Category:Letter type:L
MONTHYEARL-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-048, Core Operating Limits Report (COLR) Cycle 40 (U2C40)2023-03-18018 March 2023 Core Operating Limits Report (COLR) Cycle 40 (U2C40) L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-2023-036, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2023-02-24024 February 2023 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2023-011, Response to Requests for Additional Information (Rais) Regarding License Amendment Request 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk Informed2023-02-21021 February 2023 Response to Requests for Additional Information (Rais) Regarding License Amendment Request 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk Informed L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-2022-177, Subsequent License Renewal Application - Second Annual Update2022-11-28028 November 2022 Subsequent License Renewal Application - Second Annual Update L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-161, U1R40 Steam Generator Tube Inspection Report2022-10-13013 October 2022 U1R40 Steam Generator Tube Inspection Report L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-26
[Table view] Category:License-Operator License Exam
MONTHYEARML15076A3902015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Proposed Written Examination ML15076A5212015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Form ES-401-6 ML15076A5172015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Form ES-301-4 ML15076A5142015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Form ES-301-6 ML15076A5102015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Form ES-301-5 Revision 1 ML15076A5072015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Form ES-301-3 ML15070A5402015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Proposed Simulator Scenarios ML15070A5372015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Proposed In-Plant JPMs ML15070A5222015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Proposed Control Room JPMs ML15070A5002015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Proposed Administrative JPMs ML15139A5992014-08-22022 August 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Administrative JPMs ML14170A0932014-06-19019 June 2014 Prairie, Units 1 & 2 and Monticello - Operator Examination Data for Calendar Years 2016 Through 2019 ML15126A4592014-05-19019 May 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Simulator Scenarios ML15126A3192014-05-19019 May 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed In-Plant JPMs ML15126A3102014-05-19019 May 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Control Room JPMs ML15126A3002014-05-19019 May 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Written Examination - Senior Reactor Operator ML15126A2962014-05-19019 May 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Written Examination - Reactor Operator ML13228A0282013-08-14014 August 2013 Operator Examination Data ML1114601662010-08-16016 August 2010 2010 Palisades Nuclear Plant Initial Examination Proposed Exam Files Proposed Written Exam L-HU-05-019, Response to Regulatory Information Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations2005-09-29029 September 2005 Response to Regulatory Information Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations 2015-03-06
[Table view] Category:Draft
MONTHYEARML15076A3902015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Proposed Written Examination ML15076A5212015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Form ES-401-6 ML15076A5172015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Form ES-301-4 ML15076A5142015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Form ES-301-6 ML15076A5102015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Form ES-301-5 Revision 1 ML15076A5072015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Form ES-301-3 ML15070A5402015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Proposed Simulator Scenarios ML15070A5372015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Proposed In-Plant JPMs ML15070A5222015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Proposed Control Room JPMs ML15070A5002015-03-0606 March 2015 2015 Point Beach Nuclear Plant Initial License Examination Proposed Administrative JPMs ML15139A5992014-08-22022 August 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Administrative JPMs ML14170A0932014-06-19019 June 2014 Prairie, Units 1 & 2 and Monticello - Operator Examination Data for Calendar Years 2016 Through 2019 ML15126A2962014-05-19019 May 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Written Examination - Reactor Operator ML15126A3002014-05-19019 May 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Written Examination - Senior Reactor Operator ML15126A3102014-05-19019 May 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Control Room JPMs ML15126A3192014-05-19019 May 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed In-Plant JPMs ML15126A4592014-05-19019 May 2014 2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Simulator Scenarios ML13228A0282013-08-14014 August 2013 Operator Examination Data ML1114601662010-08-16016 August 2010 2010 Palisades Nuclear Plant Initial Examination Proposed Exam Files Proposed Written Exam ML0604004302006-02-28028 February 2006 NUREG-1437 S27 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Palisades Nuclear Plant. Draft Report for Comment L-HU-05-019, Response to Regulatory Information Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations2005-09-29029 September 2005 Response to Regulatory Information Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations ML0511901242005-05-0202 May 2005 Draft Safety Evaluation Report Related to Point Beach Nuclear Plant, Units 1 and 2 ML0215403012002-06-0303 June 2002 Draft of Safety Evaluation 2015-03-06
[Table view] |