ML13228A028

From kanterella
Jump to navigation Jump to search
Operator Examination Data
ML13228A028
Person / Time
Site: Monticello, Prairie Island  
(DPR-022, DPR-042, DPR-060)
Issue date: 08/14/2013
From: Murphy M
Northern States Power Co, Xcel Energy
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-XE-13-012
Download: ML13228A028 (4)


Text

Xcel Energy August 14, 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Prairie Island Nuclear Generating Plant, Units 1 and 2 Dockets 50-282, 50-306 Renewed License Nos. DPR-42 and DPR-60 Operator Examination Data 414 Nicollet Mall-MP4 Minneapolis, MN 55401 L-XE-13-012 RIS 2013-06 Monticello Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22 As requested by NRC Regulatory Issue Summary 2013-06, "Preparation and Scheduling of Operator Licensing Examinations", dated June 7, 2013, Northern States Power Company, a Minnesota corporation, hereby submits the operator licensing examination data for calendar years 2015 through 2018 for the Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant. Enclosed are the corresponding NRC Form 536s for each site which provide the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

Regulatory Commitments This letter makes no new commitments or changes to any existing commitments.

Ji0ftlv0 C A ut twv Martin C. Murphy Jl f d Director, Nuclear Licensing and Regulatory Affairs Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island Nuclear Generating Plant, USNRC, NRR Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC, NRR Resident Inspector, Monticello Nuclear Generating Plant, USNRC

ENCLOSURE Operator Licensing Examination Data for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 2 pages follow

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection Is used to plan budgets and resources for operator OPERATOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-Q001, or by Internet e-EXAMINATION DATA mall to lnfocollocts.Resource@nrc.gov, and to the Desk omcer, Office ol Information and Regulatory Affairs, NEOB-10202, (3160-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to lrnpose an Information collection does not display a currently valid OMB con~ol number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information colloctlon.

FACILITY NRC REGION Monticello III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 8

6 0

6 OPERATORS NUMBER OF SENIOR REACTOR 7

5 0

5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

1 0

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 06/01/2015 10/17/2016 10/22/2018 ALTERNATE DATE 06/08/2015 10/24/2016 10/29/2018

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 CANDIDATES NRC FORM 536 (09-2011)

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09130/2014 (09:2011)

Estimated burden per response to comply l'lflll this voluntary Information cotrectlon request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information collection Is used to plan budgets and rescurces for operator OPERA TOR LICENSING examinations. Send comments f89anllng burden esUmate to the Information Services Branch

[T-5 F53), u.s, Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mall to lnfocollects.Resource@n~~:.gov, and to the Desk Officer, Office of lnformaUon and Regulatory Affairs, NEOB-10202, (3160..0131), omca of Management and Budget, Washington, DC 20503.

If a means used to Impose an lnformaUon collecUon does not display a correnffy valid OMB control number, the NI\\C maynotconduc_torsponsor, and a person Is not required to respond to, the lnformatlon collection.

FACIUTY NRC REGION Prairie Island Nuclear Generating Plant Unit 1 and 2 3

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0

1 1

0 ESTIMATED NUMBER OF

-NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 2

4 OPERATORS NUMBER OF SENIOR REACTOR 9

7 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 1

1 OPERATORS-UPGRADE

.NUMBER OF SENIOR REACTOR 9PERATORS-LIMITED PROPOSED DATES PRIMARY DATE 06/13/2016 12/11/2017 ALTERNATE DATE 06/20/2016 12/18/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION {GFE) SCHEDULE CY 2014 CY 2016 PROPOSED NUMBER MARCH JUNE

  • SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 12 12 NR? FORM 536. (09-2011)