{{#Wiki_filter:12/18/2015 PaoD 1Part 21 (PAR) Event#. 51611Rep Org: QUALTECH NP Notification Date / Time: 12/18/2015 15:50 (EST)Supplier:
{{#Wiki_filter:12/18/2015                                                                                                       PaoD 1 Part 21 (PAR)                                                                               Event#.       51611 Rep Org: QUALTECH NP                                         Notification Date / Time: 12/18/2015 15:50     (EST)
QUALTECH NP Event Date/ITime:
Supplier: QUALTECH NP                                               Event Date/ITime: 10/06/2015             (EST)
10/06/2015 (EST)Last Modification:
Last Modification: 12/18/2015 Region: 3                                                 Docket #:
12/18/2015 Region: 3 Docket #:City: CINCINNATI Agreement State: YesCounty: License #:State: OHNRC Notified by: MARGIE HOVER Notifications:
City: CINCINNATI                               Agreement State:           Yes County:                                                   License #:
LADONNA SUGGS R2DOHQ Ops Officer:
State: OH NRC Notified by:   MARGIE HOVER                       Notifications:   LADONNA SUGGS                   R2DO HQ Ops Officer:   DONG HWA PARK                                       RAY AZUA                         R4DO Emergency Class:     NON EMERGENCY                                       PART 2 1/50.55 REACTORS         EMAIL 10 CFR Section:
DONG HWA PARK RAY AZUA R4DOEmergency Class: NON EMERGENCY PART 2 1/50.55 REACTORS EMAIL10 CFR Section:21.21 (d)(3)(i)
21.21 (d)(3)(i)     DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING A200 SERIES STARTERS The following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:
DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING A200 SERIES STARTERSThe following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:
"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.
"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200series starter failures since September 15, 2008. The failures would remain in the operated/energized contactstate with power removed for some period of time. All starters impacted with this failure were continuously energized.
"Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Uammer A200 series starter failures may be reportable and an extent of condition review needed to be done.
The concern was that if tripped, that the main contacts would not open to protect the motor."Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. TheTest Report from Eaton was received by QTNP for further review and evaluation.
"The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.
On October 6, 2015 QTNPdetermined that the Cutler Uammer A200 series starter failures may be reportable and an extent of condition review needed to be done."The root cause was a silicon based mold release that remained on the molded parts and would come betweenthe moving (magnet)  
"Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon based mold release was periodically used until October 2012. According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.
& fixed armatures.
"Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user
When heated for an extended period of time, this material would becomesticky causing anywhere from a minor delay in opening, up to a frozen closed condition.
 
"Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facilityin May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon basedmold release was periodically used until October 2012. According to Cutler Hammer, anything made after January1, 2013 should definitely be silicon mold release free."Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012could have this concern.
12/18/2015                   U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 should evaluate their applications for this potential failure mechanism."
This failure has only been reported for continuously energized applications.
The end user 12/18/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2should evaluate their applications for this potential failure mechanism."
QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.
QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.
CUR TISS -DOUETcoNTRACT WRIGHT TRANSMENTTALN QualTech NP, Nuclear Division TRNM TACurtiss-Wright Corporation QTP40P.O.
 
NUMBER4600 East Tech Drive, Cincinnati, OH 45245 QTP40N/AT: 513.528.7900 I F: 513.528.4537 TO: NRC'S DOCUMENT CONTROL DESK ACTION LEGEND STATUSU.S. REGULATORY COMMISSION
CUR   WRIGHT TISS -                                             DOUETcoNTRACT TRANSMENTTALN QualTech NP, Nuclear Division                                 TRNM                 TA Curtiss-Wright Corporation                                         QTP40P.O.                                                   NUMBER 4600 East Tech Drive, Cincinnati, OH 45245                         QTP40N/A T: 513.528.7900 I F: 513.528.4537 TO:   NRC'S DOCUMENT CONTROL DESK                                                       ACTION                   LEGEND                   STATUS U.S. REGULATORY COMMISSION
: 1. For Approval A. Approved-Released forWASHINGTON, DC 20555-0001  
: 1. For Approval                     A. Approved-Released for WASHINGTON, DC 20555-0001                                                     2. Final Documents for                 Construction ATTN:     HEADQUARTERS OPERATIONS OFFICER                                                   Record                           B.Approved as noted-hoo.hoc@nrc.gov                                                               3. For Information Only                 Resubmit- Construction Phone: (301) 816-5100; Fax: (301) 816-5151                                     4. For Preliminary Use                 may proceed
: 2. Final Documents for Construction ATTN: HEADQUARTERS OPERATIONS OFFICER Record B. Approved as noted-hoo.hoc@nrc.gov  
_____________________________________                    5. For Your Use                     C. Not approved- Resubmit PROJECT: ______________________                                                               6. Revised as Requested             D. _______
: 3. For Information Only Resubmit-Construction Phone: (301) 816-5100; Fax: (301) 816-5151  
NO.               NO.       LI DRAWINGS                           El REPORTS                           E DRAWING NUMBER DOUET REV.
: 4. For Preliminary Use may proceed_____________________________________
FOF PRINTS/           SEPIAS El SPECIFICATION
: 5. For Your Use C. Not approved-ResubmitPROJECT:
[] OTHERN El PROCEDUREE COPIESN D
______________________  
N/A                         N/A           INOTIFICATION                                 OF 10CFR PART 21 ON                                     2 EATON/CUTLER HAMMER A200 SERIES STARTERS
: 6. Revised as Requested D. _______NO. NO. LI DRAWINGS El REPORTS EDOUET FOF El SPECIFICATION El PROCEDUREE DRAWING NUMBER REV. PRINTS/ SEPIAS [] OTHERNCOPIESNDN/A N/A INOTIFICATION OF 10CFR PART 21 ON 2EATON/CUTLER HAMMER A200 SERIES STARTERS______ ______(&
______    ______(&           CONTACTORS) 4           4.             4.             +
CONTACTORS) 4 4. 4. +4 4. 4. +4 4. 4. 4.4 4. 4. 4.4 4. 4. 4.4. 4. 4. 4.______ 4. 4.4. 4. 4.PLEASE ACKNOWLEDGE RECEIPT BELOW ANDREMARKS ________________________
4           4.             4.             +
RETURN A SIGNED COPY____ ____ ___ ____ ____ ___ ____ ___ ____ ____ ___ ____ ___ RECEIVED BY _ _ _ _ _ _ _ _ _ _ _ _DATED ________________
4           4.             4.             4.
BY .,7Vt/rg12 fl-Oyer DATE: 12/18/2015 DOCUMENT CONTROL In order to avoid delays in the projectPAGE: 1 of 1 these documents must be returned by:______
4           4.             4.             4.
\1020-07-91, REV.4 CURTI7SS  
4           4.             4.             4.
-CriswihWRIGHT Nuclear OvsoQualTech NP4600 East Tech Drive, Cincinnati, OH 45245P: 513.528.7900!]
: 4.         4.             4.             4.
F: 513.528.9292 http://qua/technp.cwfc.ctom December 18, 2015
______     4.             4.
: 4.         4.             4.
PLEASE ACKNOWLEDGE RECEIPT BELOW AND REMARKS      ________________________                                                         RETURN A SIGNED COPY
________  ___     ____     ____ ___   ____   ___     RECEIVED BY           _  _ _ _   _ _   _ _ _ _ _ _
DATED        ________________
BY                     .,7Vt/rg12 fl-Oyer                         DATE:   12/18/2015 DOCUMENT CONTROL                                                           In order to avoid delays in the project PAGE:       1 of 1         these documents must be returned by:______
                                                                                                                                    \1 020-07-91, REV.4
 
CURTI7SS WRIGHT-                                                                                     Criswih Nuclear Ovso QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.7900!] F: 513.528.9292 http://qua/technp.cwfc.ctom December 18, 2015


==Subject:==
==Subject:==
Notification of 10CFR Part 21 on Eaton/Cutler Hammer A2OO series Starters (&
Contactors)
Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.
Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report fr'om Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starter failures may be reportable and an extent of condition review needed to be done.
The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.
Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was traditionally used. The silicon based mold release was periodically used until October 2012.
According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.
Thus any starters/contactors of the CH A200 series manufactured between May 2008 &
December 31, 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user should evaluate their applications for this potential failure mechanism.
Corrective Action to Prevent recurrence:
      *QualTech has notified all of the affected customers listed in the attached table regarding this issue.
      *QualTech will revise applicable dedication plans to add a caution that "Any starters/contactors of the CH A200 series manufactured between May 2008 &
December 31, 2012 may not be dedicated and are unacceptable". Or similar language and provide a reference to this notification or Corrective Action document that applies to this notification.
Page l of 2


Notification of 1OCFR Part 21 on Eaton/Cutler Hammer A2OO series Starters
Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176
(&Contactors)
.Sincerely, General Manager, Curtiss-Wright QualTech, NP
Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler HammerA200 series starter failures since September 15, 2008. The failures would remain in theoperated/energized contact state with power removed for some period of time. All startersimpacted with this failure were continuously energized.
 
The concern was that if tripped, thatthe main contacts would not open to protect the motor.Testing was performed by Eaton Industrial Controls Division after receiving defective samplesfrom PGE. The Test Report fr'om Eaton was received by QTNP for further review andevaluation.
.CUR WRIGHTTISS -                                                                                                                                       Curtiss-Wright Nucdear Division QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.79001I F: 513.528.9292 hftp://quaftechnp.cwfc.com Customer       Plant Customer PO#:              Year sold/shipped            /C'#RlyQy CC/J/#_elaQyag Tg              S/NCode/ Date Dominion North Anna                 4500033020       12/13/2012     CC1995/CJ2385         A20OMACAC         1     01238501               C121 119 Dominion North Anna                 4500034851         1/11/2013     CC2019/CJ2415         A200MACAC         1     CJ241501               0121119 Dominion North.Anna                 45813045         2/10/2011     CC285/CJ361           A200MACAC         I       0136101               0101023 Dominion North Anna                 45597232         7/18/2008     T8270.1               A200MAOAO         I     ,T827001               0080118 Dominion North Anna                 45619298         9/26/2008     T8446.1I               A200MACAC       1       T844601               C080118 01-02:0120111 03:C120 116 H.B.ROBISON04:                                                                                       C111230 Duke    H.OI           ON00607524                   2/16/2012       CC1262/CJ1521             A20TKIKCA   8       01152101             05:C110909 PLANT                                                                                                                           06:0C110914 07:C0111111
On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starterfailures may be reportable and an extent of condition review needed to be done.The root cause was a silicon based mold release that remained on the molded parts and wouldcome between the moving (magnet)
___     ____ __                   ___08:C0111128 Due   H.B. ROBINSON               06873/621                       C12/J155                 A 11A6               C1501             01-02:C0110909 DuePLANT                         00056           32/02           019/155                   AOKO                   J551           03-06:0110915 02: 0090323 KRSKO    Slovienia                   10106/479       4/13/2010           T8610.1             A201K5CH     2       T861003             030131 KRSKO    Slovienia                   10106/479       4/13/2010           T8610.1             A201K4CH     1       T861004               0090115 PG&E     DIABLO CANYON             3500947987         4/2/2013       00C1818/CJ2177         A200MICACEJ4   6       .0J217701         01-06: 0120928 01:0C100603 "02:C100617 PG&E     DIABLO CANYON             3500889322         2/10/2011       CC298/CJ380             A201KOCA     9       CJ38001             03:0C100701 04-07:C0101,208
& fixed armatures.
___   ___ _ ___               __   _ _   ___   ___       08-09: Cl110111 PG&E     DIABLO CANYON             3500902818         7/27/2011       00658/0J805         A200MOCACDEJ4   5       , J80501           01-*05:C01 10719 PG&E     DIABLO CANYON                 136862         6/16/2008           T8169.1           A200MI CACEJ4   6       :T816901           01-06:C0080429 "9/29/2009                                             2       ,T942 102          01:C090826 PG&E    DIABLO CANYON              350C1842462                          T9421IEL          A200MOCACDEJ4                                02:0090923 01-06:C090831
When heated for an extended period oftime, this material would become sticky causing anywhere from a minor delay in opening, up toa frozen closed condition.
                                                                                                                        -       -     I Date    Code is:
Cutler Hammer has determined that the silicone mold release was first introduced into themanufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that wastraditionally used. The silicon based mold release was periodically used until October 2012.According to Cutler Hammer, anything made after January 1, 2013 should definitely be siliconmold release free.Thus any starters/contactors of the CH A200 series manufactured between May 2008 &December 31, 2012 could have this concern.
0 120627 YYMMDD Page 2 of 2
This failure has only been reported forcontinuously energized applications.
 
The end user should evaluate their applications for thispotential failure mechanism.
12/18/2015                                                                                                       PaoD 1 Part 21 (PAR)                                                                               Event#.       51611 Rep Org: QUALTECH NP                                         Notification Date / Time: 12/18/2015 15:50     (EST)
Corrective Action to Prevent recurrence:
Supplier: QUALTECH NP                                               Event Date/ITime: 10/06/2015             (EST)
*QualTech has notified all of the affected customers listed in the attached table regarding this issue.*QualTech will revise applicable dedication plans to add a caution that "Anystarters/contactors of the CH A200 series manufactured between May 2008 &December 31, 2012 may not be dedicated and are unacceptable".
Last Modification: 12/18/2015 Region: 3                                                 Docket #:
Or similar languageand provide a reference to this notification or Corrective Action document that applies tothis notification.
City: CINCINNATI                               Agreement State:           Yes County:                                                   License #:
Page l of 2 Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176.Sincerely, General Manager,Curtiss-Wright  
State: OH NRC Notified by:   MARGIE HOVER                       Notifications:   LADONNA SUGGS                   R2DO HQ Ops Officer:   DONG HWA PARK                                       RAY AZUA                         R4DO Emergency Class:     NON EMERGENCY                                       PART 2 1/50.55 REACTORS         EMAIL 10 CFR Section:
: QualTech, NP  
21.21 (d)(3)(i)     DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING A200 SERIES STARTERS The following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:
.CUR TISS -WRIGHTCurtiss-Wright Nucdear DivisionQualTech NP4600 East Tech Drive, Cincinnati, OH 45245P: 513.528.79001I F: 513.528.9292 hftp://quaftechnp.cwfc.com Customer Plant Customer Year /C'#RlyQy Tg S/N / Date________
"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.
PO#: sold/shipped CC/J/#_elaQyag CodeDominion North Anna 4500033020 12/13/2012 CC1995/CJ2385 A20OMACAC 1 01238501 C121 119Dominion North Anna 4500034851 1/11/2013 CC2019/CJ2415 A200MACAC 1 CJ241501 0121119Dominion North.Anna 45813045 2/10/2011 CC285/CJ361 A200MACAC I 0136101 0101023Dominion North Anna 45597232 7/18/2008 T8270.1 A200MAOAO I ,T827001 0080118Dominion North Anna 45619298 9/26/2008 T8446.1I A200MACAC 1 T844601 C 08011801-02:0120111 03:C120 116H.B.ROBISON04:
"Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Uammer A200 series starter failures may be reportable and an extent of condition review needed to be done.
C111230Duke H.OI ON00607524 2/16/2012 CC 1262/CJ1521 A20TKIKCA 8 01152101 05:C110909 PLANT 06:0C110914 07:C0111111
"The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.
____ ___ ___ ____ ___ ___ ____ _ _ ___ ____ __ ___08:C0111128 Due H.B. ROBINSON 06873/621 C12/J155 A 11A6 C1501 01-02:C0110909 DuePLANT 00056 32/02 019/155 AOKO J551 03-06:0110915 02: 0090323KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K5CH 2 T861003 030131KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K4CH 1 T861004 0090115PG&E DIABLO CANYON 3500947987 4/2/2013 00C1818/CJ2177 A200MICACEJ4 6 .0J217701 01-06: 012092801:0C100603 "02: C100617PG&E DIABLO CANYON 3500889322 2/10/2011 CC298/CJ380 A201KOCA 9 CJ38001 03:0C100701 04-07:C0101,208
"Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon based mold release was periodically used until October 2012. According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.
__________
"Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user
___ ___ ___ _ __ _ _ ___ ___ 08-09: Cl110111PG&E DIABLO CANYON 3500902818 7/27/2011 00658/0J805 A200MOCACDEJ4 5 , J80501 10719PG&E DIABLO CANYON 136862 6/16/2008 T8169.1 A200MI CACEJ4 6 :T816901 01-06:C0080429 PG&EDIABLO CANYON350C1842462"9/29/2009 T9421IELA200MOCACDEJ4 2,T942 10201:C090826 02:0090923 01-06:C090831
 
--I0 120627Date Code is:YYMMDDPage 2 of 2 12/18/2015 PaoD 1Part 21 (PAR) Event#. 51611Rep Org: QUALTECH NP Notification Date / Time: 12/18/2015 15:50 (EST)Supplier:
12/18/2015                   U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 should evaluate their applications for this potential failure mechanism."
QUALTECH NP Event Date/ITime:
10/06/2015 (EST)Last Modification:
12/18/2015 Region: 3 Docket #:City: CINCINNATI Agreement State: YesCounty: License #:State: OHNRC Notified by: MARGIE HOVER Notifications:
LADONNA SUGGS R2DOHQ Ops Officer:
DONG HWA PARK RAY AZUA R4DOEmergency Class: NON EMERGENCY PART 2 1/50.55 REACTORS EMAIL10 CFR Section:21.21 (d)(3)(i)
DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING A200 SERIES STARTERSThe following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:
"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200series starter failures since September 15, 2008. The failures would remain in the operated/energized contactstate with power removed for some period of time. All starters impacted with this failure were continuously energized.
The concern was that if tripped, that the main contacts would not open to protect the motor."Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. TheTest Report from Eaton was received by QTNP for further review and evaluation.
On October 6, 2015 QTNPdetermined that the Cutler Uammer A200 series starter failures may be reportable and an extent of condition review needed to be done."The root cause was a silicon based mold release that remained on the molded parts and would come betweenthe moving (magnet)  
& fixed armatures.
When heated for an extended period of time, this material would becomesticky causing anywhere from a minor delay in opening, up to a frozen closed condition.
"Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facilityin May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon basedmold release was periodically used until October 2012. According to Cutler Hammer, anything made after January1, 2013 should definitely be silicon mold release free."Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012could have this concern.
This failure has only been reported for continuously energized applications.
The end user 12/18/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2should evaluate their applications for this potential failure mechanism."
QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.
QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.
CUR TISS -DOUETcoNTRACT WRIGHT TRANSMENTTALN QualTech NP, Nuclear Division TRNM TACurtiss-Wright Corporation QTP40P.O.
 
NUMBER4600 East Tech Drive, Cincinnati, OH 45245 QTP40N/AT: 513.528.7900 I F: 513.528.4537 TO: NRC'S DOCUMENT CONTROL DESK ACTION LEGEND STATUSU.S. REGULATORY COMMISSION
CUR   WRIGHT TISS -                                             DOUETcoNTRACT TRANSMENTTALN QualTech NP, Nuclear Division                                 TRNM                 TA Curtiss-Wright Corporation                                         QTP40P.O.                                                   NUMBER 4600 East Tech Drive, Cincinnati, OH 45245                         QTP40N/A T: 513.528.7900 I F: 513.528.4537 TO:   NRC'S DOCUMENT CONTROL DESK                                                       ACTION                   LEGEND                   STATUS U.S. REGULATORY COMMISSION
: 1. For Approval A. Approved-Released forWASHINGTON, DC 20555-0001  
: 1. For Approval                     A. Approved-Released for WASHINGTON, DC 20555-0001                                                     2. Final Documents for                 Construction ATTN:     HEADQUARTERS OPERATIONS OFFICER                                                   Record                           B.Approved as noted-hoo.hoc@nrc.gov                                                               3. For Information Only                 Resubmit- Construction Phone: (301) 816-5100; Fax: (301) 816-5151                                     4. For Preliminary Use                 may proceed
: 2. Final Documents for Construction ATTN: HEADQUARTERS OPERATIONS OFFICER Record B. Approved as noted-hoo.hoc@nrc.gov  
_____________________________________                    5. For Your Use                     C. Not approved- Resubmit PROJECT: ______________________                                                               6. Revised as Requested             D. _______
: 3. For Information Only Resubmit-Construction Phone: (301) 816-5100; Fax: (301) 816-5151  
NO.               NO.       LI DRAWINGS                           El REPORTS                           E DRAWING NUMBER DOUET REV.
: 4. For Preliminary Use may proceed_____________________________________
FOF PRINTS/           SEPIAS El SPECIFICATION
: 5. For Your Use C. Not approved-ResubmitPROJECT:
[] OTHERN El PROCEDUREE COPIESN D
______________________  
N/A                         N/A           INOTIFICATION                                 OF 10CFR PART 21 ON                                     2 EATON/CUTLER HAMMER A200 SERIES STARTERS
: 6. Revised as Requested D. _______NO. NO. LI DRAWINGS El REPORTS EDOUET FOF El SPECIFICATION El PROCEDUREE DRAWING NUMBER REV. PRINTS/ SEPIAS [] OTHERNCOPIESNDN/A N/A INOTIFICATION OF 10CFR PART 21 ON 2EATON/CUTLER HAMMER A200 SERIES STARTERS______ ______(&
______    ______(&           CONTACTORS) 4           4.             4.             +
CONTACTORS) 4 4. 4. +4 4. 4. +4 4. 4. 4.4 4. 4. 4.4 4. 4. 4.4. 4. 4. 4.______ 4. 4.4. 4. 4.PLEASE ACKNOWLEDGE RECEIPT BELOW ANDREMARKS ________________________
4           4.             4.             +
RETURN A SIGNED COPY____ ____ ___ ____ ____ ___ ____ ___ ____ ____ ___ ____ ___ RECEIVED BY _ _ _ _ _ _ _ _ _ _ _ _DATED ________________
4           4.             4.             4.
BY .,7Vt/rg12 fl-Oyer DATE: 12/18/2015 DOCUMENT CONTROL In order to avoid delays in the projectPAGE: 1 of 1 these documents must be returned by:______
4           4.             4.             4.
\1020-07-91, REV.4 CURTI7SS  
4           4.             4.             4.
-CriswihWRIGHT Nuclear OvsoQualTech NP4600 East Tech Drive, Cincinnati, OH 45245P: 513.528.7900!]
: 4.         4.             4.             4.
F: 513.528.9292 http://qua/technp.cwfc.ctom December 18, 2015
______     4.             4.
: 4.         4.             4.
PLEASE ACKNOWLEDGE RECEIPT BELOW AND REMARKS      ________________________                                                         RETURN A SIGNED COPY
________  ___     ____     ____ ___   ____   ___     RECEIVED BY           _  _ _ _   _ _   _ _ _ _ _ _
DATED        ________________
BY                     .,7Vt/rg12 fl-Oyer                         DATE:   12/18/2015 DOCUMENT CONTROL                                                           In order to avoid delays in the project PAGE:       1 of 1         these documents must be returned by:______
                                                                                                                                    \1 020-07-91, REV.4
 
CURTI7SS WRIGHT-                                                                                     Criswih Nuclear Ovso QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.7900!] F: 513.528.9292 http://qua/technp.cwfc.ctom December 18, 2015


==Subject:==
==Subject:==
Notification of 10CFR Part 21 on Eaton/Cutler Hammer A2OO series Starters (&
Contactors)
Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.
Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report fr'om Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starter failures may be reportable and an extent of condition review needed to be done.
The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.
Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was traditionally used. The silicon based mold release was periodically used until October 2012.
According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.
Thus any starters/contactors of the CH A200 series manufactured between May 2008 &
December 31, 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user should evaluate their applications for this potential failure mechanism.
Corrective Action to Prevent recurrence:
      *QualTech has notified all of the affected customers listed in the attached table regarding this issue.
      *QualTech will revise applicable dedication plans to add a caution that "Any starters/contactors of the CH A200 series manufactured between May 2008 &
December 31, 2012 may not be dedicated and are unacceptable". Or similar language and provide a reference to this notification or Corrective Action document that applies to this notification.
Page l of 2


Notification of 1OCFR Part 21 on Eaton/Cutler Hammer A2OO series Starters
Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176
(&Contactors)
.Sincerely, General Manager, Curtiss-Wright QualTech, NP
Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler HammerA200 series starter failures since September 15, 2008. The failures would remain in theoperated/energized contact state with power removed for some period of time. All startersimpacted with this failure were continuously energized.
 
The concern was that if tripped, thatthe main contacts would not open to protect the motor.Testing was performed by Eaton Industrial Controls Division after receiving defective samplesfrom PGE. The Test Report fr'om Eaton was received by QTNP for further review andevaluation.
.CUR WRIGHTTISS -                                                                                                                                       Curtiss-Wright Nucdear Division QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.79001I F: 513.528.9292 hftp://quaftechnp.cwfc.com Customer       Plant Customer PO#:              Year sold/shipped            /C'#RlyQy CC/J/#_elaQyag Tg              S/NCode/ Date Dominion North Anna                 4500033020       12/13/2012     CC1995/CJ2385         A20OMACAC         1     01238501               C121 119 Dominion North Anna                 4500034851         1/11/2013     CC2019/CJ2415         A200MACAC         1     CJ241501               0121119 Dominion North.Anna                 45813045         2/10/2011     CC285/CJ361           A200MACAC         I       0136101               0101023 Dominion North Anna                 45597232         7/18/2008     T8270.1               A200MAOAO         I     ,T827001               0080118 Dominion North Anna                 45619298         9/26/2008     T8446.1I               A200MACAC       1       T844601               C080118 01-02:0120111 03:C120 116 H.B.ROBISON04:                                                                                       C111230 Duke    H.OI           ON00607524                   2/16/2012       CC1262/CJ1521             A20TKIKCA   8       01152101             05:C110909 PLANT                                                                                                                           06:0C110914 07:C0111111
On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starterfailures may be reportable and an extent of condition review needed to be done.The root cause was a silicon based mold release that remained on the molded parts and wouldcome between the moving (magnet)
___     ____ __                   ___08:C0111128 Due   H.B. ROBINSON               06873/621                       C12/J155                 A 11A6               C1501             01-02:C0110909 DuePLANT                         00056           32/02           019/155                   AOKO                   J551           03-06:0110915 02: 0090323 KRSKO    Slovienia                   10106/479       4/13/2010           T8610.1             A201K5CH     2       T861003             030131 KRSKO    Slovienia                   10106/479       4/13/2010           T8610.1             A201K4CH     1       T861004               0090115 PG&E     DIABLO CANYON             3500947987         4/2/2013       00C1818/CJ2177         A200MICACEJ4   6       .0J217701         01-06: 0120928 01:0C100603 "02:C100617 PG&E     DIABLO CANYON             3500889322         2/10/2011       CC298/CJ380             A201KOCA     9       CJ38001             03:0C100701 04-07:C0101,208
& fixed armatures.
___   ___ _ ___               __   _ _   ___   ___       08-09: Cl110111 PG&E     DIABLO CANYON             3500902818         7/27/2011       00658/0J805         A200MOCACDEJ4   5       , J80501           01-*05:C01 10719 PG&E     DIABLO CANYON                 136862         6/16/2008           T8169.1           A200MI CACEJ4   6       :T816901           01-06:C0080429 "9/29/2009                                             2       ,T942 102          01:C090826 PG&E    DIABLO CANYON              350C1842462                          T9421IEL          A200MOCACDEJ4                                02:0090923 01-06:C090831
When heated for an extended period oftime, this material would become sticky causing anywhere from a minor delay in opening, up toa frozen closed condition.
                                                                                                                        -       -     I Date    Code is:
Cutler Hammer has determined that the silicone mold release was first introduced into themanufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that wastraditionally used. The silicon based mold release was periodically used until October 2012.According to Cutler Hammer, anything made after January 1, 2013 should definitely be siliconmold release free.Thus any starters/contactors of the CH A200 series manufactured between May 2008 &December 31, 2012 could have this concern.
0 120627 YYMMDD Page 2 of 2}}
This failure has only been reported forcontinuously energized applications.
The end user should evaluate their applications for thispotential failure mechanism.
Corrective Action to Prevent recurrence:
*QualTech has notified all of the affected customers listed in the attached table regarding this issue.*QualTech will revise applicable dedication plans to add a caution that "Anystarters/contactors of the CH A200 series manufactured between May 2008 &December 31, 2012 may not be dedicated and are unacceptable".
Or similar languageand provide a reference to this notification or Corrective Action document that applies tothis notification.
Page l of 2 Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176.Sincerely, General Manager,Curtiss-Wright  
: QualTech, NP  
.CUR TISS -WRIGHTCurtiss-Wright Nucdear DivisionQualTech NP4600 East Tech Drive, Cincinnati, OH 45245P: 513.528.79001I F: 513.528.9292 hftp://quaftechnp.cwfc.com Customer Plant Customer Year /C'#RlyQy Tg S/N / Date________
PO#: sold/shipped CC/J/#_elaQyag CodeDominion North Anna 4500033020 12/13/2012 CC1995/CJ2385 A20OMACAC 1 01238501 C121 119Dominion North Anna 4500034851 1/11/2013 CC2019/CJ2415 A200MACAC 1 CJ241501 0121119Dominion North.Anna 45813045 2/10/2011 CC285/CJ361 A200MACAC I 0136101 0101023Dominion North Anna 45597232 7/18/2008 T8270.1 A200MAOAO I ,T827001 0080118Dominion North Anna 45619298 9/26/2008 T8446.1I A200MACAC 1 T844601 C 08011801-02:0120111 03:C120 116H.B.ROBISON04:
C111230Duke H.OI ON00607524 2/16/2012 CC 1262/CJ1521 A20TKIKCA 8 01152101 05:C110909 PLANT 06:0C110914 07:C0111111
____ ___ ___ ____ ___ ___ ____ _ _ ___ ____ __ ___08:C0111128 Due H.B. ROBINSON 06873/621 C12/J155 A 11A6 C1501 01-02:C0110909 DuePLANT 00056 32/02 019/155 AOKO J551 03-06:0110915 02: 0090323KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K5CH 2 T861003 030131KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K4CH 1 T861004 0090115PG&E DIABLO CANYON 3500947987 4/2/2013 00C1818/CJ2177 A200MICACEJ4 6 .0J217701 01-06: 012092801:0C100603 "02: C100617PG&E DIABLO CANYON 3500889322 2/10/2011 CC298/CJ380 A201KOCA 9 CJ38001 03:0C100701 04-07:C0101,208
__________
___ ___ ___ _ __ _ _ ___ ___ 08-09: Cl110111PG&E DIABLO CANYON 3500902818 7/27/2011 00658/0J805 A200MOCACDEJ4 5 , J80501 10719PG&E DIABLO CANYON 136862 6/16/2008 T8169.1 A200MI CACEJ4 6 :T816901 01-06:C0080429 PG&EDIABLO CANYON350C1842462"9/29/2009 T9421IELA200MOCACDEJ4 2,T942 10201:C090826 02:0090923 01-06:C090831
--I0 120627Date Code is:YYMMDDPage 2 of 2}}

Latest revision as of 07:31, 5 February 2020

Curtiss-Wright Corp. - Notification of Part 21 Report on Eaton/Cutler Hammer A200 Series Starters (and Contactors), Per North Anna, H.B. Robinson, Diablo Canyon, and Hatch
ML15357A042
Person / Time
Site: Hatch, North Anna, Diablo Canyon, Robinson  Duke Energy icon.png
Issue date: 12/18/2015
From: Troutner J
Curtiss-Wright Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15357A042 (6)


Text

12/18/2015 PaoD 1 Part 21 (PAR) Event#. 51611 Rep Org: QUALTECH NP Notification Date / Time: 12/18/2015 15:50 (EST)

Supplier: QUALTECH NP Event Date/ITime: 10/06/2015 (EST)

Last Modification: 12/18/2015 Region: 3 Docket #:

City: CINCINNATI Agreement State: Yes County: License #:

State: OH NRC Notified by: MARGIE HOVER Notifications: LADONNA SUGGS R2DO HQ Ops Officer: DONG HWA PARK RAY AZUA R4DO Emergency Class: NON EMERGENCY PART 2 1/50.55 REACTORS EMAIL 10 CFR Section:

21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING A200 SERIES STARTERS The following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:

"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.

"Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Uammer A200 series starter failures may be reportable and an extent of condition review needed to be done.

"The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.

"Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon based mold release was periodically used until October 2012. According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.

"Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user

12/18/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 should evaluate their applications for this potential failure mechanism."

QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.

CUR WRIGHT TISS - DOUETcoNTRACT TRANSMENTTALN QualTech NP, Nuclear Division TRNM TA Curtiss-Wright Corporation QTP40P.O. NUMBER 4600 East Tech Drive, Cincinnati, OH 45245 QTP40N/A T: 513.528.7900 I F: 513.528.4537 TO: NRC'S DOCUMENT CONTROL DESK ACTION LEGEND STATUS U.S. REGULATORY COMMISSION

1. For Approval A. Approved-Released for WASHINGTON, DC 20555-0001 2. Final Documents for Construction ATTN: HEADQUARTERS OPERATIONS OFFICER Record B.Approved as noted-hoo.hoc@nrc.gov 3. For Information Only Resubmit- Construction Phone: (301) 816-5100; Fax: (301) 816-5151 4. For Preliminary Use may proceed

_____________________________________ 5. For Your Use C. Not approved- Resubmit PROJECT: ______________________ 6. Revised as Requested D. _______

NO. NO. LI DRAWINGS El REPORTS E DRAWING NUMBER DOUET REV.

FOF PRINTS/ SEPIAS El SPECIFICATION

[] OTHERN El PROCEDUREE COPIESN D

N/A N/A INOTIFICATION OF 10CFR PART 21 ON 2 EATON/CUTLER HAMMER A200 SERIES STARTERS

______ ______(& CONTACTORS) 4 4. 4. +

4 4. 4. +

4 4. 4. 4.

4 4. 4. 4.

4 4. 4. 4.

4. 4. 4. 4.

______ 4. 4.

4. 4. 4.

PLEASE ACKNOWLEDGE RECEIPT BELOW AND REMARKS ________________________ RETURN A SIGNED COPY

________ ___ ____ ____ ___ ____ ___ RECEIVED BY _ _ _ _ _ _ _ _ _ _ _ _

DATED ________________

BY .,7Vt/rg12 fl-Oyer DATE: 12/18/2015 DOCUMENT CONTROL In order to avoid delays in the project PAGE: 1 of 1 these documents must be returned by:______

\1 020-07-91, REV.4

CURTI7SS WRIGHT- Criswih Nuclear Ovso QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.7900!] F: 513.528.9292 http://qua/technp.cwfc.ctom December 18, 2015

Subject:

Notification of 10CFR Part 21 on Eaton/Cutler Hammer A2OO series Starters (&

Contactors)

Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.

Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report fr'om Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starter failures may be reportable and an extent of condition review needed to be done.

The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.

Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was traditionally used. The silicon based mold release was periodically used until October 2012.

According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.

Thus any starters/contactors of the CH A200 series manufactured between May 2008 &

December 31, 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user should evaluate their applications for this potential failure mechanism.

Corrective Action to Prevent recurrence:

  • QualTech has notified all of the affected customers listed in the attached table regarding this issue.
  • QualTech will revise applicable dedication plans to add a caution that "Any starters/contactors of the CH A200 series manufactured between May 2008 &

December 31, 2012 may not be dedicated and are unacceptable". Or similar language and provide a reference to this notification or Corrective Action document that applies to this notification.

Page l of 2

Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176

.Sincerely, General Manager, Curtiss-Wright QualTech, NP

.CUR WRIGHTTISS - Curtiss-Wright Nucdear Division QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.79001I F: 513.528.9292 hftp://quaftechnp.cwfc.com Customer Plant Customer PO#: Year sold/shipped /C'#RlyQy CC/J/#_elaQyag Tg S/NCode/ Date Dominion North Anna 4500033020 12/13/2012 CC1995/CJ2385 A20OMACAC 1 01238501 C121 119 Dominion North Anna 4500034851 1/11/2013 CC2019/CJ2415 A200MACAC 1 CJ241501 0121119 Dominion North.Anna 45813045 2/10/2011 CC285/CJ361 A200MACAC I 0136101 0101023 Dominion North Anna 45597232 7/18/2008 T8270.1 A200MAOAO I ,T827001 0080118 Dominion North Anna 45619298 9/26/2008 T8446.1I A200MACAC 1 T844601 C080118 01-02:0120111 03:C120 116 H.B.ROBISON04: C111230 Duke H.OI ON00607524 2/16/2012 CC1262/CJ1521 A20TKIKCA 8 01152101 05:C110909 PLANT 06:0C110914 07:C0111111

___ ____ __ ___08:C0111128 Due H.B. ROBINSON 06873/621 C12/J155 A 11A6 C1501 01-02:C0110909 DuePLANT 00056 32/02 019/155 AOKO J551 03-06:0110915 02: 0090323 KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K5CH 2 T861003 030131 KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K4CH 1 T861004 0090115 PG&E DIABLO CANYON 3500947987 4/2/2013 00C1818/CJ2177 A200MICACEJ4 6 .0J217701 01-06: 0120928 01:0C100603 "02:C100617 PG&E DIABLO CANYON 3500889322 2/10/2011 CC298/CJ380 A201KOCA 9 CJ38001 03:0C100701 04-07:C0101,208

___ ___ _ ___ __ _ _ ___ ___ 08-09: Cl110111 PG&E DIABLO CANYON 3500902818 7/27/2011 00658/0J805 A200MOCACDEJ4 5 , J80501 01-*05:C01 10719 PG&E DIABLO CANYON 136862 6/16/2008 T8169.1 A200MI CACEJ4 6 :T816901 01-06:C0080429 "9/29/2009 2 ,T942 102 01:C090826 PG&E DIABLO CANYON 350C1842462 T9421IEL A200MOCACDEJ4 02:0090923 01-06:C090831

- - I Date Code is:

0 120627 YYMMDD Page 2 of 2

12/18/2015 PaoD 1 Part 21 (PAR) Event#. 51611 Rep Org: QUALTECH NP Notification Date / Time: 12/18/2015 15:50 (EST)

Supplier: QUALTECH NP Event Date/ITime: 10/06/2015 (EST)

Last Modification: 12/18/2015 Region: 3 Docket #:

City: CINCINNATI Agreement State: Yes County: License #:

State: OH NRC Notified by: MARGIE HOVER Notifications: LADONNA SUGGS R2DO HQ Ops Officer: DONG HWA PARK RAY AZUA R4DO Emergency Class: NON EMERGENCY PART 2 1/50.55 REACTORS EMAIL 10 CFR Section:

21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING A200 SERIES STARTERS The following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:

"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.

"Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Uammer A200 series starter failures may be reportable and an extent of condition review needed to be done.

"The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.

"Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon based mold release was periodically used until October 2012. According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.

"Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user

12/18/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 should evaluate their applications for this potential failure mechanism."

QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.

CUR WRIGHT TISS - DOUETcoNTRACT TRANSMENTTALN QualTech NP, Nuclear Division TRNM TA Curtiss-Wright Corporation QTP40P.O. NUMBER 4600 East Tech Drive, Cincinnati, OH 45245 QTP40N/A T: 513.528.7900 I F: 513.528.4537 TO: NRC'S DOCUMENT CONTROL DESK ACTION LEGEND STATUS U.S. REGULATORY COMMISSION

1. For Approval A. Approved-Released for WASHINGTON, DC 20555-0001 2. Final Documents for Construction ATTN: HEADQUARTERS OPERATIONS OFFICER Record B.Approved as noted-hoo.hoc@nrc.gov 3. For Information Only Resubmit- Construction Phone: (301) 816-5100; Fax: (301) 816-5151 4. For Preliminary Use may proceed

_____________________________________ 5. For Your Use C. Not approved- Resubmit PROJECT: ______________________ 6. Revised as Requested D. _______

NO. NO. LI DRAWINGS El REPORTS E DRAWING NUMBER DOUET REV.

FOF PRINTS/ SEPIAS El SPECIFICATION

[] OTHERN El PROCEDUREE COPIESN D

N/A N/A INOTIFICATION OF 10CFR PART 21 ON 2 EATON/CUTLER HAMMER A200 SERIES STARTERS

______ ______(& CONTACTORS) 4 4. 4. +

4 4. 4. +

4 4. 4. 4.

4 4. 4. 4.

4 4. 4. 4.

4. 4. 4. 4.

______ 4. 4.

4. 4. 4.

PLEASE ACKNOWLEDGE RECEIPT BELOW AND REMARKS ________________________ RETURN A SIGNED COPY

________ ___ ____ ____ ___ ____ ___ RECEIVED BY _ _ _ _ _ _ _ _ _ _ _ _

DATED ________________

BY .,7Vt/rg12 fl-Oyer DATE: 12/18/2015 DOCUMENT CONTROL In order to avoid delays in the project PAGE: 1 of 1 these documents must be returned by:______

\1 020-07-91, REV.4

CURTI7SS WRIGHT- Criswih Nuclear Ovso QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.7900!] F: 513.528.9292 http://qua/technp.cwfc.ctom December 18, 2015

Subject:

Notification of 10CFR Part 21 on Eaton/Cutler Hammer A2OO series Starters (&

Contactors)

Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.

Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report fr'om Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starter failures may be reportable and an extent of condition review needed to be done.

The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.

Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was traditionally used. The silicon based mold release was periodically used until October 2012.

According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.

Thus any starters/contactors of the CH A200 series manufactured between May 2008 &

December 31, 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user should evaluate their applications for this potential failure mechanism.

Corrective Action to Prevent recurrence:

  • QualTech has notified all of the affected customers listed in the attached table regarding this issue.
  • QualTech will revise applicable dedication plans to add a caution that "Any starters/contactors of the CH A200 series manufactured between May 2008 &

December 31, 2012 may not be dedicated and are unacceptable". Or similar language and provide a reference to this notification or Corrective Action document that applies to this notification.

Page l of 2

Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176

.Sincerely, General Manager, Curtiss-Wright QualTech, NP

.CUR WRIGHTTISS - Curtiss-Wright Nucdear Division QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.79001I F: 513.528.9292 hftp://quaftechnp.cwfc.com Customer Plant Customer PO#: Year sold/shipped /C'#RlyQy CC/J/#_elaQyag Tg S/NCode/ Date Dominion North Anna 4500033020 12/13/2012 CC1995/CJ2385 A20OMACAC 1 01238501 C121 119 Dominion North Anna 4500034851 1/11/2013 CC2019/CJ2415 A200MACAC 1 CJ241501 0121119 Dominion North.Anna 45813045 2/10/2011 CC285/CJ361 A200MACAC I 0136101 0101023 Dominion North Anna 45597232 7/18/2008 T8270.1 A200MAOAO I ,T827001 0080118 Dominion North Anna 45619298 9/26/2008 T8446.1I A200MACAC 1 T844601 C080118 01-02:0120111 03:C120 116 H.B.ROBISON04: C111230 Duke H.OI ON00607524 2/16/2012 CC1262/CJ1521 A20TKIKCA 8 01152101 05:C110909 PLANT 06:0C110914 07:C0111111

___ ____ __ ___08:C0111128 Due H.B. ROBINSON 06873/621 C12/J155 A 11A6 C1501 01-02:C0110909 DuePLANT 00056 32/02 019/155 AOKO J551 03-06:0110915 02: 0090323 KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K5CH 2 T861003 030131 KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K4CH 1 T861004 0090115 PG&E DIABLO CANYON 3500947987 4/2/2013 00C1818/CJ2177 A200MICACEJ4 6 .0J217701 01-06: 0120928 01:0C100603 "02:C100617 PG&E DIABLO CANYON 3500889322 2/10/2011 CC298/CJ380 A201KOCA 9 CJ38001 03:0C100701 04-07:C0101,208

___ ___ _ ___ __ _ _ ___ ___ 08-09: Cl110111 PG&E DIABLO CANYON 3500902818 7/27/2011 00658/0J805 A200MOCACDEJ4 5 , J80501 01-*05:C01 10719 PG&E DIABLO CANYON 136862 6/16/2008 T8169.1 A200MI CACEJ4 6 :T816901 01-06:C0080429 "9/29/2009 2 ,T942 102 01:C090826 PG&E DIABLO CANYON 350C1842462 T9421IEL A200MOCACDEJ4 02:0090923 01-06:C090831

- - I Date Code is:

0 120627 YYMMDD Page 2 of 2