|
|
Line 28: |
Line 28: |
| Entergy subsequently informed the NRC staff that the information requested by the NRC staff was understood and that no additional clarification of the RAI was necessary. During the call, Mr. David Bice of Entergy agreed to provide a response to this final RAI within 30 days from the date of this correspondence. The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs ADAMS system. | | Entergy subsequently informed the NRC staff that the information requested by the NRC staff was understood and that no additional clarification of the RAI was necessary. During the call, Mr. David Bice of Entergy agreed to provide a response to this final RAI within 30 days from the date of this correspondence. The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs ADAMS system. |
| By letter dated October 27, 2016 (Agencywide Documents Access and Management System (ADAMS) | | By letter dated October 27, 2016 (Agencywide Documents Access and Management System (ADAMS) |
| Accession No. ML16302A227), as supplemented by letter dated December 2, 2016 (ADAMS Accession No. | | Accession No. ML16302A227), as supplemented by letter dated December 2, 2016 (ADAMS Accession No. ML16340A018), Entergy Operations, Inc. (the licensee), submitted a license amendment request (LAR) for Arkansas Nuclear One, Unit 2 (ANO-2), proposing to revise certain modifications required to be completed to fully implement ANO-2s risk-informed, performance-based fire protection program, as approved in the license amendment issued on February 18, 2015 (ADAMS Accession No. ML14356A227). The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is needed to complete its review, as described in the attached request for additional information (RAI). |
| ML16340A018), Entergy Operations, Inc. (the licensee), submitted a license amendment request (LAR) for Arkansas Nuclear One, Unit 2 (ANO-2), proposing to revise certain modifications required to be completed to fully implement ANO-2s risk-informed, performance-based fire protection program, as approved in the license amendment issued on February 18, 2015 (ADAMS Accession No. ML14356A227). The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is needed to complete its review, as described in the attached request for additional information (RAI). | |
| This RAI is identified as draft at this time to confirm your understanding of the information that the NRC staff needs to complete the evaluation. If the request for information is understood, please respond to this RAI within 30 days of the date of this request. Please contact me if you would like to set up a conference call to clarify this request for information. | | This RAI is identified as draft at this time to confirm your understanding of the information that the NRC staff needs to complete the evaluation. If the request for information is understood, please respond to this RAI within 30 days of the date of this request. Please contact me if you would like to set up a conference call to clarify this request for information. |
| : Regards, Tom Wengert Project Manager - Arkansas Nuclear One NRR/DORL/LPL4 (301) 415-4037 1 | | : Regards, Tom Wengert Project Manager - Arkansas Nuclear One NRR/DORL/LPL4 (301) 415-4037 1 |
Line 55: |
Line 54: |
|
| |
|
| frequency (CDF) and large early release frequency (LERF), transition delta CDF and delta LERF), including the corrected risk values associated with main control room (MCR) abandonment. | | frequency (CDF) and large early release frequency (LERF), transition delta CDF and delta LERF), including the corrected risk values associated with main control room (MCR) abandonment. |
| PRA RAI 03 In its letter dated October 27, 2016 (ADAMS Accession No. ML16302A227), the licensee stated that adequate safety margin is maintained because the codes and standards used have been accepted for use by the NRC and meet the acceptance criteria in NFPA 805. The NRC staff expected that the licensees evaluation of the changes proposed to ensure that safety margins are maintained would be performed in a manner similar to the equivalent evaluation described in the original ANO-2 NFPA 805 application dated December 17, 2012 (ADAMS Accession No. | | PRA RAI 03 In its letter dated October 27, 2016 (ADAMS Accession No. ML16302A227), the licensee stated that adequate safety margin is maintained because the codes and standards used have been accepted for use by the NRC and meet the acceptance criteria in NFPA 805. The NRC staff expected that the licensees evaluation of the changes proposed to ensure that safety margins are maintained would be performed in a manner similar to the equivalent evaluation described in the original ANO-2 NFPA 805 application dated December 17, 2012 (ADAMS Accession No. ML12353A041), as supplemented. |
| ML12353A041), as supplemented. | |
| Explain what is meant by the statement that, the codes and standards used meet the acceptance criteria in NFPA 805. If the licensees evaluations performed to ensure that safety margins are maintained for the changes proposed in this LAR differ from the evaluations described in the licensees December 17, 2012 application, as supplemented, explain the evaluation and justify the conclusion that the appropriate safety margins are maintained.}} | | Explain what is meant by the statement that, the codes and standards used meet the acceptance criteria in NFPA 805. If the licensees evaluations performed to ensure that safety margins are maintained for the changes proposed in this LAR differ from the evaluations described in the licensees December 17, 2012 application, as supplemented, explain the evaluation and justify the conclusion that the appropriate safety margins are maintained.}} |
|
---|
Category:E-Mail
MONTHYEARML24296A0652024-10-22022 October 2024 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Verbal Authorization of Relief Request for the Proposed Alternative ANO2-RR-24-001 ML24227A0072024-08-13013 August 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 2 - Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) - EPID L-2024-LLR-0048 ML24218A0652024-08-0202 August 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Arkansas Nuclear One, Unit 1 - License Amendment Request - Request for Review and Approval Changes to SAR and to a Confirmatory Order - Pzr Htr Emergency Power Supply - EPID L-2024-LLA-0092 ML24180A0022024-06-26026 June 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 1 and 2 - Proposed Alternatives for Examinations of SG Pressure Retaining Welds and Full Penetrations Nozzles - EPID L-2024-LLR-0038 ML24149A3672024-05-28028 May 2024 August 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24117A0262024-04-26026 April 2024 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Revise Typographical Errors in Technical Specifications ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23194A1752023-07-13013 July 2023 NRR E-mail Capture - ANO-1 - Acceptance Review of Alternative Request ANO1-ISI-037 ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions ML23130A2752023-05-10010 May 2023 NRR E-mail Capture - ANO Unit 2- Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23118A0692023-04-28028 April 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048) ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23039A0872023-02-0808 February 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Relief Request ANO2-RR-23-001, Half-Nozzle Repair of RVCH Penetration 46 (L-2023-LLR-0000) ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML22354A0122022-12-19019 December 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Request for Alternative ANO-CISI-002 Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (L-2022-LLR-0080) ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22341A1202022-12-0707 December 2022 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (L-2022-LLA-0161) ML22273A0982022-09-30030 September 2022 NRR E-mail Capture - ANO Units 1 and 2 - Acceptance of Requested Licensing Action Emergency Plan Staffing Requirements ML22265A2012022-09-22022 September 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-036 ML22188A1782022-07-0707 July 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22081A3902022-03-22022 March 2022 NRR E-mail Capture - ANO-2 - Acceptance Review of Relief Requests ANO2-ISI-023, -024, -025, -026, -027, and -028 (Epids: L-2022-LLR-022, -023, -024, -025, -026, and -027) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22020A0742022-01-13013 January 2022 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21314A1212021-11-0909 November 2021 Verbal Authorization of Relief Request ANO2-RR-21-002 ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21287A1692021-10-13013 October 2021 Record of 10-13-21 Verbal Authorization of ANO2-R&R-012 (L-2021-LLR-0082) ML21298A1562021-10-11011 October 2021 NRR E-mail Capture - ANO-2 Final RAI Relief Request ANO2-R&R-012 Concerning Rv Closure Head Penetration 46 ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21238A3742021-08-23023 August 2021 RFI Email - Cyber PI&R Inspection (ANO) ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21202A1662021-07-20020 July 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 ML21179A0052021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21179A0042021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping 2024-08-02
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23019A0672023-01-19019 January 2023 Inservice Inspection Request for Information ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22213A1662022-08-0101 August 2022 Information Request, Security IR 2022401 ML22208A0542022-07-26026 July 2022 Request for Information ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22159A3242022-06-0909 June 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000313/2022003 and 05000368/2022003) and Request for Information ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22122A2952022-05-0404 May 2022 Notification of Inspection NRC Inspection Report 05000368/2022003 and Request for Information ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21286A7132021-10-15015 October 2021 ANO2022010 Tfp RFI Stg, Arkansas Nuclear One, Units 1 and 2 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000313/2022010 and 05000368/2022010) and Request for Information ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21236A3222021-09-19019 September 2021 Request for Information ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21204A0842021-07-28028 July 2021 ANO Phase 4 2021013 RFI Gap ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program ML21071A2172021-03-10010 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Proposed Change to Quality Assurance Program Manual ML21026A2682021-01-26026 January 2021 Request for Information ML21022A0842021-01-22022 January 2021 Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping - Arkansas Nuclear One,Units 1 and 2 -Entergy Operations, Inc. NON-PROPRIETARY Redacted ML21019A5142021-01-14014 January 2021 March 2021 Emergency Preparedness Exercise Inspection - Request for Information ML20324A6412020-11-19019 November 2020 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-034 ML20316A0102020-11-0202 November 2020 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Concerning Relief Request EN-20-RR-01 ML20262H0752020-09-17017 September 2020 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20260H4762020-09-0909 September 2020 NRR E-mail Capture - ANO-1 Final RAI License Amendment Request to Revise Lov Relay Allowable Values ML20154K7622020-06-0101 June 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20119A0982020-04-28028 April 2020 Notification of Inspection (NRC Inspection Report 05000368/2020003 and Request for Information ML20106E8522020-04-13013 April 2020 Information Request, NRC Inspection Report 05000313/2020410 and 05000368/2020410 ML20065H7992020-03-0606 March 2020 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Revise Loss of Voltage Relay Allowable Values ML20055E9092020-02-24024 February 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Revise Control Element Assembly Drop Time ML20036D3092020-02-0505 February 2020 NRR E-mail Capture - ANO-2 - Final RAI Alternative Request VRR-ANO2-2019-1 ML20013C7472020-01-10010 January 2020 NRR E-mail Capture - ANO-1 and 2 -- Final RAI #2 LAR to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19316A0242019-11-0707 November 2019 NRR E-mail Capture - ANO-1 - - Final RAI Concerning Relief Request ANO1-ISI-033 (L-2019-LLR-0100) ML19280A0402019-10-0707 October 2019 NRR E-mail Capture - ANO-1 and 2 - Final RAI #1 License Amendment Request to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19339F5902019-09-23023 September 2019 Request for Information: Arkansas Nuclear One, IR 05000313/2019-004 Occupational Radiation Safety Inspection ML19281E0032019-08-0505 August 2019 ANO 2019 PIR Request for Information ML19203A0122019-07-16016 July 2019 Request for Information - Inservice Inspection Activities (NRC Inspection Report 05000313/2019004) ML19106A4322019-04-16016 April 2019 NRR E-mail Capture - ANO-2 Final RAI Re LAR to Add TS Actions to Address Inoperability of the Containment Building Sump ML19058A8332019-02-27027 February 2019 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-032 2024-05-22
[Table view] |
Text
NRR-PMDAPEm Resource From: Wengert, Thomas Sent: Thursday, February 02, 2017 11:22 AM To: BICE, DAVID B (ANO)
Cc: PYLE, STEPHENIE L; Pascarelli, Robert; Robinson, Jay
Subject:
Arkansas Nuclear One Unit 2 - Final Request for Additional Information Concerning License Amendment Request to Revise Certain NFPA 805 Modifications (CAC MF8691)
Attachments: ANO-2 Draft RAI for NFPA 805 Mod LAR CAC MF8691.pdf Final Request for Additional Information On January 31, 2017, the U.S. Nuclear Regulatory Commission (NRC) staff sent Entergy Operations, Inc.
(Entergy or the licensee) the draft Request for Additional Information (RAI) provided below (and attached). This RAI relates to a license amendment request (LAR) that would revise certain modifications required to be completed to fully implement Arkansas Nuclear One Unit 2s risk-informed, performance-based fire protection program, as approved in the license amendment issued on February 18, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14356A227).
On February 2, 2017, the NRC staff conducted a conference call with the licensee staff to clarify the request.
Entergy subsequently informed the NRC staff that the information requested by the NRC staff was understood and that no additional clarification of the RAI was necessary. During the call, Mr. David Bice of Entergy agreed to provide a response to this final RAI within 30 days from the date of this correspondence. The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs ADAMS system.
By letter dated October 27, 2016 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML16302A227), as supplemented by letter dated December 2, 2016 (ADAMS Accession No. ML16340A018), Entergy Operations, Inc. (the licensee), submitted a license amendment request (LAR) for Arkansas Nuclear One, Unit 2 (ANO-2), proposing to revise certain modifications required to be completed to fully implement ANO-2s risk-informed, performance-based fire protection program, as approved in the license amendment issued on February 18, 2015 (ADAMS Accession No. ML14356A227). The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is needed to complete its review, as described in the attached request for additional information (RAI).
This RAI is identified as draft at this time to confirm your understanding of the information that the NRC staff needs to complete the evaluation. If the request for information is understood, please respond to this RAI within 30 days of the date of this request. Please contact me if you would like to set up a conference call to clarify this request for information.
- Regards, Tom Wengert Project Manager - Arkansas Nuclear One NRR/DORL/LPL4 (301) 415-4037 1
Hearing Identifier: NRR_PMDA Email Number: 3313 Mail Envelope Properties (Thomas.Wengert@nrc.gov20170202112200)
Subject:
Arkansas Nuclear One Unit 2 - Final Request for Additional Information Concerning License Amendment Request to Revise Certain NFPA 805 Modifications (CAC MF8691)
Sent Date: 2/2/2017 11:22:15 AM Received Date: 2/2/2017 11:22:00 AM From: Wengert, Thomas Created By: Thomas.Wengert@nrc.gov Recipients:
"PYLE, STEPHENIE L" <SPYLE@entergy.com>
Tracking Status: None "Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>
Tracking Status: None "Robinson, Jay" <Jay.Robinson@nrc.gov>
Tracking Status: None "BICE, DAVID B (ANO)" <DBICE@entergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2457 2/2/2017 11:22:00 AM ANO-2 Draft RAI for NFPA 805 Mod LAR CAC MF8691.pdf 59786 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 MODIFICATIONS ENTERGY OPERATIONS. INC.
ARKANSAS NUCLEAR ONE, UNIT 2 DOCKET NO. 50-368 By letter dated October 27, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16302A227), as supplemented by letter dated December 2, 2016 (ADAMS Accession No. ML16340A018), Entergy Operations, Inc. (the licensee), submitted a license amendment request (LAR) for Arkansas Nuclear One, Unit 2 (ANO-2), proposing to revise certain modifications required to be completed to fully implement ANO-2s risk-informed, performance-based fire protection program (RI/PB FPP) as approved in the amendment issued on February 18, 2015 (ADAMS Accession No. ML14356A227). The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is needed to complete its review, as described below.
PRA RAI 01 In its letter dated October 27, 2016 (ADAMS Accession No. ML16302A227), the licensee stated that a new recovery action (RA) is being added to its probabilistic risk assessment (PRA) to ensure that instrumentation using the safety parameter display system (SPDS) remains available. It is not clear whether this additional RA has been evaluated using an accepted fire PRA method and approach, as summarized in the final safety evaluation accompanying the license amendment approving the transition to National Fire Protection Association Standard 805 (NFPA 805).
Summarize the method the licensee applied to evaluate the feasibility and PRA credit for this RA and whether this method has been previously used at ANO-2 or by another licensee. If not used at ANO-2, but used by another licensee, identify what NRC document describes the NRC staffs review of the method.
PRA RAI 02 In its letter dated October 27, 2016 (ADAMS Accession No. ML16302A227), the licensee stated that, during a triennial fire inspection, the NRC staff identified a concern with the licensees fire PRA regarding the improper dilution of motor ignition frequency by counting motors of 5 horsepower or less. The licensee stated that this issue is not expected to affect the ANO-2 risk results significantly, since a sensitivity study for the Arkansas Nuclear One, Unit 1 (ANO-1)
NFPA 805 transition, on this incorrect assumption, showed that the increase in ANO-1 risk from the increase in motor fire frequency was more than offset by the removal of inappropriate fire scenarios from those motors less than or equal to 5 horsepower.
Since the design of ANO-1 is not similar to ANO-2, the NRC staff determines that any conclusions about ANO-1 do not automatically apply to ANO-2. Perform a sensitivity analysis correcting the error and provide the corrected risk results (post-transition core damage
frequency (CDF) and large early release frequency (LERF), transition delta CDF and delta LERF), including the corrected risk values associated with main control room (MCR) abandonment.
PRA RAI 03 In its letter dated October 27, 2016 (ADAMS Accession No. ML16302A227), the licensee stated that adequate safety margin is maintained because the codes and standards used have been accepted for use by the NRC and meet the acceptance criteria in NFPA 805. The NRC staff expected that the licensees evaluation of the changes proposed to ensure that safety margins are maintained would be performed in a manner similar to the equivalent evaluation described in the original ANO-2 NFPA 805 application dated December 17, 2012 (ADAMS Accession No. ML12353A041), as supplemented.
Explain what is meant by the statement that, the codes and standards used meet the acceptance criteria in NFPA 805. If the licensees evaluations performed to ensure that safety margins are maintained for the changes proposed in this LAR differ from the evaluations described in the licensees December 17, 2012 application, as supplemented, explain the evaluation and justify the conclusion that the appropriate safety margins are maintained.