A negative flux rate reactor trip will be received.
Event s 6 & 7: Loss of All AC This event will occur after the Main Turbine is tripped
* The reactor will fail to automatically trip.
. A loss of offsite power occurs
* The crew will diagnose a dropped rod and manually trip the reactor per 1C5 AOP4.
. A lockout will occur on Bus 15 and Bus 16
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
. The crew will transition to 1ECA
 
-0.0, Loss of All Safeguards AC Power.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 5 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Event 5: Main Turbine Fails to Automatically Trip
11 TD AFW Pump will have failed to automatically start after the reactor trip.
* The crew will enter 1E-0, Reactor Trip or Safety Injection.
The crew will manually start 11 TD AFW Pump from the Control Room.
* The Main Turbine will fail to automatically trip.
Since both safeguards buses are locked out, the crew will go to step 8
* The Lead will manually trip the turbine from the Control Room.
. An out-plant operator will be directed to isolate RCP seals.
Events 6 & 7: Loss of All AC
Safeguards loads will be placed in pullout
* This event will occur after the Main Turbine is tripped.
. Bus 15 and 16 will remain locked out for the remainder of the scenario.
* A loss of offsite power occurs.
The crew will initiate depressurization of both SGs.
* A lockout will occur on Bus 15 and Bus 16.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* The crew will transition to 1ECA-0.0, Loss of All Safeguards AC Power.
-G-RM-01.
* 11 TD AFW Pump will have failed to automatically start after the reactor trip.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 6 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Simulator Setup:
* The crew will manually start 11 TD AFW Pump from the Control Room.
NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.
* Since both safeguards buses are locked out, the crew will go to step 8.
: 1. If available, reset the simulator to IC-26 4 and place in RUN
* An out-plant operator will be directed to isolate RCP seals.
. 2. If IC-26 4 is NOT available:
* Safeguards loads will be placed in pullout.
: a. Reset to IC
* Bus 15 and 16 will remain locked out for the remainder of the scenario.
-8. b. Place the simulator in RUN.
* The crew will initiate depressurization of both SGs.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 6 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Simulator Setup:
NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.
: 1. If available, reset the simulator to IC-264 and place in RUN.
: 2. If IC-264 is NOT available:
: a. Reset to IC-8.
: b. Place the simulator in RUN.
: c. Place ALL pressurizer heaters to ON.
: c. Place ALL pressurizer heaters to ON.
: d. Insert remote FW123 to OPEN.
: d. Insert remote FW123 to OPEN.
: e. Start 12 Condensate Pump using CS
: e. Start 12 Condensate Pump using CS-46411.
-46411. f. Start 11 FWP using CS
: f. Start 11 FWP using CS-46418.
-46418. g. Start 12 HDT Pump per 1C28.4. h. Raise HDT Pump speed to stabilize HDT level.
: g. Start 12 HDT Pump per 1C28.4.
: h. Raise HDT Pump speed to stabilize HDT level.
: i. Wait until heater drains have stabilized.
: i. Wait until heater drains have stabilized.
: j. Insert remote MS118 to RESET.
: j. Insert remote MS118 to RESET.
Line 1,787: Line 1,881:
: m. Insert Malfunction VC04C.
: m. Insert Malfunction VC04C.
: 3. Verify the ROD DEVIATION alarm is CLEARED as follows:
: 3. Verify the ROD DEVIATION alarm is CLEARED as follows:
: a. Log into the ERCS terminal with user "OVRD" and password "DUTY" (if needed). b. Go to ERCS Screen RBU (Rod Bank Update).
: a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
: c. Enter 17 5 as the new value for point 1U0052A, ROD POS BNK D.
: b. Go to ERCS Screen RBU (Rod Bank Update).
: d. Select "Apply".
: c. Enter 175 as the new value for point 1U0052A, ROD POS BNK D.
: e. Verify Annunciator 47013
: d. Select Apply.
-0507, COMPUTER ALARM / ROD DEVIATION / SEQUENCING, has cleared.
: e. Verify Annunciator 47013-0507, COMPUTER ALARM / ROD DEVIATION /
SEQUENCING, has cleared.
: 4. Verify the Pen Recorder for RCS Tavg and Tref are set correctly as follows:
: 4. Verify the Pen Recorder for RCS Tavg and Tref are set correctly as follows:
: a. Log into the ERCS terminal with user "OVRD" and password "DUTY" (if needed). b. Go to ERCS Screen PEN_TREND (Pen Trend Configuration)
: a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
. c. Enter 550 as the new Min EU value for Pen 1U9001A (point 1T0499A).
: b. Go to ERCS Screen PEN_TREND (Pen Trend Configuration).
: c. Enter 550 as the new Min EU value for Pen 1U9001A (point 1T0499A).
: d. Enter 560 as the new Max EU value for Pen 1U9001A (point 1T0499A).
: d. Enter 560 as the new Max EU value for Pen 1U9001A (point 1T0499A).
: e. Enter 550 as the new Min EU value for Pen 1U9002A (point 1T0496A).
: e. Enter 550 as the new Min EU value for Pen 1U9002A (point 1T0496A).
: f. Enter 560 as the new Max EU value for Pen 1U9002A (point 1T0496A).
: f. Enter 560 as the new Max EU value for Pen 1U9002A (point 1T0496A).
: 5. If available, run schedule file P I-ILT-NRC-14 0 4 S.sch as follows:
: 5. If available, run schedule file PI-ILT-NRC-1404S.sch as follows:
: a. Select open file in the Schedule application.
: a. Select open file in the Schedule application.
: b. Locate schedule file.
: b. Locate schedule file.
: c. Open schedule file by double clicking it.
: c. Open schedule file by double clicking it.
: d. Run the schedule file by pressing the "Stopped" button on the toolbar. e. Verify the schedule file is running.
: d. Run the schedule file by pressing the Stopped button on the toolbar.
: e. Verify the schedule file is running.
: 6. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
: 6. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
: 7. If available, run event file PI-ILT-NRC-1404S.evt as follows:
: 7. If available, run event file PI-ILT-NRC-1404S.evt as follows:
Line 1,810: Line 1,907:
: 8. If event file is NOT available, then enter event codes as specified by the Simulator Event Summary.
: 8. If event file is NOT available, then enter event codes as specified by the Simulator Event Summary.
: 9. If desired, start Scenario Based Testing Data Collection Program.
: 9. If desired, start Scenario Based Testing Data Collection Program.
: 10. Complete the "Simulator Setup Checklist."
: 10. Complete the "Simulator Setup Checklist.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 7 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 7 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW             EXPECTED STUDENT RESPONSES POS
: 1. SIMULATOR PRE
: 1. SIMULATOR PRE-BRIEF:
-BRIEF: a. The Simulator Pre
: a. The Simulator Pre-Brief is conducted prior to the crew entering the simulator.
-Brief is conducted prior to the crew entering the simulator.
: b. Review Unit 1 LPEO / PEO Turnover Log.
: b. Review Unit 1 LPEO / PEO Turnover Log.
: c. Perform a pre
: c. Perform a pre-job brief for the following activities:
-job brief for the following activities:
: 1) Alternate CFCUs and Discharge Dampers per C19.2 section 5.6.4.A.
: 1) Alternate CFCUs and Discharge Dampers per C19.2 section 5.6.4.A
(a) This is being performed so thermographs can be taken of the 12 and 14 CFCU breakers.
. (a) This is being performed so thermographs can be taken of the 12 and 14 CFCU breakers.
(b) Current CFCU lineup:
(b) Current CFCU lineup:
(1) 11 and 13 CFCUs are running in FAST to the DOME.
(1) 11 and 13 CFCUs are running in FAST to the DOME.
(2) 12 and 14 CFCUs are running in SLOW to the SUP/GAP.
(2) 12 and 14 CFCUs are running in SLOW to the SUP/GAP.
(c) Shift CFCUs such that:
(c) Shift CFCUs such that:
(1) 11 and 13 CFCUs are running in SLOW to the SUP/GAP.
(1) 11 and 13 CFCUs are running in SLOW to the SUP/GAP.
(2) 12 and 14 CFCUs are running in FAST to the DOME.
(2) 12 and 14 CFCUs are running in FAST to the DOME.
(d) A copy of C19.2 is provided.
(d) A copy of C19.2 is provided
(e) The Lead RO will perform this activity.
. (e) The Lead RO will perform this activity.
(f) This activity is to be performed after shift turnover is complete.
(f) This activity is to be performed after shift turnover is complete.
: 2) Raise power to 60%.
: 2) Raise power to 60%. (a) There is currently a power hold at 5 1% for chemistry control.
(a) There is currently a power hold at 51% for chemistry control.
(b) The Duty Chemist is performing samples and will inform the Shift Manager when it is ok to raise power to 60%.
(b) The Duty Chemist is performing samples and will inform the Shift Manager when it is ok to raise power to 60%.
(c) Once power is at 60%, another hold for chemistry will be in effect.
(c) Once power is at 60%, another hold for chemistry will be in effect.
(d) A marked up copy of 1C1.4 Section 5.1 is provided (blank copy of the page for setting up turbine controls).
(d) A marked up copy of 1C1.4 Section 5.1 is provided (blank copy of the page for setting up turbine controls).
(e) There are NO fuel conditioning requirements and NO turbine ramp limits
(e) There are NO fuel conditioning requirements and NO turbine ramp limits.
. (f) Raise Reactor Power to 60%
(f) Raise Reactor Power to 60%:
: (1) RATE: 0.5%/minute
(1) RATE: 0.5%/minute.
. (2) Rods in "MANUAL"
(2) Rods in MANUAL.
. (3) Turbine in "AUTO" in LOAD mode.
(3) Turbine in AUTO in LOAD mode.
(g) A reactivity plan was developed by the off going RO for the power increase from current power to 60%.  
(g) A reactivity plan was developed by the off going RO for the power increase from current power to 60%.
(h) Verify the reactivity plan developed by the off going reactor operator.
(h) Verify the reactivity plan developed by the off going reactor operator.
(i) Nuclear Engineering was NOT available to provide a reactivity prediction.
(i) Nuclear Engineering was NOT available to provide a reactivity prediction.
: 2. COMPLETE TURNOVER:  
: 2. COMPLETE TURNOVER:
: a. Crew performs a walk down of the control boards.
: a. Crew performs a walk down of the control boards.
: b. Review PRA Printout.
: b. Review PRA Printout.
: c. Crew takes the duty.
: c. Crew takes the duty.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 8 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 8 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 1 3. After the crew has assumed the duty, they will alternate Containment Fan Coil Units and Discharge Dampers per section 5.6.4.A of 1C19.2 so that:
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 1     3. After the crew has assumed the duty, they will alternate               1C19.2, CONTAINMENT SYS VENTILATION UNIT 1 Containment Fan Coil Units and Discharge Dampers per
: a. 11 and 13 CFCUs are running in SLOW to the DOME. b. 12 and 14 CFCUs are running in FAST to SUP/GAP.
* Shift the following fan coil units to SLOW by placing section 5.6.4.A of 1C19.2 so that:                             LEAD    the control switch in OFF for 15 seconds, then
LEAD  1C19.2 , CONTAINMENT SYS VENTILATION UNIT 1 Shift the following fan coil units to SLOW by placing the control switch in "OFF" for 15 seconds, then placing the control switch in "SLOW:"
: a. 11 and 13 CFCUs are running in SLOW to the                           placing the control switch in SLOW:
o CS-46018, 11 CNTMT FAN COIL UNIT o CS-46019, 13 CNTMT FAN COIL UNIT Align the fan coil unit discharge dampers as desired:
DOME.                                                                      o CS-46018, 11 CNTMT FAN COIL UNIT
: b. 12 and 14 CFCUs are running in FAST to SUP/GAP.                              o CS-46019, 13 CNTMT FAN COIL UNIT
* Align the fan coil unit discharge dampers as desired:
o CS-46440, 11 FCU DISCH, to DOME.
o CS-46440, 11 FCU DISCH, to DOME.
o CS-46441, 12 FCU DISCH, to SUP.
o CS-46441, 12 FCU DISCH, to SUP.
o CS-46442, 13 FCU DISCH, to DOME.
o CS-46442, 13 FCU DISCH, to DOME.
o CS-46443, 14 FCU DISCH, to GAP.
o CS-46443, 14 FCU DISCH, to GAP.
Verify the white fan coil unit damper improper lights remain NOT LIT:
* Verify the white fan coil unit damper improper lights remain NOT LIT:
o ML-44002-0101, 11 CNTMT FCU DISCH DMPRS IMPROPER o ML-44002-0102, 12 CNTMT FCU DISCH DMPRS IMPROPER o ML-44002-0103, 13 CNTMT FCU DISCH DMPRS IMPROPER o ML-44002-0104, 14 CNTMT FCU DISCH DMPRS IMPROPER Shift the following fan coil units to FAST by placing the control switch in "OFF" for at least one (1) second, then placing the control switch in "FAST:"
o ML-44002-0101, 11 CNTMT FCU DISCH DMPRS IMPROPER o ML-44002-0102, 12 CNTMT FCU DISCH DMPRS IMPROPER o ML-44002-0103, 13 CNTMT FCU DISCH DMPRS IMPROPER o ML-44002-0104, 14 CNTMT FCU DISCH DMPRS IMPROPER
* Shift the following fan coil units to FAST by placing the control switch in OFF for at least one (1) second, then placing the control switch in FAST:
o CS-46020, 12 CNTMT FAN COIL UNIT o CS-46021, 14 CNTMT FAN COIL UNIT.
o CS-46020, 12 CNTMT FAN COIL UNIT o CS-46021, 14 CNTMT FAN COIL UNIT.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 9 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 9 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 2        
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW           EXPECTED STUDENT RESPONSES POS EVENT 2     4. When CFCUs and Discharge Dampers are alternated,                       C47011-0405, FW CONTROL SYSTEM TROUBLE and/or at the discretion of the lead evaluator, then enter:
: 4. When CFCUs and Discharge Dampers are alternated , and/or at the discretion of the lead evaluator, then enter: Trigger 2 , 1PT-468, Red Channel A SG Pressure, fails HIGH. a. If contacted as I&C to trip bistables, inform the crew two I&C Technicians will be available in 1 hour. b. If contacted as the Operations Management, acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station Manager, etc. as asked.
* Verify steam generator level control operating properly Trigger 2, 1PT-468, Red Channel A SG Pressure, fails           LEAD    in automatic.
: c. If contacted as the FIN Team Supervisor, inform the crew that you will write a work order and assign an I&C Supervisor to investigate.
HIGH.
: 5. Plant Response:
* Refer to 1C51, INSTRUMENT FAILURE GUIDE.
: a. 1PT-468, A SG Pressure, rises until pegged high
: a. If contacted as I&C to trip bistables, inform the crew
. b. A SG PORV will automatically open
* Increase monitoring of steam generator level control.
. c. Annunciator 47011
two I&C Technicians will be available in 1 hour.
-0405, FW CONTROL SYSTEM TROUBLE, will be received.
* Contact I&C and System Engineer to determine cause
: b. If contacted as the Operations Management,                           of failure.
acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station 1C51.1, 11 Steam Generator Pressure 1P-468 - High Manager, etc. as asked.                                     RO
: c. If contacted as the FIN Team Supervisor, inform the
* Take manual control of 11 SG PORV and ensure crew that you will write a work order and assign an                 valve is CLOSED.
I&C Supervisor to investigate.
* Verify SG level control operating properly in automatic.
SS
* Enter T.S. LCO 3.3.2 Condition A - Reference Table
: 5. Plant Response:                                                           3.3.2-1 immediately.
: a. 1PT-468, A SG Pressure, rises until pegged high.
* Enter T.S. LCO 3.3.2 Condition D - Place 1P-468
: b. A SG PORV will automatically open.                                  channel in trip within 6 hours or be in Mode 3 in 12
: c. Annunciator 47011-0405, FW CONTROL SYSTEM                           hours and Mode 4 in 18 hrs.
TROUBLE, will be received.
* Call I&C to trip bistables.
: d. SG level will maintain program level in auto.
: d. SG level will maintain program level in auto.
LEAD RO SS C4701 1-0405 , FW CONTROL SYSTEM TROUBLE Verify steam generator level control operating properly in automatic.
* Check if TPM power is affected by the steam pressure channel failure.
Refer to 1C51, INSTRUMENT FAILURE GUIDE.
* If TPM power is affected, then change TPM Power Source input from Calorimetric to NIS and notify the computer group.
Increase monitoring of steam generator level control.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Contact I&C and System Engineer to determine cause of failure.
 
1C51.1 , 11 Steam Generator Pressure 1P
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                      Page 10 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:
-468 - High  Take manual control of 11 SG PORV and ensure valve is CLOSED.
SEQ            SEQUENCE OF EVENTS / INSTRUCTOR NOTES                          CREW            EXPECTED STUDENT RESPONSES POS EVENT 3      6. When the plant is stable and/or at the discretion of the                1C1.4, UNIT 1 POWER OPERATION lead evaluator, then:
Verify SG level control operating properly in automatic.
* Place CS-46280, ROD BANK SELECTOR, in RO/SS
Enter T.S. LCO 3.3.
: a. As the Shift Manager, inform the Control Room the                    MANUAL.
2 Condition A
Unit 1 50% Power Hold for chemistry is lifted.
- Reference Table 3.3.2-1 immediately.
* Using the On Line Control screen:
Enter T.S. LCO 3.3.
Another Power Hold for chemistry will be in effect                          o Select LOAD.
2 Conditio n D - Place 1P-468 channel in trip within 6 hours or be in Mode 3 in 12 hours and Mode 4 in 18 hrs
when Unit 1 power reaches 60%.                                              o Select 0.5% demand rate.
. Call I&C to trip bistables.
: b. If contacted as the duty chemist, acknowledge Unit 1
Check if TPM power is affected by the steam pressure channel failure.
* Verify the VPL control is not Red.
If TPM power is affected, then change TPM "Power Source" input from "Calorimetric" to "NIS" and notify the computer group.
power will be raised from 50% to 60%.
* Raise the VPL to 101% using the Valve Limiter pop-up screen.
* Set the Target setting to the desired Load using On Line Control screen Target increase/decrease NOTE                                            controls.
It is NOT intended to wait for the plant to reach 60%
* Initiate an alternate dilution of the RCS per 1C12.5.
power prior to proceeding to the next event. Once the
* When Tave shows an increase, then select the Go Lead Evaluator is satisfied with the reactivity                              control using the On Line Control screen.
manipulation, proceed to Event 4.
* Adjust the alternate dilution rate or perform alternate dilutions per 1C12.5 to maintain Tave and Tref with the desired +/-1.5&deg;F band.
1C12.5, UNIT 1 BORON CONCENTRATION CONTROL RO/SS
* Verify the RMU integrator is reset.
* Set 1YIC-111, RX MU WTR TO BLENDER BATCH INTEGRATOR, to quantity desired.
* Place CS-46300, MAKE-UP MODE SELECTOR, to ALT DIL.
* Place CS-46454, BA BLENDER TO VCT INLT CV-31201, to CLOSE.
* If desired, then adjust 1HC-111, RX MU WTR TO BLENDER FLOW CONT, set point to desired flow rate or place in MANUAL adjusted for desired flow rate.
* Momentarily place CS-46457, BORIC ACID MAKE-UP CONTROL, to START, to initiate dilution.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 11 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:
-G-RM-01.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW       EXPECTED STUDENT RESPONSES POS EVENT 3
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 10 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME
* When the desired quantity of makeup has been (cont)                                                                                added, then verify automatic makeup stopped as indicated by CS-46457, BORIC ACID MAKE-UP CONTROL, green light LIT.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 3        
* If additional alternate dilution is desired, then return to step 2.
: 6. When the plant is stable and/or at the discretion of the lead evaluator, then: a. As the Shift Manager , inform the Control Room the Unit 1 50% Power Hold for chemistry is lifted. Another Power Hold for chemistry will be in effect when Unit 1 power reaches 60%.
* Verify CS-46454, BA BLENDER TO VCT INLT CV-31201, is selected to AUTO.
: b. If contacted as the duty chemist, acknowledge Unit 1 power will be raised from 50% to 60%.
* Verify 1HC-111, RX MU WTR TO BLENDER FLOW CONT, is in AUTO set to 45%.
NOTE It is NOT intended to wait for the plant to reach 60% power prior to proceeding to the next event. Once the Lead Evaluator is satisfied with the reactivity manipulation, proceed to Event
* Place CS-46300, MAKE-UP MODE SELECTOR, to AUTO.
: 4.
* Momentarily place CS-46457, BORIC ACID MAKE-UP CONTROL, to START.
RO/SS   
* Reset the RMU integrator.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


RO/SS 1C1.4, UNIT 1 POWER OPERATION Place CS-46280, ROD BANK SELECTOR, in "MANUAL". Using the "On Line Control" screen:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                 Page 12 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:
o Select LOAD.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 4     7. When the lead evaluator is satisfied with the reactivity               1C5 AOP4, DROPPED RCCA
o Select 0.5% demand rate.
    &            manipulation, enter:
Verify the "VPL" control is not Red.
* Confirm Rod Drop using diverse indications:
Raise the "VPL" to 101% using the "Valve Limiter" pop-up screen.
EVENT 5          Trigger 4, Dropped Rod B CBA GR1.                           RO
Set the "Target" setting to the desired Load using "On Line Control" screen "Target" increase/decrease controls. Initiate an alternate dilution of the RCS per 1C12.5.
* Rod Position Indication and RCS Tavg Changes
When Tave shows an increase, then select the "Go" control using the "On Line Control" screen.
: a. Verify:                                                                     OR AUTO Trigger 5, Auto Turbine Trip Failure, is
Adjust the alternate dilution rate or perform alternate dilutions per 1C12.5 to maintain Tave and Tref with the desired 1.5&deg;F band. 1C12.5, UNIT 1 BORON CONCENTRATION CONTROL Verify the RMU integrat or is reset.
* Rod Position Indication and NIS Changes.
Set 1YIC-111, RX MU WTR TO BLENDER BATCH INTEGRATOR, to quantity desired.
entered when the reactor is manually tripped.
Place CS-46300, MAKE
* Manually trip the reactor.
-UP MODE SELECTOR, to "ALT DIL". Place CS-46454, BA BLENDER TO VCT INLT CV
: b. Upon hearing the announcement of Reactor Trip, or
-31201, to "CLOSE".
* Perform 1E-0.
If desired, then adjust 1HC
when called as the Turbine Building Operator to isolate the Unit 1 MSRs per Attachment J, then open             C47017-0404, FLUX RATE REACTOR TRIP and run schedule file E-0_Att-J.sch located in
-111, RX MU WTR TO BLENDER FLOW CONT, set point to desired flow rate or place in "MANUAL" adjusted for desired flow rate.
* Perform 1E-0.
Momentarily place CS
X:\\Trex_PI\Lightning\Schedule\EOPs. When the isolation is complete, inform the crew the MSRs are isolated.                                                       1E-0, REACTOR TRIP OR SAFETY INJECTION
-46457, BORIC ACID MAKE
* Determine the reactor did NOT automatically trip.
-UP CONTROL, to "START", to initiate dilution.
RO/
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
: 8. Plant Response:
-G-RM-01.
* Manually trip the reactor.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 11 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME
LEAD
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 3 (cont)  When the desired quantity of makeup has been added, then verify automatic makeup stopped as indicated by CS
: a. CB-A Group1 Rod B-8 rod bottom indication.
-46457, BORIC ACID MAKE
* Manually trip the main turbine.
-UP CONTROL, green light LIT.
: b. NIS power and RCS Tavg lowering.
If additional alternate dilution is desired, then return to step 2. Verify CS-46454, BA BLENDER TO VCT INLT CV
* Verify both safeguards buses are energized.
-31201, is selected to "AUTO".
: c. Flux Rate Reactor Trip and Rod at Bottom Alarms.
Verify 1HC
* Determine SI is NOT actuated.
-111, RX MU WTR TO BLENDER FLOW CONT, is in "AUTO" set to 45%.
: d. The reactor fails to automatically trip.
Place CS-46300, MAKE
-UP MODE SELECTOR, to "AUTO". Momentarily place CS
-46457, BORIC ACID MAKE
-UP CONTROL, to "START".
Reset the RMU integrator.
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 12 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 4 & EVENT 5 7. When the lead evaluator is satisfied with the reactivity manipulation, enter: Trigger 4 , Dropped Rod B CBA GR1. a. Verify: AUTO Trigger 5, Auto Turbine Trip Failure, is entered when the reactor is manually tripped. b. Upon hearing the announcement of Reactor Trip, or when called as the Turbine Building Operator to isolate the Unit 1 MSRs per Attachment J, then open and run schedule file E-0_Att-J.sch located in X:\\Trex_PI\Lightning\Schedule\EOPs. When the isolation is complete, inform the crew the MSRs are isolated. 8. Plant Response:
: a. CB-A Group1 Rod B
-8 rod bottom indication
. b. NIS power and RCS Tavg lowering
. c. Flux Rate Reactor Trip and Rod at Bottom Alarm
: s. d. The reactor fails to automatically trip.
: e. The reactor is capable of a manual trip.
: e. The reactor is capable of a manual trip.
CRITICAL TASK S  Manually trip the reactor from the control room before transition out of E
CRITICAL TASKS
-0. Manually trip the main turbine before transition out       of E-0. EMERGENCY PLAN CLASSIFICATION ALERT - SA2.1 due to the reactor failing to automatically trip during the high flux rate condition and the crew successfully manually tripping the reactor.
* Manually trip the reactor from the control room before transition out of E-0.
* Manually trip the main turbine before transition out of E-0.
EMERGENCY PLAN CLASSIFICATION ALERT - SA2.1 due to the reactor failing to automatically trip during the high flux rate condition and the crew successfully manually tripping the reactor.
However, this classification may NOT be used due to a higher classification being met in the next event.
However, this classification may NOT be used due to a higher classification being met in the next event.
RO        RO/ LEAD    1C5 AOP4, DROPPED RCCA Confirm Rod Drop using diverse indications:
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Rod Position Indication and RCS Tavg Changes OR  Rod Position Indication and NIS Changes.
 
Manually trip the reactor.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 13 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:
Perform 1E
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENTs      9. Ten (10) seconds after the Main Turbine is manually                 SS 1ECA-0.0, LOSS OF ALL SAFEGUARDS AC POWER 6&7            tripped, verify:
-0. C47017-0404, FLUX RATE REACTOR TRIP Perform 1E
* Check PRZR PORVs closed.
-0. 1E-0, REACTOR TRIP OR SAFETY INJECTION Determine the reactor did NOT automatically trip.
RO AUTO Trigger 6, LOSS OF ALL AC, is entered.
Manually trip the reactor.
* Check Letdown isolation valves closed.
Manually trip the main turbine. Verify both safeguards buses are energized.
: a. Approximately 15 seconds after the Loss of All AC,                         o CV-31255 announce the following:                                                   o CV-31226
Determine SI is NOT actuated. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
: 1) Attention all plant personnel, Unit 2 Reactor Trip.                   o CV-31330 Attention all plant personnel, Unit 2 Reactor Trip.
-G-RM-01.
* Recognize AFW flow is below 200 GPM.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 13 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME
: b. If contacted as an out-plant operator to establish
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT s 6 & 7     
* Manually start 11 TD AFW Pump.
: 9. Ten (10) seconds after the Main Turbine is manually tripped, verify
communications with the CR to throttle AFW flow,
: AUTO Trigger 6 , LOSS OF ALL AC, is entered
* Announce Unit 1 Reactor Trip then wait 2 minutes and report you are in the AFW
. a. Approximately 15 seconds after the Loss of All AC, announce the following:
* Notify Shift Manager and SEC.
: 1) "Attention all plant personnel, Unit 2 Reactor Trip. Attention all plant personnel, Unit 2 Reactor Trip."
Pump room standing by to throttle AFW flow.
: b. If contacted as an out
* Check cooling water header pressures are both Throttle AFW flow as necessary using the following                 greater than 25 PSIG.
-plant operator to establish communications with the CR to throttle AFW flow, then wait 2 minutes and report you are in the AFW Pump room standing by to throttle AFW flow. Throttle AFW flow as necessary using the following remotes: 1) FW134 - 11 AFW Pump to 11 SG (MV
remotes:                                                    LEAD
-32238) 2) FW135 - 11 AFW Pump to 12 SG (MV
* Determine neither safeguards bus is available for
-32239) c. If directed to investigate Bus 15 and 16, after 2 minutes, report Bus 15 and Bus 16 have 50G current relays showing. As an Electrical Maintenance Supervisor, report it will take at least 6 hours to get one safeguards bus restored.
: 1) FW134 - 11 AFW Pump to 11 SG (MV-32238) sequencer loading due to both being LOCKED OUT.
: d. If contacted as an out
: 2) FW135 - 11 AFW Pump to 12 SG (MV-32239)
-plant operator to isolate RCP seals, then enter: Trigger 1 6 , Isolate RCP Seals.
* Proceed to step 8.
: 1) When Trigger 1 6 is complete, report to the CR that Step 8 of 1ECA
: c. If directed to investigate Bus 15 and 16, after 2 minutes, report Bus 15 and Bus 16 have 50G current
-0.0 is complete.
* Dispatch personnel to locally close valves to isolate relays showing. As an Electrical Maintenance                       RCP seals.
: e. If contacted as an out
Supervisor, report it will take at least 6 hours to get
-plant operator to perform Attachment H, then acknowledge order
* Place the following equipment switches in PULLOUT.
. f. When the crew reaches step 18 of 1ECA
one safeguards bus restored.                                              o MD AFW Pump.
-0.0, inform the crew that Unit 2 operators will perform the following:
: d. If contacted as an out-plant operator to isolate RCP                       o Groups A & B PRZR heaters (Off position).
: 1) Initiate monitoring of DC supply using ERCS
seals, then enter:                                                         o RHR pumps.
: 2) Dispatch personnel to open Foxboro instrument rack doors SS RO LEAD 
Trigger 16, Isolate RCP Seals.                                            o SI pumps.
: 1) When Trigger 16 is complete, report to the CR                           o CS pumps.
that Step 8 of 1ECA-0.0 is complete.                                  o CFCUs (Off position).
: e. If contacted as an out-plant operator to perform                           o CC pumps.
Attachment H, then acknowledge order.                                      o CR Chillers and Fans.
: f. When the crew reaches step 18 of 1ECA-0.0, inform                           o 121 and 122 Air Compressors.
the crew that Unit 2 operators will perform the
* Place safeguards bus voltage restoration switches to following:                                                          MANUAL:
: 1) Initiate monitoring of DC supply using ERCS                             o Bus 15
: 2) Dispatch personnel to open Foxboro instrument                           o Bus 16 rack doors
* Verify Bus 15 and Bus 16 source breakers are open.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


1E CA-0.0 , LOSS OF ALL SAFEGUARDS AC POWER Check PRZR PORVs closed.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 14 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:
Check Letdown isolation valves closed.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENTs              3) Transfer MCC and Buses to Unit 2                         LEAD
o CV-31255 o CV-312 26 o CV-31330  Recognize AFW flow is below 200 GPM.
* Determine both Safeguards buses are LOCKED OUT.
Manually start 11 TD AFW Pump.
6&7                4) Establish Battery Room Cooling.
Announce Unit 1 Reactor Trip Notify Shift Manager and SEC.
* Proceed to step 13.
Check cooling water header pressures are both greater than 25 PSIG.
(cont)
Determine neither safeguards bus is available for sequencer loading due to both being LOCKED OUT.
* Close Condenser makeup isolation valve CV-31121.
Proceed to step 8.
Dispatch personnel to locally close valves to isolate RCP seals.
Place the following equipment switches in PULLOUT.
o MD AFW Pump.
o Groups A & B PRZR heaters (Off position).
o RHR pumps.
o SI pumps. o CS pumps. o CFCUs (Off position).
o CC pumps. o CR Chillers and Fans.
o 121 and 122 Air Compressors.
Place safeguards bus voltage restoration switches to "MANUAL": o Bus 15 o Bus 16  Verify Bus 15 and Bus 16 source breakers are open.
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 14 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT s 6 & 7  (cont)       
: 3) Transfer MCC and Buses to Unit 2
: 4) Establish Battery Room Cooling.
: 10. Plant Response:
: 10. Plant Response:
* Check condenser makeup flow is zero.
: a. Loss of lighting in the Control Room.
: a. Loss of lighting in the Control Room.
* Manually close MSIVs.
: b. Bus 15 and 16 voltages read zero.
: b. Bus 15 and 16 voltages read zero.
: c. Bus 15 and 16 Lockout Annunciators.
* Check MS Bypasses, MFW, MFW bypasses, and SGB
: d. 11 TD AFW Pump fails to auto start.
: c. Bus 15 and 16 Lockout Annunciators.                                valves are closed.
CRITICAL TASK S  Establish and maintain 200 GPM AFW flow to the Steam Generators prior to Step 3 of ECA
: d. 11 TD AFW Pump fails to auto start.                           RO/
-0.0. Isolate RCP seal injection before a charging pump is started. EMERGENCY PLAN CLASSIFICATION GENERAL EMERGENCY
* Check if SGs are NOT faulted.
-  S G 1.1 due to loss of offsite power to both safeguards buses 15 and 16; AND Failure of both Diesel Generators D1 and D2 to supply power to safeguards buses 15 and 16
LEAD
; A ND Restoration of Safeguards Bus 15 or 16 within 4 hours is not likely.
* Check if SGs are NOT ruptured.
LEAD    RO/ LEAD      SS      Determine both Safeguards buses are LOCKED OUT.
CRITICAL TASKS
Proceed to step 13.
* Check SG Narrow Range levels greater than 5%.
Close Condenser makeup isolation valve CV
* Establish and maintain 200 GPM AFW flow to the
-31121. Check condenser makeup flow is zero.
* Control AFW flow to maintain narrow range level Steam Generators prior to Step 3 of ECA-0.0.
Manually close MSIVs.
between 5% and 50%.
Check MS Bypasses, MFW, MFW bypasses, and SGB valves are closed.
* Isolate RCP seal injection before a charging pump is
Check if SGs are NOT faulted.
* Dispatch operator to perform Attachment H, DC Bus started.
Check if SGs are NOT ruptured.
Load Shed.
Check SG Narrow Range levels greater than 5%.
EMERGENCY PLAN CLASSIFICATION
Control AFW flow to maintain narrow range level between 5% and 50%.
* Initiate monitoring of DC supply using ERCS.
Dispatch operator to perform Attachment H, DC Bus Load Shed.
GENERAL EMERGENCY -
Initiate monitoring of DC supply using ERCS.
* Dispatch personnel to open Foxboro instrument rack SG1.1 due to loss of offsite power to both safeguards                      doors.
Dispatch personnel to open Foxboro instrument rack doors. Power transferrable MCCs and buses from Unit 2.
buses 15 and 16;
Contact security to provide access control and block open all Battery Room doors, including fire doors between Battery Rooms.
* Power transferrable MCCs and buses from Unit 2.
Arrange for fire watches at the Battery Rooms
AND                                                        SS
. Check CST level is greater than 10,000 Gallons.
* Contact security to provide access control and block Failure of both Diesel Generators D1 and D2 to supply                      open all Battery Room doors, including fire doors power to safeguards buses 15 and 16;                                        between Battery Rooms.
Depressurize Intact SGs to 300 PSIG.
AND
Check SG Narrow Range level greater than 5%.
* Arrange for fire watches at the Battery Rooms.
Manually dump steam using SG PORVs to maintain cooldown rate in RCS cold legs  
Restoration of Safeguards Bus 15 or 16 within 4 hours is
- LESS THAN 100
* Check CST level is greater than 10,000 Gallons.
&deg;F. 11. Once the crew has initiat ed a SG depressurization to 300 psig and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.
not likely.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* Depressurize Intact SGs to 300 PSIG.
-G-RM-01.
* Check SG Narrow Range level greater than 5%.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 15 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SIMULATOR INPUT  
* Manually dump steam using SG PORVs to maintain cooldown rate in RCS cold legs - LESS THAN 100&deg;F.
: 11. Once the crew has initiated a SG depressurization to 300 psig and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                             Page 15 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==
Line 2,039: Line 2,159:
==SUMMARY==
==SUMMARY==


Event ID Code Description 5 ZRPG439(1)==1 REACTOR TRIP 6 HWZTCT6427(1)==1 TURBINE TRIP Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Event ID                               Code                                                     Description 5                           ZRPG439(1)==1                                               REACTOR TRIP 6                       HWZTCT6427(1)==1                                                 TURBINE TRIP Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 16 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                           Page 16 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario
_____ Simulator Status:
_____     Simulator Status:
___ 1. "Training Load" ___ 2. Step counters "ON" ___ 3. Alarm sound "ON" ___ 4. Steps 1 - 9 on page 6 complete ___ 5. Speed: "REAL"
___ 1.         "Training Load"                       ___ 2. Step counters "ON"
___ 6. IC-264 or IC-8 running   _____ Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructor's booth
___ 3.         Alarm sound "ON"                     ___ 4. Steps 1 - 9 on page 6 complete
. _____ Verify Schedule File/Summary matches Simulator Input Summary page in the SEG
___ 5.         Speed: REAL                         ___ 6. IC-264 or IC-8 running
. _____ Verify Event File has been entered per Simulator Event Summary page in the SEG.
_____     Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructors booth.
_____ Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.
_____     Verify Schedule File/Summary matches Simulator Input Summary page in the SEG.
_____ Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset
_____     Verify Event File has been entered per Simulator Event Summary page in the SEG.
. _____ BOC I sheet displayed on C panel
_____     Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.
. _____ BOC Reactivity Briefing sheet available at Reactor Operator Desk
_____     Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset.
. _____ Turnover sheet/PRA sheet available. _____ If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN. _____ Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).
_____     BOC I sheet displayed on C panel.
_____ Electronic PINGP 577 forms closed on LAN connected PC s. _____ Board-mounted EAL Tables are cleaned
_____     BOC Reactivity Briefing sheet available at Reactor Operator Desk.
. _____ EOOS running on PC and updated as follows to reflect equipment OOS
_____     Turnover sheet/PRA sheet available.
: ___ 1. 1 3 Charging Pump
_____     If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.
_____ Update Control Board Placards:
_____     Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).
___ 1. NRC Current Authentication Code call date updated to current date.
_____     Electronic PINGP 577 forms closed on LAN connected PCs.
___ 2. High Flux At Shutdown Alarm Setpoint placards: 5900 cps
_____     Board-mounted EAL Tables are cleaned.
. ___ 3. Feedwater regulating valve position placard set to current values.
_____     EOOS running on PC and updated as follows to reflect equipment OOS:
___ 4. Recommended SG Blowdown flow set to current values.
___ 1. 13 Charging Pump
___ 5. RCS boron on the CVCS panel placard: 1465 ppm. ___ 6. Turbine reference/setter values on the CVCS panel set to current (Target/Demand on
_____     Update Control Board Placards:
-line positions)
___ 1.       NRC Current Authentication Code call date updated to current date.
. ___ 7. Shift Reactivity Guidance placard: BA: 4.8 gallons, RMU: 67 gallons
___ 2.       High Flux At Shutdown Alarm Setpoint placards: 5900 cps.
. Dilutions @ 10 gal RMU, 1
___ 3.       Feedwater regulating valve position placard set to current values.
-2 times per shift
___ 4.       Recommended SG Blowdown flow set to current values.
. _____ Magnetic placards in place:
___ 5.       RCS boron on the CVCS panel placard: 1465 ppm.
___ 1. 11 BA TANK "Lined Up For Service"
___ 6.       Turbine reference/setter values on the CVCS panel set to current (Target/Demand on-line positions).
___ 2. 11 BA PUMP "Lined Up to 11 BA Tank"
___ 7.       Shift Reactivity Guidance placard: BA: 4.8 gallons, RMU: 67 gallons.
___ 3. 12 BA PUMP "Lined Up to 11 BA Tank"
Dilutions @ 10 gal RMU, 1-2 times per shift.
___ 4. CC to SFP MV
_____       Magnetic placards in place:
-32117 "In Service"
___ 1. 11 BA TANK Lined Up For Service
___ 5. Blowdown 46470 "SGB To CDSR"
___ 2. 11 BA PUMP Lined Up to 11 BA Tank
___ 6. HU Flag above 12 RHR HX CC inlet MV
___ 3. 12 BA PUMP Lined Up to 11 BA Tank
-32094 for "1C14 Limitation"
___ 4. CC to SFP MV-32117 In Service
___ 7. "H 2 IN VCT SPACE" at VCT Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
___ 5. Blowdown 46470 SGB To CDSR
-G-RM-01.
___ 6. HU Flag above 12 RHR HX CC inlet MV-32094 for 1C14 Limitation
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 17 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0
___ 7. H 2 IN VCT SPACE at VCT Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
_____ Pink Status Control Tags in place:
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                   Page 17 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0
_____       Pink Status Control Tags in place:
___ 1. CS-46540, 22 CC WTR PUMP
___ 1. CS-46540, 22 CC WTR PUMP
___ 2. CS-46572, CC TO SFP MV
___ 2. CS-46572, CC TO SFP MV-32117
-32117 _____ Yellow Caution Tags in place: ___ 1. CS-46064, CC TO SFP MV-32115 , in CLOSED ___ 2. CS-46 294, 13 CHG PUMP, in PULLOUT
_____     Yellow Caution Tags in place:
_____ ERCS driven recorders are on
___ 1. CS-46064, CC TO SFP MV-32115, in CLOSED
-scale (RCS temperature scaled 55 0&#xba; F to 56 0&#xba; F). _____ ERCS alarm screen operating and alarms reset
___ 2. CS-46294, 13 CHG PUMP, in PULLOUT
. _____ All ERCS terminals operating and set as follows:
_____     ERCS driven recorders are on-scale (RCS temperature scaled 550&#xba; F to 560&#xba; F).
CONF VARS R02 Alarm Summary Page CONE1 Group OP31_U1 R03 AFD CONC SAS (XS11)
_____     ERCS alarm screen operating and alarms reset.
R04 TPM CONG1 Group QP CCDATA R05 QP LOADFOLL ERCS-R01 Group RADMON_U1 R06 Alarm Summary Page
_____     All ERCS terminals operating and set as follows:
_____ ERCS single point displays:
CONF             VARS                           R02               Alarm Summary Page CONE1             Group OP31_U1                 R03               AFD CONC             SAS (XS11)                     R04               TPM CONG1             Group QP CCDATA               R05               QP LOADFOLL ERCS-R01         Group RADMON_U1               R06               Alarm Summary Page
CONB 1T0499A 1U1613A CONE2 1Q0340A 1V4501A _____ ERCS TPM set (Calorimetric  
_____     ERCS single point displays:           CONB         1T0499A               1U1613A CONE2         1Q0340A               1V4501A
- Auto Scaling  
_____     ERCS TPM set (Calorimetric - Auto Scaling - LEFM).
- LEFM). _____ Verify that copy machine and printers are loaded with paper
_____     Verify that copy machine and printers are loaded with paper.
. _____ Pens/Paper/Markers available on the simulator
_____     Pens/Paper/Markers available on the simulator.
. _____ Verify 12 1 IA Compressor is in PREFERRED and 12 2 IA Compressor is in 1 st STANDBY, and   123 IA Compressor is in 2 nd STANDBY. _____ Verify R11/R12 are lined up correctly (at the R11/R12 local panel):
st
_____     Verify 121 IA Compressor is in PREFERRED and 122 IA Compressor is in 1 STANDBY, and nd 123 IA Compressor is in 2 STANDBY.
_____     Verify R11/R12 are lined up correctly (at the R11/R12 local panel):
___ 1. Sample pump is running.
___ 1. Sample pump is running.
___ 2. Alarms are reset.
___ 2. Alarms are reset.
___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.
___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.
___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.
___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.
_____ Set Turbine Control HMI Displays as follows:
_____     Set Turbine Control HMI Displays as follows:
___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview
___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview.
. ___ 2. U1 Turb Aux Cont (48088) to Turb Overview
___ 2. U1 Turb Aux Cont (48088) to Turb Overview.
. ___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control
___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control.
. _____ DEHC VPL set ~ 0.1 to 0.2 above current valve position (not on limiter).
_____     DEHC VPL set ~ 0.1 to 0.2 above current valve position (not on limiter).
_____ DEHC alarms cleared
_____     DEHC alarms cleared.
. _____ N51 & N52 Display Sheet s for 50% power are in place as necessary
_____     N51 & N52 Display Sheets for 50% power are in place as necessary.
. _____ Headsets turned on as necessary.
_____     Headsets turned on as necessary.
_____ Procedure checklist completed.
_____     Procedure checklist completed. See following page.
See following page.
_____     Peer Check performed for simulator setup.
_____ Peer Check performed for simulator setup
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                     Page 18 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 18 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:
Before           After 1C1.4, UNIT 1 POWER OPERATION 1C12.5, UNIT 1 BORON CONCENTRATION CONTROL 1C19.2, CONTAINMENT SYSTEM VENTILATION UNIT 1 1C28.1 AOP3, AUXILIARY FEEDWATER SYSTEM OPERATION WHEN AC POWER IS LOST 1C5 AOP4, DROPPED RCCA 1C51.1, 11 Steam Generator Pressure 1P-468 - High 1E-0, REACTOR TRIP OR SAFETY INJECTION 1ECA-0.0, LOSS OF ALL SAFEGUARDS AC POWER C47011-0405, FW CONTROL SYSTEM TROUBLE C47013-0407, ROD AT BOTTOM C47013-0507, COMPUTER ALARM ROD DEVIATION/SEQUENCING C47017-0404, FLUX RATE REACTOR TRIP C47019-0301, 11 CONTAINMENT SPRAY PUMP LOCAL CONTROL AUTO START BLOCKED C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES REACTIVITY BRIEFING BINDER - BOC SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.3.2 T.S. LCO 3.6.5 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Before After       1C1.4, UNIT 1 POWER OPERATION 1C12.5, UNIT 1 BORON CONCENTRATION CONTROL 1C19.2 , CONTAINMENT SYSTEM VENTILATION UNIT 1 1C28.1 AOP3, AUXILIARY FEEDWATER SYSTEM OPERATION WHEN AC POWER IS LOST 1C5 AOP4, DROPPED RCCA 1C51.1, 11 Steam Generator Pressure 1P
 
-468 - High     1E-0, REACTOR TRIP OR SAFETY INJECTION 1ECA-0.0, LOSS OF ALL SAFEGUARDS AC POWER C47011-0405, FW CONTROL SYSTEM TROUBLE C47013-0407, ROD AT BOTTOM C47013-0507, COMPUTER ALARM ROD DEVIATION/SEQUENCING C47017-0404, FLUX RATE REACTOR TRIP C47019-0301, 11 CONTAINMENT SPRAY PUMP LOCAL CONTROL AUTO START BLOCKED C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES REACTIVITY BRIEFING BINDER  
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                   Page 19 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Post-Scenario Checklist
- BOC     SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.3.2 T.S. LCO 3.6.5 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
_____     LAN connected computers are cleared of information added during the scenario.
-G-RM-01.
_____     Computer generated PINGP 577 cleared.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 19 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Post-Scenario Checklist
_____     Procedure checklist completed. See previous page.
_____ LAN connected computers are cleared of information added during the scenario.
_____     Remove Pink Status Control Tags from the following equipment:
_____ Computer generated PINGP 577 cleared.
___ 1. NONE
_____ Procedure checklist completed. See previous page. _____ Remove Pink Status Control Tags from the following equipment
_____   Magnetic placards removed:
: ___ 1. NONE _____ Magnetic placards removed:
___ 1. NONE
___ 1. NONE   _____ Remove Yellow Caution Tags from the following equipment: ___ 1. CS-46293, 12 CHG PUMP
_____     Remove Yellow Caution Tags from the following equipment:
_____ Erase marker on RCS temperature ERCS driven recorder.
___ 1. CS-46293, 12 CHG PUMP
_____ Board-mounted EAL Table is cleaned
_____     Erase marker on RCS temperature ERCS driven recorder.
. _____ All books, note pads, and calculators put away
_____     Board-mounted EAL Table is cleaned.
. End Of Day Checklist
_____     All books, note pads, and calculators put away.
_____ Signs/placards removed and put away unless normal simulator configuration
End Of Day Checklist
. _____ Floor PCs logged off if simulator will not be used again that day
_____     Signs/placards removed and put away unless normal simulator configuration.
. _____ Instructor station returned to normal with all books, paper, and etc. put away
_____     Floor PCs logged off if simulator will not be used again that day.
. _____ Headsets turned off and put away if simulator will not be used again that day
_____     Instructor station returned to normal with all books, paper, and etc. put away.
. _____ Simulator reset to IC
_____     Headsets turned off and put away if simulator will not be used again that day.
-1 0 unless another IC will be used for further training
_____     Simulator reset to IC-10 unless another IC will be used for further training.
. _____ Simulator placed in DORT if simulator will not be used again that day
_____     Simulator placed in DORT if simulator will not be used again that day.
. _____ Recorder power "OFF" if simulator will not be used again that day
_____     Recorder power "OFF" if simulator will not be used again that day.
. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 20 of 24   RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE:           DAY/NIGHT SHIFT: Day         CAT 1 VENT OPENINGS: 0 ft 2  SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS NONE PROTECTED EQUIPMENT 22 CC PUMP 121 SFP HX RAD MONITORS OOS ANNUNCIATORS OOS NONE NONE OUTSTANDING SP'S FIRE DET / PROT EQP IMPAIRMENTS NONE NONE OTHER EQUIPMENT OOS / STATUS 12 Charging Pump is Out of Service
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                             Page 20 of 24 RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE:                                                                                   DAY/NIGHT SHIFT: Day CAT 1 VENT OPENINGS: 0 ft2                                                      SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS NONE PROTECTED EQUIPMENT 22 CC PUMP 121 SFP HX RAD MONITORS OOS                                           ANNUNCIATORS OOS NONE                                                       NONE OUTSTANDING SPS                                            FIRE DET / PROT EQP IMPAIRMENTS NONE                                                       NONE OTHER EQUIPMENT OOS / STATUS
. Two 40 GPM Letdown Orifices are in service.
* 12 Charging Pump is Out of Service.
Pressurizer Heaters are ON.
* Two 40 GPM Letdown Orifices are in service.
11 and 12 Condensate Pumps are running.
* Pressurizer Heaters are ON.
11 and 12 Main Feed Pumps are running. 11 MFP recirc valve is still open; waiting until 70 percent to close per step 5.5.12 and 5.5.13 of 1C28.2. Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System. MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE Unit 1 was returned on
* 11 and 12 Condensate Pumps are running.
-line two days ago.
* 11 and 12 Main Feed Pumps are running. 11 MFP recirc valve is still open; waiting until 70 percent to close per step 5.5.12 and 5.5.13 of 1C28.2.
A 5 1% hold is in effect due to chemistry.
* Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System.
OPERATIONAL PLANS FOR COMING SHIFT Xenon is at equilibrium.
MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE
Per section 5.6.4.A of 1C19.2, alternate CFCUs and discharge dampers to the following in preparation of thermography on 12 and 14 CFCU breakers
* Unit 1 was returned on-line two days ago.
: o 11 and 13 CFCUs running in SLOW to the DOME.
* A 51% hold is in effect due to chemistry.
OPERATIONAL PLANS FOR COMING SHIFT
* Xenon is at equilibrium.
* Per section 5.6.4.A of 1C19.2, alternate CFCUs and discharge dampers to the following in preparation of thermography on 12 and 14 CFCU breakers:
o 11 and 13 CFCUs running in SLOW to the DOME.
o 12 and 14 CFCUs running in FAST to SUP/GAP.
o 12 and 14 CFCUs running in FAST to SUP/GAP.
Perform a load increase from 50% to 60% when Chemistry releases the hold
* Perform a load increase from 50% to 60% when Chemistry releases the hold.
. Dilute 10 gallons 1
* Dilute 10 gallons 1-2 times per shift for temperature control.
-2 times per shift for temperature control.
NEW PROCEDURES / INSTRUCTIONS Review altered scale on Tavg ERCS Recorder.
NEW PROCEDURES / INSTRUCTIONS Review altered scale on Tavg ERCS Recorder.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 21 of 24 Reactivity Plan Load increase from 5 0% to 60%.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 21 of 24 Reactivity Plan Load increase from 50% to 60%.
Prior to entering the simulator:
Prior to entering the simulator:
Verify the reactivity plan completed by the off going reactor operator
* Verify the reactivity plan completed by the off going reactor operator.
. Complete a Pre
* Complete a Pre-Job Brief of 1C1.4 Section 5.1.
-Job Brief of 1C1.4 Section 5.
Current conditions are:
: 1. Current conditions are:
* 11 and 12 MFPs are running.
11 and 12 MFPs are running.
* 11 and 12 Condensate Pumps are running.
11 and 12 Condensate Pumps are running.
* Power level: 50% (263 MW)
Power level: 5 0% (26 3 MW) Xenon: Equilibrium Control Rod Position: Bank D @ 17 5 steps Boron Concentration: 1465 ppm Core Exposure: 1000 MWD/MTU   Target: Turbine Load: 311 MW (60%) Rate: 0.50% /minute Control Mode: LOAD control with Rod Control in Manual  
* Xenon: Equilibrium
* Control Rod Position: Bank D @ 175 steps
* Boron Concentration: 1465 ppm
* Core Exposure: 1000 MWD/MTU Target: Turbine Load: 311 MW (60%)
Rate: 0.50% /minute Control Mode: LOAD control with Rod Control in Manual Boration/Dilution: 267 gallon dilution (batch)
Final Control Rod Position: Bank D @ 178 steps Reactivity Prediction:
Change in Power Defect: -100 pcm (Figure C1-7A)
Differential Boron Worth: -6.2 pcm/ppm (Figure C1-11A)
Differential Rod Worth: 3.8 pcm/step (Figure C1-4A)
Calculated RCS PPM change: -13 ppm (80 pcm &#xf7; -6.2 pcm/ppm)
Calculated Rod Step change: 5 steps (20 pcm &#xf7; 3.8 pcm/step)
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Boration/Dilution:  267 gallon dilution (batch)  Final Control Rod Position:  Bank D @ 17 8 steps    Reactivity Prediction
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 22 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.
:  Change in Power Defect:
: 1. The scenario contains objectives for the desired tasks and relevant human             Yes      No performance tools.                                                                    X
  -100 pcm (Figure C1
: 2. The scenario identifies key parameter response, expected alarms, and                   Yes      No automatic actions associated with the induced perturbations.                           X
-7A)  Differential Boron Worth:
: 3. The scenario content adequately addresses the desired tasks, through                   Yes      No simulator performance, instructor-led training freezes, or both.                       X
-6.2 pcm/ppm (Figure C1-11A)  Differential Rod Worth:  3.8 pcm/step (Figure C1
: 4. Plant PRA initiating events, important equipment, and important tasks are             Yes      No identified.                                                                           X
-4A)
: 5. Turnover information includes a Daily At Power or Shutdown Safety Risk                 Yes      No Assessment.                                                                           X
Calculated RCS PPM change:
: 6. The scenario contains procedurally driven success paths. Procedural                   Yes      No discrepancies are identified and corrected before training is given.                   X
  -13 ppm (80 pcm &#xf7;
: 7. The scenario guide includes responses for all anticipated communications to           Yes      No simulated personnel outside the Control Room, based on procedural guidance             X and standard operating practices. Include estimated completion times and/or notes for use of time compression.
-6.2 pcm/ppm)
: 8. The scenario includes related industry experience. SOER, SER and similar               Yes      No OE recommendations are clearly identified and fully addressed.*                                 X
Calculated Rod Step change:  5 steps (20 pcm &#xf7; 3.8 pcm/step)
: 9. The scenario guide incorporates verification of Operator Fundamental                   Yes      No application.*                                                                                   X
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
: 10. Training elements and specific human performance elements are addressed              Yes      No in the scenario critique guide to be used by the critique facilitator. The critique             X guide includes standards for expected performance.*
-G-RM-01.
: 11. For evaluations, it has been verified that without operator action the critical       Yes      No tasks will be failed.                                                                 X Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                       Page 22 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.
: 1. The scenario contains objectives for the desired tasks and relevant human performance tool
: s. Yes  No X    2. The scenario identifies key parameter response, expected alarms, and automatic actions associated with the induced perturbations
. Yes  No X   3. The scenario content adequately addresses the desired tasks, through simulator performance, instructor
-led training freezes, or both.
Yes  No X    4. Plant PRA initiating events, important equipment, and important tasks are identified.
Yes  No X    5. Turnover information includes a Daily At Power or Shutdown Safety Risk Assessment.
Yes  No X    6. The scenario contains procedurally driven success paths. Procedural discrepancies are identified and corrected before training is given.
Yes  No X    7. The scenario guide includes responses for all anticipated communications to simulated personnel outside the Control Room, based on procedural guidance and standard operating practices.
Include estimated completion times and/or notes for use of time compression
. Yes  No X    8. The scenario includes related industry experience. SOER, SER and similar OE recommendations are clearly identified and fully addressed.
* Yes  No  X 9. The scenario guide incorporates verification of Operator Fundamental application.
* Yes  No  X 10. Training elements and specific human performance elements are address ed in the scenario critique guide to be used by the critique facilitator. The critique guide includes standards for expected performance.
* Yes  No  X  11. For evaluations, it has been verified that without operator action the critical tasks will be failed. Yes  No X   Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
* For evaluations these items may be marked NO without justification.
* For evaluations these items may be marked NO without justification.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                      Page 23 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item. 
: 1. The desired initial conditions agreed with the reference plant with respect to reactor status, plant configuration, and system operation.
Yes X No  2. The simulator operated in real time during conduct of validation.
Yes X No  3. The simulator demonstrated expected plant response to operator input and to normal, transient, and accident conditions.
Yes X No  4. The simulator permitted use of the reference plant's procedures. The scenario was completed without procedural exceptions, simulator performance exceptions, or deviation from the scenario sequence.
Yes X No  5. The simulator did not "fail to cause" or "unexpectedly cause" any first principle alarm or primary automatic action.
Yes X No  6. Observable changes in parameters relevant to the scenario corresponded in trend and direction to reference plant's expected response. Yes X No  7. All malfunctions and other instructor interface items were functional an d demonstrated the expected reference plant's response to the initiating cause. Yes X No  8. All malfunctions and other instructor interface items were initiated in the same sequence described within the simulator scenario.
Yes X No  9. The scenario satisfies the learning or examination objectives without any significant simulator performance issues, or deviations from the approved scenario sequence.
Yes X No  10. Simulator fidelity has been demonstrated to be adequate for this scenario.
Yes X No    Discrepancies noted (Check "none" or list items found)
None SMAR = Simulator Action Request  SWO = Simulator Work Order SWO:  B4D-040  SMAR:    SMAR:    S MAR:    Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                      Page 24 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Comments:  The simulator is modeled to turn on the Low Press annunciator if the AFWP Aux Lube Oil Pump loses power. However, per B28B for both AFW Pumps, "A shaft
-driven lube oil pump provides lubrication for the bearings during AFW pump operation. A motor
-driven auxiliary oil pump is used to ensure a sufficient oil film for AFW pump starting is maintained during idle periods."  The simulator modeling should be revised to have sufficient oil pressure, regardless of the power availability to the Aux LO Pump (i.e., have no alarm).
Annunciators 47010-0505 and 47010
-0507 were overridden to OFF for this scenario as a compensatory action until the simulator model is updated.
Validator:  Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
Validation Personnel Name Job Title / Qualification Validation Position Shawn Sarrasin Operations Instructor Lead Evaluator Nic Abney Operations Instructor Booth Driver Jeff Human Operations SRO Shift Supervisor Rick Martin Operations RO RO Mark Haren Operations RO LEAD                  Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                          Page 1 of 27  SIMULATOR EXERCISE GUIDE (SEG)
SITE: PRAIRIE ISLAND SEG # PI-ILT-NRC-14 0 5 S  SEG TITLE:
2014 ILT NRC SIMULATOR EVALUATION #
5  REV. # 0    PROGRAM: INITIAL LICENSE OPERATOR TRAINING
#: FL-ILT    COURSE: INITIAL LICENSE OPERATOR TRAINING
#: FL-ILT    TOTAL TIME:
2.0 HOUR  Developed by:
Shawn Sarrasin 1/2 6/201 4  Instructor Date    Reviewed  by:
Fredrick Collins 2/27/2014  Instructor (Simulator Scenario Development Checklist.)
Date    Validated  by:
Shawn Sarrasin 4/2 1/2014  Validation Lead Instructor (Simulator Scenario Validation Checklist.)
Date    Approved by:
Training Supervision Date    Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                          Page 2 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Guide Requirements Goal of Training: 1. During all plant operating conditions, the crew will demonstrate


the ability to monitor and operate the plant within the limits of the Operations Manuals and Technical Specifications.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                      Page 23 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.
: 1. The desired initial conditions agreed with the reference plant with              Yes      No respect to reactor status, plant configuration, and system operation.            X
: 2. The simulator operated in real time during conduct of validation.                Yes      No X
: 3. The simulator demonstrated expected plant response to operator input              Yes      No and to normal, transient, and accident conditions.                                X
: 4. The simulator permitted use of the reference plants procedures. The              Yes      No scenario was completed without procedural exceptions, simulator                  X performance exceptions, or deviation from the scenario sequence.
: 5. The simulator did not fail to cause or unexpectedly cause any first          Yes      No principle alarm or primary automatic action.                                      X
: 6. Observable changes in parameters relevant to the scenario                        Yes      No corresponded in trend and direction to reference plants expected                X response.
: 7. All malfunctions and other instructor interface items were functional and        Yes      No demonstrated the expected reference plants response to the initiating            X cause.
: 8. All malfunctions and other instructor interface items were initiated in the      Yes      No same sequence described within the simulator scenario.                            X
: 9. The scenario satisfies the learning or examination objectives without            Yes      No any significant simulator performance issues, or deviations from the              X approved scenario sequence.
: 10. Simulator fidelity has been demonstrated to be adequate for this                Yes      No scenario.                                                                        X Discrepancies noted (Check none or list items found)              None SMAR = Simulator Action Request SWO = Simulator Work Order SWO: B4D-040                SMAR:                      SMAR:                    SMAR:
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                        Page 24 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Comments: The simulator is modeled to turn on the Low Press annunciator if the AFWP Aux Lube Oil Pump loses power. However, per B28B for both AFW Pumps, A shaft-driven lube oil pump provides lubrication for the bearings during AFW pump operation. A motor-driven auxiliary oil pump is used to ensure a sufficient oil film for AFW pump starting is maintained during idle periods. The simulator modeling should be revised to have sufficient oil pressure, regardless of the power availability to the Aux LO Pump (i.e., have no alarm). Annunciators 47010-0505 and 47010-0507 were overridden to OFF for this scenario as a compensatory action until the simulator model is updated.
Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
Validation Personnel Name                        Job Title / Qualification        Validation Position Shawn Sarrasin                            Operations Instructor                Lead Evaluator Nic Abney                                Operations Instructor                Booth Driver Jeff Human                                Operations SRO                      Shift Supervisor Rick Martin                              Operations RO                        RO Mark Haren                                Operations RO                        LEAD Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                        Page 1 of 27 SIMULATOR EXERCISE GUIDE (SEG)
SITE: PRAIRIE ISLAND                              SEG #      PI-ILT-NRC-1405S SEG TITLE:        2014 ILT NRC SIMULATOR EVALUATION #5                        REV. #  0 PROGRAM:          INITIAL LICENSE OPERATOR TRAINING                #:    FL-ILT COURSE:          INITIAL LICENSE OPERATOR TRAINING                #:    FL-ILT TOTAL TIME: 2.0 HOUR Developed by:                          Shawn Sarrasin                              1/26/2014 Instructor                                Date Reviewed by:                          Fredrick Collins                            2/27/2014 Instructor                                Date (Simulator Scenario Development Checklist.)
Validated by:                          Shawn Sarrasin                              4/21/2014 Validation Lead Instructor                          Date (Simulator Scenario Validation Checklist.)
Approved by:
Training Supervision                            Date Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                      Page 2 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Guide Requirements
: 1. During all plant operating conditions, the crew will demonstrate Goal of                  the ability to monitor and operate the plant within the limits of the Training:                Operations Manuals and Technical Specifications.
: 2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
: 2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
Learning Objectives:
: 1. Transfer power on Bus 15 from 1RY to CT11 per 1C19.2.
: 1. Transfer power on Bus 15 from 1RY to CT11 per 1C19.2
Learning              2. Diagnose and perform corrective actions for an Individual Rod Objectives:                Position Indicator failing low per 1C5 AOP4 and 1C5 AOP5.
. 2. Diagnose and perform corrective actions for an Individual Rod Position Indicator failing low per 1C5 AOP4 and 1C5 AOP5.
: 3. Diagnose and perform corrective actions for a Red Channel RCS Thot Instrument failing high per 1C51.1.
: 3. Diagnose and perform corrective actions for a Red Channel RCS Thot Instrument failing high per 1C51.
: 4. Respond to a Loss of Bus Duct Cooling per 1C22.5 AOP1 and perform a rapid power reduction per 1C1.4 AOP1.
: 1. 4. Respond to a Loss of Bus Duct Cooling per 1C22.5 AOP 1 and perform a rapid power reduction per 1C1.4 AOP1. 5. Diagnose and respond to a 12 Steam Generator Tube Rupture
: 5. Diagnose and respond to a 12 Steam Generator Tube Rupture per 1E-0 and 1E-3.
: 6. Diagnose and respond to a failure of the SI to Chilled Water signal to actuate per 1E-0 Attachment L.
: 1. Full Scope Simulator Training              2. NRC Evaluation Team Resources:            3. Booth Operator (Backup Communicator)
: 4. Primary Communicator Initiating Event with Core Damage Frequency:
Related PRA          SGTR (1.8%)
Information:
Important Components:
NONE Important Operator Actions with Task Number:
Operator fails to cooldown and depress RCS for SGTR before SG overfill (1.46%)
CRO 301 004 06 01 000 - Steam Generator Tube Rupture Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


per 1E-0 and 1E-3. 6. Diagnose and respond to a failure of the SI to Chilled Water signal to actuate per 1E
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 3 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:
-0 Attachment L.
Training Resources:
: 1. Full Scope Simulator
: 2. NRC Evaluation Team
: 3. Booth Operator (Backup Communicator)
: 4. Primary Communicator  Related PRA Information:
Initiating Event with Core Damage Frequency:
SGTR (1.8%)      Important Components:
NONE  Important Operator Actions with Task Number:
Operator fails to cooldown and depress RCS for SGTR before SG overfill (1.46%)
CRO 301 004 06 01 000
- Steam Generator Tube Rupture Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 3 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:
Before EOP Entry:
Before EOP Entry:
: 1. Rod E-3 (SBA GR1) Position Indicator fails low.
: 1. Rod E-3 (SBA GR1) Position Indicator fails low.
: 2. 1 TE-4 01 , Red Channel RCS Thot Transmitter , fails high.
: 2. 1TE-401, Red Channel RCS Thot Transmitter, fails high.
: 3. 11 and 12 Generator Bus Duct Cooler Blowers fail. After EOP Entry:
: 3. 11 and 12 Generator Bus Duct Cooler Blowers fail.
: 1. Failure of SI to Chilled Water Signal to Actuate
After EOP Entry:
. 2. Both pressurizer spray valves fail CLOSED
: 1. Failure of SI to Chilled Water Signal to Actuate.
. Abnormal Events:
: 2. Both pressurizer spray valves fail CLOSED.
Abnormal Events:
: 1. RPI Failure.
: 1. RPI Failure.
: 2. RCS Thot Instrument Failure.
: 2. RCS Thot Instrument Failure.
: 3. Loss of Bus Duct Cooling
: 3. Loss of Bus Duct Cooling.
. 4. Rapid Power Reduction
: 4. Rapid Power Reduction.
. Major Transients:
Major Transients:
: 1. 12 Steam Generator Tube Rupture
: 1. 12 Steam Generator Tube Rupture.
. Critical Tasks:
Critical Tasks:
: 1. E A: Isolate feedwater flow into and steam flow from the ruptured Steam Generator before a transition to ECA
: 1. E A: Isolate feedwater flow into and steam flow from the ruptured Steam Generator before a transition to ECA-3.1 occurs.
-3.1 occurs.
: 2. E B: Establish/maintain an RCS temperature so that transition from E-3 does not occur because of the inability to maintain required subcooling or such that an extreme or severe challenge to the Subcriticality and/or the Integrity CSF occurs.
: 2. E B: Establish/maintain an RCS temperature so that transition from E
: 3. E C: Depressurize RCS to meet SI termination criteria prior to overfilling the ruptured Steam Generator.
-3 does not occur because of the inability to maintain required subcooling or such that an extreme or severe challenge to the Subcriticality and/or the Integrity CSF occurs.
: 4. E D: Terminate SI prior to overfilling the ruptured Steam Generator.
: 3. E C: Depressurize RCS to meet SI termination criteria prior to overfilling the ruptured Steam Generator. 4. E D: Terminate SI prior to overfilling the ruptured Steam Generator.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 4 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO OVERVIEW:
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 4 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO OVERVIEW:
INITIAL CONDITIONS:                                 EQUIPMENT OOS
INITIAL CONDITIONS:
* Exposure: MOC
EQUIPMENT OOS Exposure:
* 1PT-485, Turbine First Stage Pressure, is failed low.
M OC  1PT-485, Turbine First Stage Pressure, is failed low
* Power: 100%
. Power: 100% 11 Safety Injection Pump Boron (CB): 853 ppm   Temperature:
* 11 Safety Injection Pump
5 60&deg;F   Pressure: 2235 psig   Xenon: Equilibrium Rods: "D" @
* Boron (CB): 853 ppm
218  Generator: 58 1 MW   SEQUENCE OF EVENTS:
* Temperature: 560&deg;F
Event 1: Transfer Power on Bus 15 from CT11 to 1RY   Bus 15 is initially receiving power from CT11. A designated operator is stationed to monitor Bus Phase Currents.
* Pressure: 2235 psig
The crew will transfer Bus 15 to 1RY transformer per 1C20.5.
* Xenon: Equilibrium
Event 2: Shutdown Bank Group 1 Rod E
* Rods: D @ 218
-3 Position Indication fails LOW Rod E-3 rod bottom light will turn on.
* Generator: 581 MW SEQUENCE OF EVENTS:
Rod E-3 position indication will indicate 0. RCS Tavg and NI Power will remain stable.
Event 1: Transfer Power on Bus 15 from CT11 to 1RY
The crew will enter 1C5 AOP4 and 1C5 AOP5.
* Bus 15 is initially receiving power from CT11.
The SS will enter T.S. LCO 3.1.7 Condition A.
* A designated operator is stationed to monitor Bus Phase Currents.
Event 3: Red Channel RCS Thot Instrument Fails HIGH Rods will NOT step in because rods are still in manual due to 1st Stage Pressure Instrument failed low.
* The crew will transfer Bus 15 to 1RY transformer per 1C20.5.
Pressurizer level control will be controlled manually.
Event 2: Shutdown Bank Group 1 Rod E-3 Position Indication fails LOW
Red Channel Tavg will be defeated.
* Rod E-3 rod bottom light will turn on.
The crew will restore pressurizer level control to automatic.
* Rod E-3 position indication will indicate 0.
The SS will enter T.S LCO 3.3.1 Conditions A and E and T.S. LCO 3.3.2 Conditions A and D. Event s 4 & 5: Loss of Bus Duct Cooling and Rapid Power Reduction 11 Bus Duct Cooler Blower will trip offline
* RCS Tavg and NI Power will remain stable.
. 12 Bus Duct Cooler Blower will fail to start.
* The crew will enter 1C5 AOP4 and 1C5 AOP5.
Bus Duct temperature will rise above 92&deg;C. The crew will respond per 1C22.5 AOP1.
* The SS will enter T.S. LCO 3.1.7 Condition A.
The crew will perform a Rapid Power Reduction per 1C1.4 AOP1.
Event 3: Red Channel RCS Thot Instrument Fails HIGH
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* Rods will NOT step in because rods are still in manual due to 1st Stage Pressure Instrument failed low.
-G-RM-01.
* Pressurizer level control will be controlled manually.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 5 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Event s 6 & 7: 12 Steam Generator Tube Rupture RCS pressure will slowly lower
* Red Channel Tavg will be defeated.
. Pressurizer level will slowly lower.
* The crew will restore pressurizer level control to automatic.
The crew will:
* The SS will enter T.S LCO 3.3.1 Conditions A and E and T.S. LCO 3.3.2 Conditions A and D.
o Trip the reactor and initiate Safety Injection per 1E-0. o Isolate 12 Steam Generator per 1E
Events 4 & 5: Loss of Bus Duct Cooling and Rapid Power Reduction
-3. o Manually align Safeguards Chilled Water components per 1E
* 11 Bus Duct Cooler Blower will trip offline.
-0, Attachment L.
* 12 Bus Duct Cooler Blower will fail to start.
o Cooldown the RCS per 1E
* Bus Duct temperature will rise above 92&deg;C.
-3. o Depressurize the RCS to meet SI termination per 1E
* The crew will respond per 1C22.5 AOP1.
-3. o Terminate SI.
* The crew will perform a Rapid Power Reduction per 1C1.4 AOP1.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                         Page 6 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Simulator Setup:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 5 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Events 6 & 7: 12 Steam Generator Tube Rupture
NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.
* RCS pressure will slowly lower.
: 1. If available, reset the simulator to IC
* Pressurizer level will slowly lower.
-26 5 and place in RUN
* The crew will:
. 2. If IC-26 5 is NOT available:
o Trip the reactor and initiate Safety Injection per 1E-0.
: a. Reset to IC
o Isolate 12 Steam Generator per 1E-3.
-1 0. b. Place the simulator in RUN.
o Manually align Safeguards Chilled Water components per 1E-0, Attachment L.
o Cooldown the RCS per 1E-3.
o Depressurize the RCS to meet SI termination per 1E-3.
o Terminate SI.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                     Page 6 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Simulator Setup:
NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.
: 1. If available, reset the simulator to IC-265 and place in RUN.
: 2. If IC-265 is NOT available:
: a. Reset to IC-10.
: b. Place the simulator in RUN.
: c. Place CS-46178, 11 SI PUMP, in PULLOUT.
: c. Place CS-46178, 11 SI PUMP, in PULLOUT.
: d. Place CS-46280, ROD BANK SELECTOR, in MANUAL.
: d. Place CS-46280, ROD BANK SELECTOR, in MANUAL.
: e. Place CS-46338, STEAM DUMP MODE, in STM PRESS.
: e. Place CS-46338, STEAM DUMP MODE, in STM PRESS.
: f. Insert System Override RX226 to 0 (1 st Stage Pressure Fails Low).
: f. Insert System Override RX226 to 0 (1st Stage Pressure Fails Low).
: g. Insert Remote RP181 (B/S PC
: g. Insert Remote RP181 (B/S PC-485A) to TRIP.
-485A) to TRIP.
: h. Transfer Bus 15 power to CT11 as follows:
: h. Transfer Bus 15 power to CT11 as follows:
: i. Place CS-46909, BKR 15
: i. Place CS-46909, BKR 15-7 MAN/AUTO, to MANUAL.
-7 MAN/AUTO, to MANUAL.
ii. Place CS-46951, BKR 15-3 MAN/AUTO, to MANUAL.
ii. Place CS-46951, BKR 15
-3 MAN/AUTO, to MANUAL.
iii. Place CS-46906, BUS 15 SYNCH SEL SW, to CT11.
iii. Place CS-46906, BUS 15 SYNCH SEL SW, to CT11.
iv. Close BKR 15
iv. Close BKR 15-7 using CS-46955.
-7 using CS
: v. Trip BKR 15-3 using CS-46953.
-46955. v. Trip BKR 15
vi. Place CS-46909, BKR 15-7 MAN/AUTO, to AUTO.
-3 using CS
vii. Place CS-46951, BKR 15-3 MAN/AUTO, to AUTO.
-46953. vi. Place CS-46909, BKR 15-7 MAN/AUTO, to AUTO.
vii. Place CS-46951, BKR 15
-3 MAN/AUTO, to AUTO.
viii. Place CS-46906, BUS 15 SYNCH SEL SW, to OFF.
viii. Place CS-46906, BUS 15 SYNCH SEL SW, to OFF.
: 3. If available, run schedule file P I-ILT-NRC-14 0 5 S.sch as follows:
: 3. If available, run schedule file PI-ILT-NRC-1405S.sch as follows:
: a. Select open file in the Schedule application.
: a. Select open file in the Schedule application.
: b. Locate schedule file.
: b. Locate schedule file.
: c. Open schedule file by double clicking it.
: c. Open schedule file by double clicking it.
: d. Run the schedule file by pressing the "Stopped" button on the toolbar.
: d. Run the schedule file by pressing the Stopped button on the toolbar.
: e. Verify the schedule file is running.
: e. Verify the schedule file is running.
: 4. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
: 4. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
: 5. If desired, start Scenario Based Testing Data Collection Program.
: 5. If desired, start Scenario Based Testing Data Collection Program.
: 6. Complete the "Simulator Setup Checklist."
: 6. Complete the "Simulator Setup Checklist.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 7 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 7 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW           EXPECTED STUDENT RESPONSES POS
: 1. SIMULATOR PRE
: 1. SIMULATOR PRE-BRIEF:
-BRIEF: a. The Simulator Pre
: a. The Simulator Pre-Brief is conducted prior to the crew entering the simulator.
-Brief is conducted prior to the crew entering the simulator.
: b. Review Unit 1 LPEO / PEO Turnover Log.
: b. Review Unit 1 LPEO / PEO Turnover Log.
: c. Perform a pre
: c. Perform a pre-job brief for the following activity:
-job brief for the following activity:
: 1) Transfer power on Bus 15 from CT11 to 1RY per section 5.16 of 1C20.5.
: 1) Transfer power on Bus 15 from CT11 to 1RY per section 5.16 of 1C20.5
(a) Maintenance on Bus 15 1RY Source Breaker is complete and has been returned to service.
. (a) Maintenance on Bus 15 1RY Source Breaker is complete and has been returned to service.
(b) A designated operator is stationed at the G-Panel to monitor Bus Phase Currents and perform actions of Bus 15 Sequencer Channel Alert and Bus 16 Sequencer Channel Alert Alarm Response Procedures.
(b) A designated operator is stationed at the G-Panel to monitor Bus Phase Currents and perform actions of "Bus 15 Sequencer Channel Alert" and Bus 16 Sequencer Channel Alert" Alarm Response Procedures. (c) The designated operator is NOT one of the examinees.
(c) The designated operator is NOT one of the examinees.
(d) The Lead RO will conduct the activity to transfer power on Bus 15 from CT11 to 1RY.
(d) The Lead RO will conduct the activity to transfer power on Bus 15 from CT11 to 1RY.
(e) This activity is to be performed after shift turnover is complete.
(e) This activity is to be performed after shift turnover is complete.
(f) After Bus 15 is transferred to 1RY, then secure the designated operator at the G-Panel. 2. COMPLETE TURNOVER:  
(f) After Bus 15 is transferred to 1RY, then secure the designated operator at the G-Panel.
: 2. COMPLETE TURNOVER:
: a. Crew performs a walk down of the control boards.
: a. Crew performs a walk down of the control boards.
: b. Review PRA Printout.
: b. Review PRA Printout.
: c. Crew takes the duty.
: c. Crew takes the duty.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 8 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
-G-RM-01.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 1     3. After the crew has assumed the duty, they will transfer               1C20.5, UNIT 1 - 4.16KV SYSTEM power on Bus 15 from 1RY to CT11 per section 5.16 of            LEAD
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 8 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
* Place CS-46951, BKR 15-3 MAN/AUTO CLOSURE 1C20.5.                                                                 SEL SW, in MANUAL.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 1 3. After the crew has assumed the duty, they will transfer power on Bus 15 from 1RY to CT11 per section 5.
: a. If contacted as the out-plant operator to check Bus
1 6 of 1C20.5. a. If contacted as the out
* Place CS-46906, BUS 15 SYNCHROSCOPE SEL 15 Room clear, then wait two minutes and report                     SW, in 1RY.
-plant operator to check Bus 15 Room clear, then wait two minutes and report back that Bus 15 Room is clear of personnel.
back that Bus 15 Room is clear of personnel.
: b. If contacted as the out
* Check 115 - 130 volts on Bus Incoming volt meter.
-plant operator to check closing springs on BKR 15-3, then wait two minutes and report back the closing springs are charged on BKR 15-3. LEAD  1C20.5, UNIT 1
: b. If contacted as the out-plant operator to check
- 4.16KV SYSTEM Place CS-469 51, BKR 15-3 MAN/AUTO CLOSURE SEL SW, in "MANUAL".
* Check 115 - 130 volts on Bus Running volt meter.
Place CS-4 6906, BUS 15 SYNCHROSCOPE SEL SW, in "1RY". Check 11 5 - 130 volts on Bus Incoming volt meter.
closing springs on BKR 15-3, then wait two minutes
Check 115
* Check the difference between incoming and running is and report back the closing springs are charged on                 less than 8 volts.
- 130 volts on Bus Running volt meter.
BKR 15-3.
Check the difference between incoming and running is less than 8 volts.
* Check Synchroscope is less than or approximately 20&deg; from the twelve oclock position.
Check Synchroscope is less than or approximately 20&deg; from the twelve o'clock position.
* Check the two white synchronizing lights are NOT LIT.
Check the two white synchronizing lights are NOT LIT.
* Place CS-46953, BKR 15-3 BUS 15 SOURCE FROM 1RY XFMR, in CLOSE.
Place CS-4695 3, BKR 15-3 BUS 15 SOURCE FROM 1RY XFMR, in "CLOSE".
* Place CS46955, BKR 15-7 BUS 15 SOURCE FROM BUS CT11, in TRIP.
Place CS4695 5, BKR 15-7 BUS 15 SOURCE FROM BUS CT11, in "TRIP".
* Check Bus 15 voltage is approximately 4.16kv.
Check Bus 15 voltage is approximately 4.16kv.
* Check 44021 Bus 15 light LIT.
Check 44021 Bus 15 light LIT.
* Place CS-46906, BUS 15 SYNCHROSCOPE SEL SW, in OFF.
Place CS-46906, BUS 15 SYNCHROSCOPE SEL SW, in "OFF".
* Place CS-46951, BKR 15-3 MAN/AUTO CLOSURE SEL SW, in AUTO.
Place CS-469 51, BKR 15-3 MAN/AUTO CLOSURE SEL SW, in "AUTO".
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 9 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
-G-RM-01.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 2     4. At the discretion of the lead evaluator, enter:                       1C5 AOP4, DROPPED RCCA Trigger 2, Rod E3 IRPI Failure.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 9 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
* Confirm rod drop using diverse indications:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 2 4. At the discretion of the lead evaluator, enter:
RO
Trigger 2 , Rod E3 IRPI Failure.
: a. If contacted as the Operations Management,                             o Rod Position Indication and RCS Tavg changes acknowledge the report of the failure, and agree to                                       OR make other notifications to the NRC, Duty Station                     o Rod Position Indication and NIS Changes Manager, etc. as asked.
: a. If contacted as the Operations Management, acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station Manager, etc. as asked.
* Determine a Rod Drop did NOT occur.
: b. If contacted as the FIN Team Supervisor, inform the crew that you will write a work order and assign an I&C Supervisor to investigate. c. If contacted as Nuclear Engineer, acknowledge order to perform applicable steps of SP 1319.
: b. If contacted as the FIN Team Supervisor, inform the
* Go to 1C5 AOP5.
crew that you will write a work order and assign an I&C Supervisor to investigate.
1C5 AOP5, MISALIGNED ROD, STUCK ROD, AND/OR
: c. If contacted as Nuclear Engineer, acknowledge order RPI FAILURE OR DRIFT to perform applicable steps of SP 1319.
SS
* Determine symptoms are indicative of a failed RPI.
: 5. Plant Response:
: 5. Plant Response:
* Declare rod D4 inoperable.
: a. Rod E3 rod bottom light
: a. Rod E3 rod bottom light
* Initiate a work order.
: b. Rod E3 rod position at 0 steps
: b. Rod E3 rod position at 0 steps
: c. NO change in NIS.
* Enter T.S. LCO 3.1.7 Condition A.
: c. NO change in NIS.                                                      o Verify position of rod once every 8 hours.
: d. NO change in RCS Tavg.
: d. NO change in RCS Tavg.
: e. The following annunciators will come in:
: e. The following annunciators will come in:
: 1) 47013-0407, ROD AT BOTTOM.
: 1) 47013-0407, ROD AT BOTTOM.
: 2) 47013-0507, COMPUTER ALARM ROD DEVIATION/SEQUENCING.
: 2) 47013-0507, COMPUTER ALARM ROD DEVIATION/SEQUENCING.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


RO         SS  1C5 AOP4, DROPPED RCCA Confirm rod drop using diverse indications:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                      Page 10 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
o Rod Position Indication and RCS Tavg changes
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW          EXPECTED STUDENT RESPONSES POS EVENT 3      6. After the crew has responded to the IRPI failure, and/or              C47012-0104, 0304, 0404, 0504, 0507, & 0604, at the discretion of the lead evaluator, then enter:                PANEL C ALARM RESPONSE PROCEDURES Trigger 3, 1T-401, Red Channel RCS Thot, fails HIGH.            RO
* Check RCS Tavg and deviations.
: a. If contacted as I&C to trip bistables, inform the crew
* Check RCS T and deviations.
two I&C Technicians will be available in 1 hour.
* Verify Rod Control is in MANUAL.
: b. If contacted as the Operations Management,
* Check all pressurizer level channels.
acknowledge the report of the failure, and agree to
* Shift charging pump control to MANUAL and adjust make other notifications to the NRC, Duty Station                  speed as necessary.
Manager, etc. as asked.
* Verify steam dumps are NOT open.
: c. If contacted as the FIN Team Supervisor, inform the
* Refer to 1C51, INSTRUMENT FAILURE GUIDE.
crew that you will write a work order and assign an
* Verify steam flow/feed flow balance.
I&C Supervisor to investigate.
: 7. Plant Response:                                                        1C51.1, Tavg Loop 1B 1T-401 - High
: a. Red Channel RCS Tavg pegs high.                              RO
* Determine Rod Control is already in manual.
: b. Red Channel T pegs high.
* Place charging pump speed control in MANUAL AND
: c. 11 Charging Pump speed will rise.                                    maintain pressurizer level.
: d. Pressurizer level will slowly rise.
* Select Red channel on the Tavg defeat switch and pull
: e. The following annunciators will come in:                            out.
: 1) 47012-0104, RCS HI TAVG.
* Return charging pump speed control to AUTO.
: 2) 47012-0304, RCS TAVG DEVIATION.
* Rod Control and Steam Dump Control should NOT be
: 3) 47012-0404, OVERPOWER T CH ALERT.                              placed in AUTO due to the 1st Stage Pressure
: 4) 47012-0504, OVERTEMP T CH ALERT.                                Instrument failure.
: 5) 47012-0507, PRZR LVL DEVIATION.                            SS
* Enter T.S. LCO 3.3.1 Condition A - Ref Table 3.3.1-1.
: 6) 47012-0604, RCS DT DEVIATION.
* Enter T.S. LCO 3.3.1 Condition E - Place 1T-401
: 7) 47013-0105, OPT ROD STOP TURBINE                                channel in trip within 6 hours or be in Mode 3 in 12 hr.
RUNBACK CHANNEL ALERT.
* Enter T.S. LCO 3.3.2 Condition A - Ref Table 3.3.2-1.
: 8) 47013-0205, OTT ROD STOP TURBINE
* Enter T.S. LCO 3.3.2 Condition D - Place 1T-401 RUNBACK CHANNEL ALERT.                                          channel in trip within 6 hrs or be in Mode 3 in 12 hrs AND in Mode 5 in 18 hrs.
* Enter TLCO 3.3.3 Condition A - Place channel in trip.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


OR o Rod Position Indication and NIS Changes Determine a Rod Drop did NOT occur.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 11 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
Go to 1C5 AOP5.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT 4     8. When the plant is stable and/or at the discretion of the               C47007-0301 & 0302, BUS DUCT COOLING SYSTEM HI lead evaluator, then enter:                                         TEMP AND BLOWERS NOT RUNNING LEAD Trigger 4, Loss of Bus Duct Cooling.
1C5 AOP5, MISALIGNED ROD, STUCK ROD, AND/OR RPI FAILURE OR DRIFT Determine symptoms are indicative of a failed RPI.
* Dispatch an operator to the bus duct coolers to
Declare rod D4 inoperable.
: a. If contacted as the out-plant operator to investigate,               provide an assessment of the problem.
Initiate a work order.
wait 2 minutes and report the following:
Enter T.S. LCO 3.1.7 Condition A.
* Monitor 1T2118A, 11/12 GEN BUS DUCT
o Verify position of rod once every 8 hours.
: b. Both Bus Duct Cooler Blowers are NOT running.                        CONDUCTOR TEMP, on ERCS.
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 10 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 3         
: 6. After the crew has responded to the IRPI failure , and/or at the discretion of the lead evaluator, then enter
: Trigger 3 , 1 T-4 01 , Red Channel RCS Thot , fails HIGH. a. If contacted as I&C to trip bistables, inform the crew two I&C Technicians will be available in 1 hour. b. If contacted as the Operations Management, acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Statio n
Manager, etc. as asked.
: c. If contacted as the FIN Team Supervisor, inform the crew that you will write a work order and assign an I&C Supervisor to investigate.
: 7. Plant Response:
: a. Red Channel RCS Tavg peg s high. b. Red Channel T pegs high.
: c. 11 Charging Pump speed will rise
. d. Pressurizer level will slowly rise.
: e. The following annunciators will come in:
: 1) 47012-0104, RCS HI TAVG
. 2) 47012-0304, RCS TAVG DEVIATION
. 3) 47012-0404, OVERPOWER T CH ALERT
. 4) 47012-0504, OVERTEMP T CH ALERT
. 5) 47012-0507, PRZR LVL DEVIATION
. 6) 47012-0 604, RCS DT DEVIATION
. 7) 47013-0105, OPT ROD STOP TURBINE RUNBACK CHANNEL ALERT.
: 8) 47013-0205, OTT ROD STOP TURBINE RUNBACK CHANNEL ALERT.
RO            RO SS          C4701 2-0 1 04, 0304, 0404, 0504, 0507, & 0604,  PANEL C ALARM RESPONSE PROCEDUR ES  Check RCS Tavg and deviations.
Check RCS T and deviations.
Verify Rod Control is in "MANUAL".
Check all pressurizer level channels.
Shift charging pump control to "MANUAL" and adjust speed as necessary.
Verify steam dumps are NOT open. Refer to 1C51, INSTRUMENT FAILURE GUIDE.
Verify steam flow/feed flow balance.
1C51.1 , Tavg Loop 1B 1T
-401 - High  Determine Rod Control is already in manual.
Place charging pump speed control in "MANUAL" AND maintain pressurizer level.
Select Red channel on the Tavg defeat switch and pull out. Return charging pump speed control to "AUTO".
Rod Control and Steam Dump Control should NOT be placed in AUTO due to the 1 st Stage Pressure Instrument failure.
Enter T.S. LCO 3.3.
1 Condition A
- Ref Table 3.3.
1-1. Enter T.S. LCO 3.3.1 Condition E - Place 1T-401 channel in trip within 6 hours or be in Mode 3 in 12 hr
. Enter T.S. LCO 3.3.2 Condition A
- Ref Table 3.3.2-1. Enter T.S. LCO 3.3.2 Condition D
- Place 1T-401 channel in trip within 6 h rs or be in Mode 3 in 12 hrs AND in Mode 5 in 18 hrs.
Enter TLCO 3.3.3 Condition A
- Place channel in trip.
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 11 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 4        
: 8. When the plant is stable and/or at the discretion of the lead evaluator, then enter: Trigger 4 , Loss of Bus Duct Cooling. a. If contacted as the out
-plant operator to investigate, wait 2 minutes and report the following:
: b. Both Bus Duct Cooler Blowers are NOT running.
: c. The following alarms are in locally:
: c. The following alarms are in locally:
* Refer to C22.5 AOP1.
: 1) Bus Duct Air Hi Temp.
: 1) Bus Duct Air Hi Temp.
: 2) Bus Duct Conductor Hi Temp.
: 2) Bus Duct Conductor Hi Temp.                                   C22.5 AOP1, LOSS OF GENERATOR BUS DUCT
: d. If contacted as the out-plant operator to perform actions of C22.5 AOP1, then report the following as applicable:
: d. If contacted as the out-plant operator to perform                 COOLING actions of C22.5 AOP1, then report the following as
: 1) Cooling water flow to both Bus Duct Coolers are normal and cooling water valve lineups are proper. 2) Both Bus Duct Cooler Blowers are NOT running and attempts to start either blower are NOT successful.
* Dispatch an operator to the bus duct coolers to LEAD applicable:                                                         provide an assessment of the problem.
: 3) The power supply breakers to both Bus Duct Cooler Blowers are CLOSED.
: 1) Cooling water flow to both Bus Duct Coolers are
: 9. Plant Response:
* Direct out-plant operator to perform the following:
: a. Bus Duct temperature s will rise.
normal and cooling water valve lineups are                             o Note any alarms on the Bus Duct Cooler proper.                                                                   Blower Control Panel.
: b. The following annunciators will come in:
: 2) Both Bus Duct Cooler Blowers are NOT running                           o Verify cooling water flow.
: 1) 47007-0301, BUS DUCT COOLING SYSTEM HI TEMP. 2) 47007-03 02, BUS DUCT COOLING BLOWERS NOT RUNNING.
and attempts to start either blower are NOT                           o Attempt to start standby blower.
LEAD        LEAD   
successful.                                                           o Verify discharge dampers for the inservice
: 3) The power supply breakers to both Bus Duct                                  blower are OPEN.
Cooler Blowers are CLOSED.                                            o Verify power supply breakers to the Bus Duct Cooler Blowers are CLOSED.
: 9. Plant Response:                                                                 o Inspect dampers.
: a. Bus Duct temperatures will rise.
* When 1T2118A exceeds 92&deg;C, then reduce power per
: b. The following annunciators will come in:                             1C1.4 AOP1 to reduce generator output to less than
: 1) 47007-0301, BUS DUCT COOLING SYSTEM HI                           9,000 amps.
TEMP.
* During load reduction, reduce generator excitation
: 2) 47007-0302, BUS DUCT COOLING BLOWERS                             using CS-46377, GEN VOLT REG ADJ.
NOT RUNNING.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


C47007-0301 & 0302, BUS DUCT COOLING SYSTEM HI TEMP AND BLOWERS NOT RUNNING Dispatch an operator to the bus duct coolers to provide an assessment of the problem.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                      Page 12 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
Monitor 1T2118A, 11/12 GEN BUS DUCT CONDUCTOR TEMP, on ERCS.
SEQ            SEQUENCE OF EVENTS / INSTRUCTOR NOTES                          CREW          EXPECTED STUDENT RESPONSES POS EVENT 5    10. Rapid Load Reduction:                                                1C1.4 AOP1, RAPID POWER REDUCTION UNIT 1
Refer to C22.5 AOP1.
: a. If contacted as the TSO, acknowledge that Unit1 is
C22.5 AOP1, LOSS OF GENERATOR BUS DUCT COOLING  Dispatch an operator to the bus duct coolers to provide an assessment of the problem.
* Determine the predicted Boron addition and final RO/SS reducing power due to loss of bus duct cooling.                    Control Rod Position by obtaining values from the
Direct out
: b. If contacted as Unit 2 Control Room Operators to                     appropriate contingency reactivity plan.
-plant operator to perform the following:
monitor Unit 1 Heater Drain Tank alarms (Panel F),
o Note any alarms on the Bus Duct Cooler Blower Control Panel.
* Borate the RCS as necessary to maintain control rods then acknowledge request and inform Unit 1                          above the insertion limit and control delta I within Operators that an extra operator will monitor Panel F.             limits.
o Verify cooling water flow.
* Control Rods in manual during the load reduction.
o Attempt to start standby blower.
* Place pressurizer heaters to ON.
o Verify discharge dampers for the inservice blower are OPEN.
* Using the On Line Control screen, select the Control NOTE                                            Mode pop-up screen.
o Verify power supply breakers to the Bus Duct Cooler Blowers are CLOSED.
It is NOT intended to wait for the plant to reach 55%
o Inspect dampers.
* Select the desired control mode (VPC, FSP, or power prior to proceeding to the next event. Once the                        LOAD).
When 1T2118A exceeds 92&deg;C, then reduce power per 1C1.4 AOP1 to reduce generator output to less than 9,000 amps.
Lead Evaluator is satisfied with the reactivity
During load reduction, reduce generator excitation using CS-46377, GEN VOLT REG ADJ.
* Using the On Line Control screen, select the manipulation, proceed to Event 6.                                            Demand Rate pop-up screen.
* Select the desired rate of load change.
* Set the desired Target setting using the On Line Control screen.
* Using the On Line Control screen, select the Go control to initiate load reduction.
1C12.5, UNIT 1 BORON CONCENTRATION CONTROL RO/SS
* Verify the Boric Acid integrator is reset.
* Set 1YIC-110, BA TO BLENDER BATCH INTEGRATOR, to quantity desired.
* Place CS-46300, MAKE-UP MODE SELECTOR, to BORATE.
* If desired, then adjust 1HC-110, BA TO BLENDER FLOW CONT, to MANUAL and adjust output for desired flow rate.
* Momentarily place CS-46457, BORIC ACID MAKE-UP CONTROL, to START, to initiate the boration.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 13 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
-G-RM-01.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW       EXPECTED STUDENT RESPONSES POS EVENT 5
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 12 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
* When the desired quantity of boric acid has been (cont)                                                                               added, then verify automatic makeup stopped as indicated by CS-46457, BORIC ACID MAKE-UP CONTROL, green light LIT.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 5        
* If additional boration is desired, then return to step 2.
: 10. Rapid Load Reduction:
* When the boration is complete, then verify 1HC-110, BA TO BLENDER FLOW CONT, is in AUTO.
: a. If contacted as the TSO, acknowledge that Unit1 is reducing power due to loss of bus duct cooling.
* Reset the Boric Acid integrator.
: b. If contacted as Unit 2 Control Room Operators to monitor Unit 1 Heater Drain Tank alarms (Panel F), then acknowledge request and inform Unit 1 Operators that an extra operator will monitor Panel F.
* Perform a 10 gallon flush.
NOTE It is NOT intended to wait for the plant to reach 55% power prior to proceeding to the next event. Once the Lead Evaluator is satisfied with the reactivity manipulation, proceed to Event
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 6.           RO/SS   


RO/SS 1C1.4 AOP1 , RAPID POWER REDUCTION UNIT 1  Determine the predicted Boron addition and final Control Rod Position by obtaining values from the appropriate contingency reactivity plan.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                     Page 14 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
Borate the RCS as necessary to maintain control rods above the insertion limit and control delta I within limits. Control Rods in manual during the load reduction.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT       11. When the lead evaluator is satisfied with the reactivity             1E-0, REACTOR TRIP OR SAFETY INJECTION 6&7            manipulation, enter:
Place pressurizer heaters to "ON".
* Manually trip the reactor or verify Reactor Trip.
Using the "On Line Control" screen, select the "Control Mode" pop-up screen.
RO/
Select the desired control mode ("VPC", "FSP", or "LOAD"). Using the "On Line Control" screen, select the "Demand Rate" pop
Trigger 6, 12 Steam Generator Tube Rupture.
-up screen.
* Verify Turbine Trip.
Select the desired rate of load change.
LEAD
Set the desired Target setting using the "On Line Control" screen.
: a. Upon hearing the announcement of Reactor Trip, or
Using the "On Line Control" screen, select the Go control to initiate load reduction.
* Verify both Safeguards buses energized.
1C12.5, UNIT 1 BORON CONCENTRATION CONTROL Verify the Boric Acid integrat or is reset.
when called as the Turbine Building Operator to
Set 1YIC-11 0 , BA TO BLENDER BATCH INTEGRATOR, to quantity desired.
* Determine SI is required or already actuated.
Place CS-46300, MAKE
isolate the Unit 1 MSRs per Attachment J, then open                       o Either SG pressure < 530 psig.
-UP MODE SELECTOR, to "BORATE". If desired, then adjust 1HC
and run schedule file E-0_Att-J.sch located in                             o PRZR pressure < 1830 psig.
-11 0 , BA TO BLENDER FLOW CONT, to "MANUAL" and adjust output for desired flow rate.
X:\\Trex_PI\Lightning\Schedule\EOPs. When the                             o Containment pressure > 3.5 psig.
Momentarily place CS
isolation is complete, inform the crew the MSRs are
-46457, BORIC ACID MAKE
* Manually actuate SI if it did not already actuate.
-UP CONTROL, to "START", to initiate the boration
isolated.
. Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
* Perform Attachment L (see pages 17 & 18).
-G-RM-01.
: b. Upon hearing the announcement of Safety Injection,
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 13 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
* Check AFW Status:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 5 (cont)  When the desired quantity of boric acid has been added, then verify automatic makeup stopped as indicated by CS
or when called as the Turbine Building Operator to                         o Verify total AFW flow greater than 200 secure the Turbine Building Roof Exhausters, wait 2                           GPM.
-46457, BORIC ACID MAKE
minutes and report the Turbine Building Roof                               o Verify AFW pumps discharge pressure Exhausters are all secured.                                                    greater than 1000 psig.
-UP CONTROL, green light LIT.
: c. If Control Room personnel ask if Unit 2 personnel are                       o Control feed flow to maintain 11 SG Narrow available to perform Attachment L, then inform the                             Range between 5% and 50%.
If additional boration is desired, then return to step 2.
Control Room that Unit 2 personnel are NOT
When the boration is complete, then verify 1HC
* Check RCS Temperatures trending to 547&deg;F.
-110, BA TO BLENDER FLOW CONT, is in "AUTO".
available for performing Attachment L.
Reset the Boric Acid integrator. Perform a 10 gallon flush.
* Check PRZR PORVs and Spray valves closed.
Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
: d. If contacted as RP or Duty Chemist to sample for primary-to-secondary leakage, then wait 2 minutes
-G-RM-01.
* Determine RCPs should NOT be stopped due to RCS and report cation column frisks indicate activity is               pressure greater than 1250 psig.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 14 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
high on 12 SG and reading background on 11 SG.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 6 & 7             
* Determine SGs are NOT faulted.
: 11. When the lead evaluator is satisfied with the reactivity manipulation, enter
SS
: Trigger 6 , 12 Steam Generator Tube Rupture
* Determine a SG Tube is ruptured.
. a. Upon hearing the announcement of Reactor Trip, or when called as the Turbine Building Operator to isolate the Unit 1 MSRs per Attachment J, then open and run schedule file E-0_Att-J.sch located in X:\\Trex_PI\Lightning\Schedule\EOPs. When the isolation is complete, inform the crew the MSRs are isolated. b. Upon hearing the announcement of Safety Injection, or when called as the Turbine Building Operator to secure the Turbine Building Roof Exhausters, wait 2 minutes and report the Turbine Building Roof Exhausters are all secured.
: c. If Control Room personnel ask if Unit 2 personnel are available to perform Attachment L, then inform the Control Room that Unit 2 personnel are NOT available for performing Attachment L.
: d. If contacted as RP or Duty Chemist to sample for primary-to-secondary leakage, then wait 2 minutes and report cation column frisks indicate activity is high on 1 2 SG and reading background on 1 1 SG.
: 12. Plant Response:
: 12. Plant Response:
* Go to 1E-3.
: a. RCS pressure lowers.
: a. RCS pressure lowers.
: b. 11 SG level rises.
: b. 11 SG level rises.
: c. Secondary radiation rises.
: c. Secondary radiation rises.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


RO/ LEAD 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 15 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
 
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW           EXPECTED STUDENT RESPONSES POS EVENT                                                                                 1E-3, STEAM GENERATOR TUBE RUPTURE 6&7
SS      1E-0, REACTOR TRIP OR SAFETY INJECTION Manually trip the reactor or verify Reactor Trip.
* Determine RCPs should NOT be stopped due to RCS (cont)                                                                         RO/SS EMERGENCY PLAN CLASSIFICATION                                     pressure greater than 1250 psig.
Verify Turbine Trip.
ALERT - FA1 due to a loss of the RCS Fission Product
Verify both Safeguards buses energized.
* Identify 12 Steam Generator as ruptured.
Determine SI is required or already actuated.
Barrier due to the 12 Steam Generator Tube Rupture.
o Either SG pressure < 530 psig.
* Isolate flow from 12 SG:
o PRZR pressure < 1830 psig.
o Verify 12 SG PORV at 75%.
o Containment pressure > 3.5 psig.
o Check 12 SG PORV closed.
Manually actuate SI if it did not already actuate.
o Close steam supply valve from 12 SG to TD AFWP.
Perform Attachment L (see page s 1 7 & 1 8). Check AFW Status:
o Verify blowdown isolation valves closed on 12 CRITICAL TASKS                                              SG.
o Verify total AFW flow greater than 200 GPM. o Verify AFW pumps discharge pressure greater than 1000 psig.
: 1. Isolate feedwater flow into and steam flow from the                        o Close 12 SG MSIV.
o Control feed flow to maintain 11 SG Narrow Range between 5% and 50%. Check RCS Temperatures trending to 547
ruptured Steam Generator before a transition to
&deg;F. Check PRZR PORVs and Spray valves closed.
* Stop feed flow to 12 SG after narrow range level is ECA-3.1 occurs.                                                          greater than 5%.
Determine RCPs should NOT be stopped due to RCS pressure greater than 1250 psig.
: 2. Establish/maintain an RCS temperature so that
Determine SGs are NOT faulted.
* Reset SI transition from E-3 does not occur because of the
Determine a SG Tube is ruptured. Go to 1E-3.        Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
* Check 12 SG pressure greater than 210 psig.
-G-RM-01.
inability to maintain required subcooling or such
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 15 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
* Initiate RCS Cooldown:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 6 & 7 (cont)    
that an extreme or severe challenge to the                                o Determine required core exit temperature.
 
Subcriticality and/or the Integrity CSF occurs.                          o Check one condensate pump running.
EMERGENCY PLAN CLASSIFICATION ALERT - F A 1 due to a loss of the RCS Fission Product Barrier due to the 12 Steam Generator Tube Rupture.
CRITICAL TASK S 1. Isolate feedwater flow into and steam flow from the ruptured Steam Generator before a transition to ECA-3.1 occurs.
: 2. Establish/maintain an RCS temperature so that transition from E
-3 does not occur because of the inability to maintain required subcooling or such that an extreme or severe challenge to the Subcriticality and/or the Integrity CSF occurs.
 
RO/SS   
 
1E-3 , STEAM GENERATOR TUBE RUPTURE Determine RCPs should NOT be stopped due to RCS pressure greater than 1250 psig.
Identify 12 Steam Generator as ruptured.
Isolate flow from 1 2 SG: o Verify 1 2 SG PORV at 75%.
o Check 1 2 SG PORV closed.
o Close steam supply valve from 1 2 SG to TD AFWP. o Verify blowdown isolation valves closed on 1 2 SG. o Close 1 2 SG MSIV. Stop feed flow to 12 SG after narrow range level is greater than 5%.
Reset SI Check 1 2 SG pressure greater than 210 psig.
Initiate RCS Cooldown:
o Determine required core exit temperature.
o Check one condensate pump running.
o Establish steam dump to condenser o Stop RCS cooldown.
o Establish steam dump to condenser o Stop RCS cooldown.
o Maintain CETC less than required temperature.
o Maintain CETC less than required temperature.
Control feed flow to 11 SG to maintain narrow range level between 5% and 50%.
* Control feed flow to 11 SG to maintain narrow range level between 5% and 50%.
Check PRZR PORV Block valves open.
* Check PRZR PORV Block valves open.
Check PRZR PORVs closed.
* Check PRZR PORVs closed.
Reset SI and Containment Isolation.
* Reset SI and Containment Isolation.
Verify IA to Containment is established.
* Verify IA to Containment is established.
Stop RHR pumps because RCS pressure is greater than 250 psig.
* Stop RHR pumps because RCS pressure is greater than 250 psig.
Align charging pump suction to RWST.
* Align charging pump suction to RWST.
Establish maximum charging flow.
* Establish maximum charging flow.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                            Page 16 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT  6 & 7 (cont)     
 
CRITICAL TASK S 3. Depressurize RCS to meet SI termination criteria prior to overfilling the ruptured Steam Generator.
: 4. Terminate SI prior to overfilling the ruptured Steam Generator.


RO/SS   
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                      Page 16 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
 
SEQ          SEQUENCE OF EVENTS / INSTRUCTOR NOTES                            CREW          EXPECTED STUDENT RESPONSES POS EVENT
Verify CETC less than required temperature.
* Verify CETC less than required temperature.
Check 12 SG pressure is stable or increasing.
6&7
Check RCS subcooling greater than 40&deg;F.
* Check 12 SG pressure is stable or increasing.
Depressurize RCS to minimize Break Flow and Refill PRZR. Use one pressurizer spray to depressurize RCS until ANY of the following conditions satisfied:
(cont)                                                                          RO/SS CRITICAL TASKS
* Check RCS subcooling greater than 40&deg;F.
: 3. Depressurize RCS to meet SI termination criteria
* Depressurize RCS to minimize Break Flow and Refill prior to overfilling the ruptured Steam Generator.                      PRZR.
: 4. Terminate SI prior to overfilling the ruptured Steam
* Use one pressurizer spray to depressurize RCS until Generator.                                                              ANY of the following conditions satisfied:
o Both of the following:
o Both of the following:
RCS pressure less than 12 SG pressure. PRZR level greater than 7%.
RCS pressure less than 12 SG pressure.
PRZR level greater than 7%.
o PRZR level greater than 75%.
o PRZR level greater than 75%.
o RCS subcooling less than 20&deg;F. Check RCS pressure increasing.
o RCS subcooling less than 20&deg;F.
Check if SI flow should be terminated.
* Check RCS pressure increasing.
Stop 12 SI pump (11 SI pump is OOS).
* Check if SI flow should be terminated.
* Stop 12 SI pump (11 SI pump is OOS).
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                 Page 17 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
-G-RM-01.
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT                                                                                 1E-0 Attachment L: SI Alignment Verification 6&7       13. If contacted as the out-plant operator to locally close
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 17 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
* Verify Safeguards Component Alignment:
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 6 & 7 (cont)     
(cont)                                                                          LEAD Safeguards Chilled Water Cross Tie, acknowledge order
: 13. If contacted as the out
* Verify both trains of SI actuated:
-plant operator to locally close Safeguards Chilled Water Cross Tie, acknowledge order to close the valve.
to close the valve. Wait 2 minutes, enter:                             o Both RHR pumps - RUNNING Trigger 7 to CLOSE the CW Cross Tie Valves.                                       -OR-
Wait 2 minutes, enter
: a. Report completion to the Control Room.                              o Both SI pumps - RUNNING o 11 SI Pump is OOS and should NOT be started.
: Trigger 7 to CLOSE the CW Cross Tie Valves.
: 14. If Control Room personnel ask for status of Unit 2                   * "SI NOT READY" lights - NOT LIT Cooling Water/Chilled Water lineup, then inform the                 * "SI ACTIVE" lights - LIT FOR PLANT CONDITIONS Control Room that Unit 2 Cooling Water/Chilled Water                 * "CONTAINMENT ISOLATION" lights - LIT FOR valves are in there:                                                    PLANT CONDITIONS
: a. Report completion to the Control Room.
: a. Non safeguards position if the crew has NOT
: 14. If Control Room personnel ask for status of Unit 2 Cooling Water/Chilled Water lineup, then inform the Control Room that Unit 2 Cooling Water/Chilled Water valves are in there: a. Non safeguards position if the crew has NOT         re-aligned the cooling water/chilled water lineup on Unit 2. b. Safeguards position if the crew has re
* Check Category 1 Vent Zone Boundary:
-aligned the cooling water/chilled water lineup on Unit 2.
re-aligned the cooling water/chilled water lineup on
: 15. If Control Room personnel ask for status of Battery Room Temperatures, then inform the Control Room that Battery Room temperatures are less than 84&deg;F.
* Close MV-32115, 122 SFP HX INLT HDR MV B Unit 2.
: 16. If Control Room personnel ask for status of Spent Fuel Cooling, then inform the Control Room that Spent Fueling level and temperature are norma
* Check Cooling Water Header Pressures - BOTH
: l.
: b. Safeguards position if the crew has re-aligned the GREATER THAN 65 PSIG cooling water/chilled water lineup on Unit 2.
LEAD   
* Verify Plant Announcements Complete:
: 15. If Control Room personnel ask for status of Battery Room Temperatures, then inform the Control Room that
* Check If Main Steamlines Are Isolated:
Battery Room temperatures are less than 84&deg;F.
* Determine MSIVs, Bypass Valves, and Containment
: 16. If Control Room personnel ask for status of Spent Fuel                   Instrument Air Valves do NOT need to be closed.
Cooling, then inform the Control Room that Spent
* Verify SI Flow:
Fueling level and temperature are normal.
* Verify RHR Flow
* Determine Containment Spray is NOT required.
* Check RCP Cooling
* Verify Local Actions Complete
* Verify Generator Breakers - OPEN
* Verify All Heater Drain Pumps - STOPPED
* Check Turbine Valves:
o Turbine reheat and intercept valves - CLOSED o Open turbine drain valves
* Verify Main Feedwater Alignment:
o Both main feedwater pumps - STOPPED o Main and bypass FRVs - CLOSED Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.


1E-0 Attachment L: SI Alignment Verification Verify Safeguards Component Alignment:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                   Page 18 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:
Verify both trains of SI actuated:
SEQ           SEQUENCE OF EVENTS / INSTRUCTOR NOTES                           CREW         EXPECTED STUDENT RESPONSES POS EVENT
o Both RHR pumps - RUNNING -OR- o Both SI pumps
* Verify All Condensate Pumps - STOPPED:
- RUNNING o 11 SI Pump is OOS and should NOT be started.
6&7
  "SI NOT READY" lights
* Determine Steam Dump already in "STM PRESS" (cont)                                                                         LEAD Mode
- NOT LIT  "SI ACTIVE" lights
* Verify Unit 1 Cooling Water/Chilled Water Alignment:
- LIT FOR PLANT CONDITIONS "CONTAINMENT ISOLATION" lights
NOTE                                           o CFCU control switches - "SLOW".
- LIT FOR PLANT CONDITIONS Check Category 1 Vent Zone Boundary:  Close MV-3211 5, 12 2 SFP HX INLT HDR MV B  Check Cooling Water Header Pressures
The operator will have to perform the following to align                   o CFCU dampers - ALIGNED TO DOME safeguards chilled water for SI Alignment:                                 o Unit 1 cooling water/chilled water valves closed o Unit 1 CRDM shroud cooling supply and return
- BOTH GREATER THAN 65 PSIG Verify Plant Announcements Complete:
* Place CS-46018, 11 CFCU, to SLOW.                                         valves - CLOSED
Check If Main Steamlines Are Isolated:
* Place CS-46019, 13 CFCU, to SLOW.                                     o CFCU cooling water supply and return valves -
Determine MSIVs, Bypass Valves, and Containment Instrument Air Valves do NOT need to be closed.
* Place CS-46080, Train A Unit 1 CLG WTR/CHILLED                           OPEN WATER ISOL VALVES, in ISOLATE.                                     o CFCU chilled water supply and return valves -
Verify SI Flow:
* Place CS-46081, Train B Unit 1 CLG WTR/CHILLED                           CLOSED WATER ISOL VALVES, in ISOLATE.
Verify RHR Flow Determine Containment Spray is NOT required.
* Verify 11 Safeguards Screenhouse Ventilation lineup.
Check RCP Cooling Verify Local Actions Complete Verify Generator Breakers
* Place CS-46772, Train A Unit 2 CLG WTR/CHILLED
- OPEN  Verify All Heater Drain Pumps
* Verify Control Room Ventilation Alignment:
- STOPPED  Check Turbine Valves:
WATER ISOL VALVES, in ISOLATE.                                     o Chillers and fans - RUNNING
o Turbine reheat and intercept valves
* Place CS-46773, Train B Unit 2 CLG WTR/CHILLED                       o Control room chiller suction/discharge tie closed -
- CLOSED o Open turbine drain valves Verify Main Feedwater Alignment:
WATER ISOL VALVES, in ISOLATE.                                         STATUS LIGHT LIT
o Both main feedwater pumps
* Place CS-46068, 121 CONT RM CHILLER & PUMP, in
- STOPPED o Main and bypass FRVs
* Verify Unit 2 Cooling/Chilled Water Alignment START.
- CLOSED Retention:  Life of Plant Retain in:  Training Program File Form retained in accordance with record retention schedule identified in FP
* Verify 21 Safeguards Screenhouse Ventilation lineup.
-G-RM-01.
* Place CS-46076, 122 CONT RM CHILLER & PUMP, in
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 18 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME
* Verify 11 and 12 Battery Charger Operation is normal.
-LINE: SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW POS EXPECTED STUDENT RESPONSES EVENT 6 & 7 (cont)       NOTE The operator will have to perform the following to align safeguards chilled water for SI Alignment:
START.
Place CS-46 018, 11 CFCU, to SLOW.
* Verify Battery Room temps less than 84&deg;F.
Place CS-46 019, 13 CFCU, to SLOW.
* Determine 44071-0101, CR CHILLER XTIE LIGHT, is
Place CS-46080, Train A Unit 1 CLG WTR/CHILLED WATER ISOL VALVES, in ISOLATE.
* Check status of Spent Fuel Cooling.
Place CS-46081, Train B Unit 1 CLG WTR/CHILLED WATER ISOL VALVES, in ISOLATE.
NOT LIT; therefore valve is open.
Place CS-46772, Train A Unit 2 CLG WTR/CHILLED WATER ISOL VALVES, in ISOLATE.
* Check Status Of Notifications
Place CS-46773, Train B Unit 2 CLG WTR/CHILLED WATER ISOL VALVES, in ISOLATE.
* Notify SS Of Any Discrepancies.
Place CS-46068, 121 CONT RM CHILLER & PUMP, in START. Place CS-46076, 122 CONT RM CHILLER & PUMP, in START. Determine 44071
: 17. Once the crew has stopped 12 SI Pump and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.
-0101, CR CHILLER XTIE LIGHT, is NOT LIT; therefore valve is open.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
LEAD  Verify All Condensate Pumps
 
- STOPPED:  Determine Steam Dump already in "STM PRESS" Mode  Verify Unit 1 Cooling Water/Chilled Water Alignment:
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                         Page 19 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SIMULATOR INPUT  
o CFCU control switches
- "SLOW". o CFCU dampers
- ALIGNED TO DOME o Unit 1 cooling water/chilled water valves closed o Unit 1 CRDM shroud cooling supply and return valves - CLOSED o CFCU cooling water supply and return valves
- OPEN o CFCU chilled water supply and return valves
- CLOSED  Verify 11 Safeguards Screenhouse Ventilation lineup.
Verify Control Room Ventilation Alignment:
o Chillers and fans
- RUNNING o Control room chiller suction/discharge tie closed
- STATUS LIGHT LIT Verify Unit 2 Cooling/Chilled Water Alignment Verify 21 Safeguards Screenhouse Ventilation lineup.
Verify 11 and 12 Battery Charger Operation is normal.
Verify Battery Room temps less than 84&deg;F.
Check status of Spent Fuel Cooling.
Check Status Of Notifications Notify SS Of Any Discrepancies
. 17. Once the crew has stopped 12 SI Pump and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.     Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                                                                                             Page 19 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==


Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 20 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                           Page 20 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario
_____ Simulator Status:
_____     Simulator Status:
___ 1. "Training Load" ___ 2. Step counters "ON" ___ 3. Alarm sound "ON" ___ 4. Steps 1 - 5 on page 6 complete
___ 1.         "Training Load"                       ___ 2. Step counters "ON"
___ 5. Speed: "REAL"
___ 3.         Alarm sound "ON"                     ___ 4. Steps 1 - 5 on page 6 complete
___ 6. IC-265 or IC-10 running
___ 5.         Speed: REAL                         ___ 6. IC-265 or IC-10 running
_____ Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructor's booth
_____     Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructors booth.
. _____ Verify Schedule File/Summary matches Simulator Input Summary page in the SEG
_____     Verify Schedule File/Summary matches Simulator Input Summary page in the SEG.
. _____ Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.
_____     Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.
_____ Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset
_____     Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset.
. _____ MOC I sheet displayed on C panel
_____     MOC I sheet displayed on C panel.
. _____ MOC Reactivity Briefing sheet available at Reactor Operator Desk
_____     MOC Reactivity Briefing sheet available at Reactor Operator Desk.
. _____ Turnover sheet/PRA sheet available. _____ If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.
_____     Turnover sheet/PRA sheet available.
_____ Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).
_____     If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.
_____ Electronic PINGP 577 forms closed on LAN connected PC s. _____ Board-mounted EAL Tables are cleaned
_____     Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).
. _____ EOOS running on PC and updated as follows to reflect equipment OOS
_____     Electronic PINGP 577 forms closed on LAN connected PCs.
: ___ 1. 1 1 Safety Injection Pump
_____     Board-mounted EAL Tables are cleaned.
_____ Update Control Board Placards:
_____     EOOS running on PC and updated as follows to reflect equipment OOS:
___ 1. NRC Current Authentication Code call date updated to current date. ___ 2. High Flux At Shutdown Alarm Setpoint placards: 5900 cps
___ 1. 11 Safety Injection Pump
. ___ 3. Feedwater regulating valve position placard set to current values.
_____     Update Control Board Placards:
___ 4. Recommended SG Blowdown flow set to current values.
___ 1.       NRC Current Authentication Code call date updated to current date.
___ 5. RCS boron on the CVCS panel placard:
___ 2.       High Flux At Shutdown Alarm Setpoint placards: 5900 cps.
853 ppm. ___ 6. Turbine reference/setter values on the CVCS panel set to current (Target/Demand on
___ 3.       Feedwater regulating valve position placard set to current values.
-line positions)
___ 4.       Recommended SG Blowdown flow set to current values.
. ___ 7. Shift Reactivity Guidance placard: BA: 2.7 gallons, RMU: 67 gallons
___ 5.       RCS boron on the CVCS panel placard: 853 ppm.
. Dilutions @ 10 gal RMU, 1
___ 6.       Turbine reference/setter values on the CVCS panel set to current (Target/Demand on-line positions).
-2 times per shift
___ 7.       Shift Reactivity Guidance placard: BA: 2.7 gallons, RMU: 67 gallons.
. _____ Magnetic placards in place:
Dilutions @ 10 gal RMU, 1-2 times per shift.
___ 1. 11 BA TANK "Lined Up For Service"
_____       Magnetic placards in place:
___ 2. 11 BA PUMP "Lined Up to 11 BA Tank"
___ 1. 11 BA TANK Lined Up For Service
___ 3. 12 BA PUMP "Lined Up to 11 BA Tank"
___ 2. 11 BA PUMP Lined Up to 11 BA Tank
___ 4. CC to SFP MV
___ 3. 12 BA PUMP Lined Up to 11 BA Tank
-32117 "In Service"
___ 4. CC to SFP MV-32117 In Service
___ 5. Blowdown 46470 "SGB To CDSR"
___ 5. Blowdown 46470 SGB To CDSR
___ 6. HU Flag above 12 RHR HX CC inlet MV
___ 6. HU Flag above 12 RHR HX CC inlet MV-32094 for 1C14 Limitation
-32094 for "1C14 Limitation"
___ 7. H 2 IN VCT SPACE at VCT
___ 7. "H 2 IN VCT SPACE" at VCT
_____       Pink Status Control Tags in place:
_____ Pink Status Control Tags in place: Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 21 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0   ___ 1. CS-46540, 22 CC WTR PUMP
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                   Page 21 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0
___ 2. CS-46572, CC TO SFP MV
___ 1. CS-46540, 22 CC WTR PUMP                ___ 5. CS-46185, 12 RHR PUMP
-32117 ___ 3. CS-46930, D2 DIESEL GENERATOR
___ 2. CS-46572, CC TO SFP MV-32117             ___ 6. CS-46179, 12 SI PUMP
___ 4. CS-46425, 12 MDAFWP
___ 3. CS-46930, D2 DIESEL GENERATOR            ___ 7. CS-46037, 12 CC WTR PUMP
___ 5. CS-46185, 12 RHR PUMP
___ 4. CS-46425, 12 MDAFWP                      ___ 8. CS-46523, 22 CLG WTR PUMP
___ 6. CS-46179, 12 SI PUMP
_____     Yellow Caution Tags in place:
___ 7. CS-46037, 12 CC WTR PUMP
___ 1. CS-46064, CC TO SFP MV-32115, in CLOSED
___ 8. CS-46523, 22 CLG WTR PUMP
___ 2. CS-46178, 11 SI PUMP, in PULLOUT
_____ Yellow Caution Tags in place: ___ 1. CS-46064, CC TO SFP MV-32115 , in CLOSED ___ 2. CS-46 178 , 11 SI PUMP, in PULLOUT
_____     ERCS driven recorders are on-scale (RCS temperature scaled 555&#xba; F to 565&#xba; F).
_____ ERCS driven recorders are on
_____     ERCS alarm screen operating and alarms reset.
-scale (RCS temperature scaled 55 5&#xba; F to 56 5&#xba; F). _____ ERCS alarm screen operating and alarms reset
_____     All ERCS terminals operating and set as follows:
. _____ All ERCS terminals operating and set as follows
CONF             VARS                           R02               Alarm Summary Page CONE1             Group OP31_U1                 R03               AFD CONC             SAS (XS11)                     R04               TPM CONG1             Group QP CCDATA               R05               QP LOADFOLL ERCS-R01         Group RADMON_U1               R06               Alarm Summary Page
: CONF VARS R02 Alarm Summary Page CONE1 Group OP31_U1 R03 AFD CONC SAS (XS11)
_____     ERCS single point displays:           CONB         1T0499A               1U1613A CONE2         1Q0340A               1V4501A
R04 TPM CONG1 Group QP CCDATA R05 QP LOADFOLL ERCS-R01 Group RADMON_U1 R06 Alarm Summary Page
_____     ERCS TPM set (Calorimetric - Auto Scaling - LEFM).
_____ ERCS single point displays:
_____     Verify that copy machine and printers are loaded with paper.
CONB 1T0499A 1U1613A CONE2 1Q0340A 1V4501A _____ ERCS TPM set (Calorimetric  
_____     Pens/Paper/Markers available on the simulator.
- Auto Scaling  
st
- LEFM). _____ Verify that copy machine and printers are loaded with paper
_____     Verify 121 IA Compressor is in PREFERRED and 122 IA Compressor is in 1 STANDBY, and nd 123 IA Compressor is in 2 STANDBY.
. _____ Pens/Paper/Markers available on the simulator
_____     Verify R11/R12 are lined up correctly (at the R11/R12 local panel):
. _____ Verify 12 1 IA Compressor is in PREFERRED and 12 2 IA Compressor is in 1 st STANDBY, and   123 IA Compressor is in 2 nd STANDBY. _____ Verify R11/R12 are lined up correctly (at the R11/R12 local panel):
___ 1. Sample pump is running.
___ 1. Sample pump is running.
___ 2. Alarms are reset.
___ 2. Alarms are reset.
___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.
___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.
___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.
___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.
_____ Set Turbine Control HMI Displays as follows:
_____     Set Turbine Control HMI Displays as follows:
___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview
___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview.
. ___ 2. U1 Turb Aux Cont (48088) to Turb Overview
___ 2. U1 Turb Aux Cont (48088) to Turb Overview.
. ___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control
___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control.
. _____ DEHC VPL set ~ 0.1 to 0.2 above current valve position (not on limiter).
_____     DEHC VPL set ~ 0.1 to 0.2 above current valve position (not on limiter).
_____ DEHC alarms cleared
_____     DEHC alarms cleared.
. _____ N51 & N52 Display Sheets for 100% power are in place as necessary
_____     N51 & N52 Display Sheets for 100% power are in place as necessary.
. _____ Procedure 1C51 marked up for PT
_____     Procedure 1C51 marked up for PT-485 failure.
-485 failure.
_____     Headsets turned on as necessary.
_____ Headsets turned on as necessary.
_____     Procedure checklist completed. See following page.
_____ Procedure checklist completed. See following page.
_____     Peer Check performed for simulator setup.
_____ Peer Check performed for simulator setup
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                     Page 22 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 22 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:
Before           After 1C1.4 AOP1, RAPID POWER REDUCTION UNIT 1 1C12.5, UNIT 1 BORON CONCENTRATION CONTROL 1C20.5, UNIT 1 - 4.16KV SYSTEM 1C51.1, Tavg Loop 1B 1T-401 - High st 1C51.2, Turbine 1 Stage Pressure 1P-485 - Low 1C5 AOP4, DROPPED RCCA 1C5 AOP5, MISALIGNED ROD, STUCK ROD, AND/OR RPI FAILURE OR DRIFT 1E-0, REACTOR TRIP OR SAFETY INJECTION 1E-3, STEAM GENERATOR TUBE RUPTURE C22.5 AOP1, LOSS OF GENERATOR BUS DUCT COOLING C47003-0503, 11 HEATER DRAIN TANK HI LVL C47007-0301, BUS DUCT COOLING SYSTEM HI TEMP C47007-0302, BUS DUCT COOLING BLOWERS NOT RUNNING C47012-0104, RCS HI TAVG C47012-0304, RCS TAVG DEVIATION C47012-0404, OVERPOWER T CH ALERT C47012-0504, OVERTEMP T CH ALERT C47012-0507, PRZR LVL DEVIATION C47012-0604, RCS DT DEVIATION C47013-0105, OPT ROD STOP TURBINE RUNBACK CH ALERT C47013-0205, OTT ROD STOP TURBINE RUNBACK CH ALERT C47013-0407, ROD AT BOTTOM C47013-0507, COMPUTER ALARM ROD DEVIATION/SEQUENCING C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES REACTIVITY BRIEFING BINDER - MOC SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.1.7 T.S. LCO 3.3.1 T.S. LCO 3.3.2 TLCO 3.3.3 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Before After       1C1.4 AOP1, RAPID POWER REDUCTION UNIT 1 1C12.5, UNIT 1 BORON CONCENTRATION CONTROL 1C20.5, UNIT 1  
 
- 4.16KV SYSTEM 1C51.1, Tavg Loop 1B 1T
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                   Page 23 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Post-Scenario Checklist
-401 - Hig h    1C51.2, Turbine 1 st Stage Pressure 1P
_____     LAN connected computers are cleared of information added during the scenario.
-485 - Low     1C5 AOP4, DROPPED RCCA 1C5 AOP5, MISALIGNED ROD, STUCK ROD, AND/OR RPI FAILURE OR DRIFT     1E-0, REACTOR TRIP OR SAFETY INJECTION 1E-3, STEAM GENERATOR TUBE RUPTURE C22.5 AOP1, LOSS OF GENERATOR BUS DUCT COOLING C47003-0503, 11 HEATER DRAIN TANK HI LVL C47007-0301, BUS DUCT COOLING SYSTEM HI TEMP C47007-0302, BUS DUCT COOLING BLOWERS NOT RUNNING C47012-0104, RCS HI TAVG C47012-0304, RCS TAVG DEVIATION C47012-0404, OVERPOWER T CH ALERT C47012-0504, OVERTEMP T CH ALERT C47012-0507, PRZR LVL DEVIATION C47012-0604, RCS DT DEVIATION C47013-0105, OPT ROD STOP TURBINE RUNBACK CH ALERT C47013-0205, OTT ROD STOP TURBINE RUNBACK CH ALERT C47013-0407, ROD AT BOTTOM C4701 3-0 5 0 7 , COMPUTER ALARM ROD DEVIATION/SEQUENCING C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES REACTIVITY BRIEFING BINDER  
_____     Computer generated PINGP 577 cleared.
- MOC     SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.1.7 T.S. LCO 3.3.1 T.S. LCO 3.3.2 TLCO 3.3.3 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
_____     Procedure checklist completed. See previous page.
-G-RM-01.
_____     Remove Pink Status Control Tags from the following equipment:
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 23 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0   Post-Scenario Checklist _____ LAN connected computers are cleared of information added during the scenario.
_____ Computer generated PINGP 577 cleared.
_____ Procedure checklist completed. See previous page. _____ Remove Pink Status Control Tags from the following equipment:
___ 1. CS-46930, D2 DIESEL GENERATOR
___ 1. CS-46930, D2 DIESEL GENERATOR
___ 2. CS-46425, 12 MDAFWP
___ 2. CS-46425, 12 MDAFWP
Line 2,767: Line 2,889:
___ 5. CS-46037, 12 CC WTR PUMP
___ 5. CS-46037, 12 CC WTR PUMP
___ 6. CS-46523, 22 CLG WTR PUMP
___ 6. CS-46523, 22 CLG WTR PUMP
_____ Magnetic placards removed:
_____   Magnetic placards removed:
___ 1. NONE   _____ Remove Yellow Caution Tags from the following equipment: ___ 1. CS-46178, 11 SI PUMP
___ 1. NONE
_____ Board-mounted EAL Table is cleaned
_____     Remove Yellow Caution Tags from the following equipment:
. _____ All books, note pads, and calculators put away
___ 1. CS-46178, 11 SI PUMP
. End Of Day Checklist
_____     Board-mounted EAL Table is cleaned.
_____ Signs/placards removed and put away unless normal simulator configuration
_____     All books, note pads, and calculators put away.
. _____ Floor PCs logged off if simulator will not be used again that day
End Of Day Checklist
. _____ Instructor station returned to normal with all books, paper, and etc. put away
_____     Signs/placards removed and put away unless normal simulator configuration.
. _____ Headsets turned off and put away if simulator will not be used again that day
_____     Floor PCs logged off if simulator will not be used again that day.
. _____ Simulator reset to IC
_____     Instructor station returned to normal with all books, paper, and etc. put away.
-10 unless another IC will be used for further training
_____     Headsets turned off and put away if simulator will not be used again that day.
. _____ Simulator placed in DORT if simulator will not be used again that day
_____     Simulator reset to IC-10 unless another IC will be used for further training.
. _____ Recorder power "OFF" if simulator will not be used again that day
_____     Simulator placed in DORT if simulator will not be used again that day.
. Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
_____     Recorder power "OFF" if simulator will not be used again that day.
-G-RM-01.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                                                                       Page 24 of 27   RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE:           DAY/NIGHT SHIFT: Day         CAT 1 VENT OPENINGS: 0 ft 2  SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS
 
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                             Page 24 of 27 RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE:                                                                                   DAY/NIGHT SHIFT: Day CAT 1 VENT OPENINGS: 0 ft2                                                      SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS
: 1. 11 SI PUMP is OOS for corrective maintenance.
: 1. 11 SI PUMP is OOS for corrective maintenance.
T.S. 3.5.2 Condition A was entered with 48 hours remaining.
* T.S. 3.5.2 Condition A was entered with 48 hours remaining.
: 2. PT-485, Turbine First Stage Pressure, is failed LOW. T.S. 3.3.1 Condition A and R entered.
: 2. PT-485, Turbine First Stage Pressure, is failed LOW.
P7 was verified to be in required state for existing unit conditions.
* T.S. 3.3.1 Condition A and R entered.
TRM 3.3.4 Condition A was entered.
* P7 was verified to be in required state for existing unit conditions.
A WR was initiated to repair PT-485. B/S 1PC-485A is tripped.
* TRM 3.3.4 Condition A was entered.
PROTECTED EQUIPMENT D2 DIESEL GENERATOR 12 MDAFWP 12 RHR PUMP 12 SI PUMP 12 CC PUMP 22 CLG WATER PUMP 22 CC PUMP 121 SFP HX RAD MONITORS OOS ANNUNCIATORS OOS NONE NONE OUTSTANDING SP'S FIRE DET / PROT EQP IMPAIRMENTS NONE NONE OTHER EQUIPMENT OOS / STATUS Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System. Bus 15 and 16 are powered from CT11.
* A WR was initiated to repair PT-485.
A designated operator is stationed at the G
* B/S 1PC-485A is tripped.
-Panel to monitor Bus Phase Currents and perform actions of "Bus 15 Sequencer Channel Alert" and Bus 16 Sequencer Channel Alert" Alarm Response Procedures.
PROTECTED EQUIPMENT D2 DIESEL GENERATOR                         12 CC PUMP 12 MDAFWP                                    22 CLG WATER PUMP 12 RHR PUMP                                  22 CC PUMP 12 SI PUMP                                  121 SFP HX RAD MONITORS OOS                                           ANNUNCIATORS OOS NONE                                                       NONE OUTSTANDING SPS                                            FIRE DET / PROT EQP IMPAIRMENTS NONE                                                       NONE OTHER EQUIPMENT OOS / STATUS
MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE BKR 15-3, BUS 15 1RY SOURCE BREAKER, RTS OPERATIONAL PLANS FOR COMING SHIFT Maintain Rod Control in Manual and Steam Dump in Steam Pressure Mode.
* Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System.
Xenon is at equilibrium.
* Bus 15 and 16 are powered from CT11. A designated operator is stationed at the G-Panel to monitor Bus Phase Currents and perform actions of Bus 15 Sequencer Channel Alert and Bus 16 Sequencer Channel Alert Alarm Response Procedures.
Maintain 100% power.
MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE BKR 15-3, BUS 15 1RY SOURCE BREAKER, RTS OPERATIONAL PLANS FOR COMING SHIFT
Transfer power on Bus 15 to 1RY per Step 5.11 of 1C20.5
* Maintain Rod Control in Manual and Steam Dump in Steam Pressure Mode.
. Dilute 10 gallons 1-2 times per shift for temperature control.
* Xenon is at equilibrium. Maintain 100% power.
NEW PROCEDURES / INSTRUCTIONS NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
* Transfer power on Bus 15 to 1RY per Step 5.11 of 1C20.5.
-G-RM-01.
* Dilute 10 gallons 1-2 times per shift for temperature control.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                       Page 25 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.
NEW PROCEDURES / INSTRUCTIONS NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: 1. The scenario contains objectives for the desired tasks and relevant human performance tools.
 
Yes  No X    2. The scenario identifies key parameter response, expected alarms, and automatic actions associated with the induced perturbations
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 25 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.
. Yes  No X   3. The scenario content adequately addresses the desired tasks, through simulator performance, instructor
: 1. The scenario contains objectives for the desired tasks and relevant human             Yes      No performance tools.                                                                     X
-led training freezes, or both.
: 2. The scenario identifies key parameter response, expected alarms, and                   Yes      No automatic actions associated with the induced perturbations.                           X
Yes  No X    4. Plant PRA initiating events, important equipment, and important tasks are identified.
: 3. The scenario content adequately addresses the desired tasks, through                   Yes      No simulator performance, instructor-led training freezes, or both.                       X
Yes  No X    5. Turnover information includes a Daily At Power or Shutdown Safety Risk Assessment.
: 4. Plant PRA initiating events, important equipment, and important tasks are             Yes      No identified.                                                                           X
Yes  No X    6. The scenario contains procedurally driven success paths. Procedural discrepancies are identified and corrected before training is given.
: 5. Turnover information includes a Daily At Power or Shutdown Safety Risk                 Yes      No Assessment.                                                                           X
Yes  No X    7. The scenario guide includes responses for all anticipated communications to simulated personnel outside the Control Room, based on procedural guidance and standard operating practices.
: 6. The scenario contains procedurally driven success paths. Procedural                   Yes      No discrepancies are identified and corrected before training is given.                   X
Include estimated completion times and/or notes for use of time compression
: 7. The scenario guide includes responses for all anticipated communications to           Yes      No simulated personnel outside the Control Room, based on procedural guidance             X and standard operating practices. Include estimated completion times and/or notes for use of time compression.
. Yes  No X    8. The scenario includes related industry experience. SOER, SER and similar OE recommendations are clearly identified and fully addressed.
: 8. The scenario includes related industry experience. SOER, SER and similar               Yes      No OE recommendations are clearly identified and fully addressed.*                                 X
* Yes  No  X 9. The scenario guide incorporates verification of Operator Fundamental application.
: 9. The scenario guide incorporates verification of Operator Fundamental                   Yes      No application.*                                                                                   X
* Yes  No  X 10. Training elements and specific human performance elements are addressed in the scenario critique guide to be used by the critique facilitator. The critique guide includes standards for expected performance.
: 10. Training elements and specific human performance elements are addressed               Yes      No in the scenario critique guide to be used by the critique facilitator. The critique             X guide includes standards for expected performance.*
* Yes  No  X  11. For evaluations, it has been verified that without operator action the critical tasks will be failed.
: 11. For evaluations, it has been verified that without operator action the critical       Yes      No tasks will be failed.                                                                 X Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
Yes  No X   Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
* For evaluations these items may be marked NO without justification.
* For evaluations these items may be marked NO without justification.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01.
 
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                       Page 26 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                       Page 26 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.
: 1. The desired initial conditions agreed with the reference plant with respect to reactor status, plant configuration, and system operation.
: 1. The desired initial conditions agreed with the reference plant with               Yes      No respect to reactor status, plant configuration, and system operation.             X
Yes X No  2. The simulator operated in real time during conduct of validation.
: 2. The simulator operated in real time during conduct of validation.                 Yes       No X
Yes X No  3. The simulator demonstrated expected plant response to operator input and to normal, transient, and accident conditions.
: 3. The simulator demonstrated expected plant response to operator input             Yes      No and to normal, transient, and accident conditions.                               X
Yes X No  4. The simulator permitted use of the reference plant's procedures. The scenario was completed without procedural exceptions, simulator performance exceptions, or deviation from the scenario sequence.
: 4. The simulator permitted use of the reference plants procedures. The             Yes      No scenario was completed without procedural exceptions, simulator                   X performance exceptions, or deviation from the scenario sequence.
Yes X No  5. The simulator did not "fail to cause" or "unexpectedly cause" any first principle alarm or primary automatic action.
: 5. The simulator did not fail to cause or unexpectedly cause any first           Yes      No principle alarm or primary automatic action.                                     X
Yes X No  6. Observable changes in parameters relevant to the scenario corresponded in trend and direction to reference plant's expected response. Yes X No  7. All malfunctions and other instructor interface items were functional and demonstrated the expected reference plant's response to the initiating cause. Yes X No  8. All malfunctions and other instructor interface items were initiated in the same sequence described within the simulator scenario.
: 6. Observable changes in parameters relevant to the scenario                         Yes      No corresponded in trend and direction to reference plants expected                 X response.
Yes X No  9. The scenario satisfies the learning or examination objectives without any significant simulator performance issues, or deviations from the approved scenario sequence.
: 7. All malfunctions and other instructor interface items were functional and         Yes      No demonstrated the expected reference plants response to the initiating           X cause.
Yes X No  10. Simulator fidelity has been demonstrated to be adequate for this scenario.
: 8. All malfunctions and other instructor interface items were initiated in the       Yes      No same sequence described within the simulator scenario.                           X
Yes X No    Discrepancies noted (Check "none" or list items found)
: 9. The scenario satisfies the learning or examination objectives without             Yes      No any significant simulator performance issues, or deviations from the             X approved scenario sequence.
None SMAR = Simulator Action Request SMAR: 01422319 SMAR:   SMAR:   S MAR:   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
: 10. Simulator fidelity has been demonstrated to be adequate for this                 Yes      No scenario.                                                                         X Discrepancies noted (Check none or list items found)             None SMAR = Simulator Action Request SMAR: 01422319             SMAR:                     SMAR:                   SMAR:
-G-RM-01.
Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-10 75-02 Rev. 4 (FP-T-SAT-75)                                                                                      Page 27 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Comments:  CS-46955, BKR 15
-7, indication is erratic. In the simulator, BKR 15
-7 is normally open. When CS
-46955 is taken to close, BKR 15
-7 closes, the red lamp illuminates, and the green lamp extinguishes. All as expected. When CS
-46955 is taken to TRIP, the red light should extinguish, and the green light should light, indicating BKR 15
-7 is open (tripped). The red lamp does extinguish as expected; but the green light sometimes either fails to light or it flickers on and off. If the switch is wiggled slightly, the green light usually lights, but not always. This improper indication shows up in the TAM log, indicating a possible problem with the switch. SMAR
-01422319 was initiated to investigate and repair/replace the control switch.


Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
QF-1075-02 Rev. 4 (FP-T-SAT-75)                                                          Page 27 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Comments: CS-46955, BKR 15-7, indication is erratic. In the simulator, BKR 15-7 is normally open. When CS-46955 is taken to close, BKR 15-7 closes, the red lamp illuminates, and the green lamp extinguishes. All as expected. When CS-46955 is taken to TRIP, the red light should extinguish, and the green light should light, indicating BKR 15-7 is open (tripped). The red lamp does extinguish as expected; but the green light sometimes either fails to light or it flickers on and off. If the switch is wiggled slightly, the green light usually lights, but not always.
Validation Personnel Name Job Title / Qualification Validation Positi on Shawn Sarrasin Operations Instructor Lead Evaluator Fred Collins Operations Instructor Booth Driver Jeff Human Operations SRO Shift Supervisor Mark Haren Operations RO LEAD Rick Martin Operations RO RO                   Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP
This improper indication shows up in the TAM log, indicating a possible problem with the switch. SMAR-01422319 was initiated to investigate and repair/replace the control switch.
-G-RM-01.}}
Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
Validation Personnel Name                         Job Title / Qualification         Validation Position Shawn Sarrasin                           Operations Instructor                 Lead Evaluator Fred Collins                             Operations Instructor                 Booth Driver Jeff Human                               Operations SRO                       Shift Supervisor Mark Haren                               Operations RO                         LEAD Rick Martin                               Operations RO                         RO Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.}}

Latest revision as of 12:02, 5 February 2020

2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Simulator Scenarios
ML15126A459
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/19/2014
From:
Region 3 Administrator
To:
Northern States Power Co, Xcel Energy
References
Download: ML15126A459 (132)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 1 Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________ Operators: __________________________

Initial Conditions:

-8 Reactor Power at 1 x 10 amps, Boron Concentration at 1369 ppm, RCS temperature at 547°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 144 steps, Generator Power at 0 MW.

No equipment is out of service.

Turnover:

Raise reactor power to the point of adding heat.

Event Malf. Event Type* Event No. No. Description R (ATC) 1 RAISE POWER TO THE POAH N (SRO)

I (ATC, SRO) PRZR PRESSURE CHANNEL FAILS LOW 2

TS (SRO) (CONTROLLING CHANNEL)

C (ATC, SRO) 3 22 GPM RCS LEAK INTO CONTAINMENT TS (SRO) 4 M (ALL) SMALL BREAK LOCA 5 C (BOP) 11 & 12 SI PUMPS FAIL TO AUTO START 6 C (BOP) 11 & 12 CC PUMPS FAIL TO AUTO START

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 2 Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________ Operators: __________________________

Initial Conditions:

Reactor Power at 100%, Boron Concentration at 1299 ppm, RCS temperature at 560°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 218 steps, Generator Power at 581 MW.

12 RHR Pump is out of service. T.S. LCO 3.5.2 Condition A was entered with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> remaining. D1, 11 TD AFW Pump, 11 RHR Pump, 11 SI Pump, 11 CC Pump, and 12 CLW Pump are PROTECTED. BKR 16-10 is out of service.

Turnover:

nd Place a 2 Letdown Orifice in service in preparation of SP 1047, Control Rod Quarterly Exercise.

Event Malf. Event Type* Event No. No. Description ND 1 N (BOP) PLACE 2 LETDOWN ORIFICE IN SERVICE 2 TS (SRO) CONTAINMENT PRESSURE CHANNEL FAILS HIGH I (ATC, SRO) 3 PRESSURIZER LEVEL FAILS HIGH TS (SRO) 4 C (BOP, SRO) TURBINE MALFUNCTION (10 MW LOAD CYCLING)

R (ATC) 5 RAPID DOWNPOWER (100% TO 95%)

N (SRO) 6 M (ALL) LARGE BREAK LOCA 7 C (BOP) MAIN TURBINE FAILS TO AUTO TRIP 8 C (ATC) BOTH SAFEGUARD TRAINS FAIL TO AUTO ACTUATE 9 C (BOP, SRO) 11 & 12 AFW PUMPS FAIL TO AUTO START

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 3 Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________ Operators: __________________________

Initial Conditions:

Reactor Power at 50%, Boron Concentration at 1482 ppm, RCS temperature at 556°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 181 steps, Generator Power at 272 MW.

PT-485, Turbine First Stage Pressure, is failed HIGH. Rod Control is in MANUAL. T.S. LCO 3.3.1 Condition A and R entered. P7 was verified to be in required state for existing unit conditions. TRM 3.3.4 Condition A was entered. A Work Request was initiated to repair PT-485. 123 Air Compressor is out of service. 13 Charging Pump Suction Stabilizer PM is complete are ready to be re-started.

Turnover:

Restore RCS Average Coolant Temperature to program temperature.

Swap charging pumps to 11 and 13 running and 12 is secured per 1C12.1.

Event Malf. Event Type* Event No. No. Description R (ATC) 1 RESTORE TAVE TO TREF N (SRO) 2 N (BOP) SWAP CHARGING PUMPS 3 TS (SRO) 11 SI PUMP PLACED IN LOCAL I (BOP, SRO) 4 N43 PR NUCLEAR INSTRUMENT FAILS HIGH TS (SRO) 5 C (ATC) PRESSURIZER SPRAY VALVE DRIFTS OPEN LOOP A RCS LOSS OF FLOW & REACTOR FAILS TO 6 C (ATC, SRO)

AUTOMATICALLY TRIP 7 M (ALL) FAULT IN 12 SG

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 4 Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________ Operators: __________________________

Initial Conditions:

Reactor Power at 50%, Boron Concentration at 1480 ppm, RCS temperature at 553°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 175 steps, Generator Power at 265 MW.

13 Charging Pump is out of service. Two 40 GPM letdown orifices are in service. Pressurizer heaters are on. 11 and 12 Condensate Pumps are running. 11 and 12 Main Feed Pumps are running. 11 MFP recirculation valve is still open. 11 and 12 HDT Pumps are running.

Turnover:

Alternate CFCUs and discharge dampers such that 11 and 13 CFCUs are running in slow to the dome and 12 and 14 CFCUs are running in fast to support/gap.

When directed by the Shift Manager, perform a load increase from 50% to 60%.

Event Malf. Event Type* Event No. No. Description ALTERNATE CONTAINMENT FAN COIL UNITS AND 1 N (BOP)

DISCHARGE DAMPERS I (BOP, SRO) 11 SG PRESS CHANNEL FAILS HIGH 2

TS (SRO) CAUSING 11 SG PORV TO OPEN R (ATC) 3 UNIT 1 LOAD INCREASE FROM 50% TO 60%

N (SRO)

DROPPED ROD (B-8) AND REACTOR FAILS TO 4 C (ATC, SRO)

AUTOMATICALLY TRIP 5 C (BOP) TURBINE FAILS TO AUTOMATICALLY TRIP 6 M (ALL) LOSS OF ALL AC (OCCURS 10 SECS AFTER TURB TRIP) 7 C (ATC, SRO) 11 TD AFW PUMP FAILS TO AUTO START

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 5 Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________ Operators: __________________________

Initial Conditions:

Reactor Power at 100%, Boron Concentration at 853 ppm, RCS temperature at 560°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 218 steps, Generator Power at 581 MW.

11 SI Pump is out of service. T.S. LCO 3.5.2 Condition A was entered with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> remaining. D2, 12 MD AFW Pump, 12 RHR Pump, 12 SI Pump, 12 CC Pump, and 22 CLW Pump are PROTECTED. PT-485, Turbine First Stage Pressure, is failed LOW. Rod Control is in MANUAL. T.S. LCO 3.3.1 Condition A and R entered. P7 was verified to be in required state for existing unit conditions. TRM 3.3.4 Condition A was entered. A Work Request was initiated to repair PT-485. B/S 1PC-485A is tripped. Bus 15 and 16 are powered from CT11.

A dedicated operator is monitoring phase currents at the G-Panel.

Turnover:

Transfer power on Bus 15 to 1RY after turnover is complete.

Event Malf. Event Type* Event No. No. Description 1 N (BOP) TRANSFER POWER ON BUS 15 FROM CT11 TO 1RY I (ATC, SRO) 2 ROD E-3 POSITION INDICATION FAILS LOW TS (SRO)

I (ATC, SRO) 3 RCS THOT CHANNEL FAILS HIGH TS (SRO) 4 C (BOP, SRO) LOSS OF BUS DUCT COOLING R (ATC) 5 RAPID DOWNPOWER (100% to 50%)

N (SRO) 6 M (ALL) 12 SG TUBE RUPTURE 7 C (BOP) SI TO CHILLED WATER SIGNAL FAILURE

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 1 of 22 SIMULATOR EXERCISE GUIDE (SEG)

SITE: PRAIRIE ISLAND SEG # PI-ILT-NRC-1401S SEG TITLE: 2014 ILT NRC SIMULATOR EVALUATION #1 REV. # 0 PROGRAM: INITIAL LICENSE OPERATOR TRAINING #: FL-ILT COURSE: INITIAL LICENSE OPERATOR TRAINING #: FL-ILT TOTAL TIME: 2.0 HOUR Developed by: Shawn Sarrasin 2/9/2014 Instructor Date Reviewed by: Fredrick Collins 2/28/2014 Instructor Date (Simulator Scenario Development Checklist.)

Validated by: Shawn Sarrasin 4/21/2014 Validation Lead Instructor Date (Simulator Scenario Validation Checklist.)

Approved by:

Training Supervision Date Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 2 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Guide Requirements

1. During all plant operating conditions, the crew will demonstrate Goal of the ability to monitor and operate the plant within the limits of the Training: Operations Manuals and Technical Specifications.
2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
1. Raise power to the Point of Adding Heat per 1C1.2.

Learning 2. Diagnose and perform corrective actions for a Pressurizer Objectives: Pressure Instrument failing low per 1C51.3.

3. Diagnose and respond to a RCS Leak per 1C4 AOP1.
4. Diagnose and respond to a Small Break LOCA per 1E-0 and 1E-1.
5. Diagnose and respond to a failure of the SI Pumps to automatically start per 1E-0 Attachment L.
6. Diagnose and respond to a failure of the CC Pumps to automatically start per 1E-0 Attachment L.
1. Full Scope Simulator Training 2. NRC Evaluation Team Resources: 3. Booth Operator (Backup Communicator)
4. Primary Communicator Initiating Event with Core Damage Frequency:

Related PRA LOCA (5.1%)

Information:

Important Components:

11 SI PMP 12 SI PMP 11 CC PMP 12 CC PMP Important Operator Actions with Task Number:

NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 3 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:

Before EOP Entry:

1. 1P-431, Blue Channel Pressurizer Pressure Transmitter, fails low.
2. Unidentified RCS Leak at ~21 gpm.

After EOP Entry:

1. 11 and 12 SI Pumps fail to start automatically.
2. 11 and 12 CC Pumps fail to start automatically.

Abnormal Events:

1. Pressurizer Pressure Instrument Failure.
2. RCS Leak.

Major Transients:

1. Small Break LOCA from the A Loop RTD Bypass Cold Leg Manifold.

Critical Tasks:

1. E H: Manually start at least one Safety Injection pump before transition out of E-0.
2. E K: Manually start at least one CCW pump before transition out of E-0.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 4 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO OVERVIEW:

INITIAL CONDITIONS: EQUIPMENT OOS

  • NONE
  • Power: 1 x 10-8 amps
  • Temperature: 549°F
  • Pressure: 2235 psig
  • Xenon: Equilibrium
  • Rods: D @ 148
  • Generator: 0 MW SEQUENCE OF EVENTS:

Event 1: Raise Reactor Power to the Point of Adding Heat

  • Reactor power is at 1 x 10-8 amps.
  • Rods will be stepped out to establish a positive startup rate.
  • Power will rise to between 0.5% and 2%.
  • Rods will be stepped in to level power out.

Event 2: Blue Channel Pressurizer Pressure Instrument Fails LOW

  • 1P-431 pressure instrument will peg low.
  • All pressurizer heaters will turn on.
  • Pressurizer spray valves will close.
  • Pressurizer pressure will slowly rise.
  • The crew will take manual control of pressurizer pressure.
  • Pressurizer pressure will be returned to program.
  • Pressurizer pressure control will be placed in the 2-1 position.
  • Pressurizer pressure control will be returned to automatic.
  • The SS will enter T.S. LCO 3.3.1 Conditions A, E, and K.

Event 3: RCS Leak

  • An unidentified approximate 21 gpm leak will develop on the RCS.
  • The leak will be un-isolable.
  • Pressurizer level and pressure will slowly lower.
  • The crew will enter 1C4 AOP1.
  • The Letdown and Charging Line will be isolated.
  • The Regenerative Heat Exchanger will be isolated.
  • RCP Seal Injection will be isolated and then restored.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 5 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Events 4, 5, & 6: Small Break Loss of Coolant Accident

  • RCS pressure will rapidly lower.
  • Pressurizer level will rapidly lower.
  • The crew will enter 1E-0.
  • The crew will manually:

o Trip the reactor and actuate SI.

o Start SI pump(s) and CC pump(s).

  • The crew will transition to 1E-1.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 6 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Simulator Setup:

NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.

CAUTION: A reactivity and temperature transient will occur if 1HC-484, MAIN STM HDR PRESS (STM DUMP), is NOT set to 72% when the simulator is taken to RUN.

1. If IC-261 is available, then perform the following:
a. Reset to IC-261.
b. Verify 1HC-484, MAIN STM HDR PRESS (STM DUMP), set point is set to 72%.
c. Place the simulator in RUN.
d. Verify RCS Tavg stabilized at 549°F.
2. If IC-261 is NOT available:
a. Reset to IC-18.
b. Verify 1HC-484, MAIN STM HDR PRESS (STM DUMP), set point is set to 72%.
c. Place the simulator in RUN.
d. Verify RCS Tavg stabilized at 549°F.
e. Verify RCP Seal Injection at 8 gpm and charging flow balanced with letdown.
f. Adjust rods as necessary to establish reactor power at 1 x 10-8 amps and stable.
g. Insert Remote SG100 to CW.
h. Take to the following to PULLOUT
i. CS-46362, 4.16KV BUS 11 1M XFMR (BKR 11-4) ii. CS-46363, 4.16KV BUS 12 1M XFMR (BKR 12-4) iii. CS-46364, 4.16KV BUS 13 1M XFMR (BKR 13-9) iv. CS-46365, 4.16KV BUS 14 1M XFMR (BKR 13-9)
3. Verify the ROD DEVIATION alarm is CLEARED as follows:
a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
b. Go to ERCS Screen RBU (Rod Bank Update).
c. Enter 148 as the new value for point 1U0052A, ROD POS BNK D.
d. Select Apply.
e. Verify Annunciator 47013-0507, COMPUTER ALARM / ROD DEVIATION /

SEQUENCING, has cleared.

4. Verify the Pen Recorder for RCS Tavg and Tref are set correctly as follows:
a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
b. Go to ERCS Screen PEN_TREND (Pen Trend Configuration).
c. Enter 545 as the new Min EU value for Pen 1U9001A (point 1T0499A).
d. Enter 555 as the new Max EU value for Pen 1U9001A (point 1T0499A).
e. Enter 545 as the new Min EU value for Pen 1U9002A (point 1T0496A).
f. Enter 555 as the new Max EU value for Pen 1U9002A (point 1T0496A).
5. If available, run schedule file PI-ILT-NRC-1401S.sch as follows:
a. Select open file in the Schedule application.
b. Locate schedule file.
c. Open schedule file by double clicking it.
d. Run the schedule file by pressing the Stopped button on the toolbar.
e. Verify the schedule file is running.
6. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
7. If desired, start Scenario Based Testing Data Collection Program.
8. Complete the "Simulator Setup Checklist.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 7 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS

1. SIMULATOR PRE-BRIEF:
a. The Simulator Pre-Brief is conducted prior to the crew entering the simulator.
b. Review Unit 1 LPEO / PEO Turnover Log.
c. Perform a pre-job brief for the following activity:
1) Raise power to the Point of Adding Heat per steps 5.10.20 - 5.10.23 of 1C1.2.

(a) Provide Page 71 of 1C1.2 marked up to step 5.10.19.

(b) This activity is to be performed after shift turnover is complete.

(c) Section 5.6 of 1C1.2 is complete.

2. COMPLETE TURNOVER:
a. Crew performs a walk down of the control boards.
b. Review PRA Printout.
c. Crew takes the duty.

EVENT 1 3. After the crew has assumed the duty, they will raise 1C1.2, UNIT 1 STARTUP PROCEDURE power to the Point of Adding Heat.

  • Raise reactor power to the point of adding heat using RO/SS manual rod control or boron concentration change.
  • When one or more intermediate range indicates greater than 1 x 10-9 amps, then verify ERCS is in Mode 2, STARTUP.
  • Maintain reactor power between 0.5 and 2.0%.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 8 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 2 4. After reactor power is stabilized between 0.5 - 2.0%, C47012-0408, PRZR HI/LO PRESS CHANNEL ALERT and/or at the discretion of the lead evaluator, enter:

  • Check pressurizer pressure high or low.

LEAD Trigger 2, Pressurizer Pressure Instrument Fails

  • Restore pressure to normal through use of heaters or LOW. sprays.
a. If contacted as I&C to trip bistables, inform the crew
  • Refer to 1C51.

two I&C Technicians will be available in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

b. If contacted as the Operations Management, 1C51.3, Pressurizer Pressure 1P-431 - Low acknowledge the report of the failure, and agree to
  • Place Pressurizer Pressure Controller in MANUAL make other notifications to the NRC, Duty Station and stabilize pressure.

Manager, etc. as asked.

  • Select position 2-1 (WHITE-RED) on channel
c. If contacted as the FIN Team Supervisor, inform the selector switch.

crew that you will write a work order and assign an

  • When pressure returned to normal with no deviation SS I&C Supervisor to investigate. from setpoint, then return pressure control to
5. Plant Response: automatic.
a. 1P-431 pressure instrument will peg low.
  • Verify Pressurizer Pressure Recorder not selected to
b. Pressurizer Backup Heaters will turn ON. Blue Channel.
c. Pressurizer Spray Valves will CLOSE.
d. Pressurizer pressure will slowly rise.

o Reference Table 3.3.1-1 immediately.

e. The following annunciator will come in:
1) 47012-0108, PRZR LO PRESS SI CHANNEL o Trip 1P-431 bistables in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> OR ALERT.

o Be in Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

2) 47012-0408, PRZR HI/LO PRESS CHANNEL ALERT.
3) 47012-0608, PRZR CONTROL HI PRESS OR o Trip 1P-431 bistables in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> OR BACKUP HTRS ON. o Reduce Thermal Power < P-7 and P-8 (10%).
  • Enter T.S. LCO 3.3.2 Condition A o Reference Table 3.3.2-1 immediately.
  • Enter T.S. LCO 3.3.2 Condition D o Trip 1P-431 bistables in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> OR o Be in Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in Mode 4 in 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 9 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 3 6. After Pressurizer Pressure control is back in automatic, 1C4 AOP1, REACTOR COOLANT LEAK or at the discretion of the Lead Evaluator, enter RO

  • If, at any time, RCS inventory can not be maintained Trigger 3, Reactor Coolant Leak at ~ 21 gpm. by available charging flow, then manually trip the
a. If contacted as the Operations Management, reactor, manually initiate safety injection, and exit this acknowledge the report of the failure, and agree to procedure.

make other notifications to the NRC, Duty Station

  • Start additional charging pumps as needed to control Manager, etc. as asked. pressurizer level.
b. If contacted as a Maintenance or Engineering or RO
  • Use ERCS Real-Time RCS Leakage (LEAK 1) display Radiation Protection Department Supervisor, inform and/or Control Board indications to determine the crew that you will coordinate making a approximate leak rate.

containment entry per F2 to locate the leak.

  • Determine the location of the leak using Figure 1 and associated tables, if necessary.
7. Plant Response:
  • If unable to identify the source of the leak using tables
a. RCS pressure lowers. 1, 2, 3, or 4, THEN attempt to locate the leak by
b. Pressurizer Level lowers. sequentially isolating service systems from the RCS:
c. Charging pump speed rises. o Remove Letdown from service.
d. R11 and R12 counts rise. o Isolate Charging to the RCS.
e. RCS Leak rate rises. o Close CV-31328, 11 REGEN HX CHG LINE TO
f. Containment humidity rises. RCS.

o Isolate Charging to the RCP Seals.

EMERGENCY PLAN CLASSIFICATION SS

  • Comply with T.S. 3.4.14. Condition A to reduce UNUSUAL EVENT - SU5.1 due to unidentified RCS leakage to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

leakage greater than 10 gpm.

  • Notify the Operations Manager and Resident Inspector of entry into this AOP per SWI O-28.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 10 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 8. At the discretion of the Lead Evaluator, enter: 1E-0, REACTOR TRIP OR SAFETY INJECTION 4, 5, & 6 Trigger 4, Small Break LOCA.

  • Verify or manually trip the reactor.

RO/

a. Upon hearing the announcement of Reactor Trip, or

LEAD when called as the Turbine Building Operator to

  • Verify both Safeguards buses energized.

isolate the Unit 1 MSRs per Attachment J, then open

  • Determine SI is required.

and run schedule file E-0_Att-J.sch located in o Either SG pressure < 530 psig.

X:\\Trex_PI\Lightning\Schedule\EOPs. When the o PRZR pressure < 1830 psig.

isolation is complete, inform the crew the MSRs are o Containment pressure > 3.5 psig.

isolated.

  • Manually actuate SI.
b. Upon hearing the announcement of Safety Injection,
  • Perform Attachment L (see pages 12 & 13).

or when called as the Turbine Building Operator to

  • Check AFW Status:

secure the Turbine Building Roof Exhausters, wait 2 o Verify total AFW flow greater than 200 minutes and report the Turbine Building Roof GPM.

Exhausters are all secured. o Verify AFW pumps discharge pressure

c. If Control Room personnel ask if Unit 2 personnel are greater than 1000 psig.

available to perform Attachment L, then inform the o Control feed flow to maintain 11 SG Narrow Control Room that Unit 2 personnel are NOT Range greater than 5% [Wide Range available for performing Attachment L. between 50% and 59%].

d. If contacted as RP or Duty Chemist to sample for
  • Check RCS Temperatures trending to 547°F.

primary-to-secondary leakage, then wait 2 minutes

  • Check PRZR PORVs and Spray valves closed.

and report cation column frisks indicate activity is reading background on 11 and 12 SGs.

  • Determine RCPs should NOT be stopped.
  • Determine SGs are NOT faulted.
9. Plant Response:
  • Determine SG Tubes are NOT ruptured.
a. RCS pressure lowers.
  • Determine RCS is NOT intact due to Containment
b. Pressurizer Level lowers. pressure rising.
c. RCS Leak rate rises. SS
d. Containment Pressure rises.
e. A RC Bypass Flow lowers.
f. Annunciator C47012-0503, REACTOR COOLANT RTD B-P LOOPS LO FLOW, is received.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 11 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 1E-1, LOSS OF REACTOR OR SECONDARY 4, 5, & 6 COOLANT (cont) RO/SS EMERGENCY PLAN CLASSIFICATION

  • Determine RCPs should NOT be stopped.

ALERT - FA1 due to a loss of the RCS Fission Product

  • Determine SGs are NOT faulted.

Barrier due to RCS leak rate greater than 60 gpm.

  • Check intact SG levels.
  • Control feed flow to maintain narrow range level between 5% and 50% [Wide Range 50% and 59%].
  • Check secondary radiation is normal.
  • Check power to PRZR PORV block valves available.
  • Check PRZR PORVs are closed.
  • Check at least one PRZR PORV block valve is open.
  • Reset SI and Containment Isolation.
  • Establish Instrument Air to Containment.
  • Check power supply to charging pumps are from offsite power.
  • Check at least one charging pump is running.
  • Establish charging flow as necessary.
  • Determine SI flow should NOT be terminated due to subcooling and RCS pressure.
10. If Control Room personnel ask if Unit 2 personnel are
  • Stop RHR pumps.

available to secure Diesel Generators and/or Safeguards

  • Check RCS and SG pressures Cooling Water Pumps, then inform the Control Room
  • Determine Diesel Generators should be stopped.

that Unit 2 personnel WILL secure the Diesel Generators

  • Determine Safeguards Cooling Water pumps should and/or Safeguards Cooling Water Pumps. be stopped.
  • Initiate Evaluation of Plant Status.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 12 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 1E-0 Attachment L: SI Alignment Verification 4, 5, & 6 CRITICAL TASKS

  • Verify Safeguards Component Alignment:

(cont) LEAD

  • Manually start at least one Safety Injection pump
  • Verify both trains of SI actuated:

before transition out of E-0. o Both RHR pumps - RUNNING

  • Manually start at least one CCW pump before -OR-transition out of E-0. o Both SI pumps - RUNNING o Identify both SI pumps are NOT running and start both SI pumps.
11. If Control Room personnel ask for status of Unit 2 * "SI NOT READY" lights - NOT LIT Cooling Water/Chilled Water lineup, then inform the * "SI ACTIVE" lights - LIT FOR PLANT CONDITIONS Control Room that Unit 2 Cooling Water/Chilled Water
  • Identify Both CC pumps are NOT running and start valves are in there safeguards positions. both CC pumps.
12. If Control Room personnel ask for status of Battery * "CONTAINMENT ISOLATION" lights - LIT FOR Room Temperatures, then inform the Control Room that PLANT CONDITIONS Battery Room temperatures are less than 84°F.
  • Check Category 1 Vent Zone Boundary:
13. If Control Room personnel ask for status of Spent Fuel
  • Close MV-32115, 122 SFP HX INLT HDR MV B Cooling, then inform the Control Room that Spent
  • Check Cooling Water Header Pressures - BOTH Fueling level and temperature are normal. GREATER THAN 65 PSIG
  • Verify Plant Announcements Complete:
  • Check If Main Steamlines Are Isolated:
  • Determine MSIVs, Bypass Valves, and Containment Instrument Air Valves do NOT need to be closed.
  • Verify SI Flow
  • Verify RHR Flow
  • Check RCP Cooling
  • Verify Local Actions Complete
  • Verify Generator Breakers - OPEN
  • Verify All Heater Drain Pumps - STOPPED
  • Check Turbine Valves:

o Turbine reheat and intercept valves - CLOSED o Open turbine drain valves Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 13 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT

4, 5, & 6 o Both main feedwater pumps - STOPPED (cont) LEAD o Main and bypass FRVs - CLOSED

  • Verify All Condensate Pumps - STOPPED:
  • Place Steam Dump in "STM PRESS" Mode
  • Verify Unit 1 Cooling Water/Chilled Water Alignment:

o CFCU control switches - "SLOW".

o CFCU dampers - ALIGNED TO DOME o Unit 1 cooling water/chilled water valves closed o Unit 1 CRDM shroud cooling supply and return valves - CLOSED o CFCU cooling water supply and return valves -

OPEN o CFCU chilled water supply and return valves -

CLOSED

  • Verify 11 Safeguards Screenhouse Ventilation lineup.
  • Verify Control Room Ventilation Alignment:

o Chillers and fans - RUNNING o Control room chiller suction/discharge tie closed -

STATUS LIGHT LIT

  • Verify Unit 2 Cooling/Chilled Water Alignment
  • Verify 21 Safeguards Screenhouse Ventilation lineup.
  • Verify 11 and 12 Battery Charger Operation is normal.
  • Verify Battery Room temps less than 84°F.
  • Check status of Spent Fuel Cooling.
  • Check Status Of Notifications
  • Notify SS Of Any Discrepancies.
14. Once the crew has stopped RHR Pumps and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 14 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SIMULATOR INPUT

SUMMARY

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 15 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario

_____ Simulator Status:

___ 1. "Training Load" ___ 2. Step counters "ON"

___ 3. Alarm sound "ON" ___ 4. Steps 1 - 7 on page 6 complete

___ 5. Speed: REAL ___ 6. IC-261 or IC-18 running

_____ Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructors booth.

_____ Verify Schedule File/Summary matches Simulator Input Summary page in the SEG.

_____ Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.

_____ Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset.

_____ MOC I sheet displayed on C panel.

_____ MOC Reactivity Briefing sheet available at Reactor Operator Desk.

_____ Turnover sheet/PRA sheet available.

_____ If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.

_____ Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).

_____ Electronic PINGP 577 forms closed on LAN connected PCs.

_____ Board-mounted EAL Tables are cleaned.

_____ EOOS running on PC and updated as follows to reflect equipment OOS:

___ 1. NONE

_____ Update Control Board Placards:

___ 1. NRC Current Authentication Code call date updated to current date.

___ 2. High Flux At Shutdown Alarm Setpoint placards: 5900 cps.

___ 3. Feedwater regulating valve position placard set to current values.

___ 4. Recommended SG Blowdown flow set to current values.

___ 5. RCS boron on the CVCS panel placard: 1369 ppm.

___ 6. Turbine reference/setter values on the CVCS panel set to current (Target/Demand on-line positions).

___ 7. Shift Reactivity Guidance placard: BA: 4.4 gallons, RMU: 67 gallons.

Dilutions @ NONE.

_____ Magnetic placards in place:

___ 1. 11 BA TANK Lined Up For Service

___ 2. 11 BA PUMP Lined Up to 11 BA Tank

___ 3. 12 BA PUMP Lined Up to 11 BA Tank

___ 4. CC to SFP MV-32117 In Service

___ 5. Blowdown 46470 SGB To RIVER

___ 6. HU Flag above 12 RHR HX CC inlet MV-32094 for 1C14 Limitation

___ 7. H 2 IN VCT SPACE at VCT Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 16 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0

_____ Pink Status Control Tags in place:

___ 1. CS-46540, 22 CC WTR PUMP

___ 2. CS-46572, CC TO SFP MV-32117

_____ Yellow Caution Tags in place:

___ 1. CS-46064, CC TO SFP MV-32115, in CLOSED

___ 2. CS-46362, 4.16 KV BUS 11 1M XFMR (BKR 11-4), in PULLOUT

___ 3. CS-46363, 4.16 KV BUS 12 1M XFMR (BKR 12-4), in PULLOUT

___ 4. CS-46364, 4.16 KV BUS 13 1M XFMR (BKR 13-9), in PULLOUT

___ 5. CS-46365, 4.16 KV BUS 14 1M XFMR (BKR 14-9), in PULLOUT

_____ ERCS driven recorders are on-scale (RCS temperature scaled 545º F to 555º F).

_____ ERCS alarm screen operating and alarms reset.

_____ All ERCS terminals operating and set as follows:

CONF VARS R02 Alarm Summary Page CONE1 Group OP31_U1 R03 AFD CONC SAS (XS22) R04 TPM CONG1 Group QP CCDATA R05 QP LOADFOLL ERCS-R01 Group RADMON_U1 R06 Alarm Summary Page

_____ ERCS single point displays: CONB 1T0499A 1U1613A CONE2 1Q0340A 1V4501A

_____ Verify that copy machine and printers are loaded with paper.

_____ Pens/Paper/Markers available on the simulator.

st

_____ Verify 121 IA Compressor is in PREFERRED and 122 IA Compressor is in 1 STANDBY, and nd 123 IA Compressor is in 2 STANDBY.

_____ Verify R11/R12 are lined up correctly (at the R11/R12 local panel):

___ 1. Sample pump is running.

___ 2. Alarms are reset.

___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.

___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.

_____ Set Turbine Control HMI Displays as follows:

___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview.

___ 2. U1 Turb Aux Cont (48088) to Turb Overview.

___ 3. U1 E-H Turb Cont STA 1 (48086) to Off Line Control.

_____ DEHC alarms cleared.

_____ N51 & N52 Display Sheets for current power are in place as necessary.

_____ Headsets turned on as necessary.

_____ Procedure checklist completed. See following page.

_____ Peer Check performed for simulator setup.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 17 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:

Before After 1C1.2, UNIT 1 STARTUP PROCEDURE 1C12.1, LETDOWN, CHARGING, AND SEAL WATER INJECTION -

UNIT 1 1C4 AOP1, REACTOR COOLANT LEAK 1C51.3, Pressurizer Pressure 1P-431 - Low 1E-0, REACTOR TRIP OR SAFETY INJECTION 1E-1, LOSS OF REACTOR OR SECONDARY COOLANT C47012-0108, PRZR LO PRESS SI CHANNEL ALERT C47012-0408, PRZR HI/LO PRESS CHANNEL ALERT C47012-0608, PRZR CONTROL HI PRESS OR BACKUP HTRS ON C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.3.1 T.S. LCO 3.3.2 T.S. LCO 3.4.14 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 18 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Post-Scenario Checklist

_____ LAN connected computers are cleared of information added during the scenario.

_____ Computer generated PINGP 577 cleared.

_____ Procedure checklist completed. See previous page.

_____ Remove Pink Status Control Tags from the following equipment:

___ 1. NONE

_____ Magnetic placards removed:

___ 1. NONE

_____ Remove Yellow Caution Tags from the following equipment:

___ 1. CS-46362, 4.16 KV BUS 11 1M XFMR (BKR 11-4)

___ 2. CS-46363, 4.16 KV BUS 12 1M XFMR (BKR 12-4)

___ 3. CS-46364, 4.16 KV BUS 13 1M XFMR (BKR 13-9)

___ 4. CS-46365, 4.16 KV BUS 14 1M XFMR (BKR 14-9)

_____ Erase marker on RCS temperature ERCS driven recorder.

_____ Board-mounted EAL Table is cleaned.

_____ All books, note pads, and calculators put away.

End Of Day Checklist

_____ Signs/placards removed and put away unless normal simulator configuration.

_____ Floor PCs logged off if simulator will not be used again that day.

_____ Instructor station returned to normal with all books, paper, and etc. put away.

_____ Headsets turned off and put away if simulator will not be used again that day.

_____ Simulator reset to IC-10 unless another IC will be used for further training.

_____ Simulator placed in DORT if simulator will not be used again that day.

_____ Recorder power "OFF" if simulator will not be used again that day.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 19 of 22 RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE: DAY/NIGHT SHIFT: Day CAT 1 VENT OPENINGS: 0 ft2 SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS NONE PROTECTED EQUIPMENT 22 CC PUMP 121 SFP HX RAD MONITORS OOS ANNUNCIATORS OOS NONE NONE OUTSTANDING SPS FIRE DET / PROT EQP IMPAIRMENTS NONE NONE OTHER EQUIPMENT OOS / STATUS Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System.

MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE NONE OPERATIONAL PLANS FOR COMING SHIFT

  • Raise Reactor Power from 1 x 10-8 amps to the POAH.
  • Stabilize power between 0.5 - 2%.
  • Section 5.6 of 1C1.2 is complete.

NEW PROCEDURES / INSTRUCTIONS Review altered scale on Tavg ERCS Recorder.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 20 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.

1. The scenario contains objectives for the desired tasks and relevant human Yes No performance tools. X
2. The scenario identifies key parameter response, expected alarms, and Yes No automatic actions associated with the induced perturbations. X
3. The scenario content adequately addresses the desired tasks, through Yes No simulator performance, instructor-led training freezes, or both. X
4. Plant PRA initiating events, important equipment, and important tasks are Yes No identified. X
5. Turnover information includes a Daily At Power or Shutdown Safety Risk Yes No Assessment. X
6. The scenario contains procedurally driven success paths. Procedural Yes No discrepancies are identified and corrected before training is given. X
7. The scenario guide includes responses for all anticipated communications to Yes No simulated personnel outside the Control Room, based on procedural guidance X and standard operating practices. Include estimated completion times and/or notes for use of time compression.
8. The scenario includes related industry experience. SOER, SER and similar Yes No OE recommendations are clearly identified and fully addressed.* X
9. The scenario guide incorporates verification of Operator Fundamental Yes No application.* X
10. Training elements and specific human performance elements are addressed Yes No in the scenario critique guide to be used by the critique facilitator. The critique X guide includes standards for expected performance.*
11. For evaluations, it has been verified that without operator action the critical Yes No tasks will be failed. X Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
  • For evaluations these items may be marked NO without justification.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 21 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.

1. The desired initial conditions agreed with the reference plant with Yes No respect to reactor status, plant configuration, and system operation. X
2. The simulator operated in real time during conduct of validation. Yes No X
3. The simulator demonstrated expected plant response to operator input Yes No and to normal, transient, and accident conditions. X
4. The simulator permitted use of the reference plants procedures. The Yes No scenario was completed without procedural exceptions, simulator X performance exceptions, or deviation from the scenario sequence.
5. The simulator did not fail to cause or unexpectedly cause any first Yes No principle alarm or primary automatic action. X
6. Observable changes in parameters relevant to the scenario Yes No corresponded in trend and direction to reference plants expected X response.
7. All malfunctions and other instructor interface items were functional and Yes No demonstrated the expected reference plants response to the initiating X cause.
8. All malfunctions and other instructor interface items were initiated in the Yes No same sequence described within the simulator scenario. X
9. The scenario satisfies the learning or examination objectives without Yes No any significant simulator performance issues, or deviations from the X approved scenario sequence.
10. Simulator fidelity has been demonstrated to be adequate for this Yes No scenario. X Discrepancies noted (Check none or list items found) None SMAR = Simulator Action Request SMAR: SMAR: SMAR: SMAR:

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 22 of 22 PI-ILT-NRC-1401S, 2014 ILT NRC SIMULATOR EVALUATION #1, REV. 0 Comments:

Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.

Validation Personnel Name Job Title / Qualification Validation Position Shawn Sarrasin Operations Instructor Lead Evaluator Fred Collins Operations Instructor Booth Driver Jeff Human Operations SRO Shift Supervisor Mark Haren Operations RO LEAD Rick Martin Operations RO RO Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 1 of 26 SIMULATOR EXERCISE GUIDE (SEG)

SITE: PRAIRIE ISLAND SEG # PI-ILT-NRC-1402S SEG TITLE: 2014 ILT NRC SIMULATOR EVALUATION #2 REV. # 0 PROGRAM: INITIAL LICENSE OPERATOR TRAINING #: FL-ILT COURSE: INITIAL LICENSE OPERATOR TRAINING #: FL-ILT TOTAL TIME: 2.0 HOUR Developed by: Shawn Sarrasin 2/2/2014 Instructor Date Reviewed by: Fredrick Collins 2/26/2014 Instructor Date (Simulator Scenario Development Checklist.)

Validated by: Shawn Sarrasin 4/22/2014 Validation Lead Instructor Date (Simulator Scenario Validation Checklist.)

Approved by:

Training Supervision Date Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 2 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Guide Requirements

1. During all plant operating conditions, the crew will demonstrate Goal of the ability to monitor and operate the plant within the limits of the Training: Operations Manuals and Technical Specifications.
2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
1. Place a second letdown orifice in service per 1C12.1.

Learning 2. Diagnose and perform corrective actions for a Containment Objectives: Pressure Instrument failing high per C47018-0105.

3. Diagnose and perform corrective actions for a Pressurizer Level Instrument failing high per 1C51.3.
4. Diagnose and respond to a Turbine Malfunction per 1C23 AOP2.
5. Perform a rapid power reduction per 1C1.4 AOP1.
6. Diagnose and respond to a Large Break LOCA per 1E-0 and 1E-1.
7. Diagnose and respond to a failure of the Main Turbine to Automatically Trip.
8. Diagnose and respond to a failure of the Safeguards System to automatically actuate per 1E-0.
9. Diagnose and respond to a failure of the AFW Pumps to automatically start per 1E-0 Attachment L.
1. Full Scope Simulator Training 2. NRC Evaluation Team Resources: 3. Booth Operator (Backup Communicator)
4. Primary Communicator Initiating Event with Core Damage Frequency:

Related PRA LOCA (5.1%)

Information:

Important Components:

11 TD AFW PMP 12 MD AFW PMP Important Operator Actions with Task Number:

NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 3 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:

Before EOP Entry:

1. 1P-950, Yellow Channel Containment Pressure Instrument, fails high.
2. 1LT-428, Blue Channel Pressurizer Level Transmitter, fails high.
3. Turbine Control System cycling output (10 MW Swing).

After EOP Entry:

1. Main Turbine fails to automatically trip.
2. Failure of safeguards automatic actuation.
3. 11 and 12 AFW Pumps fail to start automatically.

Abnormal Events:

1. Pressurizer Level Instrument Failure.
2. Turbine Malfunction.
3. Rapid Power Reduction.

Major Transients:

1. Large Break LOCA from the B Loop Hot Leg.

Critical Tasks:

1. E D: Manually actuate at least one train of SI-actuated safeguards equipment before transition out of E-0.
2. E Q: Manually trip the main turbine before transition out of E-0.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 4 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO OVERVIEW:

INITIAL CONDITIONS: EQUIPMENT OOS

  • Power: 100%
  • BKR 16-10
  • Temperature: 560°F
  • Pressure: 2235 psig
  • Xenon: Equilibrium
  • Rods: D @ 218
  • Generator: 581 MW SEQUENCE OF EVENTS:

Event 1: Place 2nd Letdown Orifice in Service

  • Initially, there is only one 40 gpm letdown orifice in service.
  • There are already two charging pumps running.
  • The crew will place a second 40 gpm letdown orifice in service per 1C12.1.

Event 2: Yellow Channel Containment Pressure WR Instrument Fails HIGH

  • 1P-950 pressure instrument will peg high.
  • Containment High Pressure alarm will come in.
  • The SS will enter T.S. LCO 3.3.2 Condition A, E, and D.

Event 3: Blue Channel Pressurizer Level Instrument Fails HIGH

  • Charging pump speed will lower.
  • 1L-428 level instrument will peg high
  • Actual pressurizer level will lower.
  • Charging pump speed control will be placed in manual.
  • Pressurizer heaters will be controlled in manual.
  • Pressurizer level control will be placed in the 2-1 position.
  • Pressurizer level control will be returned to automatic.
  • Pressurizer heater control will be returned to automatic.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 5 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Event 4: Turbine Malfunction

  • A Turbine Control Trouble Alarm will be received.
  • An approximately 10 MW load cycle will occur.
  • RCS Tavg will rise and lower as turbine loading changes.
  • Rods will step in and out as necessary to maintain RCS Tavg.
  • First Stage Pressure indication on the Turbine Control System will oscillate.
  • The crew will place Turbine Control in manual per 1C23 AOP2.

Event 5: Rapid Power Reduction

  • The TSO will call the Control Room requesting Unit 1 power be reduced 5% over the next 10 minutes due to impending loss of transmission capacity.
  • The crew will perform a Rapid Power Reduction to 95% per 1C1.4 AOP1.

Events 6, 7, 8, & 9: Large Break Loss of Coolant Accident

  • RCS pressure will rapidly lower.
  • Pressurizer level will rapidly lower.
  • Both trains of ECCS will fail to automatically actuate.
  • The crew will manually actuate ECCS.
  • 11 and 12 AFW pumps will fail to automatically start.
  • The crew will manually start AFW pump(s).

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 6 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Simulator Setup:

NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.

1. If available, reset the simulator to IC-262 and place in RUN.
2. If IC-262 is NOT available:
a. Reset to IC-9.
b. Place the simulator in RUN.
c. Place CS-46185, 12 RHR PUMP, in PULLOUT.
d. Place CS-46914, BUSTIE BUS 16 / BUS 26 BKR 16-10, in PULL TO LOCK.
3. If available, run schedule file PI-ILT-NRC-1402S.sch as follows:
a. Select open file in the Schedule application.
b. Locate schedule file.
c. Open schedule file by double clicking it.
d. Run the schedule file by pressing the Stopped button on the toolbar.
e. Verify the schedule file is running.
4. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
5. If desired, start Scenario Based Testing Data Collection Program.
6. Complete the "Simulator Setup Checklist.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 7 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS

1. SIMULATOR PRE-BRIEF:
a. The Simulator Pre-Brief is conducted prior to the crew entering the simulator.
b. Review Unit 1 LPEO / PEO Turnover Log.
c. Perform a pre-job brief for the following activity:
1) Place a second 40 GPM Letdown Orifice in service per Section 5.9 of 1C12.1.

(a) A second letdown orifice is being placed in service in preparation of SP 1047, Control Rod Quarterly Exercise.

(b) SP 1047 is scheduled for the next day.

(c) The Lead RO will conduct this activity.

(d) This activity is to be performed after shift turnover is complete.

2. COMPLETE TURNOVER:
a. Crew performs a walk down of the control boards.
b. Review PRA Printout.
c. Crew takes the duty.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 8 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 1 3. After the crew has assumed the duty, they will place a 1C12.1, LETDOWN, CHARGING, AND SEAL WATER second 40 gpm letdown orifice in service per Section 5.9 INJECTION - UNIT 1 of 1C12.1. LEAD

  • Notify RP Tech that an additional letdown orifice is
a. If contacted as the RP Tech or Duty Chemist, being placed into service.

acknowledge a second 40 gpm letdown orifice is

  • Determine steps 5.9.2 through 5.9.8 are not applicable being placed in service. due to two charging pumps already running.
b. If contacted as the Duty Chemist, acknowledge
  • Place 11 Charging Pump in manual speed control.

purification flow has been raised.

  • Establish approximately 70 gpm charging flow to the Regen HX by:

o Increasing charging pump speed.

o Maintain 8 gpm seal injection to each RCP.

  • Place 1HC-135A, LTDN PRESS CONT, in MANUAL.
  • Using 1HC-135A, lower letdown heat exchanger outlet pressure to approximately 200 psig.
  • Open CV-31325, LETDOWN ORIFICE 40 GPM, using CS-46170.
  • Return 1HC-135A, LTDN PRESS CONT, to AUTO.
  • Transfer one (1) of the inservice charging pumps from MANUAL to AUTOMATIC speed control per C7.
  • Notify the Duty Chemist that purification flow has been raised.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 9 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 2 4. After the crew has placed a second letdown orifice in C47018-0105, CONTAINMENT HI-HI PRESS CHANNEL service, and/or at the discretion of the lead evaluator, ALERT LEAD enter:

  • Check containment pressure channels.

Trigger 2, Containment Pressure WR Instrument

  • Determine steam line isolation is NOT required.

Fails HIGH.

a. If contacted as I&C to trip bistables, inform the crew required.

two I&C Technicians will be available in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

  • Check safeguards bistable status lights on Panel
b. If contacted as the Operations Management, 44179, Columns 13, 14, and 15.

acknowledge the report of the failure, and agree to

  • Refer to 1C51.

make other notifications to the NRC, Duty Station Manager, etc. as asked. 1C51.4, Containment Pressure 1P-950 - High

c. If contacted as the FIN Team Supervisor, inform the
  • Enter T.S. LCO 3.3.2 Condition A SS crew that you will write a work order and assign an o Reference Table 3.3.2-1 immediately.

I&C Supervisor to investigate.

  • Enter T.S. LCO 3.3.2 Condition E o Trip 1P-950 bistables in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND verify
5. Plant Response: one channel per pair operable in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
a. 1P-950, will peg high. OR
b. The following annunciator will come in: o Be in Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND be in Mode
c. 47018-0105, CONTAINMENT HI-HI PRESS 4 in 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />.

CHANNEL ALERT.

  • Enter T.S. LCO 3.3.2 Condition D o Trip 1P-950 bistables in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND in Mode 4 in 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 10 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 3 6. After the crew has responded to the Containment C47012-0307, PRZR HI LVL CHANNEL ALERT Pressure Instrument failing high, and/or at the discretion RO

  • Check pressurizer level.

of the lead evaluator, then enter:

  • Control level in manual Trigger 3, 1LT-428, Blue Channel Pressurizer Level,
  • Reduce level to program level.

fails HIGH.

  • Maintain pressurizer pressure
a. If contacted as I&C to trip bistables, inform the crew
  • Refer to 1C51.

two I&C Technicians will be available in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

b. If contacted as the Operations Management, C47012-0507, PZR LVL DEVIATION acknowledge the report of the failure, and agree to
  • Verify charging pump in automatic and charging flow make other notifications to the NRC, Duty Station RO proper for the level.

Manager, etc. as asked.

  • Place charging pump speed control in MANUAL.
c. If contacted as the FIN Team Supervisor, inform the
  • Control charging pump speed as necessary to restore crew that you will write a work order and assign an pressurizer level to program level.

I&C Supervisor to investigate.

  • Refer to 1C51.
d. If contacted as an out-plant operator, acknowledge the order to check Pressurizer Heater Backup Heater Breakers (closing springs charged). 1C51.3, Pressurizer Level 1L-428 - High RO
  • Control pressurizer heaters manually.
7. Plant Response:
  • Place charging pump speed control in Manual and
a. Blue Channel Pressurizer Level pegs high. adjust pressurizer level to setpoint.
b. 11 Charging Pump speed will lower.
  • Select position 2-1 (WHITE-RED) on PRZR Level
c. Pressurizer level will slowly lower. Control Selector switch.
d. The following annunciators will come in:
  • Return pressurizer heaters to AUTO.
1) 47012-0307, PZR HI LVL CHANNEL ALERT.
  • Return one charging pump speed control to AUTO.
2) 47012-0507, PZR LVL DEVIATION.
  • Ensure pressurizer level recorder not selected to blue channel.

SS

  • Enter T.S. LCO 3.3.1 Condition A o Reference Table 3.3.1-1 immediately.
  • Enter T.S. LCO 3.3.1 Condition K o Trip bistable for 1L-428 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or reduce thermal power to less than P-7 and P-8 (10%).

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 11 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 4 8. When the plant is stable and/or at the discretion of the 1C23 AOP2, MALFUNCTION OF TURBINE EH lead evaluator, then enter: CONTROL SYSTEM LEAD Trigger 4, Turbine Malfunction (Cycling Output).

  • Place the turbine control system in Manual by
a. If contacted as the out-plant operator to investigate, selecting Manual control using the On Line Control wait 2 minutes and report there are no indication of screen AND attempt to control load using the CV an EH Oil System problem. decrease control.
b. If contacted as the Operations Management,
  • Notify System Engineer.

acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station 1C1.4, UNIT 1 POWER OPERATION Manager, etc. as asked.

  • Notify the Duty Chemist of the load change.
c. If contacted as the FIN Team Supervisor or Turbine
  • If desired, then place CS-46280, ROD BANK Engineer, inform the crew that you will write a work SELECTOR, in MANUAL.

order and investigate.

  • Using the On Line Control screen, select the desired
d. After the plant is stable, enter the Control Room as Control Mode (VPC, FSP, or LOAD).

the Turbine Engineer and communicate the following

  • Using the On Line Control screen, select the desired to the crew: demand rate.
1) A 1 HR TIME COMPRESSION is being used.
  • Verify the VPL control is not Red.
2) Both First Stage Pressure inputs to Turbine
  • Raise the VPL as necessary using the Valve Control are faulted.

Limiter pop-up screen.

3) Turbine Control will operate correctly in VPC or
  • Set the Target setting to the desired load by using Load Mode.

the On Line Control screen Target

4) Plant Management has performed an ODMI and increase/decrease controls.

has decided the following:

5) Exit the manual control screen by pressing the
  • Select the Go control using the On Line Control exit button. screen.
6) The crew can acknowledge the Turbine Control
  • To suspend the load change, select turbine control alarm, but do NOT reset it. Hold on the On Line Control screen.
7) Operate the turbine in VPC mode when load
  • Verify the load change stops when desired load is changes are NOT in progress. obtained.
8) Operate the turbine in LOAD Mode during load
  • Lower the VPL until the Valve Position Limit signal changes. is at or close to the Current Valve Demand signal.
9) If necessary, restore the plant:
  • Verify CS-46280, ROD BANK SELECTOR, in AUTO.

(a) 100% power.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 12 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 4 (b) Bank D Rods at 218 steps. 1C5, CONTROL ROD AND ROD POSITION (cont) (c) Tavg at 560°F. INDICATION SYSTEMS

  • Verify automatic control rod withdrawal or insertion is
9. Plant Response: NOT required.
a. Annunciator 47008-0409, TURBINE CONTROL
  • Transfer CS-46280, ROD BANK SELECTOR, to SYSTEM TROUBLE MAN.
b. SCADA Yellow High Priority Alarm for 1st Stage
  • Adjust Control Rod Bank to desired position, using Pressure Fault. CS-46281, DIGITAL ROD CONTROL.
c. Unexpected load changes.
  • Verify NO rod control demand signals present.
d. VPL limit red light cycling.
  • Return CS-46280, ROD BANK SELECTOR, to
e. Rods stepping in and then out. AUTO.
f. RCS Tavg temperature rising and lowering.

EVENT 5 OPTIONAL EVENT 1C1.4 AOP1, RAPID POWER REDUCTION UNIT 1 Event 5 can be skipped if the Lead Evaluator determines

  • Determine the predicted Boron addition and final RO / SS a sufficient reactivity manipulation was performed Control Rod Position by obtaining values from the during Event 4. appropriate contingency reactivity plan.
10. When the plant is stable and/or at the discretion of the above the insertion limit and control delta I within lead evaluator, then: limits.
a. As the TSO, call the Control Room and communicate
  • Place pressurizer heaters to ON.

the following:

  • Using the On Line Control screen, select the Control
1) The King Plant has tripped offline. Mode pop-up screen.
2) Power needs to be reduced to lower the power
  • Select the desired control mode (VPC, FSP, or factor so a grid transformer breaker can be re- LOAD).

closed.

  • Using the On Line Control screen, select the
3) Prairie Island Unit 1 power needs to be lowered Demand Rate pop-up screen.

to 555 MW within the next 10 - 15 minutes.

  • Select the desired rate of load change.
4) This is urgent and needs to be done as soon as
  • Set the desired Target setting using the On Line possible.

Control screen.

  • Using the On Line Control screen, select the Go NOTE control to initiate load reduction.

Once the Lead Evaluator is satisfied with the reactivity manipulation, proceed to Event 6.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 13 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 5 1C12.5, UNIT 1 BORON CONCENTRATION CONTROL (cont)

RO / SS

  • Set 1YIC-110, BA TO BLENDER BATCH INTEGRATOR, to quantity desired.
  • Place CS-46300, MAKE-UP MODE SELECTOR, to BORATE.
  • If desired, then adjust 1HC-110, BA TO BLENDER FLOW CONT, to MANUAL and adjust output for desired flow rate.
  • Momentarily place CS-46457, BORIC ACID MAKE-UP CONTROL, to START, to initiate the boration.
  • When the desired quantity of boric acid has been added, then verify automatic makeup stopped as indicated by CS-46457, BORIC ACID MAKE-UP CONTROL, green light LIT.
  • If additional boration is desired, then return to step 2.
  • When the boration is complete, then verify 1HC-110, BA TO BLENDER FLOW CONT, is in AUTO.
  • Perform a 10 gallon flush.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 14 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENTs 11. When the lead evaluator is satisfied with the reactivity 1E-0, REACTOR TRIP OR SAFETY INJECTION 6, 7, 8, & manipulation, enter:

9 RO/

Trigger 6, Large Break LOCA from Loop B Hot Leg.

LEAD

a. Upon hearing the announcement of Reactor Trip, or
  • Verify both Safeguards buses energized.

when called as the Turbine Building Operator to

  • Determine SI is required.

isolate the Unit 1 MSRs per Attachment J, then open o Either SG pressure < 530 psig.

and run schedule file E-0_Att-J.sch located in o PRZR pressure < 1830 psig.

X:\\Trex_PI\Lightning\Schedule\EOPs. When the o Containment pressure > 3.5 psig.

isolation is complete, inform the crew the MSRs are

  • Manually actuate SI.

isolated.

  • Perform Attachment L (see pages 16 & 17).
b. Upon hearing the announcement of Safety Injection,
  • Check AFW Status:

or when called as the Turbine Building Operator to o Verify total AFW flow greater than 200 secure the Turbine Building Roof Exhausters, wait 2 GPM.

minutes and report the Turbine Building Roof o Manually start AFW pump(s).

Exhausters are all secured. o Verify AFW pumps discharge pressure

c. If Control Room personnel ask if Unit 2 personnel are greater than 1000 psig.

available to perform Attachment L, then inform the o Control feed flow to maintain 11 SG Wide Control Room that Unit 2 personnel are NOT Range between 50% and 59%.

available for performing Attachment L.

  • Check RCS Temperatures trending to 547°F.
d. If Control Room personnel ask if Unit 2 personnel are
  • Check PRZR PORVs and Spray valves closed.

available to secure Diesel Generators and/or Safeguards Cooling Water Pumps, then inform the

  • Stop RCPs due to RCS pressure below 1250 psig and Control Room that Unit 2 personnel WILL secure the SI flow.

Diesel Generators and/or Safeguards Cooling Water

  • Determine SGs are NOT faulted.

Pumps.

  • Determine SG Tubes are NOT ruptured.
  • Determine RCS is NOT intact due to Containment CRITICAL TASKS SS pressure rising.

of E-0.

  • Manually actuate at least one train of SI-actuated safeguards equipment before transition out of E-0.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 15 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENTs 12. Plant Response: 1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED 6, 7, 8, & a. RCS and PRZR pressure lowers rapidly. THERMAL SHOCK CONDITION 9 RO/SS

b. The reactor automatically trips on low pressurizer
  • Determine RCS pressure is less than 550 psig and (cont) pressure. RHR pump flow is greater than 950 gpm.
  • Return to procedure and step in effect.

EMERGENCY PLAN CLASSIFICATION ALERT - FA1 due to a loss of the RCS Fission Product 1E-1, LOSS OF REACTOR OR SECONDARY Barrier due to RCS leak rate greater than 60 gpm or a COOLANT red path in Integrity.

  • Stop RCS if not already done in 1E-0.

RO/SS

  • Determine SGs are NOT faulted and SG levels intact.

SITE AREA EMERGENCY - FS1 due to a loss of the RCS

  • Control feed flow to maintain narrow range level Fission Product Barrier and potential loss of the Fuel between 5% and 50% [Wide Range 50% and 59%].

Cladding Fission product barrier. This classification will

  • Check secondary radiation is normal.

only be applicable if an orange path in Core Cooling

  • Check power to PRZR PORV block valves available.

occurs.

  • Check PRZR PORVs are closed.
  • Check at least one PRZR PORV block valve is open.
13. If Control Room personnel ask if Unit 2 personnel are
  • Reset SI and Containment Isolation.

available to secure Diesel Generators and/or Safeguards

  • Establish Instrument Air to Containment.

Cooling Water Pumps, then inform the Control Room

  • Check power supply to charging pumps are from that Unit 2 personnel WILL secure the Diesel Generators offsite power.

and/or Safeguards Cooling Water Pumps.

  • Check at least one charging pump is running.
  • Establish charging flow as necessary.
  • Determine SI flow should NOT be terminated due to subcooling and RCS pressure.
  • Determine RHR pumps should NOT be stopped due to RCS pressure being too low.
  • Check RCS and SG pressures
  • Determine Diesel Generators should be stopped.
  • Determine Safeguards Cooling Water pumps should be stopped.
  • Initiate Evaluation of Plant Status.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 16 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENTs 1E-0 Attachment L: SI Alignment Verification 6, 7, 8, & NOTE

  • Verify Safeguards Component Alignment:

9 LEAD There should be NO discrepancies with Attachment L,

  • Verify both trains of SI actuated:

(cont) except for 12 RHR pump being OOS. o Both RHR pumps - RUNNING

-OR-o Both SI pumps - RUNNING o 12 RHR Pump is OOS and should NOT be started.

  • "SI NOT READY" lights - NOT LIT
  • "SI ACTIVE" lights - LIT FOR PLANT CONDITIONS
  • "CONTAINMENT ISOLATION" lights - LIT FOR PLANT CONDITIONS
  • Check Category 1 Vent Zone Boundary:
  • Close MV-32115, 122 SFP HX INLT HDR MV B
  • Check Cooling Water Header Pressures - BOTH GREATER THAN 65 PSIG
  • Verify Plant Announcements Complete:
  • Check If Main Steamlines Are Isolated:
  • Determine MSIVs, Bypass Valves, and Containment Instrument Air Valves do NOT need to be closed.
  • Verify SI Flow
  • Verify RHR Flow
  • Check RCP Cooling
  • Verify Local Actions Complete
  • Verify Generator Breakers - OPEN
  • Verify All Heater Drain Pumps - STOPPED
  • Check Turbine Valves:

o Turbine reheat and intercept valves - CLOSED o Open turbine drain valves

o Both main feedwater pumps - STOPPED o Main and bypass FRVs - CLOSED Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 17 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENTs 14. If Control Room personnel ask for status of Unit 2

  • Verify All Condensate Pumps - STOPPED:

6, 7, 8, & Cooling Water/Chilled Water lineup, then inform the

  • Place Steam Dump in "STM PRESS" Mode 9 LEAD Control Room that Unit 2 Cooling Water/Chilled Water
  • Verify Unit 1 Cooling Water/Chilled Water Alignment:

(cont) valves are in there safeguards positions. o CFCU control switches - "SLOW".

15. If Control Room personnel ask for status of Battery o CFCU dampers - ALIGNED TO DOME Room Temperatures, then inform the Control Room that o Unit 1 cooling water/chilled water valves closed Battery Room temperatures are less than 84°F. o Unit 1 CRDM shroud cooling supply and return
16. If Control Room personnel ask for status of Spent Fuel valves - CLOSED Cooling, then inform the Control Room that Spent o CFCU cooling water supply and return valves -

Fueling level and temperature are normal. OPEN o CFCU chilled water supply and return valves -

CLOSED

  • Verify 11 Safeguards Screenhouse Ventilation lineup.
  • Verify Control Room Ventilation Alignment:

o Chillers and fans - RUNNING o Control room chiller suction/discharge tie closed -

STATUS LIGHT LIT

  • Verify Unit 2 Cooling/Chilled Water Alignment
  • Verify 21 Safeguards Screenhouse Ventilation lineup.
  • Verify 11 and 12 Battery Charger Operation is normal.
  • Verify Battery Room temps less than 84°F.
  • Check status of Spent Fuel Cooling.
  • Check Status Of Notifications
  • Notify SS Of Any Discrepancies.
17. Once the crew has determined SI Pumps and RHR Pumps should NOT be stopped and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 18 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SIMULATOR INPUT

SUMMARY

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 19 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario

_____ Simulator Status:

___ 1. "Training Load" ___ 2. Step counters "ON"

___ 3. Alarm sound "ON" ___ 4. Steps 1 - 5 on page 6 complete

___ 5. Speed: REAL ___ 6. IC-262 or IC-9 running

_____ Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructors booth.

_____ Verify Schedule File/Summary matches Simulator Input Summary page in the SEG.

_____ Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.

_____ Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset.

_____ BOC I sheet displayed on C panel.

_____ BOC Reactivity Briefing sheet available at Reactor Operator Desk.

_____ Turnover sheet/PRA sheet available.

_____ If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.

_____ Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).

_____ Electronic PINGP 577 forms closed on LAN connected PCs.

_____ Board-mounted EAL Tables are cleaned.

_____ EOOS running on PC and updated as follows to reflect equipment OOS:

___ 1. 12 RHR Pump

___ 2. BKR 16-10 (CLOSE)

_____ Update Control Board Placards:

___ 1. NRC Current Authentication Code call date updated to current date.

___ 2. High Flux At Shutdown Alarm Setpoint placards: 5900 cps.

___ 3. Feedwater regulating valve position placard set to current values.

___ 4. Recommended SG Blowdown flow set to current values.

___ 5. RCS boron on the CVCS panel placard: 1299 ppm.

___ 6. Turbine reference/setter values on the CVCS panel set to current (Target/Demand on-line positions).

___ 7. Shift Reactivity Guidance placard: BA: 4.2 gallons, RMU: 67 gallons.

Dilutions @ 10 gal RMU, 1-2 times per shift.

_____ Magnetic placards in place:

___ 1. 11 BA TANK Lined Up For Service

___ 2. 11 BA PUMP Lined Up to 11 BA Tank

___ 3. 12 BA PUMP Lined Up to 11 BA Tank

___ 4. CC to SFP MV-32117 In Service

___ 5. Blowdown 46470 SGB To CDSR

___ 6. HU Flag above 12 RHR HX CC inlet MV-32094 for 1C14 Limitation

___ 7. H 2 IN VCT SPACE at VCT Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 20 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0

_____ Pink Status Control Tags in place:

___ 1. CS-46540, 22 CC WTR PUMP ___ 5. CS-46184, 11 RHR PUMP

___ 2. CS-46572, CC TO SFP MV-32117 ___ 6. CS-46178, 11 SI PUMP

___ 3. CS-46935, D1 DIESEL GENERATOR ___ 7. CS-46036, 11 CC WTR PUMP

___ 4. CS-46424, 11 TDAFWP ___ 8. CS-46053, 12 CLG WTR PUMP

_____ Yellow Caution Tags in place:

___ 1. CS-46064, CC TO SFP MV-32115, in CLOSED

___ 2. CS-46185, 12 RHR PUMP, in PULLOUT

___ 3. CS-46914, BUSTIE BUS 16 / BUS 26 BKR 16-10, in PULL TO LOCK

_____ ERCS driven recorders are on-scale (RCS temperature scaled 555º F to 565º F).

_____ ERCS alarm screen operating and alarms reset.

_____ All ERCS terminals operating and set as follows:

CONF VARS R02 Alarm Summary Page CONE1 Group OP31_U1 R03 AFD CONC SAS (XS11) R04 TPM CONG1 Group QP CCDATA R05 QP LOADFOLL ERCS-R01 Group RADMON_U1 R06 Alarm Summary Page

_____ ERCS single point displays: CONB 1T0499A 1U1613A CONE2 1Q0340A 1V4501A

_____ ERCS TPM set (Calorimetric - Auto Scaling - LEFM).

_____ Verify that copy machine and printers are loaded with paper.

_____ Pens/Paper/Markers available on the simulator.

st

_____ Verify 121 IA Compressor is in PREFERRED and 122 IA Compressor is in 1 STANDBY, and nd 123 IA Compressor is in 2 STANDBY.

_____ Verify R11/R12 are lined up correctly (at the R11/R12 local panel):

___ 1. Sample pump is running.

___ 2. Alarms are reset.

___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.

___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.

_____ Set Turbine Control HMI Displays as follows:

___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview.

___ 2. U1 Turb Aux Cont (48088) to Turb Overview.

___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control.

_____ DEHC VPL set ~ 0.1 to 0.2 above current valve position (not on limiter).

_____ DEHC alarms cleared.

_____ N51 & N52 Display Sheets for 100% power are in place as necessary.

_____ Headsets turned on as necessary.

_____ Procedure checklist completed. See following page.

_____ Peer Check performed for simulator setup.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 21 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:

Before After 1C1.4 AOP1, RAPID POWER REDUCTION UNIT 1 1C12.1, LETDOWN, CHARGING, AND SEAL WATER INJECTION -

UNIT 1 1C12.5, UNIT 1 BORON CONCENTRATION CONTROL 1C23 AOP2, MALFUNCTION OF TURBINE EH CONTROL SYSTEM 1C5 AOP1, UNCONTROLLED ROD MOTION 1C51.3, Pressurizer Level 1L-428 - High 1C51.4, Containment Pressure 1P-950 - High 1E-0, REACTOR TRIP OR SAFETY INJECTION 1E-1, LOSS OF REACTOR OR SECONDARY COOLANT 1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION C47008-0409, TURBINE CONTROL SYSTEM TROUBLE C47012-0307, PRZR HI LVL CHANNEL ALERT C47012-0407, PRZR HI LVL C47012-0507, PZR LVL DEVIATION C47018-0105, CONTAINMENT HI-HI PRESS CHANNEL ALERT C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES REACTIVITY BRIEFING BINDER - BOC SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.3.1 T.S. LCO 3.3.2 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 22 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Post-Scenario Checklist

_____ LAN connected computers are cleared of information added during the scenario.

_____ Computer generated PINGP 577 cleared.

_____ Procedure checklist completed. See previous page.

_____ Remove Pink Status Control Tags from the following equipment:

___ 1. CS-46935, D1 DIESEL GENERATOR

___ 2. CS-46424, 11 TDAFWP

___ 3. CS-46184, 11 RHR PUMP

___ 4. CS-46178, 11 SI PUMP

___ 5. CS-46036, 11 CC WTR PUMP

___ 6. CS-46053, 12 CLG WTR PUMP

_____ Magnetic placards removed:

___ 1. NONE

_____ Remove Yellow Caution Tags from the following equipment:

___ 1. CS-46185, 12 RHR PUMP

___ 2. CS-46914, BUSTIE BUS 16 / BUS 26 BKR 16-10

_____ Board-mounted EAL Table is cleaned.

_____ All books, note pads, and calculators put away.

End Of Day Checklist

_____ Signs/placards removed and put away unless normal simulator configuration.

_____ Floor PCs logged off if simulator will not be used again that day.

_____ Instructor station returned to normal with all books, paper, and etc. put away.

_____ Headsets turned off and put away if simulator will not be used again that day.

_____ Simulator reset to IC-10 unless another IC will be used for further training.

_____ Simulator placed in DORT if simulator will not be used again that day.

_____ Recorder power "OFF" if simulator will not be used again that day.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 23 of 26 RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE: DAY/NIGHT SHIFT: Day CAT 1 VENT OPENINGS: 0 ft2 SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS

1. 12 RHR PUMP is OOS for corrective maintenance.
  • T.S. 3.5.2 Condition A was entered with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> remaining.

PROTECTED EQUIPMENT D1 DIESEL GENERATOR 11 CC PUMP 11 TDAFWP 12 CLG WATER PUMP 11 RHR PUMP 22 CC PUMP 11 SI PUMP 121 SFP HX RAD MONITORS OOS ANNUNCIATORS OOS NONE NONE OUTSTANDING SPS FIRE DET / PROT EQP IMPAIRMENTS NONE NONE OTHER EQUIPMENT OOS / STATUS

  • BKR 16-10 is OOS for corrective maintenance.
  • Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System.

MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE NONE OPERATIONAL PLANS FOR COMING SHIFT

  • Maintain 100% power.
  • Place a 2nd Letdown Orifice in service in preparation for SP 1047, Control Rod Quarterly Exercise.
  • Dilute 10 gallons 1-2 times per shift for temperature control.

NEW PROCEDURES / INSTRUCTIONS NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 24 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.

1. The scenario contains objectives for the desired tasks and relevant human Yes No performance tools. X
2. The scenario identifies key parameter response, expected alarms, and Yes No automatic actions associated with the induced perturbations. X
3. The scenario content adequately addresses the desired tasks, through Yes No simulator performance, instructor-led training freezes, or both. X
4. Plant PRA initiating events, important equipment, and important tasks are Yes No identified. X
5. Turnover information includes a Daily At Power or Shutdown Safety Risk Yes No Assessment. X
6. The scenario contains procedurally driven success paths. Procedural Yes No discrepancies are identified and corrected before training is given. X
7. The scenario guide includes responses for all anticipated communications to Yes No simulated personnel outside the Control Room, based on procedural guidance X and standard operating practices. Include estimated completion times and/or notes for use of time compression.
8. The scenario includes related industry experience. SOER, SER and similar Yes No OE recommendations are clearly identified and fully addressed.* X
9. The scenario guide incorporates verification of Operator Fundamental Yes No application.* X
10. Training elements and specific human performance elements are addressed Yes No in the scenario critique guide to be used by the critique facilitator. The critique X guide includes standards for expected performance.*
11. For evaluations, it has been verified that without operator action the critical Yes No tasks will be failed. X Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
  • For evaluations these items may be marked NO without justification.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 25 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.

1. The desired initial conditions agreed with the reference plant with Yes No respect to reactor status, plant configuration, and system operation. X
2. The simulator operated in real time during conduct of validation. Yes No X
3. The simulator demonstrated expected plant response to operator input Yes No and to normal, transient, and accident conditions. X
4. The simulator permitted use of the reference plants procedures. The Yes No scenario was completed without procedural exceptions, simulator X performance exceptions, or deviation from the scenario sequence.
5. The simulator did not fail to cause or unexpectedly cause any first Yes No principle alarm or primary automatic action. X
6. Observable changes in parameters relevant to the scenario Yes No corresponded in trend and direction to reference plants expected X response.
7. All malfunctions and other instructor interface items were functional and Yes No demonstrated the expected reference plants response to the initiating X cause.
8. All malfunctions and other instructor interface items were initiated in the Yes No same sequence described within the simulator scenario. X
9. The scenario satisfies the learning or examination objectives without Yes No any significant simulator performance issues, or deviations from the X approved scenario sequence.
10. Simulator fidelity has been demonstrated to be adequate for this Yes No scenario. X Discrepancies noted (Check none or list items found) None SMAR = Simulator Action Request SMAR: SMAR: SMAR: SMAR:

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 26 of 26 PI-ILT-NRC-1402S, 2014 ILT NRC SIMULATOR EVALUATION #2, REV. 0 Comments:

Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.

Validation Personnel Name Job Title / Qualification Validation Position Shawn Sarrasin Operations Instructor Lead Evaluator Nic Abney Operations Instructor Booth Driver Jeff Human Operations SRO Shift Supervisor Mark Haren Operations RO LEAD Rick Martin Operations RO RO Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 1 of 28 SIMULATOR EXERCISE GUIDE (SEG)

SITE: PRAIRIE ISLAND SEG # PI-ILT-NRC-1403S SEG TITLE: 2014 ILT NRC SIMULATOR EVALUATION #3 REV. # 0 PROGRAM: INITIAL LICENSE OPERATOR TRAINING #: FL-ILT COURSE: INITIAL LICENSE OPERATOR TRAINING #: FL-ILT TOTAL TIME: 2.0 HOUR Developed by: Shawn Sarrasin 1/18/2014 Instructor Date Reviewed by: Fredrick Collins 2/26/2014 Instructor Date (Simulator Scenario Development Checklist.)

Validated by: Shawn Sarrasin 4/22/2014 Validation Lead Instructor Date (Simulator Scenario Validation Checklist.)

Approved by:

Training Supervision Date Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 2 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Guide Requirements

1. During all plant operating conditions, the crew will demonstrate Goal of the ability to monitor and operate the plant within the limits of the Training: Operations Manuals and Technical Specifications.
2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
1. Restore RCS average coolant temperature to program per Learning C47013-0305.

Objectives: 2. Swap running charging pumps per 1C12.1.

3. Diagnose and perform corrective actions for 11 Safety Injection Pump being placed in local control per C47018-0301.
4. Diagnose and perform corrective actions for N43, Blue Channel Power Range Nuclear Instrument, failing high per 1C51.3.
5. Diagnose and respond to a Pressurizer Spray valve failing 75%

open per C47012-0508.

6. Diagnose and respond to a failure of the Reactor to automatically trip during a RCS Low Flow condition per C47017-0301 and 1E-0.
7. Diagnose and respond to 12 SG faulted into containment per 1E-0 and 1E-2.
1. Full Scope Simulator Training 2. NRC Evaluation Team Resources: 3. Booth Operator (Backup Communicator)
4. Primary Communicator Initiating Event with Core Damage Frequency:

Related PRA MSLB (<1%)

Information:

Important Components:

11 SI PUMP Important Operator Actions with Task Number:

Operators fail to isolate AFW to affected SG (0.54%)

CRO 301 003 06 01 000 - Faulted Steam Generator Isolation Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 3 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:

Before EOP Entry:

1. 11 Safety Injection Pump local-remote switch placed in local.
2. N43, Blue Channel Power Range Nuclear Instrument, fails high.
3. Pressurizer Spray valve opens to the 75% position.
4. Loop A RCS low flow due to Bus 11 lockout.

After EOP Entry:

1. Reactor fails to automatically trip.

Abnormal Events:

1. Nuclear Power Instrument Failure
2. Low Pressurizer Pressure Major Transients:
1. 12 Steam Generator fault inside containment.

Critical Tasks:

1. E A: Manually trip the reactor from the control room before transition out of E-0.
2. E F: Establish and maintain 200 GPM AFW flow to the Steam Generator(s) before transition out of E-0, unless the transition is to FR-H.1, in which case the task must be initiated before RCPs are manually tripped in accordance with step 2 of FR-H.1.

NOTE: E F only applies if BOTH AFW pumps trip on low discharge pressure.

This may occur due to the fault in 12 Steam Generator.

3. E A: Isolate the faulted STEAM GENERATOR before transition out of E-2, unless the transition is to FR-P.1, in which case the task must be completed prior to checking if safety injection should be terminated per step 6 of FR-P.1.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 4 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO OVERVIEW:

INITIAL CONDITIONS: EQUIPMENT OOS

  • 1PT-485, Turbine First Stage Pressure, is failed high.
  • Power: 50%
  • 123 Air Compressor
  • Temperature: 556°F
  • Pressure: 2235 psig
  • Xenon: Equilibrium
  • Rods: D @ 181
  • Generator: 272 MW SEQUENCE OF EVENTS:

Event 1: Restore RCS Average Coolant Temperature to Program Temperature

  • 1PT-485, Turbine First Stage Pressure, failed high prior to shift turnover.
  • The previous crew has already responded per 1C5 AOP1, Uncontrolled Rod Motion, and 1C51.2, Instrument Failure Guide.
  • RCS Tavg is at 556°F and Program Temperature is 553°F.
  • Rods stepped out six steps prior to the previous crew placing Rods in manual.
  • The crew will step rods in six steps in increments determined by the RO and SRO.
  • Each rod step will change RCS Tavg approximately 0.5°F.

Event 2: Swap Running Charging Pumps

  • 11 and 12 Charging Pumps are initially running.
  • The crew will swap charging pumps to 11 and 13 running and 12 secured per 1C12.1.

Event 3: 11 Safety Injection Pump Local-Remote Switch placed in LOCAL

  • Annunciator 47018-0301, 11 SI PUMP LOCAL CONTROL SI AUTO START BLOCKED, will alarm.
  • After being dispatched, an out-plant operator will discover the local-remote switch for 11 SI Pump in local.
  • The crew will direct the out-plant operator to place 11 SI Pump in remote.

Event 4: N43, Blue Channel Power Range Instrument, fails HIGH

  • Rods will NOT step in because rods are still in manual due to 1st Stage Pressure Instrument failed high.
  • The SS will enter T.S. LCO 3.3.1 Conditions A, D, E, Q, and R.
  • The crew will remove N43 from service per 1C51.3.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 5 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Event 5: Pressurizer Spray Valve Drifts Open

  • The RCS Loop A Pressurizer Spray valve slowly opens to the 75% position.
  • The crew will place the Pressurizer Spray valve in manual per C47012-0508.
  • The Pressurizer Spray valve will close.

Event 6: Loop A RCS Loss of Flow

  • Bus 11 locks out.
  • Loop A RCS loss of flow occurs due to loss of power to 11 RCP.
  • The reactor will fail to automatically trip.
  • The crew will manually trip the reactor.

Event 7: 12 Steam Generator Faults into Containment

  • RCS pressure will lower rapidly.
  • 12 SG pressure will lower slowly.
  • Containment pressure will rise slowly.
  • Safety Injection will automatically actuate or be manually actuated by the crew.
  • The crew will transition to 1E-0.
  • The crew will diagnose a Faulted SG and transition to 1E-2.
  • The crew will transition to 1E-1.
  • A red or orange path may occur in the Integrity CSF. If this occurs, the crew will transition to 1FR-P.1.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 6 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Simulator Setup:

NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.

1. If available, reset the simulator to IC-263 and place in RUN.
2. If IC-263 is NOT available:
a. Reset to IC-8.
b. Place the simulator in RUN.
c. Place CS-46098, 123 AIR COMPRESSOR, in PULLOUT.
d. Place CS-49011, 122 AIR COMPRESSOR, in PREFERRED.
e. Place CS-49012, 123 AIR COMPRESSOR, in 1st STANDBY.
f. Insert Remote IA101 (CP-40-7) to CLOSED.
g. Insert System Override RX226 to 616 (1st Stage Pressure Fails High).
h. Place CS-46280, ROD BANK SELECTOR, in MANUAL after rods step out 6 steps.
i. Place CS-46338, STEAM DUMP MODE, in STM PRESS.
3. Verify the ROD DEVIATION alarm is CLEARED as follows:
a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
b. Go to ERCS Screen RBU (Rod Bank Update).
c. Enter 181 as the new value for point 1U0052A, ROD POS BNK D.
d. Select Apply.
e. Verify Annunciator 47013-0507, COMPUTER ALARM / ROD DEVIATION /

SEQUENCING, has cleared.

4. Verify the Pen Recorder for RCS Tavg and Tref are set correctly as follows:
a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
b. Go to ERCS Screen PEN_TREND (Pen Trend Configuration).
c. Enter 550 as the new Min EU value for Pen 1U9001A (point 1T0499A).
d. Enter 560 as the new Max EU value for Pen 1U9001A (point 1T0499A).
e. Enter 550 as the new Min EU value for Pen 1U9002A (point 1T0496A).
f. Enter 560 as the new Max EU value for Pen 1U9002A (point 1T0496A).
5. If available, run schedule file PI-ILT-NRC-1403S.sch as follows:
a. Select open file in the Schedule application.
b. Locate schedule file.
c. Open schedule file by double clicking it.
d. Run the schedule file by pressing the Stopped button on the toolbar.
e. Verify the schedule file is running.
6. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
7. If desired, start Scenario Based Testing Data Collection Program.
8. Complete the "Simulator Setup Checklist.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 7 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS

1. SIMULATOR PRE-BRIEF:
a. The Simulator Pre-Brief is conducted prior to the crew entering the simulator.
b. Review Unit 1 LPEO / PEO Turnover Log.
c. Perform a pre-job brief for the following activities:
1) Restore Tave to program temperature per C47013-0305:

(a) 1C51.2 actions are complete for the failed instrument with the exception of restoring Tavg to program temperature.

(b) Rods are in MANUAL.

(c) Hand out copy of ERCS trend showing (1) RCS Tavg.

(2) RCS Tref.

(3) Bank D Rod Height.

(d) This activity is to be performed after shift turnover is complete.

(e) If crew questions why Tavg was not restored prior to performing other actions in 1C51.2, then inform crew that Plant Management used the Operational Decision Making Process and determined to restore Tavg on a latter step.

2) After Tavg is restored to program, the crew will swap charging pumps per Section 5.4.1 of 1C12.1.

(a) 11 and 12 Charging pumps are currently running.

(b) 13 Charging Pump Suction Stabilizer PM is complete and ready for PMT.

(c) 13 Charging Pump desurger has already been checked by the out-plant operator.

(d) The crew will start 13 Charging Pump and secure 12 Charging Pump.

(e) The Lead RO will perform this evolution.

(f) The crew will also brief this evolution prior to entering the simulator.

2. COMPLETE TURNOVER:
a. Crew performs a walk down of the control boards.
b. Review PRA Printout.
c. Crew takes the duty.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 8 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 1 3. After the crew has assumed the duty, they will restore C47013-0305, AUCTIONEERED TAVG-TREF Tavg to program. DEVIATION RO/SS

  • Check Tavg-Tref temperature deviation.
  • Recognize Tref is failed high due to instrument failure and use Figure C1-5 to determine program temperature.
  • Return Tavg to program using manual rod control.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 9 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 2 4. After the crew has restored Tavg to program 1C12.1, LETDOWN, CHARGING, AND SEAL WATER temperature, they will swap charging pumps so that 11 INJECTION - UNIT 1 and 13 are running.

  • Verify 13 Charging Pump discharge desurger is
a. When contacted as the out-plant operator to verify 13 LEAD pressurized.

Charging Pump discharge desurger is pressurized,

  • Transfer the speed control for 11 Charging Pump to report the 13 Charging Pump discharge desurger is Manual per C7.

pressurized in accordance with Section 5.13.

  • Verify 13 Charging Pump speed controller is at
b. If contacted as the out-plant operator to check 13 minimum.

Charging Pump suction stabilizer, report no issues

  • Reduce 11 Charging Pump speed until seal injection noted. flow drops to approximately six gpm.
  • Verify charging pump discharge header pressure 1PI-133 is less than 2400 psig.
  • Verify 13 Charging Pump control switch green light is LIT and white light is OFF.
  • Start 13 Charging Pump.
  • Adjust 11 Charging Pump speed to maintain charging pump discharge pressure, 1PI-133 less than 2500 psig and approximately 9.5 gpm seal injection.
  • Ensure 12 Charging Pump speed is at minimum and seal injection flow is approximately 9.5 gpm.
  • Stop 12 Charging Pump.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 10 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 3 5. When charging pumps have been swapped, and/or at C47018-0301, 11 SI PUMP LOCAL CONTROL SI AUTO the discretion of the lead evaluator, then enter: START BLOCKED Trigger 3, 11 SI PUMP LCL/REM-START/STOP, LEAD

  • Dispatch an operator to investigate.

switch to LOCAL.

  • Verify CS-46178, 11 SI PUMP, is in desired position,
a. When contacted as the out-plant operator to then return CS-19624, 11 SI PUMP LCL/REM-investigate 11 SI Pump, wait 1 minute and report the START/STOP, selector switch to REMOTE.

11 SI Pump Local-Remote Switch is in the LOCAL SS

  • Refer to T.S. 3.5.2. and T.S. 3.5.3.

position and it was inadvertently bumped by NPSAs o Enter T.S LCO 3.5.2 Condition A - Restore cleaning the area. 11 SI Pump to operable within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

b. When contacted as the out-plant operator to place o T.S. LCO 3.5.3 is only applicable in Mode 4 CS-19624 to REMOTE, then wait 1 minute and and Unit 1 is currently in Mode 1.

enter:

Trigger 13, 11 SI PUMP LCL/REM-START/STOP, switch to REMOTE.

6. Plant Response:
a. Annunciator 47018-0301, 11 SI PUMP LOCAL CONTROL SI AUTO START BLOCKED.
b. 11 SI Pump Green indicating light goes OFF.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 11 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 4 7. When 11 SI Pump Remote Control is restored, and/or at C47013-0101, 0102, 0103, 0203, NIS POWER RANGE the discretion of the lead evaluator, then enter: CHANNEL ALERT AND ALARMS Trigger 4, N43 Blue Channel Power Range Nuclear RO

  • Determine N43 is the initiating channel by observing Instrument fails HIGH. NIS indications.
a. If contacted as I&C to trip bistables, inform the crew

two I&C Technicians will be available in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

  • Determine there is NO dropped, misaligned, or stuck
b. If contacted as the Operations Management, rod.

acknowledge the report of the failure, and agree to LEAD

  • Refer to 1C51, INSTRUMENT FAILURE GUIDE.

make other notifications to the NRC, Duty Station Manager, etc. as asked.

1C51.3, Power Range Nuclear Instrument N High

c. If contacted as the FIN Team Supervisor, inform the RO crew that you will write a work order and assign an
  • Determine rod control is already in manual.

I&C Supervisor to investigate. SS

  • Enter T.S. LCO 3.3.1 Condition A - Reference Table 3.3.1-1 immediately.
8. Plant Response:
  • Enter T.S. LCO 3.3.1 Condition D and Condition E -
a. N43 indication will peg high. Place N43 channel in trip within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in Mode
b. Rods will NOT move because they are already in 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. SR 3.2.4.2 is NOT required since manual. thermal power is less than 85%.
c. The following annunciators will be received:
  • Enter T.S. LCO 3.3.1 Condition Q - Verify interlock is
1) 47013-0101, NIS POWER RANGE POS FLUX in required state for existing conditions (P10 Aqua RATE CH ALERT. Light LIT) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in Mode 3 in 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.
2) 47013-0102, NIS POWER RANGE HI
  • Enter T.S. LCO 3.3.1 Condition R - Verify interlock is SETPOINT CH ALERT. in required state for existing conditions (P7, P8, & P9
3) 47013-0103, NIS POWER RANGE Aqua Lights NOT LIT) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in Mode 2 in OVERPOWER ROD WITHDRAWAL STOP. 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.
4) 47013-0203, NIS POWER RANGE CHANNEL LEAD
  • Remove N-43 from service as follows:

DEVIATION.

  • Place Rod Stop Bypass switch in the N-43 position.
  • Place Power Mismatch Bypass switch in the N-43 position.
  • Place Upper Section Current Comparator Defeat switch in the N-43 position and verify the Upper Section channel Defeat Light is LIT.
  • Place Lower Section Current Comparator Defeat Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 12 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 4 switch in the N-43 position and verify the Lower (cont) LEAD Section channel Defeat Light is LIT.

  • Place Comparator Channel Defeat switch in the N-43 position and verify Comparator Defeat Light is LIT.
  • Remove and concurrently verify removal of the N-43 instrument power fuses.
  • Remove and concurrently verify removal of the N-43 control power fuses.
  • Verify 47013-0101, 0102, 0201, 0202, and 47014-RO 0303 annunciators are received.
  • Verify 44178-0306, 0307, and 44205-0304 status lights LIT.
  • Determine Tavg is matched to program temperature.
  • Determine to NOT place rod control to AUTO due to P-485 Turbine First Stage Pressure instrument failure.
  • Call I&C to trip bistables.
  • Log Delta I for N41, N42, and N44 at 30 min intervals.
  • Verify the NR-45 recorder is selected to an operable channel.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 13 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 5 9. When N-43 is removed from service (except for tripping C47012-0508, PRZR HI/LO PRESS bistables) and/or at the discretion of the lead evaluator,

  • Determine pressure is low.

enter: RO

  • Verify all pressurizer heaters ON.

Trigger 5, Pressurizer Spray Valve PCV-431 drifts to

  • Verify PORVs, CV-31231 and CV-31232, are closed.

75% open.

  • Verify both spray valves CLOSED.
a. If contacted as the Operations Management,
  • Verify CV-31329, AUX PRZR SPRAY, is closed.

acknowledge the report of the failure, and agree to

  • Verify pressurizer pressure control in automatic and make other notifications to the NRC, Duty Station functions properly.

Manager, etc. as asked.

  • Refer to T.S. 3.4.1 and ensure required DNB
b. If contacted as the FIN Team Supervisor, inform the SS parameters are met.

crew that you will write a work order and assign a

  • If Pressurizer pressure drops below 2175 psig, then Maintenance Supervisor to investigate.

enter T.S. LCO 3.4.1 Condition A - Restore RCS DNB parameter(s) to within limit in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (i.e. restore

10. Plant Response:

pressurizer pressure above 2175 psig).

a. Pressurizer pressure lowers slowly.
b. Pressure will reach 1930 psig in approximately two minutes with NO operator action.
c. Pressurizer Heaters turn ON.

CONTIGENCY If the crew trips the reactor due to low pressurizer pressure, then skip Event 6 and proceed to Event 7 after the crew transitions to 1ES-0.1, Reactor Trip Recovery.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 14 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 6 11. When the plant is stable, and/or at the discretion of the C47017-0301, ONE LOOP LO FLOW OR RCP BKR lead evaluator, then enter: OPEN REACTOR TRIP Trigger 6, Loss of Loop A RCS flow due to Bus 11 RO

Lockout.

a. Upon hearing the announcement of Reactor Trip, or RO/ 1E-0, REACTOR TRIP OR SAFETY INJECTION when called as the Turbine Building Operator to LEAD
  • Determine the reactor did NOT automatically trip.

isolate the Unit 1 MSRs per Attachment J, then open and run schedule file E-0_Att-J.sch located in

  • Manually trip the reactor.

X:\\Trex_PI\Lightning\Schedule\EOPs. When the

isolation is complete, inform the crew the MSRs are

  • Verify both safeguards buses are energized.

isolated. SS

  • Determine SI is NOT actuated.
12. Plant Response:
a. Annunciators for a Bus 11 Lockout. RO/ 1ES-0.1, REACTOR TRIP RECOVERY
b. 11 RCP NOT running indication. LEAD/
c. Loop A RCS flow lowers rapidly. SS
  • Determine Steam Dump is already in pressure mode.
d. Annunciator C47017-0301 (Reactor Trip First Out) is
  • Check RCS temperatures.

received.

  • Check Cooling Water Header Pressures greater than
e. The reactor fails to automatically trip.

75 psig.

f. The reactor is capable of a manual trip.
  • Notify Turbine Building Operator to Isolate Unit 1 MSRs per ATTACHMENT J.

CRITICAL TASK Manually trip the reactor from the control room before

  • Check FW Status.

transition out of E-0.

EMERGENCY PLAN CLASSIFICATION ALERT - SA2.1 due to the reactor failing to automatically trip during the RCS Low Flow condition and the crew successfully manually tripping the reactor.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 15 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 7 13. After the crew has transitioned to 1ES-0.1 and/or at the 1ES-0.1, REACTOR TRIP RECOVERY, INFO PAGE discretion of the lead evaluator, then enter:

  • Actuate SI and go to 1E-0 Step 1 if either condition Trigger 7, 12 Steam Generator Fault inside SS listed below occurs:

Containment. o RCS subcooling less than 20°F.

a. If not completed during Event 6, then open and run o PRZR level cannot be maintained >5%.

schedule file E-0_Att-J.sch per step 11 above.

b. Upon hearing the announcement of Safety Injection, 1E-0, REACTOR TRIP OR SAFETY INJECTION or when called as the Turbine Building Operator to RO/

secure the Turbine Building Roof Exhausters, wait 2 LEAD

minutes and report the Turbine Building Roof Exhausters are all secured.

  • Verify both Safeguards buses energized.
c. If Control Room personnel ask if Unit 2 personnel are
  • Determine SI is required or already actuated.

available to perform Attachment L, then inform the o Either SG pressure < 530 psig.

Control Room that Unit 2 personnel are NOT o PRZR pressure < 1830 psig.

available for performing Attachment L. o Containment pressure > 3.5 psig.

  • Manually actuate SI if it did not already actuate.
14. Plant Response: LEAD
  • Perform Attachment L (see pages 16 & 17).
a. Pressurizer pressure and level rapidly lower.
  • Check AFW Status:

RO

b. SI will automatically actuate when Containment o Verify total AFW flow greater than 200 pressure reaches 3.5 psig. GPM.

o Verify AFW pumps discharge pressure CRITICAL TASK greater than 1000 psig.

Establish and maintain 200 GPM AFW flow to the Steam o Stop feed flow to 12 SG.

Generator(s) before transition out of E-0, unless the o Throttle AFW flow to 11 SG to maintain transition is to FR-H.1, in which case the task must be greater than 1000 psig discharge pressure.

initiated before RCPs are manually tripped in o Control feed flow to maintain 11 SG Wide accordance with step 2 of FR-H.1. Range between 50% and 59%.

  • Check RCS Temperatures trending to 547°F.

NOTE

  • Check PRZR PORVs and Spray valves closed.

This Critical Task only applies if BOTH AFW pumps trip

  • Check if RCPs should be stopped.

on low discharge pressure. This may occur due to the o At least one SI pump running and flow fault in 12 Steam Generator. indicated.

o RCS pressure less than 1575 psig.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 16 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 7 o Stop 12 RCP (11 RCP is already secured (cont) from the loss of bus 11).

  • Check if SGs are NOT faulted.
  • Determine 12 SG pressure is decreasing in an uncontrolled manner.
  • Stop feed flow to 12 SG.

SS

1E-2, FAULTED STEAM GENERATOR ISOLATION NOTE RO/

  • Check MSIV and Bypass valve on 12 SG are closed.

If a RED or ORANGE path is received on the INTEGRITY LEAD

  • Determine 11 SG is NOT faulted.

CRITICAL SAFETY FUNCTION TREE when the crew

  • Determine 12 SG is faulted.

transitions to 1E-2, then the crew will transition to 1FR-

  • Isolate 12 SG:

P.1 instead.

o Isolate main feedline.

o Isolate AFW flow.

CRITICAL TASK o Close steam supply valve to TD AFW pump Isolate the faulted STEAM GENERATOR before from 12 SG.

transition out of E-2, unless the transition is to FR-P.1, o Verify 12 SG PORV is closed.

in which case the task must be completed prior to o Verify SGB isolation valve closed.

checking if safety injection should be terminated per

  • Check Secondary Radiation is normal.

step 6 of FR-P.1. SS

1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION RO/

  • Check RCS pressure greater than 550 psig.

LEAD

  • Determine RCS Cold Leg Temperatures lowering.
  • Verify SG PORVs & Steam dumps closed.
  • Control feed flow to 11 SG.
  • Verify MSIV and bypass valves closed.
  • Close steam supply from 12 SG to TD AFW Pump.
  • Isolate all FW to 12 SG.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 17 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 7 1E-0 Attachment L: SI Alignment Verification (cont)

  • Verify Safeguards Component Alignment:

LEAD

  • Verify both trains of SI actuated:

o Both RHR pumps - RUNNING

-OR-o Both SI pumps - RUNNING

  • "SI NOT READY" lights - NOT LIT
  • "SI ACTIVE" lights - LIT FOR PLANT CONDITIONS
  • "CONTAINMENT ISOLATION" lights - LIT FOR PLANT CONDITIONS
  • Check Category 1 Vent Zone Boundary:
  • Close MV-32115, 122 SFP HX INLT HDR MV B
  • Check Cooling Water Header Pressures - BOTH GREATER THAN 65 PSIG
  • Verify Plant Announcements Complete:
  • Check If Main Steamlines Are Isolated:
  • MSIVs and bypass valves - CLOSED
  • Containment instrument air valves - CLOSED:
  • Verify SI Flow:
  • Verify RHR Flow
  • Check RCP Cooling
  • Verify Local Actions Complete
  • Verify Generator Breakers - OPEN
  • Verify All Heater Drain Pumps - STOPPED
  • Check Turbine Valves:

o Turbine reheat and intercept valves - CLOSED o Open turbine drain valves

o Both main feedwater pumps - STOPPED o Main and bypass FRVs - CLOSED

  • Verify All Condensate Pumps - STOPPED:

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 18 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 7 15. If Control Room personnel ask for status of Unit 2

  • Place Steam Dump In "STM PRESS" Mode (cont) Cooling Water/Chilled Water lineup, then inform the
  • Verify Unit 1 Cooling Water/Chilled Water Alignment:

Control Room that Unit 2 Cooling Water/Chilled Water o CFCU control switches - "SLOW".

valves are in there safeguards positions. o CFCU dampers - ALIGNED TO DOME

16. If Control Room personnel ask for status of Battery o Unit 1 cooling water/chilled water valves closed Room Temperatures, then inform the Control Room that o Unit 1 CRDM shroud cooling supply and return Battery Room temperatures are less than 84°F. valves - CLOSED
17. If Control Room personnel ask for status of Spent Fuel o CFCU cooling water supply and return valves -

Cooling, then inform the Control Room that Spent OPEN Fueling level and temperature are normal. o CFCU chilled water supply and return valves -

CLOSED

  • Verify 11 Safeguards Screenhouse Ventilation lineup.
  • Verify Control Room Ventilation Alignment:

o Chillers and fans - RUNNING o Control room chiller suction/discharge tie closed -

STATUS LIGHT LIT

  • Verify Unit 2 Cooling/Chilled Water Alignment
  • Verify 21 Safeguards Screenhouse Ventilation lineup.
  • Verify 11 and 12 Battery Charger Operation is normal.
  • Verify Battery Room temps less than 84°F.
  • Check status of Spent Fuel Cooling.
  • Check Status Of Notifications
  • Notify SS Of Any Discrepancies.
18. Once the crew has transitioned to 1E-1, or completed step 6 of 1FR-P.1, and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 19 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SIMULATOR INPUT

SUMMARY

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 20 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario

_____ Simulator Status:

___ 1. "Training Load" ___ 2. Step counters "ON"

___ 3. Alarm sound "ON" ___ 4. Steps 1 - 7 on page 6 complete

___ 5. Speed: REAL ___ 6. IC-263 or IC-8 running

_____ Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructors booth.

_____ Verify Schedule File/Summary matches Simulator Input Summary page in the SEG.

_____ Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.

_____ Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset.

_____ BOC I sheet displayed on C panel.

_____ BOC Reactivity Briefing sheet available at Reactor Operator Desk.

_____ Turnover sheet/PRA sheet available.

_____ If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.

_____ Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).

_____ Electronic PINGP 577 forms closed on LAN connected PCs.

_____ Board-mounted EAL Tables are cleaned.

_____ EOOS running on PC and updated as follows to reflect equipment OOS:

___ 1. 123 Air Compressor

_____ Update Control Board Placards:

___ 1. NRC Current Authentication Code call date updated to current date.

___ 2. High Flux At Shutdown Alarm Setpoint placards: 5900 cps.

___ 3. Feedwater regulating valve position placard set to current values.

___ 4. Recommended SG Blowdown flow set to current values.

___ 5. RCS boron on the CVCS panel placard: 1482 ppm.

___ 6. Turbine reference/setter values on the CVCS panel set to current (Target/Demand on-line positions).

___ 7. Shift Reactivity Guidance placard: BA: 4.8 gallons, RMU: 67 gallons.

Dilutions @ 10 gal RMU, 1-2 times per shift.

_____ Magnetic placards in place:

___ 1. 11 BA TANK Lined Up For Service

___ 2. 11 BA PUMP Lined Up to 11 BA Tank

___ 3. 12 BA PUMP Lined Up to 11 BA Tank

___ 4. CC to SFP MV-32117 In Service

___ 5. Blowdown 46470 SGB To CDSR

___ 6. HU Flag above 12 RHR HX CC inlet MV-32094 for 1C14 Limitation

___ 7. H 2 IN VCT SPACE at VCT Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 21 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0

_____ Pink Status Control Tags in place:

___ 1. CS-46540, 22 CC WTR PUMP

___ 2. CS-46572, CC TO SFP MV-32117

_____ Yellow Caution Tags in place:

___ 1. CS-46064, CC TO SFP MV-32115, in CLOSED

___ 2. CS-46098, 123 Air Compressor, in PULLOUT

_____ ERCS driven recorders are on-scale (RCS temperature scaled 550º F to 560º F).

_____ ERCS alarm screen operating and alarms reset.

_____ All ERCS terminals operating and set as follows:

CONF VARS R02 Alarm Summary Page CONE1 Group OP31_U1 R03 AFD CONC SAS (XS11) R04 TPM CONG1 Group QP CCDATA R05 QP LOADFOLL ERCS-R01 Group RADMON_U1 R06 Alarm Summary Page

_____ ERCS single point displays: CONB 1T0499A 1U1613A CONE2 1Q0340A 1V4501A

_____ ERCS TPM set (Calorimetric - Auto Scaling - LEFM).

_____ Verify that copy machine and printers are loaded with paper.

_____ Pens/Paper/Markers available on the simulator.

_____ Verify 121 IA Compressor is in PREFERRED and 122 IA Compressor is in PREFERRED.

_____ Verify R11/R12 are lined up correctly (at the R11/R12 local panel):

___ 1. Sample pump is running.

___ 2. Alarms are reset.

___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.

___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.

_____ Set Turbine Control HMI Displays as follows:

___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview.

___ 2. U1 Turb Aux Cont (48088) to Turb Overview.

___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control.

_____ DEHC VPL set ~ 0.1 to 0.2 above current valve position (not on limiter).

_____ DEHC alarms cleared.

_____ N51 & N52 Display Sheets for 50% power are in place as necessary.

_____ Procedure 1C51 marked up for PT-485 failure.

_____ Headsets turned on as necessary.

_____ Procedure checklist completed. See following page.

_____ Peer Check performed for simulator setup.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 22 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:

Before After 1C12.1, LETDOWN, CHARGING, AND SEAL WATER INJECTION -

UNIT 1 1C51.2, First Stage Pressure PT-485 - High 1C51.3, Power Range Nuclear Instrument N High 1E-0, REACTOR TRIP OR SAFETY INJECTION 1E-1, LOSS OF REACTOR OR SECONDARY COOLANT 1E-2, FAULTED STEAM GENERATOR ISOLATION 1ES-0.1, REACTOR TRIP RECOVERY 1FR-P.1, RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION C47012-0508, PRZR HI/LO PRESS C47013-0101, NIS POWER RANGE POS FLUX RATE CH ALERT.

C47013-0102, NIS POWER RANGE HI SETPOINT CH ALERT.

C47013-0103, NIS POWER RANGE OVERPOWER ROD WITHDRAWAL STOP.

C47013-0203, NIS POWER RANGE CHANNEL DEVIATION.

C47013-0305, AUCTIONEERED TAVG-TREF DEVIATION C47017-0301, ONE LOOP LO FLOW OR RCP BKR OPEN REACTOR TRIP C47018-0301, 11 SI PUMP LOCAL CONTROL SI AUTO START BLOCKED C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES FIGURE C1-5, PROGRAMMED MODERATOR TEMPERATURE FOR POWER SWING SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.2.1 T.S. LCO 3.3.1 T.S. LCO 3.4.1 T.S. LCO 3.5.2 T.S. LCO 3.5.3 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 23 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Post-Scenario Checklist

_____ LAN connected computers are cleared of information added during the scenario.

_____ Computer generated PINGP 577 cleared.

_____ Procedure checklist completed. See previous page.

_____ Remove Pink Status Control Tags from the following equipment:

___ 1. NONE

_____ Magnetic placards removed:

___ 1. NONE

_____ Remove Yellow Caution Tags from the following equipment:

___ 1. CS-46098, 123 Air Compressor.

_____ Erase marker on RCS temperature ERCS driven recorder.

_____ Board-mounted EAL Table is cleaned.

_____ All books, note pads, and calculators put away.

End Of Day Checklist

_____ Signs/placards removed and put away unless normal simulator configuration.

_____ Floor PCs logged off if simulator will not be used again that day.

_____ Instructor station returned to normal with all books, paper, and etc. put away.

_____ Headsets turned off and put away if simulator will not be used again that day.

_____ Simulator reset to IC-10 unless another IC will be used for further training.

_____ Simulator placed in DORT if simulator will not be used again that day.

_____ Recorder power "OFF" if simulator will not be used again that day.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 24 of 28 RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE: DAY/NIGHT SHIFT: Day CAT 1 VENT OPENINGS: 0 ft2 SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS

1. PT-485, Turbine First Stage Pressure, is failed HIGH.
  • T.S. 3.3.1 Condition A and R entered.
  • P7 was verified to be in required state for existing unit conditions.
  • TRM 3.3.4 Condition A was entered.
  • A WR was initiated to repair PT-485.

PROTECTED EQUIPMENT 22 CC PUMP 121 SFP HX RAD MONITORS OOS ANNUNCIATORS OOS NONE NONE OUTSTANDING SPS FIRE DET / PROT EQP IMPAIRMENTS NONE NONE OTHER EQUIPMENT OOS / STATUS

  • 123 Air Compressor is Out of Service.
  • Instrument Air is separated from Station Air due to clam shelling in progress.

MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE

  • Unit 1 was returned on-line two days ago. A 51% hold is in effect due to chemistry.
  • 12 Charging Pump Suction Stabilizer PM is complete and ready for PMT. 13 Charging Pump desurger has already been checked by the out-plant operator.

OPERATIONAL PLANS FOR COMING SHIFT

  • Maintain Rod Control in Manual and Steam Dump in Steam Pressure Mode.
  • 1C51.2 actions are complete for the failed instrument with the exception of restoring Tavg to program temperature. Tref is currently pegged high.
  • Restore RCS Average Coolant Temperature to program temperature.
  • Swap charging pumps to 11 and 13 are running and 12 secured per per Section 5.4.1 of 1C12.1.
  • Xenon is at equilibrium. Maintain 50% - 51% power for the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
  • Dilute 10 gallons 1-2 times per shift for temperature control.

NEW PROCEDURES / INSTRUCTIONS Review altered scale on Tavg ERCS Recorder.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 25 of 28 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 26 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.

1. The scenario contains objectives for the desired tasks and relevant human Yes No performance tools. X
2. The scenario identifies key parameter response, expected alarms, and Yes No automatic actions associated with the induced perturbations. X
3. The scenario content adequately addresses the desired tasks, through Yes No simulator performance, instructor-led training freezes, or both. X
4. Plant PRA initiating events, important equipment, and important tasks are Yes No identified. X
5. Turnover information includes a Daily At Power or Shutdown Safety Risk Yes No Assessment. X
6. The scenario contains procedurally driven success paths. Procedural Yes No discrepancies are identified and corrected before training is given. X
7. The scenario guide includes responses for all anticipated communications to Yes No simulated personnel outside the Control Room, based on procedural guidance X and standard operating practices. Include estimated completion times and/or notes for use of time compression.
8. The scenario includes related industry experience. SOER, SER and similar Yes No OE recommendations are clearly identified and fully addressed.* X
9. The scenario guide incorporates verification of Operator Fundamental Yes No application.* X
10. Training elements and specific human performance elements are addressed Yes No in the scenario critique guide to be used by the critique facilitator. The critique X guide includes standards for expected performance.*
11. For evaluations, it has been verified that without operator action the critical Yes No tasks will be failed. X Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
  • For evaluations these items may be marked NO without justification.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 27 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.

1. The desired initial conditions agreed with the reference plant with Yes No respect to reactor status, plant configuration, and system operation. X
2. The simulator operated in real time during conduct of validation. Yes No X
3. The simulator demonstrated expected plant response to operator input Yes No and to normal, transient, and accident conditions. X
4. The simulator permitted use of the reference plants procedures. The Yes No scenario was completed without procedural exceptions, simulator X performance exceptions, or deviation from the scenario sequence.
5. The simulator did not fail to cause or unexpectedly cause any first Yes No principle alarm or primary automatic action. X
6. Observable changes in parameters relevant to the scenario Yes No corresponded in trend and direction to reference plants expected X response.
7. All malfunctions and other instructor interface items were functional and Yes No demonstrated the expected reference plants response to the initiating X cause.
8. All malfunctions and other instructor interface items were initiated in the Yes No same sequence described within the simulator scenario. X
9. The scenario satisfies the learning or examination objectives without Yes No any significant simulator performance issues, or deviations from the X approved scenario sequence.
10. Simulator fidelity has been demonstrated to be adequate for this Yes No scenario. X Discrepancies noted (Check none or list items found) None SMAR = Simulator Action Request SMAR: SMAR: SMAR: SMAR:

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 28 of 28 PI-ILT-NRC-1403S, 2014 ILT NRC SIMULATOR EVALUATION #3, REV. 0 Comments:

Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.

Validation Personnel Name Job Title / Qualification Validation Position Fred Collins Operations Instructor Lead Evaluator Nic Abney Operations Instructor Booth Driver Jeff Human Operations SRO Shift Supervisor Rick Martin Operations RO RO Mark Haren Operations RO LEAD Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 1 of 24 SIMULATOR EXERCISE GUIDE (SEG)

SITE: PRAIRIE ISLAND SEG # PI-ILT-NRC-1404S SEG TITLE: 2014 ILT NRC SIMULATOR EVALUATION #4 REV. # 0 PROGRAM: INITIAL LICENSE OPERATOR TRAINING #: FL-ILT COURSE: INITIAL LICENSE OPERATOR TRAINING #: FL-ILT TOTAL TIME: 2.0 HOUR Developed by: Shawn Sarrasin 1/25/2014 Instructor Date Reviewed by: Fredrick Collins 2/26/2014 Instructor Date (Simulator Scenario Development Checklist.)

Validated by: Shawn Sarrasin 4/22/2014 Validation Lead Instructor Date (Simulator Scenario Validation Checklist.)

Approved by:

Training Supervision Date Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 2 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Guide Requirements

1. During all plant operating conditions, the crew will demonstrate Goal of the ability to monitor and operate the plant within the limits of the Training: Operations Manuals and Technical Specifications.
2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
1. Alternate Containment Fan Coil Units and discharge dampers Learning per 1C19.2.

Objectives: 2. Diagnose and perform corrective actions for 1PT-468, Red Channel A Steam Generator Steam Pressure, failing high per 1C51.1.

3. Perform a load increase per 1C1.4.
4. Diagnose and respond to a Dropped Rod per 1C5 AOP4.
5. Diagnose and respond to a failure of the Main Turbine to automatically trip per 1E-0.
6. Diagnose and respond to a Station Blackout per 1ECA-0.0.
7. Diagnose and respond to the TD AFW Pump failing to automatically start per 1ECA-0.0.
1. Full Scope Simulator Training 2. NRC Evaluation Team Resources: 3. Booth Operator (Backup Communicator)
4. Primary Communicator Initiating Event with Core Damage Frequency:

Related PRA LOOP (1.5%)

Information:

Important Components:

11 TD AFW PMP Important Operator Actions with Task Number:

NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 3 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:

Before EOP Entry:

1. 1PT-468, Red Channel A Steam Generator Pressure Instrument, fails high.
2. Dropped Rod (Control Bank A Group 1 Rod B8).

After EOP Entry:

1. Reactor fails to automatically trip.
2. Main Turbine fails to automatically trip.
3. 11 TD AFW Pump fails to automatically start.

Abnormal Events:

1. SG Pressure Instrument Failure.
2. Dropped RCCA.

Major Transients:

1. Loss of All AC.

Critical Tasks:

1. E A: Manually trip the reactor from the control room before transition out of E-0.
2. E Q: Manually trip the main turbine before transition out of E-0.
3. ECA-0.0 - B: Establish and maintain 200 GPM AFW flow to the Steam Generators prior to Step 3 of ECA-0.0.
4. ECA-0.0 - H: Isolate RCP seal injection before a charging pump is started.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 4 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO OVERVIEW:

INITIAL CONDITIONS: EQUIPMENT OOS

  • 13 Charging Pump
  • Power: 50%
  • Temperature: 553°F
  • Pressure: 2235 psig
  • Xenon: Equilibrium
  • Rods: D @ 175
  • Generator: 265 MW SEQUENCE OF EVENTS:

Event 1: Alternate Containment Fan Coil Units and Discharge Dampers

  • 11 and 13 CFCUs are initially in fast speed and aligned to SUP/GAP.
  • 12 and 14 CFCUs are initially in slow speed and aligned to the DOME.
  • The crew will perform section 5.6.4.A of 1C19.2.
  • 11 and 13 CFCUs will then be in slow speed and aligned to DOME.
  • 12 and 14 CFCUs will then be in fast speed and aligned to the SUP/GAP.

Event 2: Red Channel A Steam Generator Pressure Instrument fails HIGH

  • FW Control System Trouble alarm will be received.
  • The crew will place A SG PORV in manual and close it.

Event 3: Unit 1 Load Increase from 50% to 60% Power

  • The crew briefed the load increase prior to taking the duty.
  • Shift Management will direct the crew to raise power to 60% when the 50%

chemistry hold is lifted.

  • The crew will increase load per 1C1.4.

Event 4: Control Bank A Group 1 Dropped Rod (B-8)

  • Control Bank A Group 1 Rod B-8 will indicate zero steps.
  • RCS Tavg will lower.
  • NI Power will lower.
  • The reactor will fail to automatically trip.
  • The crew will diagnose a dropped rod and manually trip the reactor per 1C5 AOP4.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 5 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Event 5: Main Turbine Fails to Automatically Trip

  • The Lead will manually trip the turbine from the Control Room.

Events 6 & 7: Loss of All AC

  • A loss of offsite power occurs.
  • A lockout will occur on Bus 15 and Bus 16.
  • The crew will transition to 1ECA-0.0, Loss of All Safeguards AC Power.
  • 11 TD AFW Pump will have failed to automatically start after the reactor trip.
  • The crew will manually start 11 TD AFW Pump from the Control Room.
  • Since both safeguards buses are locked out, the crew will go to step 8.
  • An out-plant operator will be directed to isolate RCP seals.
  • Safeguards loads will be placed in pullout.
  • Bus 15 and 16 will remain locked out for the remainder of the scenario.
  • The crew will initiate depressurization of both SGs.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 6 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Simulator Setup:

NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.

1. If available, reset the simulator to IC-264 and place in RUN.
2. If IC-264 is NOT available:
a. Reset to IC-8.
b. Place the simulator in RUN.
c. Place ALL pressurizer heaters to ON.
d. Insert remote FW123 to OPEN.
e. Start 12 Condensate Pump using CS-46411.
f. Start 11 FWP using CS-46418.
g. Start 12 HDT Pump per 1C28.4.
h. Raise HDT Pump speed to stabilize HDT level.
i. Wait until heater drains have stabilized.
j. Insert remote MS118 to RESET.
k. Ensure Tavg and Tref are matched.
l. Place CS-46294, 13 CHG PUMP, in PULLOUT.
m. Insert Malfunction VC04C.
3. Verify the ROD DEVIATION alarm is CLEARED as follows:
a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
b. Go to ERCS Screen RBU (Rod Bank Update).
c. Enter 175 as the new value for point 1U0052A, ROD POS BNK D.
d. Select Apply.
e. Verify Annunciator 47013-0507, COMPUTER ALARM / ROD DEVIATION /

SEQUENCING, has cleared.

4. Verify the Pen Recorder for RCS Tavg and Tref are set correctly as follows:
a. Log into the ERCS terminal with user OVRD and password DUTY (if needed).
b. Go to ERCS Screen PEN_TREND (Pen Trend Configuration).
c. Enter 550 as the new Min EU value for Pen 1U9001A (point 1T0499A).
d. Enter 560 as the new Max EU value for Pen 1U9001A (point 1T0499A).
e. Enter 550 as the new Min EU value for Pen 1U9002A (point 1T0496A).
f. Enter 560 as the new Max EU value for Pen 1U9002A (point 1T0496A).
5. If available, run schedule file PI-ILT-NRC-1404S.sch as follows:
a. Select open file in the Schedule application.
b. Locate schedule file.
c. Open schedule file by double clicking it.
d. Run the schedule file by pressing the Stopped button on the toolbar.
e. Verify the schedule file is running.
6. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
7. If available, run event file PI-ILT-NRC-1404S.evt as follows:
a. Select open file in the Event application.
b. Locate event file.
c. Open event file by double clicking it.
8. If event file is NOT available, then enter event codes as specified by the Simulator Event Summary.
9. If desired, start Scenario Based Testing Data Collection Program.
10. Complete the "Simulator Setup Checklist.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 7 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS

1. SIMULATOR PRE-BRIEF:
a. The Simulator Pre-Brief is conducted prior to the crew entering the simulator.
b. Review Unit 1 LPEO / PEO Turnover Log.
c. Perform a pre-job brief for the following activities:
1) Alternate CFCUs and Discharge Dampers per C19.2 section 5.6.4.A.

(a) This is being performed so thermographs can be taken of the 12 and 14 CFCU breakers.

(b) Current CFCU lineup:

(1) 11 and 13 CFCUs are running in FAST to the DOME.

(2) 12 and 14 CFCUs are running in SLOW to the SUP/GAP.

(c) Shift CFCUs such that:

(1) 11 and 13 CFCUs are running in SLOW to the SUP/GAP.

(2) 12 and 14 CFCUs are running in FAST to the DOME.

(d) A copy of C19.2 is provided.

(e) The Lead RO will perform this activity.

(f) This activity is to be performed after shift turnover is complete.

2) Raise power to 60%.

(a) There is currently a power hold at 51% for chemistry control.

(b) The Duty Chemist is performing samples and will inform the Shift Manager when it is ok to raise power to 60%.

(c) Once power is at 60%, another hold for chemistry will be in effect.

(d) A marked up copy of 1C1.4 Section 5.1 is provided (blank copy of the page for setting up turbine controls).

(e) There are NO fuel conditioning requirements and NO turbine ramp limits.

(f) Raise Reactor Power to 60%:

(1) RATE: 0.5%/minute.

(2) Rods in MANUAL.

(3) Turbine in AUTO in LOAD mode.

(g) A reactivity plan was developed by the off going RO for the power increase from current power to 60%.

(h) Verify the reactivity plan developed by the off going reactor operator.

(i) Nuclear Engineering was NOT available to provide a reactivity prediction.

2. COMPLETE TURNOVER:
a. Crew performs a walk down of the control boards.
b. Review PRA Printout.
c. Crew takes the duty.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 8 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 1 3. After the crew has assumed the duty, they will alternate 1C19.2, CONTAINMENT SYS VENTILATION UNIT 1 Containment Fan Coil Units and Discharge Dampers per

  • Shift the following fan coil units to SLOW by placing section 5.6.4.A of 1C19.2 so that: LEAD the control switch in OFF for 15 seconds, then
a. 11 and 13 CFCUs are running in SLOW to the placing the control switch in SLOW:

DOME. o CS-46018, 11 CNTMT FAN COIL UNIT

b. 12 and 14 CFCUs are running in FAST to SUP/GAP. o CS-46019, 13 CNTMT FAN COIL UNIT
  • Align the fan coil unit discharge dampers as desired:

o CS-46440, 11 FCU DISCH, to DOME.

o CS-46441, 12 FCU DISCH, to SUP.

o CS-46442, 13 FCU DISCH, to DOME.

o CS-46443, 14 FCU DISCH, to GAP.

  • Verify the white fan coil unit damper improper lights remain NOT LIT:

o ML-44002-0101, 11 CNTMT FCU DISCH DMPRS IMPROPER o ML-44002-0102, 12 CNTMT FCU DISCH DMPRS IMPROPER o ML-44002-0103, 13 CNTMT FCU DISCH DMPRS IMPROPER o ML-44002-0104, 14 CNTMT FCU DISCH DMPRS IMPROPER

  • Shift the following fan coil units to FAST by placing the control switch in OFF for at least one (1) second, then placing the control switch in FAST:

o CS-46020, 12 CNTMT FAN COIL UNIT o CS-46021, 14 CNTMT FAN COIL UNIT.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 9 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 2 4. When CFCUs and Discharge Dampers are alternated, C47011-0405, FW CONTROL SYSTEM TROUBLE and/or at the discretion of the lead evaluator, then enter:

HIGH.

  • Refer to 1C51, INSTRUMENT FAILURE GUIDE.
a. If contacted as I&C to trip bistables, inform the crew

two I&C Technicians will be available in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

  • Contact I&C and System Engineer to determine cause
b. If contacted as the Operations Management, of failure.

acknowledge the report of the failure, and agree to make other notifications to the NRC, Duty Station 1C51.1, 11 Steam Generator Pressure 1P-468 - High Manager, etc. as asked. RO

c. If contacted as the FIN Team Supervisor, inform the
  • Take manual control of 11 SG PORV and ensure crew that you will write a work order and assign an valve is CLOSED.

I&C Supervisor to investigate.

  • Verify SG level control operating properly in automatic.

SS

  • Enter T.S. LCO 3.3.2 Condition A - Reference Table
5. Plant Response: 3.3.2-1 immediately.
a. 1PT-468, A SG Pressure, rises until pegged high.
b. A SG PORV will automatically open. channel in trip within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in Mode 3 in 12
c. Annunciator 47011-0405, FW CONTROL SYSTEM hours and Mode 4 in 18 hrs.

TROUBLE, will be received.

  • Call I&C to trip bistables.
d. SG level will maintain program level in auto.
  • Check if TPM power is affected by the steam pressure channel failure.
  • If TPM power is affected, then change TPM Power Source input from Calorimetric to NIS and notify the computer group.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 10 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 3 6. When the plant is stable and/or at the discretion of the 1C1.4, UNIT 1 POWER OPERATION lead evaluator, then:

  • Place CS-46280, ROD BANK SELECTOR, in RO/SS
a. As the Shift Manager, inform the Control Room the MANUAL.

Unit 1 50% Power Hold for chemistry is lifted.

  • Using the On Line Control screen:

Another Power Hold for chemistry will be in effect o Select LOAD.

when Unit 1 power reaches 60%. o Select 0.5% demand rate.

b. If contacted as the duty chemist, acknowledge Unit 1
  • Verify the VPL control is not Red.

power will be raised from 50% to 60%.

  • Raise the VPL to 101% using the Valve Limiter pop-up screen.
  • Set the Target setting to the desired Load using On Line Control screen Target increase/decrease NOTE controls.

It is NOT intended to wait for the plant to reach 60%

  • Initiate an alternate dilution of the RCS per 1C12.5.

power prior to proceeding to the next event. Once the

  • When Tave shows an increase, then select the Go Lead Evaluator is satisfied with the reactivity control using the On Line Control screen.

manipulation, proceed to Event 4.

  • Adjust the alternate dilution rate or perform alternate dilutions per 1C12.5 to maintain Tave and Tref with the desired +/-1.5°F band.

1C12.5, UNIT 1 BORON CONCENTRATION CONTROL RO/SS

  • Verify the RMU integrator is reset.
  • Set 1YIC-111, RX MU WTR TO BLENDER BATCH INTEGRATOR, to quantity desired.
  • Place CS-46300, MAKE-UP MODE SELECTOR, to ALT DIL.
  • Place CS-46454, BA BLENDER TO VCT INLT CV-31201, to CLOSE.
  • If desired, then adjust 1HC-111, RX MU WTR TO BLENDER FLOW CONT, set point to desired flow rate or place in MANUAL adjusted for desired flow rate.
  • Momentarily place CS-46457, BORIC ACID MAKE-UP CONTROL, to START, to initiate dilution.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 11 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 3

  • When the desired quantity of makeup has been (cont) added, then verify automatic makeup stopped as indicated by CS-46457, BORIC ACID MAKE-UP CONTROL, green light LIT.
  • If additional alternate dilution is desired, then return to step 2.
  • Verify CS-46454, BA BLENDER TO VCT INLT CV-31201, is selected to AUTO.
  • Verify 1HC-111, RX MU WTR TO BLENDER FLOW CONT, is in AUTO set to 45%.
  • Place CS-46300, MAKE-UP MODE SELECTOR, to AUTO.
  • Momentarily place CS-46457, BORIC ACID MAKE-UP CONTROL, to START.
  • Reset the RMU integrator.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 12 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 4 7. When the lead evaluator is satisfied with the reactivity 1C5 AOP4, DROPPED RCCA

& manipulation, enter:

  • Confirm Rod Drop using diverse indications:

EVENT 5 Trigger 4, Dropped Rod B CBA GR1. RO

  • Rod Position Indication and RCS Tavg Changes
a. Verify: OR AUTO Trigger 5, Auto Turbine Trip Failure, is
  • Rod Position Indication and NIS Changes.

entered when the reactor is manually tripped.

  • Manually trip the reactor.
b. Upon hearing the announcement of Reactor Trip, or

when called as the Turbine Building Operator to isolate the Unit 1 MSRs per Attachment J, then open C47017-0404, FLUX RATE REACTOR TRIP and run schedule file E-0_Att-J.sch located in

X:\\Trex_PI\Lightning\Schedule\EOPs. When the isolation is complete, inform the crew the MSRs are isolated. 1E-0, REACTOR TRIP OR SAFETY INJECTION

  • Determine the reactor did NOT automatically trip.

RO/

8. Plant Response:
  • Manually trip the reactor.

LEAD

a. CB-A Group1 Rod B-8 rod bottom indication.
b. NIS power and RCS Tavg lowering.
  • Verify both safeguards buses are energized.
c. Flux Rate Reactor Trip and Rod at Bottom Alarms.
  • Determine SI is NOT actuated.
d. The reactor fails to automatically trip.
e. The reactor is capable of a manual trip.

CRITICAL TASKS

  • Manually trip the reactor from the control room before transition out of E-0.
  • Manually trip the main turbine before transition out of E-0.

EMERGENCY PLAN CLASSIFICATION ALERT - SA2.1 due to the reactor failing to automatically trip during the high flux rate condition and the crew successfully manually tripping the reactor.

However, this classification may NOT be used due to a higher classification being met in the next event.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 13 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENTs 9. Ten (10) seconds after the Main Turbine is manually SS 1ECA-0.0, LOSS OF ALL SAFEGUARDS AC POWER 6&7 tripped, verify:

RO AUTO Trigger 6, LOSS OF ALL AC, is entered.

  • Check Letdown isolation valves closed.
a. Approximately 15 seconds after the Loss of All AC, o CV-31255 announce the following: o CV-31226
1) Attention all plant personnel, Unit 2 Reactor Trip. o CV-31330 Attention all plant personnel, Unit 2 Reactor Trip.
  • Recognize AFW flow is below 200 GPM.
b. If contacted as an out-plant operator to establish
  • Manually start 11 TD AFW Pump.

communications with the CR to throttle AFW flow,

  • Announce Unit 1 Reactor Trip then wait 2 minutes and report you are in the AFW
  • Notify Shift Manager and SEC.

Pump room standing by to throttle AFW flow.

  • Check cooling water header pressures are both Throttle AFW flow as necessary using the following greater than 25 PSIG.

remotes: LEAD

  • Determine neither safeguards bus is available for
1) FW134 - 11 AFW Pump to 11 SG (MV-32238) sequencer loading due to both being LOCKED OUT.
2) FW135 - 11 AFW Pump to 12 SG (MV-32239)
  • Proceed to step 8.
c. If directed to investigate Bus 15 and 16, after 2 minutes, report Bus 15 and Bus 16 have 50G current
  • Dispatch personnel to locally close valves to isolate relays showing. As an Electrical Maintenance RCP seals.

Supervisor, report it will take at least 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to get

  • Place the following equipment switches in PULLOUT.

one safeguards bus restored. o MD AFW Pump.

d. If contacted as an out-plant operator to isolate RCP o Groups A & B PRZR heaters (Off position).

seals, then enter: o RHR pumps.

Trigger 16, Isolate RCP Seals. o SI pumps.

1) When Trigger 16 is complete, report to the CR o CS pumps.

that Step 8 of 1ECA-0.0 is complete. o CFCUs (Off position).

e. If contacted as an out-plant operator to perform o CC pumps.

Attachment H, then acknowledge order. o CR Chillers and Fans.

f. When the crew reaches step 18 of 1ECA-0.0, inform o 121 and 122 Air Compressors.

the crew that Unit 2 operators will perform the

  • Place safeguards bus voltage restoration switches to following: MANUAL:
1) Initiate monitoring of DC supply using ERCS o Bus 15
2) Dispatch personnel to open Foxboro instrument o Bus 16 rack doors
  • Verify Bus 15 and Bus 16 source breakers are open.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 14 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENTs 3) Transfer MCC and Buses to Unit 2 LEAD

  • Determine both Safeguards buses are LOCKED OUT.

6&7 4) Establish Battery Room Cooling.

  • Proceed to step 13.

(cont)

  • Close Condenser makeup isolation valve CV-31121.
10. Plant Response:
  • Check condenser makeup flow is zero.
a. Loss of lighting in the Control Room.
b. Bus 15 and 16 voltages read zero.
  • Check MS Bypasses, MFW, MFW bypasses, and SGB
c. Bus 15 and 16 Lockout Annunciators. valves are closed.
d. 11 TD AFW Pump fails to auto start. RO/
  • Check if SGs are NOT faulted.

LEAD

  • Check if SGs are NOT ruptured.

CRITICAL TASKS

  • Check SG Narrow Range levels greater than 5%.
  • Establish and maintain 200 GPM AFW flow to the

between 5% and 50%.

  • Isolate RCP seal injection before a charging pump is
  • Dispatch operator to perform Attachment H, DC Bus started.

Load Shed.

EMERGENCY PLAN CLASSIFICATION

  • Initiate monitoring of DC supply using ERCS.

GENERAL EMERGENCY -

  • Dispatch personnel to open Foxboro instrument rack SG1.1 due to loss of offsite power to both safeguards doors.

buses 15 and 16;

  • Power transferrable MCCs and buses from Unit 2.

AND SS

  • Contact security to provide access control and block Failure of both Diesel Generators D1 and D2 to supply open all Battery Room doors, including fire doors power to safeguards buses 15 and 16; between Battery Rooms.

AND

  • Arrange for fire watches at the Battery Rooms.

Restoration of Safeguards Bus 15 or 16 within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is

  • Check CST level is greater than 10,000 Gallons.

not likely.

  • Depressurize Intact SGs to 300 PSIG.
  • Check SG Narrow Range level greater than 5%.
  • Manually dump steam using SG PORVs to maintain cooldown rate in RCS cold legs - LESS THAN 100°F.
11. Once the crew has initiated a SG depressurization to 300 psig and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 15 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SIMULATOR INPUT

SUMMARY

SIMULATOR EVENT

SUMMARY

Event ID Code Description 5 ZRPG439(1)==1 REACTOR TRIP 6 HWZTCT6427(1)==1 TURBINE TRIP Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 16 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario

_____ Simulator Status:

___ 1. "Training Load" ___ 2. Step counters "ON"

___ 3. Alarm sound "ON" ___ 4. Steps 1 - 9 on page 6 complete

___ 5. Speed: REAL ___ 6. IC-264 or IC-8 running

_____ Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructors booth.

_____ Verify Schedule File/Summary matches Simulator Input Summary page in the SEG.

_____ Verify Event File has been entered per Simulator Event Summary page in the SEG.

_____ Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.

_____ Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset.

_____ BOC I sheet displayed on C panel.

_____ BOC Reactivity Briefing sheet available at Reactor Operator Desk.

_____ Turnover sheet/PRA sheet available.

_____ If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.

_____ Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).

_____ Electronic PINGP 577 forms closed on LAN connected PCs.

_____ Board-mounted EAL Tables are cleaned.

_____ EOOS running on PC and updated as follows to reflect equipment OOS:

___ 1. 13 Charging Pump

_____ Update Control Board Placards:

___ 1. NRC Current Authentication Code call date updated to current date.

___ 2. High Flux At Shutdown Alarm Setpoint placards: 5900 cps.

___ 3. Feedwater regulating valve position placard set to current values.

___ 4. Recommended SG Blowdown flow set to current values.

___ 5. RCS boron on the CVCS panel placard: 1465 ppm.

___ 6. Turbine reference/setter values on the CVCS panel set to current (Target/Demand on-line positions).

___ 7. Shift Reactivity Guidance placard: BA: 4.8 gallons, RMU: 67 gallons.

Dilutions @ 10 gal RMU, 1-2 times per shift.

_____ Magnetic placards in place:

___ 1. 11 BA TANK Lined Up For Service

___ 2. 11 BA PUMP Lined Up to 11 BA Tank

___ 3. 12 BA PUMP Lined Up to 11 BA Tank

___ 4. CC to SFP MV-32117 In Service

___ 5. Blowdown 46470 SGB To CDSR

___ 6. HU Flag above 12 RHR HX CC inlet MV-32094 for 1C14 Limitation

___ 7. H 2 IN VCT SPACE at VCT Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 17 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0

_____ Pink Status Control Tags in place:

___ 1. CS-46540, 22 CC WTR PUMP

___ 2. CS-46572, CC TO SFP MV-32117

_____ Yellow Caution Tags in place:

___ 1. CS-46064, CC TO SFP MV-32115, in CLOSED

___ 2. CS-46294, 13 CHG PUMP, in PULLOUT

_____ ERCS driven recorders are on-scale (RCS temperature scaled 550º F to 560º F).

_____ ERCS alarm screen operating and alarms reset.

_____ All ERCS terminals operating and set as follows:

CONF VARS R02 Alarm Summary Page CONE1 Group OP31_U1 R03 AFD CONC SAS (XS11) R04 TPM CONG1 Group QP CCDATA R05 QP LOADFOLL ERCS-R01 Group RADMON_U1 R06 Alarm Summary Page

_____ ERCS single point displays: CONB 1T0499A 1U1613A CONE2 1Q0340A 1V4501A

_____ ERCS TPM set (Calorimetric - Auto Scaling - LEFM).

_____ Verify that copy machine and printers are loaded with paper.

_____ Pens/Paper/Markers available on the simulator.

st

_____ Verify 121 IA Compressor is in PREFERRED and 122 IA Compressor is in 1 STANDBY, and nd 123 IA Compressor is in 2 STANDBY.

_____ Verify R11/R12 are lined up correctly (at the R11/R12 local panel):

___ 1. Sample pump is running.

___ 2. Alarms are reset.

___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.

___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.

_____ Set Turbine Control HMI Displays as follows:

___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview.

___ 2. U1 Turb Aux Cont (48088) to Turb Overview.

___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control.

_____ DEHC VPL set ~ 0.1 to 0.2 above current valve position (not on limiter).

_____ DEHC alarms cleared.

_____ N51 & N52 Display Sheets for 50% power are in place as necessary.

_____ Headsets turned on as necessary.

_____ Procedure checklist completed. See following page.

_____ Peer Check performed for simulator setup.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 18 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:

Before After 1C1.4, UNIT 1 POWER OPERATION 1C12.5, UNIT 1 BORON CONCENTRATION CONTROL 1C19.2, CONTAINMENT SYSTEM VENTILATION UNIT 1 1C28.1 AOP3, AUXILIARY FEEDWATER SYSTEM OPERATION WHEN AC POWER IS LOST 1C5 AOP4, DROPPED RCCA 1C51.1, 11 Steam Generator Pressure 1P-468 - High 1E-0, REACTOR TRIP OR SAFETY INJECTION 1ECA-0.0, LOSS OF ALL SAFEGUARDS AC POWER C47011-0405, FW CONTROL SYSTEM TROUBLE C47013-0407, ROD AT BOTTOM C47013-0507, COMPUTER ALARM ROD DEVIATION/SEQUENCING C47017-0404, FLUX RATE REACTOR TRIP C47019-0301, 11 CONTAINMENT SPRAY PUMP LOCAL CONTROL AUTO START BLOCKED C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES REACTIVITY BRIEFING BINDER - BOC SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.3.2 T.S. LCO 3.6.5 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 19 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Post-Scenario Checklist

_____ LAN connected computers are cleared of information added during the scenario.

_____ Computer generated PINGP 577 cleared.

_____ Procedure checklist completed. See previous page.

_____ Remove Pink Status Control Tags from the following equipment:

___ 1. NONE

_____ Magnetic placards removed:

___ 1. NONE

_____ Remove Yellow Caution Tags from the following equipment:

___ 1. CS-46293, 12 CHG PUMP

_____ Erase marker on RCS temperature ERCS driven recorder.

_____ Board-mounted EAL Table is cleaned.

_____ All books, note pads, and calculators put away.

End Of Day Checklist

_____ Signs/placards removed and put away unless normal simulator configuration.

_____ Floor PCs logged off if simulator will not be used again that day.

_____ Instructor station returned to normal with all books, paper, and etc. put away.

_____ Headsets turned off and put away if simulator will not be used again that day.

_____ Simulator reset to IC-10 unless another IC will be used for further training.

_____ Simulator placed in DORT if simulator will not be used again that day.

_____ Recorder power "OFF" if simulator will not be used again that day.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 20 of 24 RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE: DAY/NIGHT SHIFT: Day CAT 1 VENT OPENINGS: 0 ft2 SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS NONE PROTECTED EQUIPMENT 22 CC PUMP 121 SFP HX RAD MONITORS OOS ANNUNCIATORS OOS NONE NONE OUTSTANDING SPS FIRE DET / PROT EQP IMPAIRMENTS NONE NONE OTHER EQUIPMENT OOS / STATUS

  • 12 Charging Pump is Out of Service.
  • Two 40 GPM Letdown Orifices are in service.
  • Pressurizer Heaters are ON.
  • 11 and 12 Condensate Pumps are running.
  • 11 and 12 Main Feed Pumps are running. 11 MFP recirc valve is still open; waiting until 70 percent to close per step 5.5.12 and 5.5.13 of 1C28.2.
  • Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System.

MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE

  • Unit 1 was returned on-line two days ago.
  • A 51% hold is in effect due to chemistry.

OPERATIONAL PLANS FOR COMING SHIFT

  • Per section 5.6.4.A of 1C19.2, alternate CFCUs and discharge dampers to the following in preparation of thermography on 12 and 14 CFCU breakers:

o 11 and 13 CFCUs running in SLOW to the DOME.

o 12 and 14 CFCUs running in FAST to SUP/GAP.

  • Perform a load increase from 50% to 60% when Chemistry releases the hold.
  • Dilute 10 gallons 1-2 times per shift for temperature control.

NEW PROCEDURES / INSTRUCTIONS Review altered scale on Tavg ERCS Recorder.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 21 of 24 Reactivity Plan Load increase from 50% to 60%.

Prior to entering the simulator:

  • Verify the reactivity plan completed by the off going reactor operator.
  • Complete a Pre-Job Brief of 1C1.4 Section 5.1.

Current conditions are:

  • 11 and 12 MFPs are running.
  • 11 and 12 Condensate Pumps are running.
  • Power level: 50% (263 MW)
  • Xenon: Equilibrium
  • Boron Concentration: 1465 ppm
  • Core Exposure: 1000 MWD/MTU Target: Turbine Load: 311 MW (60%)

Rate: 0.50% /minute Control Mode: LOAD control with Rod Control in Manual Boration/Dilution: 267 gallon dilution (batch)

Final Control Rod Position: Bank D @ 178 steps Reactivity Prediction:

Change in Power Defect: -100 pcm (Figure C1-7A)

Differential Boron Worth: -6.2 pcm/ppm (Figure C1-11A)

Differential Rod Worth: 3.8 pcm/step (Figure C1-4A)

Calculated RCS PPM change: -13 ppm (80 pcm ÷ -6.2 pcm/ppm)

Calculated Rod Step change: 5 steps (20 pcm ÷ 3.8 pcm/step)

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 22 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.

1. The scenario contains objectives for the desired tasks and relevant human Yes No performance tools. X
2. The scenario identifies key parameter response, expected alarms, and Yes No automatic actions associated with the induced perturbations. X
3. The scenario content adequately addresses the desired tasks, through Yes No simulator performance, instructor-led training freezes, or both. X
4. Plant PRA initiating events, important equipment, and important tasks are Yes No identified. X
5. Turnover information includes a Daily At Power or Shutdown Safety Risk Yes No Assessment. X
6. The scenario contains procedurally driven success paths. Procedural Yes No discrepancies are identified and corrected before training is given. X
7. The scenario guide includes responses for all anticipated communications to Yes No simulated personnel outside the Control Room, based on procedural guidance X and standard operating practices. Include estimated completion times and/or notes for use of time compression.
8. The scenario includes related industry experience. SOER, SER and similar Yes No OE recommendations are clearly identified and fully addressed.* X
9. The scenario guide incorporates verification of Operator Fundamental Yes No application.* X
10. Training elements and specific human performance elements are addressed Yes No in the scenario critique guide to be used by the critique facilitator. The critique X guide includes standards for expected performance.*
11. For evaluations, it has been verified that without operator action the critical Yes No tasks will be failed. X Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
  • For evaluations these items may be marked NO without justification.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 23 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.

1. The desired initial conditions agreed with the reference plant with Yes No respect to reactor status, plant configuration, and system operation. X
2. The simulator operated in real time during conduct of validation. Yes No X
3. The simulator demonstrated expected plant response to operator input Yes No and to normal, transient, and accident conditions. X
4. The simulator permitted use of the reference plants procedures. The Yes No scenario was completed without procedural exceptions, simulator X performance exceptions, or deviation from the scenario sequence.
5. The simulator did not fail to cause or unexpectedly cause any first Yes No principle alarm or primary automatic action. X
6. Observable changes in parameters relevant to the scenario Yes No corresponded in trend and direction to reference plants expected X response.
7. All malfunctions and other instructor interface items were functional and Yes No demonstrated the expected reference plants response to the initiating X cause.
8. All malfunctions and other instructor interface items were initiated in the Yes No same sequence described within the simulator scenario. X
9. The scenario satisfies the learning or examination objectives without Yes No any significant simulator performance issues, or deviations from the X approved scenario sequence.
10. Simulator fidelity has been demonstrated to be adequate for this Yes No scenario. X Discrepancies noted (Check none or list items found) None SMAR = Simulator Action Request SWO = Simulator Work Order SWO: B4D-040 SMAR: SMAR: SMAR:

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 24 of 24 PI-ILT-NRC-1404S, 2014 ILT NRC SIMULATOR EVALUATION #4, REV. 0 Comments: The simulator is modeled to turn on the Low Press annunciator if the AFWP Aux Lube Oil Pump loses power. However, per B28B for both AFW Pumps, A shaft-driven lube oil pump provides lubrication for the bearings during AFW pump operation. A motor-driven auxiliary oil pump is used to ensure a sufficient oil film for AFW pump starting is maintained during idle periods. The simulator modeling should be revised to have sufficient oil pressure, regardless of the power availability to the Aux LO Pump (i.e., have no alarm). Annunciators 47010-0505 and 47010-0507 were overridden to OFF for this scenario as a compensatory action until the simulator model is updated.

Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.

Validation Personnel Name Job Title / Qualification Validation Position Shawn Sarrasin Operations Instructor Lead Evaluator Nic Abney Operations Instructor Booth Driver Jeff Human Operations SRO Shift Supervisor Rick Martin Operations RO RO Mark Haren Operations RO LEAD Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 1 of 27 SIMULATOR EXERCISE GUIDE (SEG)

SITE: PRAIRIE ISLAND SEG # PI-ILT-NRC-1405S SEG TITLE: 2014 ILT NRC SIMULATOR EVALUATION #5 REV. # 0 PROGRAM: INITIAL LICENSE OPERATOR TRAINING #: FL-ILT COURSE: INITIAL LICENSE OPERATOR TRAINING #: FL-ILT TOTAL TIME: 2.0 HOUR Developed by: Shawn Sarrasin 1/26/2014 Instructor Date Reviewed by: Fredrick Collins 2/27/2014 Instructor Date (Simulator Scenario Development Checklist.)

Validated by: Shawn Sarrasin 4/21/2014 Validation Lead Instructor Date (Simulator Scenario Validation Checklist.)

Approved by:

Training Supervision Date Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 2 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Guide Requirements

1. During all plant operating conditions, the crew will demonstrate Goal of the ability to monitor and operate the plant within the limits of the Training: Operations Manuals and Technical Specifications.
2. When presented with various scenario events, the crew will demonstrate the ability to respond to the events using appropriate operating and administrative procedures to return the plant to stable conditions.
1. Transfer power on Bus 15 from 1RY to CT11 per 1C19.2.

Learning 2. Diagnose and perform corrective actions for an Individual Rod Objectives: Position Indicator failing low per 1C5 AOP4 and 1C5 AOP5.

3. Diagnose and perform corrective actions for a Red Channel RCS Thot Instrument failing high per 1C51.1.
4. Respond to a Loss of Bus Duct Cooling per 1C22.5 AOP1 and perform a rapid power reduction per 1C1.4 AOP1.
5. Diagnose and respond to a 12 Steam Generator Tube Rupture per 1E-0 and 1E-3.
6. Diagnose and respond to a failure of the SI to Chilled Water signal to actuate per 1E-0 Attachment L.
1. Full Scope Simulator Training 2. NRC Evaluation Team Resources: 3. Booth Operator (Backup Communicator)
4. Primary Communicator Initiating Event with Core Damage Frequency:

Related PRA SGTR (1.8%)

Information:

Important Components:

NONE Important Operator Actions with Task Number:

Operator fails to cooldown and depress RCS for SGTR before SG overfill (1.46%)

CRO 301 004 06 01 000 - Steam Generator Tube Rupture Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 3 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 QUANTITATIVE ATTRIBUTES Malfunctions:

Before EOP Entry:

1. Rod E-3 (SBA GR1) Position Indicator fails low.
2. 1TE-401, Red Channel RCS Thot Transmitter, fails high.
3. 11 and 12 Generator Bus Duct Cooler Blowers fail.

After EOP Entry:

1. Failure of SI to Chilled Water Signal to Actuate.
2. Both pressurizer spray valves fail CLOSED.

Abnormal Events:

1. RPI Failure.
2. RCS Thot Instrument Failure.
3. Loss of Bus Duct Cooling.
4. Rapid Power Reduction.

Major Transients:

1. 12 Steam Generator Tube Rupture.

Critical Tasks:

1. E A: Isolate feedwater flow into and steam flow from the ruptured Steam Generator before a transition to ECA-3.1 occurs.
2. E B: Establish/maintain an RCS temperature so that transition from E-3 does not occur because of the inability to maintain required subcooling or such that an extreme or severe challenge to the Subcriticality and/or the Integrity CSF occurs.
3. E C: Depressurize RCS to meet SI termination criteria prior to overfilling the ruptured Steam Generator.
4. E D: Terminate SI prior to overfilling the ruptured Steam Generator.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 4 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO OVERVIEW:

INITIAL CONDITIONS: EQUIPMENT OOS

  • 1PT-485, Turbine First Stage Pressure, is failed low.
  • Power: 100%
  • 11 Safety Injection Pump
  • Temperature: 560°F
  • Pressure: 2235 psig
  • Xenon: Equilibrium
  • Rods: D @ 218
  • Generator: 581 MW SEQUENCE OF EVENTS:

Event 1: Transfer Power on Bus 15 from CT11 to 1RY

  • Bus 15 is initially receiving power from CT11.
  • A designated operator is stationed to monitor Bus Phase Currents.
  • The crew will transfer Bus 15 to 1RY transformer per 1C20.5.

Event 2: Shutdown Bank Group 1 Rod E-3 Position Indication fails LOW

  • Rod E-3 rod bottom light will turn on.
  • Rod E-3 position indication will indicate 0.
  • RCS Tavg and NI Power will remain stable.
  • The crew will enter 1C5 AOP4 and 1C5 AOP5.

Event 3: Red Channel RCS Thot Instrument Fails HIGH

  • Rods will NOT step in because rods are still in manual due to 1st Stage Pressure Instrument failed low.
  • Pressurizer level control will be controlled manually.
  • Red Channel Tavg will be defeated.
  • The crew will restore pressurizer level control to automatic.

Events 4 & 5: Loss of Bus Duct Cooling and Rapid Power Reduction

  • 11 Bus Duct Cooler Blower will trip offline.
  • 12 Bus Duct Cooler Blower will fail to start.
  • Bus Duct temperature will rise above 92°C.
  • The crew will respond per 1C22.5 AOP1.
  • The crew will perform a Rapid Power Reduction per 1C1.4 AOP1.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 5 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Events 6 & 7: 12 Steam Generator Tube Rupture

  • RCS pressure will slowly lower.
  • Pressurizer level will slowly lower.
  • The crew will:

o Trip the reactor and initiate Safety Injection per 1E-0.

o Isolate 12 Steam Generator per 1E-3.

o Manually align Safeguards Chilled Water components per 1E-0, Attachment L.

o Cooldown the RCS per 1E-3.

o Depressurize the RCS to meet SI termination per 1E-3.

o Terminate SI.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 6 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Simulator Setup:

NOTE: The time between simulator reset and placing simulator in RUN should be minimized to reduce the difference between the ERCS time and actual time.

1. If available, reset the simulator to IC-265 and place in RUN.
2. If IC-265 is NOT available:
a. Reset to IC-10.
b. Place the simulator in RUN.
c. Place CS-46178, 11 SI PUMP, in PULLOUT.
d. Place CS-46280, ROD BANK SELECTOR, in MANUAL.
e. Place CS-46338, STEAM DUMP MODE, in STM PRESS.
f. Insert System Override RX226 to 0 (1st Stage Pressure Fails Low).
g. Insert Remote RP181 (B/S PC-485A) to TRIP.
h. Transfer Bus 15 power to CT11 as follows:
i. Place CS-46909, BKR 15-7 MAN/AUTO, to MANUAL.

ii. Place CS-46951, BKR 15-3 MAN/AUTO, to MANUAL.

iii. Place CS-46906, BUS 15 SYNCH SEL SW, to CT11.

iv. Close BKR 15-7 using CS-46955.

v. Trip BKR 15-3 using CS-46953.

vi. Place CS-46909, BKR 15-7 MAN/AUTO, to AUTO.

vii. Place CS-46951, BKR 15-3 MAN/AUTO, to AUTO.

viii. Place CS-46906, BUS 15 SYNCH SEL SW, to OFF.

3. If available, run schedule file PI-ILT-NRC-1405S.sch as follows:
a. Select open file in the Schedule application.
b. Locate schedule file.
c. Open schedule file by double clicking it.
d. Run the schedule file by pressing the Stopped button on the toolbar.
e. Verify the schedule file is running.
4. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
5. If desired, start Scenario Based Testing Data Collection Program.
6. Complete the "Simulator Setup Checklist.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 7 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS

1. SIMULATOR PRE-BRIEF:
a. The Simulator Pre-Brief is conducted prior to the crew entering the simulator.
b. Review Unit 1 LPEO / PEO Turnover Log.
c. Perform a pre-job brief for the following activity:
1) Transfer power on Bus 15 from CT11 to 1RY per section 5.16 of 1C20.5.

(a) Maintenance on Bus 15 1RY Source Breaker is complete and has been returned to service.

(b) A designated operator is stationed at the G-Panel to monitor Bus Phase Currents and perform actions of Bus 15 Sequencer Channel Alert and Bus 16 Sequencer Channel Alert Alarm Response Procedures.

(c) The designated operator is NOT one of the examinees.

(d) The Lead RO will conduct the activity to transfer power on Bus 15 from CT11 to 1RY.

(e) This activity is to be performed after shift turnover is complete.

(f) After Bus 15 is transferred to 1RY, then secure the designated operator at the G-Panel.

2. COMPLETE TURNOVER:
a. Crew performs a walk down of the control boards.
b. Review PRA Printout.
c. Crew takes the duty.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 8 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 1 3. After the crew has assumed the duty, they will transfer 1C20.5, UNIT 1 - 4.16KV SYSTEM power on Bus 15 from 1RY to CT11 per section 5.16 of LEAD

  • Place CS-46951, BKR 15-3 MAN/AUTO CLOSURE 1C20.5. SEL SW, in MANUAL.
a. If contacted as the out-plant operator to check Bus
  • Place CS-46906, BUS 15 SYNCHROSCOPE SEL 15 Room clear, then wait two minutes and report SW, in 1RY.

back that Bus 15 Room is clear of personnel.

  • Check 115 - 130 volts on Bus Incoming volt meter.
b. If contacted as the out-plant operator to check
  • Check 115 - 130 volts on Bus Running volt meter.

closing springs on BKR 15-3, then wait two minutes

  • Check the difference between incoming and running is and report back the closing springs are charged on less than 8 volts.

BKR 15-3.

  • Check Synchroscope is less than or approximately 20° from the twelve oclock position.
  • Check the two white synchronizing lights are NOT LIT.
  • Place CS-46953, BKR 15-3 BUS 15 SOURCE FROM 1RY XFMR, in CLOSE.
  • Place CS46955, BKR 15-7 BUS 15 SOURCE FROM BUS CT11, in TRIP.
  • Check Bus 15 voltage is approximately 4.16kv.
  • Check 44021 Bus 15 light LIT.
  • Place CS-46906, BUS 15 SYNCHROSCOPE SEL SW, in OFF.
  • Place CS-46951, BKR 15-3 MAN/AUTO CLOSURE SEL SW, in AUTO.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 9 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 2 4. At the discretion of the lead evaluator, enter: 1C5 AOP4, DROPPED RCCA Trigger 2, Rod E3 IRPI Failure.

  • Confirm rod drop using diverse indications:

RO

a. If contacted as the Operations Management, o Rod Position Indication and RCS Tavg changes acknowledge the report of the failure, and agree to OR make other notifications to the NRC, Duty Station o Rod Position Indication and NIS Changes Manager, etc. as asked.
  • Determine a Rod Drop did NOT occur.
b. If contacted as the FIN Team Supervisor, inform the
  • Go to 1C5 AOP5.

crew that you will write a work order and assign an I&C Supervisor to investigate.

1C5 AOP5, MISALIGNED ROD, STUCK ROD, AND/OR

c. If contacted as Nuclear Engineer, acknowledge order RPI FAILURE OR DRIFT to perform applicable steps of SP 1319.

SS

  • Determine symptoms are indicative of a failed RPI.
5. Plant Response:
a. Rod E3 rod bottom light
  • Initiate a work order.
b. Rod E3 rod position at 0 steps
c. NO change in NIS. o Verify position of rod once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
d. NO change in RCS Tavg.
e. The following annunciators will come in:
1) 47013-0407, ROD AT BOTTOM.
2) 47013-0507, COMPUTER ALARM ROD DEVIATION/SEQUENCING.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 10 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 3 6. After the crew has responded to the IRPI failure, and/or C47012-0104, 0304, 0404, 0504, 0507, & 0604, at the discretion of the lead evaluator, then enter: PANEL C ALARM RESPONSE PROCEDURES Trigger 3, 1T-401, Red Channel RCS Thot, fails HIGH. RO

  • Check RCS Tavg and deviations.
a. If contacted as I&C to trip bistables, inform the crew
  • Check RCS T and deviations.

two I&C Technicians will be available in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

  • Verify Rod Control is in MANUAL.
b. If contacted as the Operations Management,
  • Check all pressurizer level channels.

acknowledge the report of the failure, and agree to

  • Shift charging pump control to MANUAL and adjust make other notifications to the NRC, Duty Station speed as necessary.

Manager, etc. as asked.

  • Verify steam dumps are NOT open.
c. If contacted as the FIN Team Supervisor, inform the
  • Refer to 1C51, INSTRUMENT FAILURE GUIDE.

crew that you will write a work order and assign an

  • Verify steam flow/feed flow balance.

I&C Supervisor to investigate.

7. Plant Response: 1C51.1, Tavg Loop 1B 1T-401 - High
a. Red Channel RCS Tavg pegs high. RO
  • Determine Rod Control is already in manual.
b. Red Channel T pegs high.
  • Place charging pump speed control in MANUAL AND
c. 11 Charging Pump speed will rise. maintain pressurizer level.
d. Pressurizer level will slowly rise.
  • Select Red channel on the Tavg defeat switch and pull
e. The following annunciators will come in: out.
1) 47012-0104, RCS HI TAVG.
  • Return charging pump speed control to AUTO.
2) 47012-0304, RCS TAVG DEVIATION.
  • Rod Control and Steam Dump Control should NOT be
3) 47012-0404, OVERPOWER T CH ALERT. placed in AUTO due to the 1st Stage Pressure
4) 47012-0504, OVERTEMP T CH ALERT. Instrument failure.
5) 47012-0507, PRZR LVL DEVIATION. SS
  • Enter T.S. LCO 3.3.1 Condition A - Ref Table 3.3.1-1.
6) 47012-0604, RCS DT DEVIATION.
7) 47013-0105, OPT ROD STOP TURBINE channel in trip within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in Mode 3 in 12 hr.

RUNBACK CHANNEL ALERT.

  • Enter T.S. LCO 3.3.2 Condition A - Ref Table 3.3.2-1.
8) 47013-0205, OTT ROD STOP TURBINE
  • Enter T.S. LCO 3.3.2 Condition D - Place 1T-401 RUNBACK CHANNEL ALERT. channel in trip within 6 hrs or be in Mode 3 in 12 hrs AND in Mode 5 in 18 hrs.
  • Enter TLCO 3.3.3 Condition A - Place channel in trip.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 11 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 4 8. When the plant is stable and/or at the discretion of the C47007-0301 & 0302, BUS DUCT COOLING SYSTEM HI lead evaluator, then enter: TEMP AND BLOWERS NOT RUNNING LEAD Trigger 4, Loss of Bus Duct Cooling.

  • Dispatch an operator to the bus duct coolers to
a. If contacted as the out-plant operator to investigate, provide an assessment of the problem.

wait 2 minutes and report the following:

  • Monitor 1T2118A, 11/12 GEN BUS DUCT
b. Both Bus Duct Cooler Blowers are NOT running. CONDUCTOR TEMP, on ERCS.
c. The following alarms are in locally:
  • Refer to C22.5 AOP1.
1) Bus Duct Air Hi Temp.
2) Bus Duct Conductor Hi Temp. C22.5 AOP1, LOSS OF GENERATOR BUS DUCT
d. If contacted as the out-plant operator to perform COOLING actions of C22.5 AOP1, then report the following as
  • Dispatch an operator to the bus duct coolers to LEAD applicable: provide an assessment of the problem.
1) Cooling water flow to both Bus Duct Coolers are
  • Direct out-plant operator to perform the following:

normal and cooling water valve lineups are o Note any alarms on the Bus Duct Cooler proper. Blower Control Panel.

2) Both Bus Duct Cooler Blowers are NOT running o Verify cooling water flow.

and attempts to start either blower are NOT o Attempt to start standby blower.

successful. o Verify discharge dampers for the inservice

3) The power supply breakers to both Bus Duct blower are OPEN.

Cooler Blowers are CLOSED. o Verify power supply breakers to the Bus Duct Cooler Blowers are CLOSED.

9. Plant Response: o Inspect dampers.
a. Bus Duct temperatures will rise.
  • When 1T2118A exceeds 92°C, then reduce power per
b. The following annunciators will come in: 1C1.4 AOP1 to reduce generator output to less than
1) 47007-0301, BUS DUCT COOLING SYSTEM HI 9,000 amps.

TEMP.

  • During load reduction, reduce generator excitation
2) 47007-0302, BUS DUCT COOLING BLOWERS using CS-46377, GEN VOLT REG ADJ.

NOT RUNNING.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 12 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 5 10. Rapid Load Reduction: 1C1.4 AOP1, RAPID POWER REDUCTION UNIT 1

a. If contacted as the TSO, acknowledge that Unit1 is
  • Determine the predicted Boron addition and final RO/SS reducing power due to loss of bus duct cooling. Control Rod Position by obtaining values from the
b. If contacted as Unit 2 Control Room Operators to appropriate contingency reactivity plan.

monitor Unit 1 Heater Drain Tank alarms (Panel F),

  • Borate the RCS as necessary to maintain control rods then acknowledge request and inform Unit 1 above the insertion limit and control delta I within Operators that an extra operator will monitor Panel F. limits.
  • Place pressurizer heaters to ON.
  • Using the On Line Control screen, select the Control NOTE Mode pop-up screen.

It is NOT intended to wait for the plant to reach 55%

  • Select the desired control mode (VPC, FSP, or power prior to proceeding to the next event. Once the LOAD).

Lead Evaluator is satisfied with the reactivity

  • Using the On Line Control screen, select the manipulation, proceed to Event 6. Demand Rate pop-up screen.
  • Select the desired rate of load change.
  • Set the desired Target setting using the On Line Control screen.
  • Using the On Line Control screen, select the Go control to initiate load reduction.

1C12.5, UNIT 1 BORON CONCENTRATION CONTROL RO/SS

  • Set 1YIC-110, BA TO BLENDER BATCH INTEGRATOR, to quantity desired.
  • Place CS-46300, MAKE-UP MODE SELECTOR, to BORATE.
  • If desired, then adjust 1HC-110, BA TO BLENDER FLOW CONT, to MANUAL and adjust output for desired flow rate.
  • Momentarily place CS-46457, BORIC ACID MAKE-UP CONTROL, to START, to initiate the boration.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 13 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 5

  • When the desired quantity of boric acid has been (cont) added, then verify automatic makeup stopped as indicated by CS-46457, BORIC ACID MAKE-UP CONTROL, green light LIT.
  • If additional boration is desired, then return to step 2.
  • When the boration is complete, then verify 1HC-110, BA TO BLENDER FLOW CONT, is in AUTO.
  • Perform a 10 gallon flush.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 14 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 11. When the lead evaluator is satisfied with the reactivity 1E-0, REACTOR TRIP OR SAFETY INJECTION 6&7 manipulation, enter:

RO/

Trigger 6, 12 Steam Generator Tube Rupture.

LEAD

a. Upon hearing the announcement of Reactor Trip, or
  • Verify both Safeguards buses energized.

when called as the Turbine Building Operator to

  • Determine SI is required or already actuated.

isolate the Unit 1 MSRs per Attachment J, then open o Either SG pressure < 530 psig.

and run schedule file E-0_Att-J.sch located in o PRZR pressure < 1830 psig.

X:\\Trex_PI\Lightning\Schedule\EOPs. When the o Containment pressure > 3.5 psig.

isolation is complete, inform the crew the MSRs are

  • Manually actuate SI if it did not already actuate.

isolated.

  • Perform Attachment L (see pages 17 & 18).
b. Upon hearing the announcement of Safety Injection,
  • Check AFW Status:

or when called as the Turbine Building Operator to o Verify total AFW flow greater than 200 secure the Turbine Building Roof Exhausters, wait 2 GPM.

minutes and report the Turbine Building Roof o Verify AFW pumps discharge pressure Exhausters are all secured. greater than 1000 psig.

c. If Control Room personnel ask if Unit 2 personnel are o Control feed flow to maintain 11 SG Narrow available to perform Attachment L, then inform the Range between 5% and 50%.

Control Room that Unit 2 personnel are NOT

  • Check RCS Temperatures trending to 547°F.

available for performing Attachment L.

  • Check PRZR PORVs and Spray valves closed.
d. If contacted as RP or Duty Chemist to sample for primary-to-secondary leakage, then wait 2 minutes
  • Determine RCPs should NOT be stopped due to RCS and report cation column frisks indicate activity is pressure greater than 1250 psig.

high on 12 SG and reading background on 11 SG.

  • Determine SGs are NOT faulted.

SS

  • Determine a SG Tube is ruptured.
12. Plant Response:
a. RCS pressure lowers.
b. 11 SG level rises.
c. Secondary radiation rises.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 15 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 1E-3, STEAM GENERATOR TUBE RUPTURE 6&7

  • Determine RCPs should NOT be stopped due to RCS (cont) RO/SS EMERGENCY PLAN CLASSIFICATION pressure greater than 1250 psig.

ALERT - FA1 due to a loss of the RCS Fission Product

Barrier due to the 12 Steam Generator Tube Rupture.

  • Isolate flow from 12 SG:

o Verify 12 SG PORV at 75%.

o Check 12 SG PORV closed.

o Close steam supply valve from 12 SG to TD AFWP.

o Verify blowdown isolation valves closed on 12 CRITICAL TASKS SG.

1. Isolate feedwater flow into and steam flow from the o Close 12 SG MSIV.

ruptured Steam Generator before a transition to

  • Stop feed flow to 12 SG after narrow range level is ECA-3.1 occurs. greater than 5%.
2. Establish/maintain an RCS temperature so that
  • Reset SI transition from E-3 does not occur because of the
  • Check 12 SG pressure greater than 210 psig.

inability to maintain required subcooling or such

  • Initiate RCS Cooldown:

that an extreme or severe challenge to the o Determine required core exit temperature.

Subcriticality and/or the Integrity CSF occurs. o Check one condensate pump running.

o Establish steam dump to condenser o Stop RCS cooldown.

o Maintain CETC less than required temperature.

  • Control feed flow to 11 SG to maintain narrow range level between 5% and 50%.
  • Check PRZR PORV Block valves open.
  • Reset SI and Containment Isolation.
  • Verify IA to Containment is established.
  • Stop RHR pumps because RCS pressure is greater than 250 psig.
  • Align charging pump suction to RWST.
  • Establish maximum charging flow.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 16 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT

  • Verify CETC less than required temperature.

6&7

  • Check 12 SG pressure is stable or increasing.

(cont) RO/SS CRITICAL TASKS

  • Check RCS subcooling greater than 40°F.
3. Depressurize RCS to meet SI termination criteria
  • Depressurize RCS to minimize Break Flow and Refill prior to overfilling the ruptured Steam Generator. PRZR.
4. Terminate SI prior to overfilling the ruptured Steam
  • Use one pressurizer spray to depressurize RCS until Generator. ANY of the following conditions satisfied:

o Both of the following:

RCS pressure less than 12 SG pressure.

PRZR level greater than 7%.

o PRZR level greater than 75%.

o RCS subcooling less than 20°F.

  • Check RCS pressure increasing.
  • Check if SI flow should be terminated.
  • Stop 12 SI pump (11 SI pump is OOS).

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 17 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT 1E-0 Attachment L: SI Alignment Verification 6&7 13. If contacted as the out-plant operator to locally close

  • Verify Safeguards Component Alignment:

(cont) LEAD Safeguards Chilled Water Cross Tie, acknowledge order

  • Verify both trains of SI actuated:

to close the valve. Wait 2 minutes, enter: o Both RHR pumps - RUNNING Trigger 7 to CLOSE the CW Cross Tie Valves. -OR-

a. Report completion to the Control Room. o Both SI pumps - RUNNING o 11 SI Pump is OOS and should NOT be started.
14. If Control Room personnel ask for status of Unit 2 * "SI NOT READY" lights - NOT LIT Cooling Water/Chilled Water lineup, then inform the * "SI ACTIVE" lights - LIT FOR PLANT CONDITIONS Control Room that Unit 2 Cooling Water/Chilled Water * "CONTAINMENT ISOLATION" lights - LIT FOR valves are in there: PLANT CONDITIONS
a. Non safeguards position if the crew has NOT
  • Check Category 1 Vent Zone Boundary:

re-aligned the cooling water/chilled water lineup on

  • Close MV-32115, 122 SFP HX INLT HDR MV B Unit 2.
  • Check Cooling Water Header Pressures - BOTH
b. Safeguards position if the crew has re-aligned the GREATER THAN 65 PSIG cooling water/chilled water lineup on Unit 2.
  • Verify Plant Announcements Complete:
15. If Control Room personnel ask for status of Battery Room Temperatures, then inform the Control Room that
  • Check If Main Steamlines Are Isolated:

Battery Room temperatures are less than 84°F.

  • Determine MSIVs, Bypass Valves, and Containment
16. If Control Room personnel ask for status of Spent Fuel Instrument Air Valves do NOT need to be closed.

Cooling, then inform the Control Room that Spent

  • Verify SI Flow:

Fueling level and temperature are normal.

  • Verify RHR Flow
  • Check RCP Cooling
  • Verify Local Actions Complete
  • Verify Generator Breakers - OPEN
  • Verify All Heater Drain Pumps - STOPPED
  • Check Turbine Valves:

o Turbine reheat and intercept valves - CLOSED o Open turbine drain valves

o Both main feedwater pumps - STOPPED o Main and bypass FRVs - CLOSED Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 18 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SCENARIO TIME-LINE:

SEQ SEQUENCE OF EVENTS / INSTRUCTOR NOTES CREW EXPECTED STUDENT RESPONSES POS EVENT

  • Verify All Condensate Pumps - STOPPED:

6&7

  • Determine Steam Dump already in "STM PRESS" (cont) LEAD Mode
  • Verify Unit 1 Cooling Water/Chilled Water Alignment:

NOTE o CFCU control switches - "SLOW".

The operator will have to perform the following to align o CFCU dampers - ALIGNED TO DOME safeguards chilled water for SI Alignment: o Unit 1 cooling water/chilled water valves closed o Unit 1 CRDM shroud cooling supply and return

  • Place CS-46018, 11 CFCU, to SLOW. valves - CLOSED
  • Place CS-46019, 13 CFCU, to SLOW. o CFCU cooling water supply and return valves -
  • Place CS-46080, Train A Unit 1 CLG WTR/CHILLED OPEN WATER ISOL VALVES, in ISOLATE. o CFCU chilled water supply and return valves -
  • Place CS-46081, Train B Unit 1 CLG WTR/CHILLED CLOSED WATER ISOL VALVES, in ISOLATE.
  • Verify 11 Safeguards Screenhouse Ventilation lineup.
  • Place CS-46772, Train A Unit 2 CLG WTR/CHILLED
  • Verify Control Room Ventilation Alignment:

WATER ISOL VALVES, in ISOLATE. o Chillers and fans - RUNNING

  • Place CS-46773, Train B Unit 2 CLG WTR/CHILLED o Control room chiller suction/discharge tie closed -

WATER ISOL VALVES, in ISOLATE. STATUS LIGHT LIT

  • Place CS-46068, 121 CONT RM CHILLER & PUMP, in
  • Verify Unit 2 Cooling/Chilled Water Alignment START.
  • Verify 21 Safeguards Screenhouse Ventilation lineup.
  • Place CS-46076, 122 CONT RM CHILLER & PUMP, in
  • Verify 11 and 12 Battery Charger Operation is normal.

START.

  • Verify Battery Room temps less than 84°F.
  • Determine 44071-0101, CR CHILLER XTIE LIGHT, is
  • Check status of Spent Fuel Cooling.

NOT LIT; therefore valve is open.

  • Check Status Of Notifications
  • Notify SS Of Any Discrepancies.
17. Once the crew has stopped 12 SI Pump and/or at the discretion of the Lead Evaluator, then place the simulator in FREEZE and inform the crew that training has the duty.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 19 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SIMULATOR INPUT

SUMMARY

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 20 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 SIMULATOR SETUP CHECKLIST Before Scenario

_____ Simulator Status:

___ 1. "Training Load" ___ 2. Step counters "ON"

___ 3. Alarm sound "ON" ___ 4. Steps 1 - 5 on page 6 complete

___ 5. Speed: REAL ___ 6. IC-265 or IC-10 running

_____ Delete the memory on the Yokogawa Model DX1000 recorders by cycling the Recorder Power OFF pushbutton in the simulator instructors booth.

_____ Verify Schedule File/Summary matches Simulator Input Summary page in the SEG.

_____ Verify that control rod step counters on C panel and ERCS RBU matches the IC conditions.

_____ Boric Acid/RMU integrators set to: BA: 3, RMU: 10, and reset.

_____ MOC I sheet displayed on C panel.

_____ MOC Reactivity Briefing sheet available at Reactor Operator Desk.

_____ Turnover sheet/PRA sheet available.

_____ If it is the first scenario of the day, then perform a shutdown and restart of the floor PCs that are connected to the LAN.

_____ Log in on floor PCs using user ID: <pitrgsim> (password is the same as user ID).

_____ Electronic PINGP 577 forms closed on LAN connected PCs.

_____ Board-mounted EAL Tables are cleaned.

_____ EOOS running on PC and updated as follows to reflect equipment OOS:

___ 1. 11 Safety Injection Pump

_____ Update Control Board Placards:

___ 1. NRC Current Authentication Code call date updated to current date.

___ 2. High Flux At Shutdown Alarm Setpoint placards: 5900 cps.

___ 3. Feedwater regulating valve position placard set to current values.

___ 4. Recommended SG Blowdown flow set to current values.

___ 5. RCS boron on the CVCS panel placard: 853 ppm.

___ 6. Turbine reference/setter values on the CVCS panel set to current (Target/Demand on-line positions).

___ 7. Shift Reactivity Guidance placard: BA: 2.7 gallons, RMU: 67 gallons.

Dilutions @ 10 gal RMU, 1-2 times per shift.

_____ Magnetic placards in place:

___ 1. 11 BA TANK Lined Up For Service

___ 2. 11 BA PUMP Lined Up to 11 BA Tank

___ 3. 12 BA PUMP Lined Up to 11 BA Tank

___ 4. CC to SFP MV-32117 In Service

___ 5. Blowdown 46470 SGB To CDSR

___ 6. HU Flag above 12 RHR HX CC inlet MV-32094 for 1C14 Limitation

___ 7. H 2 IN VCT SPACE at VCT

_____ Pink Status Control Tags in place:

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 21 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0

___ 1. CS-46540, 22 CC WTR PUMP ___ 5. CS-46185, 12 RHR PUMP

___ 2. CS-46572, CC TO SFP MV-32117 ___ 6. CS-46179, 12 SI PUMP

___ 3. CS-46930, D2 DIESEL GENERATOR ___ 7. CS-46037, 12 CC WTR PUMP

___ 4. CS-46425, 12 MDAFWP ___ 8. CS-46523, 22 CLG WTR PUMP

_____ Yellow Caution Tags in place:

___ 1. CS-46064, CC TO SFP MV-32115, in CLOSED

___ 2. CS-46178, 11 SI PUMP, in PULLOUT

_____ ERCS driven recorders are on-scale (RCS temperature scaled 555º F to 565º F).

_____ ERCS alarm screen operating and alarms reset.

_____ All ERCS terminals operating and set as follows:

CONF VARS R02 Alarm Summary Page CONE1 Group OP31_U1 R03 AFD CONC SAS (XS11) R04 TPM CONG1 Group QP CCDATA R05 QP LOADFOLL ERCS-R01 Group RADMON_U1 R06 Alarm Summary Page

_____ ERCS single point displays: CONB 1T0499A 1U1613A CONE2 1Q0340A 1V4501A

_____ ERCS TPM set (Calorimetric - Auto Scaling - LEFM).

_____ Verify that copy machine and printers are loaded with paper.

_____ Pens/Paper/Markers available on the simulator.

st

_____ Verify 121 IA Compressor is in PREFERRED and 122 IA Compressor is in 1 STANDBY, and nd 123 IA Compressor is in 2 STANDBY.

_____ Verify R11/R12 are lined up correctly (at the R11/R12 local panel):

___ 1. Sample pump is running.

___ 2. Alarms are reset.

___ 3. CS-8006106, Sample Inlet Switch, is selected to CNTMT.

___ 4. CS-8006107, Sample Outlet Switch, is selected to Aux Bldg Stack.

_____ Set Turbine Control HMI Displays as follows:

___ 1. U1 E-H Turb Cont STA 2 (48087) to Control Valve Overview.

___ 2. U1 Turb Aux Cont (48088) to Turb Overview.

___ 3. U1 E-H Turb Cont STA 1 (48086) to On Line Control.

_____ DEHC VPL set ~ 0.1 to 0.2 above current valve position (not on limiter).

_____ DEHC alarms cleared.

_____ N51 & N52 Display Sheets for 100% power are in place as necessary.

_____ Procedure 1C51 marked up for PT-485 failure.

_____ Headsets turned on as necessary.

_____ Procedure checklist completed. See following page.

_____ Peer Check performed for simulator setup.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 22 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 PROCEDURE CHECKLIST The following procedures will be used during this session. Verify the procedures are free of place keeping marks before starting the session and after the session are complete:

Before After 1C1.4 AOP1, RAPID POWER REDUCTION UNIT 1 1C12.5, UNIT 1 BORON CONCENTRATION CONTROL 1C20.5, UNIT 1 - 4.16KV SYSTEM 1C51.1, Tavg Loop 1B 1T-401 - High st 1C51.2, Turbine 1 Stage Pressure 1P-485 - Low 1C5 AOP4, DROPPED RCCA 1C5 AOP5, MISALIGNED ROD, STUCK ROD, AND/OR RPI FAILURE OR DRIFT 1E-0, REACTOR TRIP OR SAFETY INJECTION 1E-3, STEAM GENERATOR TUBE RUPTURE C22.5 AOP1, LOSS OF GENERATOR BUS DUCT COOLING C47003-0503, 11 HEATER DRAIN TANK HI LVL C47007-0301, BUS DUCT COOLING SYSTEM HI TEMP C47007-0302, BUS DUCT COOLING BLOWERS NOT RUNNING C47012-0104, RCS HI TAVG C47012-0304, RCS TAVG DEVIATION C47012-0404, OVERPOWER T CH ALERT C47012-0504, OVERTEMP T CH ALERT C47012-0507, PRZR LVL DEVIATION C47012-0604, RCS DT DEVIATION C47013-0105, OPT ROD STOP TURBINE RUNBACK CH ALERT C47013-0205, OTT ROD STOP TURBINE RUNBACK CH ALERT C47013-0407, ROD AT BOTTOM C47013-0507, COMPUTER ALARM ROD DEVIATION/SEQUENCING C7, REACTOR CONTROL SYSTEM EAL BOARDS EOP INFORMATION BOOK F3-2 EAL STICKER BOOK checked for missing stickers F3-2.1, EMERGENCY ACTION LEVEL TECHNICAL BASES REACTIVITY BRIEFING BINDER - MOC SWI O-28, NOTIFICATION OF OPERATIONS MANAGER & NRC RESIDENT INSPECTOR SWI O-50, REACTIVITY MANAGEMENT T.S. LCO 3.1.7 T.S. LCO 3.3.1 T.S. LCO 3.3.2 TLCO 3.3.3 Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 23 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Post-Scenario Checklist

_____ LAN connected computers are cleared of information added during the scenario.

_____ Computer generated PINGP 577 cleared.

_____ Procedure checklist completed. See previous page.

_____ Remove Pink Status Control Tags from the following equipment:

___ 1. CS-46930, D2 DIESEL GENERATOR

___ 2. CS-46425, 12 MDAFWP

___ 3. CS-46185, 12 RHR PUMP

___ 4. CS-46179, 12 SI PUMP

___ 5. CS-46037, 12 CC WTR PUMP

___ 6. CS-46523, 22 CLG WTR PUMP

_____ Magnetic placards removed:

___ 1. NONE

_____ Remove Yellow Caution Tags from the following equipment:

___ 1. CS-46178, 11 SI PUMP

_____ Board-mounted EAL Table is cleaned.

_____ All books, note pads, and calculators put away.

End Of Day Checklist

_____ Signs/placards removed and put away unless normal simulator configuration.

_____ Floor PCs logged off if simulator will not be used again that day.

_____ Instructor station returned to normal with all books, paper, and etc. put away.

_____ Headsets turned off and put away if simulator will not be used again that day.

_____ Simulator reset to IC-10 unless another IC will be used for further training.

_____ Simulator placed in DORT if simulator will not be used again that day.

_____ Recorder power "OFF" if simulator will not be used again that day.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 24 of 27 RETENTION: 7 Days UNIT 1 LPEO / PEO TURNOVER LOG DATE: DAY/NIGHT SHIFT: Day CAT 1 VENT OPENINGS: 0 ft2 SYSTEM CONDITION: GREEN SAFEGUARDS EQUIPMENT OOS/TECH SPEC REQUIRED ACTION STATEMENTS

1. 11 SI PUMP is OOS for corrective maintenance.
  • T.S. 3.5.2 Condition A was entered with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> remaining.
2. PT-485, Turbine First Stage Pressure, is failed LOW.
  • T.S. 3.3.1 Condition A and R entered.
  • P7 was verified to be in required state for existing unit conditions.
  • TRM 3.3.4 Condition A was entered.
  • A WR was initiated to repair PT-485.

PROTECTED EQUIPMENT D2 DIESEL GENERATOR 12 CC PUMP 12 MDAFWP 22 CLG WATER PUMP 12 RHR PUMP 22 CC PUMP 12 SI PUMP 121 SFP HX RAD MONITORS OOS ANNUNCIATORS OOS NONE NONE OUTSTANDING SPS FIRE DET / PROT EQP IMPAIRMENTS NONE NONE OTHER EQUIPMENT OOS / STATUS

  • Station Air is supplementing Instrument Air per Section 5.1.3 of C34, Station Air System.
  • Bus 15 and 16 are powered from CT11. A designated operator is stationed at the G-Panel to monitor Bus Phase Currents and perform actions of Bus 15 Sequencer Channel Alert and Bus 16 Sequencer Channel Alert Alarm Response Procedures.

MAJOR EQUIPMENT REPAIRED / RETURNED TO SERVICE BKR 15-3, BUS 15 1RY SOURCE BREAKER, RTS OPERATIONAL PLANS FOR COMING SHIFT

  • Maintain Rod Control in Manual and Steam Dump in Steam Pressure Mode.
  • Xenon is at equilibrium. Maintain 100% power.
  • Transfer power on Bus 15 to 1RY per Step 5.11 of 1C20.5.
  • Dilute 10 gallons 1-2 times per shift for temperature control.

NEW PROCEDURES / INSTRUCTIONS NONE Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 25 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Simulator Scenario Development Checklist Mark with an X Yes or No for any of the following. If the answer is No, include justification for the no answer or the corrective action needed to correct the discrepancy after the item.

1. The scenario contains objectives for the desired tasks and relevant human Yes No performance tools. X
2. The scenario identifies key parameter response, expected alarms, and Yes No automatic actions associated with the induced perturbations. X
3. The scenario content adequately addresses the desired tasks, through Yes No simulator performance, instructor-led training freezes, or both. X
4. Plant PRA initiating events, important equipment, and important tasks are Yes No identified. X
5. Turnover information includes a Daily At Power or Shutdown Safety Risk Yes No Assessment. X
6. The scenario contains procedurally driven success paths. Procedural Yes No discrepancies are identified and corrected before training is given. X
7. The scenario guide includes responses for all anticipated communications to Yes No simulated personnel outside the Control Room, based on procedural guidance X and standard operating practices. Include estimated completion times and/or notes for use of time compression.
8. The scenario includes related industry experience. SOER, SER and similar Yes No OE recommendations are clearly identified and fully addressed.* X
9. The scenario guide incorporates verification of Operator Fundamental Yes No application.* X
10. Training elements and specific human performance elements are addressed Yes No in the scenario critique guide to be used by the critique facilitator. The critique X guide includes standards for expected performance.*
11. For evaluations, it has been verified that without operator action the critical Yes No tasks will be failed. X Developer and Reviewer: Once checklist is completed and deficiencies are corrected, sign the cover page.
  • For evaluations these items may be marked NO without justification.

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 26 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Simulator Scenario Validation Checklist Mark with an X Yes or No for any of the following. If the answer is No, include an explanation after the item.

1. The desired initial conditions agreed with the reference plant with Yes No respect to reactor status, plant configuration, and system operation. X
2. The simulator operated in real time during conduct of validation. Yes No X
3. The simulator demonstrated expected plant response to operator input Yes No and to normal, transient, and accident conditions. X
4. The simulator permitted use of the reference plants procedures. The Yes No scenario was completed without procedural exceptions, simulator X performance exceptions, or deviation from the scenario sequence.
5. The simulator did not fail to cause or unexpectedly cause any first Yes No principle alarm or primary automatic action. X
6. Observable changes in parameters relevant to the scenario Yes No corresponded in trend and direction to reference plants expected X response.
7. All malfunctions and other instructor interface items were functional and Yes No demonstrated the expected reference plants response to the initiating X cause.
8. All malfunctions and other instructor interface items were initiated in the Yes No same sequence described within the simulator scenario. X
9. The scenario satisfies the learning or examination objectives without Yes No any significant simulator performance issues, or deviations from the X approved scenario sequence.
10. Simulator fidelity has been demonstrated to be adequate for this Yes No scenario. X Discrepancies noted (Check none or list items found) None SMAR = Simulator Action Request SMAR: 01422319 SMAR: SMAR: SMAR:

Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-02 Rev. 4 (FP-T-SAT-75) Page 27 of 27 PI-ILT-NRC-1405S, 2014 ILT NRC SIMULATOR EVALUATION #5, REV. 0 Comments: CS-46955, BKR 15-7, indication is erratic. In the simulator, BKR 15-7 is normally open. When CS-46955 is taken to close, BKR 15-7 closes, the red lamp illuminates, and the green lamp extinguishes. All as expected. When CS-46955 is taken to TRIP, the red light should extinguish, and the green light should light, indicating BKR 15-7 is open (tripped). The red lamp does extinguish as expected; but the green light sometimes either fails to light or it flickers on and off. If the switch is wiggled slightly, the green light usually lights, but not always.

This improper indication shows up in the TAM log, indicating a possible problem with the switch. SMAR-01422319 was initiated to investigate and repair/replace the control switch.

Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.

Validation Personnel Name Job Title / Qualification Validation Position Shawn Sarrasin Operations Instructor Lead Evaluator Fred Collins Operations Instructor Booth Driver Jeff Human Operations SRO Shift Supervisor Mark Haren Operations RO LEAD Rick Martin Operations RO RO Retention: Life of Plant Retain in: Training Program File Form retained in accordance with record retention schedule identified in FP-G-RM-01.