|
|
Line 21: |
Line 21: |
|
| |
|
| ==Subject:== | | ==Subject:== |
| MF8325 DRAFT RAIs regarding the License Amendment Request to revise the table notation for Table 4.3-2, ESFAS Surveillance Requirements Leia, Maria, and Scott, By letter dated September 1, 2016 (Agencywide Document Access and Management System Accession No. | | MF8325 DRAFT RAIs regarding the License Amendment Request to revise the table notation for Table 4.3-2, ESFAS Surveillance Requirements Leia, Maria, and Scott, By letter dated September 1, 2016 (Agencywide Document Access and Management System Accession No. ML16245A359), Entergy Operations, Inc. (the licensee) submitted a license amendment request for Waterford Steam Electric Station Unit 3 (Waterford 3). The proposed amendment would revise the table notation for Table 4.3-2, Engineered Safety Feature Actuation System Surveillance Requirements to provide consistency with the existing licensee-controlled Surveillance Frequency Control Program, which is implemented in accordance with Nuclear Energy Institute 04-10, Risk Informed Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies. |
| ML16245A359), Entergy Operations, Inc. (the licensee) submitted a license amendment request for Waterford Steam Electric Station Unit 3 (Waterford 3). The proposed amendment would revise the table notation for Table 4.3-2, Engineered Safety Feature Actuation System Surveillance Requirements to provide consistency with the existing licensee-controlled Surveillance Frequency Control Program, which is implemented in accordance with Nuclear Energy Institute 04-10, Risk Informed Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies. | |
| The U.S. Nuclear Regulatory Commission staff has reviewed the application and concluded that additional information delineated below is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed amendment. Below please see the DRAFT RAIs regarding this amendment. | | The U.S. Nuclear Regulatory Commission staff has reviewed the application and concluded that additional information delineated below is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed amendment. Below please see the DRAFT RAIs regarding this amendment. |
| A clarification teleconference to discuss these DRAFT RAIs will be conducted on Wednesday, December 21, at 2 p.m. | | A clarification teleconference to discuss these DRAFT RAIs will be conducted on Wednesday, December 21, at 2 p.m. |
|
---|
Category:E-Mail
MONTHYEARML24241A1922024-08-27027 August 2024 October 2024 Emergency Preparedness Program Inspection - Request for Information ML24159A2672024-06-0707 June 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Licensee Amendment Request (LAR) to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML24137A2702024-05-16016 May 2024 NRR E-mail Capture - Entergy Fleet - Acceptance Review of License Amendment Request to Remove Obsolete License Conditions from Operating Licenses for GGNS, RBS, and WF3 (L-2024-LLA-0062) ML24115A0862024-04-23023 April 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24115A0882024-04-23023 April 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML22336A0202022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Revise Technical Specification 3/4.3.2 ML22335A4802022-12-0101 December 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22329A0152022-11-0202 November 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22215A1492022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Permit the Use of Risk-Informed Completion Times in Accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2 ML22215A2062022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Adopt Title 10 of the Code of Federal Regulations, Section 50.69: Loe and Completion Date Update ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22144A1662022-05-24024 May 2022 PI&R Request for Information and Transmittal e-mail ML22108A1792022-04-14014 April 2022 WF3 Cpcs Installation Inspection Plan Email ML22209A1062022-01-20020 January 2022 NRR E-mail Capture - (External_Sender) Options Moving Forward Regarding Waterford TSTF-505 and 50.69 ML22209A1052022-01-0606 January 2022 NRR E-mail Capture - Estimate for Completion of 50.69-TSTF-505 Peer Review ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21356A5872021-12-22022 December 2021 NRR E-mail Capture - Acceptance for Review: Waterford 3 - Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML21349A2242021-12-14014 December 2021 NRR E-mail Capture - (External_Sender) Waterford 3 - Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial EP Exercise ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21173A1082021-06-22022 June 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Adopt TSTF-563 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21160A0852021-06-0404 June 2021 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Louisiana Regarding a Waterford Steam Electric Station, Unit 3 Amendment - Digital Upgrade I&C ML21145A0062021-05-24024 May 2021 NRR E-mail Capture - Supplement Received - Waterford Unit 3 - License Amendment Request for Boration Systems Tech Specs ML21120A1192021-04-30030 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - LAR to Relocate Chemical Detection TSs to TRM ML21105A0512021-04-14014 April 2021 4-14-21 Email - RFI for In-Office Inspection of Recent WF3 Submission of EAL Procedure Revision ML21104A0382021-04-13013 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request for TSTF-505 ML21084A2552021-03-22022 March 2021 NRR E-mail Capture - Supplement to Audit Plan Dated October 1, 2020 (Waterford 3, L-2020-LLA-0164) ML21088A1512021-03-15015 March 2021 NRR E-mail Capture - Draft Waterford Acceptance Review Letter for TSTF-505 LAR ML21069A1842021-03-0202 March 2021 NRR E-mail Capture - Announcement of QA Inspection ML21040A3892021-02-0808 February 2021 NRR E-mail Capture - Announcement of QA Inspection ML21039A6412021-01-28028 January 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford 3 50.69 LAR ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email 2024-08-27
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22103A1712022-04-13013 April 2022 LAR to Revise TS to Adopt TSTF-505_NRC Request for Additional Information ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 ML21196A5302021-07-19019 July 2021 Wat 2021010 RFI Letter 21N_05 Gap ML21195A0692021-07-13013 July 2021 Staton, Unit 3 - Notification of Digital Instrumentation and Control Modification Inspection and Request for Information ML21125A6522021-05-0606 May 2021 Wat 2021003 Brq RFI- Md, Waterford Steam Electric Station, Unit 3, Notification of Inspection (NRC Inspection Report 05000382/2021003) and Request for Information ML21112A2542021-04-29029 April 2021 Request for Additional Information Digital Upgrade to the Core Protection and Control Element Assembly Calculator System (EPID L 2020 Lla 0164) - Redacted Version ML20288A2082020-10-0808 October 2020 8Oct2020 Email - Request for Information (RFI) to Support and Prepare for the Emergency Preparedness (EP) Program Inspection at the Waterford 3 Station Scheduled to Occur the Week of December 7, 2020 ML20289A3502020-10-0505 October 2020 NRR E-mail Capture - NRC Request for Additional Information - WF3 EAL Scheme Change - L-2020-LLA-0122 ML20125A3212020-05-0404 May 2020 WAT2020410 Inspection Document Request ML20086M3852020-04-0101 April 2020 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4 8.1, A.C. Sources Operating W3F1-2020-0014, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Application for Technical Specification Change to Control Room Air Conditioning System2020-03-20020 March 2020 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Application for Technical Specification Change to Control Room Air Conditioning System ML20049A4102020-02-20020 February 2020 Request for Additional Information Regarding License Amendment Request to Revise Surveillance Requirement 4.7.6.1.d, Control Room Air Filtration System ML19262H0362019-09-0404 September 2019 Ti 2515/194 Request for Information and Email ML19274D4932019-07-24024 July 2019 Request for Information IR 05000382 2019-003 Occupational Radiation Safety Inspection ML19203A0062019-07-19019 July 2019 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information (Rais) Re Relief Request WF3-RR-19-2: Alternate Repair of Degraded Drain Line of Chemical and Volume Control System ML19151A6102019-06-0404 June 2019 Non-Proprietary Second Round RAI Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19172A0852019-05-24024 May 2019 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information (Rais) Re Relief Request W3-ISI-032: Volumetric Examination Requirements ML19035A0412019-02-0101 February 2019 NRR E-mail Capture - Waterford 3 - Final Request for Information Regarding Relief Request WF3-RR-19-001 for Application of Dissimilar Metal Weld Full Structural Weld Overlay ML19018A0102019-01-28028 January 2019 Request for Additional Information Regarding License Amendment Request for Revision of Technical Specification 3/4.7.4,Ultimate Heat Sink ML18320A0902018-11-26026 November 2018 Request for Additional Information Regarding License Amendment Request for Use of the Transflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML18318A4352018-11-14014 November 2018 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information Regarding Request for Alternative to ASME Code Case N-770-2 ML18299A0862018-11-0707 November 2018 Draft Request for Additional Information License Amendment Request Regarding the Revision of UFSAR Section 3.9 ML18262A0412018-09-25025 September 2018 Request for Additional Information Regarding License Amendment Request to Revise Section 15.4.3.1 of the Waterford 3 Updated Final Safety Analysis Report to Account for Fuel Misload ML18145A2652018-06-0101 June 2018 Supplemental Information Needed for Acceptance of Request for Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Components ML18085A6942018-03-26026 March 2018 Ref: Waterford Steam Electric Station, Unit 3, License Renewal Application - RAI Set 18 ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update) ML18039A9722018-02-0808 February 2018 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000382/2018002) and Request for Information ML17233A2402017-08-14014 August 2017 NRR E-mail Capture - Draft RAI for Waterford Unit 3 Regarding License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML17170A3012017-06-16016 June 2017 Notification of Inspection (NRC Integrated Inspection Report 05000382/2017003) and Request for Information ML17101A4432017-04-17017 April 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 17 ML17086A5852017-03-28028 March 2017 Request for Additional Information for the Environmental Review of Waterford 3 ML17072A0102017-03-14014 March 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application Set - 15 ML17272A3352017-03-0101 March 2017 Request for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 14 ML17040A5382017-02-14014 February 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 13 ML17018A3592017-01-26026 January 2017 Requests For Additional Information For The Review Of The Waterford Steam Electric Station, Unit 3, License Renewal Application Set 12 (CAC MF7492.) 2024-06-04
[Table view] |
Text
NRR-PMDAPEm Resource From: Pulvirenti, April Sent: Monday, December 19, 2016 8:39 AM To: Milster, Leia Elizabeth; Zamber, Maria; MEIKLEJOHN, SCOTT W Cc: Pascarelli, Robert; Singh, Gursharan; Snyder, Pete
Subject:
MF8325 DRAFT RAIs regarding the License Amendment Request to revise the table notation for Table 4.3-2, ESFAS Surveillance Requirements Leia, Maria, and Scott, By letter dated September 1, 2016 (Agencywide Document Access and Management System Accession No. ML16245A359), Entergy Operations, Inc. (the licensee) submitted a license amendment request for Waterford Steam Electric Station Unit 3 (Waterford 3). The proposed amendment would revise the table notation for Table 4.3-2, Engineered Safety Feature Actuation System Surveillance Requirements to provide consistency with the existing licensee-controlled Surveillance Frequency Control Program, which is implemented in accordance with Nuclear Energy Institute 04-10, Risk Informed Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies.
The U.S. Nuclear Regulatory Commission staff has reviewed the application and concluded that additional information delineated below is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed amendment. Below please see the DRAFT RAIs regarding this amendment.
A clarification teleconference to discuss these DRAFT RAIs will be conducted on Wednesday, December 21, at 2 p.m.
Eastern standard time (1 p.m. central standard time). The telephone number for this clarification call is 888-566-7686 and the passcode is 46224.
The objectives of this clarification call are to
- 1) confirm that the RAIs contain no proprietary or other non-public information,
- 2) confirm that the requested information is not already contained in the application, on the docket, or in the public
- domain,
- 3) confirm that the licensee understands the wording of the question, and
- 4) confirm that the licensee is able to provide the information within the requested time frame, in this case, within 30 days.
Because the public has not been informed of and does not have an opportunity to participate in this teleconference, technical information or information which may impact a safety decision may not be discussed during this call.
After the completion of the call, the RAIs will be finalized and transmitted to the licensee by formal signed letter.
I look forward to talking to you all on Wednesday.
DRAFT RAI QUESTIONS
- 1. The staff understands that the current design does not permit in service testability, and that the current design was granted an exception to General Design Criterion (GDC) 21 and IEEE 279-1971 by invoking section D.4 of Regulatory Guide (RG) 1.22, as supported by References 7, 8, and 9 in the application. The current exception does not apply to the proposed design, which contains two contacts in each circuit, such that actuation of any one of the relays will not result in an ESFAS component actuation. If a spurious actuation of one relay during testing does not result in an ESFAS actuation, 1
then the proposed design would permit in service testability, and testing of the relays need not be limited to periods of cold shutdown. Demonstrate that the new configuration will meet the surveillance requirements of GDC 21 and IEE 279-1971, or fully justify why the new configuration should be granted an exception to GDC 21 and IEEE 279-1971 via the criteria outlined in RG 1.22 Section D.4.
- 2. The license amendment request (LAR), in part, supports the hardening of the ESFAS single-point vulnerability (SPV) by adding an additional contact in the Feedwater and Main Steam Isolation actuation by Mains Steam Isolation Signal (MSIS) and Closed Component Water containment isolation valve closure actuation by Containment Spray Actuation Signal (CSAS). Provide circuit diagrams of both the current configuration and proposed modification which demonstrate that the configuration will meet the requirements of IEEE 279-1971 as it applies to the likelihood of spurious actuation during testing. Specifically:
- a. Demonstrate that the power supply to these relays (with the new contact wiring) is independent of the power to the existing relays that are wired in the circuits to ensure trip hardening due to SPV
- b. If the DC power source are interconnected at one or more point, then please explain how the power supply independence is maintained, (e.g., is the power floating or grounded?)
- c. Have any new features, e.g., a toggle switch, been added to the circuit design to facilitate testing?
- 3. In the LAR, the licensee states that the relocation of the surveillance requirements from technical specifications to a licensee-controlled program allowed under Amendment 249 will be reviewed by NRC staff as a result of the modification; however, the modification itself can be completed pursuant to 10 CFR 50.59 without NRC review. In addition, the LAR states that part of this revision is needed to support the ESFAS SPV trip hardening modification. Clarify the relationship between the licensee-evaluated modification and the LAR. In addition, clarify the relationship between Amendment 249 and the current LAR.
- 4. The license amendment would remove the second sentence of Note 3 of the current TS Table 3/4.3-2, which states relays K109, K114, K202, K301, K305, K308 and K313 are exempt from testing during power operation but shall be test in accordance with the Surveillance Frequency Control Program and during each COLD SHUTDOWN condition unless tested within the previous 62 days. The LAR proposes to remove this sentence and relocate all of the surveillance requirements, including testing during COLD SHUTDOWN, to the Surveillance Frequency Control Program, based on the adoption of TSTF-425 as approved in License Amendment 249. However, TSTF-425, as included in Amendment 249, requires that a surveillance requirement may not be relocated to the SFCP if it falls into one of the four exclusion categories. The text unless tested within the previous 62 days seems to meet the exclusion criteria for frequencies which are event-driven but have a time component for performing the surveillance on a onetime basis once the event occurs. Explain why this text does not meet these exclusion criteria for TSTF-425, and why this text may be relocated to the SFCP.
- 5. Section 1.0 of the LAR states that Additional subgroup relays that are being added to the ESFAS as part of the modification will be subject to the same testing frequency. The note [Note 3 of the current TS Table 3/4.3-2] will be revised in order to remove information that is being included in the licensee-controlled SFCP.
Following completion of the ESFAS SPV Trip Hardening Modification, the additional relays will be added to the SFCP to the group that is not tested during power operation.
In order to establish this frequency and then relocate this frequency to the SFCP, please provide the following information:
- a. Please confirm that the LAR proposes to include the surveillance testing of the new relays in Table 4.3-2 and the SFCP with an initial frequency of once per 18 months and during each 2
COLD SHUTDOWN condition unless tested within the previous 62 days. 10 CFR 50.36(c)(2)(ii) states A technical specification limiting condition for operation of a nuclear reactor must be established for each item meeting one or more of the following criteria. 10 CFR 50.36(c)(2)(ii)(C) Criterion 3 states a structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure or of presents a challenge to the integrity of a fission product barrier. Explain why the additional subgroups relays being added meet or do not meet 10 CFR 50.36(c)(2)(ii) and 10 CFR 50.36(c)(2)(ii)(C) Criterion 3 for which a TS must be established.
- b. The surveillance frequency of the existing relays was granted as an exception to General Design Criterion (GDC) 21 and IEEE 279-1971 through invoking section D.4 of Regulatory Guide (RG) 1.22, as supported by References 7, 8, and 9 in the application. The proposed design contains two contacts in each circuit, such that actuation of any one of the relays will not result in an ESFAS component actuation. Therefore, justify that the surveillance frequency of the new relays, which is the same as the existing relays, should be granted this same exception to GDC 21 and IEEE 279-1971.
Dr. April Pulvirenti Project Manager, Waterford NRR/DORL/LPL4 OWFN 08C7 301-415-1390 3
Hearing Identifier: NRR_PMDA Email Number: 3226 Mail Envelope Properties (April.Pulvirenti@nrc.gov20161219083900)
Subject:
MF8325 DRAFT RAIs regarding the License Amendment Request to revise the table notation for Table 4.3-2, ESFAS Surveillance Requirements Sent Date: 12/19/2016 8:39:24 AM Received Date: 12/19/2016 8:39:00 AM From: Pulvirenti, April Created By: April.Pulvirenti@nrc.gov Recipients:
"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>
Tracking Status: None "Singh, Gursharan" <Gursharan.Singh@nrc.gov>
Tracking Status: None "Snyder, Pete" <Pete.Snyder@nrc.gov>
Tracking Status: None "Milster, Leia Elizabeth" <lmilste@entergy.com>
Tracking Status: None "Zamber, Maria" <mzamber@entergy.com>
Tracking Status: None "MEIKLEJOHN, SCOTT W" <smeikle@entergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 8346 12/19/2016 8:39:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: