{{#Wiki_filter:Attachment A 1.Replace Technical Specification pages 6.2-7 and 6.3-1 with the enclosed pages.8507260038 850719 PDR ADOCK 05000244 P:PDR m'~'i<
{{#Wiki_filter:Attachment A
R.E.GINNA STATION OPERATIONS AND TECHNICAL SECTIONS GROUP ORGANIZATIONS OPERATIONS MANAGER TECHNICAL MANAGER OPERATIONS SUPERVISOR (SRO)RESULTS AND TEST SUPERVISOR REACTOR ENGINEER TECHNICAL PROJECTS SUPERVISOR ENGINEER(S)
: 1. Replace Technical Specification pages 6.2-7 and 6.3-1 with the enclosed pages.
SHIFT SUPERVISOR I/SHIFT (SRO)TECHNICIANS 8 REPAIRMEN TECHNICAL COMPUTER SYSTEMS ANALYST HEAD CONTROL OPERATOR I/SHIFT (RO)CONTROL OPERATOR I/SHIFT (RO)AUXILIARY OPERATORS 2/SHIFT COMPUTER TECHNICIANS FIGURE 6.2-5 RGSE REV.54$pcf 42 S C" 1 I~'
8507260038 850719 PDR ADOCK 05000244 P               :PDR
6.3 STATION STAFF QUALIFICATIONS 6.3.1 Each member of the facility shall meet or exceed the minimum qualifications of ANSI Standard N18.1-1971,"Selection and Training of Nuclear Power Plant Personnel"<
 
as supplemented by Regulatory Guide 1.8>September 1975i for comparable positions<
m '
except for the Shift Technical Advisori and except for the Operations 1 Manager who shall have held an NRC senior operator license for Ginna.References 1 Ltr.J.Maier (RG6E)to D.Crutchfield (NRC)i dated December 30'980.6.3-1 PROPOSED r 4 f Attachment B The proposed change would delete the requirement that the station Operations Manager currrently hold an NRC senior operator license and replace it with the requirement that the individual must have held an NRC senior operator license for Ginna.The Operations Supervisor<
    ~'i<
to whom the Shift Supervisors and operating personnel report<will still be required to maintain an NRC senior operator license.Thus<an individual on the management chain will still be required to maintain a license.The ANSI N18.1-1971 requirement is only that the Operations Manager should have a license only at the time of assuming the position.The proposed requirements would meet or exceed the intent of the requirement.
 
The advantages of the proposed change are that the Operations Manager will have more time to devote to managing the operating organization due to a reduced training commitment.
R. E. GINNA STATION OPERATIONS AND TECHNICAL SECTIONS GROUP ORGANIZATIONS OPERATIONS                                       TECHNICAL MANAGER                                         MANAGER OPERATIONS         RESULTS             REACTOR            TECHNICAL AND TEST                                   PROJECTS ENGINEER(S)
In additions the base of personnel who could fill the Operations Manager position will be broadened to include not only those currently holding a license but also those who have held a license.The proposed change is acceptable since it will retain the necessary management knowledge and controls while improving the ability of the Operations Manager to manage the operating organization.
SUPERVISOR (SRO)    SUPERVISOR            ENGINEER            SUPERVISOR SHIFT       TECHNICIANS            TECHNICAL SUPERVISOR                           COMPUTER I /SHIFT (SRO)   8 REPAIRMEN       SYSTEMS ANALYST HEAD CONTROL OPERATOR                             COMPUTER I/SHIFT (RO)
In accordance with 10 CFR 50.91<the proposed change to the Technical Specifications has been evaluated against three criteria to determine if the operation of the facility in accordance with the proposed amendment would: 1.involve a significant increase in the probability or consequences of an accident previously evaluated; or 2.3.create the possibility of a new or different kind of accident from'anyaccident previously" evaluated;,or~~
TECHNICIANS CONTROL OPERATOR I/SHIFT (RO)
involve a sig'nificant reduction in" a'margin o'f safety.The proposed change will not have an adverse impact as judged against these criteria.The proposed Technical Specification change conforms to the intent of regulatory guidance and meets the Commission's example (vi)of amendments that do not involve a significant hazards consideration because the results of the change are within all acceptable criteria established by regulatory guidance.The proposed amendment does not involve any irreversible consequences.
AUXILIARY OPERATORS 2/ SHIFT FIGURE   6.2-5 RGSE REV. 54$ pcf 42 S
Therefore<
 
there is no undue risk to public health and safety and a finding of no significant hazards is warranted for the proposed Technical Specification change.
C" 1
I<<<<.<<$Jt I~~Jt}}
I ~'
 
6.3       STATION STAFF QUALIFICATIONS 6.3.1     Each member of the facility shall   meet or exceed   the minimum qualifications of   ANSI Standard   N18.1-1971, "Selection and Training of Nuclear     Power   Plant Personnel"< as supplemented   by Regulatory Guide 1.8>
September 1975i for comparable positions< except     for the Shift Technical Advisori and except for the Operations Manager who shall have held an NRC senior operator license for Ginna.
References 1
Ltr. J. Maier (RG6E) to D. Crutchfield   (NRC) i dated December 30'980.
6.3-1             PROPOSED
 
r 4
f
 
Attachment   B The proposed   change would delete the requirement that the station Operations     Manager currrently hold an NRC senior operator license and replace     it with the requirement that the individual must have held an NRC senior operator license for Ginna. The Operations Supervisor< to whom the Shift Supervisors and operating personnel report<     will still be required to maintain an NRC senior operator license. Thus< an individual on the management chain will still be required to maintain a license. The ANSI have      N18.1-1971 requirement is only that the Operations Manager should               a license only at the time of assuming the position. The proposed requirements would meet or exceed the intent of the requirement.
The advantages of the proposed change are that the Operations Manager will have more time to devote to managing the operating organization due to a reduced training commitment. In additions the base of personnel who could position   will be broadened   to fill include the Operations Manager not only those currently holding a license   but also those who have held a license.
The proposed change is acceptable since knowledge        controls it while will retain the improving the necessary management                 and ability of the Operations Manager to manage the operating organization.
In accordance with 10 CFR 50.91< the proposed change to the Technical Specifications has been evaluated against three criteria to determine   if the operation of the facility in accordance with the proposed amendment would:
: 1. involve   a significant increase in   the probability or consequences   of an accident previously evaluated; or
: 2. create the possibility of a new or different kind of accident from'any accident previously" evaluated;,or~~
: 3. involve a sig'nificant reduction in" a'margin o'f safety.
The proposed   change   will not   have an adverse   impact as judged against these   criteria.
The proposed Technical Specification change conforms to the intent of regulatory guidance and meets the Commission's example (vi) of amendments that do not involve a significant hazards consideration because the results of the change are within all acceptable criteria established by regulatory guidance. The proposed amendment does not involve any irreversible consequences.
Therefore< there is no undue risk to public health and safety and a finding of no significant hazards is warranted for the proposed Technical Specification change.
 
I<<
  <<$ Jt   I ~ ~ Jt}}

Latest revision as of 11:41, 4 February 2020

Proposed Tech Spec Changes,Revising Requirements for Station Operations Manager to Hold Senior Operator License
ML17254A450
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/19/1985
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17254A449 List:
References
NUDOCS 8507260038
Download: ML17254A450 (8)


Text

Attachment A

1. Replace Technical Specification pages 6.2-7 and 6.3-1 with the enclosed pages.

8507260038 850719 PDR ADOCK 05000244 P :PDR

m '

~'i<

R. E. GINNA STATION OPERATIONS AND TECHNICAL SECTIONS GROUP ORGANIZATIONS OPERATIONS TECHNICAL MANAGER MANAGER OPERATIONS RESULTS REACTOR TECHNICAL AND TEST PROJECTS ENGINEER(S)

SUPERVISOR (SRO) SUPERVISOR ENGINEER SUPERVISOR SHIFT TECHNICIANS TECHNICAL SUPERVISOR COMPUTER I /SHIFT (SRO) 8 REPAIRMEN SYSTEMS ANALYST HEAD CONTROL OPERATOR COMPUTER I/SHIFT (RO)

TECHNICIANS CONTROL OPERATOR I/SHIFT (RO)

AUXILIARY OPERATORS 2/ SHIFT FIGURE 6.2-5 RGSE REV. 54$ pcf 42 S

C" 1

I ~'

6.3 STATION STAFF QUALIFICATIONS 6.3.1 Each member of the facility shall meet or exceed the minimum qualifications of ANSI Standard N18.1-1971, "Selection and Training of Nuclear Power Plant Personnel"< as supplemented by Regulatory Guide 1.8>

September 1975i for comparable positions< except for the Shift Technical Advisori 1 and except for the Operations Manager who shall have held an NRC senior operator license for Ginna.

References 1

Ltr. J. Maier (RG6E) to D. Crutchfield (NRC) i dated December 30'980.

6.3-1 PROPOSED

r 4

f

Attachment B The proposed change would delete the requirement that the station Operations Manager currrently hold an NRC senior operator license and replace it with the requirement that the individual must have held an NRC senior operator license for Ginna. The Operations Supervisor< to whom the Shift Supervisors and operating personnel report< will still be required to maintain an NRC senior operator license. Thus< an individual on the management chain will still be required to maintain a license. The ANSI have N18.1-1971 requirement is only that the Operations Manager should a license only at the time of assuming the position. The proposed requirements would meet or exceed the intent of the requirement.

The advantages of the proposed change are that the Operations Manager will have more time to devote to managing the operating organization due to a reduced training commitment. In additions the base of personnel who could position will be broadened to fill include the Operations Manager not only those currently holding a license but also those who have held a license.

The proposed change is acceptable since knowledge controls it while will retain the improving the necessary management and ability of the Operations Manager to manage the operating organization.

In accordance with 10 CFR 50.91< the proposed change to the Technical Specifications has been evaluated against three criteria to determine if the operation of the facility in accordance with the proposed amendment would:

1. involve a significant increase in the probability or consequences of an accident previously evaluated; or
2. create the possibility of a new or different kind of accident from'any accident previously" evaluated;,or~~
3. involve a sig'nificant reduction in" a'margin o'f safety.

The proposed change will not have an adverse impact as judged against these criteria.

The proposed Technical Specification change conforms to the intent of regulatory guidance and meets the Commission's example (vi) of amendments that do not involve a significant hazards consideration because the results of the change are within all acceptable criteria established by regulatory guidance. The proposed amendment does not involve any irreversible consequences.

Therefore< there is no undue risk to public health and safety and a finding of no significant hazards is warranted for the proposed Technical Specification change.

I<<

<<$ Jt I ~ ~ Jt