MONTHYEARNL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers ML22307A0602022-11-0303 November 2022 EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML21225A0812021-08-0404 August 2021 Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20049A0742020-01-31031 January 2020 Fairbanks Morse Part 21 Re Fm Notification Report Serial Number 20-01 Fairbanks Morse ML20028D3802020-01-13013 January 2020 10CFR21 Notification for Ashcroft 2-1/2 & 3-1/2 1009, 63mm 2008, 63mm & 100mm 1008 Industrial Gauges, Weksler 3-1/2 Regal Gauges ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19158A1312019-05-31031 May 2019 Paragon Energy Systems LLC -10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19101A0972019-04-0404 April 2019 Weir Valves & Controls USA, Inc. Part 21 Written Notification - Event Number: 53973 - 24 Class 150 Globe Alve for RHRSW HX Isolation MOV, E1150F068B at Detroit Edison - Fermi, Unit 2, Experienced Two Stem Failures ML19087A2512019-03-11011 March 2019 Weir Valves & Controls USA, Inc. - 10 CFR Part 21 Report: 24 Class 150 Globe Failed to Fully Open Due to the Failure of the Anti-Rotation Key ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17333A3792017-11-21021 November 2017 Engine Systems, Inc. 10 CFR 21 Reportable Notification on a Power Supply (P/N 2938604) ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML17114A0692017-04-19019 April 2017 Part 21 Report - Control Rod Drive Mechanisms Contaminated with Chlorides ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17039A5692017-02-0303 February 2017 Final Part 21 Report on Defect, Potential for Test Induced Damage 0867F Series Main Steam Safety Relief Valves ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16125A3602016-04-26026 April 2016 Part 21 - Hydraulic Snubber Seal Material Deviation Interim Report ML16004A0302015-12-23023 December 2015 MPR Associates, Inc. - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 ML16020A4762015-12-18018 December 2015 Curtiss-Wright Corp. - Notification of Part 21 Report on Eaton/Cutler Hammer A200 Series Starters (and Contactors), Per North Anna, H.B. Robinson, Diablo Canyon, and Hatch ML15357A0422015-12-18018 December 2015 Curtiss-Wright Corp. - Notification of Part 21 Report on Eaton/Cutler Hammer A200 Series Starters (and Contactors), Per North Anna, H.B. Robinson, Diablo Canyon, and Hatch ML15201A2872015-07-0808 July 2015 Crane Nuclear, Inc. - Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance ML15187A1722015-06-30030 June 2015 Interim Part 21 Report - Potential Test Induced Defect in 0867F Main Steam Safety Relief Valves ML15134A0172015-05-0101 May 2015 Part 21 Report Regarding Potential Test Induced Defect in a 0867F Main Steam Safety Relief Valves ML15089A4372015-03-20020 March 2015 Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays ML15077A4222015-03-17017 March 2015 Curtiss Wright Flow Control Co., Interim Part 21 Report - Potential Test Induced Defect in a 0867F Main Steam Safety Relief Valves ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14034A1892014-01-23023 January 2014 Part 21 - Loose Battery Vent Assemblies ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13211A1682013-07-26026 July 2013 Westinghouse, Notification of Potential Existence of Defects Pursuant to 10 CFR Part 21 Inconsistency Between the Intended Design Functionality of the Shield Passive Thermal Shutdown Seal (SDS) and That Observed During Post-Service Testing ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13063A4432013-03-0101 March 2013 10 CFR Part 21 Report Notification, Dual Alarm Modules and Single Alarm Modules ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology 2023-12-15
[Table view] Category:Letter
MONTHYEARIR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 ML24012A0652024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. ML24010A0032024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24026A0532024-01-30030 January 2024 Notification of an NRC Fire Protection Team Inspection- (Report 05000348/2024011, 05000364/2024011) and Request for Information IR 05000348/20230402024-01-24024 January 2024 95001 Supplemental Inspection Report 05000348/2023040 and Follow-Up Assessment Letter IR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23346A2222023-12-22022 December 2023 Transmittal of Dam Inspection Report - Public NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems IR 05000321/20234022023-11-29029 November 2023 Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal IR 05000321/20230112023-11-17017 November 2023 Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 ML23324A4472023-11-14014 November 2023 302 Exam Approval Letter NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection IR 05000321/20230032023-11-0202 November 2023 Integrated Inspection Report 05000321/2023003, and 05000366/2023003 ML23318A0672023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Updated NFPA 805 Fire Protection Program Design Basis Document, Technical Specification Bases Changes, Technical Requirements Manual Changes, IR 05000321/20234032023-10-26026 October 2023 Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000348/20230032023-10-24024 October 2023 Integrated Inspection Report 05000348/2023003 and 05000364/2023003 IR 05000348/20230912023-10-19019 October 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter NRC Inspection Report 05000348/2023091 IR 05000348/20234022023-10-18018 October 2023 Security Baseline Inspection Report 05000348/2023402 and 05000364/2023402 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 IR 05000348/20234412023-10-12012 October 2023 Supplemental Inspection Report 05000348/2023441 and 05000364/2023441 and Follow-Up Assessment Letter (Cover Letter) ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000348/20230902023-08-31031 August 2023 NRC Inspection Report 05000348/2023090 and Preliminary White Finding and Apparent Violation ML23164A1202023-08-30030 August 2023 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0, to the Requirements of the ASME Code ML23240A0012023-08-30030 August 2023 Correction to Issuance of Amendment Nos. 241, 242, 243, and 244 IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit IR 05000348/20330012023-08-14014 August 2023 NRC Operator License Examination Report 05000348/203301 and 05000364/2023302 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal IR 05000348/20230022023-08-10010 August 2023 Integrated Inspection Report 05000348/2023002 and 05000364/2023002, and Apparent Violation ML23221A3062023-08-0909 August 2023 Notification of NRC Supplemental Inspection (95002) and Request for Information (Cover Letter) NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 2024-01-31
[Table view] Category:Part 21 Correspondence
MONTHYEARML20028D3802020-01-13013 January 2020 10CFR21 Notification for Ashcroft 2-1/2 & 3-1/2 1009, 63mm 2008, 63mm & 100mm 1008 Industrial Gauges, Weksler 3-1/2 Regal Gauges ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML15223B2662015-08-0707 August 2015 Part 21 Report - Crane Nuclear Pressure Seal Valve with Retaining Rings ML15105A3462015-03-23023 March 2015 NSAL-15-2 - Impact of a Break in the Reactor Coolant Pump No. 1 Seal Leak-off Line Piping on Seal Leakage During a Loss of Seal Cooling Event ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML1024605372010-09-0202 September 2010 Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1000700732009-11-19019 November 2009 USNRC 10CFR Part 21 Notification - Flowserve Figure 848 Disk/Disk Nut Separation ML0828003372008-10-0303 October 2008 Namco, Transmittal of 10CFR Part 21 Report - Thread Sealant Issue ML0501102232005-01-0707 January 2005 Non-Emergency Event Report, Overstress Condition on Single Failure Proof Crane Trolleys ML0428002672004-09-29029 September 2004 Submittal of Part 21 Final Report: Non-conservative SLMCPR ML0320604292003-07-21021 July 2003 Notification of Possible Defect Associated with Thermo Westronics Model 2100C Series Recorders ML0215601132002-05-10010 May 2002 Letter from W. G. Hampton Subject: 10CFR21 Notification - Potential Defect Involving Fan Assemblies Use in Forced Air Cooled Uninterruptible Power Supply Systems 2020-01-13
[Table view] |
Text
UNITED CONTROLS INTERNATIONAL 10CFR21 NOTIFICATION LETTER January 13, 2020 U.S. Nuclear Regulatory Commission Document Control Desk Washington D.C. 20555-0001
Subject:
10CFR21 Notification for Ashcroft 2-1/2" & 3-1/2" 1009, 63mm 2008, 63mm &
100mm 1008 Industrial Gauges, Weksler 3-1/2" Regal Gauges The purpose of this letter is to provide the NRC with a report in general conformity of the requirements of 10CFR Part 21.21. On December 27, 2019 United Controls International (UCI) received a Product Advisory Letter from Ashcroft Inc, dated December 2, 2019 (attached) informing of a potential error in the tip material used on Ashcroft 2-1/2" and 3-1/2" model 1009, 63mm model 2008, 63mm and 100mm model 1008 industrial gauges along with Weksler 3-1/2" regal gauges. Refer to attached Ashcroft Inc. Product Advisory Letter dated December 2, 2019 for specific configuration and model numbers affected. Due to a supplier issue, 304SS tip material may have been supplied on the subject gauges instead of the specified 316SS material.
In certain applications, the 304SS tip material may be subjected to accelerated oxidation or degradation, resulting in potential release of process media. However, no detrimental effects are expected in non-corrosive applications (i.e. water with neutral, oils/hydraulic fluids, non-corrosive gasses such as air and nitrogen, anhydrous ammonia and ammonia refrigerant).
Required information as per 10CFR Part 21.2l(d)(4) follows:
(i) Name and Address of the individual or individuals informing the Commission Rob.Hale President United Controls International 205 Scientific Drive Norcross, GA 30092 (ii) Identification of the facility, the activity, or the basic component supplied/or such facility or such activity within the United States which fails to comply or contains a defect.
Ashcroft 2-1/2" and 3-1/2" model 1009, 63mm model 2008, 63mm and 100mm model 1008 industrial gauges along with Weksler 3-1/2" regal gauges. Refer to attached Ashcroft Inc. Product Advisory Letter dated December 2, 2019 for specific configuration and model numbers affected.
Page 1 of 8
UNITED CONTROLS INTERNATIONAL (iii) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.
United Controls International 205 Scientific Drive Norcross, GA 30092 (iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.
Due to a supplier issue, 304SS tip material may have been supplied on the subject gauges instead of the specified 316SS material. In certain applications the 304SS tip material may be subjected to accelerated oxidation or degradation, resulting in potential release of process media. However, no detrimental effects are expected in non-corrosive applications (i.e. water with neutral, oils/hydraulic fluids, non-corrosive gasses such as air and nitrogen, anhydrous ammonia and ammonia refrigerant).
(v) The date on which the information of such defect or failure to comply,was obtained.
December 27, 2019 (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied/or, being supplied for, or may be supplied/or, manufactured or being manufactured/or one or more facilities or activities subject to the regulations in this Part.
Part Number Utility Purchase Order Quantity*
Georgia Power - SNG27679-0694 3 2510095\NL01L0400 Hatch Alabama Power - SNA27679-0585 2 101008502B160#/KP Farley Page 2 of 8
UNITED CONTROLS INTERNATIONAL (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
The manufacturer of the subject items (Ashcroft Inc.) has identified that the supplier material issues affect only the identified items manufactured from October 2017 through October 2019. Utilities utilizing affected items are advised to evaluate whether the items would be subject to accelerated oxidation or degradation in the installed environment as described in the Ashcroft Inc. Product Advisory Notice dated December 2, 2019 (attached). If it is determined that accelerated oxidation or degradation applies to the items then they are to be returned for replacement with items manufactured with the correct 316SS tip material.
UCI shall implement a corrective action implementing the following:
The utilities that were supplied with affected items by UCI have been notified of this issue. Items supplied to Georgia Power - Hatch were not installed and,are being returned for replacement. UCI is awaiting evaluation by Alabama Power --
Farley as to whether replacement of items is required.
The dedication plan for supplied items includes material verification of wetted components including the bourdon tube and process connections; however, verification of the bourdon tube tip material was not included. The dedication plans for the subject items shall be revised to include verification of tip material as 3 l 6SS for all future orders along with inspection of manufacture date to ensure that items manufactured between October 2017 and October 2019 are not
Training of dedication personnel regarding this issue and identification of wetted components for material verification during dedication.
(vii!) Any Advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
The manufacturer of the subject items (Ashcroft Inc.) has identified that the supplier material issues affect only the identified items manufactured from October 2017 through October 2019. Utilities utilizing affected items are advised to evaluate whether the items would be subject to accelerated oxidation or degradation in the installed environment as described in the Ashcroft Inc. Product Advisory Notice dated December 2, 2019 (attached). If it is determined that accelerated oxidation or degradation applies to the items then they are to be returned for replacement with items manufactured with the correct 316SS tip material.
Page 3 of 8
UNITED CONTROLS INTERNATIONAL (ix) In the case of an early site permit, the entities to whom an early site permit was transferred.
Not Applicable.
If you have any questions or wish to discuss this matter or this report, please contact:
Wesley Hickle Engineering Manager whickle@unitedcontrols.com 770-496-1406 X 165 Sincerely,
~~\\M Rob Hale President United Controls International Page 4 of 8
UNITED CONTROLS INTERNATIONAL
Attachment:
Ashcroft Product Advisory Letter
~ ASHCROFT~
Trust the shield~
December 2, 2019 PRODUCT ADVISORY LETTER Ashcroft* 2Yz" and 3Yz" 1009, 63 mm 2008, 63 mm & 100 mm 1008 Industrial Gauges, Weksler 3Yz" Regal Gauges:
- Ashcroft* 2510095W industrial gauges in ranges of Vacuum, Compound, lSpsi through 600psi with date codes Oct 2017 to Oct 2019. (Excludes 251009AW Gauges)
- Ashcroft* 351009SW industrial gauges in ranges of Vacuum, Compound, lSpsi through 600psi with date codes Oct 2017 to Oct 2019. (Excludes 351009AW Gauges)
- Ashcroft* 6320085 industrial gauges in ranges of Vacuum, Compound, lSpsi through 600psi with date codes Oct 2017 to Oct 2019.
- Ashcroft* 631008S industrial gauges in ranges of Vacuum, Compound, lSpsi through 600psi with date codes Oct 2017 to Oct 2019. (Excludes Center Back gauges)
- Ashcroft* 1010085 industrial gauges in ranges of Vacuum, Compound, lSpsi through 600psi with date codes Oct 2017 to Oct 2019. (Excludes Center Back gauges)
- Weksler* BA43, BS43, BY43 Regal industrial gauges in ranges of Vacuum, Compound, lSpsi through 600psi with date codes Oct 2017 to Oct 2019.
- Weksler* BM43 & BN43 Regal Altitude Gauges with date codes Oct 2017 to Oct 2019.
- Weksler* BP43 & BQ43 Regal Refrigerant and Ammonia Gauges with date codes Oct 2017 to Oct 2019.
(See figure 3 for visual identification of gauge models and figure 4 for other pressure units)
This letter is to alert you to a potential error in the tip material used on certain models of Ashcroft*
Model 1008, 2008 and 1009 pressure gauges. We have determined that due to a supplier issue, 304SS tip material may have been supplied on some 1008, 2008 and 1009 gauges instead of the specified 3165S material. The gauges in question were shipped from October of 2017 through October 2019.
(PLEASE NOTE: Bourdon tube material for all gauges was supplied with the correct 3165S material.)
In certain applications the 304SS tip material (see figure 1 below) may be subject to accelerated oxidation or degradation, resulting in the potential release of process media. However, no detrimental effects are expected in non-corrosive applications (i.e. water with neutral, oils/hydraulic fluids, non-corrosive gasses such as air and nitrogen, anhydrous ammonia and ammonia refrigerant). For additional corrosive information, please refer to our Ashcroft Corrosion Guide.
Bourdon L_ TipD~ _j Tube Wetted area
-~0;--W) r ~,..
Figure 1 - C-type Bourdon Tube Assembly with Tip Details Page 5 of 8
UNITED CONTROLS INTERNATIONAL
~ ASHCROFT.
Trust the shield~
The date code can be found on a label on the back of the gauge with the month and year of manufacture or the gauge box (see figure 2).
Date Code L UFEe GA n-100I-SWL- 02L-301MV&
133HT48 llllllllllllf&IUID 30165394-18 11/tfTnl
& WARNING - C.C., _. Rep,oduclwa Hamt--.HGW.,..,,.a.;,,.
Figure 2 -Date Code Label Ashcroft is committed to the satisfaction of our customers and to the performance of our products. We apologize for any inconvenience this may cause you.
These pressure gauges can be returned for replacement. Please contact your Ashcroft supplier or go to https:ljsales.ashcroftcom/rma-form to obtain an RMA and information on how ship the gauges back to Ashcroft.
If you have technical questions regarding your specific application and potential corrosion issues, please contact:
Jeremy M. Payne Materials and Test Engineering Manager Ashcroft Inc.
250 East Main St.
Stratford, CT 06614-5145, USA Phone: +1-203-385-0564 Mobile: +1-203-767-6236 E-mail: jeremy.payne@ashcroft.com Ob nf Page 6 of 8
UNITED CONTROLS INTERNATIONAL
~ ASHCROFT.
Trust the shield~
2008 printed on DURALi FE printed the Dial on the Dial 63 mm 2008 Gauges 2\/2"' 1009SW or 2 ** 1o09AWor 3!/2"' 1009SW Gauges 3'h'" 1009AW Gauges are not part of the product advisory 1008 printed on the Dial Lower Back Center Back lncudes both 1008 Center back gauges lower and lower are not part of the back gauges product advisory 63 mm 1008 and 100 mm 1008 Gauges not Including Center back Gauges Figure 3 - Visual Identification of 1008, 2008 and 1009 gauges 1, tf rj r ft C 1 WW w Page 7 of 8
UNITED CONTROLS INTERNATI ONAL
~ ASHCROFT.
Trust the shield~ .,,r t t nq r,. t-psi bar kPa Mpa kg/cmz 30IMV -1BR -100KP -.1MP -tKSC
-1&.68R -1oo&60KP -.1&.0tiMP -1&.6KSC 30IMV&15#
-1&1.5BR -1oo&150KP -.1&.15MP -1&1.5KSC 30IMV&30#
-1&3BR -1oo&300KP -.1&.3MP -1&3KSC 301MV&60t
-1&5BR -1CIGB60a<P -. 1'-SMP -t&.5KSC 30IMV&100#
l &9BR -loo&OOOKP -.1&.9MP -1&9KSC 15# tBR tooKP .lMP lKSC 20#
1.613A 1eoKP .16MP 1.6KSC 30t 2.5BR 250KP .25MP 2.5KSC 00# 48R 400l<P .4MP 4KSC 6BR OOOKP .6MP l'lKSC 1001 120, 1o8R 1000KP 1MP 1oKSC 160I 200#
168A 1600KP 1.6MP l OKSC 300I 258R 2500KP 2.5MP 25KSC 400#
500I 000# 408R 4000KP 4MP 40KSC Figure 4 - Gauge ranges including in the advisory A ft 11 l w" Page 8 of 8