ML15357A042: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:12/18/2015                                                                                                        PaoD 1 Part 21 (PAR)                                                                                Event#.      51611 Rep Org: QUALTECH NP                                          Notification Date / Time: 12/18/2015 15:50    (EST)
Supplier: QUALTECH NP                                              Event Date/ITime: 10/06/2015            (EST)
Last Modification: 12/18/2015 Region: 3                                                Docket #:
City: CINCINNATI                              Agreement State:            Yes County:                                                  License #:
State: OH NRC Notified by:    MARGIE HOVER                        Notifications:  LADONNA SUGGS                    R2DO HQ Ops Officer:    DONG HWA PARK                                        RAY AZUA                        R4DO Emergency Class:    NON EMERGENCY                                        PART 2 1/50.55 REACTORS          EMAIL 10 CFR Section:
21.21 (d)(3)(i)      DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING A200 SERIES STARTERS The following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:
"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.
"Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Uammer A200 series starter failures may be reportable and an extent of condition review needed to be done.
"The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.
"Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon based mold release was periodically used until October 2012. According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.
"Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user
 
12/18/2015                  U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 should evaluate their applications for this potential failure mechanism."
QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.
 
CUR  WRIGHT TISS -                                            DOUETcoNTRACT TRANSMENTTALN QualTech NP, Nuclear Division                                TRNM                TA Curtiss-Wright Corporation                                        QTP40P.O.                                                    NUMBER 4600 East Tech Drive, Cincinnati, OH 45245                        QTP40N/A T: 513.528.7900 I F: 513.528.4537 TO:    NRC'S DOCUMENT CONTROL DESK                                                      ACTION                  LEGEND                  STATUS U.S. REGULATORY COMMISSION
: 1. For Approval                      A. Approved-Released for WASHINGTON, DC 20555-0001                                                      2. Final Documents for                  Construction ATTN:    HEADQUARTERS OPERATIONS OFFICER                                                  Record                            B.Approved as noted-hoo.hoc@nrc.gov                                                                3. For Information Only                Resubmit- Construction Phone: (301) 816-5100; Fax: (301) 816-5151                                    4. For Preliminary Use                  may proceed
_____________________________________                    5. For Your Use                      C. Not approved- Resubmit PROJECT: ______________________                                                              6. Revised as Requested              D. _______
NO.              NO.        LI DRAWINGS                          El REPORTS                          E DRAWING NUMBER DOUET REV.
FOF PRINTS/          SEPIAS El SPECIFICATION
[] OTHERN El PROCEDUREE COPIESN D
N/A                        N/A          INOTIFICATION                                  OF 10CFR PART 21 ON                                    2 EATON/CUTLER HAMMER A200 SERIES STARTERS
______    ______(&          CONTACTORS) 4            4.            4.              +
4            4.            4.              +
4            4.            4.              4.
4            4.            4.              4.
4            4.            4.              4.
: 4.          4.              4.              4.
______    4.            4.
: 4.          4.              4.
PLEASE ACKNOWLEDGE RECEIPT BELOW AND REMARKS      ________________________                                                          RETURN A SIGNED COPY
________  ___    ____    ____ ___  ____  ___      RECEIVED BY            _  _  _ _  _  _    _ _  _ _ _  _
DATED        ________________
BY                    .,7Vt/rg12 fl-Oyer                        DATE:  12/18/2015 DOCUMENT CONTROL                                                          In order to avoid delays in the project PAGE:        1 of 1          these documents must be returned by:______
                                                                                                                                    \1 020-07-91, REV.4
 
CURTI7SS WRIGHT-                                                                                      Criswih Nuclear Ovso QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.7900!] F: 513.528.9292 http://qua/technp.cwfc.ctom December 18, 2015
 
==Subject:==
Notification of 10CFR Part 21 on Eaton/Cutler Hammer A2OO series Starters (&
Contactors)
Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.
Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report fr'om Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starter failures may be reportable and an extent of condition review needed to be done.
The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.
Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was traditionally used. The silicon based mold release was periodically used until October 2012.
According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.
Thus any starters/contactors of the CH A200 series manufactured between May 2008 &
December 31, 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user should evaluate their applications for this potential failure mechanism.
Corrective Action to Prevent recurrence:
      *QualTech has notified all of the affected customers listed in the attached table regarding this issue.
      *QualTech will revise applicable dedication plans to add a caution that "Any starters/contactors of the CH A200 series manufactured between May 2008 &
December 31, 2012 may not be dedicated and are unacceptable". Or similar language and provide a reference to this notification or Corrective Action document that applies to this notification.
Page l of 2
 
Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176
.Sincerely, General Manager, Curtiss-Wright QualTech, NP
 
.CUR WRIGHTTISS -                                                                                                                                        Curtiss-Wright Nucdear Division QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.79001I F: 513.528.9292 hftp://quaftechnp.cwfc.com Customer        Plant Customer PO#:              Year sold/shipped            /C'#RlyQy CC/J/#_elaQyag Tg              S/NCode/ Date Dominion North Anna                4500033020        12/13/2012    CC1995/CJ2385          A20OMACAC        1      01238501                C121 119 Dominion North Anna                4500034851        1/11/2013    CC2019/CJ2415          A200MACAC        1      CJ241501              0121119 Dominion North.Anna                  45813045        2/10/2011      CC285/CJ361            A200MACAC        I      0136101              0101023 Dominion North Anna                  45597232        7/18/2008      T8270.1                A200MAOAO        I      ,T827001              0080118 Dominion North Anna                  45619298        9/26/2008      T8446.1I              A200MACAC        1        T844601                C080118 01-02:0120111 03:C120 116 H.B.ROBISON04:                                                                                      C111230 Duke    H.OI            ON00607524                  2/16/2012      CC1262/CJ1521            A20TKIKCA    8      01152101            05:C110909 PLANT                                                                                                                            06:0C110914 07:C0111111
___    ____  __                    ___08:C0111128 Due  H.B. ROBINSON              06873/621                        C12/J155                  A 11A6              C1501            01-02:C0110909 DuePLANT                          00056            32/02          019/155                  AOKO                    J551            03-06:0110915 02: 0090323 KRSKO    Slovienia                  10106/479        4/13/2010            T8610.1              A201K5CH    2        T861003            030131 KRSKO    Slovienia                  10106/479        4/13/2010            T8610.1              A201K4CH      1      T861004              0090115 PG&E    DIABLO CANYON              3500947987        4/2/2013      00C1818/CJ2177        A200MICACEJ4    6      .0J217701          01-06: 0120928 01:0C100603 "02:C100617 PG&E    DIABLO CANYON              3500889322        2/10/2011      CC298/CJ380              A201KOCA    9        CJ38001            03:0C100701 04-07:C0101,208
___  ___  _ ___              __  _  _    ___  ___      08-09: Cl110111 PG&E    DIABLO CANYON              3500902818        7/27/2011      00658/0J805          A200MOCACDEJ4    5      , J80501          01-*05:C01 10719 PG&E    DIABLO CANYON                136862          6/16/2008          T8169.1          A200MI CACEJ4  6      :T816901          01-06:C0080429 "9/29/2009                                            2        ,T942 102          01:C090826 PG&E    DIABLO CANYON              350C1842462                          T9421IEL          A200MOCACDEJ4                                02:0090923 01-06:C090831
                                                                                                                        -        -    I Date    Code is:
0 120627 YYMMDD Page 2 of 2
 
12/18/2015                                                                                                        PaoD 1 Part 21 (PAR)                                                                                Event#.      51611 Rep Org: QUALTECH NP                                          Notification Date / Time: 12/18/2015 15:50    (EST)
Supplier: QUALTECH NP                                              Event Date/ITime: 10/06/2015            (EST)
Last Modification: 12/18/2015 Region: 3                                                Docket #:
City: CINCINNATI                              Agreement State:            Yes County:                                                  License #:
State: OH NRC Notified by:    MARGIE HOVER                        Notifications:  LADONNA SUGGS                    R2DO HQ Ops Officer:    DONG HWA PARK                                        RAY AZUA                        R4DO Emergency Class:    NON EMERGENCY                                        PART 2 1/50.55 REACTORS          EMAIL 10 CFR Section:
21.21 (d)(3)(i)      DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING A200 SERIES STARTERS The following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:
"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.
"Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Uammer A200 series starter failures may be reportable and an extent of condition review needed to be done.
"The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.
"Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon based mold release was periodically used until October 2012. According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.
"Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user
 
12/18/2015                  U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 should evaluate their applications for this potential failure mechanism."
QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.
 
CUR  WRIGHT TISS -                                            DOUETcoNTRACT TRANSMENTTALN QualTech NP, Nuclear Division                                TRNM                TA Curtiss-Wright Corporation                                        QTP40P.O.                                                    NUMBER 4600 East Tech Drive, Cincinnati, OH 45245                        QTP40N/A T: 513.528.7900 I F: 513.528.4537 TO:    NRC'S DOCUMENT CONTROL DESK                                                      ACTION                  LEGEND                  STATUS U.S. REGULATORY COMMISSION
: 1. For Approval                      A. Approved-Released for WASHINGTON, DC 20555-0001                                                      2. Final Documents for                  Construction ATTN:    HEADQUARTERS OPERATIONS OFFICER                                                  Record                            B.Approved as noted-hoo.hoc@nrc.gov                                                                3. For Information Only                Resubmit- Construction Phone: (301) 816-5100; Fax: (301) 816-5151                                    4. For Preliminary Use                  may proceed
_____________________________________                    5. For Your Use                      C. Not approved- Resubmit PROJECT: ______________________                                                              6. Revised as Requested              D. _______
NO.              NO.        LI DRAWINGS                          El REPORTS                          E DRAWING NUMBER DOUET REV.
FOF PRINTS/          SEPIAS El SPECIFICATION
[] OTHERN El PROCEDUREE COPIESN D
N/A                        N/A          INOTIFICATION                                  OF 10CFR PART 21 ON                                    2 EATON/CUTLER HAMMER A200 SERIES STARTERS
______    ______(&          CONTACTORS) 4            4.            4.              +
4            4.            4.              +
4            4.            4.              4.
4            4.            4.              4.
4            4.            4.              4.
: 4.          4.              4.              4.
______    4.            4.
: 4.          4.              4.
PLEASE ACKNOWLEDGE RECEIPT BELOW AND REMARKS      ________________________                                                          RETURN A SIGNED COPY
________  ___    ____    ____ ___  ____  ___      RECEIVED BY            _  _  _ _  _  _    _ _  _ _ _  _
DATED        ________________
BY                    .,7Vt/rg12 fl-Oyer                        DATE:  12/18/2015 DOCUMENT CONTROL                                                          In order to avoid delays in the project PAGE:        1 of 1          these documents must be returned by:______
                                                                                                                                    \1 020-07-91, REV.4
 
CURTI7SS WRIGHT-                                                                                      Criswih Nuclear Ovso QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.7900!] F: 513.528.9292 http://qua/technp.cwfc.ctom December 18, 2015
 
==Subject:==
Notification of 10CFR Part 21 on Eaton/Cutler Hammer A2OO series Starters (&
Contactors)
Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.
Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report fr'om Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starter failures may be reportable and an extent of condition review needed to be done.
The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.
Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was traditionally used. The silicon based mold release was periodically used until October 2012.
According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.
Thus any starters/contactors of the CH A200 series manufactured between May 2008 &
December 31, 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user should evaluate their applications for this potential failure mechanism.
Corrective Action to Prevent recurrence:
      *QualTech has notified all of the affected customers listed in the attached table regarding this issue.
      *QualTech will revise applicable dedication plans to add a caution that "Any starters/contactors of the CH A200 series manufactured between May 2008 &
December 31, 2012 may not be dedicated and are unacceptable". Or similar language and provide a reference to this notification or Corrective Action document that applies to this notification.
Page l of 2
 
Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176
.Sincerely, General Manager, Curtiss-Wright QualTech, NP
 
.CUR WRIGHTTISS -                                                                                                                                        Curtiss-Wright Nucdear Division QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.79001I F: 513.528.9292 hftp://quaftechnp.cwfc.com Customer        Plant Customer PO#:              Year sold/shipped            /C'#RlyQy CC/J/#_elaQyag Tg              S/NCode/ Date Dominion North Anna                4500033020        12/13/2012    CC1995/CJ2385          A20OMACAC        1      01238501                C121 119 Dominion North Anna                4500034851        1/11/2013    CC2019/CJ2415          A200MACAC        1      CJ241501              0121119 Dominion North.Anna                  45813045        2/10/2011      CC285/CJ361            A200MACAC        I      0136101              0101023 Dominion North Anna                  45597232        7/18/2008      T8270.1                A200MAOAO        I      ,T827001              0080118 Dominion North Anna                  45619298        9/26/2008      T8446.1I              A200MACAC        1        T844601                C080118 01-02:0120111 03:C120 116 H.B.ROBISON04:                                                                                      C111230 Duke    H.OI            ON00607524                  2/16/2012      CC1262/CJ1521            A20TKIKCA    8      01152101            05:C110909 PLANT                                                                                                                            06:0C110914 07:C0111111
___    ____  __                    ___08:C0111128 Due  H.B. ROBINSON              06873/621                        C12/J155                  A 11A6              C1501            01-02:C0110909 DuePLANT                          00056            32/02          019/155                  AOKO                    J551            03-06:0110915 02: 0090323 KRSKO    Slovienia                  10106/479        4/13/2010            T8610.1              A201K5CH    2        T861003            030131 KRSKO    Slovienia                  10106/479        4/13/2010            T8610.1              A201K4CH      1      T861004              0090115 PG&E    DIABLO CANYON              3500947987        4/2/2013      00C1818/CJ2177        A200MICACEJ4    6      .0J217701          01-06: 0120928 01:0C100603 "02:C100617 PG&E    DIABLO CANYON              3500889322        2/10/2011      CC298/CJ380              A201KOCA    9        CJ38001            03:0C100701 04-07:C0101,208
___  ___  _ ___              __  _  _    ___  ___      08-09: Cl110111 PG&E    DIABLO CANYON              3500902818        7/27/2011      00658/0J805          A200MOCACDEJ4    5      , J80501          01-*05:C01 10719 PG&E    DIABLO CANYON                136862          6/16/2008          T8169.1          A200MI CACEJ4  6      :T816901          01-06:C0080429 "9/29/2009                                            2        ,T942 102          01:C090826 PG&E    DIABLO CANYON              350C1842462                          T9421IEL          A200MOCACDEJ4                                02:0090923 01-06:C090831
                                                                                                                        -        -    I Date    Code is:
0 120627 YYMMDD Page 2 of 2}}

Latest revision as of 07:31, 5 February 2020

Curtiss-Wright Corp. - Notification of Part 21 Report on Eaton/Cutler Hammer A200 Series Starters (and Contactors), Per North Anna, H.B. Robinson, Diablo Canyon, and Hatch
ML15357A042
Person / Time
Site: Hatch, North Anna, Diablo Canyon, Robinson  Duke Energy icon.png
Issue date: 12/18/2015
From: Troutner J
Curtiss-Wright Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15357A042 (6)


Text

12/18/2015 PaoD 1 Part 21 (PAR) Event#. 51611 Rep Org: QUALTECH NP Notification Date / Time: 12/18/2015 15:50 (EST)

Supplier: QUALTECH NP Event Date/ITime: 10/06/2015 (EST)

Last Modification: 12/18/2015 Region: 3 Docket #:

City: CINCINNATI Agreement State: Yes County: License #:

State: OH NRC Notified by: MARGIE HOVER Notifications: LADONNA SUGGS R2DO HQ Ops Officer: DONG HWA PARK RAY AZUA R4DO Emergency Class: NON EMERGENCY PART 2 1/50.55 REACTORS EMAIL 10 CFR Section:

21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING A200 SERIES STARTERS The following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:

"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.

"Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Uammer A200 series starter failures may be reportable and an extent of condition review needed to be done.

"The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.

"Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon based mold release was periodically used until October 2012. According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.

"Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user

12/18/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 should evaluate their applications for this potential failure mechanism."

QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.

CUR WRIGHT TISS - DOUETcoNTRACT TRANSMENTTALN QualTech NP, Nuclear Division TRNM TA Curtiss-Wright Corporation QTP40P.O. NUMBER 4600 East Tech Drive, Cincinnati, OH 45245 QTP40N/A T: 513.528.7900 I F: 513.528.4537 TO: NRC'S DOCUMENT CONTROL DESK ACTION LEGEND STATUS U.S. REGULATORY COMMISSION

1. For Approval A. Approved-Released for WASHINGTON, DC 20555-0001 2. Final Documents for Construction ATTN: HEADQUARTERS OPERATIONS OFFICER Record B.Approved as noted-hoo.hoc@nrc.gov 3. For Information Only Resubmit- Construction Phone: (301) 816-5100; Fax: (301) 816-5151 4. For Preliminary Use may proceed

_____________________________________ 5. For Your Use C. Not approved- Resubmit PROJECT: ______________________ 6. Revised as Requested D. _______

NO. NO. LI DRAWINGS El REPORTS E DRAWING NUMBER DOUET REV.

FOF PRINTS/ SEPIAS El SPECIFICATION

[] OTHERN El PROCEDUREE COPIESN D

N/A N/A INOTIFICATION OF 10CFR PART 21 ON 2 EATON/CUTLER HAMMER A200 SERIES STARTERS

______ ______(& CONTACTORS) 4 4. 4. +

4 4. 4. +

4 4. 4. 4.

4 4. 4. 4.

4 4. 4. 4.

4. 4. 4. 4.

______ 4. 4.

4. 4. 4.

PLEASE ACKNOWLEDGE RECEIPT BELOW AND REMARKS ________________________ RETURN A SIGNED COPY

________ ___ ____ ____ ___ ____ ___ RECEIVED BY _ _ _ _ _ _ _ _ _ _ _ _

DATED ________________

BY .,7Vt/rg12 fl-Oyer DATE: 12/18/2015 DOCUMENT CONTROL In order to avoid delays in the project PAGE: 1 of 1 these documents must be returned by:______

\1 020-07-91, REV.4

CURTI7SS WRIGHT- Criswih Nuclear Ovso QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.7900!] F: 513.528.9292 http://qua/technp.cwfc.ctom December 18, 2015

Subject:

Notification of 10CFR Part 21 on Eaton/Cutler Hammer A2OO series Starters (&

Contactors)

Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.

Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report fr'om Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starter failures may be reportable and an extent of condition review needed to be done.

The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.

Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was traditionally used. The silicon based mold release was periodically used until October 2012.

According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.

Thus any starters/contactors of the CH A200 series manufactured between May 2008 &

December 31, 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user should evaluate their applications for this potential failure mechanism.

Corrective Action to Prevent recurrence:

  • QualTech has notified all of the affected customers listed in the attached table regarding this issue.
  • QualTech will revise applicable dedication plans to add a caution that "Any starters/contactors of the CH A200 series manufactured between May 2008 &

December 31, 2012 may not be dedicated and are unacceptable". Or similar language and provide a reference to this notification or Corrective Action document that applies to this notification.

Page l of 2

Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176

.Sincerely, General Manager, Curtiss-Wright QualTech, NP

.CUR WRIGHTTISS - Curtiss-Wright Nucdear Division QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.79001I F: 513.528.9292 hftp://quaftechnp.cwfc.com Customer Plant Customer PO#: Year sold/shipped /C'#RlyQy CC/J/#_elaQyag Tg S/NCode/ Date Dominion North Anna 4500033020 12/13/2012 CC1995/CJ2385 A20OMACAC 1 01238501 C121 119 Dominion North Anna 4500034851 1/11/2013 CC2019/CJ2415 A200MACAC 1 CJ241501 0121119 Dominion North.Anna 45813045 2/10/2011 CC285/CJ361 A200MACAC I 0136101 0101023 Dominion North Anna 45597232 7/18/2008 T8270.1 A200MAOAO I ,T827001 0080118 Dominion North Anna 45619298 9/26/2008 T8446.1I A200MACAC 1 T844601 C080118 01-02:0120111 03:C120 116 H.B.ROBISON04: C111230 Duke H.OI ON00607524 2/16/2012 CC1262/CJ1521 A20TKIKCA 8 01152101 05:C110909 PLANT 06:0C110914 07:C0111111

___ ____ __ ___08:C0111128 Due H.B. ROBINSON 06873/621 C12/J155 A 11A6 C1501 01-02:C0110909 DuePLANT 00056 32/02 019/155 AOKO J551 03-06:0110915 02: 0090323 KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K5CH 2 T861003 030131 KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K4CH 1 T861004 0090115 PG&E DIABLO CANYON 3500947987 4/2/2013 00C1818/CJ2177 A200MICACEJ4 6 .0J217701 01-06: 0120928 01:0C100603 "02:C100617 PG&E DIABLO CANYON 3500889322 2/10/2011 CC298/CJ380 A201KOCA 9 CJ38001 03:0C100701 04-07:C0101,208

___ ___ _ ___ __ _ _ ___ ___ 08-09: Cl110111 PG&E DIABLO CANYON 3500902818 7/27/2011 00658/0J805 A200MOCACDEJ4 5 , J80501 01-*05:C01 10719 PG&E DIABLO CANYON 136862 6/16/2008 T8169.1 A200MI CACEJ4 6 :T816901 01-06:C0080429 "9/29/2009 2 ,T942 102 01:C090826 PG&E DIABLO CANYON 350C1842462 T9421IEL A200MOCACDEJ4 02:0090923 01-06:C090831

- - I Date Code is:

0 120627 YYMMDD Page 2 of 2

12/18/2015 PaoD 1 Part 21 (PAR) Event#. 51611 Rep Org: QUALTECH NP Notification Date / Time: 12/18/2015 15:50 (EST)

Supplier: QUALTECH NP Event Date/ITime: 10/06/2015 (EST)

Last Modification: 12/18/2015 Region: 3 Docket #:

City: CINCINNATI Agreement State: Yes County: License #:

State: OH NRC Notified by: MARGIE HOVER Notifications: LADONNA SUGGS R2DO HQ Ops Officer: DONG HWA PARK RAY AZUA R4DO Emergency Class: NON EMERGENCY PART 2 1/50.55 REACTORS EMAIL 10 CFR Section:

21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING A200 SERIES STARTERS The following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:

"Pacific Gas and Electric (PGE) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.

"Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Uammer A200 series starter failures may be reportable and an extent of condition review needed to be done.

"The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.

"Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was tr'aditionally used. The silicon based mold release was periodically used until October 2012. According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.

"Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user

12/18/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 should evaluate their applications for this potential failure mechanism."

QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.

CUR WRIGHT TISS - DOUETcoNTRACT TRANSMENTTALN QualTech NP, Nuclear Division TRNM TA Curtiss-Wright Corporation QTP40P.O. NUMBER 4600 East Tech Drive, Cincinnati, OH 45245 QTP40N/A T: 513.528.7900 I F: 513.528.4537 TO: NRC'S DOCUMENT CONTROL DESK ACTION LEGEND STATUS U.S. REGULATORY COMMISSION

1. For Approval A. Approved-Released for WASHINGTON, DC 20555-0001 2. Final Documents for Construction ATTN: HEADQUARTERS OPERATIONS OFFICER Record B.Approved as noted-hoo.hoc@nrc.gov 3. For Information Only Resubmit- Construction Phone: (301) 816-5100; Fax: (301) 816-5151 4. For Preliminary Use may proceed

_____________________________________ 5. For Your Use C. Not approved- Resubmit PROJECT: ______________________ 6. Revised as Requested D. _______

NO. NO. LI DRAWINGS El REPORTS E DRAWING NUMBER DOUET REV.

FOF PRINTS/ SEPIAS El SPECIFICATION

[] OTHERN El PROCEDUREE COPIESN D

N/A N/A INOTIFICATION OF 10CFR PART 21 ON 2 EATON/CUTLER HAMMER A200 SERIES STARTERS

______ ______(& CONTACTORS) 4 4. 4. +

4 4. 4. +

4 4. 4. 4.

4 4. 4. 4.

4 4. 4. 4.

4. 4. 4. 4.

______ 4. 4.

4. 4. 4.

PLEASE ACKNOWLEDGE RECEIPT BELOW AND REMARKS ________________________ RETURN A SIGNED COPY

________ ___ ____ ____ ___ ____ ___ RECEIVED BY _ _ _ _ _ _ _ _ _ _ _ _

DATED ________________

BY .,7Vt/rg12 fl-Oyer DATE: 12/18/2015 DOCUMENT CONTROL In order to avoid delays in the project PAGE: 1 of 1 these documents must be returned by:______

\1 020-07-91, REV.4

CURTI7SS WRIGHT- Criswih Nuclear Ovso QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.7900!] F: 513.528.9292 http://qua/technp.cwfc.ctom December 18, 2015

Subject:

Notification of 10CFR Part 21 on Eaton/Cutler Hammer A2OO series Starters (&

Contactors)

Pacific Gas and Electric (PGE) reported to QTNP that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.

Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PGE. The Test Report fr'om Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starter failures may be reportable and an extent of condition review needed to be done.

The root cause was a silicon based mold release that remained on the molded parts and would come between the moving (magnet) & fixed armatures. When heated for an extended period of time, this material would become sticky causing anywhere from a minor delay in opening, up to a frozen closed condition.

Cutler Hammer has determined that the silicone mold release was first introduced into the manufacturing facility in May 2008 due to a shortage of the Zinc Stearate Mold release that was traditionally used. The silicon based mold release was periodically used until October 2012.

According to Cutler Hammer, anything made after January 1, 2013 should definitely be silicon mold release free.

Thus any starters/contactors of the CH A200 series manufactured between May 2008 &

December 31, 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user should evaluate their applications for this potential failure mechanism.

Corrective Action to Prevent recurrence:

  • QualTech has notified all of the affected customers listed in the attached table regarding this issue.
  • QualTech will revise applicable dedication plans to add a caution that "Any starters/contactors of the CH A200 series manufactured between May 2008 &

December 31, 2012 may not be dedicated and are unacceptable". Or similar language and provide a reference to this notification or Corrective Action document that applies to this notification.

Page l of 2

Should you have any questions, please contact me at 513-528-7900 or Tim Franchuk at 513-201-2 176

.Sincerely, General Manager, Curtiss-Wright QualTech, NP

.CUR WRIGHTTISS - Curtiss-Wright Nucdear Division QualTech NP 4600 East Tech Drive, Cincinnati, OH 45245 P: 513.528.79001I F: 513.528.9292 hftp://quaftechnp.cwfc.com Customer Plant Customer PO#: Year sold/shipped /C'#RlyQy CC/J/#_elaQyag Tg S/NCode/ Date Dominion North Anna 4500033020 12/13/2012 CC1995/CJ2385 A20OMACAC 1 01238501 C121 119 Dominion North Anna 4500034851 1/11/2013 CC2019/CJ2415 A200MACAC 1 CJ241501 0121119 Dominion North.Anna 45813045 2/10/2011 CC285/CJ361 A200MACAC I 0136101 0101023 Dominion North Anna 45597232 7/18/2008 T8270.1 A200MAOAO I ,T827001 0080118 Dominion North Anna 45619298 9/26/2008 T8446.1I A200MACAC 1 T844601 C080118 01-02:0120111 03:C120 116 H.B.ROBISON04: C111230 Duke H.OI ON00607524 2/16/2012 CC1262/CJ1521 A20TKIKCA 8 01152101 05:C110909 PLANT 06:0C110914 07:C0111111

___ ____ __ ___08:C0111128 Due H.B. ROBINSON 06873/621 C12/J155 A 11A6 C1501 01-02:C0110909 DuePLANT 00056 32/02 019/155 AOKO J551 03-06:0110915 02: 0090323 KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K5CH 2 T861003 030131 KRSKO Slovienia 10106/479 4/13/2010 T8610.1 A201K4CH 1 T861004 0090115 PG&E DIABLO CANYON 3500947987 4/2/2013 00C1818/CJ2177 A200MICACEJ4 6 .0J217701 01-06: 0120928 01:0C100603 "02:C100617 PG&E DIABLO CANYON 3500889322 2/10/2011 CC298/CJ380 A201KOCA 9 CJ38001 03:0C100701 04-07:C0101,208

___ ___ _ ___ __ _ _ ___ ___ 08-09: Cl110111 PG&E DIABLO CANYON 3500902818 7/27/2011 00658/0J805 A200MOCACDEJ4 5 , J80501 01-*05:C01 10719 PG&E DIABLO CANYON 136862 6/16/2008 T8169.1 A200MI CACEJ4 6 :T816901 01-06:C0080429 "9/29/2009 2 ,T942 102 01:C090826 PG&E DIABLO CANYON 350C1842462 T9421IEL A200MOCACDEJ4 02:0090923 01-06:C090831

- - I Date Code is:

0 120627 YYMMDD Page 2 of 2