ML16049A071: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(10 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16049A071
| number = ML16049A071
| issue date = 02/18/2016
| issue date = 02/18/2016
| title = Browns Ferry Initial Exam 2015-302 Draft Sim In-plant Jpms
| title = Initial Exam 2015-302 Draft Sim In-plant JPMs
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
Line 12: Line 12:
| document type = License-Operator, Part 55 Examination Related Material
| document type = License-Operator, Part 55 Examination Related Material
| page count = 226
| page count = 226
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:Job Performance Measure (JPM)
SITE: BFN      JPM TITLE: RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:    80A U2          REVISION: 1 TASK APPLICABILITY: SRO                      STA                UO            NAUO TASK NUMBER / TASK TITLE(S): U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:      RO: 3.2 SRO: 3.3 201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL K/A No. &STATEMENT: CONTROL SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 1 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: __80A__
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to respond to a Control Rod Drift In per 2-AOI-85-5.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    2-AOI-85-5, 2-AOI-100-1 VALIDATIONTIME:      18 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  05/27/10    All      Initial issue Incorrect task number; changed to U-085-AB-05:
1  09/01/15      1 Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    28 Exam IC 280
* Reset IC 28 or Exam IC if written in above
* Run schedule file:NRC JPM A U2 -Control Rod Drift In
* Verify all triggers and overrides are correct
* Place the simulator in RUN to ensure stable conditions Console
* Start Rod Display on RWM Screen Operator Instructions
* Provide Initial Rod Data Sheet -PRLOG
* When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02-31 into the core
* When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions  Description              Event      Severity    Delay  Initial set rd07r0231        Drifts rod 02-31 into      1            NA      35 sec    NA core rd07r2223        Drifts rod 22-23 into      2            NA      10 sec    NA core rd07r3031        Drifts rod 30-31 into      2            NA      25 sec    NA core rd07r4635        Drifts rod 46-35 into      2            NA      20 sec    NA core rd07r2619        Drifts rod 26-19 into      2            NA      30 sec    NA core rd07r3027        Drifts rod 30-27 into      2            NA      18 sec    NA core rd07r5423        Drifts rod 54-23 into      2            NA      23 sec    NA core rd07r2255        Drifts rod 22-55 into      2            NA      28 sec    NA core 4
Job Performance Measure (JPM)
Remotes            Description      Event        Severity Delay Initial set Overrides          Description      Event        Severity Delay Initial set Schedule File(s): NRC JPM A U2 -Control Rod Drift In 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is at 100% power INITIATING CUES:
The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
6
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                          SAT / UNSAT Step 1:
NOTE
: 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
CAUTIONS
: 1) Any mispositioned control rod events will be dispositioned by following the direction contained within 2-AOI-85-7.
: 2) If a control rod moves unexpectedly one notch beyond its intended    Critical Step position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position.                                SAT
: 3) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6    UNSAT may be required.
N/A 7.3 Exercising a Partially Withdrawn Control Rod
[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40.
[2] OBSERVE the following for selected control rod:
* CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
* CHECK white light on the Full Core Display is ILLUMINATED.
* CHECK Rod Out Permit light is ILLUMINATED.
Standard:
Selects a withdrawn control rod Note to Examiner: May select any partially withdrawn control rod in any order 7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 2:
[3] INSERT control rod one notch by performing the following:
Critical Step
[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN andRELEASE.                                                    SAT
[3.2] OBSERVE control rod settles into the desired position    UNSAT andROD SETTLE light extinguishes.
N/A Standard:
Inserts withdrawn control rod one notch Step 3:
[4] WITHDRAW selected control rod one notch by performing the following:                                                            Critical Step
[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD OUT NOTCHand RELEASE.                                          SAT
[4.2] OBSERVE control rod settles into the desired position and UNSAT ROD SETTLE light extinguishes.
N/A Standard:
Withdraws withdrawn control rod one notch Step 4:
[5] DOCUMENT completion of control rod test as follows:
[5.1] PERFORMER
* INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the SAT control rodjust exercised to document proper movement and CRD latching.                                              UNSAT
[5.2] Concurrent Verifier (CV)                                  N/A
* ENSURE rod inserted and returned to its original position.
* INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Standard:
Initials Attachment 1 for exercised control rod and continues to exercise rods.
Note to Examiner:
* Perform above actions for @ least two control rods.
* When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02-31 Drift In Note to Simulator Booth Operator:
* When directed by examiner insert trigger #1 for 02-31 Control Rod Drift In.
Step 5:
Performer recognizes control rod 02-31 drift in and responds per 2-AOI-85-5.
[2] IF a Control Rod is moving from its intended position without          Critical Step operator actions, THEN INSERT the Control Rod to position 00 using CONTINUOUS IN. (Otherwise N/A)                                            SAT
[3] IF a Control Rod Block occurs during rod insertion due to Rod          UNSAT Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above.
(Otherwise N/A)                                                            N/A Standard:
Responds per 2-AOI-85-5 and inserts control rod 02-31 to full in position as indicated by position 00 indication.
CUE: When report to US, state Respond per 2-AOI-85-5, Control Rod Drift In.
Step 6:
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod              SAT pattern.
UNSAT Standard:
Candidate notifies Reactor Engineer to Evaluate Core      N/A Thermal limits and Preconditioning Limits for the current Control Rod Pattern Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits 9
Job Performance Measure (JPM)
STEP / STANDARD                                                    SAT / UNSAT Step 7:
[5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,
* THEN MANUALLY SCRAM Reactor and enter 2-AOI-100-1.              SAT
[6] CHECK Thermal Limits on ICS (RUNMON).                              UNSAT Note to NRC Examiner: Step [6] performed by Reactor              N/A Engineering.
Standard:
Reviews step and asks for guidance from US or RE CUE: As Shift Manager, state RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Student will continue with Control Rod Exercise.
Step 8:
7.3 Exercising a Partially Withdrawn Control Rod
[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40.                                  Critical Step
[2] OBSERVE the following for selected control rod:                      SAT
* CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.                                                  UNSAT
* CHECK white light on the Full Core Display is ILLUMINATED.
* CHECK Rod Out Permit light is ILLUMINATED.                        N/A Standard:
Selects a withdrawn control rod 10
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 9:
[3] INSERT control rod one notch by performing the following:
Critical Step
[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN SAT andRELEASE.
UNSAT
[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
N/A Standard:
Inserts withdrawn control rod one notch Step 10:
[4] WITHDRAW selected control rod one notch by performing the Critical Step following:
[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD SAT OUT NOTCHand RELEASE.
UNSAT
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
N/A Standard:
Withdraws withdrawn control rod one notch Note to Examiner:
When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:
Multiple Control Rods Drifting In Critical Step Standard:
Recognizes Multiple Control Rods Drift into the Core and Manually          SAT Scrams the Reactor per 2-AOI-85-5.
UNSAT
* Depresses both SCRAM Pushbuttons
* Places mode switch in shutdown                                    N/A
* Verifies All Rods in 11
Job Performance Measure (JPM)
STEP / STANDARD                                              SAT / UNSAT Step 11 continued:
* Performs a Scram Announcement                          Critical Step o  Rx Mode Switch Position: Shutdown o  Rod Position: All Full In                        SAT o  Reactor Water Level ____ & Trend ___
o  Reactor Pressure ____ & Trend ___              UNSAT o  MSIV Position: OPEN o  Rx Power: <5%                                  N/A Termination Criteria: REPEAT BACK SCRAM REPORT THEN STATE, THIS COMPLETES THE JPM. THAT WILL BE ALL FOR NOW, ANOTHER OPERATOR WILL CONTINUE IN 2-AOI-100-1.
STOP TIME:
12
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is at 100% power INITIATING CUES:
The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
13
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE: RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:    80A U3          REVISION: 1 TASK APPLICABILITY: SRO                      STA                UO            NAUO TASK NUMBER / TASK TITLE(S): U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:      RO: 3.2 SRO: 3.3 201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM ; and (b) based on K/A No. &STATEMENT:
those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
Rod Drift Alarm RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 1 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _80A U3_
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to respond to a Control Rod Drift In per 3-AOI-85-5.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    3-AOI-85-5, 3-AOI-100-1 VALIDATIONTIME:
PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  05/27/10    All      Initial issue Incorrect task number; changed to U-085-AB-05:
1  05/11/15      1 Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    28 Exam IC 280
* Reset IC 28 or Exam IC if written in above
* Run schedule file: NRC JPM A U3 -Control Rod Drift In
* Verify all triggers and overrides are correct
* Place the simulator in RUN to ensure stable conditions Console Operator
* Start Rod Display on RWM Screen Instructions
* Provide Initial Rod Data Sheet -PRLOG
* When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02-31 into the core
* When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions  Description              Event      Severity    Delay  Initial set rd07r0231        Drifts rod 02-31 into      1            NA      35 sec    NA core rd07r2223        Drifts rod 22-23 into      2            NA      10 sec    NA core rd07r3031        Drifts rod 30-31 into      2            NA      25 sec    NA core rd07r4635        Drifts rod 46-35 into      2            NA      20 sec    NA core rd07r2619        Drifts rod 26-19 into      2            NA      30 sec    NA core rd07r3027        Drifts rod 30-27 into      2            NA      18 sec    NA core rd07r5423        Drifts rod 54-23 into      2            NA      23 sec    NA core rd07r2255        Drifts rod 22-55 into      2            NA      28 sec    NA core 4
Job Performance Measure (JPM)
Remotes            Description      Event        Severity Delay Initial set Overrides          Description      Event        Severity Delay Initial set Schedule File(s): NRC JPM A U3 -Control Rod Drift In 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is at 100% power INITIATING CUES:
The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
6
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                          SAT / UNSAT Step 1:
NOTE
: 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
CAUTIONS
: 3) Any mispositioned control rod events will be dispositioned by following the direction contained within 3-AOI-85-7.
: 4) If a control rod moves unexpectedly one notch beyond its intended    Critical Step position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position.                                SAT
: 5) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6    UNSAT may be required.
N/A 7.3 Exercising a Partially Withdrawn Control Rod
[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 3-XS-85-40.
[2] OBSERVE the following for selected control rod:
* CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
* CHECK white light on the Full Core Display is ILLUMINATED.
* CHECK Rod Out Permit light is ILLUMINATED.
Standard:
Selects a withdrawn control rod Note to Examiner: May select any partially withdrawn control rod in any order 7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 2:
[3] INSERT control rod one notch by performing the following:
Critical Step
[3.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD IN andRELEASE.                                                    SAT
[3.2] OBSERVE control rod settles into the desired position    UNSAT andROD SETTLE light extinguishes.
N/A Standard:
Inserts withdrawn control rod one notch Step 3:
[4] WITHDRAW selected control rod one notch by performing the following:                                                            Critical Step
[4.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD OUT NOTCHand RELEASE.                                          SAT
[4.2] OBSERVE control rod settles into the desired position and UNSAT ROD SETTLE light extinguishes.
N/A Standard:
Withdraws withdrawn control rod one notch Step 4:
[5] DOCUMENT completion of control rod test as follows:
[5.1] PERFORMER
* INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the SAT control rodjust exercised to document proper movement and CRD latching.                                              UNSAT
[5.2] Concurrent Verifier (CV)                                  N/A
* ENSURE rod inserted and returned to its original position.
* INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                              SAT / UNSAT Standard:
Initials Attachment 1 for exercised control rod and continues to exercise rods.
Note to Examiner:
* Perform above actions for @ least two control rods.
* When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02-31 Drift In Note to Simulator Booth Operator:
* When directed by examiner insert trigger #1 for 02-31 Control Rod Drift In.
Step 5:
Performer recognizes control rod 02-31 drift in and responds per 3-AOI-85-5.
[2] IF a Control Rod is moving from its intended position without            Critical Step operator actions, THEN INSERT the Control Rod to position 00 using CONTINUOUS IN. (Otherwise N/A)                                                SAT
[3] IF a Control Rod Block occurs during rod insertion due to Rod            UNSAT Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above.
(Otherwise N/A)                                                              N/A Standard:
Responds per 3-AOI-85-5 and inserts control rod 02-31 to full in position as indicated by position 00 indication.
CUE: When report to US, state Respond per 3-AOI-85-5, Control Rod Drift In.
Step 6:
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod                SAT pattern.
UNSAT Standard:
Candidate notifies Reactor Engineer to Evaluate Core          N/A Thermal limits and Preconditioning Limits for the current Control Rod Pattern Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits 9
Job Performance Measure (JPM)
STEP / STANDARD                                                    SAT / UNSAT Step 7:
[5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,
* THEN MANUALLY SCRAM Reactor and enter 2-AOI-100-1.              SAT
[6] CHECK Thermal Limits on ICS (RUNMON).                              UNSAT Note to NRC Examiner: Step [6] performed by Reactor              N/A Engineering.
Standard:
Reviews step and asks for guidance from US or RE CUE: As Shift Manager, state RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Student will continue with Control Rod Exercise.
Step 8:
7.3 Exercising a Partially Withdrawn Control Rod
[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40.                                  Critical Step
[2] OBSERVE the following for selected control rod:                      SAT
* CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.                                                  UNSAT
* CHECK white light on the Full Core Display is ILLUMINATED.
* CHECK Rod Out Permit light is ILLUMINATED.                        N/A Standard:
Selects a withdrawn control rod 10
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 9:
[3] INSERT control rod one notch by performing the following:
Critical Step
[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN SAT andRELEASE.
UNSAT
[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
N/A Standard:
Inserts withdrawn control rod one notch Step 10:
[4] WITHDRAW selected control rod one notch by performing the Critical Step following:
[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD SAT OUT NOTCHand RELEASE.
UNSAT
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
N/A Standard:
Withdraws withdrawn control rod one notch Note to Examiner:
When satisfied with the number of rod manipulations direct Simulator BoothOperator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:
Multiple Control Rods Drifting In Standard:                                                                Critical Step Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 3-AOI-85-5.                                      SAT
* Depresses both SCRAM Pushbuttons                                UNSAT
* Places mode switch in shutdown
* Verifies All Rods in                                            N/A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 11 continued:
Critical Step
* Performs a Scram Announcement o  Rx Mode Switch Position: Shutdown                          SAT o  Rod Position: All Full In o  Reactor Water Level ____ & Trend ___                      UNSAT o  Reactor Pressure ____ & Trend ___
o  MSIV Position: OPEN                                        N/A o  Rx Power: <5%
Termination Criteria: repeat back scram report then state, this completes the JPM. That will be all for now, another operator will continue in 2-AOI-100-1 STOP TIME:
12
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is at 100% power INITIATING CUES:
The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
13
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE: EHC Auto Cooldown JPM NUMBER:    276 U2          REVISION: 1 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-000-NO-32 Perform Reactor Cooldown TASK NUMBER / TASK TITLE(S): U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:      RO: 3.9 SRO: 3.9 239001Main and Reheat Steam System: A4.09 Ability to K/A No. &STATEMENT: manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 4 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _276 U2 RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    2-OI-47 VALIDATIONTIME: 4 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  06/19/12    All      Initial issue 1  07/22/15    All      General revision & re-format 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    40 Exam IC 281
* Reset IC 40 or Exam IC if written in above
* Ensure RFP is in Manual on PDS controller with plant parameters stable.
Console Operator Instructions Malfunctions    Description            Event          Severity    Delay    Initial set Remotes          Description        Event          Severity    Delay    Initial set Overrides          Description        Event          Severity    Delay    Initial set Schedule File(s): None 4
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
INITIATING CUES:
The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 2-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].
5
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                        SAT / UNSAT Step 1:                                                                SAT
[6] VERIFY EHC is in Pressure Control using 2-HS-47-204.        UNSAT N/A Standard:
Observes light on for EHC Pressure Control on 2-HS-47-204.
Step 2:
[7] On the EHC Work Station on Panel 9-7:
[7.1] SELECT Main Menu from the toolbar at bottom of the screen.                                                          Critical Step
[7.2]  SELECT Log In on Display Screen and ENTER OPS                      SAT for name and OPS for Password.
UNSAT
[7.3] SELECT Auto Cooldown from list of function on the screen.                                                                      N/A Standard:
Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.
Step 3:
[8] On the Auto Cooldown Display Screen CHECK the following are displayed.
SAT
* Turbine Tripped or All Valves Closed - indicates Reset.
* Rx Press Ctrl - indicates Reset.                            UNSAT Standard:                                                                    N/A
* Candidate checks the Turbine Tripped or All Valves Closed
              -indicates Reset.
* Candidate checks Rx Press Ctrl - indicates Reset.
6
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Step 4:
[9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
[9.1] SELECT the block above the FINAL PRESSURE Critical Step TARGET.
SAT
[9.2] ENTER the desired pressure using the Display Screen or Key Board.
UNSAT
[9.3] WHEN desired Pressure is entered SELECT OK N/A Standard:
Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Step 5:
[10] WHEN Cooldown is ready to commence, THEN
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)
Critical Step
[10.2] DEPRESS the START button on the Auto Cooldown Display Screen.                                                SAT
[11] WHEN Caution Are You Sure You Want to Initiate Auto                    UNSAT Cooldown? appears N/A SELECT Yes Screen Button to start the cooldown.
Standard:
Candidate depresses START and acknowledges YES to commence auto cooldown.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 6:
[12] CHECK the following:
* EHC PRESSURE SETPOINT, 2-PI-47-162, is lowering.
* EHC AUTO COOLDOWN displays IN PROGRESS                  SAT Standard:                                                                UNSAT Candidate monitors EHC pressure and the auto cooldown is IN        N/A PROGRESS.
Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig.
Step 7:
[13]  IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.
[13.1] SELECT the block above the FINAL PRESSURE TARGET                                              Critical Step
[13.2] ENTER the desired pressure using the Display                  SAT Screen or Key Board.
UNSAT
[13.3] WHEN desired Pressure is entered SELECT OK N/A Standard:
Candidate adjusts FINAL PRESSURE TARGET to 100 psig and recommences the auto cooldown.
Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
STOP TIME:
8
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
INITIATING CUES:
The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 2-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].
9
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE: EHC Auto Cooldown JPM NUMBER:    276 U3          REVISION: 1 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-000-NO-32 Perform Reactor Cooldown TASK NUMBER / TASK TITLE(S): U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:      RO: 3.9 SRO: 3.9 239001Main and Reheat Steam System: A4.09 Ability to K/A No. &STATEMENT: manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 4 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _276 U3_
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    3-OI-47 VALIDATIONTIME:
PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  06/19/12    All      Initial issue 1  07/22/15    All      General revision & re-format 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    40 Exam IC 281
* Reset IC 40 or Exam IC if written in above
* Ensure RFP is in Manual on PDS controller with plant parameters stable.
Console Operator Instructions Malfunctions    Description            Event          Severity    Delay    Initial set Remotes          Description        Event          Severity    Delay    Initial set Overrides          Description        Event          Severity    Delay    Initial set Schedule File(s): None 4
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
INITIATING CUES:
The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].
5
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                        SAT / UNSAT Step 1:
[6] VERIFY EHC is in Pressure Control using 3-HS-47-204.              SAT UNSAT Standard:
N/A Observes light on for EHC Pressure Control on 3-HS-47-204.
Step 2:
[7] On the EHC Work Station on Panel 9-7:
[7.1] SELECT Main Menu from the toolbar at bottom of the screen.                                                          Critical Step
[7.2]  SELECT Log In on Display Screen and ENTER OPS                      SAT for name and OPS for Password.
UNSAT
[7.3] SELECT Auto Cooldown from list of function on the screen.                                                                      N/A Standard:
Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.
Step 3:
[8] On the Auto Cooldown Display Screen CHECK the following are displayed.
SAT
* Turbine Tripped or All Valves Closed - indicates Reset.
* Rx Press Ctrl - indicates Reset.                            UNSAT Standard:                                                                    N/A
* Candidate checks the Turbine Tripped or All Valves Closed
              -indicates Reset.
* Candidate checks Rx Press Ctrl - indicates Reset.
6
Job Performance Measure (JPM)
Step 4:
[9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
[9.1] SELECT the block above the FINAL PRESSURE Critical Step TARGET.
SAT
[9.2] ENTER the desired pressure using the Display Screen or Key Board.
UNSAT
[9.3] WHEN desired Pressure is entered SELECT OK N/A Standard:
Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Step 5:
[10] WHEN Cooldown is ready to commence, THEN
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)
Critical Step
[10.2] DEPRESS the START button on the Auto Cooldown Display Screen.                                                SAT
[11] WHEN Caution Are You Sure You Want to Initiate Auto                    UNSAT Cooldown? appears N/A SELECT Yes Screen Button to start the cooldown.
Standard:
Candidate depresses START and acknowledges YES to commence auto cooldown.
7
Job Performance Measure (JPM)
Step 6:
[12] CHECK the following:
* EHC PRESSURE SETPOINT, 3-PI-47-162, is lowering.
* EHC AUTO COOLDOWN displays IN PROGRESS                  SAT Standard:                                                                UNSAT Candidate monitors EHC pressure and the auto cooldown is IN N/A PROGRESS.
Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig.
Step 7:
[13]  IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.
[13.1] SELECT the block above the FINAL PRESSURE TARGET                                              Critical Step
[13.2] ENTER the desired pressure using the Display                  SAT Screen or Key Board.
UNSAT
[13.3] WHEN desired Pressure is entered SELECT OK N/A Standard:
Candidate adjusts FINAL PRESSURE TARGET to 100 psig and recommences the auto cooldown.
Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
STOP TIME:
8
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
INITIATING CUES:
The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].
9
Job Performance Measure (JPM)
LOSS OF REFERENCE APRM TO ROD BLOCK SITE:    BFN    JPM TITLE:
MONITOR JPM NUMBER:      672A U2        REVISION: 0 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-085-AL-03 RESPOND TO CONTROL ROD TASK NUMBER / TASK TITLE(S):
WITHDRAWL BLOCK K/A RATINGS:      RO: 3.1 SRO: 3.3 215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures K/A No. &STATEMENT:
to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR-3,4,5 RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 7 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N        ALTERNATE PATH (Y/N)  Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _672A U2_
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED: 2-OI-85, 2-OI-92B, 2-ARP-9-5A, 2-SR-3.1.3.5(A)
VALIDATIONTIME: 16 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  09/01/15    All      Initial issue 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC      39 Exam IC    282
* Reset to IC-39 to ~ 30% Reactor Power
* Open Schedule File: NRC JPM C U2 -RBM APRM Fail Console Operator Downscale.sch Instructions
* Open Event File: NRC JPM C U2 -RBM APRM Fail Downscale.evt Malfunctions    Description            Event    Severity Delay  Initial set NM07L3233C          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 32-33-C NM07L4025B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-25-B NM07L4033D          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-33-D NM07L0817B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 08-17-B NM07L4017B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-17-B NM07L4041D          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-41-D NM07L4049B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-49-B NM07L4057B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-57-B NM07L4817C          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 48-17-C NM07L4825C          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 48-25-C NM07L4833A          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 48-33-A NM07L4841A          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 48-41-A NM07L4849C          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 48-49-C NM07L0825B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 08-25-B 4
Job Performance Measure (JPM)
NM07L0833D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-33-D NM07L0841D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-41-D NM07L0849B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-49-B NM07L2409B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-09-B NM07L2417D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-17-D NM07L2425D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-25-D NM07L2433B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-33-B NM07L2449D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-49-D NM07L2457D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-57-D NM07L1617C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-17-C NM07L1625C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-25-C NM07L1633A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-33-A NM07L1641A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-41-A NM07L1649C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-49-C NM07L1657C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-57-C NM07L1609A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-09-A NM07L3209C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-09-C NM07L3217A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-17-A NM07L3225A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-25-A NM07L3249A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-49-A NM07L3257A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-57-A NM07L4009D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 40-09-D NM07L4809A LPRM AMPLIFIER    15        0  N/A N/A 5
Job Performance Measure (JPM)
FAILURE 48-09-A NM07L5617D            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-17-D NM07L5633B            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-33-B NM07L5641B            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-41-B NM07L3241C            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 32-41-C Remotes              Description      Event      Severity    Delay Initial set Overrides            Description      Event      Severity    Delay Initial set ZLO4631LGREENT(1)      Control Rod 46-31    15          0        N/A  N/A GREEN INDICATION Schedule File(s):
Event File: NRC JPM C U2 -RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
Schedule File: NRC JPM C U2 -RBM APRM Fail Downscale.sch 6
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is at 30% power
* Startup Sequence Control Rod Movement Data Sheet 2-SR-3.1.3.5(A) completed through group 57.
* No Control Rods are Fast Notching INITIATING CUES:
The US has directed you to raise Reactor Power to 40% per 2-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14-31.
7
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                              SAT / UNSAT Step 1:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
Step 2:
[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT
* THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS              UNSAT 23A. (Otherwise N/A)
N/A Standard:
Determines that step in N/A Step 3:
[3] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED 8
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 4:
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 5:
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 6:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                              SAT / UNSAT Step 7:
[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT
* THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS              UNSAT 23A. (Otherwise N/A)
N/A Standard:
Determines that step in N/A Step 8:
[3] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 9:
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the              SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing 10
Job Performance Measure (JPM)
STEP / STANDARD                                                              SAT / UNSAT Step 10:
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 11:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
Step 12:
[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT
* THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS              UNSAT 23A. (Otherwise N/A)
N/A Standard:
Determines that step in N/A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 13:
[3] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 14:
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 15:
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 12
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Note to Examiner: This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.
Step 16:
APRM Sensor/Trip Point:
DOWNSCALE/
APRM Downscale: <= 5%
OPRM INOP                    OPRM Inop: Less than 23 operable cells 4
Sensor Location:
Control Room Panel 2-9-14.
Probable Cause:
A. Unbypassed APRM channel at or below sensor set point.
B. SI or SR in progress.
C. Unit shutdown (Mode 3 or 4).                                Critical Step D. Failed sensor.
SAT Automatic Action:                                                                UNSAT A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
N/A Operator Action:
A. DETERMINE which APRM/OPRM channel is downscale/inop.
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 2-OI-92B.
13
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 16(continued)
CONTROL ROD Sensor/Trip Point:
WITHDRAWAL Relays:    3A-K1 Nuclear Instrumentation BLOCK                                  3A-K2 Refuel Equipment in Use High Level in Scram Discharge 7                    Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)
Sensor Location:
Panel 2-9-28 Elevation 593' Aux Instr Room Probable Cause:
A. One or more sensors at or above set point.
B. Malfunction of sensor.
C. Control rod drop accident Automatic Action:
Rod withdrawal block Operator Action:
A. DETERMINE initiating condition from corresponding rod withdrawal block alarm(s) and REFER TO operator action for alarm(s).
Standard:
Reference 2-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 2-OI-92B CUE: Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B.
14
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 17:
NOTES
: 1) Only one APRM/OPRM in each trip system can be bypassed at a time.
: 2) All operations are performed on Panel 2-9-5 unless specifically stated otherwise.
: 3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.                                                SAT UNSAT 6.1 Bypassing APRM/OPRM Channel N/A CAUTION
[QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures.
[ISE-HPS-92-RO1]
[1] REVIEW all precautions and limitations. REFER TO Section 3.0.
Standard:
Demonstrates reviewing precautions and limitations section 3.0.
Step 18:
Critical Step
[2] PLACE APRM BYPASS, 2-HS-92-7B/S3, to desired channel to be bypassed.                                                                SAT Standard:                                                                UNSAT PLACE APRM BYPASS, 2-HS-92-7B/S3, to APRM CH 2                  N/A 15
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 19:
[3] CHECK BLUE BYPASSED lights illuminated on Panel 2-9-14 Voters.                                                              SAT Standard:                                                            UNSAT Observes BLUE BYPASS light illuminated on Panel 2-9-14 for    N/A APRM CH 2.
Step 20:
[4] VERIFY white bypass light on Panel 2-9-5 is illuminated.          SAT Standard:                                                            UNSAT Observes WHITE BYPASS light illuminated on Panel 2-9-5.        N/A Note to Examiner: If needed, cue student to proceed with actions required to continue rod movements. Student may continue at step 21 or 24.
Step 21:
6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)
[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN                                                          SAT PERFORM the following at the Unit Supervisors discretion to  UNSAT REINITIALIZE the RBM:
N/A
[6.1] PLACE CRD POWER, 2-HS-85-46 in the OFF position to deselect the Control Rod.
Standard:
CRD POWER, 2-HS-85-46 in the OFF position.
16
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 22:
SAT
[6.2] PLACE CRD POWER, 2-HS-85-46, in the ON position.
UNSAT Standard:
N/A PLACED CRD POWER, 2-HS-85-46, in the ON position.
Step 23:
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and SAT PERFORM applicable section for Control Rod withdrawal.
UNSAT Standard:
N/A Continues with Control Rod Movement CUE: Proceed with Control Rod Movement.
Step 24:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
17
Job Performance Measure (JPM)
STEP / STANDARD                                                              SAT / UNSAT Step 25:
[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT
* THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS              UNSAT 23A. (Otherwise N/A)
N/A Standard:
Determines that step in N/A Step 26:
[3] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED                      SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 27:
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the              SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing 18
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 28:
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, state End of Task STOP TIME:
19
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is at 30% power
* Startup Sequence Control Rod Movement Data Sheet 2-SR-3.1.3.5(A) completed through group 57.
INITIATING CUES:
The US has directed you to raise Reactor Power to 40% per 2-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14-31.
20
Job Performance Measure (JPM)
LOSS OF REFERENCE APRM TO ROD BLOCK SITE:    BFN    JPM TITLE:
MONITOR JPM NUMBER:    672A U3          REVISION: 0 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-085-AL-03 RESPOND TO CONTROL ROD TASK NUMBER / TASK TITLE(S):
WITHDRAWL BLOCK K/A RATINGS:      RO: 3.1 SRO: 3.3 215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures K/A No. &STATEMENT:
to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR-3,4,5 RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 7 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _672A U3_
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED: 3-OI-85, 3-OI-92B, 3-ARP-9-5A, 3-SR-3.1.3.5(A)
VALIDATIONTIME:
PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  04/30/15    All      Initial issue 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC      39 Exam IC    282
* Reset IC-39to ~ 30% Reactor Power
* Open Schedule File: NRC JPM C U3 -RBM APRM Fail Console Operator Downscale.sch Instructions
* Open Event File: NRC JPM C U3 -RBM APRM Fail Downscale.evt Malfunctions    Description          Event    Severity  Delay  Initial set NM07L3233C          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 32-33-C NM07L4025B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-25-B NM07L4033D          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-33-D NM07L0817B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 08-17-B NM07L4017B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-17-B NM07L4041D          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-41-D NM07L4049B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-49-B NM07L4057B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-57-B NM07L4817C          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 48-17-C NM07L4825C          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 48-25-C NM07L4833A          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 48-33-A NM07L4841A          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 48-41-A NM07L4849C          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 48-49-C NM07L0825B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 08-25-B 4
Job Performance Measure (JPM)
NM07L0833D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-33-D NM07L0841D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-41-D NM07L0849B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-49-B NM07L2409B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-09-B NM07L2417D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-17-D NM07L2425D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-25-D NM07L2433B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-33-B NM07L2449D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-49-D NM07L2457D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-57-D NM07L1617C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-17-C NM07L1625C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-25-C NM07L1633A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-33-A NM07L1641A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-41-A NM07L1649C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-49-C NM07L1657C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-57-C NM07L1609A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-09-A NM07L3209C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-09-C NM07L3217A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-17-A NM07L3225A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-25-A NM07L3249A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-49-A NM07L3257A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-57-A NM07L4009D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 40-09-D NM07L4809A LPRM AMPLIFIER    15        0  N/A N/A 5
Job Performance Measure (JPM)
FAILURE 48-09-A NM07L5617D            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-17-D NM07L5633B            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-33-B NM07L5641B            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-41-B NM07L3241C            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 32-41-C Remotes              Description    Event      Severity    Delay Initial set Overrides            Description    Event      Severity    Delay Initial set ZLO4631LGREENT(1)      Control Rod 46-31      15          0        N/A  N/A GREEN INDICATION Schedule File(s):
Event File: NRC JPM C U3 -RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
Schedule File: NRC JPM C U3 -RBM APRM Fail Downscale.sch 6
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is at 30% power
* Startup Sequence Control Rod Movement Data Sheet 3-SR-3.1.3.5(A) completed through group 58.
INITIATING CUES:
The US has directed you to raise Reactor Power to 40% per 3-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22-39.
7
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                      SAT / UNSAT Step 1:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
Step 2:
[2] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 3:
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing 8
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 4:
[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 5:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
Step 6:
[2] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED 9
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 7:
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 8:
[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 9:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
10
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 10:
[2] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 11:
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 12:
[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 11
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Note to Examiner: This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.
Step 13:
APRM Sensor/Trip Point:
DOWNSCALE/
APRM Downscale: <= 5%
OPRM INOP                    OPRM Inop: Less than 23 operable cells 4
Sensor Location:
Control Room Panel 3-9-14.
Probable Cause:
A. Unbypassed APRM channel at or below sensor set point.
B. SI or SR in progress.
C. Unit shutdown (Mode 3 or 4).                                Critical Step D. Failed sensor.
SAT Automatic Action:                                                                UNSAT A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
N/A Operator Action:
A. DETERMINE which APRM/OPRM channel is downscale/inop.
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 3-OI-92B.
12
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 13(continued)
CONTROL ROD Sensor/Trip Point:
WITHDRAWAL Relays:3A-K1 Nuclear Instrumentation BLOCK            7                  3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)
Sensor Location:
Panel 3-9-28 Elevation 593' Aux Instr Room Probable Cause:
A. One or more sensors at or above set point.
B. Malfunction of sensor.
C. Control rod drop accident Automatic Action:
Rod withdrawal block Operator Action:
A. DETERMINE initiating condition from corresponding rod withdrawalblock alarm(s) and REFER TO operator action for alarm(s).
Standard:
Reference 3-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 3-OI-92B CUE:Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B.
13
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 14:
NOTES
: 1) Only one APRM/OPRM in each trip system can be bypassed at a time.
: 2) All operations are performed on Panel 3-9-5 unless specifically stated otherwise.
: 3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.                                                SAT UNSAT 6.1 Bypassing APRM/OPRM Channel N/A CAUTION
[QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures.
[ISE-HPS-92-RO1]
[1] REVIEW all precautions and limitations. REFER TO Section 3.0.
Standard:
Demonstrates reviewing precautions and limitations section 3.0.
CUE: If asked per note 2 above, Panel 9-14 Voter BLUE LIGHTS are extinguished.
Step 15:
Critical Step
[2] PLACE APRM BYPASS, 3-HS-92-7B/S3, to desired channel to be bypassed.                                                                SAT Standard:                                                                UNSAT PLACE APRM BYPASS, 3-HS-92-7B/S3, to APRM CH 2                  N/A 14
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 16:
[3] CHECK BLUE BYPASSED lights illuminated on Panel 3-9-14 Voters.                                                              SAT Standard:                                                            UNSAT Simulates observing BLUE BYPASS light illuminated on Panel 3- N/A 9-14 for APRM CH 2.
Cue: Blue Light is illuminated on Panel 3-9-14 for APRM CH 2.
Step 17:
[4] VERIFY white bypass light on Panel 3-9-5 is illuminated.        SAT Standard:                                                            UNSAT Observes WHITE BYPASS light illuminated on Panel 3-9-5.      N/A Note to NRC Examiner: If needed, cue student to proceed with actions required to continue rod movements.Student may continue at step 18 or 21.
Step 18:
6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)
[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN                                                          SAT PERFORM the following at the Unit Supervisors discretion to  UNSAT REINITIALIZE the RBM:
N/A
[6.1] PLACE CRD POWER, 3-HS-85-46 in the OFF position to deselect the Control Rod.
Standard:
CRD POWER, 3-HS-85-46 in the OFF position.
15
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 19:
SAT
[6.2] PLACE CRD POWER, 3-HS-85-46, in the ON position.
UNSAT Standard:
N/A PLACED CRD POWER, 3-HS-85-46, in the ON position.
Step 20:
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and SAT PERFORM applicable section for Control Rod withdrawal.
UNSAT Standard:
N/A Continues with Control Rod Movement Cue:If asked,Proceed with Control Rod Movement.
Step 21:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
16
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 22:
[2] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED              SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 23:
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 24:
[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, state End of Task STOP TIME:
17
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is at 30% power
* Startup Sequence Control Rod Movement Data Sheet 3-SR-3.1.3.5(A) completed through group 58.
INITIATING CUES:
The US has directed you to raise Reactor Power to 40% per 3-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22-39.
18
Job Performance Measure (JPM) 2-EOI APPENDIX-6E INJECTION SUBSYSTEM LINEUP SITE:    BFN    JPM TITLE:
CS SYSTEM II JPM NUMBER:    257A U2          REVISION: 1 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-000-EM-35/ Lineup Injection Subsystem-Core TASK NUMBER / TASK TITLE(S): Spray Loop I(II) in Accordance with EOI Appendix 6D(E)
K/A RATINGS:      RO: 3.9 SRO: 3.9 209001 Low Pressure Core Spray SystemA4.08 Ability to K/A No. &STATEMENT:        manually operate and/or monitor in thecontrol room: Reactor water level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 2 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _257A U2_
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    2-EOI APPENDIX-6E VALIDATIONTIME: 8 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  12/06/10    All      Initial issue 1  04/27/15    All      General revision & re-format 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    28 Exam IC 283
: 1. Open Schedule File
: 2. Open Event File
: 3. Reset to IC-28and take out of freeze.
: 4. CLOSE 2-FCV-75-51 Console
: 5. OPEN 2-FCV-75-53 Operator
: 6. Man Scram Rx and place MS to SD.
Instructions
: 7. Open 6 ADS Valves.
: 8. Wait until various alarms with Supp Pool Temp High come in to save IC.
Malfunctions    Description              Event      Severity    Delay    Initial set TH22              COOLANT LEAK              15          75%        5      Yes INSIDE DRYWELL CS04A            CORE SPRAY                15          N/A        N/A      Yes LOGIC POWER FAILURE DIV I CS04B            CORE SPRAY                15          N/A        N/A      Yes LOGIC POWER FAILURE DIV II CS02B            CS INBOARD                15          N/A        N/A      Yes INJECTION VALVE AUTO OPENING FAILURE (FCV                  53)
RH06A            RHR LOGIC POWER          15          N/A        N/A      Yes FAILURE DIV I RH06B            RHR LOGIC POWER          15          N/A        N/A      Yes FAILURE DIV II RC01              RCIC TURBINE TRIP        15          N/A        N/A      Yes SYSTEM FAILURE HP04              HPCI STEAM                15          N/A        N/A      Yes SUPPLY VALVE AUTO OPENING FAILURE FW01A            CONDENSATE                15          N/A        10      Yes PUMP TRIP 2A 4
Job Performance Measure (JPM)
FW01B            CONDENSATE              15          N/A    10    Yes PUMP TRIP 2B FW01C            CONDENSATE              15          N/A    10    Yes PUMP TRIP 2C Remotes            Description        Event      Severity Delay Initial set Overrides          Description        Event      Severity Delay Initial set Schedule File(s): JPM 257A U2 Core Spray Alt Inj.sch Event File(s): JPM 257A U2 Core Spray Alt Inj.evt 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is Shutdown
* RPV Water Level is lowering slowly.
* 1-EOI-1 has been entered and followed to RC-L6.
INITIATING CUES:
The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above
(-)162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.
6
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                    SAT / UNSAT Step 1:
Location: Unit 2 Control Room Attachments: 1. NPSH Monitoring
[1] VERIFY OPEN the following valves:
SAT
* 2-FCV-75-30, CORE SPRAY PUMP 2B SUPPR POOL SUCT UNSAT VLV
* 2-FCV-75-39, CORE SPRAY PUMP 2D SUPPR POOL SUCT            N/A VLV Standard:
Verifies2-FCV-75-30 and 2-FCV-75-39 are open.
Step 2:
[1] (continued)VERIFY OPEN the following valves:                  Critical Step
* 2-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.          SAT UNSAT Standard:
N/A Recognizes 2-FCV-75-51 is closed and 2-FCV-75-53 is open, valve closes 2-FCV-75-53 and Opens 2-FCV-75-51.
Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI-75, Core Spray System line up.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 3:
[2] VERIFY CLOSED 2-FCV-75-50, CORE SPRAY SYS II                          SAT TESTVALVE.
UNSAT Standard:
N/A Verifies 2-FCV-75-50 closed Step 4:
Critical Step
[3] VERIFY CS Pump 2B and/or 2D running.
SAT Standard:
UNSAT Starts Core Pumps 2B and/or 2D N/A (Only starting one pump is Critical, the second pump is optional).
Step 6:
[4] WHEN RPV pressure is below 450 psig, THEN Critical Step THROTTLE2-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, SAT as necessary to control injection at or below4000 gpm per pump.
UNSAT Standard:
N/A Verifies pressure < 450 psig and opens 2-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or
      <8000 gpm for 2 pumps).
Step 7:
CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.
SAT
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
UNSAT Standard:
Operator comparesCore Spray Pump flow rate with Suppression N/A Pool temperature and Suppression Pool pressure and Determined adequate NPSH.
Termination Criteria: Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.
STOP TIME:
8
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is Shutdown
* RPV Water Level is lowering slowly.
* 1-EOI-1 has been entered and followed to RC-L6.
INITIATING CUES:
The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above 162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.
9
Job Performance Measure (JPM) 3-EOI APPENDIX-6E INJECTION SUBSYSTEM LINEUP SITE:    BFN    JPM TITLE:
CS SYSTEM II JPM NUMBER:    257A U3          REVISION: 1 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-000-EM-35/ Lineup Injection Subsystem-Core TASK NUMBER / TASK TITLE(S): Spray Loop I(II) in Accordance with EOI Appendix 6D(E)
K/A RATINGS:      RO: 3.9 SRO: 3.9 209001 Low Pressure Core Spray System A4.08 Ability to K/A No. &STATEMENT:        manually operate and/or monitor in the control room: Reactor water level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 2 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _257A U3_
RO            SRO                  DATE: _______
TASK STANDARD: Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    3-EOI APPENDIX-6E VALIDATIONTIME: 5 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  12/06/10    All      Initial issue 1  04/27/15    All      General revision & re-format 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    28 Exam IC 283
: 1. Open Schedule File
: 2. Open Event File
: 3. Reset to IC-28 and take out of freeze.
: 4. CLOSE 2-FCV-75-51 Console
: 5. OPEN 2-FCV-75-53 Operator
: 6. Man Scram Rx and place MS to SD.
Instructions
: 7. Open 6 ADS Valves.
: 8. Wait until various alarms with Supp Pool Temp High come in to save IC.
Malfunctions    Description              Event      Severity    Delay    Initial set TH22              COOLANT LEAK              15            75%        5      Yes INSIDE DRYWELL CS04A            CORE SPRAY                15            N/A      N/A      Yes LOGIC POWER FAILURE DIV I CS04B            CORE SPRAY                15            N/A      N/A      Yes LOGIC POWER FAILURE DIV II CS02B            CS INBOARD                15            N/A      N/A      Yes INJECTION VALVE AUTO OPENING FAILURE (FCV                  53)
RH06A            RHR LOGIC POWER          15            N/A      N/A      Yes FAILURE DIV I RH06B            RHR LOGIC POWER          15            N/A      N/A      Yes FAILURE DIV II RC01              RCIC TURBINE TRIP        15            N/A      N/A      Yes SYSTEM FAILURE HP04              HPCI STEAM                15            N/A      N/A      Yes SUPPLY VALVE AUTO OPENING FAILURE FW01A            CONDENSATE                15            N/A        10      Yes PUMP TRIP 3A 4
Job Performance Measure (JPM)
FW01B            CONDENSATE              15          N/A    10    Yes PUMP TRIP 3B FW01C            CONDENSATE              15          N/A    10    Yes PUMP TRIP 3C Remotes            Description        Event      Severity Delay Initial set Overrides          Description        Event      Severity Delay Initial set Schedule File(s): JPM 257A U3 Core Spray Alt Inj.sch Event File(s): JPM 257A U3 Core Spray Alt Inj.evt 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is Shutdown
* RPV Water Level is lowering slowly.
* 1-EOI-1 has been entered and followed to RC-L6.
INITIATING CUES:
The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above
(-)162 inches (TAF) using Core Spray System II as directed by 3-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.
6
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                    SAT / UNSAT Step 1:
Location: Unit 3 Control Room Attachments: 1. NPSH Monitoring
[1] VERIFY OPEN the following valves:
SAT
* 3-FCV-75-30, CORE SPRAY PUMP 3B SUPPR POOL SUCT UNSAT VLV
* 3-FCV-75-39, CORE SPRAY PUMP 3D SUPPR POOL SUCT            N/A VLV Standard:
Verifies3-FCV-75-30 and 3-FCV-75-39 are open.
Step 2:
Critical Step
[1] (continued) VERIFY OPEN the following valves:
* 3-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.
SAT UNSAT Standard:
N/A Recognizes 3-FCV-75-51 is closed and 3-FCV-75-53 is open, closes 3-FCV-75-53 and Opens 3-FCV-75-51.
Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI-75, Core Spray System line up.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Step 3:
[2] VERIFY CLOSED 3-FCV-75-50, CORE SPRAY SYS II TEST                      SAT VALVE.
UNSAT Standard:
N/A Verifies 3-FCV-75-50 closed Step 4:
Critical Step
[3] VERIFY CS Pump 3B and/or 3D running.
SAT Standard:
UNSAT Starts Core Pumps 3B and/or 3D (Only starting one pump is N/A Critical, the second pump is optional).
Step 6:
[4] WHEN RPV pressure is below 450 psig, THEN Critical Step THROTTLE 3-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, SAT as necessary to control injection at or below4000 gpm per pump.
UNSAT Standard:
N/A Verifies pressure < 450 psig and opens 3-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or
      <8000 gpm for 2 pumps).
Step 7:
CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.
SAT
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
UNSAT Standard:
Operator compares Core Spray pump flow rate with Suppression N/A Pool temperature and Suppression Pool pressure and Determined adequate NPSH.
Termination Criteria: Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.
STOP TIME:
8
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is Shutdown
* RPV Water Level is lowering slowly.
* 1-EOI-1 has been entered and followed to RC-L6.
INITIATING CUES:
The Unit Supervisor directs you to inject water into the RPV to restore RPV water level using Core Spray System II as directed by 3-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II. Directed level band is +2 to +51 inches.
9
Job Performance Measure (JPM) 2-EOI Appendix-11F Alternate RPV Pressure Control SITE:    BFN    JPM TITLE:
Systems: RFPT On Minimum Flow JPM NUMBER:      670A U2        REVISION: 0 TASK APPLICABILITY:          SRO                STA                UO              NAUO U-000-EM-58 Lineup Alternate RPV Pressure Control TASK NUMBER / TASK TITLE(S): Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:    RO: 3.6SRO: 3.6 239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with K/A No. &STATEMENT:
operating the MAIN ANDREHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION: None SAFETY FUNCTION: 3 EVALUATION LOCATION:              In-Plant          Simulator        Control Room        Lab Other - List APPLICABLE METHOD OF TESTING:          Discussion    Simulate/Walkthrough    Perform TIME FOR COMPLETION:    NA          TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                    Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                    JPM Number: _670A U2_
RO    SRO        DATE: _______
TASK STANDARD: Perform operations necessary to necessary to place one RFPT in pressure control as directed by 2-EOI Appendix-11F.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                  Procedure: 2-EOI-APPENDIX-11F VERIFICATION TIME: 12 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC 284 Malfunctions      Description              Event    Severity      Delay    Initial set fw15a              SPURIOUS RFP              15        N/A          0        N/A BEARING LOW OIL PRESSURE tc03a-j            Fail Bypass Valves        1        0%            0        N/A closed ad01e 20            SRV 1-31 stuck open        1        20%            0        N/A 20%
Remotes        Description              Event    Severity      Delay    Initial set Overrides        Description              Event    Severity      Delay    Initial set Initial Setup:
: 1. Reset to IC 28
: 2. Manually Scram RX
: 3. Trip 2A and 2B RFPT
: 4. Run Schedule File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
: 5. Insert Manual Trigger #1
: 6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
: 7. Verify Auto Trigger #15 is ACTIVE
: 8. Freeze simulator and save IC.
Schedule Files:
: 1. NRC JPM E U2-Alt RPV Press Control RFP Min Flow.sch
: 2. NRC JPM E U2-Alt RPV Press Control RFP Min Flow RFPT Trip.evt 3
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  09/01/15    All      Initial issue 4
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 2C.
INITIATING CUES:
The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.
5
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                            SAT / UNSAT Step 1:
[1] IF BOTH of the following exist:
* Emergency RPV Depressurization is required, AND
* Group 1 Isolation Signal exists, THEN SAT EXIT this procedure and ENTER EOI Appendix 11H.                                                      UNSAT N/A Standard:
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Step 2:
SAT
[2] VERIFY MSIVs open.
UNSAT Standard:
N/A Verifies MSIVs OPEN 6
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 3:
[3] VERIFY Hotwell Pressure at or below -7 in. Hg.                          SAT Standard:                                                                UNSAT Verifies Hotwell Pressure at or below -7 in. Hg                            N/A Step 4:
[4] PLACE RFPTs in service as follows:
[4.1] VERIFY the following:
SAT
[4.1.1] At least one condensate pump running.
[4.1.2] At least one condensate booster pump running.
UNSAT
[4.1.3] Condensate System aligned to supply suction toRFPs.
N/A Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Step 5:
[4.2] VERIFY Main Oil Pump running for each RFPT to bestarted.              SAT Standard:                                                                UNSAT Verifies main oil pump running for RFPT 2A                                  N/A Step 6:
Critical Step
[4.3] VERIFY CLOSED 2-FCV-3-19, RFP 2ADISCHARGE VALVE.
SAT Standard:
UNSAT VERIFY CLOSED 2-FCV-3-19, RFP 2A DISCHARGE VALVE.
N/A 7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 7:
Critical Step
[4.4] DEPRESS 2-HS-46-8A RFPT 2A SPEED CONT RAISE/LOWER, and VERIFY amber lightis illuminated.                                      SAT Standard:                                                                UNSAT Depresses 2-HS-46-8A                                                        N/A Step 8:
[4.5] DEPRESS 2-HS-3-124A, RFPT 2A TRIP RESET.                        Critical Step Standard:                                                                  SAT Depresses 2-HS-3-124A and verifies the 2-Z1-1-123 LP Stop Valve and      UNSAT 2-Z1-127 HP Stop Valve comes OPEN.
N/A Step 9:
Critical Step
[4.6] PLACE 2-HS-46-112A RFPT 2A START/LOCAL ENABLE, in START.                                                                      SAT Standard:                                                                UNSAT Places 2-HS-46-112A in START                                                N/A Note to Examiner:
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:
Critical Step
[4.7] CHECK RFPT 2A speed increases to approximately 600 rpm.
SAT Standard:
UNSAT Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 2-EOI-APPENDIX-11F.                        N/A CUE:
US: Proceed as directed per 2-EOI-APPENDIX-11F.
AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Step 11:
[1] IF BOTH of the following exist:
* Emergency RPV Depressurization is required, AND
* Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER                                                  SAT EOI Appendix 11H.
UNSAT Standard:                                                                      N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Step 12:
[2] VERIFY MSIVs open.                                                        SAT Standard:                                                                    UNSAT Verifies MSIVs OPEN                                                            N/A 9
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 13:
[3] VERIFY Hotwell Pressure at or below -7 in. Hg.                          SAT Standard:                                                                UNSAT Verifies Hotwell Pressure at or below -7 in. Hg                            N/A Step 14:
[4] PLACE RFPTs in service as follows:
[4.1] VERIFY the following:
SAT
[4.1.1] At least one condensate pump running.
[4.1.2] At least one condensate booster pump running.
UNSAT
[4.1.3] Condensate System aligned to supply suction toRFPs.
N/A Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Step 15:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started.            SAT Standard:                                                                UNSAT Verifies main oil pump running for RFPT 2B                                  N/A Step 16:
Critical Step
[4.3] VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
SAT Standard:
UNSAT VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
N/A 10
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 17:
Critical Step
[4.4] DEPRESS 2-HS-46-9A, RFPT 2BSPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.                                      SAT Standard:                                                                UNSAT Depresses 2-HS-46-9A                                                        N/A Step 18:
Critical Step
[4.5] DEPRESS 2-HS-3-150A, RFPT 2B TRIP RESET.
SAT Standard:
UNSAT Depresses 2-HS-3-150A and verifies the 2-ZI-1-133 LP Stop Valve and 2-FCV-135 HP Stop Valve comes OPEN.                                          N/A Step 19:
Critical Step
[4.6] PLACE 2-HS-46-138A, RFPT 2B START/LOCAL ENABLE, in START.                                                                      SAT Standard:                                                                UNSAT Places 2-HS-46-138A in START                                                N/A Step 20:
[4.7] CHECK RFPT 2B speed increases to approximately 600 rpm.              SAT Standard:                                                                UNSAT Verifies RFPT 2B speed increases to approximately 600 rpm                  N/A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 21:
[4.8] VERIFY OPEN 2-FCV-3-13, RFP2B MIN FLOW VALVE.                          SAT Standard:                                                                UNSAT Verifies 2-FCV-3-13 OPEN                                                    N/A Step 21:
CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.
[4.9] PLACE 2-HS-46-9A, RFPT 2B SPEED CONT RAISE/LOWER in              Critical Step RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig.                                                                  SAT Standard:                                                                UNSAT Raises RFPT speed using Manual Speed Control Handswitch,                    N/A maintaining discharge pressure <1250 psig as indicated on 2-PI-3-9A RFPT 2B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
STOP TIME END OF TASK 12
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 2C.
INITIATING CUES:
The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.
13
Job Performance Measure (JPM) 3-EOI Appendix-11F Alternate RPV Pressure Control SITE:    BFN    JPM TITLE:
Systems: RFPT On Minimum Flow JPM 670A JPM NUMBER:                      REVISION:        0 U3 TASK APPLICABILITY:              SRO                STA              UO                NAUO U-000-EM-58 Lineup Alternate RPV Pressure Control TASK NUMBER / TASK TITLE(S): Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:    RO: 3.6 SRO: 3.6 239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with K/A No. & STATEMENT:
operating the MAIN AND REHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION: None SAFETY FUNCTION: 3 EVALUATION LOCATION:              In-Plant          Simulator        Control Room        Lab Other - List APPLICABLE METHOD OF TESTING:          Discussion      Simulate/Walkthrough      Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N          ALTERNATE PATH (Y/N) Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                    JPM Number: _______
RO            SRO                DATE: _______
TASK STANDARD: Perform operations necessary to necessary to place one RFPT in pressure control as directed by 3-EOI Appendix-11F.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                  Procedure: 3-EOI-APPENDIX-11F VERIFICATION TIME:
PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC    28 Exam IC 284 Malfunctions Description            Event    Severity Delay Initial set fw15a        SPURIOUS RFP            15      N/A      0    N/A BEARING LOW OIL PRESSURE tc03a-j      Fail Bypass Valves        1      0%      0    N/A closed ad01e        SRV 1-31 stuck open      1      26%      0    N/A Remotes    Description            Event    Severity Delay Initial set Overrides  Description            Event    Severity Delay Initial set 3
Job Performance Measure (JPM)
Initial Setup:
: 1. Reset to IC 28
: 2. Manually Scram RX
: 3. Trip 2A and 2B RFPT
: 4. Run Schedule File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
: 5. Insert Manual Trigger #1
: 6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
: 7. Verify Auto Trigger #15 is ACTIVE
: 8. Freeze simulator and save IC.
Schedule Files:
: 1. NRC JPM E U3-Alt RPV Press Control RFP Min Flow.sch
: 2. NRC JPM E U3-Alt RPV Press Control RFP Min Flow RFPT Trip.evt 4
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  05/11/15    All      Initial issue 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 3C.
INITIATING CUES:
The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.
6
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                            SAT / UNSAT Step 1:
[1] IF BOTH of the following exist:
* Emergency RPV Depressurization is required, AND
* Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER                                            SAT EOI Appendix 11H.
UNSAT Standard:                                                                      N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Step 2:
[2] VERIFY MSIVs open.
SAT Standard:
UNSAT Verifies MSIVs OPEN N/A 7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 3:
[3] VERIFY Hotwell Pressure at or below -7 in. Hg.
SAT Standard:
UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 4:
[4] PLACE RFPTs in service as follows:
[4.1] VERIFY the following:
[4.1.1] At least one condensate pump running.
SAT
[4.1.2] At least one condensate booster pump running.
[4.1.3] Condensate System aligned to supply suction to RFPs.
UNSAT Standard:
N/A Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Step 5:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started.
SAT Standard:
UNSAT Verifies main oil pump running for RFPT 3A N/A Step 6:                                                                Critical Step
[4.3] VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.
SAT Standard:
UNSAT VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.
N/A 8
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 7:
[4.4] DEPRESS 3-HS-46-8A, RFPT 3A SPEED CONT RAISE/LOWER,              Critical Step and VERIFY amber light is illuminated.
SAT Standard:
UNSAT Depresses 3-HS-46-8A N/A Step 8:
[4.5] DEPRESS 3-HS-3-124A, RFPT 3A TRIP RESET.                        Critical Step Standard:                                                                  SAT Depresses 3-HS-3-124A and resets RFPT Trip and verifies the 3-ZI      UNSAT 123 LP Stop Valve and 3-ZI-127 HP Stop Valve comes OPEN.
N/A Step 9:
[4.6] PLACE 3-HS-46-112A RFPT 3A START/LOCAL ENABLE, in                Critical Step START.
SAT Standard:
UNSAT Places 3-HS-46-112A in START N/A Note to Examiner:
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:
[4.7] CHECK RFPT 3A speed increases to approximately 600 rpm.
SAT Standard:
UNSAT Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 3-EOI-APPENDIX-11F.                        N/A CUE:
US: Proceed as directed per 3-EOI-APPENDIX-11F.
AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Step 11:
[1] IF BOTH of the following exist:
* Emergency RPV Depressurization is required, AND
* Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.                                                              SAT UNSAT Standard:
N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Step 12:
[2] VERIFY MSIVs open.
SAT Standard:
UNSAT Verifies MSIVs OPEN N/A 10
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 13:
[3] VERIFY Hotwell Pressure at or below -7 in. Hg.
SAT Standard:
UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 14:
[4] PLACE RFPTs in service as follows:
[4.1] VERIFY the following:
[4.1.1] At least one condensate pump running.
SAT
[4.1.2] At least one condensate booster pump running.
[4.1.3] Condensate System aligned to supply suction to RFPs.
UNSAT Standard:
N/A Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Step 15:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started.
SAT Standard:
UNSAT Verifies main oil pump running for RFPT 3B N/A Step 16:                                                              Critical Step
[4.3] VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.
SAT Standard:
UNSAT VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.
N/A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 17:
[4.4] DEPRESS 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER,              Critical Step and VERIFY amber light is illuminated.
SAT Standard:
UNSAT Depresses 3-HS-46-9A N/A Step 18:
[4.5] DEPRESS 3-HS-3-150A, RFPT 3B TRIP RESET.                        Critical Step Standard:                                                                  SAT Depresses 3-HS-3-150A and verifies the 3-ZI-1-133 LP Stop Valve and 3-  UNSAT FCV-135 HP Stop Valve comes OPEN.
N/A Step 19:
[4.6] PLACE 3-HS-46-138A, RFPT 3B START/LOCAL ENABLE, in              Critical Step START.
SAT Standard:
UNSAT Places 3-HS-46-138A in START N/A Step 20:
[4.7] CHECK RFPT 3B speed increases to approximately 600 rpm.
SAT Standard:
UNSAT Verifies RFPT 3B speed increases to approximately 600 rpm N/A 12
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 21:
[4.8] VERIFY OPEN 3-FCV-3-13, RFP 3B MIN FLOW VALVE.                    Critical Step Standard:                                                                    SAT Verifies 3-FCV-3-13 OPEN                                                  UNSAT N/A Step 21:
CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.
[4.9] PLACE 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER in Critical Step RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig.
SAT Standard:
UNSAT Raises RFPT speed using Manual Speed Control Handswitch, N/A maintaining discharge pressure <1250 psig as indicated on 3-PI-3-9A RFPT 3B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
STOP TIME END OF TASK 13
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 3C.
INITIATING CUES:
The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.
14
Job Performance Measure (JPM)
N2 MAKEUP TO PRIMARY CONTAINMENT WITH SITE:    BFN    JPM TITLE:
2-EOI-APPENDIX-14A JPM NUMBER:      669 U2        REVISION: 0 TASK APPLICABILITY:          SRO                STA                UO              NAUO U-000-EM-77 Lineup nitrogen Makeup to primary TASK NUMBER / TASK TITLE(S):
Containment IAW EOI-APPENDIX-14A K/A RATINGS:    RO: 3.7SRO: 3.8 223001 Primary Containment System and Auxiliaries A2.04; Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and K/A No. &STATEMENT: (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations: High containment/drywell hydrogen concentration RELATED PRA INFORMATION: None SAFETY FUNCTION: 5 EVALUATION LOCATION:              In-Plant          Simulator        Control Room        Lab Other - List APPLICABLE METHOD OF TESTING:          Discussion    Simulate/Walkthrough    Perform TIME FOR COMPLETION:    NA          TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                    Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                    JPM Number: _669 U2__
RO    SRO        DATE: _______
TASK STANDARD: Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                  Procedure: 2-EOI-APPENDIX-14A VERIFICATION TIME:        15 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC    285
: 1. Open Schedule File
: 2. Open Event File
: 3. Reset to IC-28 and take out of freeze.
: 4. Man Scram Rx and place MS to SD.
: 5. Inhibit ADS & Open 6 ADS Valves.
Console
: 6. Fire Trigger 2 Operator
: 7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch Instructions in BYPASS per EOI APPDX 19
: 8. Place DW Vent in Service per EOI APPX 12
: 9. Wait for Group 6 schedule file to time out and alrms to settle
: 10. Freeze simulator and save IC.
Malfunctions      Description            Event        Severity        Delay Initial set TH22                COOLANT LEAK            2            100            0    Yes INSIDE DRYWELL TH23                  FUEL CLADDING            2            100%            0    N/A DAMAGE RC08                  RCIC STEAM              1            N/A            0    N/A SUPPLY VALVE AUTO OPENING FAILURE HP04                  HPCI STEAM              1            N/A            0    N/A SUPPLY VALVE AUTO OPENING FAILURE CS04A                CORE SPRAY              1            N/A            0    N/A LOGIC POWER FAILURE DIV I CS04B                CORE SPRAY              1            N/A            0    N/A LOGIC POWER FAILURE DIV II RD01A                CRD PUMP TRIP            1            N/A            0    N/A 2A RD01B                CRD PUMP TRIP            1            N/A            0    N/A 2B FW01A                CONDENSATE              1            N/A            0    N/A PUMP TRIP 2A FW01B                CONDENSATE              1            N/A            0    N/A 3
Job Performance Measure (JPM)
PUMP TRIP 2B FW01C              CONDENSATE              1          N/A        0      N/A PUMP TRIP 2C PC08              H2 IN DRYWELL_          2            29        0      N/A PC09              OXYGEN IN              2          2.8        0      N/A DRYWELL_
PC10              H2 IN                  2            18        0      N/A SUPPRESSION POOL_
PC11              OXYGEN IN              2          1.5        0      N/A SUPPRESSION POOL_
Remotes      Description          Event      Severity    Delay  Initial set Overrides    Description          Event      Severity    Delay  Initial set ZLOXA554C9        DW EQUIP DRAIN          2          N/A        N/A    ON SUMP LEVEL ABNORMAL Schedule File(s):
* JPM 669 U2 N2 Makeup to Primary Containment 2-EOI-APPENDIX-14A.sch
* Appendix\App. 8E.sch
* JPM 669 U2 N2 Makeup to Primary Containment 2-EOI-APPENDIX-14A.evt 4
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  05/27/15    All      Initial issue 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is shutdown.
* 2-EOI-APPENDIX-12has been completed
* 2-EOI-APPENDIX-19 has been completed.
* PCIS Group 6 has been overridden per 2-EOI-APPENDIX-8E.
INITIATING CUES:
The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2-EOI-APPENDIX-14A beginning on step 2.
6
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                          SAT / UNSAT Step 1:
: 2. MONITOR Drywell and Suppression Chamber H2 and O2concentrations on one or more of the following displays(2-EOI Appendix 19):
SAT
* 2-MON-76-110, H2/O2 ANALYZER (Panel 2-9-55)
UNSAT
* 2-XR-76-110, H2/O2 CONCENTRATION (Panel 2-9-54)
N/A Standard:
Verifies H2 and O2 concentrations Step 2:
: 3. IF ................. Drywell/Suppression Chamber H2 /O2 analyzer is or becomes inoperable, SAT THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H2 and O2 using CI-644.
UNSAT Standard:
N/A Verifies Drywell/Suppression Chamber H2 /O2 analyzers are Operable 7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 3:
4.WHEN ......... Drywell or Suppression Chamber H2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure.                SAT Standard:                                                                  UNSAT Observes a rise in Drywell H2 Concentration and continues with                N/A procedure.
Step 4:
NOTE This procedure assumes that the normal makeup is from N2 Storage Tank B.
SAT
: 5. DISPATCH personnel to N2 Storage Tank B to CHECK 0-PI-76-331, UNSAT N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
N/A Standard:
Dispatches UO to verifyN2 Storage Tank B Pressure CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:
: 6. DETERMINE area with highest H2 and/or O2 concentrations and          Critical Step INFORM SRO.
SAT Standard:
UNSAT Correctly determines highest concentration is in the drywell and informs US                                                                            N/A CUE: If asked about 15 minute sample time, state 15 minutes have elapsed 8
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 6:
Critical Step
: 7. VERIFY PCIS RESET (Panel 2-9-4).
SAT Standard:
UNSAT Verifies PCIS RESET on Panel 2-9-4 N/A Step 7:
Critical Step
: 8. IF ................. It is desired to makeup N2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.          SAT Standard:                                                                UNSAT Correctly determine step is not applicable and proceeds to step 9.          N/A Step 8:
: 9. CONTROL Drywell H2 and O2 as follows:
Critical Step
: a. OPEN the following valves to admit N2 to Drywell (Panel 2-9-3):
SAT
* 2-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV
* 2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.            UNSAT Standard:
N/A OPENS 2-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV &
2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Step 9:
: b. SLOWLY ADJUST 2-PC-76-14, DW/SUPPR CHBR N2 MU Critical Step PRESS CONTROL (Panel 2-9-3), to maintain flow > 55 and
  <60 scfm on 2-XR-76-14, DW/SUPPR CHBR N2 MAKEUP SAT FLOW/PRESS (Panel 2-9-3), or as directed by SRO if SAMG execution is in progress.
UNSAT Standard:
N/A Achieves a flowrate between 55-60 scfm and monitors Drywell Hydrogen Concentration Lowering 9
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 10:
: c. CONTINUEN2 admission to the Drywell UNTIL Drywell H2 andO2 are        SAT below desired values.
UNSAT Standard:
N/A Monitors Drywell Hydrogen Concentration Note to Examiner: Once satisfied with N2 Flow established between 55 - 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
Pass/ Fail Criteria: Establish N2 Flow> 55 scfm and H2 Concentration on a downward trend.
STOP TIME END OF TASK 10
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is shutdown.
* 2-EOI-APPENDIX-12 has been completed
* 2-EOI-APPENDIX-19 has been completed.
* PCIS Group 6 has been overridden per 2-EOI-APPENDIX-8E.
INITIATING CUES:
The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2-EOI-APPENDIX-14A beginning on step 2.
11
Job Performance Measure (JPM)
N2 MAKEUP TO PRIMARY CONTAINMENT WITH 3-SITE:    BFN    JPM TITLE:
EOI-APPENDIX-14A JPM NUMBER:      670 U3        REVISION: 0 TASK APPLICABILITY:          SRO                STA                UO              NAUO U-000-EM-77 Lineup nitrogen Makeup to primary TASK NUMBER / TASK TITLE(S):
Containment IAW EOI-APPENDIX-14A K/A RATINGS:    RO: 3.7SRO: 3.8 223001 Primary Containment System and Auxiliaries A2.04; Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and K/A No. &STATEMENT: (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations: High containment/drywell hydrogen concentration RELATED PRA INFORMATION: None SAFETY FUNCTION: 5 EVALUATION LOCATION:              In-Plant          Simulator        Control Room        Lab Other - List APPLICABLE METHOD OF TESTING:          Discussion    Simulate/Walkthrough    Perform TIME FOR COMPLETION:    NA          TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                    Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                    JPM Number: _670 U3_
RO    SRO        DATE: _______
TASK STANDARD: Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                  Procedure: 3-EOI-APPENDIX-14A VERIFICATION TIME:
PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC    285
: 1. Open Schedule File
: 2. Open Event File
: 3. Reset to IC-28 and take out of freeze.
: 4. Man Scram Rx and place MS to SD.
: 5. Inhibit ADS & Open 6 ADS Valves.
Console
: 6. Fire Trigger 2 Operator
: 7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch Instructions in BYPASS per EOI APPDX 19
: 8. Place DW Vent in Service per EOI APPX 12
: 9. Wait for Group 6 schedule file to time out and alrms to settle
: 10. Freeze simulator and save IC.
Malfunctions      Description          Event        Severity        Delay Initial set TH22                COOLANT LEAK            2            100            0    Yes INSIDE DRYWELL TH23                  FUEL CLADDING            2            100%            0    N/A DAMAGE RC08                  RCIC STEAM              1            N/A            0    N/A SUPPLY VALVE AUTO OPENING FAILURE HP04                  HPCI STEAM              1            N/A            0    N/A SUPPLY VALVE AUTO OPENING FAILURE CS04A                CORE SPRAY              1            N/A            0    N/A LOGIC POWER FAILURE DIV I CS04B                CORE SPRAY              1            N/A            0    N/A LOGIC POWER FAILURE DIV II RD01A                CRD PUMP TRIP            1            N/A            0    N/A 2A RD01B                CRD PUMP TRIP            1            N/A            0    N/A 2B 3
Job Performance Measure (JPM)
FW01C              CONDENSATE              1          N/A        0      N/A PUMP TRIP 2C PC08              H2 IN DRYWELL_          2          29          0      N/A PC09              OXYGEN IN              2          2.8        0      N/A DRYWELL_
PC10              H2 IN                  2          18          0      N/A SUPPRESSION POOL_
PC11              OXYGEN IN              2          1.5        0      N/A SUPPRESSION POOL_
Overrides    Description          Event      Severity    Delay  Initial set ZLOXA554C9        DW EQUIP DRAIN          2          N/A        N/A    ON SUMP LEVEL ABNORMAL Schedule File(s):
* JPM 669 U3 N2 Makeup to Primary Containment 2-EOI-APPENDIX-14A.sch
* Appendix\App. 8E.sch
* JPM 669 U3 N2 Makeup to Primary Containment 2-EOI-APPENDIX-14A.evt 4
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  05/27/15    All      Initial issue 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is shutdown.
* 3-EOI-APPENDIX-12 has been completed.
* 3-EOI-APPENDIX-19 has been completed.
* PCIS Group 6 has been overridden per 3-EOI-APPENDIX-8E.
INITIATING CUES:
The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2.
6
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                          SAT / UNSAT Step 1:
: 3. MONITOR Drywell and Suppression Chamber H2 and O2concentrations on one or more of the following displays(3-EOI Appendix 19):
SAT
* 3-MON-76-110, H2/O2 ANALYZER (Panel 3-9-55)
UNSAT
* 3-XR-76-110, H2/O2 CONCENTRATION (Panel 3-9-54)
N/A Standard:
Verifies H2 and O2 concentrations Step 2:
: 3. IF ................. Drywell/Suppression Chamber H2 /O2 analyzer is or becomes inoperable,                                                    SAT THEN ...........NOTIFY Chemistry Lab to sample Drywell                UNSAT andSuppression Chamber for H2 and O2 using CI-644.
N/A Standard:
Verifies Drywell/Suppression Chamber H2 /O2 analyzers are Operable 7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 3:
: 4. WHEN ......... Drywell or Suppression Chamber H2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure.                SAT Standard:                                                                  UNSAT Observes a rise in Drywell H2 Concentration and continues with                N/A procedure.
Step 4:
NOTE This procedure assumes that the normal makeup is from N2 Storage Tank B.
SAT
: 5. DISPATCH personnel to N2 Storage Tank B to CHECK 0-PI-76-331, UNSAT N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
N/A Standard:
Dispatches UO to verifyN2 Storage Tank B Pressure CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:
: 6. DETERMINE area with highest H2 and/or O2 concentrations and          Critical Step INFORM SRO.
SAT Standard:
UNSAT Correctly determines highest concentration is in the drywell and informs US                                                                            N/A CUE: If asked about 15 minute sample time, state 15 minutes have elapsed 8
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 6:
Critical Step
: 7. VERIFY PCIS RESET (Panel 3-9-4).
SAT Standard:
UNSAT Verifies PCIS RESET on Panel 3-9-4 N/A Step 7:
Critical Step
: 8. IF ................. It is desired to makeup N2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.          SAT Standard:                                                                UNSAT Correctly determine step is not applicable and proceeds to step 9.          N/A Step 8:
: 9. CONTROL Drywell H2 and O2 as follows:
Critical Step
: a. OPEN the following valves to admit N2 to Drywell (Panel 3-9-3):
SAT
* 3-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV
* 3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.            UNSAT Standard:
N/A OPENS 3-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV
&3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Step 9:
: b. SLOWLY ADJUST 3-PC-76-14, DW/SUPPR CHBR N2 MUPRESS Critical Step CONTROL (Panel 3-9-3), to maintain flow between 55 and60 scfm on 3-XR-76-14, DW/SUPPR CHBR N2 MAKEUPFLOW/PRESS (Panel 3-SAT 9-3), or as directed by SRO if SAMGexecution is in progress.
UNSAT Standard:
N/A Achieves a flowrate between 55-60 scfm and monitors Drywell Hydrogen Concentration Lowering 9
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 10:
: c. CONTINUE N2 admission to the Drywell UNTIL Drywell H2 and O2 are below desired values.                                              SAT Standard:                                                                UNSAT Monitors Drywell Hydrogen Concentration                                    N/A Note to Examiner: Once satisfied with N2 Flow established between 55 - 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
Pass/ Fail Criteria: Establish N2 Flow > 55 scfm and H2 Concentration on a downward trend.
STOP TIME END OF TASK 10
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is shutdown.
* 3-EOI-APPENDIX-12 has been completed.
* 3-EOI-APPENDIX-19 has been completed.
* PCIS Group 6 has been overridden per 3-EOI-APPENDIX-8E.
INITIATING CUES:
The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2.
11
Job Performance Measure (JPM)
Restore Offsite Power to 4KV shutdown board at SITE:  BFN    JPM TITLE:
PNL 9-23 JPM NUMBER:      631 U2      REVISION: 0 TASK SRO              STA            UO              NAUO APPLICABILITY:
U-082-NO-09 / Restore Offsite Power to 4KV TASK NUMBER / TASK TITLE(S):
shutdown board at PNL 9-23 K/A RATINGS:    RO 3.4 SRO 3.4 262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control room: Synchroscope, K/A STATEMENT:
including understanding of running andincoming voltages RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 6 EVALUATION LOCATION:            In -P la n t  Simulator    Control Room          Lab Other - List APPLICABLE METHOD OF TESTING:        Discussion  Simulate/Walkthrough    Perform TIME FOR COMPLETION: NATIME CRITICAL (Y/N)            N ALTERNATE PATH (Y/N)          N Developed by:
Developer                              Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                              Date Approved by:
Site Training Management                          Date Approved by:
Site Training Program Owner                        Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________              JPM Number: 631 U2 RO    SRO        DATE: _______
TASK STANDARD: Perform operations necessary to restore offsite power to 4KV SD BD A from 4KV SD BUS 1.
PRA: NA REFERENCES/PROCEDURES NEEDED:              Procedure 0-OI-82 VERIFICATION TIME:      15 Min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:    SATISFACTORY ____      UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC    286 Console      1. Reset to IC 28 and take out of freeze Operator      2. Start A EDG and parallel with offsite Instructions    3. Open 4-kV Shutdown Board A Breaker 1614 Malfunctions    Description            Event          Severity Delay Initial set Remotes      Description            Event          Severity Delay Initial set Overrides    Description            Event          Severity Delay Initial set 3
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed.
I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* No Inclement weather currently exists in the area
* 8 hours ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0-OI-82, Standby Diesel Generator System.
INITIATING CUE:
The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.
4
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                        SAT /
UNSAT Step 1:
0-OI-82 Standby Diesel Generator System Section 8.3 Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23 NOTE The following list of 4-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:
SAT
__UNSAT Shutdown                A            B          C          D Board N/A Norm Feed Bkr      1614        1616        1718          1724 Alt Feed Bkr        1716        1714        1624          1618
[1]    VERIFY 4-kV Shutdown Board A is being supplied power by its respective Diesel Generator as the only source of power.
Standard:
Verifies 4-kV Shutdown Board A is being supplied by DG A.
Step 2:
[2]    VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
Diesel  Handswitch Name Handswitch Panel SAT No.
4KV SD BD A                                          UNSAT A                                    0-211-3EA    0-9-23-7 AUTO/LOCKOUT RESET N/A Standard:
Verifies 4KV SD BD A AUTO/LOCKOUT RESET, HS-0-211-A, is tripped to manual.
5
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 3:
[3]    PLACE the synchroscope switch for the 4-kV shutdown board        Critical Step feeder breaker that is to be paralleled with the Diesel Generator in ON.                                                            SAT Standard:                                                                UNSAT Places Synchroscope switch for 4-kV Shutdown Board A normal      N/A feeder breaker 1614 to ON.
Step 4:
[4]    VERIFY 4-kV Shutdown Bus 1(2) voltage is between 3950 Volts SAT and 4400 Volts and NOT undergoing abnormal voltage transients.
UNSAT Standard:
N/A Verifies 4-kV Shutdown Bus 1 voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
Step 5:
[5]    VERIFY associated incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients.
Shutdown      Instrument Name      Instrument No.          Panel Bd SAT A or B          GEN SYNC            0-SI-82-0AB          0-9-23-7 FREQUENCY UNSAT C or D          GEN SYNC            0-SI-82-0CD          0-9-23-8 FREQUENCY N/A Standard:
Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY,0-SI-82-AB.
6
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 6:
CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclementweather (e.g., lightning, heavy winds).
SAT
[6]    IF 4-kV Shutdown Bus 1 (2) is experiencing abnormal voltage or  UNSAT frequency conditions, THEN PERFORM the following:
N/A Standard:
STEP N/A Step 7:
CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.
Critical Step
[7]    PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.                      SAT Diesel      Handswitch Name          Handswitch          Panel    UNSAT No.
A      DG A MODE SELECT          0-HS-82-A/5A        0-9-23-7  N/A Standard:
Pulls DG A MODE SELECT switch 0-HS-82-A/5A and places it in PARALLELED WITH SYSTEM.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 8:
CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.
SAT UNSAT
[8]    RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.
N/A Standard:
Releases the Diesel Generator A mode selector switch, 0-HS        A/5A and observesPARALLELED WITH SYSTEM light is illuminated.
Step 9:
[9]    ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Critical Step Diesel      Handswitch Name            Handswitch          Panel No.                        SAT A        DG A GOVERNOR            0-HS-82-A/3A        0-9-23-7 CONTROL                                              UNSAT Standard:                                                              N/A AdjustsDiesel Generator A frequency using Diesel Generator governor control switch, 3-HS-82-A/3A, (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 10:
[10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
Diesel        Instrument Name                Inst No. Panel DG A VOLT REGULATOR            0-HS-82-A/2A            SAT CONT A      GEN SYNC REF VOLTAGE          0-EI-82-AB    0-9-23-7  UNSAT SYSTEM SYNC REF                0-EI-211-0AB VOLTAGE                                                N/A Standard:
Matches DG A voltage with system voltage using DG A VOLT REGULATOR CONT switch 0-HS-82-A/2A.
Step 11:
[11]  WHEN the synchroscope needle is approximately 2 minutes on Critical Step the right hand side of the 12 o'clock position, THEN CLOSE the 4-kV shutdown board feeder breaker that is to be SAT paralleled with the Diesel Generator.
UNSAT Standard:
N/A Closesthe 4-kV shutdown board feeder breaker 1614 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Step 12:
[12]  PLACE the synchroscope switch for the 4-kV shutdown board SAT feeder breaker that was paralleled with the Diesel Generator in OFF.
UNSAT Standard:
N/A Places the synchroscope switch for BKR 1614 in OFF.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 13:
NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.
[13]    IF DG has been operating at a low-load condition (50%) for an extended period of time (4 hours) THEN PERFORM the following (Otherwise N/A):
[13.1] USE the associated Diesel Generator's governor controlswitch and voltage regulator control switch toINCREASE kW and kVAR load, in increments of Critical Step 100kWevery 15 minutes.
SAT Diesel    Handswitch Name                    Hands      Panel witch UNSAT No.
DG A GOVERNOR CONTROL              0-HS-N/A 82-A/3A A                                                          0-9-23-7 DG A VOLT REGULATOR                0-HS-CONTROL                            82-A/2A
[13.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.
[13.3] STEP N/A
[13.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
[13.5] MAINTAIN 100% load for a minimum of 30 minutes.
Standard:
Loads DG to 2600 kW and 1850 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.
CUE: After first 100 kW load adjustment state 15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.
10
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 14:
NOTE Lagging VARs should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.
SAT UNSAT
[14]    USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and N/A kVAR load.
Diesel          Handswitch Name          Handswitch No. Panel DG A GOVERNOR CONTROL            0-HS-82-A/3A A                                                        0-9-23-7 DG A VOLT REGULATOR CONT        0-HS-82-A/2A Standard:
Obtains desired kW and kVAR load using DG A Governor Control switch, 0-HS-82-A/3A and DG Volt Regulator Cont switch, 0-HS-82-A/2A.
CUE: state 30 minutes have elapsed continue with procedure.
Step 15:
[15]    MONITOR the offsite source that is paralleled with the Diesel Generator.                                                        SAT
[16]    IF abnormal voltage or frequency transients are experienced,      UNSAT THEN N/A Standard:
Step is N/A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 16:
[17]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVARlimit may result in a reverse power trip of the Diesel Generator output breaker.
[17.1] USE the associated Diesel Generator's governor control    Critical Step switch and voltage regulator control switch to reduce generator load to approximately 300 kW and                SAT 250 kVAR:
UNSAT Diesel        Instrument Name              Inst No.      Panel N/A DG A GOVERNOR CONTROL          0-HS-82-A/3A DG A VOLTAGE                  0-HS-82-A/2A A    REGULATOR CONTROL                              0-9-23-7 DG A KILOWATTS                0-JI-82-A/A DG A KILOVARS                  0-VAR-82-A/A Standard:
Unloads the DG to approximately 300 KW and 250 kVAR.
Step 17
[17.2] PLACE the associated Diesel Generator breaker control Critical Step switch in TRIP SAT Diesel    Handswitch Name        Handswitch No.            Panel A        DG A BKR 1818        0-HS-211-A/22A          0-9-23-7 UNSAT N/A Standard:
Trips Diesel Generator breaker 1818.
12
Job Performance Measure (JPM)
STEP / STANDARD                                                    SAT /
UNSAT Step 18:
[17.3] PULL and PLACE the associated Diesel Generator mode Critical Step selector switch in SINGLE UNIT.
SAT Diesel      Handswitch Name          Handswitch No. Panel A      DG A MODE SELECT            0-HS-211-A/5A  0-9-23-7 UNSAT N/A Standard:
Pulls and places 0-HS-211-A/5A to Single Unit.
Step 19:
[17.4] RELEASE the Diesel Generator mode selector switch and SAT OBSERVE the SINGLE UNIT light illuminated.
UNSAT Standard:
N/A Verifies Single Unit light illuminated.
CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK 13
Job Performance Measure (JPM)
Provide to Applicant INITIAL CONDITIONS:
You are an Operator on Unit 2.
* No Inclement weather currently exists in the area
* 8 hours ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0-OI-82, Standby Diesel Generator System.
INITIATING CUE:
The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.
14
Job Performance Measure (JPM)
Restore Offsite Power to 4KV shutdown board at PNL 9-SITE:  BFN    JPM TITLE:
23      U-3 JPM NUMBER:    631          REVISION: 0 TASK SRO              STA            UO            NAUO APPLICABILITY:
U-082-NO-09 / Restore Offsite Power to 4KV TASK NUMBER / TASK TITLE(S):
shutdown board at PNL 9-23 K/A RATINGS:    RO 3.4 SRO 3.4 262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control K/A STATEMENT: room: Synchroscope, including understanding of running and incoming voltages RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 6 EVALUATION LOCATION:          In -P la n t    Simulator    Control Room        Lab Other - List APPLICABLE METHOD OF TESTING:        Discussion  Simulate/Walkthrough    Perform TIME FOR COMPLETION: NA        TIME CRITICAL (Y/N) N      ALTERNATE PATH (Y/N) N Developed by:
Developer                              Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                              Date Approved by:
Site Training Management                          Date Approved by:
Site Training Program Owner                        Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________              JPM Number: 631 RO          SRO                DATE: _______
TASK STANDARD: Perform operations necessary to restore offsite power to 4KV SD BD EC.
PRA: NA REFERENCES/PROCEDURES NEEDED:              Procedure 3-OI-82 VERIFICATION TIME:      15 Min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:    SATISFACTORY ____      UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC 286
: 1. Reset to IC 28 and take out of freeze Console
: 2. Start C EDG and parallel with offsite Operator
: 3. Open 4-kV Shutdown Board 3EC Breaker 1338 Instructions Malfunctions    Description              Event        Severity Delay Initial set Remotes      Description              Event        Severity Delay Initial set Overrides      Description              Event        Severity Delay Initial set Batch / Pref File(s):
3
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed.
I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* No Inclement weather currently exists in the area
* 8 hours ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3-OI-82, Standby Diesel Generator System.
INITIATING CUE:
The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.
4
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                        SAT /
UNSAT Step 1:
3-OI-82 Standby Diesel Generator System Section 8.3 Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23 NOTE The following list of 4-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:
SAT UNSAT Shutdown            3EA        3EB          3EC          3ED Board N/A Norm Feed Bkr      1334        1336        1338          1342 Alt Feed Bkr        1726        1728        1626          1628
[1]    VERIFY 4-kV Shutdown Board 3EC is being supplied power by its respective Diesel Generator as the only source of power.
Standard:
Verifies 4-kV Shutdown Board EC is being supplied by DG C Step 2:
[2]    VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
SAT Diesel  Handswitch Name                Handswitch No. Panel 4KV SD BD 3EC                  3-43-211-                UNSAT 3C                                                      3-9-23 AUTO/LOCKOUT RESET              3EC N/A Standard:
Verifies 4KV SD BD 3EC AUTO/LOCKOUT RESET, 3-43-211-3EC, is tripped to manual.
5
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 3:
[3]    PLACE the synchroscope switch for the 4-kV shutdown board        Critical Step feeder breaker that is to be paralleled with the Diesel Generator in ON.                                                                SAT Standard:                                                                  UNSAT Places Synchroscope switch for 4-kV Shutdown Board EC normal          N/A feeder breaker 1338 to ON Step 4:
[4]    CHECK the applicable 4-kV unit board (4-kV bus tie board)
SAT voltage is between 3950 VOLTS and 4400 VOLTS and NOT undergoing abnormal voltage transients.
UNSAT Standard:
N/A Verifies 4-kV Unit Board voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
Step 5:
[5]    VERIFY associated incoming frequency is between 59 HERTZ and 61 HERTZ and NOT undergoing abnormal frequency transients.
Shutdown      Instrument Name      Instrument No.          Panel SAT Bd 3EA or          GEN SYNC            3-SI-82-3AB          3-9-23 UNSAT 3EB          FREQUENCY 3EC or          GEN SYNC            3-SI-82-3CD          3-9-23 N/A 3ED          FREQUENCY Standard:
Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY, 3-SI-82-CD .
6
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 6:
CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclement weather (e.g., lightning, heavy winds).                SAT UNSAT
[6]    IF 4-kV unit board (4-kV bus tie board) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:          N/A Standard:
N/A Step 7:
CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.
Critical Step
[7]    PULL and PLACE the associated Diesel Generator mode SAT selector switch in PARALLELED WITH SYSTEM.
UNSAT Diesel      Handswitch Name          Handswitch          Panel No.
N/A 3C      DG 3C MODE SELECT          3-HS-82-3C/5A        3-9-23 Standard:
Pulls DG 3C MODE SELECT switch 3-HS-82-3C/5A and places it in PARALLELED WITH SYSTEM 7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 8:
CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.                                                                    SAT UNSAT
[8]    RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.                    N/A Standard:
Releases the Diesel Generator 3C mode selector switch, 3-HS-82-3C/5C and observes PARALLELED WITH SYSTEM light is illuminated.
Step 9:
[9]    ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Critical Step Diesel      Handswitch Name            Handswitch          Panel No.                            SAT 3C        DG 3C GOVERNOR          3-HS-82-3C/3A          3-9-23 CONTROL                                                UNSAT Standard:                                                                    N/A Adjusts Diesel Generator 3C frequency using Diesel Generator governor control switch, 3-HS-82-3C/3A (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 10:
[10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
Dies        Instrument Name                Inst No. Panel el                                                                SAT DG 3C VOLT REGULATOR          3-HS                CONT                          3C/2A UNSAT 3C    GEN SYNC REF VOLTAGE          3-EI-82-3CD    3-9-23 SYSTEM SYNC REF                3-EI-211-VOLTAGE                        3ECB/B                      N/A Standard:
Matches DG C voltage with system voltage using DG 3C VOLT REGULATOR CONT switch 3-HS-82-3C/2A Step 11:
[11]  WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN Critical Step CLOSE the 4-kV shutdown board feeder breaker that is to be SAT paralleled with the Diesel Generator.
UNSAT Standard:
N/A Closes the 4-kV shutdown board normal feeder breaker 1338 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Step 12:
[12]  PLACE the synchroscope switch for the 4-kV shutdown board            SAT feeder breaker that was paralleled with the Diesel Generator in OFF.                                                              UNSAT Standard:                                                                  N/A Places the synchroscope switch for BKR 1338 in OFF 9
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 13:
[13]    IF the normal feeder breaker is supplying the 4-kV shutdown board, THEN RESET the associated 4kV shutdown board auto transfer lockout Critical Step relay.
SAT Diesel      Handswitch Name          Handswitch            Panel No.
UNSAT 3C          4KV SD BD 3EC          3-43-211-3EC          3-9-23 AUTO/LOCKOUT N/A RESET Standard:
Resets 4KV SD BD 3EC Auto Transfer Lockout Relay Step 14:
NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.
[14]    IF DG has been operating at a low-load condition (50%) for an extended period of time (4 hours) THEN PERFORM the following (Otherwise N/A):                                    Critical Step
[14.1] USE the associated Diesel Generators governor control      SAT switch and voltage regulator control switch to INCREASE kW and kVAR load, in increments of 100kW every 15        UNSAT minutes.
N/A Diesel      Handswitch Name                    Hands    Panel witch No.
DG 3C GOVERNOR CONTROL            3-HS-82-3C/3A 3C                                                        3-9-23 DG 3C VOLT REGULATOR              3-HS-CONTROL                            82-3C/2A 10
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 14 continued:
[14.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.
[14.3] STEP N/A
[14.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
[14.5] MAINTAIN 100% load for a minimum of 30 minutes.
Standard:
Loads DG to 2600 kW and 1850 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.
CUE: After first 100 kW load adjustment state 15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.
Step 15:
NOTE VARs lagging should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to        SAT the maximum kVAR lagging the system will allow.
UNSAT
[15]    USE the associated Diesel Generator's governor control switch        N/A and voltage regulator control switch to obtain desired kW and kVAR load.
Diesel          Handswitch Name          Handswitch No. Panel DG 3C GOVERNOR                  3-HS              CONTROL                        3C/3A 3C                                                        3-9-23 DG 3C VOLT REGULATOR            3-HS              CONT                            3C/2A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Standard:
Obtains desired kW and kVAR load using DG 3C Governor Control switch, 3-HS-82-3C/3A and DG Volt Regulator Control switch, 3-HS-82-3C/2A CUE: state 30 minutes have elapsed continue with procedure.
Step 16:
[16]  MONITOR the offsite source that is paralleled with the Diesel Generator.                                                            SAT
[17]  IF abnormal voltage or frequency transients are experienced,      UNSAT THEN N/A Standard:
Step is N/A Step 17:
[18]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVAR limit may result in a reverse power trip of the Diesel Generator output breaker.                                              Critical Step SAT
[18.1] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce      UNSAT generator load to approximately 300 kW and 250 kVAR:                                                      N/A Diesel        Instrument Name                Inst No.      Panel DG 3C GOVERNOR CONTROL          3-HS-82-3C/3A DG 3C VOLT REGULATOR            3-HS-82-3C/2A 3C                                                        3-9-23 CONT DG 3C KILOWATTS                  3-JI-82-3C/A DG 3C KILOVARS                  3-VAR-82-3C/A 12
Job Performance Measure (JPM)
STEP / STANDARD                                                    SAT /
UNSAT Step 17 continued:
Standard:
Unloads the DG to approximately 300 KW and 250 kVAR Step 18:
[18.2] PLACE the associated Diesel Generator breaker control Critical Step switch in TRIP.
SAT Diesel      Handswitch Name          Handswitch No. Panel 3C        DG 3C BKR 1832              3-HS-211-    3-9-23 UNSAT 3EC/10A N/A Standard:
Trips breaker DG 3C BKR 1832 Step 19:
[18.3] PULL and PLACE the associated Diesel Generator mode  Critical Step selector switch in SINGLE UNIT.
SAT Diesel      Handswitch Name          Handswitch No. Panel 3C      DG 3C MODE SELECT            3-HS-82-3C/5A  0-9-23      UNSAT Standard:                                                              N/A Pulls and places 3-HS-82-3C/5A to Single Unit Step 20:                                                          SAT
[18.4] RELEASE the Diesel Generator mode selector switch and UNSAT OBSERVE the SINGLE UNIT light illuminated.
N/A Standard:
Verifies Single Unit light illuminated CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK 13
Job Performance Measure (JPM)
Provide to Applicant INITIAL CONDITIONS:
You are an Operator on Unit 3.
* No Inclement weather currently exists in the area
* 8 hours ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3-OI-82, Standby Diesel Generator System.
INITIATING CUE:
The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.
14
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE:          Respond to Off-Gas Post Treatment Radiation HI-HI-HI JPM NUMBER:        190 U2          REVISION: 0 TASK APPLICABILITY:      SRO                  STA                UO              NAUO U-066-AB-02 -Respond to Off-Gas Post Treatment TASK NUMBER / TASK TITLE(S):
Radiation Hi-Hi-Hi K/A RATINGS:    RO 2.9 SRO 3.2 271000 Offgas System: A2.16; Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those K/A STATEMENT: predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2)
RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 9 EVALUATION LOCATION:              In-Plant          Simulator      Control Room      Lab Other - List APPLICABLE METHOD OF TESTING:        Discussion    Simulate/Walkthrough    Perform TIME FOR COMPLETION: N/A            TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                    Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                JPM Number: 190 U2 RO    SRO        DATE: _______
TASK STANDARD: Respond to Off-Gas Post Treatment Radiation HI-HI-HI per 2-AOI-66-2 and/or 2-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED:                2-AOI-66-2, 2-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____      UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC    287
: 1. Reset to IC 28 Console        2. Fire Manual Trigger 2 Operator      3. Fire Manual Trigger 1 Instructions    4. Station 2nd operator to respond to alarms Malfunctions Description              Event      Severity    Delay Initial set TH23          FUEL CLADDING              1            50      N/A  YES DAMAGE RM14C          OFFGAS RAD                1        1E6 CPS      N/A  YES MONITOR FAILURERM                265A RM14D          OFFGAS RAD                1        1E6 CPS      N/A  YES MONITOR FAILURE RM-90-266A Remotes    Description              Event      Severity    Delay Initial set OG06          Bypass FCV-66-28          2            N/A      N/A  BYP Post Treatment Hi-Hi-Hi Rad Isol Overrides  Description              Event      Severity    Delay Initial set ZAORI9014A    RX BLDG AREA            1            2.5      N/A  YES RAD ZAORI9017A    RX BLDG AREA            1            2.6      N/A  YES RAD ZAORM90265A      90-265 METER            1            6.0      N/A  YES UPSCALE ZAORM90266A      90-266 METER            1            6.0      N/A  YES UPSCALE ZAORR90135R1 90-135 RECORDER              1            6.0      N/A  YES UPSCALE PEN 1 ZAORR90135R2 90-135 RECORDER              1            6.0      N/A  YES UPSCALE PEN 2 ZLORM90265A_1 90-265 DRAW LITE            1            N/A      N/A  YES 3
Job Performance Measure (JPM)
ZLORM90265A_2      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90265A_3      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90265A_4      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_1      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_2      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_3      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_4      90-265 DRAW LITE      1          N/A  N/A YES XA553A5              OG PRETREAT          1          N/A  N/A YES RAD HI XA553A6              STACK GAS RAD        1          N/A  N/A YES HI HI XA553A7                MSL RAD HI        1          N/A  N/A YES XA553A13            STACK GAS RAD        1          N/A  N/A YES HI XA553A27              MSL RAD HI HI        1          N/A  N/A YES XA554C26              CARBON BED          1          N/A  N/A YES VAULT RAD HI XA554C27                OG ANNUAL          1          N/A  N/A YES RELEASE LIMIT EXCEEDED XA554C33            OG POST TREAT        1          N/A  N/A YES RAD HI XA554C34            OG POST TREAT        1          N/A  N/A YES RAD HI HI XA554C35            OG POST TREAT        1          N/A  N/A YES RAD HI HIHI ZDIHS6628              66-28 VALVE        1          N/A  N/A YES CLOSED ZAORR90265R1      90-265 RECORDER        1          6.0  N/A YES UPSCALE PEN 1 ZAORR90265R2      90-265 RECORDER        1          6.0  N/A YES UPSCALE PEN 2 ZAORR90160R1          OG PRETREAT          1          -2.0 N/A YES RECORDER UPSCALE XA554B2              RWCU FILTER          1          N/A  N/A YES INLET CNDT HIGH Schedule File(s): JPM 190 U2 OG Post treat Rad HI HIHI 4
Job Performance Measure (JPM)
IN-SIMULATOR:
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are the Unit 2 Operator. Unit 2 is at 100% power.
INITIATING CUE:
The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 2-XA-55-4C, window 35.
5
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                        SAT / UNSAT Performance Step 1:
SAT When directed, identify/obtain copy of ARP-9-4C, window 35.
UNSAT Standard:
N/A Obtains copy of 2-ARP-9-4C, window 35 Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 2-AOI-66-2. In that event, continue at Performance Step 5.
Performance Step 2:
2-ARP-9-4C window 35 Operator Action:
A. VERIFY alarm condition on the following
* OFFGAS POST-TREATMENT RADIATION recorder, SAT 2-RR-90-265 on Panel 2-9-2.
* OG POST-TREATMENT CHAN A RAD MON RTMR UNSAT radiationmonitor, 2-RM-90-266A on Panel 2-9-10.
* OG POST-TREATMENT CHAN B RAD MON RTMR                          N/A radiationmonitor, 2-RM-90-265A on Panel 2-9-10.
Standard:
Verified alarm condition on 2-RR-90-265 and 2-RM-265/266.
Performance Step 3:
B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 2-FCV-              Critical Step 66-28 has the Mechanical Restraint DISENGAGED and 2-FCV-66-28 isCLOSED.                                              SAT Standard:                                                                  UNSAT Takes handswitch 2-FCV-66-28 to close and observes green light          N/A illuminated and red light out.
Cue: If asked, the Offgas Isolation Valve, 2-FCV-66-28 is NOT mechanically restrained.
6
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 4:
C. REFER to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-SAT Hi-Hi UNSAT Standard:
N/A Refers to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 5:
2-AOI-66-2 4.0    OPERATOR ACTIONS 4.1    Immediate Actions Critical Step
[1]    IF scram has not occurred, THEN SAT PERFORM the following:
UNSAT
[1.1]  IF core flow is above 60%, THEN N/A REDUCE core flow to between 50-60%.
Standard:
Reduced core flow to between 50-60% with recirc system.
Performance Step 6:
[1.2]  MANUALLY SCRAM the Reactor. (Reference 2-AOI-100-1).
Standard:
Critical Step
* Depresses both SCRAM Pushbuttons
* Places mode switch in shutdown SAT
* Verifies All Rods in
* Performs a Scram Announcement                                      UNSAT o Rx Mode Switch Position: Shutdown                              N/A o Rod Position: All Full In o Reactor Water Level ____ & Trend ___
o Reactor Pressure ____ & Trend ___
o MSIV Position: OPEN o Rx Power: <5%
Examiner Note: The scram report and referring to 2-AOI-100-1 are not considered critical.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT CUE: Proceed with subsequent actions of 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 7:
4.2 Subsequent Actions
[1]    IF OFFGAS SYSTEM ISOLATION VALVE, 2-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN SAT DISENGAGE 2-FCV-066-0028 mechanical restraint by UNSAT rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise N/A N/A)
Standard:
Verifies that 2-FCV-066-0028 in NOT mechanically restrained.
Cue: 2-FCV-066 is NOT mechanically restrained.
Performance Step 8:
[2]    VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, Critical Step 2-FCV-66-28 on Panel 2-9-53 or locally.
SAT Standard:
UNSAT Verifies 2-FCV-66-28 is closed at panel 9-53 by Verifying RED light above handswitch extinguished and GREEN light above N/A handswitch illuminated. (May have already verified valve closed from the ARP).
Examiner Note: May have already verified valve closed from the ARP Performance Step 9:
[3]    MONITOR area radiation levels at Panel: 2-9-11.                  SAT Standard:                                                                  UNSAT Monitored radiation levels at Panel 9-11.                                N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 10:
[4]    REFER TO EPIP-1 for emergency classification level and        SAT response.
UNSAT Standard; N/A Notifies SM to implement EPIP-1.
Cue: The Shift Manager is implementing the EPIPs as needed.
Performance Step 11:
[5]    MONITOR the following parameters:
A. MAIN STEAM LINE RADIATION, 2-RR-90-135, Panel 2-9-2.
B. OFFGAS PRETREATMENT RADIATION 2-RR                    157, Pnl 2-9-2.                                          SAT C. OFFGAS POST-TREATMENT RADIATION 2RR-                  UNSAT 90-265, Pnl 2-9-2 N/A D. STACK GAS RADIATION, 0-RR-90-147, Unit 1 Panel 1-9-2.
Standard; Monitors 90-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147.
Cue: As Unit 1 Operator, Stack Gas Radiation, 0-RR-90-147 is reading 5X10E6 cps.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 12:
[6]    IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10E5 cps as indicated on OFFGASRADIATION recorder 2-RR-90-266 on panel 2                                                                          Critical Step 2, THEN SAT CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 2-FCV-1-55 and 2-FCV-1-56.
UNSAT Standard:
N/A Recognizes that the Off-Gas Post Treatment activity is >6 X 10E5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (2-FCV-1-55/56)
Cue: The Unit has been scrammed for 5 minutes.
* Acknowledge closing of MSIVs.
Examiner Note: Closing 1-55 and 1-56 is not considered critical.
Performance Step 13:
NOTE Placing additional Stack Dilution Air Fans in service should keep 0-RM-90-147and 0-RM-90-148 on scale.
[7]    PLACE STACK DILUTION FAN SEL control switch,                    SAT 2-XS-66-29, Panel 2-9-8, in OFF.
UNSAT
[8]    START standby STACK DILUTION FAN 2B(2A) using controlswitch, 2-HS-66-31A(29A), Panel 2-9-8.                  N/A Standard:
Places 2-XS-66-29 in OFF and Starts standby Stack Dilution fan 2B, using 2-HS-66-31A Cue: That completes this task.
STOP TIME _______
END OF TASK 10
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR:
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are the Unit 2 Operator. Unit 2 is at 100% power.
INITIATING CUE:
The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 2-XA-55-4C, window 35.
11
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE:          Respond to Off-Gas Post Treatment Radiation HI-HI-HI JPM NUMBER:    190 U3              REVISION: 0 TASK APPLICABILITY:      SRO                  STA                UO              NAUO U-066-AB-02 -Respond to Off-Gas Post Treatment TASK NUMBER / TASK TITLE(S):
Radiation Hi-Hi-Hi K/A RATINGS:    RO 2.9 SRO 3.2 271000 Offgas System: A2.16;Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the K/A STATEMENT:
consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2)
RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 9 EVALUATION LOCATION:              In-Plant          Simulator      Control Room      Lab Other - List APPLICABLE METHOD OF TESTING:        Discussion    Simulate/Walkthrough    Perform TIME FOR COMPLETION: N/A            TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                    Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                JPM Number: 190 RO    SRO        DATE: _______
TASK STANDARD: Respond to Off-Gas Post Treatment Radiation HI-HI-HI per 3-AOI-66-2 and/or 3-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED:                3-AOI-66-2, 3-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____      UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC    288
: 1. Reset to IC 28 Console        2. Fire Manual Trigger 2 Operator      3. Fire Manual Trigger 1 Instructions    4. Station 2nd operator to respond to alarms Malfunctions Description              Event      Severity    Delay Initial set TH23          FUEL CLADDING              1            50      N/A  YES DAMAGE RM14C          OFFGAS RAD                1        1E6 CPS      N/A  YES MONITOR FAILURE RM-90-265A RM14D          OFFGAS RAD                1        1E6 CPS      N/A  YES MONITOR FAILURE RM-90-266A Remotes    Description              Event      Severity    Delay Initial set OG06          Bypass FCV-66-28          2            N/A      N/A  BYP Post Treatment Hi-Hi-Hi Rad Isol Overrides  Description              Event      Severity    Delay Initial set ZAORI9014A      RX BLDG AREA            1            2.5      N/A  YES RAD ZAORI9017A      RX BLDG AREA            1            2.6      N/A  YES RAD ZAORM90265A      90-265 METER            1            6.0      N/A  YES UPSCALE ZAORM90266A      90-266 METER            1            6.0      N/A  YES UPSCALE ZAORR90135R1 90-135 RECORDER              1            6.0      N/A  YES UPSCALE PEN 1 ZAORR90135R2 90-135 RECORDER              1            6.0      N/A  YES UPSCALE PEN 2 ZLORM90265A_1 90-265 DRAW LITE            1            N/A      N/A  YES ZLORM90265A_2 90-265 DRAW LITE            1            N/A      N/A  YES 3
Job Performance Measure (JPM)
ZLORM90265A_3      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90265A_4      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_1      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_2      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_3      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_4      90-265 DRAW LITE      1          N/A  N/A YES XA553A5              OG PRETREAT          1          N/A  N/A YES RAD HI XA553A6              STACK GAS RAD        1          N/A  N/A YES HI HI XA553A7                MSL RAD HI        1          N/A  N/A YES XA553A13            STACK GAS RAD        1          N/A  N/A YES HI XA553A27              MSL RAD HI HI        1          N/A  N/A YES XA554C26              CARBON BED          1          N/A  N/A YES VAULT RAD HI XA554C27                OG ANNUAL          1          N/A  N/A YES RELEASE LIMIT EXCEEDED XA554C33            OG POST TREAT        1          N/A  N/A YES RAD HI XA554C34            OG POST TREAT        1          N/A  N/A YES RAD HI HI XA554C35            OG POST TREAT        1          N/A  N/A YES RAD HI HIHI ZDIHS6628              66-28 VALVE        1          N/A  N/A YES CLOSED ZAORR90265R1      90-265 RECORDER        1          6.0  N/A YES UPSCALE PEN 1 ZAORR90265R2      90-265 RECORDER        1          6.0  N/A YES UPSCALE PEN 2 ZAORR90160R1          OG PRETREAT          1          -2.0 N/A YES RECORDER UPSCALE XA554B2              RWCU FILTER          1          N/A  N/A YES INLET CNDT HIGH Schedule File(s): JPM 190 U3 OG Post treat Rad HI HIHI 4
Job Performance Measure (JPM)
IN-SIMULATOR:
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are the Unit 3 Operator. Unit 3 is at 100% power.
INITIATING CUE:
The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 3-XA-55-4C, window 35.
5
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                        SAT / UNSAT Performance Step 1:
SAT When directed, identify/obtain copy of ARP-9-4C, window 35.
UNSAT Standard:
N/A Obtains copy of 3-ARP-9-4C, window 35 Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 3-AOI-66-2. In that event, continue at Performance Step 5.
Performance Step 2:
3-ARP-9-4C window 35 Operator Action:
A. VERIFY alarm condition on the following
* OFFGAS POST-TREATMENT RADIATION recorder,                      SAT 3-RR-90-265 on Panel 3-9-2.
* OG POST-TREATMENT CHAN A RAD MON RTMR                      UNSAT radiationmonitor, 3-RM-90-266A on Panel 3-9-10.
* OG POST-TREATMENT CHAN B RAD MON RTMR                          N/A radiationmonitor, 3-RM-90-265A on Panel 3-9-10.
Standard:
Verified alarm condition on 3-RR-90-265 and 3-RM-265/266.
Performance Step 3:
B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 3-FCV-              Critical Step 66-28 has the Mechanical Restraint DISENGAGED and 3-FCV-66-28 isCLOSED.                                              SAT Standard:                                                                  UNSAT Takes handswitch 3-FCV-66-28 to close and observes green light          N/A illuminated and red light out.
Cue: If asked, the Offgas Isolation Valve, 3-FCV-66-28 is NOT mechanically restrained.
6
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 4:
C. REFER to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi                                                                SAT Standard:                                                                  UNSAT Refers to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi      N/A Performance Step 5:
3-AOI-66-2 4.0    OPERATOR ACTIONS 4.1    Immediate Actions Critical Step
[1]    IF scram has not occurred, THEN SAT PERFORM the following:
UNSAT
[1.1]  IF core flow is above 60%, THEN N/A REDUCE core flow to between 50-60%.
Standard:
Reduced core flow to between 50-60% with recirc system.
Performance Step 6:
[1.2]  MANUALLY SCRAM the Reactor. (Reference 3-AOI-100-1).
Standard:
Critical Step
* Depresses both SCRAM Pushbuttons
* Places mode switch in shutdown SAT
* Verifies All Rods in
* Performs a Scram Announcement                                      UNSAT o Rx Mode Switch Position: Shutdown                              N/A o Rod Position: All Full In o Reactor Water Level ____ & Trend ___
o Reactor Pressure ____ & Trend ___
o MSIV Position: OPEN o Rx Power: <5%
Examiner Note: The scram report and referring to 3-AOI-100-1 are not considered critical.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT CUE: Proceed with subsequent actions of 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 7:
4.2 Subsequent Actions
[1]    IF OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN                                                  SAT DISENGAGE3-FCV-066-0028 mechanical restraint by              UNSAT rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise      N/A N/A)
Standard:
Verifies that 3-FCV-066-0028 in NOT mechanically restrained.
Cue: 3-FCV-066 is NOT mechanically restrained.
Performance Step 8:
[2]    VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, Critical Step 3-FCV-66-28 on Panel 3-9-53 or locally.
SAT Standard:
UNSAT Verifies 3-FCV-66-28 is closed at panel 9-53 by Verifying RED light above handswitch extinguished and GREEN light above N/A handswitch illuminated. (May have already verified valve closed from the ARP).
Examiner Note: May have already verified valve closed from the ARP Performance Step 9:
SAT
[3]    MONITOR area radiation levels at Panel: 3-9-11.
UNSAT Standard:
N/A Monitored radiation levels at Panel 9-11.
Cue: Another operator will monitor and evaluate Area Radiation Levels.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 10:
[4]    REFER TO EPIP-1 for emergency classification level and        SAT response.
UNSAT Standard; N/A Notifies SM to implement EPIP-1.
Cue: The Shift Manager is implementing the EPIPs as needed.
Performance Step 11:
[5]    MONITOR the following parameters:
A. MAIN STEAM LINE RADIATION, 3-RR-90-135, Panel 3-9-2.
B. OFFGAS PRETREATMENT RADIATION 3-RR                    157, Pnl3-9-2.                                          SAT C. OFFGAS POST-TREATMENT RADIATION 3-RR-                  UNSAT 90-265, Pnl3-9-2 N/A D. STACK GAS RADIATION, 0-RR-90-147, Unit 1 Panel 1-9-2.
Standard; Monitors 90-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147.
Cue: As Unit 1 Operator, Stack Gas Radiation, 0-RR-90-147 is reading 5X10E6 cps.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 12:
[6]    IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10E5 cps as indicated on OFFGASRADIATION recorder 3-RR-90-265 on panel 3              2, THEN                                                    Critical Step CLOSE all Main Steam Isolation Valves and Main Steam            SAT LineDrain Valves, 3-FCV-1-55 and 3-FCV-1-56.
UNSAT Standard:
N/A Recognizes that the Off-Gas Post Treatment activity is >6 X 10E5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (3-FCV-1-55/56)
Cue: The Unit has been scrammed for 5 minutes.
* Acknowledge closing of MSIVs.
Examiner Note: Closing 1-55 and 1-56 is not considered critical.
Performance Step 13:
NOTE Placing additional Stack Dilution Air Fans in service should keep 0-RM-90-147and 0-RM-90-148 on scale.
[7]    PLACE STACK DILUTION FAN SEL control switch,                    SAT 3-XS-66-29, Panel 3-9-8, in OFF.
UNSAT
[8]    START standby STACK DILUTION FAN 3B(3A) using controlswitch, 3-HS-66-31A(29A), Panel 3-9-8.                  N/A Standard:
Places 3-XS-66-29 in OFF and Starts standby Stack Dilution fan 3B, using 3-HS-66-31A Cue: That completes this task.
STOP TIME ________
END OF TASK 10
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR:
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are the Unit 3 Operator. Unit 3 is at 100% power.
INITIATING CUE:
The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 3-XA-55-4C, window 35.
11
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE: AUTOMATIC START FAILURE OF A & C FIRE PUMPS JPM NUMBER:        673          REVISION: 0 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-026-NO-01/ MONITOR AUTO START OF FIRE TASK NUMBER / TASK TITLE(S):
PUMP K/A RATINGS:      RO: 3.4 SRO: 3.4 286000 Fire Protection System A2.08; Ability to (a) predict the impacts of the following on the FIRE PROTECTION SYSTEM; K/A No. &STATEMENT: and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Failure to actuate when required RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 8 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N        ALTERNATE PATH (Y/N)    Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _673A___
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to manually start A, B and C Fire Pumps.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    0-OI-26 VALIDATIONTIME:__15 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  04/28/15    All      Initial issue 3
Job Performance Measure (JPM)
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 1.
* The Reactor Power at 70%
* A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir.
* Fire OPS has been dispatched to the scene.
* Fire Pump B Tagged Out for Maintenance
* A and C Fire Pumps failed to Auto Start.
INITIATING CUES:
The US directs you to start A and C Electric Fire Pumps per 0-OI-26 section 5.4.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
4
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                    SAT / UNSAT Step 1:
[1] PLACE the FIRE PUMP A TRANSFER switch, 0-XS-26-1 in EMERGENCY position, at the respective switchgear.
Critical Step Pump                    Board                  Compt A            4160V Shutdown Bd A              11            SAT C            4160V Shutdown Bd C              10 UNSAT Standard:
N/A Simulates placing FIRE PUMP A TRANSFER switch 0-XS-26-3 in EMERGENCY position at 4160 Shutdown Board A, Compartment 11 CUE: FIRE PUMP A TRANSFER switch 0-XS-26-1 is in the EMERGENCY position Step 2:
Critical Step
[2] CLOSE the breaker by placing the FIRE PUMP A CONTROL switch, 0-HS-26-1C to CLOSE.                                                SAT Standard:                                                          UNSAT Simulates placing FIRE PUMP A CONTROL switch, 0-HS-26-1C    N/A to CLOSE position.
CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF.
Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.
Step 3:
[3] CHECK pump ammeter at breaker indicates between 25 and 40 amps.                                                                SAT Standard                                                            UNSAT VERIFIES pump ammeter at breaker indicates between 25 and    N/A 40 amps.
CUE: FIRE PUMP A ammeter at breaker indicates 30 amps.
5
Job Performance Measure (JPM)
Step 4:
[4] PLACE the NORM/EMERG Switch in NORMAL.
SAT Standard UNSAT PLACES the NORM/EMERG Switch in NORMAL for FIRE N/A PUMP A.
CUE: FIRE PUMP A NORM/EMERG Switch is in NORMAL Step 5:
[1] PLACE the FIRE PUMP C TRANSFER switch, 0-XS-26-3 in EMERGENCY position, at the respective switchgear.
Critical Step Pump                    Board                  Compt A            4160V Shutdown Bd A              11            SAT C            4160V Shutdown Bd C              10 UNSAT Standard:
N/A Simulates placing FIRE PUMP C TRANSFER switch 0-XS-26-3 in EMERGENCY position at 4160 Shutdown Board C, Compartment 10 CUE: FIRE PUMP C TRANSFER switch 0-XS-26-3 is in the EMERGENCY position Step 5:
Critical Step
[2] CLOSE the breaker by placing the FIRE PUMP C CONTROL switch, 0-HS-26-3C to CLOSE.
SAT Standard:
UNSAT Simulates placing FIRE PUMP C CONTROL switch, 0-HS-26-3C N/A to CLOSE position.
CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF.
Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.
6
Job Performance Measure (JPM)
Step 6:
[3] CHECK pump ammeter at breaker indicates between 25 and 40 amps.                                                                SAT Standard                                                            UNSAT VERIFIES pump ammeter at breaker indicates between 25 and    N/A 40 amps.
CUE: FIRE PUMP C ammeter at breaker indicates 30 amps.
Step 7:
[4] PLACE the NORM/EMERG Switch in NORMAL.
SAT Standard UNSAT PLACES the NORM/EMERG Switch in NORMAL for FIRE N/A PUMP C.
CUE: FIRE PUMP C NORM/EMERG Switch is in NORMAL and this completes the JPM.
Termination Criteria: When two Fire Pumps are in service the JPM is complete.
STOP TIME:
7
Job Performance Measure (JPM)
Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 1.
* The Reactor Power at 70%
* A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir.
* Fire OPS has been dispatched to the scene.
* Fire Pump B Tagged Out for Maintenance
* A and C Fire Pumps failed to Auto Start.
INITIATING CUES:
The US directs you to start A and C Electric Fire Pumps per 0-OI-26 section 5.2.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
8
Job Performance Measure (JPM)
ALIGNING EMERGENCY EECW MAKEUP TO SPENT SITE:    BFN    JPM TITLE:
FUEL POOL JPM NUMBER:        674          REVISION: 0 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-000-EM-95/ Make-Up To SFP By EECW With TASK NUMBER / TASK TITLE(S):
Fire Hose (Internal Make-Up)
K/A RATINGS:      RO: 3.1 SRO: 3.3 233000 Fuel Pool Cooling and Clean-up; A2.02; Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CLEAN-UP ; and (b) based on those K/A No. &STATEMENT:
predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Low pool level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 9 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N      ALTERNATE PATH (Y/N)    N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: __674__
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to align either North or South Headers of EECW to Unit 2 Spent Fuel Pool.
Operator Fundamental evaluated:
OF-2 Controlling plant evolutions and indications closely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    2-AOI-78-1 VALIDATION TIME:            25 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  09/01/15    All      Initial issue 3
Job Performance Measure (JPM)
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is in cold shutdown
* The Unit 2 Spent Fuel Pool water level is lowering.
* Fire Protection is available to assist INITIATING CUES:
The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3].
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
4
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                          SAT / UNSAT Step 1:
NOTES
: 1) Hose straps are staged at the hoses at the following locations:
* Unit 1/Unit 2 Reactor Bldg Stairwell, El. 621, R6 U Line (placed on hose to carry weight of charged hose lines).
* Hose reel on the Refuel Floor, El. 664, R6 U Line (for use in securing hose ends as needed).
: 2) Additional hose is stored in a cabinet located in Unit 1/Unit 2 Elevator Room, Reactor Bldg, El 595.
Critical Step CAUTION Performance of this attachment will degrade water chemistry in the    SAT Spent Fuel Pool.
UNSAT
[3] UNLOCK and OPEN the following valves:
N/A
* NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792.
* SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793.
Standard:
Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793 by demonstrating opening each valve counter-clockwise and breaking seal.
CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793 is OPEN Located in stairwell between elevation 565 ft and 593 ft. Hoses are already connected, no tools required.
5
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 3:
[4] VERIFY charged hoses in stairwell are not obstructing stairway access and/or kinked.
SAT
[4.1] ADJUST hose straps, as necessary.
UNSAT Standard:
N/A VERIFIES hoses in stairwell are not kinked Note to Examiner: Hoses are already run along the stairwell. Applicant should verify hoses not kinked and connected.
Step 4:
[5] VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and route to Unit 2 Spent Fuel Pool        Critical Step (El 664, Refuel Floor, R6-U Line).
SAT Standard:
UNSAT VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and route to Unit 2 Spent          N/A Fuel Pool (El 664, Refuel Floor, R6-U Line).
Note to Examiner: Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable. Hoses are already connected, no tools required.
Location: Refuel Floor Elevation 664 ft, R U Line.
Step 5:
[6] VERIFY hose connected from SOUTH HDR SPLY TO EMER Critical Step FUEL POOL MU, 1-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664, Refuel Floor, R6-U Line)
SAT Standard:
UNSAT VERIFY hose connected from SOUTH HDR SPLY TO EMER N/A FUEL POOL MU, 1-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664, Refuel Floor, R6-U Line) 6
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Note to Examiner: Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable. Hoses are already connected, no tools required.
Location: Refuel Floor Elevation 664 ft, R U Line.
Step 6:
[7] VERIFY OPEN the following valves (El 664, Refuel Floor, R6 U Line):
* NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-Critical Step 0796.
SAT
* SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797.
UNSAT Standard:
N/A Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797 by demonstrating opening each valve counter-clockwise.
CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797 is OPEN Location: Refuel Floor Elevation 664 ft, R U Line.
Step 7:
[8] VERIFY charged hoses on the Refuel Floor are not kinked.
SAT Standard:                                                                UNSAT VERIFY charged hoses on the Refuel Floor are not kinked          N/A Termination Criteria: NORTH and SOUTH Header are aligned then the JPM is complete. State another operator will perform the remaining steps.
STOP TIME:
7
Job Performance Measure (JPM)
Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is in cold shutdown
* The Unit 2 Spent Fuel Pool water level is lowering.
* Fire Protection is available to assist INITIATING CUES:
The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3].
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
8
Job Performance Measure (JPM)
START UP AND SYNCHRONIZE UNIT 3 PREFERRED SITE:    BFN    JPM TITLE:
MMG SET JPM NUMBER:        307          REVISION: 6 TASK APPLICABILITY: SRO                      STA                UO            NAUO TASK NUMBER / TASK TITLE(S): S-57C-NO-04 K/A RATINGS:      RO: 2.5 SRO: 2.9 262002 Uninterruptable Power Supply (A.C./D.C.) A1.02; Ability to predict and/or monitor changes in parameters associated with K/A No. &STATEMENT:
operating the UNINTERRUPTABLE POWER SUPPLY (A.C./D.C.) controls including: Motor generator outputs RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 6 EVALUATION LOCATION: In-Plant                      Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N        ALTERNATE PATH (Y/N)  N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _307___
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to Start-up and synchronize Unit Preferred MMG Set Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant Evolutions Precisely PRA: NA REFERENCES/PROCEDURES NEEDED:                    0-OI-57C VALIDATIONTIME: 25 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 1  10/26/94    ALL        GENERAL REVISION 2  05/07/95    ALL        GENERAL REVISION FORMAT, PROCEDURE REVISION, ADDED 3  10/15/97    ALL        PLANT WORK EXPECTATIONS TOUCH STAAR, SAFETY, AND 3-WAY COMM.
PROCEDURE REVISION, FORMAT 4  11/10/99    ALL DOCUMENT 5  10/03/01    ALL        PROCEDURE REVISION 6  04/28/15    ALL        UPDATE TO NEW FORMAT 3
Job Performance Measure (JPM)
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is in cold shutdown
* The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
* Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.
INITIATING CUES:
The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16].
NOTE: PERFORMER WILL NEED GGMKA KEY.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
4
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                  SAT / UNSAT Step 1:
NOTE Steps 5.5[16] through 5.5[26] are performed from Battery Board Room 2 UNIT PFD Sync. & Speed Control Panel.                  Critical Step SAT
[16] PLACE UNIT 3 MMG OPERATING MODE, 3-HS-252-02AB in AUTO.
UNSAT Standard:
N/A VERIFIED/SIMULATED PLACING the Unit 3 MMG SET OPERATING MODE 3-HS-252-02AB in AUTO.
Cue: The Unit 3 MMG SET OPERATING MODE 3-HS-252-02AB is in AUTO position.
Step 2:
Critical Step
[17] PLACE UNIT 3 MMG LOCAL-REMOTE CONTROL, 3-XS-252-02A in REMOTE.
SAT Standard:
UNSAT SIMULATED PLACING the Unit 3 MMG SET LOCAL-REMOTE N/A CONTROL 3-XS-252-02A in the REMOTE position.
Cue: The Unit 3 MMG SET LOCAL-REMOTE CONTROL 3-HS-252-02A is in the REMOTE position.
Step 3:
[18] PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE                    Critical Step SYNC SWITCH SS-7, 3-HS-252-03/SS-7 in ON.
SAT Standard:
UNSAT SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 3-HS-252-03/SS-7, in the ON      N/A position.
5
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Cue: The Unit 3 PFD SYSTEM GENERATOR SOURCE SYNC SS-7, SWITCH 3-HS-252-003/SS-7 is in the ON position.
Step 4:
NOTE MMG voltage and hertz are read as INCOMING.
Critical Step
[19] MATCH Incoming to Running AC volts using UNIT 3 MMG VOLTAGE ADJUST, 3-HS-252-02CD.                                            SAT Standard:                                                                  UNSAT SIMULATED MANIPULATING UNIT 3 MMG VOLTAGE ADJUST,                  N/A 3-HS 252-02CD until cued that incoming and running AC volts are matched.
Cue: INCOMING and RUNNING VOLTAGES are EQUAL at 122 Volts Step 5:
[20] ADJUST MMG speed using UNIT 3 MMG FREQUENCY ADJUST, 3-HS-252-02CF to obtain a synchroscope slowly rotating in the SLOW Critical Step (counter-clockwise) direction (10 to 15 second rotation) as indicated on SYNCHROSCOPE, 0-SCP-252-000A/B.
SAT Standard:
UNSAT SIMULATED ADJUSTING UNIT 3 MMG FREQUENCY ADJUST N/A 3-HS-252-02CF speed control switch until cued that synchroscope indicator rotating in the counterclockwise direction at 10 to 15 seconds per revolution.
Cue: State: The Initial Synchroscope indicator is standing still at the 5 oclock position.
Note: If student raises frequency the state: Synchroscope indicator is rotating in the CLOCKWISE direction at 12 seconds per revolution.
Note: If student lowers frequency the state: Synchroscope indicator is rotating in the COUNTERCLOCKWISE direction at 12 seconds per revolution.
6
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Step 6:
NOTES
: 1) Section 5.5[21] should be performed expeditiously (within about 15 seconds) to minimize the time AC Systems are paralleled to prevent tripping the MMG set. Voltage and amps is expected to fluctuate while the AC systems are paralleled and the MMG set will trip if the AC systems are paralleled for approximately 30 seconds.
: 2) If breaker 1001 trips, it must be reset with reset push button on the respective Unit Battery Board, Panel 10.
CAUTIONS
: 1) Voltage Oscillations may occur during Bus Power Transfers.
These oscillations are caused when two Power Supplies having separate Voltage Regulators try to maintain voltage control.
Therefore, the time the Power Supplies are paralleled should be minimized as follows:[PER 64835]
* When transferring Bus power supplies from one MMG to            Critical Step another MMG.
* When transferring Bus power supplies from one MMG with the      SAT unit preferred transformer. (Unit 2 has a Voltage Regulator Transformer which makes voltage oscillations more              UNSAT susceptible.)
N/A
: 2) Minimize the number of Bus power supply transfers and only transfer Bus power supplies when absolutely necessary.
: 3) During the transfer of Bus power supplies the affiliated RPS circuit protectors 1(2)C1 and/or 1(2)C2 may trip.
Start of Critical Step(s)
[21] WHEN SYNCHROSCOPE, 0-SCP-252-000A/B is 5 minutes prior to 12 o'clock, in the SLOW counter-clockwise direction, THEN PERFORM the following expeditiously:
[21.1] CLOSE UNIT 3 BKR 1001, using 0-HS-280-003/1001.
[21.2] ENSURE CLOSED UNIT 3 BKR 1001.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Standard( step 6 continued):
When cued synchroscope indicator at 5 minutes prior to 12 o'clock, SIMULATED PLACING 3-BKR 1001, 0-HS-252-003/1001 in the CLOSE position.
NOTE: IT WOULD ASSIST THE EXAMINEE IF THE EVALUATOR WOULD USE HIS FINGER TO DEMONSTRATE INDICATOR POSITION ON THE SYNCHROSCOPE AS THE READINGS ARE ENUNCIATED.
CUE: THE SYNCHROSCOPE INDICATOR IS AT 30 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 15 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 5 MINUTES BEFORE THE 12 O'CLOCK POSITION.
CUE: [WHEN CLOSED] UNIT 3 BREAKER 1001 BREAKER POSITION INDICATING LAMP CHANGED FROM ILLUMINATED GREEN TO ILLUMINATED RED.
Step 7:
[21.3] OPEN the UNIT 3)BKR 1002, using 0-HS-280-003/1002.                Critical Step End of Critical Step(s)                                                SAT Standard:                                                                UNSAT SIMULATED UNIT 3 BKR 1002, 0-HS-282-003/1002in the OPEN            N/A position.
CUE: UNIT 3 BKR 1002, 0-HS-282-003/1002 IS IN THE OPEN POSITION WITH RED LIGHT ILLUMINATED.
NOTE: DO NOT ALLOW THE EXAMINEE TO OPERATE THE AMMETER SELECTOR SWITCH FOR THE FOLLOWING STEP.
Step 8:
SAT
[22] CHECK generator is loaded by observing UNIT 3 MMG GENERATOR amps, 3-II-252-02C/1AMR L2 rise, "N" should be UNSAT approximately the difference of L1& L2 (UNIT 3 MMG GENERATOR amps, 3-HS-252-02CH positions 1, 2, & 3 are respective to L1, L2 & N).
N/A 8
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Standard:
CHECKED amp indicators L1 MINUS L2 approximately equals n.
Cue: L1, L2, N AMPS INDICATIONS HAVE RISEN and L1-L2 = N.
Note: Selector Switch positions are labeled as follows: Position 1 is L1, position 2 is L2 and Position 3 is N.
Step 9:
[23] ENSURE OPEN UNIT 3 BKR 1003, 0-HS-280-003/1003                      SAT Standard:                                                                UNSAT VERIFIED ILLUMINATED GREEN position indicating light above 0- N/A HS-282-003/1003.
Cue: Unit 3 Breaker 1003 0-HS-280-003/1003 Position Indicating Lamp changed from illuminated RED to illuminated GREEN.
Step 10:
[24] On Unit 2 Unit Preferred MMG Set Local Control Panel, ENSURE OPEN the following fused disconnect switches:
* BACKUP SOURCE TO BAT BD 1 BKR 1003, 1-FUDS-280-001/1003 SAT
* BACKUP SOURCE TO BAT BD 3 BKR 1003, 3-FUDS-280-UNSAT 003/1003 N/A Standard:
At Unit 2 Unit Preferred MMG Set Local Control Panel VERIFIED 1-FUDS-280-001/1003 AND 3-FUDS-280-003/1003 in the OPEN POSITION.
Cue: 1-FUDS-280-001/1003 and 3-FUDS-280-003/1003 are in the OPEN position.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 11:
[25] On Unit 3 Unit Preferred MMG Set Local Control Panel, ENSURE the BACKUP SOURCE TO BAT BD 2 BKR 1003,                        SAT 2-FUDS-280-002/1003 fused disconnect switch is open:
UNSAT Standard:
N/A On Unit 3 Unit Preferred MMG Set Local Control Panel, VERIFIED 2-FUDS-280-002/1003 in the OPEN position.
Cue: 2-FUDS-280-002/1003 is in the OPEN position.
Step 12:
[26] On Battery Board 2:
PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH                  SAT SS-7, 1-HS-252-03/SS-7 in OFF.
UNSAT Standard:
N/A SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 1-HS-252-03/SS-7 in the OFF position.
Cue: UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 1-HS-252-03/SS-7 is in the OFF position.
Step 13:
[27] On Battery Board 2:
Critical Step DEPRESS UNIT 3 MMG AC MOTOR START, 3-HS-252-02AD to return SAT to Normal AC power from DC drive.
UNSAT Standard:
N/A SIMULATED DEPRESSING and RELEASING UNIT 3 MMG AC MOTOR START , 3-HS-252-02AD pushbutton.
Cue: [The AC motor Breaker Position Indicating Lamp changed from illuminated GREEN to illuminated RED. State Another Operator will continue with procedure and this will end the task.
STOP TIME:
10
Job Performance Measure (JPM)
Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is in cold shutdown
* The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
* Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.
INITIATING CUES:
The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16].
NOTE: PERFORMER WILL NEED GGMKA KEY.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
11
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE: RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:    80A U2          REVISION: 1 TASK APPLICABILITY: SRO                      STA                UO            NAUO TASK NUMBER / TASK TITLE(S): U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:      RO: 3.2 SRO: 3.3 201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL K/A No. &STATEMENT: CONTROL SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 1 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: __80A__
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to respond to a Control Rod Drift In per 2-AOI-85-5.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    2-AOI-85-5, 2-AOI-100-1 VALIDATIONTIME:      18 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  05/27/10    All      Initial issue Incorrect task number; changed to U-085-AB-05:
1  09/01/15      1 Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    28 Exam IC 280
* Reset IC 28 or Exam IC if written in above
* Run schedule file:NRC JPM A U2 -Control Rod Drift In
* Verify all triggers and overrides are correct
* Place the simulator in RUN to ensure stable conditions Console
* Start Rod Display on RWM Screen Operator Instructions
* Provide Initial Rod Data Sheet -PRLOG
* When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02-31 into the core
* When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions  Description              Event      Severity    Delay  Initial set rd07r0231        Drifts rod 02-31 into      1            NA      35 sec    NA core rd07r2223        Drifts rod 22-23 into      2            NA      10 sec    NA core rd07r3031        Drifts rod 30-31 into      2            NA      25 sec    NA core rd07r4635        Drifts rod 46-35 into      2            NA      20 sec    NA core rd07r2619        Drifts rod 26-19 into      2            NA      30 sec    NA core rd07r3027        Drifts rod 30-27 into      2            NA      18 sec    NA core rd07r5423        Drifts rod 54-23 into      2            NA      23 sec    NA core rd07r2255        Drifts rod 22-55 into      2            NA      28 sec    NA core 4
Job Performance Measure (JPM)
Remotes            Description      Event        Severity Delay Initial set Overrides          Description      Event        Severity Delay Initial set Schedule File(s): NRC JPM A U2 -Control Rod Drift In 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is at 100% power INITIATING CUES:
The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
6
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                          SAT / UNSAT Step 1:
NOTE
: 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
CAUTIONS
: 1) Any mispositioned control rod events will be dispositioned by following the direction contained within 2-AOI-85-7.
: 2) If a control rod moves unexpectedly one notch beyond its intended    Critical Step position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position.                                SAT
: 3) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6    UNSAT may be required.
N/A 7.3 Exercising a Partially Withdrawn Control Rod
[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40.
[2] OBSERVE the following for selected control rod:
* CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
* CHECK white light on the Full Core Display is ILLUMINATED.
* CHECK Rod Out Permit light is ILLUMINATED.
Standard:
Selects a withdrawn control rod Note to Examiner: May select any partially withdrawn control rod in any order 7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 2:
[3] INSERT control rod one notch by performing the following:
Critical Step
[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN andRELEASE.                                                    SAT
[3.2] OBSERVE control rod settles into the desired position    UNSAT andROD SETTLE light extinguishes.
N/A Standard:
Inserts withdrawn control rod one notch Step 3:
[4] WITHDRAW selected control rod one notch by performing the following:                                                            Critical Step
[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD OUT NOTCHand RELEASE.                                          SAT
[4.2] OBSERVE control rod settles into the desired position and UNSAT ROD SETTLE light extinguishes.
N/A Standard:
Withdraws withdrawn control rod one notch Step 4:
[5] DOCUMENT completion of control rod test as follows:
[5.1] PERFORMER
* INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the SAT control rodjust exercised to document proper movement and CRD latching.                                              UNSAT
[5.2] Concurrent Verifier (CV)                                  N/A
* ENSURE rod inserted and returned to its original position.
* INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Standard:
Initials Attachment 1 for exercised control rod and continues to exercise rods.
Note to Examiner:
* Perform above actions for @ least two control rods.
* When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02-31 Drift In Note to Simulator Booth Operator:
* When directed by examiner insert trigger #1 for 02-31 Control Rod Drift In.
Step 5:
Performer recognizes control rod 02-31 drift in and responds per 2-AOI-85-5.
[2] IF a Control Rod is moving from its intended position without          Critical Step operator actions, THEN INSERT the Control Rod to position 00 using CONTINUOUS IN. (Otherwise N/A)                                            SAT
[3] IF a Control Rod Block occurs during rod insertion due to Rod          UNSAT Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above.
(Otherwise N/A)                                                            N/A Standard:
Responds per 2-AOI-85-5 and inserts control rod 02-31 to full in position as indicated by position 00 indication.
CUE: When report to US, state Respond per 2-AOI-85-5, Control Rod Drift In.
Step 6:
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod              SAT pattern.
UNSAT Standard:
Candidate notifies Reactor Engineer to Evaluate Core      N/A Thermal limits and Preconditioning Limits for the current Control Rod Pattern Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits 9
Job Performance Measure (JPM)
STEP / STANDARD                                                    SAT / UNSAT Step 7:
[5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,
* THEN MANUALLY SCRAM Reactor and enter 2-AOI-100-1.              SAT
[6] CHECK Thermal Limits on ICS (RUNMON).                              UNSAT Note to NRC Examiner: Step [6] performed by Reactor              N/A Engineering.
Standard:
Reviews step and asks for guidance from US or RE CUE: As Shift Manager, state RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Student will continue with Control Rod Exercise.
Step 8:
7.3 Exercising a Partially Withdrawn Control Rod
[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40.                                  Critical Step
[2] OBSERVE the following for selected control rod:                      SAT
* CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.                                                  UNSAT
* CHECK white light on the Full Core Display is ILLUMINATED.
* CHECK Rod Out Permit light is ILLUMINATED.                        N/A Standard:
Selects a withdrawn control rod 10
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 9:
[3] INSERT control rod one notch by performing the following:
Critical Step
[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN SAT andRELEASE.
UNSAT
[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
N/A Standard:
Inserts withdrawn control rod one notch Step 10:
[4] WITHDRAW selected control rod one notch by performing the Critical Step following:
[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD SAT OUT NOTCHand RELEASE.
UNSAT
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
N/A Standard:
Withdraws withdrawn control rod one notch Note to Examiner:
When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:
Multiple Control Rods Drifting In Critical Step Standard:
Recognizes Multiple Control Rods Drift into the Core and Manually          SAT Scrams the Reactor per 2-AOI-85-5.
UNSAT
* Depresses both SCRAM Pushbuttons
* Places mode switch in shutdown                                    N/A
* Verifies All Rods in 11
Job Performance Measure (JPM)
STEP / STANDARD                                              SAT / UNSAT Step 11 continued:
* Performs a Scram Announcement                          Critical Step o  Rx Mode Switch Position: Shutdown o  Rod Position: All Full In                        SAT o  Reactor Water Level ____ & Trend ___
o  Reactor Pressure ____ & Trend ___              UNSAT o  MSIV Position: OPEN o  Rx Power: <5%                                  N/A Termination Criteria: REPEAT BACK SCRAM REPORT THEN STATE, THIS COMPLETES THE JPM. THAT WILL BE ALL FOR NOW, ANOTHER OPERATOR WILL CONTINUE IN 2-AOI-100-1.
STOP TIME:
12
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is at 100% power INITIATING CUES:
The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
13
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE: RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:    80A U3          REVISION: 1 TASK APPLICABILITY: SRO                      STA                UO            NAUO TASK NUMBER / TASK TITLE(S): U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:      RO: 3.2 SRO: 3.3 201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM ; and (b) based on K/A No. &STATEMENT:
those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
Rod Drift Alarm RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 1 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _80A U3_
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to respond to a Control Rod Drift In per 3-AOI-85-5.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    3-AOI-85-5, 3-AOI-100-1 VALIDATIONTIME:
PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  05/27/10    All      Initial issue Incorrect task number; changed to U-085-AB-05:
1  05/11/15      1 Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    28 Exam IC 280
* Reset IC 28 or Exam IC if written in above
* Run schedule file: NRC JPM A U3 -Control Rod Drift In
* Verify all triggers and overrides are correct
* Place the simulator in RUN to ensure stable conditions Console Operator
* Start Rod Display on RWM Screen Instructions
* Provide Initial Rod Data Sheet -PRLOG
* When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02-31 into the core
* When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions  Description              Event      Severity    Delay  Initial set rd07r0231        Drifts rod 02-31 into      1            NA      35 sec    NA core rd07r2223        Drifts rod 22-23 into      2            NA      10 sec    NA core rd07r3031        Drifts rod 30-31 into      2            NA      25 sec    NA core rd07r4635        Drifts rod 46-35 into      2            NA      20 sec    NA core rd07r2619        Drifts rod 26-19 into      2            NA      30 sec    NA core rd07r3027        Drifts rod 30-27 into      2            NA      18 sec    NA core rd07r5423        Drifts rod 54-23 into      2            NA      23 sec    NA core rd07r2255        Drifts rod 22-55 into      2            NA      28 sec    NA core 4
Job Performance Measure (JPM)
Remotes            Description      Event        Severity Delay Initial set Overrides          Description      Event        Severity Delay Initial set Schedule File(s): NRC JPM A U3 -Control Rod Drift In 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is at 100% power INITIATING CUES:
The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
6
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                          SAT / UNSAT Step 1:
NOTE
: 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
CAUTIONS
: 3) Any mispositioned control rod events will be dispositioned by following the direction contained within 3-AOI-85-7.
: 4) If a control rod moves unexpectedly one notch beyond its intended    Critical Step position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position.                                SAT
: 5) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6    UNSAT may be required.
N/A 7.3 Exercising a Partially Withdrawn Control Rod
[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 3-XS-85-40.
[2] OBSERVE the following for selected control rod:
* CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
* CHECK white light on the Full Core Display is ILLUMINATED.
* CHECK Rod Out Permit light is ILLUMINATED.
Standard:
Selects a withdrawn control rod Note to Examiner: May select any partially withdrawn control rod in any order 7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 2:
[3] INSERT control rod one notch by performing the following:
Critical Step
[3.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD IN andRELEASE.                                                    SAT
[3.2] OBSERVE control rod settles into the desired position    UNSAT andROD SETTLE light extinguishes.
N/A Standard:
Inserts withdrawn control rod one notch Step 3:
[4] WITHDRAW selected control rod one notch by performing the following:                                                            Critical Step
[4.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD OUT NOTCHand RELEASE.                                          SAT
[4.2] OBSERVE control rod settles into the desired position and UNSAT ROD SETTLE light extinguishes.
N/A Standard:
Withdraws withdrawn control rod one notch Step 4:
[5] DOCUMENT completion of control rod test as follows:
[5.1] PERFORMER
* INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the SAT control rodjust exercised to document proper movement and CRD latching.                                              UNSAT
[5.2] Concurrent Verifier (CV)                                  N/A
* ENSURE rod inserted and returned to its original position.
* INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                              SAT / UNSAT Standard:
Initials Attachment 1 for exercised control rod and continues to exercise rods.
Note to Examiner:
* Perform above actions for @ least two control rods.
* When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02-31 Drift In Note to Simulator Booth Operator:
* When directed by examiner insert trigger #1 for 02-31 Control Rod Drift In.
Step 5:
Performer recognizes control rod 02-31 drift in and responds per 3-AOI-85-5.
[2] IF a Control Rod is moving from its intended position without            Critical Step operator actions, THEN INSERT the Control Rod to position 00 using CONTINUOUS IN. (Otherwise N/A)                                                SAT
[3] IF a Control Rod Block occurs during rod insertion due to Rod            UNSAT Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above.
(Otherwise N/A)                                                              N/A Standard:
Responds per 3-AOI-85-5 and inserts control rod 02-31 to full in position as indicated by position 00 indication.
CUE: When report to US, state Respond per 3-AOI-85-5, Control Rod Drift In.
Step 6:
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod                SAT pattern.
UNSAT Standard:
Candidate notifies Reactor Engineer to Evaluate Core          N/A Thermal limits and Preconditioning Limits for the current Control Rod Pattern Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits 9
Job Performance Measure (JPM)
STEP / STANDARD                                                    SAT / UNSAT Step 7:
[5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,
* THEN MANUALLY SCRAM Reactor and enter 2-AOI-100-1.              SAT
[6] CHECK Thermal Limits on ICS (RUNMON).                              UNSAT Note to NRC Examiner: Step [6] performed by Reactor              N/A Engineering.
Standard:
Reviews step and asks for guidance from US or RE CUE: As Shift Manager, state RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Student will continue with Control Rod Exercise.
Step 8:
7.3 Exercising a Partially Withdrawn Control Rod
[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40.                                  Critical Step
[2] OBSERVE the following for selected control rod:                      SAT
* CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.                                                  UNSAT
* CHECK white light on the Full Core Display is ILLUMINATED.
* CHECK Rod Out Permit light is ILLUMINATED.                        N/A Standard:
Selects a withdrawn control rod 10
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 9:
[3] INSERT control rod one notch by performing the following:
Critical Step
[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN SAT andRELEASE.
UNSAT
[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
N/A Standard:
Inserts withdrawn control rod one notch Step 10:
[4] WITHDRAW selected control rod one notch by performing the Critical Step following:
[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD SAT OUT NOTCHand RELEASE.
UNSAT
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
N/A Standard:
Withdraws withdrawn control rod one notch Note to Examiner:
When satisfied with the number of rod manipulations direct Simulator BoothOperator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:
Multiple Control Rods Drifting In Standard:                                                                Critical Step Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 3-AOI-85-5.                                      SAT
* Depresses both SCRAM Pushbuttons                                UNSAT
* Places mode switch in shutdown
* Verifies All Rods in                                            N/A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 11 continued:
Critical Step
* Performs a Scram Announcement o  Rx Mode Switch Position: Shutdown                          SAT o  Rod Position: All Full In o  Reactor Water Level ____ & Trend ___                      UNSAT o  Reactor Pressure ____ & Trend ___
o  MSIV Position: OPEN                                        N/A o  Rx Power: <5%
Termination Criteria: repeat back scram report then state, this completes the JPM. That will be all for now, another operator will continue in 2-AOI-100-1 STOP TIME:
12
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is at 100% power INITIATING CUES:
The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
13
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE: EHC Auto Cooldown JPM NUMBER:    276 U2          REVISION: 1 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-000-NO-32 Perform Reactor Cooldown TASK NUMBER / TASK TITLE(S): U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:      RO: 3.9 SRO: 3.9 239001Main and Reheat Steam System: A4.09 Ability to K/A No. &STATEMENT: manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 4 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _276 U2 RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    2-OI-47 VALIDATIONTIME: 4 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  06/19/12    All      Initial issue 1  07/22/15    All      General revision & re-format 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    40 Exam IC 281
* Reset IC 40 or Exam IC if written in above
* Ensure RFP is in Manual on PDS controller with plant parameters stable.
Console Operator Instructions Malfunctions    Description            Event          Severity    Delay    Initial set Remotes          Description        Event          Severity    Delay    Initial set Overrides          Description        Event          Severity    Delay    Initial set Schedule File(s): None 4
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
INITIATING CUES:
The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 2-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].
5
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                        SAT / UNSAT Step 1:                                                                SAT
[6] VERIFY EHC is in Pressure Control using 2-HS-47-204.        UNSAT N/A Standard:
Observes light on for EHC Pressure Control on 2-HS-47-204.
Step 2:
[7] On the EHC Work Station on Panel 9-7:
[7.1] SELECT Main Menu from the toolbar at bottom of the screen.                                                          Critical Step
[7.2]  SELECT Log In on Display Screen and ENTER OPS                      SAT for name and OPS for Password.
UNSAT
[7.3] SELECT Auto Cooldown from list of function on the screen.                                                                      N/A Standard:
Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.
Step 3:
[8] On the Auto Cooldown Display Screen CHECK the following are displayed.
SAT
* Turbine Tripped or All Valves Closed - indicates Reset.
* Rx Press Ctrl - indicates Reset.                            UNSAT Standard:                                                                    N/A
* Candidate checks the Turbine Tripped or All Valves Closed
              -indicates Reset.
* Candidate checks Rx Press Ctrl - indicates Reset.
6
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Step 4:
[9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
[9.1] SELECT the block above the FINAL PRESSURE Critical Step TARGET.
SAT
[9.2] ENTER the desired pressure using the Display Screen or Key Board.
UNSAT
[9.3] WHEN desired Pressure is entered SELECT OK N/A Standard:
Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Step 5:
[10] WHEN Cooldown is ready to commence, THEN
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)
Critical Step
[10.2] DEPRESS the START button on the Auto Cooldown Display Screen.                                                SAT
[11] WHEN Caution Are You Sure You Want to Initiate Auto                    UNSAT Cooldown? appears N/A SELECT Yes Screen Button to start the cooldown.
Standard:
Candidate depresses START and acknowledges YES to commence auto cooldown.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 6:
[12] CHECK the following:
* EHC PRESSURE SETPOINT, 2-PI-47-162, is lowering.
* EHC AUTO COOLDOWN displays IN PROGRESS                  SAT Standard:                                                                UNSAT Candidate monitors EHC pressure and the auto cooldown is IN        N/A PROGRESS.
Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig.
Step 7:
[13]  IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.
[13.1] SELECT the block above the FINAL PRESSURE TARGET                                              Critical Step
[13.2] ENTER the desired pressure using the Display                  SAT Screen or Key Board.
UNSAT
[13.3] WHEN desired Pressure is entered SELECT OK N/A Standard:
Candidate adjusts FINAL PRESSURE TARGET to 100 psig and recommences the auto cooldown.
Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
STOP TIME:
8
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
INITIATING CUES:
The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 2-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].
9
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE: EHC Auto Cooldown JPM NUMBER:    276 U3          REVISION: 1 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-000-NO-32 Perform Reactor Cooldown TASK NUMBER / TASK TITLE(S): U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:      RO: 3.9 SRO: 3.9 239001Main and Reheat Steam System: A4.09 Ability to K/A No. &STATEMENT: manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 4 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _276 U3_
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    3-OI-47 VALIDATIONTIME:
PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  06/19/12    All      Initial issue 1  07/22/15    All      General revision & re-format 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    40 Exam IC 281
* Reset IC 40 or Exam IC if written in above
* Ensure RFP is in Manual on PDS controller with plant parameters stable.
Console Operator Instructions Malfunctions    Description            Event          Severity    Delay    Initial set Remotes          Description        Event          Severity    Delay    Initial set Overrides          Description        Event          Severity    Delay    Initial set Schedule File(s): None 4
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
INITIATING CUES:
The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].
5
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                        SAT / UNSAT Step 1:
[6] VERIFY EHC is in Pressure Control using 3-HS-47-204.              SAT UNSAT Standard:
N/A Observes light on for EHC Pressure Control on 3-HS-47-204.
Step 2:
[7] On the EHC Work Station on Panel 9-7:
[7.1] SELECT Main Menu from the toolbar at bottom of the screen.                                                          Critical Step
[7.2]  SELECT Log In on Display Screen and ENTER OPS                      SAT for name and OPS for Password.
UNSAT
[7.3] SELECT Auto Cooldown from list of function on the screen.                                                                      N/A Standard:
Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.
Step 3:
[8] On the Auto Cooldown Display Screen CHECK the following are displayed.
SAT
* Turbine Tripped or All Valves Closed - indicates Reset.
* Rx Press Ctrl - indicates Reset.                            UNSAT Standard:                                                                    N/A
* Candidate checks the Turbine Tripped or All Valves Closed
              -indicates Reset.
* Candidate checks Rx Press Ctrl - indicates Reset.
6
Job Performance Measure (JPM)
Step 4:
[9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
[9.1] SELECT the block above the FINAL PRESSURE Critical Step TARGET.
SAT
[9.2] ENTER the desired pressure using the Display Screen or Key Board.
UNSAT
[9.3] WHEN desired Pressure is entered SELECT OK N/A Standard:
Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Step 5:
[10] WHEN Cooldown is ready to commence, THEN
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)
Critical Step
[10.2] DEPRESS the START button on the Auto Cooldown Display Screen.                                                SAT
[11] WHEN Caution Are You Sure You Want to Initiate Auto                    UNSAT Cooldown? appears N/A SELECT Yes Screen Button to start the cooldown.
Standard:
Candidate depresses START and acknowledges YES to commence auto cooldown.
7
Job Performance Measure (JPM)
Step 6:
[12] CHECK the following:
* EHC PRESSURE SETPOINT, 3-PI-47-162, is lowering.
* EHC AUTO COOLDOWN displays IN PROGRESS                  SAT Standard:                                                                UNSAT Candidate monitors EHC pressure and the auto cooldown is IN N/A PROGRESS.
Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig.
Step 7:
[13]  IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.
[13.1] SELECT the block above the FINAL PRESSURE TARGET                                              Critical Step
[13.2] ENTER the desired pressure using the Display                  SAT Screen or Key Board.
UNSAT
[13.3] WHEN desired Pressure is entered SELECT OK N/A Standard:
Candidate adjusts FINAL PRESSURE TARGET to 100 psig and recommences the auto cooldown.
Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
STOP TIME:
8
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
INITIATING CUES:
The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].
9
Job Performance Measure (JPM)
LOSS OF REFERENCE APRM TO ROD BLOCK SITE:    BFN    JPM TITLE:
MONITOR JPM NUMBER:      672A U2        REVISION: 0 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-085-AL-03 RESPOND TO CONTROL ROD TASK NUMBER / TASK TITLE(S):
WITHDRAWL BLOCK K/A RATINGS:      RO: 3.1 SRO: 3.3 215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures K/A No. &STATEMENT:
to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR-3,4,5 RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 7 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N        ALTERNATE PATH (Y/N)  Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _672A U2_
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED: 2-OI-85, 2-OI-92B, 2-ARP-9-5A, 2-SR-3.1.3.5(A)
VALIDATIONTIME: 16 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  09/01/15    All      Initial issue 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC      39 Exam IC    282
* Reset to IC-39 to ~ 30% Reactor Power
* Open Schedule File: NRC JPM C U2 -RBM APRM Fail Console Operator Downscale.sch Instructions
* Open Event File: NRC JPM C U2 -RBM APRM Fail Downscale.evt Malfunctions    Description            Event    Severity Delay  Initial set NM07L3233C          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 32-33-C NM07L4025B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-25-B NM07L4033D          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-33-D NM07L0817B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 08-17-B NM07L4017B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-17-B NM07L4041D          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-41-D NM07L4049B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-49-B NM07L4057B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 40-57-B NM07L4817C          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 48-17-C NM07L4825C          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 48-25-C NM07L4833A          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 48-33-A NM07L4841A          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 48-41-A NM07L4849C          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 48-49-C NM07L0825B          LPRM AMPLIFIER          15          0      N/A    N/A FAILURE 08-25-B 4
Job Performance Measure (JPM)
NM07L0833D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-33-D NM07L0841D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-41-D NM07L0849B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-49-B NM07L2409B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-09-B NM07L2417D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-17-D NM07L2425D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-25-D NM07L2433B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-33-B NM07L2449D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-49-D NM07L2457D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-57-D NM07L1617C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-17-C NM07L1625C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-25-C NM07L1633A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-33-A NM07L1641A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-41-A NM07L1649C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-49-C NM07L1657C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-57-C NM07L1609A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-09-A NM07L3209C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-09-C NM07L3217A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-17-A NM07L3225A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-25-A NM07L3249A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-49-A NM07L3257A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-57-A NM07L4009D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 40-09-D NM07L4809A LPRM AMPLIFIER    15        0  N/A N/A 5
Job Performance Measure (JPM)
FAILURE 48-09-A NM07L5617D            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-17-D NM07L5633B            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-33-B NM07L5641B            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-41-B NM07L3241C            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 32-41-C Remotes              Description      Event      Severity    Delay Initial set Overrides            Description      Event      Severity    Delay Initial set ZLO4631LGREENT(1)      Control Rod 46-31    15          0        N/A  N/A GREEN INDICATION Schedule File(s):
Event File: NRC JPM C U2 -RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
Schedule File: NRC JPM C U2 -RBM APRM Fail Downscale.sch 6
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is at 30% power
* Startup Sequence Control Rod Movement Data Sheet 2-SR-3.1.3.5(A) completed through group 57.
* No Control Rods are Fast Notching INITIATING CUES:
The US has directed you to raise Reactor Power to 40% per 2-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14-31.
7
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                              SAT / UNSAT Step 1:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
Step 2:
[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT
* THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS              UNSAT 23A. (Otherwise N/A)
N/A Standard:
Determines that step in N/A Step 3:
[3] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED 8
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 4:
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 5:
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 6:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                              SAT / UNSAT Step 7:
[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT
* THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS              UNSAT 23A. (Otherwise N/A)
N/A Standard:
Determines that step in N/A Step 8:
[3] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 9:
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the              SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing 10
Job Performance Measure (JPM)
STEP / STANDARD                                                              SAT / UNSAT Step 10:
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 11:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
Step 12:
[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT
* THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS              UNSAT 23A. (Otherwise N/A)
N/A Standard:
Determines that step in N/A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 13:
[3] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 14:
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 15:
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 12
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Note to Examiner: This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.
Step 16:
APRM Sensor/Trip Point:
DOWNSCALE/
APRM Downscale: <= 5%
OPRM INOP                    OPRM Inop: Less than 23 operable cells 4
Sensor Location:
Control Room Panel 2-9-14.
Probable Cause:
A. Unbypassed APRM channel at or below sensor set point.
B. SI or SR in progress.
C. Unit shutdown (Mode 3 or 4).                                Critical Step D. Failed sensor.
SAT Automatic Action:                                                                UNSAT A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
N/A Operator Action:
A. DETERMINE which APRM/OPRM channel is downscale/inop.
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 2-OI-92B.
13
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 16(continued)
CONTROL ROD Sensor/Trip Point:
WITHDRAWAL Relays:    3A-K1 Nuclear Instrumentation BLOCK                                  3A-K2 Refuel Equipment in Use High Level in Scram Discharge 7                    Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)
Sensor Location:
Panel 2-9-28 Elevation 593' Aux Instr Room Probable Cause:
A. One or more sensors at or above set point.
B. Malfunction of sensor.
C. Control rod drop accident Automatic Action:
Rod withdrawal block Operator Action:
A. DETERMINE initiating condition from corresponding rod withdrawal block alarm(s) and REFER TO operator action for alarm(s).
Standard:
Reference 2-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 2-OI-92B CUE: Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B.
14
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 17:
NOTES
: 1) Only one APRM/OPRM in each trip system can be bypassed at a time.
: 2) All operations are performed on Panel 2-9-5 unless specifically stated otherwise.
: 3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.                                                SAT UNSAT 6.1 Bypassing APRM/OPRM Channel N/A CAUTION
[QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures.
[ISE-HPS-92-RO1]
[1] REVIEW all precautions and limitations. REFER TO Section 3.0.
Standard:
Demonstrates reviewing precautions and limitations section 3.0.
Step 18:
Critical Step
[2] PLACE APRM BYPASS, 2-HS-92-7B/S3, to desired channel to be bypassed.                                                                SAT Standard:                                                                UNSAT PLACE APRM BYPASS, 2-HS-92-7B/S3, to APRM CH 2                  N/A 15
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 19:
[3] CHECK BLUE BYPASSED lights illuminated on Panel 2-9-14 Voters.                                                              SAT Standard:                                                            UNSAT Observes BLUE BYPASS light illuminated on Panel 2-9-14 for    N/A APRM CH 2.
Step 20:
[4] VERIFY white bypass light on Panel 2-9-5 is illuminated.          SAT Standard:                                                            UNSAT Observes WHITE BYPASS light illuminated on Panel 2-9-5.        N/A Note to Examiner: If needed, cue student to proceed with actions required to continue rod movements. Student may continue at step 21 or 24.
Step 21:
6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)
[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN                                                          SAT PERFORM the following at the Unit Supervisors discretion to  UNSAT REINITIALIZE the RBM:
N/A
[6.1] PLACE CRD POWER, 2-HS-85-46 in the OFF position to deselect the Control Rod.
Standard:
CRD POWER, 2-HS-85-46 in the OFF position.
16
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 22:
SAT
[6.2] PLACE CRD POWER, 2-HS-85-46, in the ON position.
UNSAT Standard:
N/A PLACED CRD POWER, 2-HS-85-46, in the ON position.
Step 23:
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and SAT PERFORM applicable section for Control Rod withdrawal.
UNSAT Standard:
N/A Continues with Control Rod Movement CUE: Proceed with Control Rod Movement.
Step 24:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
17
Job Performance Measure (JPM)
STEP / STANDARD                                                              SAT / UNSAT Step 25:
[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT
* THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS              UNSAT 23A. (Otherwise N/A)
N/A Standard:
Determines that step in N/A Step 26:
[3] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED                      SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 27:
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the              SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing 18
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 28:
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, state End of Task STOP TIME:
19
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is at 30% power
* Startup Sequence Control Rod Movement Data Sheet 2-SR-3.1.3.5(A) completed through group 57.
INITIATING CUES:
The US has directed you to raise Reactor Power to 40% per 2-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14-31.
20
Job Performance Measure (JPM)
LOSS OF REFERENCE APRM TO ROD BLOCK SITE:    BFN    JPM TITLE:
MONITOR JPM NUMBER:    672A U3          REVISION: 0 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-085-AL-03 RESPOND TO CONTROL ROD TASK NUMBER / TASK TITLE(S):
WITHDRAWL BLOCK K/A RATINGS:      RO: 3.1 SRO: 3.3 215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures K/A No. &STATEMENT:
to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR-3,4,5 RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 7 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _672A U3_
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant evolutions precisely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED: 3-OI-85, 3-OI-92B, 3-ARP-9-5A, 3-SR-3.1.3.5(A)
VALIDATIONTIME:
PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  04/30/15    All      Initial issue 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC      39 Exam IC    282
* Reset IC-39to ~ 30% Reactor Power
* Open Schedule File: NRC JPM C U3 -RBM APRM Fail Console Operator Downscale.sch Instructions
* Open Event File: NRC JPM C U3 -RBM APRM Fail Downscale.evt Malfunctions    Description          Event    Severity  Delay  Initial set NM07L3233C          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 32-33-C NM07L4025B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-25-B NM07L4033D          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-33-D NM07L0817B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 08-17-B NM07L4017B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-17-B NM07L4041D          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-41-D NM07L4049B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-49-B NM07L4057B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 40-57-B NM07L4817C          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 48-17-C NM07L4825C          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 48-25-C NM07L4833A          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 48-33-A NM07L4841A          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 48-41-A NM07L4849C          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 48-49-C NM07L0825B          LPRM AMPLIFIER        15          0      N/A    N/A FAILURE 08-25-B 4
Job Performance Measure (JPM)
NM07L0833D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-33-D NM07L0841D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-41-D NM07L0849B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 08-49-B NM07L2409B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-09-B NM07L2417D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-17-D NM07L2425D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-25-D NM07L2433B LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-33-B NM07L2449D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-49-D NM07L2457D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 24-57-D NM07L1617C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-17-C NM07L1625C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-25-C NM07L1633A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-33-A NM07L1641A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-41-A NM07L1649C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-49-C NM07L1657C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-57-C NM07L1609A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 16-09-A NM07L3209C LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-09-C NM07L3217A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-17-A NM07L3225A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-25-A NM07L3249A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-49-A NM07L3257A LPRM AMPLIFIER    15        0  N/A N/A FAILURE 32-57-A NM07L4009D LPRM AMPLIFIER    15        0  N/A N/A FAILURE 40-09-D NM07L4809A LPRM AMPLIFIER    15        0  N/A N/A 5
Job Performance Measure (JPM)
FAILURE 48-09-A NM07L5617D            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-17-D NM07L5633B            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-33-B NM07L5641B            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 56-41-B NM07L3241C            LPRM AMPLIFIER        15          0        N/A  N/A FAILURE 32-41-C Remotes              Description    Event      Severity    Delay Initial set Overrides            Description    Event      Severity    Delay Initial set ZLO4631LGREENT(1)      Control Rod 46-31      15          0        N/A  N/A GREEN INDICATION Schedule File(s):
Event File: NRC JPM C U3 -RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
Schedule File: NRC JPM C U3 -RBM APRM Fail Downscale.sch 6
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is at 30% power
* Startup Sequence Control Rod Movement Data Sheet 3-SR-3.1.3.5(A) completed through group 58.
INITIATING CUES:
The US has directed you to raise Reactor Power to 40% per 3-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22-39.
7
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                      SAT / UNSAT Step 1:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
Step 2:
[2] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 3:
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing 8
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 4:
[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 5:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
Step 6:
[2] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED 9
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 7:
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 8:
[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 9:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
10
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 10:
[2] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 11:
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 12:
[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 11
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Note to Examiner: This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.
Step 13:
APRM Sensor/Trip Point:
DOWNSCALE/
APRM Downscale: <= 5%
OPRM INOP                    OPRM Inop: Less than 23 operable cells 4
Sensor Location:
Control Room Panel 3-9-14.
Probable Cause:
A. Unbypassed APRM channel at or below sensor set point.
B. SI or SR in progress.
C. Unit shutdown (Mode 3 or 4).                                Critical Step D. Failed sensor.
SAT Automatic Action:                                                                UNSAT A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
N/A Operator Action:
A. DETERMINE which APRM/OPRM channel is downscale/inop.
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 3-OI-92B.
12
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 13(continued)
CONTROL ROD Sensor/Trip Point:
WITHDRAWAL Relays:3A-K1 Nuclear Instrumentation BLOCK            7                  3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)
Sensor Location:
Panel 3-9-28 Elevation 593' Aux Instr Room Probable Cause:
A. One or more sensors at or above set point.
B. Malfunction of sensor.
C. Control rod drop accident Automatic Action:
Rod withdrawal block Operator Action:
A. DETERMINE initiating condition from corresponding rod withdrawalblock alarm(s) and REFER TO operator action for alarm(s).
Standard:
Reference 3-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 3-OI-92B CUE:Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B.
13
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 14:
NOTES
: 1) Only one APRM/OPRM in each trip system can be bypassed at a time.
: 2) All operations are performed on Panel 3-9-5 unless specifically stated otherwise.
: 3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.                                                SAT UNSAT 6.1 Bypassing APRM/OPRM Channel N/A CAUTION
[QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures.
[ISE-HPS-92-RO1]
[1] REVIEW all precautions and limitations. REFER TO Section 3.0.
Standard:
Demonstrates reviewing precautions and limitations section 3.0.
CUE: If asked per note 2 above, Panel 9-14 Voter BLUE LIGHTS are extinguished.
Step 15:
Critical Step
[2] PLACE APRM BYPASS, 3-HS-92-7B/S3, to desired channel to be bypassed.                                                                SAT Standard:                                                                UNSAT PLACE APRM BYPASS, 3-HS-92-7B/S3, to APRM CH 2                  N/A 14
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 16:
[3] CHECK BLUE BYPASSED lights illuminated on Panel 3-9-14 Voters.                                                              SAT Standard:                                                            UNSAT Simulates observing BLUE BYPASS light illuminated on Panel 3- N/A 9-14 for APRM CH 2.
Cue: Blue Light is illuminated on Panel 3-9-14 for APRM CH 2.
Step 17:
[4] VERIFY white bypass light on Panel 3-9-5 is illuminated.        SAT Standard:                                                            UNSAT Observes WHITE BYPASS light illuminated on Panel 3-9-5.      N/A Note to NRC Examiner: If needed, cue student to proceed with actions required to continue rod movements.Student may continue at step 18 or 21.
Step 18:
6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)
[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN                                                          SAT PERFORM the following at the Unit Supervisors discretion to  UNSAT REINITIALIZE the RBM:
N/A
[6.1] PLACE CRD POWER, 3-HS-85-46 in the OFF position to deselect the Control Rod.
Standard:
CRD POWER, 3-HS-85-46 in the OFF position.
15
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 19:
SAT
[6.2] PLACE CRD POWER, 3-HS-85-46, in the ON position.
UNSAT Standard:
N/A PLACED CRD POWER, 3-HS-85-46, in the ON position.
Step 20:
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and SAT PERFORM applicable section for Control Rod withdrawal.
UNSAT Standard:
N/A Continues with Control Rod Movement Cue:If asked,Proceed with Control Rod Movement.
Step 21:
Critical Step
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
SAT Standard:
UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.
16
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 22:
[2] OBSERVE the following for the selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED              SAT
* Rod Out Permit light ILLUMINATED UNSAT Standard:
N/A VERIFIES
* CRD ROD SELECT pushbutton is brightly ILLUMINATED
* White light on the Full Core Display ILLUMINATED
* Rod Out Permit light ILLUMINATED Step 23:
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the      SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:
N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 24:
[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
Critical Step
[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.
UNSAT Standard:
N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.
Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, state End of Task STOP TIME:
17
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is at 30% power
* Startup Sequence Control Rod Movement Data Sheet 3-SR-3.1.3.5(A) completed through group 58.
INITIATING CUES:
The US has directed you to raise Reactor Power to 40% per 3-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22-39.
18
Job Performance Measure (JPM) 2-EOI APPENDIX-6E INJECTION SUBSYSTEM LINEUP SITE:    BFN    JPM TITLE:
CS SYSTEM II JPM NUMBER:    257A U2          REVISION: 1 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-000-EM-35/ Lineup Injection Subsystem-Core TASK NUMBER / TASK TITLE(S): Spray Loop I(II) in Accordance with EOI Appendix 6D(E)
K/A RATINGS:      RO: 3.9 SRO: 3.9 209001 Low Pressure Core Spray SystemA4.08 Ability to K/A No. &STATEMENT:        manually operate and/or monitor in thecontrol room: Reactor water level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 2 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _257A U2_
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    2-EOI APPENDIX-6E VALIDATIONTIME: 8 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  12/06/10    All      Initial issue 1  04/27/15    All      General revision & re-format 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    28 Exam IC 283
: 1. Open Schedule File
: 2. Open Event File
: 3. Reset to IC-28and take out of freeze.
: 4. CLOSE 2-FCV-75-51 Console
: 5. OPEN 2-FCV-75-53 Operator
: 6. Man Scram Rx and place MS to SD.
Instructions
: 7. Open 6 ADS Valves.
: 8. Wait until various alarms with Supp Pool Temp High come in to save IC.
Malfunctions    Description              Event      Severity    Delay    Initial set TH22              COOLANT LEAK              15          75%        5      Yes INSIDE DRYWELL CS04A            CORE SPRAY                15          N/A        N/A      Yes LOGIC POWER FAILURE DIV I CS04B            CORE SPRAY                15          N/A        N/A      Yes LOGIC POWER FAILURE DIV II CS02B            CS INBOARD                15          N/A        N/A      Yes INJECTION VALVE AUTO OPENING FAILURE (FCV                  53)
RH06A            RHR LOGIC POWER          15          N/A        N/A      Yes FAILURE DIV I RH06B            RHR LOGIC POWER          15          N/A        N/A      Yes FAILURE DIV II RC01              RCIC TURBINE TRIP        15          N/A        N/A      Yes SYSTEM FAILURE HP04              HPCI STEAM                15          N/A        N/A      Yes SUPPLY VALVE AUTO OPENING FAILURE FW01A            CONDENSATE                15          N/A        10      Yes PUMP TRIP 2A 4
Job Performance Measure (JPM)
FW01B            CONDENSATE              15          N/A    10    Yes PUMP TRIP 2B FW01C            CONDENSATE              15          N/A    10    Yes PUMP TRIP 2C Remotes            Description        Event      Severity Delay Initial set Overrides          Description        Event      Severity Delay Initial set Schedule File(s): JPM 257A U2 Core Spray Alt Inj.sch Event File(s): JPM 257A U2 Core Spray Alt Inj.evt 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is Shutdown
* RPV Water Level is lowering slowly.
* 1-EOI-1 has been entered and followed to RC-L6.
INITIATING CUES:
The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above
(-)162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.
6
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                    SAT / UNSAT Step 1:
Location: Unit 2 Control Room Attachments: 1. NPSH Monitoring
[1] VERIFY OPEN the following valves:
SAT
* 2-FCV-75-30, CORE SPRAY PUMP 2B SUPPR POOL SUCT UNSAT VLV
* 2-FCV-75-39, CORE SPRAY PUMP 2D SUPPR POOL SUCT            N/A VLV Standard:
Verifies2-FCV-75-30 and 2-FCV-75-39 are open.
Step 2:
[1] (continued)VERIFY OPEN the following valves:                  Critical Step
* 2-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.          SAT UNSAT Standard:
N/A Recognizes 2-FCV-75-51 is closed and 2-FCV-75-53 is open, valve closes 2-FCV-75-53 and Opens 2-FCV-75-51.
Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI-75, Core Spray System line up.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 3:
[2] VERIFY CLOSED 2-FCV-75-50, CORE SPRAY SYS II                          SAT TESTVALVE.
UNSAT Standard:
N/A Verifies 2-FCV-75-50 closed Step 4:
Critical Step
[3] VERIFY CS Pump 2B and/or 2D running.
SAT Standard:
UNSAT Starts Core Pumps 2B and/or 2D N/A (Only starting one pump is Critical, the second pump is optional).
Step 6:
[4] WHEN RPV pressure is below 450 psig, THEN Critical Step THROTTLE2-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, SAT as necessary to control injection at or below4000 gpm per pump.
UNSAT Standard:
N/A Verifies pressure < 450 psig and opens 2-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or
      <8000 gpm for 2 pumps).
Step 7:
CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.
SAT
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
UNSAT Standard:
Operator comparesCore Spray Pump flow rate with Suppression N/A Pool temperature and Suppression Pool pressure and Determined adequate NPSH.
Termination Criteria: Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.
STOP TIME:
8
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is Shutdown
* RPV Water Level is lowering slowly.
* 1-EOI-1 has been entered and followed to RC-L6.
INITIATING CUES:
The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above 162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.
9
Job Performance Measure (JPM) 3-EOI APPENDIX-6E INJECTION SUBSYSTEM LINEUP SITE:    BFN    JPM TITLE:
CS SYSTEM II JPM NUMBER:    257A U3          REVISION: 1 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-000-EM-35/ Lineup Injection Subsystem-Core TASK NUMBER / TASK TITLE(S): Spray Loop I(II) in Accordance with EOI Appendix 6D(E)
K/A RATINGS:      RO: 3.9 SRO: 3.9 209001 Low Pressure Core Spray System A4.08 Ability to K/A No. &STATEMENT:        manually operate and/or monitor in the control room: Reactor water level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 2 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _257A U3_
RO            SRO                  DATE: _______
TASK STANDARD: Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    3-EOI APPENDIX-6E VALIDATIONTIME: 5 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  12/06/10    All      Initial issue 1  04/27/15    All      General revision & re-format 3
Job Performance Measure (JPM)
SIMULATOR SETUP IC    28 Exam IC 283
: 1. Open Schedule File
: 2. Open Event File
: 3. Reset to IC-28 and take out of freeze.
: 4. CLOSE 2-FCV-75-51 Console
: 5. OPEN 2-FCV-75-53 Operator
: 6. Man Scram Rx and place MS to SD.
Instructions
: 7. Open 6 ADS Valves.
: 8. Wait until various alarms with Supp Pool Temp High come in to save IC.
Malfunctions    Description              Event      Severity    Delay    Initial set TH22              COOLANT LEAK              15            75%        5      Yes INSIDE DRYWELL CS04A            CORE SPRAY                15            N/A      N/A      Yes LOGIC POWER FAILURE DIV I CS04B            CORE SPRAY                15            N/A      N/A      Yes LOGIC POWER FAILURE DIV II CS02B            CS INBOARD                15            N/A      N/A      Yes INJECTION VALVE AUTO OPENING FAILURE (FCV                  53)
RH06A            RHR LOGIC POWER          15            N/A      N/A      Yes FAILURE DIV I RH06B            RHR LOGIC POWER          15            N/A      N/A      Yes FAILURE DIV II RC01              RCIC TURBINE TRIP        15            N/A      N/A      Yes SYSTEM FAILURE HP04              HPCI STEAM                15            N/A      N/A      Yes SUPPLY VALVE AUTO OPENING FAILURE FW01A            CONDENSATE                15            N/A        10      Yes PUMP TRIP 3A 4
Job Performance Measure (JPM)
FW01B            CONDENSATE              15          N/A    10    Yes PUMP TRIP 3B FW01C            CONDENSATE              15          N/A    10    Yes PUMP TRIP 3C Remotes            Description        Event      Severity Delay Initial set Overrides          Description        Event      Severity Delay Initial set Schedule File(s): JPM 257A U3 Core Spray Alt Inj.sch Event File(s): JPM 257A U3 Core Spray Alt Inj.evt 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is Shutdown
* RPV Water Level is lowering slowly.
* 1-EOI-1 has been entered and followed to RC-L6.
INITIATING CUES:
The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above
(-)162 inches (TAF) using Core Spray System II as directed by 3-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.
6
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                    SAT / UNSAT Step 1:
Location: Unit 3 Control Room Attachments: 1. NPSH Monitoring
[1] VERIFY OPEN the following valves:
SAT
* 3-FCV-75-30, CORE SPRAY PUMP 3B SUPPR POOL SUCT UNSAT VLV
* 3-FCV-75-39, CORE SPRAY PUMP 3D SUPPR POOL SUCT            N/A VLV Standard:
Verifies3-FCV-75-30 and 3-FCV-75-39 are open.
Step 2:
Critical Step
[1] (continued) VERIFY OPEN the following valves:
* 3-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.
SAT UNSAT Standard:
N/A Recognizes 3-FCV-75-51 is closed and 3-FCV-75-53 is open, closes 3-FCV-75-53 and Opens 3-FCV-75-51.
Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI-75, Core Spray System line up.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Step 3:
[2] VERIFY CLOSED 3-FCV-75-50, CORE SPRAY SYS II TEST                      SAT VALVE.
UNSAT Standard:
N/A Verifies 3-FCV-75-50 closed Step 4:
Critical Step
[3] VERIFY CS Pump 3B and/or 3D running.
SAT Standard:
UNSAT Starts Core Pumps 3B and/or 3D (Only starting one pump is N/A Critical, the second pump is optional).
Step 6:
[4] WHEN RPV pressure is below 450 psig, THEN Critical Step THROTTLE 3-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, SAT as necessary to control injection at or below4000 gpm per pump.
UNSAT Standard:
N/A Verifies pressure < 450 psig and opens 3-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or
      <8000 gpm for 2 pumps).
Step 7:
CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.
SAT
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
UNSAT Standard:
Operator compares Core Spray pump flow rate with Suppression N/A Pool temperature and Suppression Pool pressure and Determined adequate NPSH.
Termination Criteria: Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.
STOP TIME:
8
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is Shutdown
* RPV Water Level is lowering slowly.
* 1-EOI-1 has been entered and followed to RC-L6.
INITIATING CUES:
The Unit Supervisor directs you to inject water into the RPV to restore RPV water level using Core Spray System II as directed by 3-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II. Directed level band is +2 to +51 inches.
9
Job Performance Measure (JPM) 2-EOI Appendix-11F Alternate RPV Pressure Control SITE:    BFN    JPM TITLE:
Systems: RFPT On Minimum Flow JPM NUMBER:      670A U2        REVISION: 0 TASK APPLICABILITY:          SRO                STA                UO              NAUO U-000-EM-58 Lineup Alternate RPV Pressure Control TASK NUMBER / TASK TITLE(S): Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:    RO: 3.6SRO: 3.6 239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with K/A No. &STATEMENT:
operating the MAIN ANDREHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION: None SAFETY FUNCTION: 3 EVALUATION LOCATION:              In-Plant          Simulator        Control Room        Lab Other - List APPLICABLE METHOD OF TESTING:          Discussion    Simulate/Walkthrough    Perform TIME FOR COMPLETION:    NA          TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                    Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                    JPM Number: _670A U2_
RO    SRO        DATE: _______
TASK STANDARD: Perform operations necessary to necessary to place one RFPT in pressure control as directed by 2-EOI Appendix-11F.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                  Procedure: 2-EOI-APPENDIX-11F VERIFICATION TIME: 12 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC 284 Malfunctions      Description              Event    Severity      Delay    Initial set fw15a              SPURIOUS RFP              15        N/A          0        N/A BEARING LOW OIL PRESSURE tc03a-j            Fail Bypass Valves        1        0%            0        N/A closed ad01e 20            SRV 1-31 stuck open        1        20%            0        N/A 20%
Remotes        Description              Event    Severity      Delay    Initial set Overrides        Description              Event    Severity      Delay    Initial set Initial Setup:
: 1. Reset to IC 28
: 2. Manually Scram RX
: 3. Trip 2A and 2B RFPT
: 4. Run Schedule File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
: 5. Insert Manual Trigger #1
: 6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
: 7. Verify Auto Trigger #15 is ACTIVE
: 8. Freeze simulator and save IC.
Schedule Files:
: 1. NRC JPM E U2-Alt RPV Press Control RFP Min Flow.sch
: 2. NRC JPM E U2-Alt RPV Press Control RFP Min Flow RFPT Trip.evt 3
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  09/01/15    All      Initial issue 4
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 2C.
INITIATING CUES:
The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.
5
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                            SAT / UNSAT Step 1:
[1] IF BOTH of the following exist:
* Emergency RPV Depressurization is required, AND
* Group 1 Isolation Signal exists, THEN SAT EXIT this procedure and ENTER EOI Appendix 11H.                                                      UNSAT N/A Standard:
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Step 2:
SAT
[2] VERIFY MSIVs open.
UNSAT Standard:
N/A Verifies MSIVs OPEN 6
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 3:
[3] VERIFY Hotwell Pressure at or below -7 in. Hg.                          SAT Standard:                                                                UNSAT Verifies Hotwell Pressure at or below -7 in. Hg                            N/A Step 4:
[4] PLACE RFPTs in service as follows:
[4.1] VERIFY the following:
SAT
[4.1.1] At least one condensate pump running.
[4.1.2] At least one condensate booster pump running.
UNSAT
[4.1.3] Condensate System aligned to supply suction toRFPs.
N/A Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Step 5:
[4.2] VERIFY Main Oil Pump running for each RFPT to bestarted.              SAT Standard:                                                                UNSAT Verifies main oil pump running for RFPT 2A                                  N/A Step 6:
Critical Step
[4.3] VERIFY CLOSED 2-FCV-3-19, RFP 2ADISCHARGE VALVE.
SAT Standard:
UNSAT VERIFY CLOSED 2-FCV-3-19, RFP 2A DISCHARGE VALVE.
N/A 7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 7:
Critical Step
[4.4] DEPRESS 2-HS-46-8A RFPT 2A SPEED CONT RAISE/LOWER, and VERIFY amber lightis illuminated.                                      SAT Standard:                                                                UNSAT Depresses 2-HS-46-8A                                                        N/A Step 8:
[4.5] DEPRESS 2-HS-3-124A, RFPT 2A TRIP RESET.                        Critical Step Standard:                                                                  SAT Depresses 2-HS-3-124A and verifies the 2-Z1-1-123 LP Stop Valve and      UNSAT 2-Z1-127 HP Stop Valve comes OPEN.
N/A Step 9:
Critical Step
[4.6] PLACE 2-HS-46-112A RFPT 2A START/LOCAL ENABLE, in START.                                                                      SAT Standard:                                                                UNSAT Places 2-HS-46-112A in START                                                N/A Note to Examiner:
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:
Critical Step
[4.7] CHECK RFPT 2A speed increases to approximately 600 rpm.
SAT Standard:
UNSAT Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 2-EOI-APPENDIX-11F.                        N/A CUE:
US: Proceed as directed per 2-EOI-APPENDIX-11F.
AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Step 11:
[1] IF BOTH of the following exist:
* Emergency RPV Depressurization is required, AND
* Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER                                                  SAT EOI Appendix 11H.
UNSAT Standard:                                                                      N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Step 12:
[2] VERIFY MSIVs open.                                                        SAT Standard:                                                                    UNSAT Verifies MSIVs OPEN                                                            N/A 9
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 13:
[3] VERIFY Hotwell Pressure at or below -7 in. Hg.                          SAT Standard:                                                                UNSAT Verifies Hotwell Pressure at or below -7 in. Hg                            N/A Step 14:
[4] PLACE RFPTs in service as follows:
[4.1] VERIFY the following:
SAT
[4.1.1] At least one condensate pump running.
[4.1.2] At least one condensate booster pump running.
UNSAT
[4.1.3] Condensate System aligned to supply suction toRFPs.
N/A Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Step 15:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started.            SAT Standard:                                                                UNSAT Verifies main oil pump running for RFPT 2B                                  N/A Step 16:
Critical Step
[4.3] VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
SAT Standard:
UNSAT VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
N/A 10
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 17:
Critical Step
[4.4] DEPRESS 2-HS-46-9A, RFPT 2BSPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.                                      SAT Standard:                                                                UNSAT Depresses 2-HS-46-9A                                                        N/A Step 18:
Critical Step
[4.5] DEPRESS 2-HS-3-150A, RFPT 2B TRIP RESET.
SAT Standard:
UNSAT Depresses 2-HS-3-150A and verifies the 2-ZI-1-133 LP Stop Valve and 2-FCV-135 HP Stop Valve comes OPEN.                                          N/A Step 19:
Critical Step
[4.6] PLACE 2-HS-46-138A, RFPT 2B START/LOCAL ENABLE, in START.                                                                      SAT Standard:                                                                UNSAT Places 2-HS-46-138A in START                                                N/A Step 20:
[4.7] CHECK RFPT 2B speed increases to approximately 600 rpm.              SAT Standard:                                                                UNSAT Verifies RFPT 2B speed increases to approximately 600 rpm                  N/A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 21:
[4.8] VERIFY OPEN 2-FCV-3-13, RFP2B MIN FLOW VALVE.                          SAT Standard:                                                                UNSAT Verifies 2-FCV-3-13 OPEN                                                    N/A Step 21:
CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.
[4.9] PLACE 2-HS-46-9A, RFPT 2B SPEED CONT RAISE/LOWER in              Critical Step RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig.                                                                  SAT Standard:                                                                UNSAT Raises RFPT speed using Manual Speed Control Handswitch,                    N/A maintaining discharge pressure <1250 psig as indicated on 2-PI-3-9A RFPT 2B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
STOP TIME END OF TASK 12
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 2C.
INITIATING CUES:
The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.
13
Job Performance Measure (JPM) 3-EOI Appendix-11F Alternate RPV Pressure Control SITE:    BFN    JPM TITLE:
Systems: RFPT On Minimum Flow JPM 670A JPM NUMBER:                      REVISION:        0 U3 TASK APPLICABILITY:              SRO                STA              UO                NAUO U-000-EM-58 Lineup Alternate RPV Pressure Control TASK NUMBER / TASK TITLE(S): Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:    RO: 3.6 SRO: 3.6 239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with K/A No. & STATEMENT:
operating the MAIN AND REHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION: None SAFETY FUNCTION: 3 EVALUATION LOCATION:              In-Plant          Simulator        Control Room        Lab Other - List APPLICABLE METHOD OF TESTING:          Discussion      Simulate/Walkthrough      Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N          ALTERNATE PATH (Y/N) Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                    JPM Number: _______
RO            SRO                DATE: _______
TASK STANDARD: Perform operations necessary to necessary to place one RFPT in pressure control as directed by 3-EOI Appendix-11F.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                  Procedure: 3-EOI-APPENDIX-11F VERIFICATION TIME:
PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC    28 Exam IC 284 Malfunctions Description            Event    Severity Delay Initial set fw15a        SPURIOUS RFP            15      N/A      0    N/A BEARING LOW OIL PRESSURE tc03a-j      Fail Bypass Valves        1      0%      0    N/A closed ad01e        SRV 1-31 stuck open      1      26%      0    N/A Remotes    Description            Event    Severity Delay Initial set Overrides  Description            Event    Severity Delay Initial set 3
Job Performance Measure (JPM)
Initial Setup:
: 1. Reset to IC 28
: 2. Manually Scram RX
: 3. Trip 2A and 2B RFPT
: 4. Run Schedule File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
: 5. Insert Manual Trigger #1
: 6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
: 7. Verify Auto Trigger #15 is ACTIVE
: 8. Freeze simulator and save IC.
Schedule Files:
: 1. NRC JPM E U3-Alt RPV Press Control RFP Min Flow.sch
: 2. NRC JPM E U3-Alt RPV Press Control RFP Min Flow RFPT Trip.evt 4
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  05/11/15    All      Initial issue 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 3C.
INITIATING CUES:
The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.
6
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                            SAT / UNSAT Step 1:
[1] IF BOTH of the following exist:
* Emergency RPV Depressurization is required, AND
* Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER                                            SAT EOI Appendix 11H.
UNSAT Standard:                                                                      N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Step 2:
[2] VERIFY MSIVs open.
SAT Standard:
UNSAT Verifies MSIVs OPEN N/A 7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 3:
[3] VERIFY Hotwell Pressure at or below -7 in. Hg.
SAT Standard:
UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 4:
[4] PLACE RFPTs in service as follows:
[4.1] VERIFY the following:
[4.1.1] At least one condensate pump running.
SAT
[4.1.2] At least one condensate booster pump running.
[4.1.3] Condensate System aligned to supply suction to RFPs.
UNSAT Standard:
N/A Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Step 5:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started.
SAT Standard:
UNSAT Verifies main oil pump running for RFPT 3A N/A Step 6:                                                                Critical Step
[4.3] VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.
SAT Standard:
UNSAT VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.
N/A 8
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 7:
[4.4] DEPRESS 3-HS-46-8A, RFPT 3A SPEED CONT RAISE/LOWER,              Critical Step and VERIFY amber light is illuminated.
SAT Standard:
UNSAT Depresses 3-HS-46-8A N/A Step 8:
[4.5] DEPRESS 3-HS-3-124A, RFPT 3A TRIP RESET.                        Critical Step Standard:                                                                  SAT Depresses 3-HS-3-124A and resets RFPT Trip and verifies the 3-ZI      UNSAT 123 LP Stop Valve and 3-ZI-127 HP Stop Valve comes OPEN.
N/A Step 9:
[4.6] PLACE 3-HS-46-112A RFPT 3A START/LOCAL ENABLE, in                Critical Step START.
SAT Standard:
UNSAT Places 3-HS-46-112A in START N/A Note to Examiner:
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:
[4.7] CHECK RFPT 3A speed increases to approximately 600 rpm.
SAT Standard:
UNSAT Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 3-EOI-APPENDIX-11F.                        N/A CUE:
US: Proceed as directed per 3-EOI-APPENDIX-11F.
AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Step 11:
[1] IF BOTH of the following exist:
* Emergency RPV Depressurization is required, AND
* Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.                                                              SAT UNSAT Standard:
N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Step 12:
[2] VERIFY MSIVs open.
SAT Standard:
UNSAT Verifies MSIVs OPEN N/A 10
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 13:
[3] VERIFY Hotwell Pressure at or below -7 in. Hg.
SAT Standard:
UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 14:
[4] PLACE RFPTs in service as follows:
[4.1] VERIFY the following:
[4.1.1] At least one condensate pump running.
SAT
[4.1.2] At least one condensate booster pump running.
[4.1.3] Condensate System aligned to supply suction to RFPs.
UNSAT Standard:
N/A Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Step 15:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started.
SAT Standard:
UNSAT Verifies main oil pump running for RFPT 3B N/A Step 16:                                                              Critical Step
[4.3] VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.
SAT Standard:
UNSAT VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.
N/A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 17:
[4.4] DEPRESS 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER,              Critical Step and VERIFY amber light is illuminated.
SAT Standard:
UNSAT Depresses 3-HS-46-9A N/A Step 18:
[4.5] DEPRESS 3-HS-3-150A, RFPT 3B TRIP RESET.                        Critical Step Standard:                                                                  SAT Depresses 3-HS-3-150A and verifies the 3-ZI-1-133 LP Stop Valve and 3-  UNSAT FCV-135 HP Stop Valve comes OPEN.
N/A Step 19:
[4.6] PLACE 3-HS-46-138A, RFPT 3B START/LOCAL ENABLE, in              Critical Step START.
SAT Standard:
UNSAT Places 3-HS-46-138A in START N/A Step 20:
[4.7] CHECK RFPT 3B speed increases to approximately 600 rpm.
SAT Standard:
UNSAT Verifies RFPT 3B speed increases to approximately 600 rpm N/A 12
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 21:
[4.8] VERIFY OPEN 3-FCV-3-13, RFP 3B MIN FLOW VALVE.                    Critical Step Standard:                                                                    SAT Verifies 3-FCV-3-13 OPEN                                                  UNSAT N/A Step 21:
CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.
[4.9] PLACE 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER in Critical Step RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig.
SAT Standard:
UNSAT Raises RFPT speed using Manual Speed Control Handswitch, N/A maintaining discharge pressure <1250 psig as indicated on 3-PI-3-9A RFPT 3B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
STOP TIME END OF TASK 13
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 3C.
INITIATING CUES:
The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.
14
Job Performance Measure (JPM)
N2 MAKEUP TO PRIMARY CONTAINMENT WITH SITE:    BFN    JPM TITLE:
2-EOI-APPENDIX-14A JPM NUMBER:      669 U2        REVISION: 0 TASK APPLICABILITY:          SRO                STA                UO              NAUO U-000-EM-77 Lineup nitrogen Makeup to primary TASK NUMBER / TASK TITLE(S):
Containment IAW EOI-APPENDIX-14A K/A RATINGS:    RO: 3.7SRO: 3.8 223001 Primary Containment System and Auxiliaries A2.04; Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and K/A No. &STATEMENT: (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations: High containment/drywell hydrogen concentration RELATED PRA INFORMATION: None SAFETY FUNCTION: 5 EVALUATION LOCATION:              In-Plant          Simulator        Control Room        Lab Other - List APPLICABLE METHOD OF TESTING:          Discussion    Simulate/Walkthrough    Perform TIME FOR COMPLETION:    NA          TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                    Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                    JPM Number: _669 U2__
RO    SRO        DATE: _______
TASK STANDARD: Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                  Procedure: 2-EOI-APPENDIX-14A VERIFICATION TIME:        15 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC    285
: 1. Open Schedule File
: 2. Open Event File
: 3. Reset to IC-28 and take out of freeze.
: 4. Man Scram Rx and place MS to SD.
: 5. Inhibit ADS & Open 6 ADS Valves.
Console
: 6. Fire Trigger 2 Operator
: 7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch Instructions in BYPASS per EOI APPDX 19
: 8. Place DW Vent in Service per EOI APPX 12
: 9. Wait for Group 6 schedule file to time out and alrms to settle
: 10. Freeze simulator and save IC.
Malfunctions      Description            Event        Severity        Delay Initial set TH22                COOLANT LEAK            2            100            0    Yes INSIDE DRYWELL TH23                  FUEL CLADDING            2            100%            0    N/A DAMAGE RC08                  RCIC STEAM              1            N/A            0    N/A SUPPLY VALVE AUTO OPENING FAILURE HP04                  HPCI STEAM              1            N/A            0    N/A SUPPLY VALVE AUTO OPENING FAILURE CS04A                CORE SPRAY              1            N/A            0    N/A LOGIC POWER FAILURE DIV I CS04B                CORE SPRAY              1            N/A            0    N/A LOGIC POWER FAILURE DIV II RD01A                CRD PUMP TRIP            1            N/A            0    N/A 2A RD01B                CRD PUMP TRIP            1            N/A            0    N/A 2B FW01A                CONDENSATE              1            N/A            0    N/A PUMP TRIP 2A FW01B                CONDENSATE              1            N/A            0    N/A 3
Job Performance Measure (JPM)
PUMP TRIP 2B FW01C              CONDENSATE              1          N/A        0      N/A PUMP TRIP 2C PC08              H2 IN DRYWELL_          2            29        0      N/A PC09              OXYGEN IN              2          2.8        0      N/A DRYWELL_
PC10              H2 IN                  2            18        0      N/A SUPPRESSION POOL_
PC11              OXYGEN IN              2          1.5        0      N/A SUPPRESSION POOL_
Remotes      Description          Event      Severity    Delay  Initial set Overrides    Description          Event      Severity    Delay  Initial set ZLOXA554C9        DW EQUIP DRAIN          2          N/A        N/A    ON SUMP LEVEL ABNORMAL Schedule File(s):
* JPM 669 U2 N2 Makeup to Primary Containment 2-EOI-APPENDIX-14A.sch
* Appendix\App. 8E.sch
* JPM 669 U2 N2 Makeup to Primary Containment 2-EOI-APPENDIX-14A.evt 4
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  05/27/15    All      Initial issue 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is shutdown.
* 2-EOI-APPENDIX-12has been completed
* 2-EOI-APPENDIX-19 has been completed.
* PCIS Group 6 has been overridden per 2-EOI-APPENDIX-8E.
INITIATING CUES:
The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2-EOI-APPENDIX-14A beginning on step 2.
6
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                          SAT / UNSAT Step 1:
: 2. MONITOR Drywell and Suppression Chamber H2 and O2concentrations on one or more of the following displays(2-EOI Appendix 19):
SAT
* 2-MON-76-110, H2/O2 ANALYZER (Panel 2-9-55)
UNSAT
* 2-XR-76-110, H2/O2 CONCENTRATION (Panel 2-9-54)
N/A Standard:
Verifies H2 and O2 concentrations Step 2:
: 3. IF ................. Drywell/Suppression Chamber H2 /O2 analyzer is or becomes inoperable, SAT THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H2 and O2 using CI-644.
UNSAT Standard:
N/A Verifies Drywell/Suppression Chamber H2 /O2 analyzers are Operable 7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 3:
4.WHEN ......... Drywell or Suppression Chamber H2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure.                SAT Standard:                                                                  UNSAT Observes a rise in Drywell H2 Concentration and continues with                N/A procedure.
Step 4:
NOTE This procedure assumes that the normal makeup is from N2 Storage Tank B.
SAT
: 5. DISPATCH personnel to N2 Storage Tank B to CHECK 0-PI-76-331, UNSAT N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
N/A Standard:
Dispatches UO to verifyN2 Storage Tank B Pressure CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:
: 6. DETERMINE area with highest H2 and/or O2 concentrations and          Critical Step INFORM SRO.
SAT Standard:
UNSAT Correctly determines highest concentration is in the drywell and informs US                                                                            N/A CUE: If asked about 15 minute sample time, state 15 minutes have elapsed 8
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 6:
Critical Step
: 7. VERIFY PCIS RESET (Panel 2-9-4).
SAT Standard:
UNSAT Verifies PCIS RESET on Panel 2-9-4 N/A Step 7:
Critical Step
: 8. IF ................. It is desired to makeup N2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.          SAT Standard:                                                                UNSAT Correctly determine step is not applicable and proceeds to step 9.          N/A Step 8:
: 9. CONTROL Drywell H2 and O2 as follows:
Critical Step
: a. OPEN the following valves to admit N2 to Drywell (Panel 2-9-3):
SAT
* 2-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV
* 2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.            UNSAT Standard:
N/A OPENS 2-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV &
2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Step 9:
: b. SLOWLY ADJUST 2-PC-76-14, DW/SUPPR CHBR N2 MU Critical Step PRESS CONTROL (Panel 2-9-3), to maintain flow > 55 and
  <60 scfm on 2-XR-76-14, DW/SUPPR CHBR N2 MAKEUP SAT FLOW/PRESS (Panel 2-9-3), or as directed by SRO if SAMG execution is in progress.
UNSAT Standard:
N/A Achieves a flowrate between 55-60 scfm and monitors Drywell Hydrogen Concentration Lowering 9
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 10:
: c. CONTINUEN2 admission to the Drywell UNTIL Drywell H2 andO2 are        SAT below desired values.
UNSAT Standard:
N/A Monitors Drywell Hydrogen Concentration Note to Examiner: Once satisfied with N2 Flow established between 55 - 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
Pass/ Fail Criteria: Establish N2 Flow> 55 scfm and H2 Concentration on a downward trend.
STOP TIME END OF TASK 10
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is shutdown.
* 2-EOI-APPENDIX-12 has been completed
* 2-EOI-APPENDIX-19 has been completed.
* PCIS Group 6 has been overridden per 2-EOI-APPENDIX-8E.
INITIATING CUES:
The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2-EOI-APPENDIX-14A beginning on step 2.
11
Job Performance Measure (JPM)
N2 MAKEUP TO PRIMARY CONTAINMENT WITH 3-SITE:    BFN    JPM TITLE:
EOI-APPENDIX-14A JPM NUMBER:      670 U3        REVISION: 0 TASK APPLICABILITY:          SRO                STA                UO              NAUO U-000-EM-77 Lineup nitrogen Makeup to primary TASK NUMBER / TASK TITLE(S):
Containment IAW EOI-APPENDIX-14A K/A RATINGS:    RO: 3.7SRO: 3.8 223001 Primary Containment System and Auxiliaries A2.04; Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and K/A No. &STATEMENT: (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations: High containment/drywell hydrogen concentration RELATED PRA INFORMATION: None SAFETY FUNCTION: 5 EVALUATION LOCATION:              In-Plant          Simulator        Control Room        Lab Other - List APPLICABLE METHOD OF TESTING:          Discussion    Simulate/Walkthrough    Perform TIME FOR COMPLETION:    NA          TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                    Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                    JPM Number: _670 U3_
RO    SRO        DATE: _______
TASK STANDARD: Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:                  Procedure: 3-EOI-APPENDIX-14A VERIFICATION TIME:
PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC    285
: 1. Open Schedule File
: 2. Open Event File
: 3. Reset to IC-28 and take out of freeze.
: 4. Man Scram Rx and place MS to SD.
: 5. Inhibit ADS & Open 6 ADS Valves.
Console
: 6. Fire Trigger 2 Operator
: 7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch Instructions in BYPASS per EOI APPDX 19
: 8. Place DW Vent in Service per EOI APPX 12
: 9. Wait for Group 6 schedule file to time out and alrms to settle
: 10. Freeze simulator and save IC.
Malfunctions      Description          Event        Severity        Delay Initial set TH22                COOLANT LEAK            2            100            0    Yes INSIDE DRYWELL TH23                  FUEL CLADDING            2            100%            0    N/A DAMAGE RC08                  RCIC STEAM              1            N/A            0    N/A SUPPLY VALVE AUTO OPENING FAILURE HP04                  HPCI STEAM              1            N/A            0    N/A SUPPLY VALVE AUTO OPENING FAILURE CS04A                CORE SPRAY              1            N/A            0    N/A LOGIC POWER FAILURE DIV I CS04B                CORE SPRAY              1            N/A            0    N/A LOGIC POWER FAILURE DIV II RD01A                CRD PUMP TRIP            1            N/A            0    N/A 2A RD01B                CRD PUMP TRIP            1            N/A            0    N/A 2B 3
Job Performance Measure (JPM)
FW01C              CONDENSATE              1          N/A        0      N/A PUMP TRIP 2C PC08              H2 IN DRYWELL_          2          29          0      N/A PC09              OXYGEN IN              2          2.8        0      N/A DRYWELL_
PC10              H2 IN                  2          18          0      N/A SUPPRESSION POOL_
PC11              OXYGEN IN              2          1.5        0      N/A SUPPRESSION POOL_
Overrides    Description          Event      Severity    Delay  Initial set ZLOXA554C9        DW EQUIP DRAIN          2          N/A        N/A    ON SUMP LEVEL ABNORMAL Schedule File(s):
* JPM 669 U3 N2 Makeup to Primary Containment 2-EOI-APPENDIX-14A.sch
* Appendix\App. 8E.sch
* JPM 669 U3 N2 Makeup to Primary Containment 2-EOI-APPENDIX-14A.evt 4
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  05/27/15    All      Initial issue 5
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is shutdown.
* 3-EOI-APPENDIX-12 has been completed.
* 3-EOI-APPENDIX-19 has been completed.
* PCIS Group 6 has been overridden per 3-EOI-APPENDIX-8E.
INITIATING CUES:
The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2.
6
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                          SAT / UNSAT Step 1:
: 3. MONITOR Drywell and Suppression Chamber H2 and O2concentrations on one or more of the following displays(3-EOI Appendix 19):
SAT
* 3-MON-76-110, H2/O2 ANALYZER (Panel 3-9-55)
UNSAT
* 3-XR-76-110, H2/O2 CONCENTRATION (Panel 3-9-54)
N/A Standard:
Verifies H2 and O2 concentrations Step 2:
: 3. IF ................. Drywell/Suppression Chamber H2 /O2 analyzer is or becomes inoperable,                                                    SAT THEN ...........NOTIFY Chemistry Lab to sample Drywell                UNSAT andSuppression Chamber for H2 and O2 using CI-644.
N/A Standard:
Verifies Drywell/Suppression Chamber H2 /O2 analyzers are Operable 7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Step 3:
: 4. WHEN ......... Drywell or Suppression Chamber H2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure.                SAT Standard:                                                                  UNSAT Observes a rise in Drywell H2 Concentration and continues with                N/A procedure.
Step 4:
NOTE This procedure assumes that the normal makeup is from N2 Storage Tank B.
SAT
: 5. DISPATCH personnel to N2 Storage Tank B to CHECK 0-PI-76-331, UNSAT N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
N/A Standard:
Dispatches UO to verifyN2 Storage Tank B Pressure CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:
: 6. DETERMINE area with highest H2 and/or O2 concentrations and          Critical Step INFORM SRO.
SAT Standard:
UNSAT Correctly determines highest concentration is in the drywell and informs US                                                                            N/A CUE: If asked about 15 minute sample time, state 15 minutes have elapsed 8
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 6:
Critical Step
: 7. VERIFY PCIS RESET (Panel 3-9-4).
SAT Standard:
UNSAT Verifies PCIS RESET on Panel 3-9-4 N/A Step 7:
Critical Step
: 8. IF ................. It is desired to makeup N2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.          SAT Standard:                                                                UNSAT Correctly determine step is not applicable and proceeds to step 9.          N/A Step 8:
: 9. CONTROL Drywell H2 and O2 as follows:
Critical Step
: a. OPEN the following valves to admit N2 to Drywell (Panel 3-9-3):
SAT
* 3-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV
* 3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.            UNSAT Standard:
N/A OPENS 3-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV
&3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Step 9:
: b. SLOWLY ADJUST 3-PC-76-14, DW/SUPPR CHBR N2 MUPRESS Critical Step CONTROL (Panel 3-9-3), to maintain flow between 55 and60 scfm on 3-XR-76-14, DW/SUPPR CHBR N2 MAKEUPFLOW/PRESS (Panel 3-SAT 9-3), or as directed by SRO if SAMGexecution is in progress.
UNSAT Standard:
N/A Achieves a flowrate between 55-60 scfm and monitors Drywell Hydrogen Concentration Lowering 9
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 10:
: c. CONTINUE N2 admission to the Drywell UNTIL Drywell H2 and O2 are below desired values.                                              SAT Standard:                                                                UNSAT Monitors Drywell Hydrogen Concentration                                    N/A Note to Examiner: Once satisfied with N2 Flow established between 55 - 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
Pass/ Fail Criteria: Establish N2 Flow > 55 scfm and H2 Concentration on a downward trend.
STOP TIME END OF TASK 10
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is shutdown.
* 3-EOI-APPENDIX-12 has been completed.
* 3-EOI-APPENDIX-19 has been completed.
* PCIS Group 6 has been overridden per 3-EOI-APPENDIX-8E.
INITIATING CUES:
The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2.
11
Job Performance Measure (JPM)
Restore Offsite Power to 4KV shutdown board at SITE:  BFN    JPM TITLE:
PNL 9-23 JPM NUMBER:      631 U2      REVISION: 0 TASK SRO              STA            UO              NAUO APPLICABILITY:
U-082-NO-09 / Restore Offsite Power to 4KV TASK NUMBER / TASK TITLE(S):
shutdown board at PNL 9-23 K/A RATINGS:    RO 3.4 SRO 3.4 262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control room: Synchroscope, K/A STATEMENT:
including understanding of running andincoming voltages RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 6 EVALUATION LOCATION:            In -P la n t  Simulator    Control Room          Lab Other - List APPLICABLE METHOD OF TESTING:        Discussion  Simulate/Walkthrough    Perform TIME FOR COMPLETION: NATIME CRITICAL (Y/N)            N ALTERNATE PATH (Y/N)          N Developed by:
Developer                              Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                              Date Approved by:
Site Training Management                          Date Approved by:
Site Training Program Owner                        Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________              JPM Number: 631 U2 RO    SRO        DATE: _______
TASK STANDARD: Perform operations necessary to restore offsite power to 4KV SD BD A from 4KV SD BUS 1.
PRA: NA REFERENCES/PROCEDURES NEEDED:              Procedure 0-OI-82 VERIFICATION TIME:      15 Min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:    SATISFACTORY ____      UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC    286 Console      1. Reset to IC 28 and take out of freeze Operator      2. Start A EDG and parallel with offsite Instructions    3. Open 4-kV Shutdown Board A Breaker 1614 Malfunctions    Description            Event          Severity Delay Initial set Remotes      Description            Event          Severity Delay Initial set Overrides    Description            Event          Severity Delay Initial set 3
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed.
I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* No Inclement weather currently exists in the area
* 8 hours ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0-OI-82, Standby Diesel Generator System.
INITIATING CUE:
The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.
4
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                        SAT /
UNSAT Step 1:
0-OI-82 Standby Diesel Generator System Section 8.3 Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23 NOTE The following list of 4-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:
SAT
__UNSAT Shutdown                A            B          C          D Board N/A Norm Feed Bkr      1614        1616        1718          1724 Alt Feed Bkr        1716        1714        1624          1618
[1]    VERIFY 4-kV Shutdown Board A is being supplied power by its respective Diesel Generator as the only source of power.
Standard:
Verifies 4-kV Shutdown Board A is being supplied by DG A.
Step 2:
[2]    VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
Diesel  Handswitch Name Handswitch Panel SAT No.
4KV SD BD A                                          UNSAT A                                    0-211-3EA    0-9-23-7 AUTO/LOCKOUT RESET N/A Standard:
Verifies 4KV SD BD A AUTO/LOCKOUT RESET, HS-0-211-A, is tripped to manual.
5
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 3:
[3]    PLACE the synchroscope switch for the 4-kV shutdown board        Critical Step feeder breaker that is to be paralleled with the Diesel Generator in ON.                                                            SAT Standard:                                                                UNSAT Places Synchroscope switch for 4-kV Shutdown Board A normal      N/A feeder breaker 1614 to ON.
Step 4:
[4]    VERIFY 4-kV Shutdown Bus 1(2) voltage is between 3950 Volts SAT and 4400 Volts and NOT undergoing abnormal voltage transients.
UNSAT Standard:
N/A Verifies 4-kV Shutdown Bus 1 voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
Step 5:
[5]    VERIFY associated incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients.
Shutdown      Instrument Name      Instrument No.          Panel Bd SAT A or B          GEN SYNC            0-SI-82-0AB          0-9-23-7 FREQUENCY UNSAT C or D          GEN SYNC            0-SI-82-0CD          0-9-23-8 FREQUENCY N/A Standard:
Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY,0-SI-82-AB.
6
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 6:
CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclementweather (e.g., lightning, heavy winds).
SAT
[6]    IF 4-kV Shutdown Bus 1 (2) is experiencing abnormal voltage or  UNSAT frequency conditions, THEN PERFORM the following:
N/A Standard:
STEP N/A Step 7:
CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.
Critical Step
[7]    PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.                      SAT Diesel      Handswitch Name          Handswitch          Panel    UNSAT No.
A      DG A MODE SELECT          0-HS-82-A/5A        0-9-23-7  N/A Standard:
Pulls DG A MODE SELECT switch 0-HS-82-A/5A and places it in PARALLELED WITH SYSTEM.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 8:
CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.
SAT UNSAT
[8]    RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.
N/A Standard:
Releases the Diesel Generator A mode selector switch, 0-HS        A/5A and observesPARALLELED WITH SYSTEM light is illuminated.
Step 9:
[9]    ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Critical Step Diesel      Handswitch Name            Handswitch          Panel No.                        SAT A        DG A GOVERNOR            0-HS-82-A/3A        0-9-23-7 CONTROL                                              UNSAT Standard:                                                              N/A AdjustsDiesel Generator A frequency using Diesel Generator governor control switch, 3-HS-82-A/3A, (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 10:
[10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
Diesel        Instrument Name                Inst No. Panel DG A VOLT REGULATOR            0-HS-82-A/2A            SAT CONT A      GEN SYNC REF VOLTAGE          0-EI-82-AB    0-9-23-7  UNSAT SYSTEM SYNC REF                0-EI-211-0AB VOLTAGE                                                N/A Standard:
Matches DG A voltage with system voltage using DG A VOLT REGULATOR CONT switch 0-HS-82-A/2A.
Step 11:
[11]  WHEN the synchroscope needle is approximately 2 minutes on Critical Step the right hand side of the 12 o'clock position, THEN CLOSE the 4-kV shutdown board feeder breaker that is to be SAT paralleled with the Diesel Generator.
UNSAT Standard:
N/A Closesthe 4-kV shutdown board feeder breaker 1614 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Step 12:
[12]  PLACE the synchroscope switch for the 4-kV shutdown board SAT feeder breaker that was paralleled with the Diesel Generator in OFF.
UNSAT Standard:
N/A Places the synchroscope switch for BKR 1614 in OFF.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 13:
NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.
[13]    IF DG has been operating at a low-load condition (50%) for an extended period of time (4 hours) THEN PERFORM the following (Otherwise N/A):
[13.1] USE the associated Diesel Generator's governor controlswitch and voltage regulator control switch toINCREASE kW and kVAR load, in increments of Critical Step 100kWevery 15 minutes.
SAT Diesel    Handswitch Name                    Hands      Panel witch UNSAT No.
DG A GOVERNOR CONTROL              0-HS-N/A 82-A/3A A                                                          0-9-23-7 DG A VOLT REGULATOR                0-HS-CONTROL                            82-A/2A
[13.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.
[13.3] STEP N/A
[13.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
[13.5] MAINTAIN 100% load for a minimum of 30 minutes.
Standard:
Loads DG to 2600 kW and 1850 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.
CUE: After first 100 kW load adjustment state 15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.
10
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 14:
NOTE Lagging VARs should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.
SAT UNSAT
[14]    USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and N/A kVAR load.
Diesel          Handswitch Name          Handswitch No. Panel DG A GOVERNOR CONTROL            0-HS-82-A/3A A                                                        0-9-23-7 DG A VOLT REGULATOR CONT        0-HS-82-A/2A Standard:
Obtains desired kW and kVAR load using DG A Governor Control switch, 0-HS-82-A/3A and DG Volt Regulator Cont switch, 0-HS-82-A/2A.
CUE: state 30 minutes have elapsed continue with procedure.
Step 15:
[15]    MONITOR the offsite source that is paralleled with the Diesel Generator.                                                        SAT
[16]    IF abnormal voltage or frequency transients are experienced,      UNSAT THEN N/A Standard:
Step is N/A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 16:
[17]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVARlimit may result in a reverse power trip of the Diesel Generator output breaker.
[17.1] USE the associated Diesel Generator's governor control    Critical Step switch and voltage regulator control switch to reduce generator load to approximately 300 kW and                SAT 250 kVAR:
UNSAT Diesel        Instrument Name              Inst No.      Panel N/A DG A GOVERNOR CONTROL          0-HS-82-A/3A DG A VOLTAGE                  0-HS-82-A/2A A    REGULATOR CONTROL                              0-9-23-7 DG A KILOWATTS                0-JI-82-A/A DG A KILOVARS                  0-VAR-82-A/A Standard:
Unloads the DG to approximately 300 KW and 250 kVAR.
Step 17
[17.2] PLACE the associated Diesel Generator breaker control Critical Step switch in TRIP SAT Diesel    Handswitch Name        Handswitch No.            Panel A        DG A BKR 1818        0-HS-211-A/22A          0-9-23-7 UNSAT N/A Standard:
Trips Diesel Generator breaker 1818.
12
Job Performance Measure (JPM)
STEP / STANDARD                                                    SAT /
UNSAT Step 18:
[17.3] PULL and PLACE the associated Diesel Generator mode Critical Step selector switch in SINGLE UNIT.
SAT Diesel      Handswitch Name          Handswitch No. Panel A      DG A MODE SELECT            0-HS-211-A/5A  0-9-23-7 UNSAT N/A Standard:
Pulls and places 0-HS-211-A/5A to Single Unit.
Step 19:
[17.4] RELEASE the Diesel Generator mode selector switch and SAT OBSERVE the SINGLE UNIT light illuminated.
UNSAT Standard:
N/A Verifies Single Unit light illuminated.
CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK 13
Job Performance Measure (JPM)
Provide to Applicant INITIAL CONDITIONS:
You are an Operator on Unit 2.
* No Inclement weather currently exists in the area
* 8 hours ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0-OI-82, Standby Diesel Generator System.
INITIATING CUE:
The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.
14
Job Performance Measure (JPM)
Restore Offsite Power to 4KV shutdown board at PNL 9-SITE:  BFN    JPM TITLE:
23      U-3 JPM NUMBER:    631          REVISION: 0 TASK SRO              STA            UO            NAUO APPLICABILITY:
U-082-NO-09 / Restore Offsite Power to 4KV TASK NUMBER / TASK TITLE(S):
shutdown board at PNL 9-23 K/A RATINGS:    RO 3.4 SRO 3.4 262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control K/A STATEMENT: room: Synchroscope, including understanding of running and incoming voltages RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 6 EVALUATION LOCATION:          In -P la n t    Simulator    Control Room        Lab Other - List APPLICABLE METHOD OF TESTING:        Discussion  Simulate/Walkthrough    Perform TIME FOR COMPLETION: NA        TIME CRITICAL (Y/N) N      ALTERNATE PATH (Y/N) N Developed by:
Developer                              Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                              Date Approved by:
Site Training Management                          Date Approved by:
Site Training Program Owner                        Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________              JPM Number: 631 RO          SRO                DATE: _______
TASK STANDARD: Perform operations necessary to restore offsite power to 4KV SD BD EC.
PRA: NA REFERENCES/PROCEDURES NEEDED:              Procedure 3-OI-82 VERIFICATION TIME:      15 Min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:    SATISFACTORY ____      UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC 286
: 1. Reset to IC 28 and take out of freeze Console
: 2. Start C EDG and parallel with offsite Operator
: 3. Open 4-kV Shutdown Board 3EC Breaker 1338 Instructions Malfunctions    Description              Event        Severity Delay Initial set Remotes      Description              Event        Severity Delay Initial set Overrides      Description              Event        Severity Delay Initial set Batch / Pref File(s):
3
Job Performance Measure (JPM)
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed.
I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* No Inclement weather currently exists in the area
* 8 hours ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3-OI-82, Standby Diesel Generator System.
INITIATING CUE:
The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.
4
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                        SAT /
UNSAT Step 1:
3-OI-82 Standby Diesel Generator System Section 8.3 Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23 NOTE The following list of 4-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:
SAT UNSAT Shutdown            3EA        3EB          3EC          3ED Board N/A Norm Feed Bkr      1334        1336        1338          1342 Alt Feed Bkr        1726        1728        1626          1628
[1]    VERIFY 4-kV Shutdown Board 3EC is being supplied power by its respective Diesel Generator as the only source of power.
Standard:
Verifies 4-kV Shutdown Board EC is being supplied by DG C Step 2:
[2]    VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
SAT Diesel  Handswitch Name                Handswitch No. Panel 4KV SD BD 3EC                  3-43-211-                UNSAT 3C                                                      3-9-23 AUTO/LOCKOUT RESET              3EC N/A Standard:
Verifies 4KV SD BD 3EC AUTO/LOCKOUT RESET, 3-43-211-3EC, is tripped to manual.
5
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 3:
[3]    PLACE the synchroscope switch for the 4-kV shutdown board        Critical Step feeder breaker that is to be paralleled with the Diesel Generator in ON.                                                                SAT Standard:                                                                  UNSAT Places Synchroscope switch for 4-kV Shutdown Board EC normal          N/A feeder breaker 1338 to ON Step 4:
[4]    CHECK the applicable 4-kV unit board (4-kV bus tie board)
SAT voltage is between 3950 VOLTS and 4400 VOLTS and NOT undergoing abnormal voltage transients.
UNSAT Standard:
N/A Verifies 4-kV Unit Board voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
Step 5:
[5]    VERIFY associated incoming frequency is between 59 HERTZ and 61 HERTZ and NOT undergoing abnormal frequency transients.
Shutdown      Instrument Name      Instrument No.          Panel SAT Bd 3EA or          GEN SYNC            3-SI-82-3AB          3-9-23 UNSAT 3EB          FREQUENCY 3EC or          GEN SYNC            3-SI-82-3CD          3-9-23 N/A 3ED          FREQUENCY Standard:
Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY, 3-SI-82-CD .
6
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 6:
CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclement weather (e.g., lightning, heavy winds).                SAT UNSAT
[6]    IF 4-kV unit board (4-kV bus tie board) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:          N/A Standard:
N/A Step 7:
CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.
Critical Step
[7]    PULL and PLACE the associated Diesel Generator mode SAT selector switch in PARALLELED WITH SYSTEM.
UNSAT Diesel      Handswitch Name          Handswitch          Panel No.
N/A 3C      DG 3C MODE SELECT          3-HS-82-3C/5A        3-9-23 Standard:
Pulls DG 3C MODE SELECT switch 3-HS-82-3C/5A and places it in PARALLELED WITH SYSTEM 7
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 8:
CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.                                                                    SAT UNSAT
[8]    RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.                    N/A Standard:
Releases the Diesel Generator 3C mode selector switch, 3-HS-82-3C/5C and observes PARALLELED WITH SYSTEM light is illuminated.
Step 9:
[9]    ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Critical Step Diesel      Handswitch Name            Handswitch          Panel No.                            SAT 3C        DG 3C GOVERNOR          3-HS-82-3C/3A          3-9-23 CONTROL                                                UNSAT Standard:                                                                    N/A Adjusts Diesel Generator 3C frequency using Diesel Generator governor control switch, 3-HS-82-3C/3A (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 10:
[10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
Dies        Instrument Name                Inst No. Panel el                                                                SAT DG 3C VOLT REGULATOR          3-HS                CONT                          3C/2A UNSAT 3C    GEN SYNC REF VOLTAGE          3-EI-82-3CD    3-9-23 SYSTEM SYNC REF                3-EI-211-VOLTAGE                        3ECB/B                      N/A Standard:
Matches DG C voltage with system voltage using DG 3C VOLT REGULATOR CONT switch 3-HS-82-3C/2A Step 11:
[11]  WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN Critical Step CLOSE the 4-kV shutdown board feeder breaker that is to be SAT paralleled with the Diesel Generator.
UNSAT Standard:
N/A Closes the 4-kV shutdown board normal feeder breaker 1338 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Step 12:
[12]  PLACE the synchroscope switch for the 4-kV shutdown board            SAT feeder breaker that was paralleled with the Diesel Generator in OFF.                                                              UNSAT Standard:                                                                  N/A Places the synchroscope switch for BKR 1338 in OFF 9
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Step 13:
[13]    IF the normal feeder breaker is supplying the 4-kV shutdown board, THEN RESET the associated 4kV shutdown board auto transfer lockout Critical Step relay.
SAT Diesel      Handswitch Name          Handswitch            Panel No.
UNSAT 3C          4KV SD BD 3EC          3-43-211-3EC          3-9-23 AUTO/LOCKOUT N/A RESET Standard:
Resets 4KV SD BD 3EC Auto Transfer Lockout Relay Step 14:
NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.
[14]    IF DG has been operating at a low-load condition (50%) for an extended period of time (4 hours) THEN PERFORM the following (Otherwise N/A):                                    Critical Step
[14.1] USE the associated Diesel Generators governor control      SAT switch and voltage regulator control switch to INCREASE kW and kVAR load, in increments of 100kW every 15        UNSAT minutes.
N/A Diesel      Handswitch Name                    Hands    Panel witch No.
DG 3C GOVERNOR CONTROL            3-HS-82-3C/3A 3C                                                        3-9-23 DG 3C VOLT REGULATOR              3-HS-CONTROL                            82-3C/2A 10
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT /
UNSAT Step 14 continued:
[14.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.
[14.3] STEP N/A
[14.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
[14.5] MAINTAIN 100% load for a minimum of 30 minutes.
Standard:
Loads DG to 2600 kW and 1850 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.
CUE: After first 100 kW load adjustment state 15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.
Step 15:
NOTE VARs lagging should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to        SAT the maximum kVAR lagging the system will allow.
UNSAT
[15]    USE the associated Diesel Generator's governor control switch        N/A and voltage regulator control switch to obtain desired kW and kVAR load.
Diesel          Handswitch Name          Handswitch No. Panel DG 3C GOVERNOR                  3-HS              CONTROL                        3C/3A 3C                                                        3-9-23 DG 3C VOLT REGULATOR            3-HS              CONT                            3C/2A 11
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT /
UNSAT Standard:
Obtains desired kW and kVAR load using DG 3C Governor Control switch, 3-HS-82-3C/3A and DG Volt Regulator Control switch, 3-HS-82-3C/2A CUE: state 30 minutes have elapsed continue with procedure.
Step 16:
[16]  MONITOR the offsite source that is paralleled with the Diesel Generator.                                                            SAT
[17]  IF abnormal voltage or frequency transients are experienced,      UNSAT THEN N/A Standard:
Step is N/A Step 17:
[18]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVAR limit may result in a reverse power trip of the Diesel Generator output breaker.                                              Critical Step SAT
[18.1] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce      UNSAT generator load to approximately 300 kW and 250 kVAR:                                                      N/A Diesel        Instrument Name                Inst No.      Panel DG 3C GOVERNOR CONTROL          3-HS-82-3C/3A DG 3C VOLT REGULATOR            3-HS-82-3C/2A 3C                                                        3-9-23 CONT DG 3C KILOWATTS                  3-JI-82-3C/A DG 3C KILOVARS                  3-VAR-82-3C/A 12
Job Performance Measure (JPM)
STEP / STANDARD                                                    SAT /
UNSAT Step 17 continued:
Standard:
Unloads the DG to approximately 300 KW and 250 kVAR Step 18:
[18.2] PLACE the associated Diesel Generator breaker control Critical Step switch in TRIP.
SAT Diesel      Handswitch Name          Handswitch No. Panel 3C        DG 3C BKR 1832              3-HS-211-    3-9-23 UNSAT 3EC/10A N/A Standard:
Trips breaker DG 3C BKR 1832 Step 19:
[18.3] PULL and PLACE the associated Diesel Generator mode  Critical Step selector switch in SINGLE UNIT.
SAT Diesel      Handswitch Name          Handswitch No. Panel 3C      DG 3C MODE SELECT            3-HS-82-3C/5A  0-9-23      UNSAT Standard:                                                              N/A Pulls and places 3-HS-82-3C/5A to Single Unit Step 20:                                                          SAT
[18.4] RELEASE the Diesel Generator mode selector switch and UNSAT OBSERVE the SINGLE UNIT light illuminated.
N/A Standard:
Verifies Single Unit light illuminated CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK 13
Job Performance Measure (JPM)
Provide to Applicant INITIAL CONDITIONS:
You are an Operator on Unit 3.
* No Inclement weather currently exists in the area
* 8 hours ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3-OI-82, Standby Diesel Generator System.
INITIATING CUE:
The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.
14
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE:          Respond to Off-Gas Post Treatment Radiation HI-HI-HI JPM NUMBER:        190 U2          REVISION: 0 TASK APPLICABILITY:      SRO                  STA                UO              NAUO U-066-AB-02 -Respond to Off-Gas Post Treatment TASK NUMBER / TASK TITLE(S):
Radiation Hi-Hi-Hi K/A RATINGS:    RO 2.9 SRO 3.2 271000 Offgas System: A2.16; Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those K/A STATEMENT: predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2)
RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 9 EVALUATION LOCATION:              In-Plant          Simulator      Control Room      Lab Other - List APPLICABLE METHOD OF TESTING:        Discussion    Simulate/Walkthrough    Perform TIME FOR COMPLETION: N/A            TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                    Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                JPM Number: 190 U2 RO    SRO        DATE: _______
TASK STANDARD: Respond to Off-Gas Post Treatment Radiation HI-HI-HI per 2-AOI-66-2 and/or 2-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED:                2-AOI-66-2, 2-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____      UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC    287
: 1. Reset to IC 28 Console        2. Fire Manual Trigger 2 Operator      3. Fire Manual Trigger 1 Instructions    4. Station 2nd operator to respond to alarms Malfunctions Description              Event      Severity    Delay Initial set TH23          FUEL CLADDING              1            50      N/A  YES DAMAGE RM14C          OFFGAS RAD                1        1E6 CPS      N/A  YES MONITOR FAILURERM                265A RM14D          OFFGAS RAD                1        1E6 CPS      N/A  YES MONITOR FAILURE RM-90-266A Remotes    Description              Event      Severity    Delay Initial set OG06          Bypass FCV-66-28          2            N/A      N/A  BYP Post Treatment Hi-Hi-Hi Rad Isol Overrides  Description              Event      Severity    Delay Initial set ZAORI9014A    RX BLDG AREA            1            2.5      N/A  YES RAD ZAORI9017A    RX BLDG AREA            1            2.6      N/A  YES RAD ZAORM90265A      90-265 METER            1            6.0      N/A  YES UPSCALE ZAORM90266A      90-266 METER            1            6.0      N/A  YES UPSCALE ZAORR90135R1 90-135 RECORDER              1            6.0      N/A  YES UPSCALE PEN 1 ZAORR90135R2 90-135 RECORDER              1            6.0      N/A  YES UPSCALE PEN 2 ZLORM90265A_1 90-265 DRAW LITE            1            N/A      N/A  YES 3
Job Performance Measure (JPM)
ZLORM90265A_2      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90265A_3      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90265A_4      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_1      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_2      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_3      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_4      90-265 DRAW LITE      1          N/A  N/A YES XA553A5              OG PRETREAT          1          N/A  N/A YES RAD HI XA553A6              STACK GAS RAD        1          N/A  N/A YES HI HI XA553A7                MSL RAD HI        1          N/A  N/A YES XA553A13            STACK GAS RAD        1          N/A  N/A YES HI XA553A27              MSL RAD HI HI        1          N/A  N/A YES XA554C26              CARBON BED          1          N/A  N/A YES VAULT RAD HI XA554C27                OG ANNUAL          1          N/A  N/A YES RELEASE LIMIT EXCEEDED XA554C33            OG POST TREAT        1          N/A  N/A YES RAD HI XA554C34            OG POST TREAT        1          N/A  N/A YES RAD HI HI XA554C35            OG POST TREAT        1          N/A  N/A YES RAD HI HIHI ZDIHS6628              66-28 VALVE        1          N/A  N/A YES CLOSED ZAORR90265R1      90-265 RECORDER        1          6.0  N/A YES UPSCALE PEN 1 ZAORR90265R2      90-265 RECORDER        1          6.0  N/A YES UPSCALE PEN 2 ZAORR90160R1          OG PRETREAT          1          -2.0 N/A YES RECORDER UPSCALE XA554B2              RWCU FILTER          1          N/A  N/A YES INLET CNDT HIGH Schedule File(s): JPM 190 U2 OG Post treat Rad HI HIHI 4
Job Performance Measure (JPM)
IN-SIMULATOR:
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are the Unit 2 Operator. Unit 2 is at 100% power.
INITIATING CUE:
The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 2-XA-55-4C, window 35.
5
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                        SAT / UNSAT Performance Step 1:
SAT When directed, identify/obtain copy of ARP-9-4C, window 35.
UNSAT Standard:
N/A Obtains copy of 2-ARP-9-4C, window 35 Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 2-AOI-66-2. In that event, continue at Performance Step 5.
Performance Step 2:
2-ARP-9-4C window 35 Operator Action:
A. VERIFY alarm condition on the following
* OFFGAS POST-TREATMENT RADIATION recorder, SAT 2-RR-90-265 on Panel 2-9-2.
* OG POST-TREATMENT CHAN A RAD MON RTMR UNSAT radiationmonitor, 2-RM-90-266A on Panel 2-9-10.
* OG POST-TREATMENT CHAN B RAD MON RTMR                          N/A radiationmonitor, 2-RM-90-265A on Panel 2-9-10.
Standard:
Verified alarm condition on 2-RR-90-265 and 2-RM-265/266.
Performance Step 3:
B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 2-FCV-              Critical Step 66-28 has the Mechanical Restraint DISENGAGED and 2-FCV-66-28 isCLOSED.                                              SAT Standard:                                                                  UNSAT Takes handswitch 2-FCV-66-28 to close and observes green light          N/A illuminated and red light out.
Cue: If asked, the Offgas Isolation Valve, 2-FCV-66-28 is NOT mechanically restrained.
6
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 4:
C. REFER to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-SAT Hi-Hi UNSAT Standard:
N/A Refers to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 5:
2-AOI-66-2 4.0    OPERATOR ACTIONS 4.1    Immediate Actions Critical Step
[1]    IF scram has not occurred, THEN SAT PERFORM the following:
UNSAT
[1.1]  IF core flow is above 60%, THEN N/A REDUCE core flow to between 50-60%.
Standard:
Reduced core flow to between 50-60% with recirc system.
Performance Step 6:
[1.2]  MANUALLY SCRAM the Reactor. (Reference 2-AOI-100-1).
Standard:
Critical Step
* Depresses both SCRAM Pushbuttons
* Places mode switch in shutdown SAT
* Verifies All Rods in
* Performs a Scram Announcement                                      UNSAT o Rx Mode Switch Position: Shutdown                              N/A o Rod Position: All Full In o Reactor Water Level ____ & Trend ___
o Reactor Pressure ____ & Trend ___
o MSIV Position: OPEN o Rx Power: <5%
Examiner Note: The scram report and referring to 2-AOI-100-1 are not considered critical.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT CUE: Proceed with subsequent actions of 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 7:
4.2 Subsequent Actions
[1]    IF OFFGAS SYSTEM ISOLATION VALVE, 2-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN SAT DISENGAGE 2-FCV-066-0028 mechanical restraint by UNSAT rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise N/A N/A)
Standard:
Verifies that 2-FCV-066-0028 in NOT mechanically restrained.
Cue: 2-FCV-066 is NOT mechanically restrained.
Performance Step 8:
[2]    VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, Critical Step 2-FCV-66-28 on Panel 2-9-53 or locally.
SAT Standard:
UNSAT Verifies 2-FCV-66-28 is closed at panel 9-53 by Verifying RED light above handswitch extinguished and GREEN light above N/A handswitch illuminated. (May have already verified valve closed from the ARP).
Examiner Note: May have already verified valve closed from the ARP Performance Step 9:
[3]    MONITOR area radiation levels at Panel: 2-9-11.                  SAT Standard:                                                                  UNSAT Monitored radiation levels at Panel 9-11.                                N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 10:
[4]    REFER TO EPIP-1 for emergency classification level and        SAT response.
UNSAT Standard; N/A Notifies SM to implement EPIP-1.
Cue: The Shift Manager is implementing the EPIPs as needed.
Performance Step 11:
[5]    MONITOR the following parameters:
A. MAIN STEAM LINE RADIATION, 2-RR-90-135, Panel 2-9-2.
B. OFFGAS PRETREATMENT RADIATION 2-RR                    157, Pnl 2-9-2.                                          SAT C. OFFGAS POST-TREATMENT RADIATION 2RR-                  UNSAT 90-265, Pnl 2-9-2 N/A D. STACK GAS RADIATION, 0-RR-90-147, Unit 1 Panel 1-9-2.
Standard; Monitors 90-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147.
Cue: As Unit 1 Operator, Stack Gas Radiation, 0-RR-90-147 is reading 5X10E6 cps.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 12:
[6]    IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10E5 cps as indicated on OFFGASRADIATION recorder 2-RR-90-266 on panel 2                                                                          Critical Step 2, THEN SAT CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 2-FCV-1-55 and 2-FCV-1-56.
UNSAT Standard:
N/A Recognizes that the Off-Gas Post Treatment activity is >6 X 10E5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (2-FCV-1-55/56)
Cue: The Unit has been scrammed for 5 minutes.
* Acknowledge closing of MSIVs.
Examiner Note: Closing 1-55 and 1-56 is not considered critical.
Performance Step 13:
NOTE Placing additional Stack Dilution Air Fans in service should keep 0-RM-90-147and 0-RM-90-148 on scale.
[7]    PLACE STACK DILUTION FAN SEL control switch,                    SAT 2-XS-66-29, Panel 2-9-8, in OFF.
UNSAT
[8]    START standby STACK DILUTION FAN 2B(2A) using controlswitch, 2-HS-66-31A(29A), Panel 2-9-8.                  N/A Standard:
Places 2-XS-66-29 in OFF and Starts standby Stack Dilution fan 2B, using 2-HS-66-31A Cue: That completes this task.
STOP TIME _______
END OF TASK 10
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR:
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are the Unit 2 Operator. Unit 2 is at 100% power.
INITIATING CUE:
The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 2-XA-55-4C, window 35.
11
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE:          Respond to Off-Gas Post Treatment Radiation HI-HI-HI JPM NUMBER:    190 U3              REVISION: 0 TASK APPLICABILITY:      SRO                  STA                UO              NAUO U-066-AB-02 -Respond to Off-Gas Post Treatment TASK NUMBER / TASK TITLE(S):
Radiation Hi-Hi-Hi K/A RATINGS:    RO 2.9 SRO 3.2 271000 Offgas System: A2.16;Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the K/A STATEMENT:
consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2)
RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 9 EVALUATION LOCATION:              In-Plant          Simulator      Control Room      Lab Other - List APPLICABLE METHOD OF TESTING:        Discussion    Simulate/Walkthrough    Perform TIME FOR COMPLETION: N/A            TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N)          Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                    Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                JPM Number: 190 RO    SRO        DATE: _______
TASK STANDARD: Respond to Off-Gas Post Treatment Radiation HI-HI-HI per 3-AOI-66-2 and/or 3-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED:                3-AOI-66-2, 3-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____      UNSATISFACTORY ____ (Retain entire JPM for records)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
SIMULATOR SETUP IC      28 Exam IC    288
: 1. Reset to IC 28 Console        2. Fire Manual Trigger 2 Operator      3. Fire Manual Trigger 1 Instructions    4. Station 2nd operator to respond to alarms Malfunctions Description              Event      Severity    Delay Initial set TH23          FUEL CLADDING              1            50      N/A  YES DAMAGE RM14C          OFFGAS RAD                1        1E6 CPS      N/A  YES MONITOR FAILURE RM-90-265A RM14D          OFFGAS RAD                1        1E6 CPS      N/A  YES MONITOR FAILURE RM-90-266A Remotes    Description              Event      Severity    Delay Initial set OG06          Bypass FCV-66-28          2            N/A      N/A  BYP Post Treatment Hi-Hi-Hi Rad Isol Overrides  Description              Event      Severity    Delay Initial set ZAORI9014A      RX BLDG AREA            1            2.5      N/A  YES RAD ZAORI9017A      RX BLDG AREA            1            2.6      N/A  YES RAD ZAORM90265A      90-265 METER            1            6.0      N/A  YES UPSCALE ZAORM90266A      90-266 METER            1            6.0      N/A  YES UPSCALE ZAORR90135R1 90-135 RECORDER              1            6.0      N/A  YES UPSCALE PEN 1 ZAORR90135R2 90-135 RECORDER              1            6.0      N/A  YES UPSCALE PEN 2 ZLORM90265A_1 90-265 DRAW LITE            1            N/A      N/A  YES ZLORM90265A_2 90-265 DRAW LITE            1            N/A      N/A  YES 3
Job Performance Measure (JPM)
ZLORM90265A_3      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90265A_4      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_1      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_2      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_3      90-265 DRAW LITE      1          N/A  N/A YES ZLORM90266A_4      90-265 DRAW LITE      1          N/A  N/A YES XA553A5              OG PRETREAT          1          N/A  N/A YES RAD HI XA553A6              STACK GAS RAD        1          N/A  N/A YES HI HI XA553A7                MSL RAD HI        1          N/A  N/A YES XA553A13            STACK GAS RAD        1          N/A  N/A YES HI XA553A27              MSL RAD HI HI        1          N/A  N/A YES XA554C26              CARBON BED          1          N/A  N/A YES VAULT RAD HI XA554C27                OG ANNUAL          1          N/A  N/A YES RELEASE LIMIT EXCEEDED XA554C33            OG POST TREAT        1          N/A  N/A YES RAD HI XA554C34            OG POST TREAT        1          N/A  N/A YES RAD HI HI XA554C35            OG POST TREAT        1          N/A  N/A YES RAD HI HIHI ZDIHS6628              66-28 VALVE        1          N/A  N/A YES CLOSED ZAORR90265R1      90-265 RECORDER        1          6.0  N/A YES UPSCALE PEN 1 ZAORR90265R2      90-265 RECORDER        1          6.0  N/A YES UPSCALE PEN 2 ZAORR90160R1          OG PRETREAT          1          -2.0 N/A YES RECORDER UPSCALE XA554B2              RWCU FILTER          1          N/A  N/A YES INLET CNDT HIGH Schedule File(s): JPM 190 U3 OG Post treat Rad HI HIHI 4
Job Performance Measure (JPM)
IN-SIMULATOR:
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are the Unit 3 Operator. Unit 3 is at 100% power.
INITIATING CUE:
The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 3-XA-55-4C, window 35.
5
Job Performance Measure (JPM)
START TIME STEP / STANDARD                                                        SAT / UNSAT Performance Step 1:
SAT When directed, identify/obtain copy of ARP-9-4C, window 35.
UNSAT Standard:
N/A Obtains copy of 3-ARP-9-4C, window 35 Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 3-AOI-66-2. In that event, continue at Performance Step 5.
Performance Step 2:
3-ARP-9-4C window 35 Operator Action:
A. VERIFY alarm condition on the following
* OFFGAS POST-TREATMENT RADIATION recorder,                      SAT 3-RR-90-265 on Panel 3-9-2.
* OG POST-TREATMENT CHAN A RAD MON RTMR                      UNSAT radiationmonitor, 3-RM-90-266A on Panel 3-9-10.
* OG POST-TREATMENT CHAN B RAD MON RTMR                          N/A radiationmonitor, 3-RM-90-265A on Panel 3-9-10.
Standard:
Verified alarm condition on 3-RR-90-265 and 3-RM-265/266.
Performance Step 3:
B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 3-FCV-              Critical Step 66-28 has the Mechanical Restraint DISENGAGED and 3-FCV-66-28 isCLOSED.                                              SAT Standard:                                                                  UNSAT Takes handswitch 3-FCV-66-28 to close and observes green light          N/A illuminated and red light out.
Cue: If asked, the Offgas Isolation Valve, 3-FCV-66-28 is NOT mechanically restrained.
6
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 4:
C. REFER to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi                                                                SAT Standard:                                                                  UNSAT Refers to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi      N/A Performance Step 5:
3-AOI-66-2 4.0    OPERATOR ACTIONS 4.1    Immediate Actions Critical Step
[1]    IF scram has not occurred, THEN SAT PERFORM the following:
UNSAT
[1.1]  IF core flow is above 60%, THEN N/A REDUCE core flow to between 50-60%.
Standard:
Reduced core flow to between 50-60% with recirc system.
Performance Step 6:
[1.2]  MANUALLY SCRAM the Reactor. (Reference 3-AOI-100-1).
Standard:
Critical Step
* Depresses both SCRAM Pushbuttons
* Places mode switch in shutdown SAT
* Verifies All Rods in
* Performs a Scram Announcement                                      UNSAT o Rx Mode Switch Position: Shutdown                              N/A o Rod Position: All Full In o Reactor Water Level ____ & Trend ___
o Reactor Pressure ____ & Trend ___
o MSIV Position: OPEN o Rx Power: <5%
Examiner Note: The scram report and referring to 3-AOI-100-1 are not considered critical.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT CUE: Proceed with subsequent actions of 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 7:
4.2 Subsequent Actions
[1]    IF OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN                                                  SAT DISENGAGE3-FCV-066-0028 mechanical restraint by              UNSAT rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise      N/A N/A)
Standard:
Verifies that 3-FCV-066-0028 in NOT mechanically restrained.
Cue: 3-FCV-066 is NOT mechanically restrained.
Performance Step 8:
[2]    VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, Critical Step 3-FCV-66-28 on Panel 3-9-53 or locally.
SAT Standard:
UNSAT Verifies 3-FCV-66-28 is closed at panel 9-53 by Verifying RED light above handswitch extinguished and GREEN light above N/A handswitch illuminated. (May have already verified valve closed from the ARP).
Examiner Note: May have already verified valve closed from the ARP Performance Step 9:
SAT
[3]    MONITOR area radiation levels at Panel: 3-9-11.
UNSAT Standard:
N/A Monitored radiation levels at Panel 9-11.
Cue: Another operator will monitor and evaluate Area Radiation Levels.
8
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 10:
[4]    REFER TO EPIP-1 for emergency classification level and        SAT response.
UNSAT Standard; N/A Notifies SM to implement EPIP-1.
Cue: The Shift Manager is implementing the EPIPs as needed.
Performance Step 11:
[5]    MONITOR the following parameters:
A. MAIN STEAM LINE RADIATION, 3-RR-90-135, Panel 3-9-2.
B. OFFGAS PRETREATMENT RADIATION 3-RR                    157, Pnl3-9-2.                                          SAT C. OFFGAS POST-TREATMENT RADIATION 3-RR-                  UNSAT 90-265, Pnl3-9-2 N/A D. STACK GAS RADIATION, 0-RR-90-147, Unit 1 Panel 1-9-2.
Standard; Monitors 90-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147.
Cue: As Unit 1 Operator, Stack Gas Radiation, 0-RR-90-147 is reading 5X10E6 cps.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Performance Step 12:
[6]    IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10E5 cps as indicated on OFFGASRADIATION recorder 3-RR-90-265 on panel 3              2, THEN                                                    Critical Step CLOSE all Main Steam Isolation Valves and Main Steam            SAT LineDrain Valves, 3-FCV-1-55 and 3-FCV-1-56.
UNSAT Standard:
N/A Recognizes that the Off-Gas Post Treatment activity is >6 X 10E5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (3-FCV-1-55/56)
Cue: The Unit has been scrammed for 5 minutes.
* Acknowledge closing of MSIVs.
Examiner Note: Closing 1-55 and 1-56 is not considered critical.
Performance Step 13:
NOTE Placing additional Stack Dilution Air Fans in service should keep 0-RM-90-147and 0-RM-90-148 on scale.
[7]    PLACE STACK DILUTION FAN SEL control switch,                    SAT 3-XS-66-29, Panel 3-9-8, in OFF.
UNSAT
[8]    START standby STACK DILUTION FAN 3B(3A) using controlswitch, 3-HS-66-31A(29A), Panel 3-9-8.                  N/A Standard:
Places 3-XS-66-29 in OFF and Starts standby Stack Dilution fan 3B, using 3-HS-66-31A Cue: That completes this task.
STOP TIME ________
END OF TASK 10
Job Performance Measure (JPM)
Provide to Applicant IN-SIMULATOR:
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are the Unit 3 Operator. Unit 3 is at 100% power.
INITIATING CUE:
The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 3-XA-55-4C, window 35.
11
Job Performance Measure (JPM)
SITE: BFN      JPM TITLE: AUTOMATIC START FAILURE OF A & C FIRE PUMPS JPM NUMBER:        673          REVISION: 0 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-026-NO-01/ MONITOR AUTO START OF FIRE TASK NUMBER / TASK TITLE(S):
PUMP K/A RATINGS:      RO: 3.4 SRO: 3.4 286000 Fire Protection System A2.08; Ability to (a) predict the impacts of the following on the FIRE PROTECTION SYSTEM; K/A No. &STATEMENT: and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Failure to actuate when required RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 8 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N        ALTERNATE PATH (Y/N)    Y Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _673A___
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to manually start A, B and C Fire Pumps.
Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    0-OI-26 VALIDATIONTIME:__15 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  04/28/15    All      Initial issue 3
Job Performance Measure (JPM)
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 1.
* The Reactor Power at 70%
* A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir.
* Fire OPS has been dispatched to the scene.
* Fire Pump B Tagged Out for Maintenance
* A and C Fire Pumps failed to Auto Start.
INITIATING CUES:
The US directs you to start A and C Electric Fire Pumps per 0-OI-26 section 5.4.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
4
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                    SAT / UNSAT Step 1:
[1] PLACE the FIRE PUMP A TRANSFER switch, 0-XS-26-1 in EMERGENCY position, at the respective switchgear.
Critical Step Pump                    Board                  Compt A            4160V Shutdown Bd A              11            SAT C            4160V Shutdown Bd C              10 UNSAT Standard:
N/A Simulates placing FIRE PUMP A TRANSFER switch 0-XS-26-3 in EMERGENCY position at 4160 Shutdown Board A, Compartment 11 CUE: FIRE PUMP A TRANSFER switch 0-XS-26-1 is in the EMERGENCY position Step 2:
Critical Step
[2] CLOSE the breaker by placing the FIRE PUMP A CONTROL switch, 0-HS-26-1C to CLOSE.                                                SAT Standard:                                                          UNSAT Simulates placing FIRE PUMP A CONTROL switch, 0-HS-26-1C    N/A to CLOSE position.
CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF.
Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.
Step 3:
[3] CHECK pump ammeter at breaker indicates between 25 and 40 amps.                                                                SAT Standard                                                            UNSAT VERIFIES pump ammeter at breaker indicates between 25 and    N/A 40 amps.
CUE: FIRE PUMP A ammeter at breaker indicates 30 amps.
5
Job Performance Measure (JPM)
Step 4:
[4] PLACE the NORM/EMERG Switch in NORMAL.
SAT Standard UNSAT PLACES the NORM/EMERG Switch in NORMAL for FIRE N/A PUMP A.
CUE: FIRE PUMP A NORM/EMERG Switch is in NORMAL Step 5:
[1] PLACE the FIRE PUMP C TRANSFER switch, 0-XS-26-3 in EMERGENCY position, at the respective switchgear.
Critical Step Pump                    Board                  Compt A            4160V Shutdown Bd A              11            SAT C            4160V Shutdown Bd C              10 UNSAT Standard:
N/A Simulates placing FIRE PUMP C TRANSFER switch 0-XS-26-3 in EMERGENCY position at 4160 Shutdown Board C, Compartment 10 CUE: FIRE PUMP C TRANSFER switch 0-XS-26-3 is in the EMERGENCY position Step 5:
Critical Step
[2] CLOSE the breaker by placing the FIRE PUMP C CONTROL switch, 0-HS-26-3C to CLOSE.
SAT Standard:
UNSAT Simulates placing FIRE PUMP C CONTROL switch, 0-HS-26-3C N/A to CLOSE position.
CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF.
Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.
6
Job Performance Measure (JPM)
Step 6:
[3] CHECK pump ammeter at breaker indicates between 25 and 40 amps.                                                                SAT Standard                                                            UNSAT VERIFIES pump ammeter at breaker indicates between 25 and    N/A 40 amps.
CUE: FIRE PUMP C ammeter at breaker indicates 30 amps.
Step 7:
[4] PLACE the NORM/EMERG Switch in NORMAL.
SAT Standard UNSAT PLACES the NORM/EMERG Switch in NORMAL for FIRE N/A PUMP C.
CUE: FIRE PUMP C NORM/EMERG Switch is in NORMAL and this completes the JPM.
Termination Criteria: When two Fire Pumps are in service the JPM is complete.
STOP TIME:
7
Job Performance Measure (JPM)
Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 1.
* The Reactor Power at 70%
* A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir.
* Fire OPS has been dispatched to the scene.
* Fire Pump B Tagged Out for Maintenance
* A and C Fire Pumps failed to Auto Start.
INITIATING CUES:
The US directs you to start A and C Electric Fire Pumps per 0-OI-26 section 5.2.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
8
Job Performance Measure (JPM)
ALIGNING EMERGENCY EECW MAKEUP TO SPENT SITE:    BFN    JPM TITLE:
FUEL POOL JPM NUMBER:        674          REVISION: 0 TASK APPLICABILITY:      SRO                STA                UO            NAUO U-000-EM-95/ Make-Up To SFP By EECW With TASK NUMBER / TASK TITLE(S):
Fire Hose (Internal Make-Up)
K/A RATINGS:      RO: 3.1 SRO: 3.3 233000 Fuel Pool Cooling and Clean-up; A2.02; Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CLEAN-UP ; and (b) based on those K/A No. &STATEMENT:
predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Low pool level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 9 EVALUATION LOCATION: In-Plant                    Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N      ALTERNATE PATH (Y/N)    N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: __674__
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to align either North or South Headers of EECW to Unit 2 Spent Fuel Pool.
Operator Fundamental evaluated:
OF-2 Controlling plant evolutions and indications closely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:                    2-AOI-78-1 VALIDATION TIME:            25 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 0  09/01/15    All      Initial issue 3
Job Performance Measure (JPM)
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is in cold shutdown
* The Unit 2 Spent Fuel Pool water level is lowering.
* Fire Protection is available to assist INITIATING CUES:
The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3].
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
4
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                          SAT / UNSAT Step 1:
NOTES
: 1) Hose straps are staged at the hoses at the following locations:
* Unit 1/Unit 2 Reactor Bldg Stairwell, El. 621, R6 U Line (placed on hose to carry weight of charged hose lines).
* Hose reel on the Refuel Floor, El. 664, R6 U Line (for use in securing hose ends as needed).
: 2) Additional hose is stored in a cabinet located in Unit 1/Unit 2 Elevator Room, Reactor Bldg, El 595.
Critical Step CAUTION Performance of this attachment will degrade water chemistry in the    SAT Spent Fuel Pool.
UNSAT
[3] UNLOCK and OPEN the following valves:
N/A
* NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792.
* SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793.
Standard:
Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793 by demonstrating opening each valve counter-clockwise and breaking seal.
CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793 is OPEN Located in stairwell between elevation 565 ft and 593 ft. Hoses are already connected, no tools required.
5
Job Performance Measure (JPM)
STEP / STANDARD                                                        SAT / UNSAT Step 3:
[4] VERIFY charged hoses in stairwell are not obstructing stairway access and/or kinked.
SAT
[4.1] ADJUST hose straps, as necessary.
UNSAT Standard:
N/A VERIFIES hoses in stairwell are not kinked Note to Examiner: Hoses are already run along the stairwell. Applicant should verify hoses not kinked and connected.
Step 4:
[5] VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and route to Unit 2 Spent Fuel Pool        Critical Step (El 664, Refuel Floor, R6-U Line).
SAT Standard:
UNSAT VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and route to Unit 2 Spent          N/A Fuel Pool (El 664, Refuel Floor, R6-U Line).
Note to Examiner: Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable. Hoses are already connected, no tools required.
Location: Refuel Floor Elevation 664 ft, R U Line.
Step 5:
[6] VERIFY hose connected from SOUTH HDR SPLY TO EMER Critical Step FUEL POOL MU, 1-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664, Refuel Floor, R6-U Line)
SAT Standard:
UNSAT VERIFY hose connected from SOUTH HDR SPLY TO EMER N/A FUEL POOL MU, 1-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664, Refuel Floor, R6-U Line) 6
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Note to Examiner: Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable. Hoses are already connected, no tools required.
Location: Refuel Floor Elevation 664 ft, R U Line.
Step 6:
[7] VERIFY OPEN the following valves (El 664, Refuel Floor, R6 U Line):
* NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-Critical Step 0796.
SAT
* SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797.
UNSAT Standard:
N/A Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797 by demonstrating opening each valve counter-clockwise.
CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797 is OPEN Location: Refuel Floor Elevation 664 ft, R U Line.
Step 7:
[8] VERIFY charged hoses on the Refuel Floor are not kinked.
SAT Standard:                                                                UNSAT VERIFY charged hoses on the Refuel Floor are not kinked          N/A Termination Criteria: NORTH and SOUTH Header are aligned then the JPM is complete. State another operator will perform the remaining steps.
STOP TIME:
7
Job Performance Measure (JPM)
Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 2.
* The Reactor is in cold shutdown
* The Unit 2 Spent Fuel Pool water level is lowering.
* Fire Protection is available to assist INITIATING CUES:
The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3].
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
8
Job Performance Measure (JPM)
START UP AND SYNCHRONIZE UNIT 3 PREFERRED SITE:    BFN    JPM TITLE:
MMG SET JPM NUMBER:        307          REVISION: 6 TASK APPLICABILITY: SRO                      STA                UO            NAUO TASK NUMBER / TASK TITLE(S): S-57C-NO-04 K/A RATINGS:      RO: 2.5 SRO: 2.9 262002 Uninterruptable Power Supply (A.C./D.C.) A1.02; Ability to predict and/or monitor changes in parameters associated with K/A No. &STATEMENT:
operating the UNINTERRUPTABLE POWER SUPPLY (A.C./D.C.) controls including: Motor generator outputs RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 6 EVALUATION LOCATION: In-Plant                      Simulator  Control Room            Lab Other - List APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:    NA        TIME CRITICAL (Y/N) N        ALTERNATE PATH (Y/N)  N Developed by:
Developer                                  Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)
(See JPM Validation Checklist in NPG-SPP-17.8.2)
Validated by:
Validator                                  Date Approved by:
Site Training Management                              Date Approved by:
Site Training Program Owner                            Date 1
Job Performance Measure (JPM)
OPERATOR: ________________________________                      JPM Number: _307___
RO    SRO          DATE: _______
TASK STANDARD: Perform operations necessary to Start-up and synchronize Unit Preferred MMG Set Operator Fundamental evaluated:
OF-1 Monitoring plant indications and conditions closely.
OF-2 Controlling plant Evolutions Precisely PRA: NA REFERENCES/PROCEDURES NEEDED:                    0-OI-57C VALIDATIONTIME: 25 min PERFORMANCE TIME:
COMMENTS:
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
IF      UNSAT results are obtained THEN    Retain entire JPM for records.(Otherwise just retain this page.)
SIGNATURE: ___________________________ DATE: __________
EXAMINER 2
Job Performance Measure (JPM)
Revision Summary Rev Effective  Pages Description No. Date    Affected 1  10/26/94    ALL        GENERAL REVISION 2  05/07/95    ALL        GENERAL REVISION FORMAT, PROCEDURE REVISION, ADDED 3  10/15/97    ALL        PLANT WORK EXPECTATIONS TOUCH STAAR, SAFETY, AND 3-WAY COMM.
PROCEDURE REVISION, FORMAT 4  11/10/99    ALL DOCUMENT 5  10/03/01    ALL        PROCEDURE REVISION 6  04/28/15    ALL        UPDATE TO NEW FORMAT 3
Job Performance Measure (JPM)
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is in cold shutdown
* The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
* Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.
INITIATING CUES:
The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16].
NOTE: PERFORMER WILL NEED GGMKA KEY.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
4
Job Performance Measure (JPM)
START TIME:
STEP / STANDARD                                                  SAT / UNSAT Step 1:
NOTE Steps 5.5[16] through 5.5[26] are performed from Battery Board Room 2 UNIT PFD Sync. & Speed Control Panel.                  Critical Step SAT
[16] PLACE UNIT 3 MMG OPERATING MODE, 3-HS-252-02AB in AUTO.
UNSAT Standard:
N/A VERIFIED/SIMULATED PLACING the Unit 3 MMG SET OPERATING MODE 3-HS-252-02AB in AUTO.
Cue: The Unit 3 MMG SET OPERATING MODE 3-HS-252-02AB is in AUTO position.
Step 2:
Critical Step
[17] PLACE UNIT 3 MMG LOCAL-REMOTE CONTROL, 3-XS-252-02A in REMOTE.
SAT Standard:
UNSAT SIMULATED PLACING the Unit 3 MMG SET LOCAL-REMOTE N/A CONTROL 3-XS-252-02A in the REMOTE position.
Cue: The Unit 3 MMG SET LOCAL-REMOTE CONTROL 3-HS-252-02A is in the REMOTE position.
Step 3:
[18] PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE                    Critical Step SYNC SWITCH SS-7, 3-HS-252-03/SS-7 in ON.
SAT Standard:
UNSAT SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 3-HS-252-03/SS-7, in the ON      N/A position.
5
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Cue: The Unit 3 PFD SYSTEM GENERATOR SOURCE SYNC SS-7, SWITCH 3-HS-252-003/SS-7 is in the ON position.
Step 4:
NOTE MMG voltage and hertz are read as INCOMING.
Critical Step
[19] MATCH Incoming to Running AC volts using UNIT 3 MMG VOLTAGE ADJUST, 3-HS-252-02CD.                                            SAT Standard:                                                                  UNSAT SIMULATED MANIPULATING UNIT 3 MMG VOLTAGE ADJUST,                  N/A 3-HS 252-02CD until cued that incoming and running AC volts are matched.
Cue: INCOMING and RUNNING VOLTAGES are EQUAL at 122 Volts Step 5:
[20] ADJUST MMG speed using UNIT 3 MMG FREQUENCY ADJUST, 3-HS-252-02CF to obtain a synchroscope slowly rotating in the SLOW Critical Step (counter-clockwise) direction (10 to 15 second rotation) as indicated on SYNCHROSCOPE, 0-SCP-252-000A/B.
SAT Standard:
UNSAT SIMULATED ADJUSTING UNIT 3 MMG FREQUENCY ADJUST N/A 3-HS-252-02CF speed control switch until cued that synchroscope indicator rotating in the counterclockwise direction at 10 to 15 seconds per revolution.
Cue: State: The Initial Synchroscope indicator is standing still at the 5 oclock position.
Note: If student raises frequency the state: Synchroscope indicator is rotating in the CLOCKWISE direction at 12 seconds per revolution.
Note: If student lowers frequency the state: Synchroscope indicator is rotating in the COUNTERCLOCKWISE direction at 12 seconds per revolution.
6
Job Performance Measure (JPM)
STEP / STANDARD                                                            SAT / UNSAT Step 6:
NOTES
: 1) Section 5.5[21] should be performed expeditiously (within about 15 seconds) to minimize the time AC Systems are paralleled to prevent tripping the MMG set. Voltage and amps is expected to fluctuate while the AC systems are paralleled and the MMG set will trip if the AC systems are paralleled for approximately 30 seconds.
: 2) If breaker 1001 trips, it must be reset with reset push button on the respective Unit Battery Board, Panel 10.
CAUTIONS
: 1) Voltage Oscillations may occur during Bus Power Transfers.
These oscillations are caused when two Power Supplies having separate Voltage Regulators try to maintain voltage control.
Therefore, the time the Power Supplies are paralleled should be minimized as follows:[PER 64835]
* When transferring Bus power supplies from one MMG to            Critical Step another MMG.
* When transferring Bus power supplies from one MMG with the      SAT unit preferred transformer. (Unit 2 has a Voltage Regulator Transformer which makes voltage oscillations more              UNSAT susceptible.)
N/A
: 2) Minimize the number of Bus power supply transfers and only transfer Bus power supplies when absolutely necessary.
: 3) During the transfer of Bus power supplies the affiliated RPS circuit protectors 1(2)C1 and/or 1(2)C2 may trip.
Start of Critical Step(s)
[21] WHEN SYNCHROSCOPE, 0-SCP-252-000A/B is 5 minutes prior to 12 o'clock, in the SLOW counter-clockwise direction, THEN PERFORM the following expeditiously:
[21.1] CLOSE UNIT 3 BKR 1001, using 0-HS-280-003/1001.
[21.2] ENSURE CLOSED UNIT 3 BKR 1001.
7
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Standard( step 6 continued):
When cued synchroscope indicator at 5 minutes prior to 12 o'clock, SIMULATED PLACING 3-BKR 1001, 0-HS-252-003/1001 in the CLOSE position.
NOTE: IT WOULD ASSIST THE EXAMINEE IF THE EVALUATOR WOULD USE HIS FINGER TO DEMONSTRATE INDICATOR POSITION ON THE SYNCHROSCOPE AS THE READINGS ARE ENUNCIATED.
CUE: THE SYNCHROSCOPE INDICATOR IS AT 30 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 15 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 5 MINUTES BEFORE THE 12 O'CLOCK POSITION.
CUE: [WHEN CLOSED] UNIT 3 BREAKER 1001 BREAKER POSITION INDICATING LAMP CHANGED FROM ILLUMINATED GREEN TO ILLUMINATED RED.
Step 7:
[21.3] OPEN the UNIT 3)BKR 1002, using 0-HS-280-003/1002.                Critical Step End of Critical Step(s)                                                SAT Standard:                                                                UNSAT SIMULATED UNIT 3 BKR 1002, 0-HS-282-003/1002in the OPEN            N/A position.
CUE: UNIT 3 BKR 1002, 0-HS-282-003/1002 IS IN THE OPEN POSITION WITH RED LIGHT ILLUMINATED.
NOTE: DO NOT ALLOW THE EXAMINEE TO OPERATE THE AMMETER SELECTOR SWITCH FOR THE FOLLOWING STEP.
Step 8:
SAT
[22] CHECK generator is loaded by observing UNIT 3 MMG GENERATOR amps, 3-II-252-02C/1AMR L2 rise, "N" should be UNSAT approximately the difference of L1& L2 (UNIT 3 MMG GENERATOR amps, 3-HS-252-02CH positions 1, 2, & 3 are respective to L1, L2 & N).
N/A 8
Job Performance Measure (JPM)
STEP / STANDARD                                                          SAT / UNSAT Standard:
CHECKED amp indicators L1 MINUS L2 approximately equals n.
Cue: L1, L2, N AMPS INDICATIONS HAVE RISEN and L1-L2 = N.
Note: Selector Switch positions are labeled as follows: Position 1 is L1, position 2 is L2 and Position 3 is N.
Step 9:
[23] ENSURE OPEN UNIT 3 BKR 1003, 0-HS-280-003/1003                      SAT Standard:                                                                UNSAT VERIFIED ILLUMINATED GREEN position indicating light above 0- N/A HS-282-003/1003.
Cue: Unit 3 Breaker 1003 0-HS-280-003/1003 Position Indicating Lamp changed from illuminated RED to illuminated GREEN.
Step 10:
[24] On Unit 2 Unit Preferred MMG Set Local Control Panel, ENSURE OPEN the following fused disconnect switches:
* BACKUP SOURCE TO BAT BD 1 BKR 1003, 1-FUDS-280-001/1003 SAT
* BACKUP SOURCE TO BAT BD 3 BKR 1003, 3-FUDS-280-UNSAT 003/1003 N/A Standard:
At Unit 2 Unit Preferred MMG Set Local Control Panel VERIFIED 1-FUDS-280-001/1003 AND 3-FUDS-280-003/1003 in the OPEN POSITION.
Cue: 1-FUDS-280-001/1003 and 3-FUDS-280-003/1003 are in the OPEN position.
9
Job Performance Measure (JPM)
STEP / STANDARD                                                      SAT / UNSAT Step 11:
[25] On Unit 3 Unit Preferred MMG Set Local Control Panel, ENSURE the BACKUP SOURCE TO BAT BD 2 BKR 1003,                        SAT 2-FUDS-280-002/1003 fused disconnect switch is open:
UNSAT Standard:
N/A On Unit 3 Unit Preferred MMG Set Local Control Panel, VERIFIED 2-FUDS-280-002/1003 in the OPEN position.
Cue: 2-FUDS-280-002/1003 is in the OPEN position.
Step 12:
[26] On Battery Board 2:
PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH                  SAT SS-7, 1-HS-252-03/SS-7 in OFF.
UNSAT Standard:
N/A SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 1-HS-252-03/SS-7 in the OFF position.
Cue: UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 1-HS-252-03/SS-7 is in the OFF position.
Step 13:
[27] On Battery Board 2:
Critical Step DEPRESS UNIT 3 MMG AC MOTOR START, 3-HS-252-02AD to return SAT to Normal AC power from DC drive.
UNSAT Standard:
N/A SIMULATED DEPRESSING and RELEASING UNIT 3 MMG AC MOTOR START , 3-HS-252-02AD pushbutton.
Cue: [The AC motor Breaker Position Indicating Lamp changed from illuminated GREEN to illuminated RED. State Another Operator will continue with procedure and this will end the task.
STOP TIME:
10
Job Performance Measure (JPM)
Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
You are an Operator on Unit 3.
* The Reactor is in cold shutdown
* The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
* Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.
INITIATING CUES:
The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16].
NOTE: PERFORMER WILL NEED GGMKA KEY.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
11}}

Latest revision as of 06:01, 5 February 2020

Initial Exam 2015-302 Draft Sim In-plant JPMs
ML16049A071
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/18/2016
From:
Division of Reactor Safety II
To:
Tennessee Valley Authority
References
Download: ML16049A071 (226)


Text

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER: 80A U2 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS: RO: 3.2 SRO: 3.3 201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL K/A No. &STATEMENT: CONTROL SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 1 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: __80A__

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to respond to a Control Rod Drift In per 2-AOI-85-5.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: 2-AOI-85-5, 2-AOI-100-1 VALIDATIONTIME: 18 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 05/27/10 All Initial issue Incorrect task number; changed to U-085-AB-05:

1 09/01/15 1 Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 280

  • Reset IC 28 or Exam IC if written in above
  • Run schedule file:NRC JPM A U2 -Control Rod Drift In
  • Verify all triggers and overrides are correct
  • Place the simulator in RUN to ensure stable conditions Console
  • Start Rod Display on RWM Screen Operator Instructions
  • Provide Initial Rod Data Sheet -PRLOG
  • When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02-31 into the core
  • When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02-31 into 1 NA 35 sec NA core rd07r2223 Drifts rod 22-23 into 2 NA 10 sec NA core rd07r3031 Drifts rod 30-31 into 2 NA 25 sec NA core rd07r4635 Drifts rod 46-35 into 2 NA 20 sec NA core rd07r2619 Drifts rod 26-19 into 2 NA 30 sec NA core rd07r3027 Drifts rod 30-27 into 2 NA 18 sec NA core rd07r5423 Drifts rod 54-23 into 2 NA 23 sec NA core rd07r2255 Drifts rod 22-55 into 2 NA 28 sec NA core 4

Job Performance Measure (JPM)

Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): NRC JPM A U2 -Control Rod Drift In 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is at 100% power INITIATING CUES:

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

6

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

NOTE

1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.

CAUTIONS

1) Any mispositioned control rod events will be dispositioned by following the direction contained within 2-AOI-85-7.
2) If a control rod moves unexpectedly one notch beyond its intended Critical Step position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position. SAT
3) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6 UNSAT may be required.

N/A 7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40.

[2] OBSERVE the following for selected control rod:

  • CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
  • CHECK white light on the Full Core Display is ILLUMINATED.
  • CHECK Rod Out Permit light is ILLUMINATED.

Standard:

Selects a withdrawn control rod Note to Examiner: May select any partially withdrawn control rod in any order 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 2:

[3] INSERT control rod one notch by performing the following:

Critical Step

[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN andRELEASE. SAT

[3.2] OBSERVE control rod settles into the desired position UNSAT andROD SETTLE light extinguishes.

N/A Standard:

Inserts withdrawn control rod one notch Step 3:

[4] WITHDRAW selected control rod one notch by performing the following: Critical Step

[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD OUT NOTCHand RELEASE. SAT

[4.2] OBSERVE control rod settles into the desired position and UNSAT ROD SETTLE light extinguishes.

N/A Standard:

Withdraws withdrawn control rod one notch Step 4:

[5] DOCUMENT completion of control rod test as follows:

[5.1] PERFORMER

  • INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the SAT control rodjust exercised to document proper movement and CRD latching. UNSAT

[5.2] Concurrent Verifier (CV) N/A

  • ENSURE rod inserted and returned to its original position.
  • INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Standard:

Initials Attachment 1 for exercised control rod and continues to exercise rods.

Note to Examiner:

  • When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02-31 Drift In Note to Simulator Booth Operator:

Step 5:

Performer recognizes control rod 02-31 drift in and responds per 2-AOI-85-5.

[2] IF a Control Rod is moving from its intended position without Critical Step operator actions, THEN INSERT the Control Rod to position 00 using CONTINUOUS IN. (Otherwise N/A) SAT

[3] IF a Control Rod Block occurs during rod insertion due to Rod UNSAT Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above.

(Otherwise N/A) N/A Standard:

Responds per 2-AOI-85-5 and inserts control rod 02-31 to full in position as indicated by position 00 indication.

CUE: When report to US, state Respond per 2-AOI-85-5, Control Rod Drift In.

Step 6:

[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod SAT pattern.

UNSAT Standard:

Candidate notifies Reactor Engineer to Evaluate Core N/A Thermal limits and Preconditioning Limits for the current Control Rod Pattern Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

[5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,

  • THEN MANUALLY SCRAM Reactor and enter 2-AOI-100-1. SAT

[6] CHECK Thermal Limits on ICS (RUNMON). UNSAT Note to NRC Examiner: Step [6] performed by Reactor N/A Engineering.

Standard:

Reviews step and asks for guidance from US or RE CUE: As Shift Manager, state RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.

Student will continue with Control Rod Exercise.

Step 8:

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40. Critical Step

[2] OBSERVE the following for selected control rod: SAT

  • CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED. UNSAT
  • CHECK white light on the Full Core Display is ILLUMINATED.
  • CHECK Rod Out Permit light is ILLUMINATED. N/A Standard:

Selects a withdrawn control rod 10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 9:

[3] INSERT control rod one notch by performing the following:

Critical Step

[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN SAT andRELEASE.

UNSAT

[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

N/A Standard:

Inserts withdrawn control rod one notch Step 10:

[4] WITHDRAW selected control rod one notch by performing the Critical Step following:

[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD SAT OUT NOTCHand RELEASE.

UNSAT

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

N/A Standard:

Withdraws withdrawn control rod one notch Note to Examiner:

When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:

Multiple Control Rods Drifting In Critical Step Standard:

Recognizes Multiple Control Rods Drift into the Core and Manually SAT Scrams the Reactor per 2-AOI-85-5.

UNSAT

  • Depresses both SCRAM Pushbuttons
  • Places mode switch in shutdown N/A
  • Verifies All Rods in 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 11 continued:

  • Performs a Scram Announcement Critical Step o Rx Mode Switch Position: Shutdown o Rod Position: All Full In SAT o Reactor Water Level ____ & Trend ___

o Reactor Pressure ____ & Trend ___ UNSAT o MSIV Position: OPEN o Rx Power: <5% N/A Termination Criteria: REPEAT BACK SCRAM REPORT THEN STATE, THIS COMPLETES THE JPM. THAT WILL BE ALL FOR NOW, ANOTHER OPERATOR WILL CONTINUE IN 2-AOI-100-1.

STOP TIME:

12

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is at 100% power INITIATING CUES:

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

13

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER: 80A U3 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS: RO: 3.2 SRO: 3.3 201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM ; and (b) based on K/A No. &STATEMENT:

those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

Rod Drift Alarm RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 1 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _80A U3_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to respond to a Control Rod Drift In per 3-AOI-85-5.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: 3-AOI-85-5, 3-AOI-100-1 VALIDATIONTIME:

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 05/27/10 All Initial issue Incorrect task number; changed to U-085-AB-05:

1 05/11/15 1 Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 280

  • Reset IC 28 or Exam IC if written in above
  • Run schedule file: NRC JPM A U3 -Control Rod Drift In
  • Verify all triggers and overrides are correct
  • Place the simulator in RUN to ensure stable conditions Console Operator
  • Start Rod Display on RWM Screen Instructions
  • Provide Initial Rod Data Sheet -PRLOG
  • When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02-31 into the core
  • When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02-31 into 1 NA 35 sec NA core rd07r2223 Drifts rod 22-23 into 2 NA 10 sec NA core rd07r3031 Drifts rod 30-31 into 2 NA 25 sec NA core rd07r4635 Drifts rod 46-35 into 2 NA 20 sec NA core rd07r2619 Drifts rod 26-19 into 2 NA 30 sec NA core rd07r3027 Drifts rod 30-27 into 2 NA 18 sec NA core rd07r5423 Drifts rod 54-23 into 2 NA 23 sec NA core rd07r2255 Drifts rod 22-55 into 2 NA 28 sec NA core 4

Job Performance Measure (JPM)

Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): NRC JPM A U3 -Control Rod Drift In 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is at 100% power INITIATING CUES:

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

6

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

NOTE

1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.

CAUTIONS

3) Any mispositioned control rod events will be dispositioned by following the direction contained within 3-AOI-85-7.
4) If a control rod moves unexpectedly one notch beyond its intended Critical Step position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position. SAT
5) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6 UNSAT may be required.

N/A 7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 3-XS-85-40.

[2] OBSERVE the following for selected control rod:

  • CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
  • CHECK white light on the Full Core Display is ILLUMINATED.
  • CHECK Rod Out Permit light is ILLUMINATED.

Standard:

Selects a withdrawn control rod Note to Examiner: May select any partially withdrawn control rod in any order 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 2:

[3] INSERT control rod one notch by performing the following:

Critical Step

[3.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD IN andRELEASE. SAT

[3.2] OBSERVE control rod settles into the desired position UNSAT andROD SETTLE light extinguishes.

N/A Standard:

Inserts withdrawn control rod one notch Step 3:

[4] WITHDRAW selected control rod one notch by performing the following: Critical Step

[4.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD OUT NOTCHand RELEASE. SAT

[4.2] OBSERVE control rod settles into the desired position and UNSAT ROD SETTLE light extinguishes.

N/A Standard:

Withdraws withdrawn control rod one notch Step 4:

[5] DOCUMENT completion of control rod test as follows:

[5.1] PERFORMER

  • INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the SAT control rodjust exercised to document proper movement and CRD latching. UNSAT

[5.2] Concurrent Verifier (CV) N/A

  • ENSURE rod inserted and returned to its original position.
  • INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Standard:

Initials Attachment 1 for exercised control rod and continues to exercise rods.

Note to Examiner:

  • When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02-31 Drift In Note to Simulator Booth Operator:

Step 5:

Performer recognizes control rod 02-31 drift in and responds per 3-AOI-85-5.

[2] IF a Control Rod is moving from its intended position without Critical Step operator actions, THEN INSERT the Control Rod to position 00 using CONTINUOUS IN. (Otherwise N/A) SAT

[3] IF a Control Rod Block occurs during rod insertion due to Rod UNSAT Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above.

(Otherwise N/A) N/A Standard:

Responds per 3-AOI-85-5 and inserts control rod 02-31 to full in position as indicated by position 00 indication.

CUE: When report to US, state Respond per 3-AOI-85-5, Control Rod Drift In.

Step 6:

[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod SAT pattern.

UNSAT Standard:

Candidate notifies Reactor Engineer to Evaluate Core N/A Thermal limits and Preconditioning Limits for the current Control Rod Pattern Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

[5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,

  • THEN MANUALLY SCRAM Reactor and enter 2-AOI-100-1. SAT

[6] CHECK Thermal Limits on ICS (RUNMON). UNSAT Note to NRC Examiner: Step [6] performed by Reactor N/A Engineering.

Standard:

Reviews step and asks for guidance from US or RE CUE: As Shift Manager, state RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.

Student will continue with Control Rod Exercise.

Step 8:

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40. Critical Step

[2] OBSERVE the following for selected control rod: SAT

  • CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED. UNSAT
  • CHECK white light on the Full Core Display is ILLUMINATED.
  • CHECK Rod Out Permit light is ILLUMINATED. N/A Standard:

Selects a withdrawn control rod 10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 9:

[3] INSERT control rod one notch by performing the following:

Critical Step

[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN SAT andRELEASE.

UNSAT

[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

N/A Standard:

Inserts withdrawn control rod one notch Step 10:

[4] WITHDRAW selected control rod one notch by performing the Critical Step following:

[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD SAT OUT NOTCHand RELEASE.

UNSAT

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

N/A Standard:

Withdraws withdrawn control rod one notch Note to Examiner:

When satisfied with the number of rod manipulations direct Simulator BoothOperator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:

Multiple Control Rods Drifting In Standard: Critical Step Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 3-AOI-85-5. SAT

  • Depresses both SCRAM Pushbuttons UNSAT
  • Places mode switch in shutdown
  • Verifies All Rods in N/A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 11 continued:

Critical Step

  • Performs a Scram Announcement o Rx Mode Switch Position: Shutdown SAT o Rod Position: All Full In o Reactor Water Level ____ & Trend ___ UNSAT o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN N/A o Rx Power: <5%

Termination Criteria: repeat back scram report then state, this completes the JPM. That will be all for now, another operator will continue in 2-AOI-100-1 STOP TIME:

12

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is at 100% power INITIATING CUES:

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

13

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: EHC Auto Cooldown JPM NUMBER: 276 U2 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO U-000-NO-32 Perform Reactor Cooldown TASK NUMBER / TASK TITLE(S): U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS: RO: 3.9 SRO: 3.9 239001Main and Reheat Steam System: A4.09 Ability to K/A No. &STATEMENT: manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 4 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _276 U2 RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 2-OI-47 VALIDATIONTIME: 4 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 06/19/12 All Initial issue 1 07/22/15 All General revision & re-format 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 40 Exam IC 281

  • Reset IC 40 or Exam IC if written in above
  • Ensure RFP is in Manual on PDS controller with plant parameters stable.

Console Operator Instructions Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): None 4

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES:

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 2-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].

5

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1: SAT

[6] VERIFY EHC is in Pressure Control using 2-HS-47-204. UNSAT N/A Standard:

Observes light on for EHC Pressure Control on 2-HS-47-204.

Step 2:

[7] On the EHC Work Station on Panel 9-7:

[7.1] SELECT Main Menu from the toolbar at bottom of the screen. Critical Step

[7.2] SELECT Log In on Display Screen and ENTER OPS SAT for name and OPS for Password.

UNSAT

[7.3] SELECT Auto Cooldown from list of function on the screen. N/A Standard:

Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.

Step 3:

[8] On the Auto Cooldown Display Screen CHECK the following are displayed.

SAT

  • Turbine Tripped or All Valves Closed - indicates Reset.
  • Rx Press Ctrl - indicates Reset. UNSAT Standard: N/A
  • Candidate checks the Turbine Tripped or All Valves Closed

-indicates Reset.

  • Candidate checks Rx Press Ctrl - indicates Reset.

6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 4:

[9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:

[9.1] SELECT the block above the FINAL PRESSURE Critical Step TARGET.

SAT

[9.2] ENTER the desired pressure using the Display Screen or Key Board.

UNSAT

[9.3] WHEN desired Pressure is entered SELECT OK N/A Standard:

Candidate sets the desired final target pressure of 20psig (given in initial conditions).

Step 5:

[10] WHEN Cooldown is ready to commence, THEN

[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)

Critical Step

[10.2] DEPRESS the START button on the Auto Cooldown Display Screen. SAT

[11] WHEN Caution Are You Sure You Want to Initiate Auto UNSAT Cooldown? appears N/A SELECT Yes Screen Button to start the cooldown.

Standard:

Candidate depresses START and acknowledges YES to commence auto cooldown.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 6:

[12] CHECK the following:

  • EHC PRESSURE SETPOINT, 2-PI-47-162, is lowering.
  • EHC AUTO COOLDOWN displays IN PROGRESS SAT Standard: UNSAT Candidate monitors EHC pressure and the auto cooldown is IN N/A PROGRESS.

Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig.

Step 7:

[13] IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.

[13.1] SELECT the block above the FINAL PRESSURE TARGET Critical Step

[13.2] ENTER the desired pressure using the Display SAT Screen or Key Board.

UNSAT

[13.3] WHEN desired Pressure is entered SELECT OK N/A Standard:

Candidate adjusts FINAL PRESSURE TARGET to 100 psig and recommences the auto cooldown.

Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.

STOP TIME:

8

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES:

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 2-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].

9

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: EHC Auto Cooldown JPM NUMBER: 276 U3 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO U-000-NO-32 Perform Reactor Cooldown TASK NUMBER / TASK TITLE(S): U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS: RO: 3.9 SRO: 3.9 239001Main and Reheat Steam System: A4.09 Ability to K/A No. &STATEMENT: manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 4 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _276 U3_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 3-OI-47 VALIDATIONTIME:

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 06/19/12 All Initial issue 1 07/22/15 All General revision & re-format 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 40 Exam IC 281

  • Reset IC 40 or Exam IC if written in above
  • Ensure RFP is in Manual on PDS controller with plant parameters stable.

Console Operator Instructions Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): None 4

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES:

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].

5

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

[6] VERIFY EHC is in Pressure Control using 3-HS-47-204. SAT UNSAT Standard:

N/A Observes light on for EHC Pressure Control on 3-HS-47-204.

Step 2:

[7] On the EHC Work Station on Panel 9-7:

[7.1] SELECT Main Menu from the toolbar at bottom of the screen. Critical Step

[7.2] SELECT Log In on Display Screen and ENTER OPS SAT for name and OPS for Password.

UNSAT

[7.3] SELECT Auto Cooldown from list of function on the screen. N/A Standard:

Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.

Step 3:

[8] On the Auto Cooldown Display Screen CHECK the following are displayed.

SAT

  • Turbine Tripped or All Valves Closed - indicates Reset.
  • Rx Press Ctrl - indicates Reset. UNSAT Standard: N/A
  • Candidate checks the Turbine Tripped or All Valves Closed

-indicates Reset.

  • Candidate checks Rx Press Ctrl - indicates Reset.

6

Job Performance Measure (JPM)

Step 4:

[9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:

[9.1] SELECT the block above the FINAL PRESSURE Critical Step TARGET.

SAT

[9.2] ENTER the desired pressure using the Display Screen or Key Board.

UNSAT

[9.3] WHEN desired Pressure is entered SELECT OK N/A Standard:

Candidate sets the desired final target pressure of 20psig (given in initial conditions).

Step 5:

[10] WHEN Cooldown is ready to commence, THEN

[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)

Critical Step

[10.2] DEPRESS the START button on the Auto Cooldown Display Screen. SAT

[11] WHEN Caution Are You Sure You Want to Initiate Auto UNSAT Cooldown? appears N/A SELECT Yes Screen Button to start the cooldown.

Standard:

Candidate depresses START and acknowledges YES to commence auto cooldown.

7

Job Performance Measure (JPM)

Step 6:

[12] CHECK the following:

  • EHC PRESSURE SETPOINT, 3-PI-47-162, is lowering.
  • EHC AUTO COOLDOWN displays IN PROGRESS SAT Standard: UNSAT Candidate monitors EHC pressure and the auto cooldown is IN N/A PROGRESS.

Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig.

Step 7:

[13] IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.

[13.1] SELECT the block above the FINAL PRESSURE TARGET Critical Step

[13.2] ENTER the desired pressure using the Display SAT Screen or Key Board.

UNSAT

[13.3] WHEN desired Pressure is entered SELECT OK N/A Standard:

Candidate adjusts FINAL PRESSURE TARGET to 100 psig and recommences the auto cooldown.

Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.

STOP TIME:

8

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES:

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].

9

Job Performance Measure (JPM)

LOSS OF REFERENCE APRM TO ROD BLOCK SITE: BFN JPM TITLE:

MONITOR JPM NUMBER: 672A U2 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-085-AL-03 RESPOND TO CONTROL ROD TASK NUMBER / TASK TITLE(S):

WITHDRAWL BLOCK K/A RATINGS: RO: 3.1 SRO: 3.3 215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures K/A No. &STATEMENT:

to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR-3,4,5 RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 7 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _672A U2_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 2-OI-85, 2-OI-92B, 2-ARP-9-5A, 2-SR-3.1.3.5(A)

VALIDATIONTIME: 16 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 09/01/15 All Initial issue 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 39 Exam IC 282

  • Reset to IC-39 to ~ 30% Reactor Power
  • Open Schedule File: NRC JPM C U2 -RBM APRM Fail Console Operator Downscale.sch Instructions
  • Open Event File: NRC JPM C U2 -RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-33-C NM07L4025B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-25-B NM07L4033D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-33-D NM07L0817B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-17-B NM07L4017B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-17-B NM07L4041D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-41-D NM07L4049B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-49-B NM07L4057B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-57-B NM07L4817C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-17-C NM07L4825C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-25-C NM07L4833A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-33-A NM07L4841A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-41-A NM07L4849C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-49-C NM07L0825B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-25-B 4

Job Performance Measure (JPM)

NM07L0833D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-33-D NM07L0841D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-41-D NM07L0849B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-49-B NM07L2409B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-09-B NM07L2417D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-17-D NM07L2425D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-25-D NM07L2433B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-33-B NM07L2449D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-49-D NM07L2457D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-57-D NM07L1617C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-17-C NM07L1625C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-25-C NM07L1633A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-33-A NM07L1641A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-41-A NM07L1649C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-49-C NM07L1657C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-57-C NM07L1609A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-09-A NM07L3209C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-09-C NM07L3217A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-17-A NM07L3225A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-25-A NM07L3249A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-49-A NM07L3257A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-57-A NM07L4009D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-09-D NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A 5

Job Performance Measure (JPM)

FAILURE 48-09-A NM07L5617D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-17-D NM07L5633B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-33-B NM07L5641B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-41-B NM07L3241C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-41-C Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1) Control Rod 46-31 15 0 N/A N/A GREEN INDICATION Schedule File(s):

Event File: NRC JPM C U2 -RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>

Schedule File: NRC JPM C U2 -RBM APRM Fail Downscale.sch 6

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is at 30% power
  • Startup Sequence Control Rod Movement Data Sheet 2-SR-3.1.3.5(A) completed through group 57.

The US has directed you to raise Reactor Power to 40% per 2-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14-31.

7

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

Step 2:

[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT

  • THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS UNSAT 23A. (Otherwise N/A)

N/A Standard:

Determines that step in N/A Step 3:

[3] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 4:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 5:

[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 6:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT

  • THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS UNSAT 23A. (Otherwise N/A)

N/A Standard:

Determines that step in N/A Step 8:

[3] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 9:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing 10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 10:

[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 11:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

Step 12:

[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT

  • THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS UNSAT 23A. (Otherwise N/A)

N/A Standard:

Determines that step in N/A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 13:

[3] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 14:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 15:

[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 12

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Note to Examiner: This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.

Step 16:

APRM Sensor/Trip Point:

DOWNSCALE/

APRM Downscale: <= 5%

OPRM INOP OPRM Inop: Less than 23 operable cells 4

Sensor Location:

Control Room Panel 2-9-14.

Probable Cause:

A. Unbypassed APRM channel at or below sensor set point.

B. SI or SR in progress.

C. Unit shutdown (Mode 3 or 4). Critical Step D. Failed sensor.

SAT Automatic Action: UNSAT A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)

N/A Operator Action:

A. DETERMINE which APRM/OPRM channel is downscale/inop.

B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 2-OI-92B.

13

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 16(continued)

CONTROL ROD Sensor/Trip Point:

WITHDRAWAL Relays: 3A-K1 Nuclear Instrumentation BLOCK 3A-K2 Refuel Equipment in Use High Level in Scram Discharge 7 Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)

Sensor Location:

Panel 2-9-28 Elevation 593' Aux Instr Room Probable Cause:

A. One or more sensors at or above set point.

B. Malfunction of sensor.

C. Control rod drop accident Automatic Action:

Rod withdrawal block Operator Action:

A. DETERMINE initiating condition from corresponding rod withdrawal block alarm(s) and REFER TO operator action for alarm(s).

Standard:

Reference 2-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 2-OI-92B CUE: Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B.

14

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 17:

NOTES

1) Only one APRM/OPRM in each trip system can be bypassed at a time.
2) All operations are performed on Panel 2-9-5 unless specifically stated otherwise.
3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9-14 Voters are required to be illuminated prior to testing, operating, or working on that channel. SAT UNSAT 6.1 Bypassing APRM/OPRM Channel N/A CAUTION

[QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures.

[ISE-HPS-92-RO1]

[1] REVIEW all precautions and limitations. REFER TO Section 3.0.

Standard:

Demonstrates reviewing precautions and limitations section 3.0.

Step 18:

Critical Step

[2] PLACE APRM BYPASS, 2-HS-92-7B/S3, to desired channel to be bypassed. SAT Standard: UNSAT PLACE APRM BYPASS, 2-HS-92-7B/S3, to APRM CH 2 N/A 15

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 19:

[3] CHECK BLUE BYPASSED lights illuminated on Panel 2-9-14 Voters. SAT Standard: UNSAT Observes BLUE BYPASS light illuminated on Panel 2-9-14 for N/A APRM CH 2.

Step 20:

[4] VERIFY white bypass light on Panel 2-9-5 is illuminated. SAT Standard: UNSAT Observes WHITE BYPASS light illuminated on Panel 2-9-5. N/A Note to Examiner: If needed, cue student to proceed with actions required to continue rod movements. Student may continue at step 21 or 24.

Step 21:

6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)

[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN SAT PERFORM the following at the Unit Supervisors discretion to UNSAT REINITIALIZE the RBM:

N/A

[6.1] PLACE CRD POWER, 2-HS-85-46 in the OFF position to deselect the Control Rod.

Standard:

CRD POWER, 2-HS-85-46 in the OFF position.

16

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 22:

SAT

[6.2] PLACE CRD POWER, 2-HS-85-46, in the ON position.

UNSAT Standard:

N/A PLACED CRD POWER, 2-HS-85-46, in the ON position.

Step 23:

[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and SAT PERFORM applicable section for Control Rod withdrawal.

UNSAT Standard:

N/A Continues with Control Rod Movement CUE: Proceed with Control Rod Movement.

Step 24:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

17

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 25:

[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT

  • THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS UNSAT 23A. (Otherwise N/A)

N/A Standard:

Determines that step in N/A Step 26:

[3] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 27:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing 18

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 28:

[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, state End of Task STOP TIME:

19

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is at 30% power
  • Startup Sequence Control Rod Movement Data Sheet 2-SR-3.1.3.5(A) completed through group 57.

INITIATING CUES:

The US has directed you to raise Reactor Power to 40% per 2-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14-31.

20

Job Performance Measure (JPM)

LOSS OF REFERENCE APRM TO ROD BLOCK SITE: BFN JPM TITLE:

MONITOR JPM NUMBER: 672A U3 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-085-AL-03 RESPOND TO CONTROL ROD TASK NUMBER / TASK TITLE(S):

WITHDRAWL BLOCK K/A RATINGS: RO: 3.1 SRO: 3.3 215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures K/A No. &STATEMENT:

to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR-3,4,5 RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 7 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _672A U3_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 3-OI-85, 3-OI-92B, 3-ARP-9-5A, 3-SR-3.1.3.5(A)

VALIDATIONTIME:

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 04/30/15 All Initial issue 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 39 Exam IC 282

  • Reset IC-39to ~ 30% Reactor Power
  • Open Schedule File: NRC JPM C U3 -RBM APRM Fail Console Operator Downscale.sch Instructions
  • Open Event File: NRC JPM C U3 -RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-33-C NM07L4025B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-25-B NM07L4033D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-33-D NM07L0817B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-17-B NM07L4017B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-17-B NM07L4041D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-41-D NM07L4049B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-49-B NM07L4057B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-57-B NM07L4817C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-17-C NM07L4825C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-25-C NM07L4833A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-33-A NM07L4841A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-41-A NM07L4849C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-49-C NM07L0825B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-25-B 4

Job Performance Measure (JPM)

NM07L0833D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-33-D NM07L0841D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-41-D NM07L0849B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-49-B NM07L2409B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-09-B NM07L2417D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-17-D NM07L2425D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-25-D NM07L2433B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-33-B NM07L2449D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-49-D NM07L2457D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-57-D NM07L1617C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-17-C NM07L1625C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-25-C NM07L1633A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-33-A NM07L1641A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-41-A NM07L1649C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-49-C NM07L1657C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-57-C NM07L1609A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-09-A NM07L3209C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-09-C NM07L3217A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-17-A NM07L3225A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-25-A NM07L3249A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-49-A NM07L3257A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-57-A NM07L4009D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-09-D NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A 5

Job Performance Measure (JPM)

FAILURE 48-09-A NM07L5617D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-17-D NM07L5633B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-33-B NM07L5641B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-41-B NM07L3241C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-41-C Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1) Control Rod 46-31 15 0 N/A N/A GREEN INDICATION Schedule File(s):

Event File: NRC JPM C U3 -RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>

Schedule File: NRC JPM C U3 -RBM APRM Fail Downscale.sch 6

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is at 30% power
  • Startup Sequence Control Rod Movement Data Sheet 3-SR-3.1.3.5(A) completed through group 58.

INITIATING CUES:

The US has directed you to raise Reactor Power to 40% per 3-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22-39.

7

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

Step 2:

[2] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 3:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 4:

[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 5:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

Step 6:

[2] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 8:

[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 9:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 10:

[2] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 11:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 12:

[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Note to Examiner: This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.

Step 13:

APRM Sensor/Trip Point:

DOWNSCALE/

APRM Downscale: <= 5%

OPRM INOP OPRM Inop: Less than 23 operable cells 4

Sensor Location:

Control Room Panel 3-9-14.

Probable Cause:

A. Unbypassed APRM channel at or below sensor set point.

B. SI or SR in progress.

C. Unit shutdown (Mode 3 or 4). Critical Step D. Failed sensor.

SAT Automatic Action: UNSAT A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)

N/A Operator Action:

A. DETERMINE which APRM/OPRM channel is downscale/inop.

B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 3-OI-92B.

12

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 13(continued)

CONTROL ROD Sensor/Trip Point:

WITHDRAWAL Relays:3A-K1 Nuclear Instrumentation BLOCK 7 3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)

Sensor Location:

Panel 3-9-28 Elevation 593' Aux Instr Room Probable Cause:

A. One or more sensors at or above set point.

B. Malfunction of sensor.

C. Control rod drop accident Automatic Action:

Rod withdrawal block Operator Action:

A. DETERMINE initiating condition from corresponding rod withdrawalblock alarm(s) and REFER TO operator action for alarm(s).

Standard:

Reference 3-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 3-OI-92B CUE:Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B.

13

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 14:

NOTES

1) Only one APRM/OPRM in each trip system can be bypassed at a time.
2) All operations are performed on Panel 3-9-5 unless specifically stated otherwise.
3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9-14 Voters are required to be illuminated prior to testing, operating, or working on that channel. SAT UNSAT 6.1 Bypassing APRM/OPRM Channel N/A CAUTION

[QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures.

[ISE-HPS-92-RO1]

[1] REVIEW all precautions and limitations. REFER TO Section 3.0.

Standard:

Demonstrates reviewing precautions and limitations section 3.0.

CUE: If asked per note 2 above, Panel 9-14 Voter BLUE LIGHTS are extinguished.

Step 15:

Critical Step

[2] PLACE APRM BYPASS, 3-HS-92-7B/S3, to desired channel to be bypassed. SAT Standard: UNSAT PLACE APRM BYPASS, 3-HS-92-7B/S3, to APRM CH 2 N/A 14

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 16:

[3] CHECK BLUE BYPASSED lights illuminated on Panel 3-9-14 Voters. SAT Standard: UNSAT Simulates observing BLUE BYPASS light illuminated on Panel 3- N/A 9-14 for APRM CH 2.

Cue: Blue Light is illuminated on Panel 3-9-14 for APRM CH 2.

Step 17:

[4] VERIFY white bypass light on Panel 3-9-5 is illuminated. SAT Standard: UNSAT Observes WHITE BYPASS light illuminated on Panel 3-9-5. N/A Note to NRC Examiner: If needed, cue student to proceed with actions required to continue rod movements.Student may continue at step 18 or 21.

Step 18:

6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)

[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN SAT PERFORM the following at the Unit Supervisors discretion to UNSAT REINITIALIZE the RBM:

N/A

[6.1] PLACE CRD POWER, 3-HS-85-46 in the OFF position to deselect the Control Rod.

Standard:

CRD POWER, 3-HS-85-46 in the OFF position.

15

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 19:

SAT

[6.2] PLACE CRD POWER, 3-HS-85-46, in the ON position.

UNSAT Standard:

N/A PLACED CRD POWER, 3-HS-85-46, in the ON position.

Step 20:

[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and SAT PERFORM applicable section for Control Rod withdrawal.

UNSAT Standard:

N/A Continues with Control Rod Movement Cue:If asked,Proceed with Control Rod Movement.

Step 21:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

16

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 22:

[2] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 23:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 24:

[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, state End of Task STOP TIME:

17

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is at 30% power
  • Startup Sequence Control Rod Movement Data Sheet 3-SR-3.1.3.5(A) completed through group 58.

INITIATING CUES:

The US has directed you to raise Reactor Power to 40% per 3-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22-39.

18

Job Performance Measure (JPM) 2-EOI APPENDIX-6E INJECTION SUBSYSTEM LINEUP SITE: BFN JPM TITLE:

CS SYSTEM II JPM NUMBER: 257A U2 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-35/ Lineup Injection Subsystem-Core TASK NUMBER / TASK TITLE(S): Spray Loop I(II) in Accordance with EOI Appendix 6D(E)

K/A RATINGS: RO: 3.9 SRO: 3.9 209001 Low Pressure Core Spray SystemA4.08 Ability to K/A No. &STATEMENT: manually operate and/or monitor in thecontrol room: Reactor water level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 2 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _257A U2_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 2-EOI APPENDIX-6E VALIDATIONTIME: 8 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 12/06/10 All Initial issue 1 04/27/15 All General revision & re-format 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 283

1. Open Schedule File
2. Open Event File
3. Reset to IC-28and take out of freeze.
4. CLOSE 2-FCV-75-51 Console
5. OPEN 2-FCV-75-53 Operator
6. Man Scram Rx and place MS to SD.

Instructions

7. Open 6 ADS Valves.
8. Wait until various alarms with Supp Pool Temp High come in to save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK 15 75% 5 Yes INSIDE DRYWELL CS04A CORE SPRAY 15 N/A N/A Yes LOGIC POWER FAILURE DIV I CS04B CORE SPRAY 15 N/A N/A Yes LOGIC POWER FAILURE DIV II CS02B CS INBOARD 15 N/A N/A Yes INJECTION VALVE AUTO OPENING FAILURE (FCV 53)

RH06A RHR LOGIC POWER 15 N/A N/A Yes FAILURE DIV I RH06B RHR LOGIC POWER 15 N/A N/A Yes FAILURE DIV II RC01 RCIC TURBINE TRIP 15 N/A N/A Yes SYSTEM FAILURE HP04 HPCI STEAM 15 N/A N/A Yes SUPPLY VALVE AUTO OPENING FAILURE FW01A CONDENSATE 15 N/A 10 Yes PUMP TRIP 2A 4

Job Performance Measure (JPM)

FW01B CONDENSATE 15 N/A 10 Yes PUMP TRIP 2B FW01C CONDENSATE 15 N/A 10 Yes PUMP TRIP 2C Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U2 Core Spray Alt Inj.sch Event File(s): JPM 257A U2 Core Spray Alt Inj.evt 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is Shutdown
  • RPV Water Level is lowering slowly.
  • 1-EOI-1 has been entered and followed to RC-L6.

INITIATING CUES:

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above

(-)162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.

6

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

Location: Unit 2 Control Room Attachments: 1. NPSH Monitoring

[1] VERIFY OPEN the following valves:

SAT

  • 2-FCV-75-39, CORE SPRAY PUMP 2D SUPPR POOL SUCT N/A VLV Standard:

Verifies2-FCV-75-30 and 2-FCV-75-39 are open.

Step 2:

[1] (continued)VERIFY OPEN the following valves: Critical Step

N/A Recognizes 2-FCV-75-51 is closed and 2-FCV-75-53 is open, valve closes 2-FCV-75-53 and Opens 2-FCV-75-51.

Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI-75, Core Spray System line up.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

[2] VERIFY CLOSED 2-FCV-75-50, CORE SPRAY SYS II SAT TESTVALVE.

UNSAT Standard:

N/A Verifies 2-FCV-75-50 closed Step 4:

Critical Step

[3] VERIFY CS Pump 2B and/or 2D running.

SAT Standard:

UNSAT Starts Core Pumps 2B and/or 2D N/A (Only starting one pump is Critical, the second pump is optional).

Step 6:

[4] WHEN RPV pressure is below 450 psig, THEN Critical Step THROTTLE2-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, SAT as necessary to control injection at or below4000 gpm per pump.

UNSAT Standard:

N/A Verifies pressure < 450 psig and opens 2-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or

<8000 gpm for 2 pumps).

Step 7:

CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.

SAT

[5] MONITOR Core Spray Pump NPSH using Attachment 1.

UNSAT Standard:

Operator comparesCore Spray Pump flow rate with Suppression N/A Pool temperature and Suppression Pool pressure and Determined adequate NPSH.

Termination Criteria: Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.

STOP TIME:

8

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is Shutdown
  • RPV Water Level is lowering slowly.
  • 1-EOI-1 has been entered and followed to RC-L6.

INITIATING CUES:

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above 162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.

9

Job Performance Measure (JPM) 3-EOI APPENDIX-6E INJECTION SUBSYSTEM LINEUP SITE: BFN JPM TITLE:

CS SYSTEM II JPM NUMBER: 257A U3 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-35/ Lineup Injection Subsystem-Core TASK NUMBER / TASK TITLE(S): Spray Loop I(II) in Accordance with EOI Appendix 6D(E)

K/A RATINGS: RO: 3.9 SRO: 3.9 209001 Low Pressure Core Spray System A4.08 Ability to K/A No. &STATEMENT: manually operate and/or monitor in the control room: Reactor water level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 2 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _257A U3_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 3-EOI APPENDIX-6E VALIDATIONTIME: 5 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 12/06/10 All Initial issue 1 04/27/15 All General revision & re-format 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 283

1. Open Schedule File
2. Open Event File
3. Reset to IC-28 and take out of freeze.
4. CLOSE 2-FCV-75-51 Console
5. OPEN 2-FCV-75-53 Operator
6. Man Scram Rx and place MS to SD.

Instructions

7. Open 6 ADS Valves.
8. Wait until various alarms with Supp Pool Temp High come in to save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK 15 75% 5 Yes INSIDE DRYWELL CS04A CORE SPRAY 15 N/A N/A Yes LOGIC POWER FAILURE DIV I CS04B CORE SPRAY 15 N/A N/A Yes LOGIC POWER FAILURE DIV II CS02B CS INBOARD 15 N/A N/A Yes INJECTION VALVE AUTO OPENING FAILURE (FCV 53)

RH06A RHR LOGIC POWER 15 N/A N/A Yes FAILURE DIV I RH06B RHR LOGIC POWER 15 N/A N/A Yes FAILURE DIV II RC01 RCIC TURBINE TRIP 15 N/A N/A Yes SYSTEM FAILURE HP04 HPCI STEAM 15 N/A N/A Yes SUPPLY VALVE AUTO OPENING FAILURE FW01A CONDENSATE 15 N/A 10 Yes PUMP TRIP 3A 4

Job Performance Measure (JPM)

FW01B CONDENSATE 15 N/A 10 Yes PUMP TRIP 3B FW01C CONDENSATE 15 N/A 10 Yes PUMP TRIP 3C Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U3 Core Spray Alt Inj.sch Event File(s): JPM 257A U3 Core Spray Alt Inj.evt 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is Shutdown
  • RPV Water Level is lowering slowly.
  • 1-EOI-1 has been entered and followed to RC-L6.

INITIATING CUES:

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above

(-)162 inches (TAF) using Core Spray System II as directed by 3-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.

6

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

Location: Unit 3 Control Room Attachments: 1. NPSH Monitoring

[1] VERIFY OPEN the following valves:

SAT

  • 3-FCV-75-39, CORE SPRAY PUMP 3D SUPPR POOL SUCT N/A VLV Standard:

Verifies3-FCV-75-30 and 3-FCV-75-39 are open.

Step 2:

Critical Step

[1] (continued) VERIFY OPEN the following valves:

SAT UNSAT Standard:

N/A Recognizes 3-FCV-75-51 is closed and 3-FCV-75-53 is open, closes 3-FCV-75-53 and Opens 3-FCV-75-51.

Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI-75, Core Spray System line up.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

[2] VERIFY CLOSED 3-FCV-75-50, CORE SPRAY SYS II TEST SAT VALVE.

UNSAT Standard:

N/A Verifies 3-FCV-75-50 closed Step 4:

Critical Step

[3] VERIFY CS Pump 3B and/or 3D running.

SAT Standard:

UNSAT Starts Core Pumps 3B and/or 3D (Only starting one pump is N/A Critical, the second pump is optional).

Step 6:

[4] WHEN RPV pressure is below 450 psig, THEN Critical Step THROTTLE 3-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, SAT as necessary to control injection at or below4000 gpm per pump.

UNSAT Standard:

N/A Verifies pressure < 450 psig and opens 3-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or

<8000 gpm for 2 pumps).

Step 7:

CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.

SAT

[5] MONITOR Core Spray Pump NPSH using Attachment 1.

UNSAT Standard:

Operator compares Core Spray pump flow rate with Suppression N/A Pool temperature and Suppression Pool pressure and Determined adequate NPSH.

Termination Criteria: Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.

STOP TIME:

8

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is Shutdown
  • RPV Water Level is lowering slowly.
  • 1-EOI-1 has been entered and followed to RC-L6.

INITIATING CUES:

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level using Core Spray System II as directed by 3-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II. Directed level band is +2 to +51 inches.

9

Job Performance Measure (JPM) 2-EOI Appendix-11F Alternate RPV Pressure Control SITE: BFN JPM TITLE:

Systems: RFPT On Minimum Flow JPM NUMBER: 670A U2 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-58 Lineup Alternate RPV Pressure Control TASK NUMBER / TASK TITLE(S): Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS: RO: 3.6SRO: 3.6 239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with K/A No. &STATEMENT:

operating the MAIN ANDREHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION: None SAFETY FUNCTION: 3 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _670A U2_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to necessary to place one RFPT in pressure control as directed by 2-EOI Appendix-11F.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure: 2-EOI-APPENDIX-11F VERIFICATION TIME: 12 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 284 Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP 15 N/A 0 N/A BEARING LOW OIL PRESSURE tc03a-j Fail Bypass Valves 1 0% 0 N/A closed ad01e 20 SRV 1-31 stuck open 1 20% 0 N/A 20%

Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Initial Setup:

1. Reset to IC 28
2. Manually Scram RX
3. Trip 2A and 2B RFPT
4. Run Schedule File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
5. Insert Manual Trigger #1
6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
7. Verify Auto Trigger #15 is ACTIVE
8. Freeze simulator and save IC.

Schedule Files:

1. NRC JPM E U2-Alt RPV Press Control RFP Min Flow.sch
2. NRC JPM E U2-Alt RPV Press Control RFP Min Flow RFPT Trip.evt 3

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 09/01/15 All Initial issue 4

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 2C.

INITIATING CUES:

The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

5

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Step 1:

[1] IF BOTH of the following exist:

  • Emergency RPV Depressurization is required, AND
  • Group 1 Isolation Signal exists, THEN SAT EXIT this procedure and ENTER EOI Appendix 11H. UNSAT N/A Standard:

Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

Step 2:

SAT

[2] VERIFY MSIVs open.

UNSAT Standard:

N/A Verifies MSIVs OPEN 6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

[3] VERIFY Hotwell Pressure at or below -7 in. Hg. SAT Standard: UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

SAT

[4.1.1] At least one condensate pump running.

[4.1.2] At least one condensate booster pump running.

UNSAT

[4.1.3] Condensate System aligned to supply suction toRFPs.

N/A Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

Step 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to bestarted. SAT Standard: UNSAT Verifies main oil pump running for RFPT 2A N/A Step 6:

Critical Step

[4.3] VERIFY CLOSED 2-FCV-3-19, RFP 2ADISCHARGE VALVE.

SAT Standard:

UNSAT VERIFY CLOSED 2-FCV-3-19, RFP 2A DISCHARGE VALVE.

N/A 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

Critical Step

[4.4] DEPRESS 2-HS-46-8A RFPT 2A SPEED CONT RAISE/LOWER, and VERIFY amber lightis illuminated. SAT Standard: UNSAT Depresses 2-HS-46-8A N/A Step 8:

[4.5] DEPRESS 2-HS-3-124A, RFPT 2A TRIP RESET. Critical Step Standard: SAT Depresses 2-HS-3-124A and verifies the 2-Z1-1-123 LP Stop Valve and UNSAT 2-Z1-127 HP Stop Valve comes OPEN.

N/A Step 9:

Critical Step

[4.6] PLACE 2-HS-46-112A RFPT 2A START/LOCAL ENABLE, in START. SAT Standard: UNSAT Places 2-HS-46-112A in START N/A Note to Examiner:

RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:

Critical Step

[4.7] CHECK RFPT 2A speed increases to approximately 600 rpm.

SAT Standard:

UNSAT Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 2-EOI-APPENDIX-11F. N/A CUE:

US: Proceed as directed per 2-EOI-APPENDIX-11F.

AO: Reports an oil leak of ~5 gpm on RFPT A bearings.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 11:

[1] IF BOTH of the following exist:

  • Emergency RPV Depressurization is required, AND
  • Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER SAT EOI Appendix 11H.

UNSAT Standard: N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

Step 12:

[2] VERIFY MSIVs open. SAT Standard: UNSAT Verifies MSIVs OPEN N/A 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 13:

[3] VERIFY Hotwell Pressure at or below -7 in. Hg. SAT Standard: UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 14:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

SAT

[4.1.1] At least one condensate pump running.

[4.1.2] At least one condensate booster pump running.

UNSAT

[4.1.3] Condensate System aligned to supply suction toRFPs.

N/A Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

Step 15:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started. SAT Standard: UNSAT Verifies main oil pump running for RFPT 2B N/A Step 16:

Critical Step

[4.3] VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.

SAT Standard:

UNSAT VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.

N/A 10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 17:

Critical Step

[4.4] DEPRESS 2-HS-46-9A, RFPT 2BSPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated. SAT Standard: UNSAT Depresses 2-HS-46-9A N/A Step 18:

Critical Step

[4.5] DEPRESS 2-HS-3-150A, RFPT 2B TRIP RESET.

SAT Standard:

UNSAT Depresses 2-HS-3-150A and verifies the 2-ZI-1-133 LP Stop Valve and 2-FCV-135 HP Stop Valve comes OPEN. N/A Step 19:

Critical Step

[4.6] PLACE 2-HS-46-138A, RFPT 2B START/LOCAL ENABLE, in START. SAT Standard: UNSAT Places 2-HS-46-138A in START N/A Step 20:

[4.7] CHECK RFPT 2B speed increases to approximately 600 rpm. SAT Standard: UNSAT Verifies RFPT 2B speed increases to approximately 600 rpm N/A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 21:

[4.8] VERIFY OPEN 2-FCV-3-13, RFP2B MIN FLOW VALVE. SAT Standard: UNSAT Verifies 2-FCV-3-13 OPEN N/A Step 21:

CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.

[4.9] PLACE 2-HS-46-9A, RFPT 2B SPEED CONT RAISE/LOWER in Critical Step RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. SAT Standard: UNSAT Raises RFPT speed using Manual Speed Control Handswitch, N/A maintaining discharge pressure <1250 psig as indicated on 2-PI-3-9A RFPT 2B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).

STOP TIME END OF TASK 12

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 2C.

INITIATING CUES:

The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

13

Job Performance Measure (JPM) 3-EOI Appendix-11F Alternate RPV Pressure Control SITE: BFN JPM TITLE:

Systems: RFPT On Minimum Flow JPM 670A JPM NUMBER: REVISION: 0 U3 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-58 Lineup Alternate RPV Pressure Control TASK NUMBER / TASK TITLE(S): Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS: RO: 3.6 SRO: 3.6 239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with K/A No. & STATEMENT:

operating the MAIN AND REHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION: None SAFETY FUNCTION: 3 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _______

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to necessary to place one RFPT in pressure control as directed by 3-EOI Appendix-11F.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure: 3-EOI-APPENDIX-11F VERIFICATION TIME:

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 284 Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP 15 N/A 0 N/A BEARING LOW OIL PRESSURE tc03a-j Fail Bypass Valves 1 0% 0 N/A closed ad01e SRV 1-31 stuck open 1 26% 0 N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set 3

Job Performance Measure (JPM)

Initial Setup:

1. Reset to IC 28
2. Manually Scram RX
3. Trip 2A and 2B RFPT
4. Run Schedule File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
5. Insert Manual Trigger #1
6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
7. Verify Auto Trigger #15 is ACTIVE
8. Freeze simulator and save IC.

Schedule Files:

1. NRC JPM E U3-Alt RPV Press Control RFP Min Flow.sch
2. NRC JPM E U3-Alt RPV Press Control RFP Min Flow RFPT Trip.evt 4

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 05/11/15 All Initial issue 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 3C.

INITIATING CUES:

The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

6

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Step 1:

[1] IF BOTH of the following exist:

  • Emergency RPV Depressurization is required, AND
  • Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER SAT EOI Appendix 11H.

UNSAT Standard: N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

Step 2:

[2] VERIFY MSIVs open.

SAT Standard:

UNSAT Verifies MSIVs OPEN N/A 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

[3] VERIFY Hotwell Pressure at or below -7 in. Hg.

SAT Standard:

UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running.

SAT

[4.1.2] At least one condensate booster pump running.

[4.1.3] Condensate System aligned to supply suction to RFPs.

UNSAT Standard:

N/A Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

Step 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started.

SAT Standard:

UNSAT Verifies main oil pump running for RFPT 3A N/A Step 6: Critical Step

[4.3] VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.

SAT Standard:

UNSAT VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.

N/A 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

[4.4] DEPRESS 3-HS-46-8A, RFPT 3A SPEED CONT RAISE/LOWER, Critical Step and VERIFY amber light is illuminated.

SAT Standard:

UNSAT Depresses 3-HS-46-8A N/A Step 8:

[4.5] DEPRESS 3-HS-3-124A, RFPT 3A TRIP RESET. Critical Step Standard: SAT Depresses 3-HS-3-124A and resets RFPT Trip and verifies the 3-ZI UNSAT 123 LP Stop Valve and 3-ZI-127 HP Stop Valve comes OPEN.

N/A Step 9:

[4.6] PLACE 3-HS-46-112A RFPT 3A START/LOCAL ENABLE, in Critical Step START.

SAT Standard:

UNSAT Places 3-HS-46-112A in START N/A Note to Examiner:

RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:

[4.7] CHECK RFPT 3A speed increases to approximately 600 rpm.

SAT Standard:

UNSAT Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 3-EOI-APPENDIX-11F. N/A CUE:

US: Proceed as directed per 3-EOI-APPENDIX-11F.

AO: Reports an oil leak of ~5 gpm on RFPT A bearings.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 11:

[1] IF BOTH of the following exist:

  • Emergency RPV Depressurization is required, AND
  • Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H. SAT UNSAT Standard:

N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

Step 12:

[2] VERIFY MSIVs open.

SAT Standard:

UNSAT Verifies MSIVs OPEN N/A 10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 13:

[3] VERIFY Hotwell Pressure at or below -7 in. Hg.

SAT Standard:

UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 14:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running.

SAT

[4.1.2] At least one condensate booster pump running.

[4.1.3] Condensate System aligned to supply suction to RFPs.

UNSAT Standard:

N/A Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

Step 15:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started.

SAT Standard:

UNSAT Verifies main oil pump running for RFPT 3B N/A Step 16: Critical Step

[4.3] VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.

SAT Standard:

UNSAT VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.

N/A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 17:

[4.4] DEPRESS 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER, Critical Step and VERIFY amber light is illuminated.

SAT Standard:

UNSAT Depresses 3-HS-46-9A N/A Step 18:

[4.5] DEPRESS 3-HS-3-150A, RFPT 3B TRIP RESET. Critical Step Standard: SAT Depresses 3-HS-3-150A and verifies the 3-ZI-1-133 LP Stop Valve and 3- UNSAT FCV-135 HP Stop Valve comes OPEN.

N/A Step 19:

[4.6] PLACE 3-HS-46-138A, RFPT 3B START/LOCAL ENABLE, in Critical Step START.

SAT Standard:

UNSAT Places 3-HS-46-138A in START N/A Step 20:

[4.7] CHECK RFPT 3B speed increases to approximately 600 rpm.

SAT Standard:

UNSAT Verifies RFPT 3B speed increases to approximately 600 rpm N/A 12

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 21:

[4.8] VERIFY OPEN 3-FCV-3-13, RFP 3B MIN FLOW VALVE. Critical Step Standard: SAT Verifies 3-FCV-3-13 OPEN UNSAT N/A Step 21:

CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.

[4.9] PLACE 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER in Critical Step RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig.

SAT Standard:

UNSAT Raises RFPT speed using Manual Speed Control Handswitch, N/A maintaining discharge pressure <1250 psig as indicated on 3-PI-3-9A RFPT 3B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).

STOP TIME END OF TASK 13

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 3C.

INITIATING CUES:

The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

14

Job Performance Measure (JPM)

N2 MAKEUP TO PRIMARY CONTAINMENT WITH SITE: BFN JPM TITLE:

2-EOI-APPENDIX-14A JPM NUMBER: 669 U2 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-77 Lineup nitrogen Makeup to primary TASK NUMBER / TASK TITLE(S):

Containment IAW EOI-APPENDIX-14A K/A RATINGS: RO: 3.7SRO: 3.8 223001 Primary Containment System and Auxiliaries A2.04; Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and K/A No. &STATEMENT: (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations: High containment/drywell hydrogen concentration RELATED PRA INFORMATION: None SAFETY FUNCTION: 5 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _669 U2__

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure: 2-EOI-APPENDIX-14A VERIFICATION TIME: 15 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 285

1. Open Schedule File
2. Open Event File
3. Reset to IC-28 and take out of freeze.
4. Man Scram Rx and place MS to SD.
5. Inhibit ADS & Open 6 ADS Valves.

Console

6. Fire Trigger 2 Operator
7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch Instructions in BYPASS per EOI APPDX 19
8. Place DW Vent in Service per EOI APPX 12
9. Wait for Group 6 schedule file to time out and alrms to settle
10. Freeze simulator and save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK 2 100 0 Yes INSIDE DRYWELL TH23 FUEL CLADDING 2 100% 0 N/A DAMAGE RC08 RCIC STEAM 1 N/A 0 N/A SUPPLY VALVE AUTO OPENING FAILURE HP04 HPCI STEAM 1 N/A 0 N/A SUPPLY VALVE AUTO OPENING FAILURE CS04A CORE SPRAY 1 N/A 0 N/A LOGIC POWER FAILURE DIV I CS04B CORE SPRAY 1 N/A 0 N/A LOGIC POWER FAILURE DIV II RD01A CRD PUMP TRIP 1 N/A 0 N/A 2A RD01B CRD PUMP TRIP 1 N/A 0 N/A 2B FW01A CONDENSATE 1 N/A 0 N/A PUMP TRIP 2A FW01B CONDENSATE 1 N/A 0 N/A 3

Job Performance Measure (JPM)

PUMP TRIP 2B FW01C CONDENSATE 1 N/A 0 N/A PUMP TRIP 2C PC08 H2 IN DRYWELL_ 2 29 0 N/A PC09 OXYGEN IN 2 2.8 0 N/A DRYWELL_

PC10 H2 IN 2 18 0 N/A SUPPRESSION POOL_

PC11 OXYGEN IN 2 1.5 0 N/A SUPPRESSION POOL_

Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN 2 N/A N/A ON SUMP LEVEL ABNORMAL Schedule File(s):

  • Appendix\App. 8E.sch

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 05/27/15 All Initial issue 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is shutdown.
  • 2-EOI-APPENDIX-12has been completed
  • 2-EOI-APPENDIX-19 has been completed.
  • PCIS Group 6 has been overridden per 2-EOI-APPENDIX-8E.

INITIATING CUES:

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2-EOI-APPENDIX-14A beginning on step 2.

6

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Step 1:

2. MONITOR Drywell and Suppression Chamber H2 and O2concentrations on one or more of the following displays(2-EOI Appendix 19):

SAT

  • 2-MON-76-110, H2/O2 ANALYZER (Panel 2-9-55)

UNSAT

  • 2-XR-76-110, H2/O2 CONCENTRATION (Panel 2-9-54)

N/A Standard:

Verifies H2 and O2 concentrations Step 2:

3. IF ................. Drywell/Suppression Chamber H2 /O2 analyzer is or becomes inoperable, SAT THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H2 and O2 using CI-644.

UNSAT Standard:

N/A Verifies Drywell/Suppression Chamber H2 /O2 analyzers are Operable 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

4.WHEN ......... Drywell or Suppression Chamber H2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure. SAT Standard: UNSAT Observes a rise in Drywell H2 Concentration and continues with N/A procedure.

Step 4:

NOTE This procedure assumes that the normal makeup is from N2 Storage Tank B.

SAT

5. DISPATCH personnel to N2 Storage Tank B to CHECK 0-PI-76-331, UNSAT N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.

N/A Standard:

Dispatches UO to verifyN2 Storage Tank B Pressure CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:

6. DETERMINE area with highest H2 and/or O2 concentrations and Critical Step INFORM SRO.

SAT Standard:

UNSAT Correctly determines highest concentration is in the drywell and informs US N/A CUE: If asked about 15 minute sample time, state 15 minutes have elapsed 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 6:

Critical Step

7. VERIFY PCIS RESET (Panel 2-9-4).

SAT Standard:

UNSAT Verifies PCIS RESET on Panel 2-9-4 N/A Step 7:

Critical Step

8. IF ................. It is desired to makeup N2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10. SAT Standard: UNSAT Correctly determine step is not applicable and proceeds to step 9. N/A Step 8:
9. CONTROL Drywell H2 and O2 as follows:

Critical Step

a. OPEN the following valves to admit N2 to Drywell (Panel 2-9-3):

SAT

  • 2-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV
  • 2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV. UNSAT Standard:

N/A OPENS 2-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV &

2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Step 9:

b. SLOWLY ADJUST 2-PC-76-14, DW/SUPPR CHBR N2 MU Critical Step PRESS CONTROL (Panel 2-9-3), to maintain flow > 55 and

<60 scfm on 2-XR-76-14, DW/SUPPR CHBR N2 MAKEUP SAT FLOW/PRESS (Panel 2-9-3), or as directed by SRO if SAMG execution is in progress.

UNSAT Standard:

N/A Achieves a flowrate between 55-60 scfm and monitors Drywell Hydrogen Concentration Lowering 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 10:

c. CONTINUEN2 admission to the Drywell UNTIL Drywell H2 andO2 are SAT below desired values.

UNSAT Standard:

N/A Monitors Drywell Hydrogen Concentration Note to Examiner: Once satisfied with N2 Flow established between 55 - 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.

Pass/ Fail Criteria: Establish N2 Flow> 55 scfm and H2 Concentration on a downward trend.

STOP TIME END OF TASK 10

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is shutdown.
  • 2-EOI-APPENDIX-12 has been completed
  • 2-EOI-APPENDIX-19 has been completed.
  • PCIS Group 6 has been overridden per 2-EOI-APPENDIX-8E.

INITIATING CUES:

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2-EOI-APPENDIX-14A beginning on step 2.

11

Job Performance Measure (JPM)

N2 MAKEUP TO PRIMARY CONTAINMENT WITH 3-SITE: BFN JPM TITLE:

EOI-APPENDIX-14A JPM NUMBER: 670 U3 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-77 Lineup nitrogen Makeup to primary TASK NUMBER / TASK TITLE(S):

Containment IAW EOI-APPENDIX-14A K/A RATINGS: RO: 3.7SRO: 3.8 223001 Primary Containment System and Auxiliaries A2.04; Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and K/A No. &STATEMENT: (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations: High containment/drywell hydrogen concentration RELATED PRA INFORMATION: None SAFETY FUNCTION: 5 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _670 U3_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure: 3-EOI-APPENDIX-14A VERIFICATION TIME:

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 285

1. Open Schedule File
2. Open Event File
3. Reset to IC-28 and take out of freeze.
4. Man Scram Rx and place MS to SD.
5. Inhibit ADS & Open 6 ADS Valves.

Console

6. Fire Trigger 2 Operator
7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch Instructions in BYPASS per EOI APPDX 19
8. Place DW Vent in Service per EOI APPX 12
9. Wait for Group 6 schedule file to time out and alrms to settle
10. Freeze simulator and save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK 2 100 0 Yes INSIDE DRYWELL TH23 FUEL CLADDING 2 100% 0 N/A DAMAGE RC08 RCIC STEAM 1 N/A 0 N/A SUPPLY VALVE AUTO OPENING FAILURE HP04 HPCI STEAM 1 N/A 0 N/A SUPPLY VALVE AUTO OPENING FAILURE CS04A CORE SPRAY 1 N/A 0 N/A LOGIC POWER FAILURE DIV I CS04B CORE SPRAY 1 N/A 0 N/A LOGIC POWER FAILURE DIV II RD01A CRD PUMP TRIP 1 N/A 0 N/A 2A RD01B CRD PUMP TRIP 1 N/A 0 N/A 2B 3

Job Performance Measure (JPM)

FW01C CONDENSATE 1 N/A 0 N/A PUMP TRIP 2C PC08 H2 IN DRYWELL_ 2 29 0 N/A PC09 OXYGEN IN 2 2.8 0 N/A DRYWELL_

PC10 H2 IN 2 18 0 N/A SUPPRESSION POOL_

PC11 OXYGEN IN 2 1.5 0 N/A SUPPRESSION POOL_

Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN 2 N/A N/A ON SUMP LEVEL ABNORMAL Schedule File(s):

  • Appendix\App. 8E.sch

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 05/27/15 All Initial issue 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is shutdown.
  • 3-EOI-APPENDIX-12 has been completed.
  • 3-EOI-APPENDIX-19 has been completed.
  • PCIS Group 6 has been overridden per 3-EOI-APPENDIX-8E.

INITIATING CUES:

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2.

6

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Step 1:

3. MONITOR Drywell and Suppression Chamber H2 and O2concentrations on one or more of the following displays(3-EOI Appendix 19):

SAT

  • 3-MON-76-110, H2/O2 ANALYZER (Panel 3-9-55)

UNSAT

  • 3-XR-76-110, H2/O2 CONCENTRATION (Panel 3-9-54)

N/A Standard:

Verifies H2 and O2 concentrations Step 2:

3. IF ................. Drywell/Suppression Chamber H2 /O2 analyzer is or becomes inoperable, SAT THEN ...........NOTIFY Chemistry Lab to sample Drywell UNSAT andSuppression Chamber for H2 and O2 using CI-644.

N/A Standard:

Verifies Drywell/Suppression Chamber H2 /O2 analyzers are Operable 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

4. WHEN ......... Drywell or Suppression Chamber H2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure. SAT Standard: UNSAT Observes a rise in Drywell H2 Concentration and continues with N/A procedure.

Step 4:

NOTE This procedure assumes that the normal makeup is from N2 Storage Tank B.

SAT

5. DISPATCH personnel to N2 Storage Tank B to CHECK 0-PI-76-331, UNSAT N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.

N/A Standard:

Dispatches UO to verifyN2 Storage Tank B Pressure CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:

6. DETERMINE area with highest H2 and/or O2 concentrations and Critical Step INFORM SRO.

SAT Standard:

UNSAT Correctly determines highest concentration is in the drywell and informs US N/A CUE: If asked about 15 minute sample time, state 15 minutes have elapsed 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 6:

Critical Step

7. VERIFY PCIS RESET (Panel 3-9-4).

SAT Standard:

UNSAT Verifies PCIS RESET on Panel 3-9-4 N/A Step 7:

Critical Step

8. IF ................. It is desired to makeup N2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10. SAT Standard: UNSAT Correctly determine step is not applicable and proceeds to step 9. N/A Step 8:
9. CONTROL Drywell H2 and O2 as follows:

Critical Step

a. OPEN the following valves to admit N2 to Drywell (Panel 3-9-3):

SAT

  • 3-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV
  • 3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV. UNSAT Standard:

N/A OPENS 3-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV

&3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Step 9:

b. SLOWLY ADJUST 3-PC-76-14, DW/SUPPR CHBR N2 MUPRESS Critical Step CONTROL (Panel 3-9-3), to maintain flow between 55 and60 scfm on 3-XR-76-14, DW/SUPPR CHBR N2 MAKEUPFLOW/PRESS (Panel 3-SAT 9-3), or as directed by SRO if SAMGexecution is in progress.

UNSAT Standard:

N/A Achieves a flowrate between 55-60 scfm and monitors Drywell Hydrogen Concentration Lowering 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 10:

c. CONTINUE N2 admission to the Drywell UNTIL Drywell H2 and O2 are below desired values. SAT Standard: UNSAT Monitors Drywell Hydrogen Concentration N/A Note to Examiner: Once satisfied with N2 Flow established between 55 - 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.

Pass/ Fail Criteria: Establish N2 Flow > 55 scfm and H2 Concentration on a downward trend.

STOP TIME END OF TASK 10

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is shutdown.
  • 3-EOI-APPENDIX-12 has been completed.
  • 3-EOI-APPENDIX-19 has been completed.
  • PCIS Group 6 has been overridden per 3-EOI-APPENDIX-8E.

INITIATING CUES:

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2.

11

Job Performance Measure (JPM)

Restore Offsite Power to 4KV shutdown board at SITE: BFN JPM TITLE:

PNL 9-23 JPM NUMBER: 631 U2 REVISION: 0 TASK SRO STA UO NAUO APPLICABILITY:

U-082-NO-09 / Restore Offsite Power to 4KV TASK NUMBER / TASK TITLE(S):

shutdown board at PNL 9-23 K/A RATINGS: RO 3.4 SRO 3.4 262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control room: Synchroscope, K/A STATEMENT:

including understanding of running andincoming voltages RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 6 EVALUATION LOCATION: In -P la n t Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NATIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: 631 U2 RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to restore offsite power to 4KV SD BD A from 4KV SD BUS 1.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure 0-OI-82 VERIFICATION TIME: 15 Min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 286 Console 1. Reset to IC 28 and take out of freeze Operator 2. Start A EDG and parallel with offsite Instructions 3. Open 4-kV Shutdown Board A Breaker 1614 Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set 3

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed.

I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • No Inclement weather currently exists in the area
  • 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.

4

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT /

UNSAT Step 1:

0-OI-82 Standby Diesel Generator System Section 8.3 Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23 NOTE The following list of 4-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:

SAT

__UNSAT Shutdown A B C D Board N/A Norm Feed Bkr 1614 1616 1718 1724 Alt Feed Bkr 1716 1714 1624 1618

[1] VERIFY 4-kV Shutdown Board A is being supplied power by its respective Diesel Generator as the only source of power.

Standard:

Verifies 4-kV Shutdown Board A is being supplied by DG A.

Step 2:

[2] VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.

Diesel Handswitch Name Handswitch Panel SAT No.

4KV SD BD A UNSAT A 0-211-3EA 0-9-23-7 AUTO/LOCKOUT RESET N/A Standard:

Verifies 4KV SD BD A AUTO/LOCKOUT RESET, HS-0-211-A, is tripped to manual.

5

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 3:

[3] PLACE the synchroscope switch for the 4-kV shutdown board Critical Step feeder breaker that is to be paralleled with the Diesel Generator in ON. SAT Standard: UNSAT Places Synchroscope switch for 4-kV Shutdown Board A normal N/A feeder breaker 1614 to ON.

Step 4:

[4] VERIFY 4-kV Shutdown Bus 1(2) voltage is between 3950 Volts SAT and 4400 Volts and NOT undergoing abnormal voltage transients.

UNSAT Standard:

N/A Verifies 4-kV Shutdown Bus 1 voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.

Step 5:

[5] VERIFY associated incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients.

Shutdown Instrument Name Instrument No. Panel Bd SAT A or B GEN SYNC 0-SI-82-0AB 0-9-23-7 FREQUENCY UNSAT C or D GEN SYNC 0-SI-82-0CD 0-9-23-8 FREQUENCY N/A Standard:

Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY,0-SI-82-AB.

6

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 6:

CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclementweather (e.g., lightning, heavy winds).

SAT

[6] IF 4-kV Shutdown Bus 1 (2) is experiencing abnormal voltage or UNSAT frequency conditions, THEN PERFORM the following:

N/A Standard:

STEP N/A Step 7:

CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.

Critical Step

[7] PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM. SAT Diesel Handswitch Name Handswitch Panel UNSAT No.

A DG A MODE SELECT 0-HS-82-A/5A 0-9-23-7 N/A Standard:

Pulls DG A MODE SELECT switch 0-HS-82-A/5A and places it in PARALLELED WITH SYSTEM.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 8:

CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.

SAT UNSAT

[8] RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.

N/A Standard:

Releases the Diesel Generator A mode selector switch, 0-HS A/5A and observesPARALLELED WITH SYSTEM light is illuminated.

Step 9:

[9] ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Critical Step Diesel Handswitch Name Handswitch Panel No. SAT A DG A GOVERNOR 0-HS-82-A/3A 0-9-23-7 CONTROL UNSAT Standard: N/A AdjustsDiesel Generator A frequency using Diesel Generator governor control switch, 3-HS-82-A/3A, (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 10:

[10] USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.

Diesel Instrument Name Inst No. Panel DG A VOLT REGULATOR 0-HS-82-A/2A SAT CONT A GEN SYNC REF VOLTAGE 0-EI-82-AB 0-9-23-7 UNSAT SYSTEM SYNC REF 0-EI-211-0AB VOLTAGE N/A Standard:

Matches DG A voltage with system voltage using DG A VOLT REGULATOR CONT switch 0-HS-82-A/2A.

Step 11:

[11] WHEN the synchroscope needle is approximately 2 minutes on Critical Step the right hand side of the 12 o'clock position, THEN CLOSE the 4-kV shutdown board feeder breaker that is to be SAT paralleled with the Diesel Generator.

UNSAT Standard:

N/A Closesthe 4-kV shutdown board feeder breaker 1614 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.

Step 12:

[12] PLACE the synchroscope switch for the 4-kV shutdown board SAT feeder breaker that was paralleled with the Diesel Generator in OFF.

UNSAT Standard:

N/A Places the synchroscope switch for BKR 1614 in OFF.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 13:

NOTE If diesel operates greater than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.

[13] IF DG has been operating at a low-load condition (50%) for an extended period of time (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) THEN PERFORM the following (Otherwise N/A):

[13.1] USE the associated Diesel Generator's governor controlswitch and voltage regulator control switch toINCREASE kW and kVAR load, in increments of Critical Step 100kWevery 15 minutes.

SAT Diesel Handswitch Name Hands Panel witch UNSAT No.

DG A GOVERNOR CONTROL 0-HS-N/A 82-A/3A A 0-9-23-7 DG A VOLT REGULATOR 0-HS-CONTROL 82-A/2A

[13.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.

[13.3] STEP N/A

[13.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.

[13.5] MAINTAIN 100% load for a minimum of 30 minutes.

Standard:

Loads DG to 2600 kW and 1850 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.

CUE: After first 100 kW load adjustment state 15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.

10

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 14:

NOTE Lagging VARs should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.

SAT UNSAT

[14] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and N/A kVAR load.

Diesel Handswitch Name Handswitch No. Panel DG A GOVERNOR CONTROL 0-HS-82-A/3A A 0-9-23-7 DG A VOLT REGULATOR CONT 0-HS-82-A/2A Standard:

Obtains desired kW and kVAR load using DG A Governor Control switch, 0-HS-82-A/3A and DG Volt Regulator Cont switch, 0-HS-82-A/2A.

CUE: state 30 minutes have elapsed continue with procedure.

Step 15:

[15] MONITOR the offsite source that is paralleled with the Diesel Generator. SAT

[16] IF abnormal voltage or frequency transients are experienced, UNSAT THEN N/A Standard:

Step is N/A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 16:

[17] WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:

CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVARlimit may result in a reverse power trip of the Diesel Generator output breaker.

[17.1] USE the associated Diesel Generator's governor control Critical Step switch and voltage regulator control switch to reduce generator load to approximately 300 kW and SAT 250 kVAR:

UNSAT Diesel Instrument Name Inst No. Panel N/A DG A GOVERNOR CONTROL 0-HS-82-A/3A DG A VOLTAGE 0-HS-82-A/2A A REGULATOR CONTROL 0-9-23-7 DG A KILOWATTS 0-JI-82-A/A DG A KILOVARS 0-VAR-82-A/A Standard:

Unloads the DG to approximately 300 KW and 250 kVAR.

Step 17

[17.2] PLACE the associated Diesel Generator breaker control Critical Step switch in TRIP SAT Diesel Handswitch Name Handswitch No. Panel A DG A BKR 1818 0-HS-211-A/22A 0-9-23-7 UNSAT N/A Standard:

Trips Diesel Generator breaker 1818.

12

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 18:

[17.3] PULL and PLACE the associated Diesel Generator mode Critical Step selector switch in SINGLE UNIT.

SAT Diesel Handswitch Name Handswitch No. Panel A DG A MODE SELECT 0-HS-211-A/5A 0-9-23-7 UNSAT N/A Standard:

Pulls and places 0-HS-211-A/5A to Single Unit.

Step 19:

[17.4] RELEASE the Diesel Generator mode selector switch and SAT OBSERVE the SINGLE UNIT light illuminated.

UNSAT Standard:

N/A Verifies Single Unit light illuminated.

CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK 13

Job Performance Measure (JPM)

Provide to Applicant INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • No Inclement weather currently exists in the area
  • 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.

14

Job Performance Measure (JPM)

Restore Offsite Power to 4KV shutdown board at PNL 9-SITE: BFN JPM TITLE:

23 U-3 JPM NUMBER: 631 REVISION: 0 TASK SRO STA UO NAUO APPLICABILITY:

U-082-NO-09 / Restore Offsite Power to 4KV TASK NUMBER / TASK TITLE(S):

shutdown board at PNL 9-23 K/A RATINGS: RO 3.4 SRO 3.4 262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control K/A STATEMENT: room: Synchroscope, including understanding of running and incoming voltages RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 6 EVALUATION LOCATION: In -P la n t Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: 631 RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to restore offsite power to 4KV SD BD EC.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure 3-OI-82 VERIFICATION TIME: 15 Min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 286

1. Reset to IC 28 and take out of freeze Console
2. Start C EDG and parallel with offsite Operator
3. Open 4-kV Shutdown Board 3EC Breaker 1338 Instructions Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Batch / Pref File(s):

3

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed.

I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • No Inclement weather currently exists in the area
  • 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.

4

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT /

UNSAT Step 1:

3-OI-82 Standby Diesel Generator System Section 8.3 Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23 NOTE The following list of 4-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:

SAT UNSAT Shutdown 3EA 3EB 3EC 3ED Board N/A Norm Feed Bkr 1334 1336 1338 1342 Alt Feed Bkr 1726 1728 1626 1628

[1] VERIFY 4-kV Shutdown Board 3EC is being supplied power by its respective Diesel Generator as the only source of power.

Standard:

Verifies 4-kV Shutdown Board EC is being supplied by DG C Step 2:

[2] VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.

SAT Diesel Handswitch Name Handswitch No. Panel 4KV SD BD 3EC 3-43-211- UNSAT 3C 3-9-23 AUTO/LOCKOUT RESET 3EC N/A Standard:

Verifies 4KV SD BD 3EC AUTO/LOCKOUT RESET, 3-43-211-3EC, is tripped to manual.

5

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 3:

[3] PLACE the synchroscope switch for the 4-kV shutdown board Critical Step feeder breaker that is to be paralleled with the Diesel Generator in ON. SAT Standard: UNSAT Places Synchroscope switch for 4-kV Shutdown Board EC normal N/A feeder breaker 1338 to ON Step 4:

[4] CHECK the applicable 4-kV unit board (4-kV bus tie board)

SAT voltage is between 3950 VOLTS and 4400 VOLTS and NOT undergoing abnormal voltage transients.

UNSAT Standard:

N/A Verifies 4-kV Unit Board voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.

Step 5:

[5] VERIFY associated incoming frequency is between 59 HERTZ and 61 HERTZ and NOT undergoing abnormal frequency transients.

Shutdown Instrument Name Instrument No. Panel SAT Bd 3EA or GEN SYNC 3-SI-82-3AB 3-9-23 UNSAT 3EB FREQUENCY 3EC or GEN SYNC 3-SI-82-3CD 3-9-23 N/A 3ED FREQUENCY Standard:

Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY, 3-SI-82-CD .

6

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 6:

CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclement weather (e.g., lightning, heavy winds). SAT UNSAT

[6] IF 4-kV unit board (4-kV bus tie board) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following: N/A Standard:

N/A Step 7:

CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.

Critical Step

[7] PULL and PLACE the associated Diesel Generator mode SAT selector switch in PARALLELED WITH SYSTEM.

UNSAT Diesel Handswitch Name Handswitch Panel No.

N/A 3C DG 3C MODE SELECT 3-HS-82-3C/5A 3-9-23 Standard:

Pulls DG 3C MODE SELECT switch 3-HS-82-3C/5A and places it in PARALLELED WITH SYSTEM 7

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 8:

CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed. SAT UNSAT

[8] RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated. N/A Standard:

Releases the Diesel Generator 3C mode selector switch, 3-HS-82-3C/5C and observes PARALLELED WITH SYSTEM light is illuminated.

Step 9:

[9] ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Critical Step Diesel Handswitch Name Handswitch Panel No. SAT 3C DG 3C GOVERNOR 3-HS-82-3C/3A 3-9-23 CONTROL UNSAT Standard: N/A Adjusts Diesel Generator 3C frequency using Diesel Generator governor control switch, 3-HS-82-3C/3A (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 10:

[10] USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.

Dies Instrument Name Inst No. Panel el SAT DG 3C VOLT REGULATOR 3-HS CONT 3C/2A UNSAT 3C GEN SYNC REF VOLTAGE 3-EI-82-3CD 3-9-23 SYSTEM SYNC REF 3-EI-211-VOLTAGE 3ECB/B N/A Standard:

Matches DG C voltage with system voltage using DG 3C VOLT REGULATOR CONT switch 3-HS-82-3C/2A Step 11:

[11] WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN Critical Step CLOSE the 4-kV shutdown board feeder breaker that is to be SAT paralleled with the Diesel Generator.

UNSAT Standard:

N/A Closes the 4-kV shutdown board normal feeder breaker 1338 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.

Step 12:

[12] PLACE the synchroscope switch for the 4-kV shutdown board SAT feeder breaker that was paralleled with the Diesel Generator in OFF. UNSAT Standard: N/A Places the synchroscope switch for BKR 1338 in OFF 9

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 13:

[13] IF the normal feeder breaker is supplying the 4-kV shutdown board, THEN RESET the associated 4kV shutdown board auto transfer lockout Critical Step relay.

SAT Diesel Handswitch Name Handswitch Panel No.

UNSAT 3C 4KV SD BD 3EC 3-43-211-3EC 3-9-23 AUTO/LOCKOUT N/A RESET Standard:

Resets 4KV SD BD 3EC Auto Transfer Lockout Relay Step 14:

NOTE If diesel operates greater than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.

[14] IF DG has been operating at a low-load condition (50%) for an extended period of time (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) THEN PERFORM the following (Otherwise N/A): Critical Step

[14.1] USE the associated Diesel Generators governor control SAT switch and voltage regulator control switch to INCREASE kW and kVAR load, in increments of 100kW every 15 UNSAT minutes.

N/A Diesel Handswitch Name Hands Panel witch No.

DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A 3C 3-9-23 DG 3C VOLT REGULATOR 3-HS-CONTROL 82-3C/2A 10

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 14 continued:

[14.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.

[14.3] STEP N/A

[14.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.

[14.5] MAINTAIN 100% load for a minimum of 30 minutes.

Standard:

Loads DG to 2600 kW and 1850 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.

CUE: After first 100 kW load adjustment state 15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.

Step 15:

NOTE VARs lagging should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to SAT the maximum kVAR lagging the system will allow.

UNSAT

[15] USE the associated Diesel Generator's governor control switch N/A and voltage regulator control switch to obtain desired kW and kVAR load.

Diesel Handswitch Name Handswitch No. Panel DG 3C GOVERNOR 3-HS CONTROL 3C/3A 3C 3-9-23 DG 3C VOLT REGULATOR 3-HS CONT 3C/2A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Standard:

Obtains desired kW and kVAR load using DG 3C Governor Control switch, 3-HS-82-3C/3A and DG Volt Regulator Control switch, 3-HS-82-3C/2A CUE: state 30 minutes have elapsed continue with procedure.

Step 16:

[16] MONITOR the offsite source that is paralleled with the Diesel Generator. SAT

[17] IF abnormal voltage or frequency transients are experienced, UNSAT THEN N/A Standard:

Step is N/A Step 17:

[18] WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:

CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVAR limit may result in a reverse power trip of the Diesel Generator output breaker. Critical Step SAT

[18.1] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce UNSAT generator load to approximately 300 kW and 250 kVAR: N/A Diesel Instrument Name Inst No. Panel DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A DG 3C VOLT REGULATOR 3-HS-82-3C/2A 3C 3-9-23 CONT DG 3C KILOWATTS 3-JI-82-3C/A DG 3C KILOVARS 3-VAR-82-3C/A 12

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 17 continued:

Standard:

Unloads the DG to approximately 300 KW and 250 kVAR Step 18:

[18.2] PLACE the associated Diesel Generator breaker control Critical Step switch in TRIP.

SAT Diesel Handswitch Name Handswitch No. Panel 3C DG 3C BKR 1832 3-HS-211- 3-9-23 UNSAT 3EC/10A N/A Standard:

Trips breaker DG 3C BKR 1832 Step 19:

[18.3] PULL and PLACE the associated Diesel Generator mode Critical Step selector switch in SINGLE UNIT.

SAT Diesel Handswitch Name Handswitch No. Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5A 0-9-23 UNSAT Standard: N/A Pulls and places 3-HS-82-3C/5A to Single Unit Step 20: SAT

[18.4] RELEASE the Diesel Generator mode selector switch and UNSAT OBSERVE the SINGLE UNIT light illuminated.

N/A Standard:

Verifies Single Unit light illuminated CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK 13

Job Performance Measure (JPM)

Provide to Applicant INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • No Inclement weather currently exists in the area
  • 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.

14

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: Respond to Off-Gas Post Treatment Radiation HI-HI-HI JPM NUMBER: 190 U2 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-066-AB-02 -Respond to Off-Gas Post Treatment TASK NUMBER / TASK TITLE(S):

Radiation Hi-Hi-Hi K/A RATINGS: RO 2.9 SRO 3.2 271000 Offgas System: A2.16; Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those K/A STATEMENT: predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2)

RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 9 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: N/A TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: 190 U2 RO SRO DATE: _______

TASK STANDARD: Respond to Off-Gas Post Treatment Radiation HI-HI-HI per 2-AOI-66-2 and/or 2-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED: 2-AOI-66-2, 2-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 287

1. Reset to IC 28 Console 2. Fire Manual Trigger 2 Operator 3. Fire Manual Trigger 1 Instructions 4. Station 2nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING 1 50 N/A YES DAMAGE RM14C OFFGAS RAD 1 1E6 CPS N/A YES MONITOR FAILURERM 265A RM14D OFFGAS RAD 1 1E6 CPS N/A YES MONITOR FAILURE RM-90-266A Remotes Description Event Severity Delay Initial set OG06 Bypass FCV-66-28 2 N/A N/A BYP Post Treatment Hi-Hi-Hi Rad Isol Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA 1 2.5 N/A YES RAD ZAORI9017A RX BLDG AREA 1 2.6 N/A YES RAD ZAORM90265A 90-265 METER 1 6.0 N/A YES UPSCALE ZAORM90266A 90-266 METER 1 6.0 N/A YES UPSCALE ZAORR90135R1 90-135 RECORDER 1 6.0 N/A YES UPSCALE PEN 1 ZAORR90135R2 90-135 RECORDER 1 6.0 N/A YES UPSCALE PEN 2 ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES 3

Job Performance Measure (JPM)

ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT 1 N/A N/A YES RAD HI XA553A6 STACK GAS RAD 1 N/A N/A YES HI HI XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD 1 N/A N/A YES HI XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED 1 N/A N/A YES VAULT RAD HI XA554C27 OG ANNUAL 1 N/A N/A YES RELEASE LIMIT EXCEEDED XA554C33 OG POST TREAT 1 N/A N/A YES RAD HI XA554C34 OG POST TREAT 1 N/A N/A YES RAD HI HI XA554C35 OG POST TREAT 1 N/A N/A YES RAD HI HIHI ZDIHS6628 66-28 VALVE 1 N/A N/A YES CLOSED ZAORR90265R1 90-265 RECORDER 1 6.0 N/A YES UPSCALE PEN 1 ZAORR90265R2 90-265 RECORDER 1 6.0 N/A YES UPSCALE PEN 2 ZAORR90160R1 OG PRETREAT 1 -2.0 N/A YES RECORDER UPSCALE XA554B2 RWCU FILTER 1 N/A N/A YES INLET CNDT HIGH Schedule File(s): JPM 190 U2 OG Post treat Rad HI HIHI 4

Job Performance Measure (JPM)

IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 2 Operator. Unit 2 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 2-XA-55-4C, window 35.

5

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Performance Step 1:

SAT When directed, identify/obtain copy of ARP-9-4C, window 35.

UNSAT Standard:

N/A Obtains copy of 2-ARP-9-4C, window 35 Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 2-AOI-66-2. In that event, continue at Performance Step 5.

Performance Step 2:

2-ARP-9-4C window 35 Operator Action:

A. VERIFY alarm condition on the following

  • OFFGAS POST-TREATMENT RADIATION recorder, SAT 2-RR-90-265 on Panel 2-9-2.
  • OG POST-TREATMENT CHAN A RAD MON RTMR UNSAT radiationmonitor, 2-RM-90-266A on Panel 2-9-10.
  • OG POST-TREATMENT CHAN B RAD MON RTMR N/A radiationmonitor, 2-RM-90-265A on Panel 2-9-10.

Standard:

Verified alarm condition on 2-RR-90-265 and 2-RM-265/266.

Performance Step 3:

B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 2-FCV- Critical Step 66-28 has the Mechanical Restraint DISENGAGED and 2-FCV-66-28 isCLOSED. SAT Standard: UNSAT Takes handswitch 2-FCV-66-28 to close and observes green light N/A illuminated and red light out.

Cue: If asked, the Offgas Isolation Valve, 2-FCV-66-28 is NOT mechanically restrained.

6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 4:

C. REFER to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-SAT Hi-Hi UNSAT Standard:

N/A Refers to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 5:

2-AOI-66-2 4.0 OPERATOR ACTIONS 4.1 Immediate Actions Critical Step

[1] IF scram has not occurred, THEN SAT PERFORM the following:

UNSAT

[1.1] IF core flow is above 60%, THEN N/A REDUCE core flow to between 50-60%.

Standard:

Reduced core flow to between 50-60% with recirc system.

Performance Step 6:

[1.2] MANUALLY SCRAM the Reactor. (Reference 2-AOI-100-1).

Standard:

Critical Step

  • Depresses both SCRAM Pushbuttons
  • Places mode switch in shutdown SAT
  • Verifies All Rods in
  • Performs a Scram Announcement UNSAT o Rx Mode Switch Position: Shutdown N/A o Rod Position: All Full In o Reactor Water Level ____ & Trend ___

o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5%

Examiner Note: The scram report and referring to 2-AOI-100-1 are not considered critical.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 7:

4.2 Subsequent Actions

[1] IF OFFGAS SYSTEM ISOLATION VALVE, 2-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN SAT DISENGAGE 2-FCV-066-0028 mechanical restraint by UNSAT rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise N/A N/A)

Standard:

Verifies that 2-FCV-066-0028 in NOT mechanically restrained.

Cue: 2-FCV-066 is NOT mechanically restrained.

Performance Step 8:

[2] VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, Critical Step 2-FCV-66-28 on Panel 2-9-53 or locally.

SAT Standard:

UNSAT Verifies 2-FCV-66-28 is closed at panel 9-53 by Verifying RED light above handswitch extinguished and GREEN light above N/A handswitch illuminated. (May have already verified valve closed from the ARP).

Examiner Note: May have already verified valve closed from the ARP Performance Step 9:

[3] MONITOR area radiation levels at Panel: 2-9-11. SAT Standard: UNSAT Monitored radiation levels at Panel 9-11. N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 10:

[4] REFER TO EPIP-1 for emergency classification level and SAT response.

UNSAT Standard; N/A Notifies SM to implement EPIP-1.

Cue: The Shift Manager is implementing the EPIPs as needed.

Performance Step 11:

[5] MONITOR the following parameters:

A. MAIN STEAM LINE RADIATION, 2-RR-90-135, Panel 2-9-2.

B. OFFGAS PRETREATMENT RADIATION 2-RR 157, Pnl 2-9-2. SAT C. OFFGAS POST-TREATMENT RADIATION 2RR- UNSAT 90-265, Pnl 2-9-2 N/A D. STACK GAS RADIATION, 0-RR-90-147, Unit 1 Panel 1-9-2.

Standard; Monitors90-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147.

Cue: As Unit 1 Operator, Stack Gas Radiation, 0-RR-90-147 is reading 5X10E6 cps.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 12:

[6] IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10E5 cps as indicated on OFFGASRADIATION recorder 2-RR-90-266 on panel 2 Critical Step 2, THEN SAT CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 2-FCV-1-55 and 2-FCV-1-56.

UNSAT Standard:

N/A Recognizes that the Off-Gas Post Treatment activity is >6 X 10E5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (2-FCV-1-55/56)

Cue: The Unit has been scrammed for 5 minutes.

  • Acknowledge closing of MSIVs.

Examiner Note: Closing 1-55 and 1-56 is not considered critical.

Performance Step 13:

NOTE Placing additional Stack Dilution Air Fans in service should keep 0-RM-90-147and 0-RM-90-148 on scale.

[7] PLACE STACK DILUTION FAN SEL control switch, SAT 2-XS-66-29, Panel 2-9-8, in OFF.

UNSAT

[8] START standby STACK DILUTION FAN 2B(2A) using controlswitch, 2-HS-66-31A(29A), Panel 2-9-8. N/A Standard:

Places 2-XS-66-29 in OFF and Starts standby Stack Dilution fan 2B, using 2-HS-66-31A Cue: That completes this task.

STOP TIME _______

END OF TASK 10

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 2 Operator. Unit 2 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 2-XA-55-4C, window 35.

11

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: Respond to Off-Gas Post Treatment Radiation HI-HI-HI JPM NUMBER: 190 U3 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-066-AB-02 -Respond to Off-Gas Post Treatment TASK NUMBER / TASK TITLE(S):

Radiation Hi-Hi-Hi K/A RATINGS: RO 2.9 SRO 3.2 271000 Offgas System: A2.16;Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the K/A STATEMENT:

consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2)

RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 9 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: N/A TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: 190 RO SRO DATE: _______

TASK STANDARD: Respond to Off-Gas Post Treatment Radiation HI-HI-HI per 3-AOI-66-2 and/or 3-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED: 3-AOI-66-2, 3-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 288

1. Reset to IC 28 Console 2. Fire Manual Trigger 2 Operator 3. Fire Manual Trigger 1 Instructions 4. Station 2nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING 1 50 N/A YES DAMAGE RM14C OFFGAS RAD 1 1E6 CPS N/A YES MONITOR FAILURE RM-90-265A RM14D OFFGAS RAD 1 1E6 CPS N/A YES MONITOR FAILURE RM-90-266A Remotes Description Event Severity Delay Initial set OG06 Bypass FCV-66-28 2 N/A N/A BYP Post Treatment Hi-Hi-Hi Rad Isol Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA 1 2.5 N/A YES RAD ZAORI9017A RX BLDG AREA 1 2.6 N/A YES RAD ZAORM90265A 90-265 METER 1 6.0 N/A YES UPSCALE ZAORM90266A 90-266 METER 1 6.0 N/A YES UPSCALE ZAORR90135R1 90-135 RECORDER 1 6.0 N/A YES UPSCALE PEN 1 ZAORR90135R2 90-135 RECORDER 1 6.0 N/A YES UPSCALE PEN 2 ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES 3

Job Performance Measure (JPM)

ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT 1 N/A N/A YES RAD HI XA553A6 STACK GAS RAD 1 N/A N/A YES HI HI XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD 1 N/A N/A YES HI XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED 1 N/A N/A YES VAULT RAD HI XA554C27 OG ANNUAL 1 N/A N/A YES RELEASE LIMIT EXCEEDED XA554C33 OG POST TREAT 1 N/A N/A YES RAD HI XA554C34 OG POST TREAT 1 N/A N/A YES RAD HI HI XA554C35 OG POST TREAT 1 N/A N/A YES RAD HI HIHI ZDIHS6628 66-28 VALVE 1 N/A N/A YES CLOSED ZAORR90265R1 90-265 RECORDER 1 6.0 N/A YES UPSCALE PEN 1 ZAORR90265R2 90-265 RECORDER 1 6.0 N/A YES UPSCALE PEN 2 ZAORR90160R1 OG PRETREAT 1 -2.0 N/A YES RECORDER UPSCALE XA554B2 RWCU FILTER 1 N/A N/A YES INLET CNDT HIGH Schedule File(s): JPM 190 U3 OG Post treat Rad HI HIHI 4

Job Performance Measure (JPM)

IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 3 Operator. Unit 3 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 3-XA-55-4C, window 35.

5

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Performance Step 1:

SAT When directed, identify/obtain copy of ARP-9-4C, window 35.

UNSAT Standard:

N/A Obtains copy of 3-ARP-9-4C, window 35 Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 3-AOI-66-2. In that event, continue at Performance Step 5.

Performance Step 2:

3-ARP-9-4C window 35 Operator Action:

A. VERIFY alarm condition on the following

  • OFFGAS POST-TREATMENT RADIATION recorder, SAT 3-RR-90-265 on Panel 3-9-2.
  • OG POST-TREATMENT CHAN A RAD MON RTMR UNSAT radiationmonitor, 3-RM-90-266A on Panel 3-9-10.
  • OG POST-TREATMENT CHAN B RAD MON RTMR N/A radiationmonitor, 3-RM-90-265A on Panel 3-9-10.

Standard:

Verified alarm condition on 3-RR-90-265 and 3-RM-265/266.

Performance Step 3:

B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 3-FCV- Critical Step 66-28 has the Mechanical Restraint DISENGAGED and 3-FCV-66-28 isCLOSED. SAT Standard: UNSAT Takes handswitch 3-FCV-66-28 to close and observes green light N/A illuminated and red light out.

Cue: If asked, the Offgas Isolation Valve, 3-FCV-66-28 is NOT mechanically restrained.

6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 4:

C. REFER to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi SAT Standard: UNSAT Refers to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi N/A Performance Step 5:

3-AOI-66-2 4.0 OPERATOR ACTIONS 4.1 Immediate Actions Critical Step

[1] IF scram has not occurred, THEN SAT PERFORM the following:

UNSAT

[1.1] IF core flow is above 60%, THEN N/A REDUCE core flow to between 50-60%.

Standard:

Reduced core flow to between 50-60% with recirc system.

Performance Step 6:

[1.2] MANUALLY SCRAM the Reactor. (Reference 3-AOI-100-1).

Standard:

Critical Step

  • Depresses both SCRAM Pushbuttons
  • Places mode switch in shutdown SAT
  • Verifies All Rods in
  • Performs a Scram Announcement UNSAT o Rx Mode Switch Position: Shutdown N/A o Rod Position: All Full In o Reactor Water Level ____ & Trend ___

o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5%

Examiner Note: The scram report and referring to 3-AOI-100-1 are not considered critical.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 7:

4.2 Subsequent Actions

[1] IF OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN SAT DISENGAGE3-FCV-066-0028 mechanical restraint by UNSAT rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise N/A N/A)

Standard:

Verifies that 3-FCV-066-0028 in NOT mechanically restrained.

Cue: 3-FCV-066 is NOT mechanically restrained.

Performance Step 8:

[2] VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, Critical Step 3-FCV-66-28 on Panel 3-9-53 or locally.

SAT Standard:

UNSAT Verifies 3-FCV-66-28 is closed at panel 9-53 by Verifying RED light above handswitch extinguished and GREEN light above N/A handswitch illuminated. (May have already verified valve closed from the ARP).

Examiner Note: May have already verified valve closed from the ARP Performance Step 9:

SAT

[3] MONITOR area radiation levels at Panel: 3-9-11.

UNSAT Standard:

N/A Monitored radiation levels at Panel 9-11.

Cue: Another operator will monitor and evaluate Area Radiation Levels.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 10:

[4] REFER TO EPIP-1 for emergency classification level and SAT response.

UNSAT Standard; N/A Notifies SM to implement EPIP-1.

Cue: The Shift Manager is implementing the EPIPs as needed.

Performance Step 11:

[5] MONITOR the following parameters:

A. MAIN STEAM LINE RADIATION, 3-RR-90-135, Panel 3-9-2.

B. OFFGAS PRETREATMENT RADIATION 3-RR 157, Pnl3-9-2. SAT C. OFFGAS POST-TREATMENT RADIATION 3-RR- UNSAT 90-265, Pnl3-9-2 N/A D. STACK GAS RADIATION, 0-RR-90-147, Unit 1 Panel 1-9-2.

Standard; Monitors90-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147.

Cue: As Unit 1 Operator, Stack Gas Radiation, 0-RR-90-147 is reading 5X10E6 cps.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 12:

[6] IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10E5 cps as indicated on OFFGASRADIATION recorder 3-RR-90-265 on panel 3 2, THEN Critical Step CLOSE all Main Steam Isolation Valves and Main Steam SAT LineDrain Valves, 3-FCV-1-55 and 3-FCV-1-56.

UNSAT Standard:

N/A Recognizes that the Off-Gas Post Treatment activity is >6 X 10E5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (3-FCV-1-55/56)

Cue: The Unit has been scrammed for 5 minutes.

  • Acknowledge closing of MSIVs.

Examiner Note: Closing 1-55 and 1-56 is not considered critical.

Performance Step 13:

NOTE Placing additional Stack Dilution Air Fans in service should keep 0-RM-90-147and 0-RM-90-148 on scale.

[7] PLACE STACK DILUTION FAN SEL control switch, SAT 3-XS-66-29, Panel 3-9-8, in OFF.

UNSAT

[8] START standby STACK DILUTION FAN 3B(3A) using controlswitch, 3-HS-66-31A(29A), Panel 3-9-8. N/A Standard:

Places 3-XS-66-29 in OFF and Starts standby Stack Dilution fan 3B, using 3-HS-66-31A Cue: That completes this task.

STOP TIME ________

END OF TASK 10

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 3 Operator. Unit 3 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 3-XA-55-4C, window 35.

11

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: AUTOMATIC START FAILURE OF A & C FIRE PUMPS JPM NUMBER: 673 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-026-NO-01/ MONITOR AUTO START OF FIRE TASK NUMBER / TASK TITLE(S):

PUMP K/A RATINGS: RO: 3.4 SRO: 3.4 286000 Fire Protection System A2.08; Ability to (a) predict the impacts of the following on the FIRE PROTECTION SYSTEM; K/A No. &STATEMENT: and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Failure to actuate when required RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 8 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _673A___

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to manually start A, B and C Fire Pumps.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 0-OI-26 VALIDATIONTIME:__15 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 04/28/15 All Initial issue 3

Job Performance Measure (JPM)

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 1.

  • The Reactor Power at 70%
  • A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir.
  • Fire OPS has been dispatched to the scene.
  • Fire Pump B Tagged Out for Maintenance
  • A and C Fire Pumps failed to Auto Start.

INITIATING CUES:

The US directs you to start A and C Electric Fire Pumps per 0-OI-26 section 5.4.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

4

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

[1] PLACE the FIRE PUMP A TRANSFER switch, 0-XS-26-1 in EMERGENCY position, at the respective switchgear.

Critical Step Pump Board Compt A 4160V Shutdown Bd A 11 SAT C 4160V Shutdown Bd C 10 UNSAT Standard:

N/A Simulates placing FIRE PUMP A TRANSFER switch 0-XS-26-3 in EMERGENCY position at 4160 Shutdown Board A, Compartment 11 CUE: FIRE PUMP A TRANSFER switch 0-XS-26-1 is in the EMERGENCY position Step 2:

Critical Step

[2] CLOSE the breaker by placing the FIRE PUMP A CONTROL switch, 0-HS-26-1C to CLOSE. SAT Standard: UNSAT Simulates placing FIRE PUMP A CONTROL switch, 0-HS-26-1C N/A to CLOSE position.

CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF.

Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.

Step 3:

[3] CHECK pump ammeter at breaker indicates between 25 and 40 amps. SAT Standard UNSAT VERIFIES pump ammeter at breaker indicates between 25 and N/A 40 amps.

CUE: FIRE PUMP A ammeter at breaker indicates 30 amps.

5

Job Performance Measure (JPM)

Step 4:

[4] PLACE the NORM/EMERG Switch in NORMAL.

SAT Standard UNSAT PLACES the NORM/EMERG Switch in NORMAL for FIRE N/A PUMP A.

CUE: FIRE PUMP A NORM/EMERG Switch is in NORMAL Step 5:

[1] PLACE the FIRE PUMP C TRANSFER switch, 0-XS-26-3 in EMERGENCY position, at the respective switchgear.

Critical Step Pump Board Compt A 4160V Shutdown Bd A 11 SAT C 4160V Shutdown Bd C 10 UNSAT Standard:

N/A Simulates placing FIRE PUMP C TRANSFER switch 0-XS-26-3 in EMERGENCY position at 4160 Shutdown Board C, Compartment 10 CUE: FIRE PUMP C TRANSFER switch 0-XS-26-3 is in the EMERGENCY position Step 5:

Critical Step

[2] CLOSE the breaker by placing the FIRE PUMP C CONTROL switch, 0-HS-26-3C to CLOSE.

SAT Standard:

UNSAT Simulates placing FIRE PUMP C CONTROL switch, 0-HS-26-3C N/A to CLOSE position.

CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF.

Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.

6

Job Performance Measure (JPM)

Step 6:

[3] CHECK pump ammeter at breaker indicates between 25 and 40 amps. SAT Standard UNSAT VERIFIES pump ammeter at breaker indicates between 25 and N/A 40 amps.

CUE: FIRE PUMP C ammeter at breaker indicates 30 amps.

Step 7:

[4] PLACE the NORM/EMERG Switch in NORMAL.

SAT Standard UNSAT PLACES the NORM/EMERG Switch in NORMAL for FIRE N/A PUMP C.

CUE: FIRE PUMP C NORM/EMERG Switch is in NORMAL and this completes the JPM.

Termination Criteria: When two Fire Pumps are in service the JPM is complete.

STOP TIME:

7

Job Performance Measure (JPM)

Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 1.

  • The Reactor Power at 70%
  • A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir.
  • Fire OPS has been dispatched to the scene.
  • Fire Pump B Tagged Out for Maintenance
  • A and C Fire Pumps failed to Auto Start.

INITIATING CUES:

The US directs you to start A and C Electric Fire Pumps per 0-OI-26 section 5.2.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

8

Job Performance Measure (JPM)

ALIGNING EMERGENCY EECW MAKEUP TO SPENT SITE: BFN JPM TITLE:

FUEL POOL JPM NUMBER: 674 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-95/ Make-Up To SFP By EECW With TASK NUMBER / TASK TITLE(S):

Fire Hose (Internal Make-Up)

K/A RATINGS: RO: 3.1 SRO: 3.3 233000 Fuel Pool Cooling and Clean-up; A2.02; Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CLEAN-UP ; and (b) based on those K/A No. &STATEMENT:

predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Low pool level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 9 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: __674__

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to align either North or South Headers of EECW to Unit 2 Spent Fuel Pool.

Operator Fundamental evaluated:

OF-2 Controlling plant evolutions and indications closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 2-AOI-78-1 VALIDATION TIME: 25 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 09/01/15 All Initial issue 3

Job Performance Measure (JPM)

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is in cold shutdown
  • The Unit 2 Spent Fuel Pool water level is lowering.
  • Fire Protection is available to assist INITIATING CUES:

The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3].

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

4

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

NOTES

1) Hose straps are staged at the hoses at the following locations:
  • Unit 1/Unit 2 Reactor Bldg Stairwell, El. 621, R6 U Line (placed on hose to carry weight of charged hose lines).
  • Hose reel on the Refuel Floor, El. 664, R6 U Line (for use in securing hose ends as needed).
2) Additional hose is stored in a cabinet located in Unit 1/Unit 2 Elevator Room, Reactor Bldg, El 595.

Critical Step CAUTION Performance of this attachment will degrade water chemistry in the SAT Spent Fuel Pool.

UNSAT

[3] UNLOCK and OPEN the following valves:

N/A

  • NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792.
  • SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793.

Standard:

Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793 by demonstrating opening each valve counter-clockwise and breaking seal.

CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793 is OPEN Located in stairwell between elevation 565 ft and 593 ft. Hoses are already connected, no tools required.

5

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

[4] VERIFY charged hoses in stairwell are not obstructing stairway access and/or kinked.

SAT

[4.1] ADJUST hose straps, as necessary.

UNSAT Standard:

N/A VERIFIES hoses in stairwell are not kinked Note to Examiner: Hoses are already run along the stairwell. Applicant should verify hoses not kinked and connected.

Step 4:

[5] VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and route to Unit 2 Spent Fuel Pool Critical Step (El 664, Refuel Floor, R6-U Line).

SAT Standard:

UNSAT VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and route to Unit 2 Spent N/A Fuel Pool (El 664, Refuel Floor, R6-U Line).

Note to Examiner: Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable. Hoses are already connected, no tools required.

Location: Refuel Floor Elevation 664 ft, R U Line.

Step 5:

[6] VERIFY hose connected from SOUTH HDR SPLY TO EMER Critical Step FUEL POOL MU, 1-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664, Refuel Floor, R6-U Line)

SAT Standard:

UNSAT VERIFY hose connected from SOUTH HDR SPLY TO EMER N/A FUEL POOL MU, 1-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664, Refuel Floor, R6-U Line) 6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Note to Examiner: Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable. Hoses are already connected, no tools required.

Location: Refuel Floor Elevation 664 ft, R U Line.

Step 6:

[7] VERIFY OPEN the following valves (El 664, Refuel Floor, R6 U Line):

  • NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-Critical Step 0796.

SAT

  • SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797.

UNSAT Standard:

N/A Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797 by demonstrating opening each valve counter-clockwise.

CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797 is OPEN Location: Refuel Floor Elevation 664 ft, R U Line.

Step 7:

[8] VERIFY charged hoses on the Refuel Floor are not kinked.

SAT Standard: UNSAT VERIFY charged hoses on the Refuel Floor are not kinked N/A Termination Criteria: NORTH and SOUTH Header are aligned then the JPM is complete. State another operator will perform the remaining steps.

STOP TIME:

7

Job Performance Measure (JPM)

Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is in cold shutdown
  • The Unit 2 Spent Fuel Pool water level is lowering.
  • Fire Protection is available to assist INITIATING CUES:

The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3].

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

8

Job Performance Measure (JPM)

START UP AND SYNCHRONIZE UNIT 3 PREFERRED SITE: BFN JPM TITLE:

MMG SET JPM NUMBER: 307 REVISION: 6 TASK APPLICABILITY: SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): S-57C-NO-04 K/A RATINGS: RO: 2.5 SRO: 2.9 262002 Uninterruptable Power Supply (A.C./D.C.) A1.02; Ability to predict and/or monitor changes in parameters associated with K/A No. &STATEMENT:

operating the UNINTERRUPTABLE POWER SUPPLY (A.C./D.C.) controls including: Motor generator outputs RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 6 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _307___

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to Start-up and synchronize Unit Preferred MMG Set Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant Evolutions Precisely PRA: NA REFERENCES/PROCEDURES NEEDED: 0-OI-57C VALIDATIONTIME: 25 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 1 10/26/94 ALL GENERAL REVISION 2 05/07/95 ALL GENERAL REVISION FORMAT, PROCEDURE REVISION, ADDED 3 10/15/97 ALL PLANT WORK EXPECTATIONS TOUCH STAAR, SAFETY, AND 3-WAY COMM.

PROCEDURE REVISION, FORMAT 4 11/10/99 ALL DOCUMENT 5 10/03/01 ALL PROCEDURE REVISION 6 04/28/15 ALL UPDATE TO NEW FORMAT 3

Job Performance Measure (JPM)

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is in cold shutdown
  • The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
  • Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.

INITIATING CUES:

The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16].

NOTE: PERFORMER WILL NEED GGMKA KEY.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

4

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

NOTE Steps 5.5[16] through 5.5[26] are performed from Battery Board Room 2 UNIT PFD Sync. & Speed Control Panel. Critical Step SAT

[16] PLACE UNIT 3 MMG OPERATING MODE, 3-HS-252-02AB in AUTO.

UNSAT Standard:

N/A VERIFIED/SIMULATED PLACING the Unit 3 MMG SET OPERATING MODE 3-HS-252-02AB in AUTO.

Cue: The Unit 3 MMG SET OPERATING MODE 3-HS-252-02AB is in AUTO position.

Step 2:

Critical Step

[17] PLACE UNIT 3 MMG LOCAL-REMOTE CONTROL, 3-XS-252-02A in REMOTE.

SAT Standard:

UNSAT SIMULATED PLACING the Unit 3 MMG SET LOCAL-REMOTE N/A CONTROL 3-XS-252-02A in the REMOTE position.

Cue: The Unit 3 MMG SET LOCAL-REMOTE CONTROL 3-HS-252-02A is in the REMOTE position.

Step 3:

[18] PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE Critical Step SYNC SWITCH SS-7, 3-HS-252-03/SS-7 in ON.

SAT Standard:

UNSAT SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 3-HS-252-03/SS-7, in the ON N/A position.

5

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Cue: The Unit 3 PFD SYSTEM GENERATOR SOURCE SYNC SS-7, SWITCH 3-HS-252-003/SS-7 is in the ON position.

Step 4:

NOTE MMG voltage and hertz are read as INCOMING.

Critical Step

[19] MATCH Incoming to Running AC volts using UNIT 3 MMG VOLTAGE ADJUST, 3-HS-252-02CD. SAT Standard: UNSAT SIMULATED MANIPULATING UNIT 3 MMG VOLTAGE ADJUST, N/A 3-HS 252-02CD until cued that incoming and running AC volts are matched.

Cue: INCOMING and RUNNING VOLTAGES are EQUAL at 122 Volts Step 5:

[20] ADJUST MMG speed using UNIT 3 MMG FREQUENCY ADJUST, 3-HS-252-02CF to obtain a synchroscope slowly rotating in the SLOW Critical Step (counter-clockwise) direction (10 to 15 second rotation) as indicated on SYNCHROSCOPE, 0-SCP-252-000A/B.

SAT Standard:

UNSAT SIMULATED ADJUSTING UNIT 3 MMG FREQUENCY ADJUST N/A 3-HS-252-02CF speed control switch until cued that synchroscope indicator rotating in the counterclockwise direction at 10 to 15 seconds per revolution.

Cue: State: The Initial Synchroscope indicator is standing still at the 5 oclock position.

Note: If student raises frequency the state: Synchroscope indicator is rotating in the CLOCKWISE direction at 12 seconds per revolution.

Note: If student lowers frequency the state: Synchroscope indicator is rotating in the COUNTERCLOCKWISE direction at 12 seconds per revolution.

6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 6:

NOTES

1) Section 5.5[21] should be performed expeditiously (within about 15 seconds) to minimize the time AC Systems are paralleled to prevent tripping the MMG set. Voltage and amps is expected to fluctuate while the AC systems are paralleled and the MMG set will trip if the AC systems are paralleled for approximately 30 seconds.
2) If breaker 1001 trips, it must be reset with reset push button on the respective Unit Battery Board, Panel 10.

CAUTIONS

1) Voltage Oscillations may occur during Bus Power Transfers.

These oscillations are caused when two Power Supplies having separate Voltage Regulators try to maintain voltage control.

Therefore, the time the Power Supplies are paralleled should be minimized as follows:[PER 64835]

  • When transferring Bus power supplies from one MMG to Critical Step another MMG.
  • When transferring Bus power supplies from one MMG with the SAT unit preferred transformer. (Unit 2 has a Voltage Regulator Transformer which makes voltage oscillations more UNSAT susceptible.)

N/A

2) Minimize the number of Bus power supply transfers and only transfer Bus power supplies when absolutely necessary.
3) During the transfer of Bus power supplies the affiliated RPS circuit protectors 1(2)C1 and/or 1(2)C2 may trip.

Start of Critical Step(s)

[21] WHEN SYNCHROSCOPE, 0-SCP-252-000A/B is 5 minutes prior to 12 o'clock, in the SLOW counter-clockwise direction, THEN PERFORM the following expeditiously:

[21.1] CLOSE UNIT 3 BKR 1001, using 0-HS-280-003/1001.

[21.2] ENSURE CLOSED UNIT 3 BKR 1001.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Standard( step 6 continued):

When cued synchroscope indicator at 5 minutes prior to 12 o'clock, SIMULATED PLACING 3-BKR 1001, 0-HS-252-003/1001 in the CLOSE position.

NOTE: IT WOULD ASSIST THE EXAMINEE IF THE EVALUATOR WOULD USE HIS FINGER TO DEMONSTRATE INDICATOR POSITION ON THE SYNCHROSCOPE AS THE READINGS ARE ENUNCIATED.

CUE: THE SYNCHROSCOPE INDICATOR IS AT 30 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 15 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 5 MINUTES BEFORE THE 12 O'CLOCK POSITION.

CUE: [WHEN CLOSED] UNIT 3 BREAKER 1001 BREAKER POSITION INDICATING LAMP CHANGED FROM ILLUMINATED GREEN TO ILLUMINATED RED.

Step 7:

[21.3] OPEN the UNIT 3)BKR 1002, using 0-HS-280-003/1002. Critical Step End of Critical Step(s) SAT Standard: UNSAT SIMULATED UNIT 3 BKR 1002, 0-HS-282-003/1002in the OPEN N/A position.

CUE: UNIT 3 BKR 1002, 0-HS-282-003/1002 IS IN THE OPEN POSITION WITH RED LIGHT ILLUMINATED.

NOTE: DO NOT ALLOW THE EXAMINEE TO OPERATE THE AMMETER SELECTOR SWITCH FOR THE FOLLOWING STEP.

Step 8:

SAT

[22] CHECK generator is loaded by observing UNIT 3 MMG GENERATOR amps, 3-II-252-02C/1AMR L2 rise, "N" should be UNSAT approximately the difference of L1& L2 (UNIT 3 MMG GENERATOR amps, 3-HS-252-02CH positions 1, 2, & 3 are respective to L1, L2 & N).

N/A 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Standard:

CHECKED amp indicators L1 MINUS L2 approximately equals n.

Cue: L1, L2, N AMPS INDICATIONS HAVE RISEN and L1-L2 = N.

Note: Selector Switch positions are labeled as follows: Position 1 is L1, position 2 is L2 and Position 3 is N.

Step 9:

[23] ENSURE OPEN UNIT 3 BKR 1003, 0-HS-280-003/1003 SAT Standard: UNSAT VERIFIED ILLUMINATED GREEN position indicating light above 0- N/A HS-282-003/1003.

Cue: Unit 3 Breaker 1003 0-HS-280-003/1003 Position Indicating Lamp changed from illuminated RED to illuminated GREEN.

Step 10:

[24] On Unit 2 Unit Preferred MMG Set Local Control Panel, ENSURE OPEN the following fused disconnect switches:

  • BACKUP SOURCE TO BAT BD 1 BKR 1003, 1-FUDS-280-001/1003 SAT
  • BACKUP SOURCE TO BAT BD 3 BKR 1003, 3-FUDS-280-UNSAT 003/1003 N/A Standard:

At Unit 2 Unit Preferred MMG Set Local Control Panel VERIFIED 1-FUDS-280-001/1003 AND 3-FUDS-280-003/1003 in the OPEN POSITION.

Cue: 1-FUDS-280-001/1003 and 3-FUDS-280-003/1003 are in the OPEN position.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 11:

[25] On Unit 3 Unit Preferred MMG Set Local Control Panel, ENSURE the BACKUP SOURCE TO BAT BD 2 BKR 1003, SAT 2-FUDS-280-002/1003 fused disconnect switch is open:

UNSAT Standard:

N/A On Unit 3 Unit Preferred MMG Set Local Control Panel, VERIFIED 2-FUDS-280-002/1003 in the OPEN position.

Cue: 2-FUDS-280-002/1003 is in the OPEN position.

Step 12:

[26] On Battery Board 2:

PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SAT SS-7, 1-HS-252-03/SS-7 in OFF.

UNSAT Standard:

N/A SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 1-HS-252-03/SS-7 in the OFF position.

Cue: UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 1-HS-252-03/SS-7 is in the OFF position.

Step 13:

[27] On Battery Board 2:

Critical Step DEPRESS UNIT 3 MMG AC MOTOR START, 3-HS-252-02AD to return SAT to Normal AC power from DC drive.

UNSAT Standard:

N/A SIMULATED DEPRESSING and RELEASING UNIT 3 MMG AC MOTOR START , 3-HS-252-02AD pushbutton.

Cue: [The AC motor Breaker Position Indicating Lamp changed from illuminated GREEN to illuminated RED. State Another Operator will continue with procedure and this will end the task.

STOP TIME:

10

Job Performance Measure (JPM)

Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is in cold shutdown
  • The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
  • Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.

INITIATING CUES:

The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16].

NOTE: PERFORMER WILL NEED GGMKA KEY.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

11

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER: 80A U2 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS: RO: 3.2 SRO: 3.3 201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL K/A No. &STATEMENT: CONTROL SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 1 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: __80A__

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to respond to a Control Rod Drift In per 2-AOI-85-5.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: 2-AOI-85-5, 2-AOI-100-1 VALIDATIONTIME: 18 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 05/27/10 All Initial issue Incorrect task number; changed to U-085-AB-05:

1 09/01/15 1 Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 280

  • Reset IC 28 or Exam IC if written in above
  • Run schedule file:NRC JPM A U2 -Control Rod Drift In
  • Verify all triggers and overrides are correct
  • Place the simulator in RUN to ensure stable conditions Console
  • Start Rod Display on RWM Screen Operator Instructions
  • Provide Initial Rod Data Sheet -PRLOG
  • When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02-31 into the core
  • When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02-31 into 1 NA 35 sec NA core rd07r2223 Drifts rod 22-23 into 2 NA 10 sec NA core rd07r3031 Drifts rod 30-31 into 2 NA 25 sec NA core rd07r4635 Drifts rod 46-35 into 2 NA 20 sec NA core rd07r2619 Drifts rod 26-19 into 2 NA 30 sec NA core rd07r3027 Drifts rod 30-27 into 2 NA 18 sec NA core rd07r5423 Drifts rod 54-23 into 2 NA 23 sec NA core rd07r2255 Drifts rod 22-55 into 2 NA 28 sec NA core 4

Job Performance Measure (JPM)

Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): NRC JPM A U2 -Control Rod Drift In 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is at 100% power INITIATING CUES:

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

6

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

NOTE

1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.

CAUTIONS

1) Any mispositioned control rod events will be dispositioned by following the direction contained within 2-AOI-85-7.
2) If a control rod moves unexpectedly one notch beyond its intended Critical Step position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position. SAT
3) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6 UNSAT may be required.

N/A 7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40.

[2] OBSERVE the following for selected control rod:

  • CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
  • CHECK white light on the Full Core Display is ILLUMINATED.
  • CHECK Rod Out Permit light is ILLUMINATED.

Standard:

Selects a withdrawn control rod Note to Examiner: May select any partially withdrawn control rod in any order 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 2:

[3] INSERT control rod one notch by performing the following:

Critical Step

[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN andRELEASE. SAT

[3.2] OBSERVE control rod settles into the desired position UNSAT andROD SETTLE light extinguishes.

N/A Standard:

Inserts withdrawn control rod one notch Step 3:

[4] WITHDRAW selected control rod one notch by performing the following: Critical Step

[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD OUT NOTCHand RELEASE. SAT

[4.2] OBSERVE control rod settles into the desired position and UNSAT ROD SETTLE light extinguishes.

N/A Standard:

Withdraws withdrawn control rod one notch Step 4:

[5] DOCUMENT completion of control rod test as follows:

[5.1] PERFORMER

  • INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the SAT control rodjust exercised to document proper movement and CRD latching. UNSAT

[5.2] Concurrent Verifier (CV) N/A

  • ENSURE rod inserted and returned to its original position.
  • INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Standard:

Initials Attachment 1 for exercised control rod and continues to exercise rods.

Note to Examiner:

  • When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02-31 Drift In Note to Simulator Booth Operator:

Step 5:

Performer recognizes control rod 02-31 drift in and responds per 2-AOI-85-5.

[2] IF a Control Rod is moving from its intended position without Critical Step operator actions, THEN INSERT the Control Rod to position 00 using CONTINUOUS IN. (Otherwise N/A) SAT

[3] IF a Control Rod Block occurs during rod insertion due to Rod UNSAT Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above.

(Otherwise N/A) N/A Standard:

Responds per 2-AOI-85-5 and inserts control rod 02-31 to full in position as indicated by position 00 indication.

CUE: When report to US, state Respond per 2-AOI-85-5, Control Rod Drift In.

Step 6:

[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod SAT pattern.

UNSAT Standard:

Candidate notifies Reactor Engineer to Evaluate Core N/A Thermal limits and Preconditioning Limits for the current Control Rod Pattern Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

[5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,

  • THEN MANUALLY SCRAM Reactor and enter 2-AOI-100-1. SAT

[6] CHECK Thermal Limits on ICS (RUNMON). UNSAT Note to NRC Examiner: Step [6] performed by Reactor N/A Engineering.

Standard:

Reviews step and asks for guidance from US or RE CUE: As Shift Manager, state RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.

Student will continue with Control Rod Exercise.

Step 8:

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40. Critical Step

[2] OBSERVE the following for selected control rod: SAT

  • CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED. UNSAT
  • CHECK white light on the Full Core Display is ILLUMINATED.
  • CHECK Rod Out Permit light is ILLUMINATED. N/A Standard:

Selects a withdrawn control rod 10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 9:

[3] INSERT control rod one notch by performing the following:

Critical Step

[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN SAT andRELEASE.

UNSAT

[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

N/A Standard:

Inserts withdrawn control rod one notch Step 10:

[4] WITHDRAW selected control rod one notch by performing the Critical Step following:

[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD SAT OUT NOTCHand RELEASE.

UNSAT

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

N/A Standard:

Withdraws withdrawn control rod one notch Note to Examiner:

When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:

Multiple Control Rods Drifting In Critical Step Standard:

Recognizes Multiple Control Rods Drift into the Core and Manually SAT Scrams the Reactor per 2-AOI-85-5.

UNSAT

  • Depresses both SCRAM Pushbuttons
  • Places mode switch in shutdown N/A
  • Verifies All Rods in 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 11 continued:

  • Performs a Scram Announcement Critical Step o Rx Mode Switch Position: Shutdown o Rod Position: All Full In SAT o Reactor Water Level ____ & Trend ___

o Reactor Pressure ____ & Trend ___ UNSAT o MSIV Position: OPEN o Rx Power: <5% N/A Termination Criteria: REPEAT BACK SCRAM REPORT THEN STATE, THIS COMPLETES THE JPM. THAT WILL BE ALL FOR NOW, ANOTHER OPERATOR WILL CONTINUE IN 2-AOI-100-1.

STOP TIME:

12

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is at 100% power INITIATING CUES:

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

13

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER: 80A U3 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS: RO: 3.2 SRO: 3.3 201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM ; and (b) based on K/A No. &STATEMENT:

those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

Rod Drift Alarm RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 1 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _80A U3_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to respond to a Control Rod Drift In per 3-AOI-85-5.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: 3-AOI-85-5, 3-AOI-100-1 VALIDATIONTIME:

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 05/27/10 All Initial issue Incorrect task number; changed to U-085-AB-05:

1 05/11/15 1 Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 280

  • Reset IC 28 or Exam IC if written in above
  • Run schedule file: NRC JPM A U3 -Control Rod Drift In
  • Verify all triggers and overrides are correct
  • Place the simulator in RUN to ensure stable conditions Console Operator
  • Start Rod Display on RWM Screen Instructions
  • Provide Initial Rod Data Sheet -PRLOG
  • When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02-31 into the core
  • When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02-31 into 1 NA 35 sec NA core rd07r2223 Drifts rod 22-23 into 2 NA 10 sec NA core rd07r3031 Drifts rod 30-31 into 2 NA 25 sec NA core rd07r4635 Drifts rod 46-35 into 2 NA 20 sec NA core rd07r2619 Drifts rod 26-19 into 2 NA 30 sec NA core rd07r3027 Drifts rod 30-27 into 2 NA 18 sec NA core rd07r5423 Drifts rod 54-23 into 2 NA 23 sec NA core rd07r2255 Drifts rod 22-55 into 2 NA 28 sec NA core 4

Job Performance Measure (JPM)

Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): NRC JPM A U3 -Control Rod Drift In 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is at 100% power INITIATING CUES:

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

6

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

NOTE

1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.

CAUTIONS

3) Any mispositioned control rod events will be dispositioned by following the direction contained within 3-AOI-85-7.
4) If a control rod moves unexpectedly one notch beyond its intended Critical Step position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position. SAT
5) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6 UNSAT may be required.

N/A 7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 3-XS-85-40.

[2] OBSERVE the following for selected control rod:

  • CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
  • CHECK white light on the Full Core Display is ILLUMINATED.
  • CHECK Rod Out Permit light is ILLUMINATED.

Standard:

Selects a withdrawn control rod Note to Examiner: May select any partially withdrawn control rod in any order 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 2:

[3] INSERT control rod one notch by performing the following:

Critical Step

[3.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD IN andRELEASE. SAT

[3.2] OBSERVE control rod settles into the desired position UNSAT andROD SETTLE light extinguishes.

N/A Standard:

Inserts withdrawn control rod one notch Step 3:

[4] WITHDRAW selected control rod one notch by performing the following: Critical Step

[4.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD OUT NOTCHand RELEASE. SAT

[4.2] OBSERVE control rod settles into the desired position and UNSAT ROD SETTLE light extinguishes.

N/A Standard:

Withdraws withdrawn control rod one notch Step 4:

[5] DOCUMENT completion of control rod test as follows:

[5.1] PERFORMER

  • INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the SAT control rodjust exercised to document proper movement and CRD latching. UNSAT

[5.2] Concurrent Verifier (CV) N/A

  • ENSURE rod inserted and returned to its original position.
  • INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Standard:

Initials Attachment 1 for exercised control rod and continues to exercise rods.

Note to Examiner:

  • When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02-31 Drift In Note to Simulator Booth Operator:

Step 5:

Performer recognizes control rod 02-31 drift in and responds per 3-AOI-85-5.

[2] IF a Control Rod is moving from its intended position without Critical Step operator actions, THEN INSERT the Control Rod to position 00 using CONTINUOUS IN. (Otherwise N/A) SAT

[3] IF a Control Rod Block occurs during rod insertion due to Rod UNSAT Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above.

(Otherwise N/A) N/A Standard:

Responds per 3-AOI-85-5 and inserts control rod 02-31 to full in position as indicated by position 00 indication.

CUE: When report to US, state Respond per 3-AOI-85-5, Control Rod Drift In.

Step 6:

[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod SAT pattern.

UNSAT Standard:

Candidate notifies Reactor Engineer to Evaluate Core N/A Thermal limits and Preconditioning Limits for the current Control Rod Pattern Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

[5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,

  • THEN MANUALLY SCRAM Reactor and enter 2-AOI-100-1. SAT

[6] CHECK Thermal Limits on ICS (RUNMON). UNSAT Note to NRC Examiner: Step [6] performed by Reactor N/A Engineering.

Standard:

Reviews step and asks for guidance from US or RE CUE: As Shift Manager, state RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.

Student will continue with Control Rod Exercise.

Step 8:

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2-XS-85-40. Critical Step

[2] OBSERVE the following for selected control rod: SAT

  • CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED. UNSAT
  • CHECK white light on the Full Core Display is ILLUMINATED.
  • CHECK Rod Out Permit light is ILLUMINATED. N/A Standard:

Selects a withdrawn control rod 10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 9:

[3] INSERT control rod one notch by performing the following:

Critical Step

[3.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD IN SAT andRELEASE.

UNSAT

[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

N/A Standard:

Inserts withdrawn control rod one notch Step 10:

[4] WITHDRAW selected control rod one notch by performing the Critical Step following:

[4.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48 in ROD SAT OUT NOTCHand RELEASE.

UNSAT

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

N/A Standard:

Withdraws withdrawn control rod one notch Note to Examiner:

When satisfied with the number of rod manipulations direct Simulator BoothOperator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:

Multiple Control Rods Drifting In Standard: Critical Step Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 3-AOI-85-5. SAT

  • Depresses both SCRAM Pushbuttons UNSAT
  • Places mode switch in shutdown
  • Verifies All Rods in N/A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 11 continued:

Critical Step

  • Performs a Scram Announcement o Rx Mode Switch Position: Shutdown SAT o Rod Position: All Full In o Reactor Water Level ____ & Trend ___ UNSAT o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN N/A o Rx Power: <5%

Termination Criteria: repeat back scram report then state, this completes the JPM. That will be all for now, another operator will continue in 2-AOI-100-1 STOP TIME:

12

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is at 100% power INITIATING CUES:

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

13

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: EHC Auto Cooldown JPM NUMBER: 276 U2 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO U-000-NO-32 Perform Reactor Cooldown TASK NUMBER / TASK TITLE(S): U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS: RO: 3.9 SRO: 3.9 239001Main and Reheat Steam System: A4.09 Ability to K/A No. &STATEMENT: manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 4 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _276 U2 RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 2-OI-47 VALIDATIONTIME: 4 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 06/19/12 All Initial issue 1 07/22/15 All General revision & re-format 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 40 Exam IC 281

  • Reset IC 40 or Exam IC if written in above
  • Ensure RFP is in Manual on PDS controller with plant parameters stable.

Console Operator Instructions Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): None 4

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES:

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 2-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].

5

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1: SAT

[6] VERIFY EHC is in Pressure Control using 2-HS-47-204. UNSAT N/A Standard:

Observes light on for EHC Pressure Control on 2-HS-47-204.

Step 2:

[7] On the EHC Work Station on Panel 9-7:

[7.1] SELECT Main Menu from the toolbar at bottom of the screen. Critical Step

[7.2] SELECT Log In on Display Screen and ENTER OPS SAT for name and OPS for Password.

UNSAT

[7.3] SELECT Auto Cooldown from list of function on the screen. N/A Standard:

Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.

Step 3:

[8] On the Auto Cooldown Display Screen CHECK the following are displayed.

SAT

  • Turbine Tripped or All Valves Closed - indicates Reset.
  • Rx Press Ctrl - indicates Reset. UNSAT Standard: N/A
  • Candidate checks the Turbine Tripped or All Valves Closed

-indicates Reset.

  • Candidate checks Rx Press Ctrl - indicates Reset.

6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 4:

[9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:

[9.1] SELECT the block above the FINAL PRESSURE Critical Step TARGET.

SAT

[9.2] ENTER the desired pressure using the Display Screen or Key Board.

UNSAT

[9.3] WHEN desired Pressure is entered SELECT OK N/A Standard:

Candidate sets the desired final target pressure of 20psig (given in initial conditions).

Step 5:

[10] WHEN Cooldown is ready to commence, THEN

[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)

Critical Step

[10.2] DEPRESS the START button on the Auto Cooldown Display Screen. SAT

[11] WHEN Caution Are You Sure You Want to Initiate Auto UNSAT Cooldown? appears N/A SELECT Yes Screen Button to start the cooldown.

Standard:

Candidate depresses START and acknowledges YES to commence auto cooldown.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 6:

[12] CHECK the following:

  • EHC PRESSURE SETPOINT, 2-PI-47-162, is lowering.
  • EHC AUTO COOLDOWN displays IN PROGRESS SAT Standard: UNSAT Candidate monitors EHC pressure and the auto cooldown is IN N/A PROGRESS.

Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig.

Step 7:

[13] IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.

[13.1] SELECT the block above the FINAL PRESSURE TARGET Critical Step

[13.2] ENTER the desired pressure using the Display SAT Screen or Key Board.

UNSAT

[13.3] WHEN desired Pressure is entered SELECT OK N/A Standard:

Candidate adjusts FINAL PRESSURE TARGET to 100 psig and recommences the auto cooldown.

Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.

STOP TIME:

8

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES:

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 2-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].

9

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: EHC Auto Cooldown JPM NUMBER: 276 U3 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO U-000-NO-32 Perform Reactor Cooldown TASK NUMBER / TASK TITLE(S): U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS: RO: 3.9 SRO: 3.9 239001Main and Reheat Steam System: A4.09 Ability to K/A No. &STATEMENT: manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 4 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _276 U3_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 3-OI-47 VALIDATIONTIME:

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 06/19/12 All Initial issue 1 07/22/15 All General revision & re-format 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 40 Exam IC 281

  • Reset IC 40 or Exam IC if written in above
  • Ensure RFP is in Manual on PDS controller with plant parameters stable.

Console Operator Instructions Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): None 4

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES:

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].

5

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

[6] VERIFY EHC is in Pressure Control using 3-HS-47-204. SAT UNSAT Standard:

N/A Observes light on for EHC Pressure Control on 3-HS-47-204.

Step 2:

[7] On the EHC Work Station on Panel 9-7:

[7.1] SELECT Main Menu from the toolbar at bottom of the screen. Critical Step

[7.2] SELECT Log In on Display Screen and ENTER OPS SAT for name and OPS for Password.

UNSAT

[7.3] SELECT Auto Cooldown from list of function on the screen. N/A Standard:

Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.

Step 3:

[8] On the Auto Cooldown Display Screen CHECK the following are displayed.

SAT

  • Turbine Tripped or All Valves Closed - indicates Reset.
  • Rx Press Ctrl - indicates Reset. UNSAT Standard: N/A
  • Candidate checks the Turbine Tripped or All Valves Closed

-indicates Reset.

  • Candidate checks Rx Press Ctrl - indicates Reset.

6

Job Performance Measure (JPM)

Step 4:

[9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:

[9.1] SELECT the block above the FINAL PRESSURE Critical Step TARGET.

SAT

[9.2] ENTER the desired pressure using the Display Screen or Key Board.

UNSAT

[9.3] WHEN desired Pressure is entered SELECT OK N/A Standard:

Candidate sets the desired final target pressure of 20psig (given in initial conditions).

Step 5:

[10] WHEN Cooldown is ready to commence, THEN

[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)

Critical Step

[10.2] DEPRESS the START button on the Auto Cooldown Display Screen. SAT

[11] WHEN Caution Are You Sure You Want to Initiate Auto UNSAT Cooldown? appears N/A SELECT Yes Screen Button to start the cooldown.

Standard:

Candidate depresses START and acknowledges YES to commence auto cooldown.

7

Job Performance Measure (JPM)

Step 6:

[12] CHECK the following:

  • EHC PRESSURE SETPOINT, 3-PI-47-162, is lowering.
  • EHC AUTO COOLDOWN displays IN PROGRESS SAT Standard: UNSAT Candidate monitors EHC pressure and the auto cooldown is IN N/A PROGRESS.

Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig.

Step 7:

[13] IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.

[13.1] SELECT the block above the FINAL PRESSURE TARGET Critical Step

[13.2] ENTER the desired pressure using the Display SAT Screen or Key Board.

UNSAT

[13.3] WHEN desired Pressure is entered SELECT OK N/A Standard:

Candidate adjusts FINAL PRESSURE TARGET to 100 psig and recommences the auto cooldown.

Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.

STOP TIME:

8

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES:

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine-Generator System, Section 8.1.2, starting at step [6].

9

Job Performance Measure (JPM)

LOSS OF REFERENCE APRM TO ROD BLOCK SITE: BFN JPM TITLE:

MONITOR JPM NUMBER: 672A U2 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-085-AL-03 RESPOND TO CONTROL ROD TASK NUMBER / TASK TITLE(S):

WITHDRAWL BLOCK K/A RATINGS: RO: 3.1 SRO: 3.3 215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures K/A No. &STATEMENT:

to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR-3,4,5 RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 7 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _672A U2_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 2-OI-85, 2-OI-92B, 2-ARP-9-5A, 2-SR-3.1.3.5(A)

VALIDATIONTIME: 16 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 09/01/15 All Initial issue 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 39 Exam IC 282

  • Reset to IC-39 to ~ 30% Reactor Power
  • Open Schedule File: NRC JPM C U2 -RBM APRM Fail Console Operator Downscale.sch Instructions
  • Open Event File: NRC JPM C U2 -RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-33-C NM07L4025B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-25-B NM07L4033D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-33-D NM07L0817B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-17-B NM07L4017B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-17-B NM07L4041D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-41-D NM07L4049B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-49-B NM07L4057B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-57-B NM07L4817C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-17-C NM07L4825C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-25-C NM07L4833A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-33-A NM07L4841A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-41-A NM07L4849C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-49-C NM07L0825B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-25-B 4

Job Performance Measure (JPM)

NM07L0833D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-33-D NM07L0841D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-41-D NM07L0849B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-49-B NM07L2409B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-09-B NM07L2417D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-17-D NM07L2425D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-25-D NM07L2433B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-33-B NM07L2449D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-49-D NM07L2457D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-57-D NM07L1617C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-17-C NM07L1625C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-25-C NM07L1633A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-33-A NM07L1641A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-41-A NM07L1649C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-49-C NM07L1657C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-57-C NM07L1609A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-09-A NM07L3209C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-09-C NM07L3217A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-17-A NM07L3225A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-25-A NM07L3249A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-49-A NM07L3257A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-57-A NM07L4009D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-09-D NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A 5

Job Performance Measure (JPM)

FAILURE 48-09-A NM07L5617D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-17-D NM07L5633B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-33-B NM07L5641B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-41-B NM07L3241C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-41-C Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1) Control Rod 46-31 15 0 N/A N/A GREEN INDICATION Schedule File(s):

Event File: NRC JPM C U2 -RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>

Schedule File: NRC JPM C U2 -RBM APRM Fail Downscale.sch 6

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is at 30% power
  • Startup Sequence Control Rod Movement Data Sheet 2-SR-3.1.3.5(A) completed through group 57.

The US has directed you to raise Reactor Power to 40% per 2-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14-31.

7

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

Step 2:

[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT

  • THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS UNSAT 23A. (Otherwise N/A)

N/A Standard:

Determines that step in N/A Step 3:

[3] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 4:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 5:

[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 6:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT

  • THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS UNSAT 23A. (Otherwise N/A)

N/A Standard:

Determines that step in N/A Step 8:

[3] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 9:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing 10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 10:

[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 11:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

Step 12:

[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT

  • THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS UNSAT 23A. (Otherwise N/A)

N/A Standard:

Determines that step in N/A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 13:

[3] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 14:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 15:

[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 12

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Note to Examiner: This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.

Step 16:

APRM Sensor/Trip Point:

DOWNSCALE/

APRM Downscale: <= 5%

OPRM INOP OPRM Inop: Less than 23 operable cells 4

Sensor Location:

Control Room Panel 2-9-14.

Probable Cause:

A. Unbypassed APRM channel at or below sensor set point.

B. SI or SR in progress.

C. Unit shutdown (Mode 3 or 4). Critical Step D. Failed sensor.

SAT Automatic Action: UNSAT A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)

N/A Operator Action:

A. DETERMINE which APRM/OPRM channel is downscale/inop.

B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 2-OI-92B.

13

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 16(continued)

CONTROL ROD Sensor/Trip Point:

WITHDRAWAL Relays: 3A-K1 Nuclear Instrumentation BLOCK 3A-K2 Refuel Equipment in Use High Level in Scram Discharge 7 Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)

Sensor Location:

Panel 2-9-28 Elevation 593' Aux Instr Room Probable Cause:

A. One or more sensors at or above set point.

B. Malfunction of sensor.

C. Control rod drop accident Automatic Action:

Rod withdrawal block Operator Action:

A. DETERMINE initiating condition from corresponding rod withdrawal block alarm(s) and REFER TO operator action for alarm(s).

Standard:

Reference 2-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 2-OI-92B CUE: Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B.

14

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 17:

NOTES

1) Only one APRM/OPRM in each trip system can be bypassed at a time.
2) All operations are performed on Panel 2-9-5 unless specifically stated otherwise.
3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9-14 Voters are required to be illuminated prior to testing, operating, or working on that channel. SAT UNSAT 6.1 Bypassing APRM/OPRM Channel N/A CAUTION

[QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures.

[ISE-HPS-92-RO1]

[1] REVIEW all precautions and limitations. REFER TO Section 3.0.

Standard:

Demonstrates reviewing precautions and limitations section 3.0.

Step 18:

Critical Step

[2] PLACE APRM BYPASS, 2-HS-92-7B/S3, to desired channel to be bypassed. SAT Standard: UNSAT PLACE APRM BYPASS, 2-HS-92-7B/S3, to APRM CH 2 N/A 15

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 19:

[3] CHECK BLUE BYPASSED lights illuminated on Panel 2-9-14 Voters. SAT Standard: UNSAT Observes BLUE BYPASS light illuminated on Panel 2-9-14 for N/A APRM CH 2.

Step 20:

[4] VERIFY white bypass light on Panel 2-9-5 is illuminated. SAT Standard: UNSAT Observes WHITE BYPASS light illuminated on Panel 2-9-5. N/A Note to Examiner: If needed, cue student to proceed with actions required to continue rod movements. Student may continue at step 21 or 24.

Step 21:

6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)

[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN SAT PERFORM the following at the Unit Supervisors discretion to UNSAT REINITIALIZE the RBM:

N/A

[6.1] PLACE CRD POWER, 2-HS-85-46 in the OFF position to deselect the Control Rod.

Standard:

CRD POWER, 2-HS-85-46 in the OFF position.

16

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 22:

SAT

[6.2] PLACE CRD POWER, 2-HS-85-46, in the ON position.

UNSAT Standard:

N/A PLACED CRD POWER, 2-HS-85-46, in the ON position.

Step 23:

[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and SAT PERFORM applicable section for Control Rod withdrawal.

UNSAT Standard:

N/A Continues with Control Rod Movement CUE: Proceed with Control Rod Movement.

Step 24:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

17

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 25:

[2] IF selected control rod has been identified as a fast notching control rod by engineering, THEN SAT

  • THROTTLE OPEN 2-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2-HS UNSAT 23A. (Otherwise N/A)

N/A Standard:

Determines that step in N/A Step 26:

[3] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 27:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing 18

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 28:

[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[6] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, state End of Task STOP TIME:

19

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is at 30% power
  • Startup Sequence Control Rod Movement Data Sheet 2-SR-3.1.3.5(A) completed through group 57.

INITIATING CUES:

The US has directed you to raise Reactor Power to 40% per 2-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14-31.

20

Job Performance Measure (JPM)

LOSS OF REFERENCE APRM TO ROD BLOCK SITE: BFN JPM TITLE:

MONITOR JPM NUMBER: 672A U3 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-085-AL-03 RESPOND TO CONTROL ROD TASK NUMBER / TASK TITLE(S):

WITHDRAWL BLOCK K/A RATINGS: RO: 3.1 SRO: 3.3 215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures K/A No. &STATEMENT:

to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR-3,4,5 RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 7 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _672A U3_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 3-OI-85, 3-OI-92B, 3-ARP-9-5A, 3-SR-3.1.3.5(A)

VALIDATIONTIME:

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 04/30/15 All Initial issue 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 39 Exam IC 282

  • Reset IC-39to ~ 30% Reactor Power
  • Open Schedule File: NRC JPM C U3 -RBM APRM Fail Console Operator Downscale.sch Instructions
  • Open Event File: NRC JPM C U3 -RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-33-C NM07L4025B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-25-B NM07L4033D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-33-D NM07L0817B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-17-B NM07L4017B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-17-B NM07L4041D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-41-D NM07L4049B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-49-B NM07L4057B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-57-B NM07L4817C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-17-C NM07L4825C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-25-C NM07L4833A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-33-A NM07L4841A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-41-A NM07L4849C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 48-49-C NM07L0825B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-25-B 4

Job Performance Measure (JPM)

NM07L0833D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-33-D NM07L0841D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-41-D NM07L0849B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 08-49-B NM07L2409B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-09-B NM07L2417D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-17-D NM07L2425D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-25-D NM07L2433B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-33-B NM07L2449D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-49-D NM07L2457D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 24-57-D NM07L1617C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-17-C NM07L1625C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-25-C NM07L1633A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-33-A NM07L1641A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-41-A NM07L1649C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-49-C NM07L1657C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-57-C NM07L1609A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 16-09-A NM07L3209C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-09-C NM07L3217A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-17-A NM07L3225A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-25-A NM07L3249A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-49-A NM07L3257A LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-57-A NM07L4009D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 40-09-D NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A 5

Job Performance Measure (JPM)

FAILURE 48-09-A NM07L5617D LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-17-D NM07L5633B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-33-B NM07L5641B LPRM AMPLIFIER 15 0 N/A N/A FAILURE 56-41-B NM07L3241C LPRM AMPLIFIER 15 0 N/A N/A FAILURE 32-41-C Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1) Control Rod 46-31 15 0 N/A N/A GREEN INDICATION Schedule File(s):

Event File: NRC JPM C U3 -RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>

Schedule File: NRC JPM C U3 -RBM APRM Fail Downscale.sch 6

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is at 30% power
  • Startup Sequence Control Rod Movement Data Sheet 3-SR-3.1.3.5(A) completed through group 58.

INITIATING CUES:

The US has directed you to raise Reactor Power to 40% per 3-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22-39.

7

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

Step 2:

[2] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 3:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 4:

[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 5:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

Step 6:

[2] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 8:

[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 9:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 10:

[2] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 11:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 12:

[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Note to Examiner: This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.

Step 13:

APRM Sensor/Trip Point:

DOWNSCALE/

APRM Downscale: <= 5%

OPRM INOP OPRM Inop: Less than 23 operable cells 4

Sensor Location:

Control Room Panel 3-9-14.

Probable Cause:

A. Unbypassed APRM channel at or below sensor set point.

B. SI or SR in progress.

C. Unit shutdown (Mode 3 or 4). Critical Step D. Failed sensor.

SAT Automatic Action: UNSAT A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)

N/A Operator Action:

A. DETERMINE which APRM/OPRM channel is downscale/inop.

B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 3-OI-92B.

12

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 13(continued)

CONTROL ROD Sensor/Trip Point:

WITHDRAWAL Relays:3A-K1 Nuclear Instrumentation BLOCK 7 3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)

Sensor Location:

Panel 3-9-28 Elevation 593' Aux Instr Room Probable Cause:

A. One or more sensors at or above set point.

B. Malfunction of sensor.

C. Control rod drop accident Automatic Action:

Rod withdrawal block Operator Action:

A. DETERMINE initiating condition from corresponding rod withdrawalblock alarm(s) and REFER TO operator action for alarm(s).

Standard:

Reference 3-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 3-OI-92B CUE:Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B.

13

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 14:

NOTES

1) Only one APRM/OPRM in each trip system can be bypassed at a time.
2) All operations are performed on Panel 3-9-5 unless specifically stated otherwise.
3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9-14 Voters are required to be illuminated prior to testing, operating, or working on that channel. SAT UNSAT 6.1 Bypassing APRM/OPRM Channel N/A CAUTION

[QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures.

[ISE-HPS-92-RO1]

[1] REVIEW all precautions and limitations. REFER TO Section 3.0.

Standard:

Demonstrates reviewing precautions and limitations section 3.0.

CUE: If asked per note 2 above, Panel 9-14 Voter BLUE LIGHTS are extinguished.

Step 15:

Critical Step

[2] PLACE APRM BYPASS, 3-HS-92-7B/S3, to desired channel to be bypassed. SAT Standard: UNSAT PLACE APRM BYPASS, 3-HS-92-7B/S3, to APRM CH 2 N/A 14

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 16:

[3] CHECK BLUE BYPASSED lights illuminated on Panel 3-9-14 Voters. SAT Standard: UNSAT Simulates observing BLUE BYPASS light illuminated on Panel 3- N/A 9-14 for APRM CH 2.

Cue: Blue Light is illuminated on Panel 3-9-14 for APRM CH 2.

Step 17:

[4] VERIFY white bypass light on Panel 3-9-5 is illuminated. SAT Standard: UNSAT Observes WHITE BYPASS light illuminated on Panel 3-9-5. N/A Note to NRC Examiner: If needed, cue student to proceed with actions required to continue rod movements.Student may continue at step 18 or 21.

Step 18:

6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)

[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN SAT PERFORM the following at the Unit Supervisors discretion to UNSAT REINITIALIZE the RBM:

N/A

[6.1] PLACE CRD POWER, 3-HS-85-46 in the OFF position to deselect the Control Rod.

Standard:

CRD POWER, 3-HS-85-46 in the OFF position.

15

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 19:

SAT

[6.2] PLACE CRD POWER, 3-HS-85-46, in the ON position.

UNSAT Standard:

N/A PLACED CRD POWER, 3-HS-85-46, in the ON position.

Step 20:

[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and SAT PERFORM applicable section for Control Rod withdrawal.

UNSAT Standard:

N/A Continues with Control Rod Movement Cue:If asked,Proceed with Control Rod Movement.

Step 21:

Critical Step

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.

SAT Standard:

UNSAT Selects Control Rod by depressing CRD ROD SELECT N/A pushbutton.

16

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 22:

[2] OBSERVE the following for the selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED SAT
  • Rod Out Permit light ILLUMINATED UNSAT Standard:

N/A VERIFIES

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED
  • White light on the Full Core Display ILLUMINATED
  • Rod Out Permit light ILLUMINATED Step 23:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the SAT correct ROD GROUP when the Rod Worth Minimizer is enforcing UNSAT Standard:

N/A STEP is N/A due to Rod Block Monitor is Enforcing Step 24:

[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

Critical Step

[5] OBSERVE the control rod settles into the desired position and SAT the ROD SETTLE light extinguishes.

UNSAT Standard:

N/A PLACED CRD CONTROL SWITCH, 3-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display.

Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, state End of Task STOP TIME:

17

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is at 30% power
  • Startup Sequence Control Rod Movement Data Sheet 3-SR-3.1.3.5(A) completed through group 58.

INITIATING CUES:

The US has directed you to raise Reactor Power to 40% per 3-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22-39.

18

Job Performance Measure (JPM) 2-EOI APPENDIX-6E INJECTION SUBSYSTEM LINEUP SITE: BFN JPM TITLE:

CS SYSTEM II JPM NUMBER: 257A U2 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-35/ Lineup Injection Subsystem-Core TASK NUMBER / TASK TITLE(S): Spray Loop I(II) in Accordance with EOI Appendix 6D(E)

K/A RATINGS: RO: 3.9 SRO: 3.9 209001 Low Pressure Core Spray SystemA4.08 Ability to K/A No. &STATEMENT: manually operate and/or monitor in thecontrol room: Reactor water level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 2 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _257A U2_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 2-EOI APPENDIX-6E VALIDATIONTIME: 8 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 12/06/10 All Initial issue 1 04/27/15 All General revision & re-format 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 283

1. Open Schedule File
2. Open Event File
3. Reset to IC-28and take out of freeze.
4. CLOSE 2-FCV-75-51 Console
5. OPEN 2-FCV-75-53 Operator
6. Man Scram Rx and place MS to SD.

Instructions

7. Open 6 ADS Valves.
8. Wait until various alarms with Supp Pool Temp High come in to save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK 15 75% 5 Yes INSIDE DRYWELL CS04A CORE SPRAY 15 N/A N/A Yes LOGIC POWER FAILURE DIV I CS04B CORE SPRAY 15 N/A N/A Yes LOGIC POWER FAILURE DIV II CS02B CS INBOARD 15 N/A N/A Yes INJECTION VALVE AUTO OPENING FAILURE (FCV 53)

RH06A RHR LOGIC POWER 15 N/A N/A Yes FAILURE DIV I RH06B RHR LOGIC POWER 15 N/A N/A Yes FAILURE DIV II RC01 RCIC TURBINE TRIP 15 N/A N/A Yes SYSTEM FAILURE HP04 HPCI STEAM 15 N/A N/A Yes SUPPLY VALVE AUTO OPENING FAILURE FW01A CONDENSATE 15 N/A 10 Yes PUMP TRIP 2A 4

Job Performance Measure (JPM)

FW01B CONDENSATE 15 N/A 10 Yes PUMP TRIP 2B FW01C CONDENSATE 15 N/A 10 Yes PUMP TRIP 2C Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U2 Core Spray Alt Inj.sch Event File(s): JPM 257A U2 Core Spray Alt Inj.evt 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is Shutdown
  • RPV Water Level is lowering slowly.
  • 1-EOI-1 has been entered and followed to RC-L6.

INITIATING CUES:

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above

(-)162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.

6

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

Location: Unit 2 Control Room Attachments: 1. NPSH Monitoring

[1] VERIFY OPEN the following valves:

SAT

  • 2-FCV-75-39, CORE SPRAY PUMP 2D SUPPR POOL SUCT N/A VLV Standard:

Verifies2-FCV-75-30 and 2-FCV-75-39 are open.

Step 2:

[1] (continued)VERIFY OPEN the following valves: Critical Step

N/A Recognizes 2-FCV-75-51 is closed and 2-FCV-75-53 is open, valve closes 2-FCV-75-53 and Opens 2-FCV-75-51.

Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI-75, Core Spray System line up.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

[2] VERIFY CLOSED 2-FCV-75-50, CORE SPRAY SYS II SAT TESTVALVE.

UNSAT Standard:

N/A Verifies 2-FCV-75-50 closed Step 4:

Critical Step

[3] VERIFY CS Pump 2B and/or 2D running.

SAT Standard:

UNSAT Starts Core Pumps 2B and/or 2D N/A (Only starting one pump is Critical, the second pump is optional).

Step 6:

[4] WHEN RPV pressure is below 450 psig, THEN Critical Step THROTTLE2-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, SAT as necessary to control injection at or below4000 gpm per pump.

UNSAT Standard:

N/A Verifies pressure < 450 psig and opens 2-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or

<8000 gpm for 2 pumps).

Step 7:

CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.

SAT

[5] MONITOR Core Spray Pump NPSH using Attachment 1.

UNSAT Standard:

Operator comparesCore Spray Pump flow rate with Suppression N/A Pool temperature and Suppression Pool pressure and Determined adequate NPSH.

Termination Criteria: Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.

STOP TIME:

8

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is Shutdown
  • RPV Water Level is lowering slowly.
  • 1-EOI-1 has been entered and followed to RC-L6.

INITIATING CUES:

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above 162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.

9

Job Performance Measure (JPM) 3-EOI APPENDIX-6E INJECTION SUBSYSTEM LINEUP SITE: BFN JPM TITLE:

CS SYSTEM II JPM NUMBER: 257A U3 REVISION: 1 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-35/ Lineup Injection Subsystem-Core TASK NUMBER / TASK TITLE(S): Spray Loop I(II) in Accordance with EOI Appendix 6D(E)

K/A RATINGS: RO: 3.9 SRO: 3.9 209001 Low Pressure Core Spray System A4.08 Ability to K/A No. &STATEMENT: manually operate and/or monitor in the control room: Reactor water level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 2 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _257A U3_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 3-EOI APPENDIX-6E VALIDATIONTIME: 5 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 12/06/10 All Initial issue 1 04/27/15 All General revision & re-format 3

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 283

1. Open Schedule File
2. Open Event File
3. Reset to IC-28 and take out of freeze.
4. CLOSE 2-FCV-75-51 Console
5. OPEN 2-FCV-75-53 Operator
6. Man Scram Rx and place MS to SD.

Instructions

7. Open 6 ADS Valves.
8. Wait until various alarms with Supp Pool Temp High come in to save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK 15 75% 5 Yes INSIDE DRYWELL CS04A CORE SPRAY 15 N/A N/A Yes LOGIC POWER FAILURE DIV I CS04B CORE SPRAY 15 N/A N/A Yes LOGIC POWER FAILURE DIV II CS02B CS INBOARD 15 N/A N/A Yes INJECTION VALVE AUTO OPENING FAILURE (FCV 53)

RH06A RHR LOGIC POWER 15 N/A N/A Yes FAILURE DIV I RH06B RHR LOGIC POWER 15 N/A N/A Yes FAILURE DIV II RC01 RCIC TURBINE TRIP 15 N/A N/A Yes SYSTEM FAILURE HP04 HPCI STEAM 15 N/A N/A Yes SUPPLY VALVE AUTO OPENING FAILURE FW01A CONDENSATE 15 N/A 10 Yes PUMP TRIP 3A 4

Job Performance Measure (JPM)

FW01B CONDENSATE 15 N/A 10 Yes PUMP TRIP 3B FW01C CONDENSATE 15 N/A 10 Yes PUMP TRIP 3C Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U3 Core Spray Alt Inj.sch Event File(s): JPM 257A U3 Core Spray Alt Inj.evt 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is Shutdown
  • RPV Water Level is lowering slowly.
  • 1-EOI-1 has been entered and followed to RC-L6.

INITIATING CUES:

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above

(-)162 inches (TAF) using Core Spray System II as directed by 3-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II.

6

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

Location: Unit 3 Control Room Attachments: 1. NPSH Monitoring

[1] VERIFY OPEN the following valves:

SAT

  • 3-FCV-75-39, CORE SPRAY PUMP 3D SUPPR POOL SUCT N/A VLV Standard:

Verifies3-FCV-75-30 and 3-FCV-75-39 are open.

Step 2:

Critical Step

[1] (continued) VERIFY OPEN the following valves:

SAT UNSAT Standard:

N/A Recognizes 3-FCV-75-51 is closed and 3-FCV-75-53 is open, closes 3-FCV-75-53 and Opens 3-FCV-75-51.

Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI-75, Core Spray System line up.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

[2] VERIFY CLOSED 3-FCV-75-50, CORE SPRAY SYS II TEST SAT VALVE.

UNSAT Standard:

N/A Verifies 3-FCV-75-50 closed Step 4:

Critical Step

[3] VERIFY CS Pump 3B and/or 3D running.

SAT Standard:

UNSAT Starts Core Pumps 3B and/or 3D (Only starting one pump is N/A Critical, the second pump is optional).

Step 6:

[4] WHEN RPV pressure is below 450 psig, THEN Critical Step THROTTLE 3-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, SAT as necessary to control injection at or below4000 gpm per pump.

UNSAT Standard:

N/A Verifies pressure < 450 psig and opens 3-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or

<8000 gpm for 2 pumps).

Step 7:

CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.

SAT

[5] MONITOR Core Spray Pump NPSH using Attachment 1.

UNSAT Standard:

Operator compares Core Spray pump flow rate with Suppression N/A Pool temperature and Suppression Pool pressure and Determined adequate NPSH.

Termination Criteria: Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.

STOP TIME:

8

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is Shutdown
  • RPV Water Level is lowering slowly.
  • 1-EOI-1 has been entered and followed to RC-L6.

INITIATING CUES:

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level using Core Spray System II as directed by 3-EOI Appendix-6E, Injection Subsystems Lineup Core Spray System II. Directed level band is +2 to +51 inches.

9

Job Performance Measure (JPM) 2-EOI Appendix-11F Alternate RPV Pressure Control SITE: BFN JPM TITLE:

Systems: RFPT On Minimum Flow JPM NUMBER: 670A U2 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-58 Lineup Alternate RPV Pressure Control TASK NUMBER / TASK TITLE(S): Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS: RO: 3.6SRO: 3.6 239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with K/A No. &STATEMENT:

operating the MAIN ANDREHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION: None SAFETY FUNCTION: 3 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _670A U2_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to necessary to place one RFPT in pressure control as directed by 2-EOI Appendix-11F.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure: 2-EOI-APPENDIX-11F VERIFICATION TIME: 12 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 284 Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP 15 N/A 0 N/A BEARING LOW OIL PRESSURE tc03a-j Fail Bypass Valves 1 0% 0 N/A closed ad01e 20 SRV 1-31 stuck open 1 20% 0 N/A 20%

Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Initial Setup:

1. Reset to IC 28
2. Manually Scram RX
3. Trip 2A and 2B RFPT
4. Run Schedule File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
5. Insert Manual Trigger #1
6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
7. Verify Auto Trigger #15 is ACTIVE
8. Freeze simulator and save IC.

Schedule Files:

1. NRC JPM E U2-Alt RPV Press Control RFP Min Flow.sch
2. NRC JPM E U2-Alt RPV Press Control RFP Min Flow RFPT Trip.evt 3

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 09/01/15 All Initial issue 4

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 2C.

INITIATING CUES:

The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

5

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Step 1:

[1] IF BOTH of the following exist:

  • Emergency RPV Depressurization is required, AND
  • Group 1 Isolation Signal exists, THEN SAT EXIT this procedure and ENTER EOI Appendix 11H. UNSAT N/A Standard:

Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

Step 2:

SAT

[2] VERIFY MSIVs open.

UNSAT Standard:

N/A Verifies MSIVs OPEN 6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

[3] VERIFY Hotwell Pressure at or below -7 in. Hg. SAT Standard: UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

SAT

[4.1.1] At least one condensate pump running.

[4.1.2] At least one condensate booster pump running.

UNSAT

[4.1.3] Condensate System aligned to supply suction toRFPs.

N/A Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

Step 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to bestarted. SAT Standard: UNSAT Verifies main oil pump running for RFPT 2A N/A Step 6:

Critical Step

[4.3] VERIFY CLOSED 2-FCV-3-19, RFP 2ADISCHARGE VALVE.

SAT Standard:

UNSAT VERIFY CLOSED 2-FCV-3-19, RFP 2A DISCHARGE VALVE.

N/A 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

Critical Step

[4.4] DEPRESS 2-HS-46-8A RFPT 2A SPEED CONT RAISE/LOWER, and VERIFY amber lightis illuminated. SAT Standard: UNSAT Depresses 2-HS-46-8A N/A Step 8:

[4.5] DEPRESS 2-HS-3-124A, RFPT 2A TRIP RESET. Critical Step Standard: SAT Depresses 2-HS-3-124A and verifies the 2-Z1-1-123 LP Stop Valve and UNSAT 2-Z1-127 HP Stop Valve comes OPEN.

N/A Step 9:

Critical Step

[4.6] PLACE 2-HS-46-112A RFPT 2A START/LOCAL ENABLE, in START. SAT Standard: UNSAT Places 2-HS-46-112A in START N/A Note to Examiner:

RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:

Critical Step

[4.7] CHECK RFPT 2A speed increases to approximately 600 rpm.

SAT Standard:

UNSAT Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 2-EOI-APPENDIX-11F. N/A CUE:

US: Proceed as directed per 2-EOI-APPENDIX-11F.

AO: Reports an oil leak of ~5 gpm on RFPT A bearings.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 11:

[1] IF BOTH of the following exist:

  • Emergency RPV Depressurization is required, AND
  • Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER SAT EOI Appendix 11H.

UNSAT Standard: N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

Step 12:

[2] VERIFY MSIVs open. SAT Standard: UNSAT Verifies MSIVs OPEN N/A 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 13:

[3] VERIFY Hotwell Pressure at or below -7 in. Hg. SAT Standard: UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 14:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

SAT

[4.1.1] At least one condensate pump running.

[4.1.2] At least one condensate booster pump running.

UNSAT

[4.1.3] Condensate System aligned to supply suction toRFPs.

N/A Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

Step 15:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started. SAT Standard: UNSAT Verifies main oil pump running for RFPT 2B N/A Step 16:

Critical Step

[4.3] VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.

SAT Standard:

UNSAT VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.

N/A 10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 17:

Critical Step

[4.4] DEPRESS 2-HS-46-9A, RFPT 2BSPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated. SAT Standard: UNSAT Depresses 2-HS-46-9A N/A Step 18:

Critical Step

[4.5] DEPRESS 2-HS-3-150A, RFPT 2B TRIP RESET.

SAT Standard:

UNSAT Depresses 2-HS-3-150A and verifies the 2-ZI-1-133 LP Stop Valve and 2-FCV-135 HP Stop Valve comes OPEN. N/A Step 19:

Critical Step

[4.6] PLACE 2-HS-46-138A, RFPT 2B START/LOCAL ENABLE, in START. SAT Standard: UNSAT Places 2-HS-46-138A in START N/A Step 20:

[4.7] CHECK RFPT 2B speed increases to approximately 600 rpm. SAT Standard: UNSAT Verifies RFPT 2B speed increases to approximately 600 rpm N/A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 21:

[4.8] VERIFY OPEN 2-FCV-3-13, RFP2B MIN FLOW VALVE. SAT Standard: UNSAT Verifies 2-FCV-3-13 OPEN N/A Step 21:

CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.

[4.9] PLACE 2-HS-46-9A, RFPT 2B SPEED CONT RAISE/LOWER in Critical Step RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. SAT Standard: UNSAT Raises RFPT speed using Manual Speed Control Handswitch, N/A maintaining discharge pressure <1250 psig as indicated on 2-PI-3-9A RFPT 2B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).

STOP TIME END OF TASK 12

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 2C.

INITIATING CUES:

The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

13

Job Performance Measure (JPM) 3-EOI Appendix-11F Alternate RPV Pressure Control SITE: BFN JPM TITLE:

Systems: RFPT On Minimum Flow JPM 670A JPM NUMBER: REVISION: 0 U3 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-58 Lineup Alternate RPV Pressure Control TASK NUMBER / TASK TITLE(S): Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS: RO: 3.6 SRO: 3.6 239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with K/A No. & STATEMENT:

operating the MAIN AND REHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION: None SAFETY FUNCTION: 3 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _______

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to necessary to place one RFPT in pressure control as directed by 3-EOI Appendix-11F.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure: 3-EOI-APPENDIX-11F VERIFICATION TIME:

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 284 Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP 15 N/A 0 N/A BEARING LOW OIL PRESSURE tc03a-j Fail Bypass Valves 1 0% 0 N/A closed ad01e SRV 1-31 stuck open 1 26% 0 N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set 3

Job Performance Measure (JPM)

Initial Setup:

1. Reset to IC 28
2. Manually Scram RX
3. Trip 2A and 2B RFPT
4. Run Schedule File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
5. Insert Manual Trigger #1
6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
7. Verify Auto Trigger #15 is ACTIVE
8. Freeze simulator and save IC.

Schedule Files:

1. NRC JPM E U3-Alt RPV Press Control RFP Min Flow.sch
2. NRC JPM E U3-Alt RPV Press Control RFP Min Flow RFPT Trip.evt 4

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 05/11/15 All Initial issue 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 3C.

INITIATING CUES:

The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

6

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Step 1:

[1] IF BOTH of the following exist:

  • Emergency RPV Depressurization is required, AND
  • Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER SAT EOI Appendix 11H.

UNSAT Standard: N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

Step 2:

[2] VERIFY MSIVs open.

SAT Standard:

UNSAT Verifies MSIVs OPEN N/A 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

[3] VERIFY Hotwell Pressure at or below -7 in. Hg.

SAT Standard:

UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running.

SAT

[4.1.2] At least one condensate booster pump running.

[4.1.3] Condensate System aligned to supply suction to RFPs.

UNSAT Standard:

N/A Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

Step 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started.

SAT Standard:

UNSAT Verifies main oil pump running for RFPT 3A N/A Step 6: Critical Step

[4.3] VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.

SAT Standard:

UNSAT VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.

N/A 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 7:

[4.4] DEPRESS 3-HS-46-8A, RFPT 3A SPEED CONT RAISE/LOWER, Critical Step and VERIFY amber light is illuminated.

SAT Standard:

UNSAT Depresses 3-HS-46-8A N/A Step 8:

[4.5] DEPRESS 3-HS-3-124A, RFPT 3A TRIP RESET. Critical Step Standard: SAT Depresses 3-HS-3-124A and resets RFPT Trip and verifies the 3-ZI UNSAT 123 LP Stop Valve and 3-ZI-127 HP Stop Valve comes OPEN.

N/A Step 9:

[4.6] PLACE 3-HS-46-112A RFPT 3A START/LOCAL ENABLE, in Critical Step START.

SAT Standard:

UNSAT Places 3-HS-46-112A in START N/A Note to Examiner:

RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:

[4.7] CHECK RFPT 3A speed increases to approximately 600 rpm.

SAT Standard:

UNSAT Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 3-EOI-APPENDIX-11F. N/A CUE:

US: Proceed as directed per 3-EOI-APPENDIX-11F.

AO: Reports an oil leak of ~5 gpm on RFPT A bearings.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 11:

[1] IF BOTH of the following exist:

  • Emergency RPV Depressurization is required, AND
  • Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H. SAT UNSAT Standard:

N/A Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

Step 12:

[2] VERIFY MSIVs open.

SAT Standard:

UNSAT Verifies MSIVs OPEN N/A 10

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 13:

[3] VERIFY Hotwell Pressure at or below -7 in. Hg.

SAT Standard:

UNSAT Verifies Hotwell Pressure at or below -7 in. Hg N/A Step 14:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running.

SAT

[4.1.2] At least one condensate booster pump running.

[4.1.3] Condensate System aligned to supply suction to RFPs.

UNSAT Standard:

N/A Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

Step 15:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started.

SAT Standard:

UNSAT Verifies main oil pump running for RFPT 3B N/A Step 16: Critical Step

[4.3] VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.

SAT Standard:

UNSAT VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.

N/A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 17:

[4.4] DEPRESS 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER, Critical Step and VERIFY amber light is illuminated.

SAT Standard:

UNSAT Depresses 3-HS-46-9A N/A Step 18:

[4.5] DEPRESS 3-HS-3-150A, RFPT 3B TRIP RESET. Critical Step Standard: SAT Depresses 3-HS-3-150A and verifies the 3-ZI-1-133 LP Stop Valve and 3- UNSAT FCV-135 HP Stop Valve comes OPEN.

N/A Step 19:

[4.6] PLACE 3-HS-46-138A, RFPT 3B START/LOCAL ENABLE, in Critical Step START.

SAT Standard:

UNSAT Places 3-HS-46-138A in START N/A Step 20:

[4.7] CHECK RFPT 3B speed increases to approximately 600 rpm.

SAT Standard:

UNSAT Verifies RFPT 3B speed increases to approximately 600 rpm N/A 12

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 21:

[4.8] VERIFY OPEN 3-FCV-3-13, RFP 3B MIN FLOW VALVE. Critical Step Standard: SAT Verifies 3-FCV-3-13 OPEN UNSAT N/A Step 21:

CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.

[4.9] PLACE 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER in Critical Step RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig.

SAT Standard:

UNSAT Raises RFPT speed using Manual Speed Control Handswitch, N/A maintaining discharge pressure <1250 psig as indicated on 3-PI-3-9A RFPT 3B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).

STOP TIME END OF TASK 13

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EOI-1 has been followed to RC/P-4. Reactor water level control is in automatic on RFPT 3C.

INITIATING CUES:

The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

14

Job Performance Measure (JPM)

N2 MAKEUP TO PRIMARY CONTAINMENT WITH SITE: BFN JPM TITLE:

2-EOI-APPENDIX-14A JPM NUMBER: 669 U2 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-77 Lineup nitrogen Makeup to primary TASK NUMBER / TASK TITLE(S):

Containment IAW EOI-APPENDIX-14A K/A RATINGS: RO: 3.7SRO: 3.8 223001 Primary Containment System and Auxiliaries A2.04; Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and K/A No. &STATEMENT: (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations: High containment/drywell hydrogen concentration RELATED PRA INFORMATION: None SAFETY FUNCTION: 5 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _669 U2__

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure: 2-EOI-APPENDIX-14A VERIFICATION TIME: 15 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 285

1. Open Schedule File
2. Open Event File
3. Reset to IC-28 and take out of freeze.
4. Man Scram Rx and place MS to SD.
5. Inhibit ADS & Open 6 ADS Valves.

Console

6. Fire Trigger 2 Operator
7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch Instructions in BYPASS per EOI APPDX 19
8. Place DW Vent in Service per EOI APPX 12
9. Wait for Group 6 schedule file to time out and alrms to settle
10. Freeze simulator and save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK 2 100 0 Yes INSIDE DRYWELL TH23 FUEL CLADDING 2 100% 0 N/A DAMAGE RC08 RCIC STEAM 1 N/A 0 N/A SUPPLY VALVE AUTO OPENING FAILURE HP04 HPCI STEAM 1 N/A 0 N/A SUPPLY VALVE AUTO OPENING FAILURE CS04A CORE SPRAY 1 N/A 0 N/A LOGIC POWER FAILURE DIV I CS04B CORE SPRAY 1 N/A 0 N/A LOGIC POWER FAILURE DIV II RD01A CRD PUMP TRIP 1 N/A 0 N/A 2A RD01B CRD PUMP TRIP 1 N/A 0 N/A 2B FW01A CONDENSATE 1 N/A 0 N/A PUMP TRIP 2A FW01B CONDENSATE 1 N/A 0 N/A 3

Job Performance Measure (JPM)

PUMP TRIP 2B FW01C CONDENSATE 1 N/A 0 N/A PUMP TRIP 2C PC08 H2 IN DRYWELL_ 2 29 0 N/A PC09 OXYGEN IN 2 2.8 0 N/A DRYWELL_

PC10 H2 IN 2 18 0 N/A SUPPRESSION POOL_

PC11 OXYGEN IN 2 1.5 0 N/A SUPPRESSION POOL_

Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN 2 N/A N/A ON SUMP LEVEL ABNORMAL Schedule File(s):

  • Appendix\App. 8E.sch

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 05/27/15 All Initial issue 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is shutdown.
  • 2-EOI-APPENDIX-12has been completed
  • 2-EOI-APPENDIX-19 has been completed.
  • PCIS Group 6 has been overridden per 2-EOI-APPENDIX-8E.

INITIATING CUES:

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2-EOI-APPENDIX-14A beginning on step 2.

6

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Step 1:

2. MONITOR Drywell and Suppression Chamber H2 and O2concentrations on one or more of the following displays(2-EOI Appendix 19):

SAT

  • 2-MON-76-110, H2/O2 ANALYZER (Panel 2-9-55)

UNSAT

  • 2-XR-76-110, H2/O2 CONCENTRATION (Panel 2-9-54)

N/A Standard:

Verifies H2 and O2 concentrations Step 2:

3. IF ................. Drywell/Suppression Chamber H2 /O2 analyzer is or becomes inoperable, SAT THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H2 and O2 using CI-644.

UNSAT Standard:

N/A Verifies Drywell/Suppression Chamber H2 /O2 analyzers are Operable 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

4.WHEN ......... Drywell or Suppression Chamber H2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure. SAT Standard: UNSAT Observes a rise in Drywell H2 Concentration and continues with N/A procedure.

Step 4:

NOTE This procedure assumes that the normal makeup is from N2 Storage Tank B.

SAT

5. DISPATCH personnel to N2 Storage Tank B to CHECK 0-PI-76-331, UNSAT N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.

N/A Standard:

Dispatches UO to verifyN2 Storage Tank B Pressure CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:

6. DETERMINE area with highest H2 and/or O2 concentrations and Critical Step INFORM SRO.

SAT Standard:

UNSAT Correctly determines highest concentration is in the drywell and informs US N/A CUE: If asked about 15 minute sample time, state 15 minutes have elapsed 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 6:

Critical Step

7. VERIFY PCIS RESET (Panel 2-9-4).

SAT Standard:

UNSAT Verifies PCIS RESET on Panel 2-9-4 N/A Step 7:

Critical Step

8. IF ................. It is desired to makeup N2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10. SAT Standard: UNSAT Correctly determine step is not applicable and proceeds to step 9. N/A Step 8:
9. CONTROL Drywell H2 and O2 as follows:

Critical Step

a. OPEN the following valves to admit N2 to Drywell (Panel 2-9-3):

SAT

  • 2-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV
  • 2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV. UNSAT Standard:

N/A OPENS 2-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV &

2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Step 9:

b. SLOWLY ADJUST 2-PC-76-14, DW/SUPPR CHBR N2 MU Critical Step PRESS CONTROL (Panel 2-9-3), to maintain flow > 55 and

<60 scfm on 2-XR-76-14, DW/SUPPR CHBR N2 MAKEUP SAT FLOW/PRESS (Panel 2-9-3), or as directed by SRO if SAMG execution is in progress.

UNSAT Standard:

N/A Achieves a flowrate between 55-60 scfm and monitors Drywell Hydrogen Concentration Lowering 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 10:

c. CONTINUEN2 admission to the Drywell UNTIL Drywell H2 andO2 are SAT below desired values.

UNSAT Standard:

N/A Monitors Drywell Hydrogen Concentration Note to Examiner: Once satisfied with N2 Flow established between 55 - 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.

Pass/ Fail Criteria: Establish N2 Flow> 55 scfm and H2 Concentration on a downward trend.

STOP TIME END OF TASK 10

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is shutdown.
  • 2-EOI-APPENDIX-12 has been completed
  • 2-EOI-APPENDIX-19 has been completed.
  • PCIS Group 6 has been overridden per 2-EOI-APPENDIX-8E.

INITIATING CUES:

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2-EOI-APPENDIX-14A beginning on step 2.

11

Job Performance Measure (JPM)

N2 MAKEUP TO PRIMARY CONTAINMENT WITH 3-SITE: BFN JPM TITLE:

EOI-APPENDIX-14A JPM NUMBER: 670 U3 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-77 Lineup nitrogen Makeup to primary TASK NUMBER / TASK TITLE(S):

Containment IAW EOI-APPENDIX-14A K/A RATINGS: RO: 3.7SRO: 3.8 223001 Primary Containment System and Auxiliaries A2.04; Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and K/A No. &STATEMENT: (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations: High containment/drywell hydrogen concentration RELATED PRA INFORMATION: None SAFETY FUNCTION: 5 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _670 U3_

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure: 3-EOI-APPENDIX-14A VERIFICATION TIME:

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 285

1. Open Schedule File
2. Open Event File
3. Reset to IC-28 and take out of freeze.
4. Man Scram Rx and place MS to SD.
5. Inhibit ADS & Open 6 ADS Valves.

Console

6. Fire Trigger 2 Operator
7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch Instructions in BYPASS per EOI APPDX 19
8. Place DW Vent in Service per EOI APPX 12
9. Wait for Group 6 schedule file to time out and alrms to settle
10. Freeze simulator and save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK 2 100 0 Yes INSIDE DRYWELL TH23 FUEL CLADDING 2 100% 0 N/A DAMAGE RC08 RCIC STEAM 1 N/A 0 N/A SUPPLY VALVE AUTO OPENING FAILURE HP04 HPCI STEAM 1 N/A 0 N/A SUPPLY VALVE AUTO OPENING FAILURE CS04A CORE SPRAY 1 N/A 0 N/A LOGIC POWER FAILURE DIV I CS04B CORE SPRAY 1 N/A 0 N/A LOGIC POWER FAILURE DIV II RD01A CRD PUMP TRIP 1 N/A 0 N/A 2A RD01B CRD PUMP TRIP 1 N/A 0 N/A 2B 3

Job Performance Measure (JPM)

FW01C CONDENSATE 1 N/A 0 N/A PUMP TRIP 2C PC08 H2 IN DRYWELL_ 2 29 0 N/A PC09 OXYGEN IN 2 2.8 0 N/A DRYWELL_

PC10 H2 IN 2 18 0 N/A SUPPRESSION POOL_

PC11 OXYGEN IN 2 1.5 0 N/A SUPPRESSION POOL_

Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN 2 N/A N/A ON SUMP LEVEL ABNORMAL Schedule File(s):

  • Appendix\App. 8E.sch

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 05/27/15 All Initial issue 5

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is shutdown.
  • 3-EOI-APPENDIX-12 has been completed.
  • 3-EOI-APPENDIX-19 has been completed.
  • PCIS Group 6 has been overridden per 3-EOI-APPENDIX-8E.

INITIATING CUES:

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2.

6

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Step 1:

3. MONITOR Drywell and Suppression Chamber H2 and O2concentrations on one or more of the following displays(3-EOI Appendix 19):

SAT

  • 3-MON-76-110, H2/O2 ANALYZER (Panel 3-9-55)

UNSAT

  • 3-XR-76-110, H2/O2 CONCENTRATION (Panel 3-9-54)

N/A Standard:

Verifies H2 and O2 concentrations Step 2:

3. IF ................. Drywell/Suppression Chamber H2 /O2 analyzer is or becomes inoperable, SAT THEN ...........NOTIFY Chemistry Lab to sample Drywell UNSAT andSuppression Chamber for H2 and O2 using CI-644.

N/A Standard:

Verifies Drywell/Suppression Chamber H2 /O2 analyzers are Operable 7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

4. WHEN ......... Drywell or Suppression Chamber H2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure. SAT Standard: UNSAT Observes a rise in Drywell H2 Concentration and continues with N/A procedure.

Step 4:

NOTE This procedure assumes that the normal makeup is from N2 Storage Tank B.

SAT

5. DISPATCH personnel to N2 Storage Tank B to CHECK 0-PI-76-331, UNSAT N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.

N/A Standard:

Dispatches UO to verifyN2 Storage Tank B Pressure CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:

6. DETERMINE area with highest H2 and/or O2 concentrations and Critical Step INFORM SRO.

SAT Standard:

UNSAT Correctly determines highest concentration is in the drywell and informs US N/A CUE: If asked about 15 minute sample time, state 15 minutes have elapsed 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 6:

Critical Step

7. VERIFY PCIS RESET (Panel 3-9-4).

SAT Standard:

UNSAT Verifies PCIS RESET on Panel 3-9-4 N/A Step 7:

Critical Step

8. IF ................. It is desired to makeup N2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10. SAT Standard: UNSAT Correctly determine step is not applicable and proceeds to step 9. N/A Step 8:
9. CONTROL Drywell H2 and O2 as follows:

Critical Step

a. OPEN the following valves to admit N2 to Drywell (Panel 3-9-3):

SAT

  • 3-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV
  • 3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV. UNSAT Standard:

N/A OPENS 3-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV

&3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Step 9:

b. SLOWLY ADJUST 3-PC-76-14, DW/SUPPR CHBR N2 MUPRESS Critical Step CONTROL (Panel 3-9-3), to maintain flow between 55 and60 scfm on 3-XR-76-14, DW/SUPPR CHBR N2 MAKEUPFLOW/PRESS (Panel 3-SAT 9-3), or as directed by SRO if SAMGexecution is in progress.

UNSAT Standard:

N/A Achieves a flowrate between 55-60 scfm and monitors Drywell Hydrogen Concentration Lowering 9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 10:

c. CONTINUE N2 admission to the Drywell UNTIL Drywell H2 and O2 are below desired values. SAT Standard: UNSAT Monitors Drywell Hydrogen Concentration N/A Note to Examiner: Once satisfied with N2 Flow established between 55 - 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.

Pass/ Fail Criteria: Establish N2 Flow > 55 scfm and H2 Concentration on a downward trend.

STOP TIME END OF TASK 10

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is shutdown.
  • 3-EOI-APPENDIX-12 has been completed.
  • 3-EOI-APPENDIX-19 has been completed.
  • PCIS Group 6 has been overridden per 3-EOI-APPENDIX-8E.

INITIATING CUES:

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2.

11

Job Performance Measure (JPM)

Restore Offsite Power to 4KV shutdown board at SITE: BFN JPM TITLE:

PNL 9-23 JPM NUMBER: 631 U2 REVISION: 0 TASK SRO STA UO NAUO APPLICABILITY:

U-082-NO-09 / Restore Offsite Power to 4KV TASK NUMBER / TASK TITLE(S):

shutdown board at PNL 9-23 K/A RATINGS: RO 3.4 SRO 3.4 262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control room: Synchroscope, K/A STATEMENT:

including understanding of running andincoming voltages RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 6 EVALUATION LOCATION: In -P la n t Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NATIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: 631 U2 RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to restore offsite power to 4KV SD BD A from 4KV SD BUS 1.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure 0-OI-82 VERIFICATION TIME: 15 Min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 286 Console 1. Reset to IC 28 and take out of freeze Operator 2. Start A EDG and parallel with offsite Instructions 3. Open 4-kV Shutdown Board A Breaker 1614 Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set 3

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed.

I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • No Inclement weather currently exists in the area
  • 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.

4

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT /

UNSAT Step 1:

0-OI-82 Standby Diesel Generator System Section 8.3 Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23 NOTE The following list of 4-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:

SAT

__UNSAT Shutdown A B C D Board N/A Norm Feed Bkr 1614 1616 1718 1724 Alt Feed Bkr 1716 1714 1624 1618

[1] VERIFY 4-kV Shutdown Board A is being supplied power by its respective Diesel Generator as the only source of power.

Standard:

Verifies 4-kV Shutdown Board A is being supplied by DG A.

Step 2:

[2] VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.

Diesel Handswitch Name Handswitch Panel SAT No.

4KV SD BD A UNSAT A 0-211-3EA 0-9-23-7 AUTO/LOCKOUT RESET N/A Standard:

Verifies 4KV SD BD A AUTO/LOCKOUT RESET, HS-0-211-A, is tripped to manual.

5

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 3:

[3] PLACE the synchroscope switch for the 4-kV shutdown board Critical Step feeder breaker that is to be paralleled with the Diesel Generator in ON. SAT Standard: UNSAT Places Synchroscope switch for 4-kV Shutdown Board A normal N/A feeder breaker 1614 to ON.

Step 4:

[4] VERIFY 4-kV Shutdown Bus 1(2) voltage is between 3950 Volts SAT and 4400 Volts and NOT undergoing abnormal voltage transients.

UNSAT Standard:

N/A Verifies 4-kV Shutdown Bus 1 voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.

Step 5:

[5] VERIFY associated incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients.

Shutdown Instrument Name Instrument No. Panel Bd SAT A or B GEN SYNC 0-SI-82-0AB 0-9-23-7 FREQUENCY UNSAT C or D GEN SYNC 0-SI-82-0CD 0-9-23-8 FREQUENCY N/A Standard:

Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY,0-SI-82-AB.

6

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 6:

CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclementweather (e.g., lightning, heavy winds).

SAT

[6] IF 4-kV Shutdown Bus 1 (2) is experiencing abnormal voltage or UNSAT frequency conditions, THEN PERFORM the following:

N/A Standard:

STEP N/A Step 7:

CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.

Critical Step

[7] PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM. SAT Diesel Handswitch Name Handswitch Panel UNSAT No.

A DG A MODE SELECT 0-HS-82-A/5A 0-9-23-7 N/A Standard:

Pulls DG A MODE SELECT switch 0-HS-82-A/5A and places it in PARALLELED WITH SYSTEM.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 8:

CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.

SAT UNSAT

[8] RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.

N/A Standard:

Releases the Diesel Generator A mode selector switch, 0-HS A/5A and observesPARALLELED WITH SYSTEM light is illuminated.

Step 9:

[9] ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Critical Step Diesel Handswitch Name Handswitch Panel No. SAT A DG A GOVERNOR 0-HS-82-A/3A 0-9-23-7 CONTROL UNSAT Standard: N/A AdjustsDiesel Generator A frequency using Diesel Generator governor control switch, 3-HS-82-A/3A, (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 10:

[10] USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.

Diesel Instrument Name Inst No. Panel DG A VOLT REGULATOR 0-HS-82-A/2A SAT CONT A GEN SYNC REF VOLTAGE 0-EI-82-AB 0-9-23-7 UNSAT SYSTEM SYNC REF 0-EI-211-0AB VOLTAGE N/A Standard:

Matches DG A voltage with system voltage using DG A VOLT REGULATOR CONT switch 0-HS-82-A/2A.

Step 11:

[11] WHEN the synchroscope needle is approximately 2 minutes on Critical Step the right hand side of the 12 o'clock position, THEN CLOSE the 4-kV shutdown board feeder breaker that is to be SAT paralleled with the Diesel Generator.

UNSAT Standard:

N/A Closesthe 4-kV shutdown board feeder breaker 1614 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.

Step 12:

[12] PLACE the synchroscope switch for the 4-kV shutdown board SAT feeder breaker that was paralleled with the Diesel Generator in OFF.

UNSAT Standard:

N/A Places the synchroscope switch for BKR 1614 in OFF.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 13:

NOTE If diesel operates greater than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.

[13] IF DG has been operating at a low-load condition (50%) for an extended period of time (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) THEN PERFORM the following (Otherwise N/A):

[13.1] USE the associated Diesel Generator's governor controlswitch and voltage regulator control switch toINCREASE kW and kVAR load, in increments of Critical Step 100kWevery 15 minutes.

SAT Diesel Handswitch Name Hands Panel witch UNSAT No.

DG A GOVERNOR CONTROL 0-HS-N/A 82-A/3A A 0-9-23-7 DG A VOLT REGULATOR 0-HS-CONTROL 82-A/2A

[13.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.

[13.3] STEP N/A

[13.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.

[13.5] MAINTAIN 100% load for a minimum of 30 minutes.

Standard:

Loads DG to 2600 kW and 1850 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.

CUE: After first 100 kW load adjustment state 15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.

10

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 14:

NOTE Lagging VARs should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.

SAT UNSAT

[14] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and N/A kVAR load.

Diesel Handswitch Name Handswitch No. Panel DG A GOVERNOR CONTROL 0-HS-82-A/3A A 0-9-23-7 DG A VOLT REGULATOR CONT 0-HS-82-A/2A Standard:

Obtains desired kW and kVAR load using DG A Governor Control switch, 0-HS-82-A/3A and DG Volt Regulator Cont switch, 0-HS-82-A/2A.

CUE: state 30 minutes have elapsed continue with procedure.

Step 15:

[15] MONITOR the offsite source that is paralleled with the Diesel Generator. SAT

[16] IF abnormal voltage or frequency transients are experienced, UNSAT THEN N/A Standard:

Step is N/A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 16:

[17] WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:

CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVARlimit may result in a reverse power trip of the Diesel Generator output breaker.

[17.1] USE the associated Diesel Generator's governor control Critical Step switch and voltage regulator control switch to reduce generator load to approximately 300 kW and SAT 250 kVAR:

UNSAT Diesel Instrument Name Inst No. Panel N/A DG A GOVERNOR CONTROL 0-HS-82-A/3A DG A VOLTAGE 0-HS-82-A/2A A REGULATOR CONTROL 0-9-23-7 DG A KILOWATTS 0-JI-82-A/A DG A KILOVARS 0-VAR-82-A/A Standard:

Unloads the DG to approximately 300 KW and 250 kVAR.

Step 17

[17.2] PLACE the associated Diesel Generator breaker control Critical Step switch in TRIP SAT Diesel Handswitch Name Handswitch No. Panel A DG A BKR 1818 0-HS-211-A/22A 0-9-23-7 UNSAT N/A Standard:

Trips Diesel Generator breaker 1818.

12

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 18:

[17.3] PULL and PLACE the associated Diesel Generator mode Critical Step selector switch in SINGLE UNIT.

SAT Diesel Handswitch Name Handswitch No. Panel A DG A MODE SELECT 0-HS-211-A/5A 0-9-23-7 UNSAT N/A Standard:

Pulls and places 0-HS-211-A/5A to Single Unit.

Step 19:

[17.4] RELEASE the Diesel Generator mode selector switch and SAT OBSERVE the SINGLE UNIT light illuminated.

UNSAT Standard:

N/A Verifies Single Unit light illuminated.

CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK 13

Job Performance Measure (JPM)

Provide to Applicant INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • No Inclement weather currently exists in the area
  • 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.

14

Job Performance Measure (JPM)

Restore Offsite Power to 4KV shutdown board at PNL 9-SITE: BFN JPM TITLE:

23 U-3 JPM NUMBER: 631 REVISION: 0 TASK SRO STA UO NAUO APPLICABILITY:

U-082-NO-09 / Restore Offsite Power to 4KV TASK NUMBER / TASK TITLE(S):

shutdown board at PNL 9-23 K/A RATINGS: RO 3.4 SRO 3.4 262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control K/A STATEMENT: room: Synchroscope, including understanding of running and incoming voltages RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 6 EVALUATION LOCATION: In -P la n t Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: 631 RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to restore offsite power to 4KV SD BD EC.

PRA: NA REFERENCES/PROCEDURES NEEDED: Procedure 3-OI-82 VERIFICATION TIME: 15 Min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 286

1. Reset to IC 28 and take out of freeze Console
2. Start C EDG and parallel with offsite Operator
3. Open 4-kV Shutdown Board 3EC Breaker 1338 Instructions Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Batch / Pref File(s):

3

Job Performance Measure (JPM)

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed.

I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • No Inclement weather currently exists in the area
  • 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.

4

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT /

UNSAT Step 1:

3-OI-82 Standby Diesel Generator System Section 8.3 Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23 NOTE The following list of 4-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:

SAT UNSAT Shutdown 3EA 3EB 3EC 3ED Board N/A Norm Feed Bkr 1334 1336 1338 1342 Alt Feed Bkr 1726 1728 1626 1628

[1] VERIFY 4-kV Shutdown Board 3EC is being supplied power by its respective Diesel Generator as the only source of power.

Standard:

Verifies 4-kV Shutdown Board EC is being supplied by DG C Step 2:

[2] VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.

SAT Diesel Handswitch Name Handswitch No. Panel 4KV SD BD 3EC 3-43-211- UNSAT 3C 3-9-23 AUTO/LOCKOUT RESET 3EC N/A Standard:

Verifies 4KV SD BD 3EC AUTO/LOCKOUT RESET, 3-43-211-3EC, is tripped to manual.

5

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 3:

[3] PLACE the synchroscope switch for the 4-kV shutdown board Critical Step feeder breaker that is to be paralleled with the Diesel Generator in ON. SAT Standard: UNSAT Places Synchroscope switch for 4-kV Shutdown Board EC normal N/A feeder breaker 1338 to ON Step 4:

[4] CHECK the applicable 4-kV unit board (4-kV bus tie board)

SAT voltage is between 3950 VOLTS and 4400 VOLTS and NOT undergoing abnormal voltage transients.

UNSAT Standard:

N/A Verifies 4-kV Unit Board voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.

Step 5:

[5] VERIFY associated incoming frequency is between 59 HERTZ and 61 HERTZ and NOT undergoing abnormal frequency transients.

Shutdown Instrument Name Instrument No. Panel SAT Bd 3EA or GEN SYNC 3-SI-82-3AB 3-9-23 UNSAT 3EB FREQUENCY 3EC or GEN SYNC 3-SI-82-3CD 3-9-23 N/A 3ED FREQUENCY Standard:

Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY, 3-SI-82-CD .

6

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 6:

CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclement weather (e.g., lightning, heavy winds). SAT UNSAT

[6] IF 4-kV unit board (4-kV bus tie board) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following: N/A Standard:

N/A Step 7:

CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.

Critical Step

[7] PULL and PLACE the associated Diesel Generator mode SAT selector switch in PARALLELED WITH SYSTEM.

UNSAT Diesel Handswitch Name Handswitch Panel No.

N/A 3C DG 3C MODE SELECT 3-HS-82-3C/5A 3-9-23 Standard:

Pulls DG 3C MODE SELECT switch 3-HS-82-3C/5A and places it in PARALLELED WITH SYSTEM 7

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 8:

CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed. SAT UNSAT

[8] RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated. N/A Standard:

Releases the Diesel Generator 3C mode selector switch, 3-HS-82-3C/5C and observes PARALLELED WITH SYSTEM light is illuminated.

Step 9:

[9] ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Critical Step Diesel Handswitch Name Handswitch Panel No. SAT 3C DG 3C GOVERNOR 3-HS-82-3C/3A 3-9-23 CONTROL UNSAT Standard: N/A Adjusts Diesel Generator 3C frequency using Diesel Generator governor control switch, 3-HS-82-3C/3A (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 10:

[10] USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.

Dies Instrument Name Inst No. Panel el SAT DG 3C VOLT REGULATOR 3-HS CONT 3C/2A UNSAT 3C GEN SYNC REF VOLTAGE 3-EI-82-3CD 3-9-23 SYSTEM SYNC REF 3-EI-211-VOLTAGE 3ECB/B N/A Standard:

Matches DG C voltage with system voltage using DG 3C VOLT REGULATOR CONT switch 3-HS-82-3C/2A Step 11:

[11] WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN Critical Step CLOSE the 4-kV shutdown board feeder breaker that is to be SAT paralleled with the Diesel Generator.

UNSAT Standard:

N/A Closes the 4-kV shutdown board normal feeder breaker 1338 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.

Step 12:

[12] PLACE the synchroscope switch for the 4-kV shutdown board SAT feeder breaker that was paralleled with the Diesel Generator in OFF. UNSAT Standard: N/A Places the synchroscope switch for BKR 1338 in OFF 9

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 13:

[13] IF the normal feeder breaker is supplying the 4-kV shutdown board, THEN RESET the associated 4kV shutdown board auto transfer lockout Critical Step relay.

SAT Diesel Handswitch Name Handswitch Panel No.

UNSAT 3C 4KV SD BD 3EC 3-43-211-3EC 3-9-23 AUTO/LOCKOUT N/A RESET Standard:

Resets 4KV SD BD 3EC Auto Transfer Lockout Relay Step 14:

NOTE If diesel operates greater than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.

[14] IF DG has been operating at a low-load condition (50%) for an extended period of time (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) THEN PERFORM the following (Otherwise N/A): Critical Step

[14.1] USE the associated Diesel Generators governor control SAT switch and voltage regulator control switch to INCREASE kW and kVAR load, in increments of 100kW every 15 UNSAT minutes.

N/A Diesel Handswitch Name Hands Panel witch No.

DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A 3C 3-9-23 DG 3C VOLT REGULATOR 3-HS-CONTROL 82-3C/2A 10

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 14 continued:

[14.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.

[14.3] STEP N/A

[14.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.

[14.5] MAINTAIN 100% load for a minimum of 30 minutes.

Standard:

Loads DG to 2600 kW and 1850 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.

CUE: After first 100 kW load adjustment state 15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.

Step 15:

NOTE VARs lagging should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to SAT the maximum kVAR lagging the system will allow.

UNSAT

[15] USE the associated Diesel Generator's governor control switch N/A and voltage regulator control switch to obtain desired kW and kVAR load.

Diesel Handswitch Name Handswitch No. Panel DG 3C GOVERNOR 3-HS CONTROL 3C/3A 3C 3-9-23 DG 3C VOLT REGULATOR 3-HS CONT 3C/2A 11

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Standard:

Obtains desired kW and kVAR load using DG 3C Governor Control switch, 3-HS-82-3C/3A and DG Volt Regulator Control switch, 3-HS-82-3C/2A CUE: state 30 minutes have elapsed continue with procedure.

Step 16:

[16] MONITOR the offsite source that is paralleled with the Diesel Generator. SAT

[17] IF abnormal voltage or frequency transients are experienced, UNSAT THEN N/A Standard:

Step is N/A Step 17:

[18] WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:

CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVAR limit may result in a reverse power trip of the Diesel Generator output breaker. Critical Step SAT

[18.1] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce UNSAT generator load to approximately 300 kW and 250 kVAR: N/A Diesel Instrument Name Inst No. Panel DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A DG 3C VOLT REGULATOR 3-HS-82-3C/2A 3C 3-9-23 CONT DG 3C KILOWATTS 3-JI-82-3C/A DG 3C KILOVARS 3-VAR-82-3C/A 12

Job Performance Measure (JPM)

STEP / STANDARD SAT /

UNSAT Step 17 continued:

Standard:

Unloads the DG to approximately 300 KW and 250 kVAR Step 18:

[18.2] PLACE the associated Diesel Generator breaker control Critical Step switch in TRIP.

SAT Diesel Handswitch Name Handswitch No. Panel 3C DG 3C BKR 1832 3-HS-211- 3-9-23 UNSAT 3EC/10A N/A Standard:

Trips breaker DG 3C BKR 1832 Step 19:

[18.3] PULL and PLACE the associated Diesel Generator mode Critical Step selector switch in SINGLE UNIT.

SAT Diesel Handswitch Name Handswitch No. Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5A 0-9-23 UNSAT Standard: N/A Pulls and places 3-HS-82-3C/5A to Single Unit Step 20: SAT

[18.4] RELEASE the Diesel Generator mode selector switch and UNSAT OBSERVE the SINGLE UNIT light illuminated.

N/A Standard:

Verifies Single Unit light illuminated CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK 13

Job Performance Measure (JPM)

Provide to Applicant INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • No Inclement weather currently exists in the area
  • 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3-OI-82, Section 8.3, Restoring Offsite Power to 4-kV Shutdown Board at Panel 9-23.

14

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: Respond to Off-Gas Post Treatment Radiation HI-HI-HI JPM NUMBER: 190 U2 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-066-AB-02 -Respond to Off-Gas Post Treatment TASK NUMBER / TASK TITLE(S):

Radiation Hi-Hi-Hi K/A RATINGS: RO 2.9 SRO 3.2 271000 Offgas System: A2.16; Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those K/A STATEMENT: predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2)

RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 9 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: N/A TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: 190 U2 RO SRO DATE: _______

TASK STANDARD: Respond to Off-Gas Post Treatment Radiation HI-HI-HI per 2-AOI-66-2 and/or 2-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED: 2-AOI-66-2, 2-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 287

1. Reset to IC 28 Console 2. Fire Manual Trigger 2 Operator 3. Fire Manual Trigger 1 Instructions 4. Station 2nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING 1 50 N/A YES DAMAGE RM14C OFFGAS RAD 1 1E6 CPS N/A YES MONITOR FAILURERM 265A RM14D OFFGAS RAD 1 1E6 CPS N/A YES MONITOR FAILURE RM-90-266A Remotes Description Event Severity Delay Initial set OG06 Bypass FCV-66-28 2 N/A N/A BYP Post Treatment Hi-Hi-Hi Rad Isol Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA 1 2.5 N/A YES RAD ZAORI9017A RX BLDG AREA 1 2.6 N/A YES RAD ZAORM90265A 90-265 METER 1 6.0 N/A YES UPSCALE ZAORM90266A 90-266 METER 1 6.0 N/A YES UPSCALE ZAORR90135R1 90-135 RECORDER 1 6.0 N/A YES UPSCALE PEN 1 ZAORR90135R2 90-135 RECORDER 1 6.0 N/A YES UPSCALE PEN 2 ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES 3

Job Performance Measure (JPM)

ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT 1 N/A N/A YES RAD HI XA553A6 STACK GAS RAD 1 N/A N/A YES HI HI XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD 1 N/A N/A YES HI XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED 1 N/A N/A YES VAULT RAD HI XA554C27 OG ANNUAL 1 N/A N/A YES RELEASE LIMIT EXCEEDED XA554C33 OG POST TREAT 1 N/A N/A YES RAD HI XA554C34 OG POST TREAT 1 N/A N/A YES RAD HI HI XA554C35 OG POST TREAT 1 N/A N/A YES RAD HI HIHI ZDIHS6628 66-28 VALVE 1 N/A N/A YES CLOSED ZAORR90265R1 90-265 RECORDER 1 6.0 N/A YES UPSCALE PEN 1 ZAORR90265R2 90-265 RECORDER 1 6.0 N/A YES UPSCALE PEN 2 ZAORR90160R1 OG PRETREAT 1 -2.0 N/A YES RECORDER UPSCALE XA554B2 RWCU FILTER 1 N/A N/A YES INLET CNDT HIGH Schedule File(s): JPM 190 U2 OG Post treat Rad HI HIHI 4

Job Performance Measure (JPM)

IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 2 Operator. Unit 2 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 2-XA-55-4C, window 35.

5

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Performance Step 1:

SAT When directed, identify/obtain copy of ARP-9-4C, window 35.

UNSAT Standard:

N/A Obtains copy of 2-ARP-9-4C, window 35 Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 2-AOI-66-2. In that event, continue at Performance Step 5.

Performance Step 2:

2-ARP-9-4C window 35 Operator Action:

A. VERIFY alarm condition on the following

  • OFFGAS POST-TREATMENT RADIATION recorder, SAT 2-RR-90-265 on Panel 2-9-2.
  • OG POST-TREATMENT CHAN A RAD MON RTMR UNSAT radiationmonitor, 2-RM-90-266A on Panel 2-9-10.
  • OG POST-TREATMENT CHAN B RAD MON RTMR N/A radiationmonitor, 2-RM-90-265A on Panel 2-9-10.

Standard:

Verified alarm condition on 2-RR-90-265 and 2-RM-265/266.

Performance Step 3:

B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 2-FCV- Critical Step 66-28 has the Mechanical Restraint DISENGAGED and 2-FCV-66-28 isCLOSED. SAT Standard: UNSAT Takes handswitch 2-FCV-66-28 to close and observes green light N/A illuminated and red light out.

Cue: If asked, the Offgas Isolation Valve, 2-FCV-66-28 is NOT mechanically restrained.

6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 4:

C. REFER to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-SAT Hi-Hi UNSAT Standard:

N/A Refers to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 5:

2-AOI-66-2 4.0 OPERATOR ACTIONS 4.1 Immediate Actions Critical Step

[1] IF scram has not occurred, THEN SAT PERFORM the following:

UNSAT

[1.1] IF core flow is above 60%, THEN N/A REDUCE core flow to between 50-60%.

Standard:

Reduced core flow to between 50-60% with recirc system.

Performance Step 6:

[1.2] MANUALLY SCRAM the Reactor. (Reference 2-AOI-100-1).

Standard:

Critical Step

  • Depresses both SCRAM Pushbuttons
  • Places mode switch in shutdown SAT
  • Verifies All Rods in
  • Performs a Scram Announcement UNSAT o Rx Mode Switch Position: Shutdown N/A o Rod Position: All Full In o Reactor Water Level ____ & Trend ___

o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5%

Examiner Note: The scram report and referring to 2-AOI-100-1 are not considered critical.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 2-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 7:

4.2 Subsequent Actions

[1] IF OFFGAS SYSTEM ISOLATION VALVE, 2-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN SAT DISENGAGE 2-FCV-066-0028 mechanical restraint by UNSAT rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise N/A N/A)

Standard:

Verifies that 2-FCV-066-0028 in NOT mechanically restrained.

Cue: 2-FCV-066 is NOT mechanically restrained.

Performance Step 8:

[2] VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, Critical Step 2-FCV-66-28 on Panel 2-9-53 or locally.

SAT Standard:

UNSAT Verifies 2-FCV-66-28 is closed at panel 9-53 by Verifying RED light above handswitch extinguished and GREEN light above N/A handswitch illuminated. (May have already verified valve closed from the ARP).

Examiner Note: May have already verified valve closed from the ARP Performance Step 9:

[3] MONITOR area radiation levels at Panel: 2-9-11. SAT Standard: UNSAT Monitored radiation levels at Panel 9-11. N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 10:

[4] REFER TO EPIP-1 for emergency classification level and SAT response.

UNSAT Standard; N/A Notifies SM to implement EPIP-1.

Cue: The Shift Manager is implementing the EPIPs as needed.

Performance Step 11:

[5] MONITOR the following parameters:

A. MAIN STEAM LINE RADIATION, 2-RR-90-135, Panel 2-9-2.

B. OFFGAS PRETREATMENT RADIATION 2-RR 157, Pnl 2-9-2. SAT C. OFFGAS POST-TREATMENT RADIATION 2RR- UNSAT 90-265, Pnl 2-9-2 N/A D. STACK GAS RADIATION, 0-RR-90-147, Unit 1 Panel 1-9-2.

Standard; Monitors90-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147.

Cue: As Unit 1 Operator, Stack Gas Radiation, 0-RR-90-147 is reading 5X10E6 cps.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 12:

[6] IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10E5 cps as indicated on OFFGASRADIATION recorder 2-RR-90-266 on panel 2 Critical Step 2, THEN SAT CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 2-FCV-1-55 and 2-FCV-1-56.

UNSAT Standard:

N/A Recognizes that the Off-Gas Post Treatment activity is >6 X 10E5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (2-FCV-1-55/56)

Cue: The Unit has been scrammed for 5 minutes.

  • Acknowledge closing of MSIVs.

Examiner Note: Closing 1-55 and 1-56 is not considered critical.

Performance Step 13:

NOTE Placing additional Stack Dilution Air Fans in service should keep 0-RM-90-147and 0-RM-90-148 on scale.

[7] PLACE STACK DILUTION FAN SEL control switch, SAT 2-XS-66-29, Panel 2-9-8, in OFF.

UNSAT

[8] START standby STACK DILUTION FAN 2B(2A) using controlswitch, 2-HS-66-31A(29A), Panel 2-9-8. N/A Standard:

Places 2-XS-66-29 in OFF and Starts standby Stack Dilution fan 2B, using 2-HS-66-31A Cue: That completes this task.

STOP TIME _______

END OF TASK 10

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 2 Operator. Unit 2 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 2-XA-55-4C, window 35.

11

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: Respond to Off-Gas Post Treatment Radiation HI-HI-HI JPM NUMBER: 190 U3 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-066-AB-02 -Respond to Off-Gas Post Treatment TASK NUMBER / TASK TITLE(S):

Radiation Hi-Hi-Hi K/A RATINGS: RO 2.9 SRO 3.2 271000 Offgas System: A2.16;Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the K/A STATEMENT:

consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2)

RELATED PRA INFORMATION: N/A SAFETY FUNCTION: 9 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: N/A TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: 190 RO SRO DATE: _______

TASK STANDARD: Respond to Off-Gas Post Treatment Radiation HI-HI-HI per 3-AOI-66-2 and/or 3-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED: 3-AOI-66-2, 3-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

SIMULATOR SETUP IC 28 Exam IC 288

1. Reset to IC 28 Console 2. Fire Manual Trigger 2 Operator 3. Fire Manual Trigger 1 Instructions 4. Station 2nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING 1 50 N/A YES DAMAGE RM14C OFFGAS RAD 1 1E6 CPS N/A YES MONITOR FAILURE RM-90-265A RM14D OFFGAS RAD 1 1E6 CPS N/A YES MONITOR FAILURE RM-90-266A Remotes Description Event Severity Delay Initial set OG06 Bypass FCV-66-28 2 N/A N/A BYP Post Treatment Hi-Hi-Hi Rad Isol Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA 1 2.5 N/A YES RAD ZAORI9017A RX BLDG AREA 1 2.6 N/A YES RAD ZAORM90265A 90-265 METER 1 6.0 N/A YES UPSCALE ZAORM90266A 90-266 METER 1 6.0 N/A YES UPSCALE ZAORR90135R1 90-135 RECORDER 1 6.0 N/A YES UPSCALE PEN 1 ZAORR90135R2 90-135 RECORDER 1 6.0 N/A YES UPSCALE PEN 2 ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES 3

Job Performance Measure (JPM)

ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT 1 N/A N/A YES RAD HI XA553A6 STACK GAS RAD 1 N/A N/A YES HI HI XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD 1 N/A N/A YES HI XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED 1 N/A N/A YES VAULT RAD HI XA554C27 OG ANNUAL 1 N/A N/A YES RELEASE LIMIT EXCEEDED XA554C33 OG POST TREAT 1 N/A N/A YES RAD HI XA554C34 OG POST TREAT 1 N/A N/A YES RAD HI HI XA554C35 OG POST TREAT 1 N/A N/A YES RAD HI HIHI ZDIHS6628 66-28 VALVE 1 N/A N/A YES CLOSED ZAORR90265R1 90-265 RECORDER 1 6.0 N/A YES UPSCALE PEN 1 ZAORR90265R2 90-265 RECORDER 1 6.0 N/A YES UPSCALE PEN 2 ZAORR90160R1 OG PRETREAT 1 -2.0 N/A YES RECORDER UPSCALE XA554B2 RWCU FILTER 1 N/A N/A YES INLET CNDT HIGH Schedule File(s): JPM 190 U3 OG Post treat Rad HI HIHI 4

Job Performance Measure (JPM)

IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 3 Operator. Unit 3 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 3-XA-55-4C, window 35.

5

Job Performance Measure (JPM)

START TIME STEP / STANDARD SAT / UNSAT Performance Step 1:

SAT When directed, identify/obtain copy of ARP-9-4C, window 35.

UNSAT Standard:

N/A Obtains copy of 3-ARP-9-4C, window 35 Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 3-AOI-66-2. In that event, continue at Performance Step 5.

Performance Step 2:

3-ARP-9-4C window 35 Operator Action:

A. VERIFY alarm condition on the following

  • OFFGAS POST-TREATMENT RADIATION recorder, SAT 3-RR-90-265 on Panel 3-9-2.
  • OG POST-TREATMENT CHAN A RAD MON RTMR UNSAT radiationmonitor, 3-RM-90-266A on Panel 3-9-10.
  • OG POST-TREATMENT CHAN B RAD MON RTMR N/A radiationmonitor, 3-RM-90-265A on Panel 3-9-10.

Standard:

Verified alarm condition on 3-RR-90-265 and 3-RM-265/266.

Performance Step 3:

B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 3-FCV- Critical Step 66-28 has the Mechanical Restraint DISENGAGED and 3-FCV-66-28 isCLOSED. SAT Standard: UNSAT Takes handswitch 3-FCV-66-28 to close and observes green light N/A illuminated and red light out.

Cue: If asked, the Offgas Isolation Valve, 3-FCV-66-28 is NOT mechanically restrained.

6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 4:

C. REFER to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi SAT Standard: UNSAT Refers to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi N/A Performance Step 5:

3-AOI-66-2 4.0 OPERATOR ACTIONS 4.1 Immediate Actions Critical Step

[1] IF scram has not occurred, THEN SAT PERFORM the following:

UNSAT

[1.1] IF core flow is above 60%, THEN N/A REDUCE core flow to between 50-60%.

Standard:

Reduced core flow to between 50-60% with recirc system.

Performance Step 6:

[1.2] MANUALLY SCRAM the Reactor. (Reference 3-AOI-100-1).

Standard:

Critical Step

  • Depresses both SCRAM Pushbuttons
  • Places mode switch in shutdown SAT
  • Verifies All Rods in
  • Performs a Scram Announcement UNSAT o Rx Mode Switch Position: Shutdown N/A o Rod Position: All Full In o Reactor Water Level ____ & Trend ___

o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5%

Examiner Note: The scram report and referring to 3-AOI-100-1 are not considered critical.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 3-AOI-66-2, Off-gas Post-treatment Radiation Hi-Hi-Hi Performance Step 7:

4.2 Subsequent Actions

[1] IF OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN SAT DISENGAGE3-FCV-066-0028 mechanical restraint by UNSAT rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise N/A N/A)

Standard:

Verifies that 3-FCV-066-0028 in NOT mechanically restrained.

Cue: 3-FCV-066 is NOT mechanically restrained.

Performance Step 8:

[2] VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, Critical Step 3-FCV-66-28 on Panel 3-9-53 or locally.

SAT Standard:

UNSAT Verifies 3-FCV-66-28 is closed at panel 9-53 by Verifying RED light above handswitch extinguished and GREEN light above N/A handswitch illuminated. (May have already verified valve closed from the ARP).

Examiner Note: May have already verified valve closed from the ARP Performance Step 9:

SAT

[3] MONITOR area radiation levels at Panel: 3-9-11.

UNSAT Standard:

N/A Monitored radiation levels at Panel 9-11.

Cue: Another operator will monitor and evaluate Area Radiation Levels.

8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 10:

[4] REFER TO EPIP-1 for emergency classification level and SAT response.

UNSAT Standard; N/A Notifies SM to implement EPIP-1.

Cue: The Shift Manager is implementing the EPIPs as needed.

Performance Step 11:

[5] MONITOR the following parameters:

A. MAIN STEAM LINE RADIATION, 3-RR-90-135, Panel 3-9-2.

B. OFFGAS PRETREATMENT RADIATION 3-RR 157, Pnl3-9-2. SAT C. OFFGAS POST-TREATMENT RADIATION 3-RR- UNSAT 90-265, Pnl3-9-2 N/A D. STACK GAS RADIATION, 0-RR-90-147, Unit 1 Panel 1-9-2.

Standard; Monitors90-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147.

Cue: As Unit 1 Operator, Stack Gas Radiation, 0-RR-90-147 is reading 5X10E6 cps.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Performance Step 12:

[6] IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10E5 cps as indicated on OFFGASRADIATION recorder 3-RR-90-265 on panel 3 2, THEN Critical Step CLOSE all Main Steam Isolation Valves and Main Steam SAT LineDrain Valves, 3-FCV-1-55 and 3-FCV-1-56.

UNSAT Standard:

N/A Recognizes that the Off-Gas Post Treatment activity is >6 X 10E5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (3-FCV-1-55/56)

Cue: The Unit has been scrammed for 5 minutes.

  • Acknowledge closing of MSIVs.

Examiner Note: Closing 1-55 and 1-56 is not considered critical.

Performance Step 13:

NOTE Placing additional Stack Dilution Air Fans in service should keep 0-RM-90-147and 0-RM-90-148 on scale.

[7] PLACE STACK DILUTION FAN SEL control switch, SAT 3-XS-66-29, Panel 3-9-8, in OFF.

UNSAT

[8] START standby STACK DILUTION FAN 3B(3A) using controlswitch, 3-HS-66-31A(29A), Panel 3-9-8. N/A Standard:

Places 3-XS-66-29 in OFF and Starts standby Stack Dilution fan 3B, using 3-HS-66-31A Cue: That completes this task.

STOP TIME ________

END OF TASK 10

Job Performance Measure (JPM)

Provide to Applicant IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 3 Operator. Unit 3 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI-HI-HI annunciator, 3-XA-55-4C, window 35.

11

Job Performance Measure (JPM)

SITE: BFN JPM TITLE: AUTOMATIC START FAILURE OF A & C FIRE PUMPS JPM NUMBER: 673 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-026-NO-01/ MONITOR AUTO START OF FIRE TASK NUMBER / TASK TITLE(S):

PUMP K/A RATINGS: RO: 3.4 SRO: 3.4 286000 Fire Protection System A2.08; Ability to (a) predict the impacts of the following on the FIRE PROTECTION SYSTEM; K/A No. &STATEMENT: and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Failure to actuate when required RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 8 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) Y Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _673A___

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to manually start A, B and C Fire Pumps.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 0-OI-26 VALIDATIONTIME:__15 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 04/28/15 All Initial issue 3

Job Performance Measure (JPM)

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 1.

  • The Reactor Power at 70%
  • A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir.
  • Fire OPS has been dispatched to the scene.
  • Fire Pump B Tagged Out for Maintenance
  • A and C Fire Pumps failed to Auto Start.

INITIATING CUES:

The US directs you to start A and C Electric Fire Pumps per 0-OI-26 section 5.4.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

4

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

[1] PLACE the FIRE PUMP A TRANSFER switch, 0-XS-26-1 in EMERGENCY position, at the respective switchgear.

Critical Step Pump Board Compt A 4160V Shutdown Bd A 11 SAT C 4160V Shutdown Bd C 10 UNSAT Standard:

N/A Simulates placing FIRE PUMP A TRANSFER switch 0-XS-26-3 in EMERGENCY position at 4160 Shutdown Board A, Compartment 11 CUE: FIRE PUMP A TRANSFER switch 0-XS-26-1 is in the EMERGENCY position Step 2:

Critical Step

[2] CLOSE the breaker by placing the FIRE PUMP A CONTROL switch, 0-HS-26-1C to CLOSE. SAT Standard: UNSAT Simulates placing FIRE PUMP A CONTROL switch, 0-HS-26-1C N/A to CLOSE position.

CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF.

Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.

Step 3:

[3] CHECK pump ammeter at breaker indicates between 25 and 40 amps. SAT Standard UNSAT VERIFIES pump ammeter at breaker indicates between 25 and N/A 40 amps.

CUE: FIRE PUMP A ammeter at breaker indicates 30 amps.

5

Job Performance Measure (JPM)

Step 4:

[4] PLACE the NORM/EMERG Switch in NORMAL.

SAT Standard UNSAT PLACES the NORM/EMERG Switch in NORMAL for FIRE N/A PUMP A.

CUE: FIRE PUMP A NORM/EMERG Switch is in NORMAL Step 5:

[1] PLACE the FIRE PUMP C TRANSFER switch, 0-XS-26-3 in EMERGENCY position, at the respective switchgear.

Critical Step Pump Board Compt A 4160V Shutdown Bd A 11 SAT C 4160V Shutdown Bd C 10 UNSAT Standard:

N/A Simulates placing FIRE PUMP C TRANSFER switch 0-XS-26-3 in EMERGENCY position at 4160 Shutdown Board C, Compartment 10 CUE: FIRE PUMP C TRANSFER switch 0-XS-26-3 is in the EMERGENCY position Step 5:

Critical Step

[2] CLOSE the breaker by placing the FIRE PUMP C CONTROL switch, 0-HS-26-3C to CLOSE.

SAT Standard:

UNSAT Simulates placing FIRE PUMP C CONTROL switch, 0-HS-26-3C N/A to CLOSE position.

CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF.

Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.

6

Job Performance Measure (JPM)

Step 6:

[3] CHECK pump ammeter at breaker indicates between 25 and 40 amps. SAT Standard UNSAT VERIFIES pump ammeter at breaker indicates between 25 and N/A 40 amps.

CUE: FIRE PUMP C ammeter at breaker indicates 30 amps.

Step 7:

[4] PLACE the NORM/EMERG Switch in NORMAL.

SAT Standard UNSAT PLACES the NORM/EMERG Switch in NORMAL for FIRE N/A PUMP C.

CUE: FIRE PUMP C NORM/EMERG Switch is in NORMAL and this completes the JPM.

Termination Criteria: When two Fire Pumps are in service the JPM is complete.

STOP TIME:

7

Job Performance Measure (JPM)

Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 1.

  • The Reactor Power at 70%
  • A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir.
  • Fire OPS has been dispatched to the scene.
  • Fire Pump B Tagged Out for Maintenance
  • A and C Fire Pumps failed to Auto Start.

INITIATING CUES:

The US directs you to start A and C Electric Fire Pumps per 0-OI-26 section 5.2.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

8

Job Performance Measure (JPM)

ALIGNING EMERGENCY EECW MAKEUP TO SPENT SITE: BFN JPM TITLE:

FUEL POOL JPM NUMBER: 674 REVISION: 0 TASK APPLICABILITY: SRO STA UO NAUO U-000-EM-95/ Make-Up To SFP By EECW With TASK NUMBER / TASK TITLE(S):

Fire Hose (Internal Make-Up)

K/A RATINGS: RO: 3.1 SRO: 3.3 233000 Fuel Pool Cooling and Clean-up; A2.02; Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CLEAN-UP ; and (b) based on those K/A No. &STATEMENT:

predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Low pool level RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 9 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: __674__

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to align either North or South Headers of EECW to Unit 2 Spent Fuel Pool.

Operator Fundamental evaluated:

OF-2 Controlling plant evolutions and indications closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED: 2-AOI-78-1 VALIDATION TIME: 25 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 0 09/01/15 All Initial issue 3

Job Performance Measure (JPM)

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is in cold shutdown
  • The Unit 2 Spent Fuel Pool water level is lowering.
  • Fire Protection is available to assist INITIATING CUES:

The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3].

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

4

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

NOTES

1) Hose straps are staged at the hoses at the following locations:
  • Unit 1/Unit 2 Reactor Bldg Stairwell, El. 621, R6 U Line (placed on hose to carry weight of charged hose lines).
  • Hose reel on the Refuel Floor, El. 664, R6 U Line (for use in securing hose ends as needed).
2) Additional hose is stored in a cabinet located in Unit 1/Unit 2 Elevator Room, Reactor Bldg, El 595.

Critical Step CAUTION Performance of this attachment will degrade water chemistry in the SAT Spent Fuel Pool.

UNSAT

[3] UNLOCK and OPEN the following valves:

N/A

  • NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792.
  • SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793.

Standard:

Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793 by demonstrating opening each valve counter-clockwise and breaking seal.

CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0793 is OPEN Located in stairwell between elevation 565 ft and 593 ft. Hoses are already connected, no tools required.

5

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 3:

[4] VERIFY charged hoses in stairwell are not obstructing stairway access and/or kinked.

SAT

[4.1] ADJUST hose straps, as necessary.

UNSAT Standard:

N/A VERIFIES hoses in stairwell are not kinked Note to Examiner: Hoses are already run along the stairwell. Applicant should verify hoses not kinked and connected.

Step 4:

[5] VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and route to Unit 2 Spent Fuel Pool Critical Step (El 664, Refuel Floor, R6-U Line).

SAT Standard:

UNSAT VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and route to Unit 2 Spent N/A Fuel Pool (El 664, Refuel Floor, R6-U Line).

Note to Examiner: Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable. Hoses are already connected, no tools required.

Location: Refuel Floor Elevation 664 ft, R U Line.

Step 5:

[6] VERIFY hose connected from SOUTH HDR SPLY TO EMER Critical Step FUEL POOL MU, 1-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664, Refuel Floor, R6-U Line)

SAT Standard:

UNSAT VERIFY hose connected from SOUTH HDR SPLY TO EMER N/A FUEL POOL MU, 1-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664, Refuel Floor, R6-U Line) 6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Note to Examiner: Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable. Hoses are already connected, no tools required.

Location: Refuel Floor Elevation 664 ft, R U Line.

Step 6:

[7] VERIFY OPEN the following valves (El 664, Refuel Floor, R6 U Line):

  • NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-Critical Step 0796.

SAT

  • SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797.

UNSAT Standard:

N/A Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797 by demonstrating opening each valve counter-clockwise.

CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0797 is OPEN Location: Refuel Floor Elevation 664 ft, R U Line.

Step 7:

[8] VERIFY charged hoses on the Refuel Floor are not kinked.

SAT Standard: UNSAT VERIFY charged hoses on the Refuel Floor are not kinked N/A Termination Criteria: NORTH and SOUTH Header are aligned then the JPM is complete. State another operator will perform the remaining steps.

STOP TIME:

7

Job Performance Measure (JPM)

Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

  • The Reactor is in cold shutdown
  • The Unit 2 Spent Fuel Pool water level is lowering.
  • Fire Protection is available to assist INITIATING CUES:

The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3].

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

8

Job Performance Measure (JPM)

START UP AND SYNCHRONIZE UNIT 3 PREFERRED SITE: BFN JPM TITLE:

MMG SET JPM NUMBER: 307 REVISION: 6 TASK APPLICABILITY: SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): S-57C-NO-04 K/A RATINGS: RO: 2.5 SRO: 2.9 262002 Uninterruptable Power Supply (A.C./D.C.) A1.02; Ability to predict and/or monitor changes in parameters associated with K/A No. &STATEMENT:

operating the UNINTERRUPTABLE POWER SUPPLY (A.C./D.C.) controls including: Motor generator outputs RELATED PRA INFORMATION: Risk Significant SAFETY FUNCTION: 6 EVALUATION LOCATION: In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) N ALTERNATE PATH (Y/N) N Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG-SPP-17.8.1)

(See JPM Validation Checklist in NPG-SPP-17.8.2)

Validated by:

Validator Date Approved by:

Site Training Management Date Approved by:

Site Training Program Owner Date 1

Job Performance Measure (JPM)

OPERATOR: ________________________________ JPM Number: _307___

RO SRO DATE: _______

TASK STANDARD: Perform operations necessary to Start-up and synchronize Unit Preferred MMG Set Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant Evolutions Precisely PRA: NA REFERENCES/PROCEDURES NEEDED: 0-OI-57C VALIDATIONTIME: 25 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.)

SIGNATURE: ___________________________ DATE: __________

EXAMINER 2

Job Performance Measure (JPM)

Revision Summary Rev Effective Pages Description No. Date Affected 1 10/26/94 ALL GENERAL REVISION 2 05/07/95 ALL GENERAL REVISION FORMAT, PROCEDURE REVISION, ADDED 3 10/15/97 ALL PLANT WORK EXPECTATIONS TOUCH STAAR, SAFETY, AND 3-WAY COMM.

PROCEDURE REVISION, FORMAT 4 11/10/99 ALL DOCUMENT 5 10/03/01 ALL PROCEDURE REVISION 6 04/28/15 ALL UPDATE TO NEW FORMAT 3

Job Performance Measure (JPM)

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is in cold shutdown
  • The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
  • Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.

INITIATING CUES:

The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16].

NOTE: PERFORMER WILL NEED GGMKA KEY.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

4

Job Performance Measure (JPM)

START TIME:

STEP / STANDARD SAT / UNSAT Step 1:

NOTE Steps 5.5[16] through 5.5[26] are performed from Battery Board Room 2 UNIT PFD Sync. & Speed Control Panel. Critical Step SAT

[16] PLACE UNIT 3 MMG OPERATING MODE, 3-HS-252-02AB in AUTO.

UNSAT Standard:

N/A VERIFIED/SIMULATED PLACING the Unit 3 MMG SET OPERATING MODE 3-HS-252-02AB in AUTO.

Cue: The Unit 3 MMG SET OPERATING MODE 3-HS-252-02AB is in AUTO position.

Step 2:

Critical Step

[17] PLACE UNIT 3 MMG LOCAL-REMOTE CONTROL, 3-XS-252-02A in REMOTE.

SAT Standard:

UNSAT SIMULATED PLACING the Unit 3 MMG SET LOCAL-REMOTE N/A CONTROL 3-XS-252-02A in the REMOTE position.

Cue: The Unit 3 MMG SET LOCAL-REMOTE CONTROL 3-HS-252-02A is in the REMOTE position.

Step 3:

[18] PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE Critical Step SYNC SWITCH SS-7, 3-HS-252-03/SS-7 in ON.

SAT Standard:

UNSAT SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 3-HS-252-03/SS-7, in the ON N/A position.

5

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Cue: The Unit 3 PFD SYSTEM GENERATOR SOURCE SYNC SS-7, SWITCH 3-HS-252-003/SS-7 is in the ON position.

Step 4:

NOTE MMG voltage and hertz are read as INCOMING.

Critical Step

[19] MATCH Incoming to Running AC volts using UNIT 3 MMG VOLTAGE ADJUST, 3-HS-252-02CD. SAT Standard: UNSAT SIMULATED MANIPULATING UNIT 3 MMG VOLTAGE ADJUST, N/A 3-HS 252-02CD until cued that incoming and running AC volts are matched.

Cue: INCOMING and RUNNING VOLTAGES are EQUAL at 122 Volts Step 5:

[20] ADJUST MMG speed using UNIT 3 MMG FREQUENCY ADJUST, 3-HS-252-02CF to obtain a synchroscope slowly rotating in the SLOW Critical Step (counter-clockwise) direction (10 to 15 second rotation) as indicated on SYNCHROSCOPE, 0-SCP-252-000A/B.

SAT Standard:

UNSAT SIMULATED ADJUSTING UNIT 3 MMG FREQUENCY ADJUST N/A 3-HS-252-02CF speed control switch until cued that synchroscope indicator rotating in the counterclockwise direction at 10 to 15 seconds per revolution.

Cue: State: The Initial Synchroscope indicator is standing still at the 5 oclock position.

Note: If student raises frequency the state: Synchroscope indicator is rotating in the CLOCKWISE direction at 12 seconds per revolution.

Note: If student lowers frequency the state: Synchroscope indicator is rotating in the COUNTERCLOCKWISE direction at 12 seconds per revolution.

6

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 6:

NOTES

1) Section 5.5[21] should be performed expeditiously (within about 15 seconds) to minimize the time AC Systems are paralleled to prevent tripping the MMG set. Voltage and amps is expected to fluctuate while the AC systems are paralleled and the MMG set will trip if the AC systems are paralleled for approximately 30 seconds.
2) If breaker 1001 trips, it must be reset with reset push button on the respective Unit Battery Board, Panel 10.

CAUTIONS

1) Voltage Oscillations may occur during Bus Power Transfers.

These oscillations are caused when two Power Supplies having separate Voltage Regulators try to maintain voltage control.

Therefore, the time the Power Supplies are paralleled should be minimized as follows:[PER 64835]

  • When transferring Bus power supplies from one MMG to Critical Step another MMG.
  • When transferring Bus power supplies from one MMG with the SAT unit preferred transformer. (Unit 2 has a Voltage Regulator Transformer which makes voltage oscillations more UNSAT susceptible.)

N/A

2) Minimize the number of Bus power supply transfers and only transfer Bus power supplies when absolutely necessary.
3) During the transfer of Bus power supplies the affiliated RPS circuit protectors 1(2)C1 and/or 1(2)C2 may trip.

Start of Critical Step(s)

[21] WHEN SYNCHROSCOPE, 0-SCP-252-000A/B is 5 minutes prior to 12 o'clock, in the SLOW counter-clockwise direction, THEN PERFORM the following expeditiously:

[21.1] CLOSE UNIT 3 BKR 1001, using 0-HS-280-003/1001.

[21.2] ENSURE CLOSED UNIT 3 BKR 1001.

7

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Standard( step 6 continued):

When cued synchroscope indicator at 5 minutes prior to 12 o'clock, SIMULATED PLACING 3-BKR 1001, 0-HS-252-003/1001 in the CLOSE position.

NOTE: IT WOULD ASSIST THE EXAMINEE IF THE EVALUATOR WOULD USE HIS FINGER TO DEMONSTRATE INDICATOR POSITION ON THE SYNCHROSCOPE AS THE READINGS ARE ENUNCIATED.

CUE: THE SYNCHROSCOPE INDICATOR IS AT 30 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 15 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 5 MINUTES BEFORE THE 12 O'CLOCK POSITION.

CUE: [WHEN CLOSED] UNIT 3 BREAKER 1001 BREAKER POSITION INDICATING LAMP CHANGED FROM ILLUMINATED GREEN TO ILLUMINATED RED.

Step 7:

[21.3] OPEN the UNIT 3)BKR 1002, using 0-HS-280-003/1002. Critical Step End of Critical Step(s) SAT Standard: UNSAT SIMULATED UNIT 3 BKR 1002, 0-HS-282-003/1002in the OPEN N/A position.

CUE: UNIT 3 BKR 1002, 0-HS-282-003/1002 IS IN THE OPEN POSITION WITH RED LIGHT ILLUMINATED.

NOTE: DO NOT ALLOW THE EXAMINEE TO OPERATE THE AMMETER SELECTOR SWITCH FOR THE FOLLOWING STEP.

Step 8:

SAT

[22] CHECK generator is loaded by observing UNIT 3 MMG GENERATOR amps, 3-II-252-02C/1AMR L2 rise, "N" should be UNSAT approximately the difference of L1& L2 (UNIT 3 MMG GENERATOR amps, 3-HS-252-02CH positions 1, 2, & 3 are respective to L1, L2 & N).

N/A 8

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Standard:

CHECKED amp indicators L1 MINUS L2 approximately equals n.

Cue: L1, L2, N AMPS INDICATIONS HAVE RISEN and L1-L2 = N.

Note: Selector Switch positions are labeled as follows: Position 1 is L1, position 2 is L2 and Position 3 is N.

Step 9:

[23] ENSURE OPEN UNIT 3 BKR 1003, 0-HS-280-003/1003 SAT Standard: UNSAT VERIFIED ILLUMINATED GREEN position indicating light above 0- N/A HS-282-003/1003.

Cue: Unit 3 Breaker 1003 0-HS-280-003/1003 Position Indicating Lamp changed from illuminated RED to illuminated GREEN.

Step 10:

[24] On Unit 2 Unit Preferred MMG Set Local Control Panel, ENSURE OPEN the following fused disconnect switches:

  • BACKUP SOURCE TO BAT BD 1 BKR 1003, 1-FUDS-280-001/1003 SAT
  • BACKUP SOURCE TO BAT BD 3 BKR 1003, 3-FUDS-280-UNSAT 003/1003 N/A Standard:

At Unit 2 Unit Preferred MMG Set Local Control Panel VERIFIED 1-FUDS-280-001/1003 AND 3-FUDS-280-003/1003 in the OPEN POSITION.

Cue: 1-FUDS-280-001/1003 and 3-FUDS-280-003/1003 are in the OPEN position.

9

Job Performance Measure (JPM)

STEP / STANDARD SAT / UNSAT Step 11:

[25] On Unit 3 Unit Preferred MMG Set Local Control Panel, ENSURE the BACKUP SOURCE TO BAT BD 2 BKR 1003, SAT 2-FUDS-280-002/1003 fused disconnect switch is open:

UNSAT Standard:

N/A On Unit 3 Unit Preferred MMG Set Local Control Panel, VERIFIED 2-FUDS-280-002/1003 in the OPEN position.

Cue: 2-FUDS-280-002/1003 is in the OPEN position.

Step 12:

[26] On Battery Board 2:

PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SAT SS-7, 1-HS-252-03/SS-7 in OFF.

UNSAT Standard:

N/A SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 1-HS-252-03/SS-7 in the OFF position.

Cue: UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS-7, 1-HS-252-03/SS-7 is in the OFF position.

Step 13:

[27] On Battery Board 2:

Critical Step DEPRESS UNIT 3 MMG AC MOTOR START, 3-HS-252-02AD to return SAT to Normal AC power from DC drive.

UNSAT Standard:

N/A SIMULATED DEPRESSING and RELEASING UNIT 3 MMG AC MOTOR START , 3-HS-252-02AD pushbutton.

Cue: [The AC motor Breaker Position Indicating Lamp changed from illuminated GREEN to illuminated RED. State Another Operator will continue with procedure and this will end the task.

STOP TIME:

10

Job Performance Measure (JPM)

Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3.

  • The Reactor is in cold shutdown
  • The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
  • Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.

INITIATING CUES:

The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16].

NOTE: PERFORMER WILL NEED GGMKA KEY.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

11