Prairie, Units 1 & 2 and Monticello - Operator Examination Data for Calendar Years 2016 Through 2019
ML14170A093
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 06/19/2014
From: Murphy M
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-XE-14-008, RIS 2014-05
Download: ML14170A093 (4)


Text

414 Nicollet Mall- MP4 Xcel Energy@ Minneapolis, MN 55401 L-XE-14-008 June 19, 2014 RIS 2014-05 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant, Monticello Nuclear Generating Plant Units 1 and 2 Docket 50-263 Dockets 50-282, 50-306 Renewed License No. DPR-22 Renewed License Nos. DPR-42 and DPR-60 Operator Examination Data As requested by NRC Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations", dated April 29, 2014, Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, hereby submits the operator licensing examination data for calendar years 2016 through 2019 for the Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant.

Enclosed are the corresponding NRC Form 536s for each site which provide the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

Regulatory Commitments This letter makes no new commitments or changes to any existing commitments.

M~clAnno~

  • Martin C. Mu~;[y* "/ Q Director, Nuclear Licensing and Regulatory Affairs Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island Nuclear Generating Plant, USNRC, NRR Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC, NRR Resident Inspector, Monticello Nuclear Generating Plant, USNRC

ENCLOSURE Operator Licensing Examination Data for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 2 pages follow

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary lnfonnation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of lnfonnatlon and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to Impose an lnfonnation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the lnfonnation collection.

FACILITY NRC REGION Prairie Island III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR OPERATORS 6 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 10 7 0 7 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 0 1 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 6/13/2016 11/6/2017 5/27/2019 ALTERNATE DATE 6/20/2016 11/13/2017 6/3/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 12 CANDIDATES NRC FORM 536 (09-2011)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply wUh this voluntary lnfonnation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the lnfonnation Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by lntemet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk OffJcer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to Impose an lnfonnation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the lnfonnation collection.

FACILITY NRC REGION Monticello III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR OPERATORS 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 5 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 0 1 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/24/2016 10/22/2018 ALTERNATE DATE 10/31/2016 10/29/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 CANDIDATES NRC FORM 536 (09-2011)