ML17258A746: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/29/1981
| issue date = 01/29/1981
| title = to App C-Ginna Station Inservice Pump & Valve Testing Program for 810101 Through 901230.
| title = to App C-Ginna Station Inservice Pump & Valve Testing Program for 810101 Through 901230.
| author name = ANDERSON C R
| author name = Anderson C
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.c'UALITYASSURANCE ltANUALGINNASTATIONREY.PAGE1DF28OCHESTERGAS6ELECTRICCORPORATION EFFECTIVE DATE.5'ebruary 1,1981DATESIGNATURE TITLE:AppendixC-GinnaStationInservice PumpandValveTestingProgramfortheJanuary1,1981throughDecember31,1990PeriodPREPAREDBYREVIEWAPPROVEDBYProgramTableofContentsntroduction:
{{#Wiki_filter:'UALITY
efinitions:
.c ASSURANCE ltANUAL                          RE Y.       PAGE GINNA STATION                                                  1 DF 28 EFFECTIVE DATE.
Discussion rogram:PVT1.0ScopeandResponsibility PVT2.0CodeEditionandTestingIntervalPVT3.0Inseryice PumpTestingProgramPVT4.0Inservice ValveTestingProgramPVT5.0Records810'.08077k, r.se0~,.j(~QUALITYASSURANCE MANUALGINNASTATXONTITLE:APPENDIXCPumpandValveTestingProgramDATE2/1/8142~5RCPAGE228OFXntroduction ThisappendixtotheQualityAssurance ManualdefinestheInservice Pumpand~Valve(
OCHESTER GAS 6 ELECTRIC CORPORATION                    5'ebruary 1, 1981 SIGNATURE      DATE TITLE:                                 PREPARED BY Appendix  C  Ginna Station Inservice Pump and Valve Testing Program for the January 1, 1981            REVIEW through December 31, 1990 Period APPROVED BY Program Table  of Contents ntroduction:       Discussion efinitions:
TestingProgramforthetenyearperiodstartingJanuary1,1981throughDecember31,1990.IncludedinthisprogramaretheQualityGroupsA,BandCPumpswhichareprovidedwitha'nemergency powersourceandthoseQualityGroupsA,BandCValveswhicharerequiredtoshutdownthereactorortomitigatetheconsequences ofanaccidentandmaintainthereactorinasafeshutdowncondition.
rogram:       PVT  1.0  Scope and  Responsibility PVT  2.Code Edition and Testing Interval PVT  3.0  Inseryice Pump Testing Program PVT  4.0   Inservice Valve Testing Program PVT 5.0   Records 810 '.0 8077k,
Thisprogramhasbeendeveloped asrequiredbySection*50.55a(g) of10CFR50following theguidanceoftheASMEBoilerandPressureVesselCodeSectionXI-"RulesforInservice Inspection ofNuclearPowerPlantComponents,"
(hereafter referredtoasthe"Code")excluding thecontrolsoftheAuthorized Inspector, Enforcement Authority, Report-ingSystemsandN-StampSymbol.Theinservice testingpro-gramshallbecontrolled bytheGinnaStationQualityAssur-anceProgramforStationOperation.
QualityGroupsA,BandCcomponents correspond tothosedefinedinNRCRegula-toryGuide1.26.FurtheraddendaandeditionsofSectionXIoftheCodeshallbeusedforclarification oftestrequirements andperformance.
TheInservice PumpandValveTestingProgramdoesnotaffectthepumpandvalvesurveillance programrequiredbyTechnical Specifications.
Technical Specification re-quirements shallcontinuetobeimplemented attherequiredfrequency.
054'f QUALITYASSURANCE MANUALGINNASTATIONTITLEsAPPENDIXCPumpandValveTestingProgramDATE2/1/814252CPAGE328OFDefinitions AFPAOV,APVBACodeCCCSCSPCVC/RECCSFCVGAGDTHCVHXLCVMAFPMOV.MVPCVPIVPORVPRTPRVPVTQRRCDTRCPRCVRHRRMWRVRWSTRXS/GSAFWPSISIVSOVSWAuxiliary Feedwater PumpAirOperatedValveAirOperatedPistonValve.BoricAcidAmericanSocietyofMechanical EBoilerandPressure'Vessel CodeComponent CoolingContainment SprayContainment SprayPumpCheckValveColdShutdownandRefueling Emergency CoreCoolingSystemFlowControlValveGasAnalyzerGasDecayTankHandControlValveHeatExchanger LevelControl.ValveMotorDrivenAuxiliary Feedwater MotorOperatedValveManualValvePressureControlValvePrimaryIsolation ValvePowerOperatedReliefValvePressurizer ReliefTankPressureReliefValvePumpandValveTestingQuarterly Refueling OutageReactorCoolantDrainTankReactorCoolantPumpRadiation ControlValveResidualHeatRemovalReactorMakeupWaterReliefValveRefueling WaterStorageTankReactorVesselSteamGenerator StandbyAuxiliary Feedwater PumpSafetyInjection Secondary Isolation ValveSolenoidOperatedValveServiceWaterngxneersPump
')lIlf QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE4252C4DP28Definitions TAFPVCVCTVHTurbineDrivenAuxiliary Feedwater PumpVolumeControlVolumeControlTankVentHeader
'el~~L QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIX, CPumpandValveTestingProgramDATE2/1/81PAGE4252C5DP28PumandValveTestinProramPVT1.0'coeandResonsibilit Theinservice testingprogramdefinesthetestingprogramforQualityGroupsA,BandCPumpsandValvesinaccordance withtherequirements ofArticlesIWPandIWVofSectionXIoftheCode.Theresultsofthesetestsaretoassuretheoperational readiness ofpumpsandvalves.1.2Itistheresponsibility oftheGinnaStationTestandResultsSupervisor toimplement thistestprogramanddevelopinservice testproce-dureswhichwilloutlinethespecifictestforeachpump.andvalveincludedintheprogram.1.3Whenavalve,pumporitscontrolsystemhasbeenreplacedorrepairedorhasundergone maintenance thatcouldaffectitsperformance, andpriortothetimeitisreturnedtoservice,itshallbe=testedasnecessary todemonstrate thattheper-formanceparameters whichcouldhavebeenaffectedbythereplacement, repair,ormaintenance arewithinacceptable limits.PVT2.0CodeEditionandTestinInterval2.1PVT3.0TheInservice PumpandValveTestingProgramfortheten(10)yearperiodstartingJanuary1,1981throughDecember31,1990wasdeveloped utilizing the1977EditionofSectionXIoftheCodethroughtheSummer1978Addenda.Inservice PumTestinqProram3.1The.Inservice PumpTestingProgramwasdeveloped inaccordance withtherequirements ofArticleIWPofSectionXIoftheCode.ThisprogramincludesallQualityGroupA,BandCpumpswhichareprovidedwithanemergency powersourceandarerequired'to performaspecificfunctioninshuttingdownareactororinmitigating theconsequences ofanaccidentandmaintainthereactorinasafeshutdowncondition.
~l~)~~
QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE6OF4252C283.23.3Thefollowing pumpsshallbetestedinaccord-ancewithArticleIWPofSectionXI:(a)lAComponent Cooling(b)1BComponent Cooling(c)1ASafetyInjection (d)lBSafetyInjection (e)1CSafetyInjection (f)lAResidualHeatRemoval(g)lBResidualHeatRemoval(h)lAContainment Spray(i)1BContainment Spray(j)lAMotorDrivenAuxiliary Feedwater (k)1BMotorDrivenAuxiliary Feedwater (1)TurbineDrivenAuxiliary Feedwater (m)1AServiceWater(n)1BServiceWater(o)1CServiceWater(p)1DServiceWater(q)1CStandbyAuxiliary Feedwater (r)1DStandbyAuxiliary Feedwater Flowrateswillnotbeaccuratefortheresidualheatremovalpumpsbecausethebypasstestloopcan'onlypass200gpm.Thisbypasstestloopisafixedresistance system;therefore, hydraulic resistance remainsunchanged fromtesttotest.3.4Bearingtemperatures willnotbeavailable fortheServiceWaterpumps.Thesepumpsandtheirbearingsaresubmersed infortyfeetofwater,makingit,impossible totakemeasurements.
Be-causetheyaresubmersed, thebearingtemperatures stayveryclosetothetemperature oftheintakewater.PVT4.0Inservice-Valve TestinProram4.1TheInservice ValveTestingProgramwasdeveloped inaccordance withtherequirements ofArticle'IWVofSectionXIoftheCode.Allthosevalvesthatarerequiredtoperformaspecificfunctioneithertoshutdownthereactortothecoldshut-downcondition orinmitigating theconsequences ofanaccidentandmaintainthereactorinasafeshutdowncondition areincludedintheprogram.
~<<'I')i~
QUALITYASSURANCE MANUALGINNASTATIONTlTLEtAPPENDIXCPumpandValveTestingProgramDATE2/1/814252CPAGE728OF4.2TheInservice ValveTestingProgramRequirements forCategoryAandBValvesareinTablesPVT4.7and4.8,respectively.
CategoryCValvesarebrokendownintotwocategories, CheckValvesandReliefValves,whichareinTablesPVT4.9and4.10,respectively.
CategoryDValvesarenotincludedinthistestingprogrambecausetherearenoneincludedinGinnaStationdesign.4.3Someexceptions andexemptions tothetestingre-quirements ofArticleI07Vhavebeentakenbasedonoperational interference, placingtheplantinanunsafecondition andTechnical Specification requirements.
Allexceptions andexemptions arelistedonthe,valvetablesandexplained inthereferenced notes,PVT.4.11.4.4Theexercising programforCategoryAandBValves,withtheexception ofcheckvalves,shallrequireacompletestrokingofeachvalveperthevalvetestingtables.Allcheckvalves,including CategoryCValves,shallbeexercised totheposi-tionrequiredtofulfilltheirfunction.
Thesefunctional testsshallbeverifiedbytheoperation oftherequiredsystem.4.5CategoryAandBvalvesoperation shallbetimedeachtimetheyarestrokedutilizing switchinitiation andthepositionindicators, whichareaccessible duringplantoperation.
Duringeachrefueling outageavisualverification shallbemadetoconfirmdirectcorrespondence betweenvalveoperators andthepositionindicators.
0,)~'a.~'>l~'
QUALITYASSURANCE MANUAL.GINNASTATIONTITLE:APPEl'3DlX CPumpandValveTestingProgramDATE2/1/81425RCPAGE828OF4.6Thetestingofvalvesrequiredatcoldshutdownandrefueling outageswillnormallytakefour(4)daystocomplete.
Whencoldshutdowns areofashorterduration(2-3days),testpersonnel shallattempttotestasmanyvalvesaspossiblewithoutholdingupthestartupoftheunitwithtesting'eginning nolongerthan48hoursaftertheplantreachescoldshutdown(asdefinedinTechnical Specification 1.2).Forveryshortcoldshutdowns (lessthan48hours),itwouldbeimpossible tomobilizetestpersonnel toimplement thetestingprogramundertherequiredprocedural
: controls, therefore novalveswouldbetested.Itispossiblethat,duringafour(4)daycoldshutdown, theworkloadontestpersonnel mayprecludetheircompletion ofalltherequiredvalvetestspriortostartup.Valvetestingduringcoldshutdowns neednotbemorefrequentthanonetestperquarterforeachvalveinthetestprogram.304B'V1-BRCPSealInjection 313MOVSealWaterReturnIsolation 370BCVChargingLineIsolation 371AOVLetdownIsolation 4.7CategoryAValvesValve&#xb9;~Te304ACV1-ARCPSealInjection Note'estFreer1StrokeC/RLeakR1StrokeC/RLeakR1StrokeC/RLeakR2StrokeC/RLeakR3StrokeC/RLeakR383B508CVAlternate ChargingLineAOVRMWtoContainment VesselStopStrokeLeakStrokeLeakC/RRQR 0EJ'Pa~li~r QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE2/1/81PAGEOF4252C28528529539743745750A750B759A759B813814846862ACVCVNSupplytoPRTRMWtoPRTAOVReturnFromExcessLet-downHX.CVCC,toARCPCVCCtoBRCPMOVContainment'top CCFromLoopARCPMOVContainment StopCCFromLoopBRCPMOVSupplyCCtoRXSupportCoolersMOVReturnCCtoRXSupportCoolersAOVN2SupplytoAccumulators CV1-ACSPDischAOVPRTStopValvetoGasAnalyzerCVCCFromExcessLetdownHX.NoteTestFreerStrokeQLeakRStrokeQLeakRStrokeQLeakRStrokeQLeakRStroke0LeakRStrokeC/RLeakRStrokeC/RLeakRStrokeC/RLeakRStrokeC/RLeakRStrokeC/RLeakRStrokeC/RLeakRStrokeQLeakRStrokeQLeakR862BCV1-BCSPDischStrokeLeak t~Iy~
QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE10OF4252C28Va1veI~TeDescritionNoteTestFreer870A870BCVCV1-Ato1-CSIPumpDisch.1-Bto1-CSIPumpDischStrokeLeakQRStrokeQLeakR879889A889BMVSITestLineIsolation CV1-ASIPumpDischCV1-BSIPumpDischStrokeLeakStrokeLeakStrokeLeakQR956AMVPressurizer LiquidSpaceContainment Isolation StrokeLeak956B956CMVLoopAandLoopBHotLegContainment, Isolation Pressurizer'team SpaceContainment Isolation StrokeLeakStrokeLeak966A966B966C1003AAOVPressurizer SteamSpaceContainment Isolation AOVPressurizer LiquidSpaceContainment Isolation AOVLoopAandBHotLegContainment Isolation LCV1-ARCDTPumpSuctionStrokeLeakStrokeLeakStrokeLeakStrokeLeakQR1003BLCV1-BRCDTPumpSuctionStrokeLeakQR1076AIV-3AMVHydrogento","A"Recombiner 11PilotContainment Isolation SOVHydrogento"A"Recombiner 11PilotContainment SIVStrokeLeakStrokeLeak vJ'l~~hfI4II" I'QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE11OF28Valve1~TeNoteTestFr~cr1076BIV-3B1080AIV-2AIV-2B1084AMVSOVHydrogento"B"Recombiner 11PilotContainment Isolation Hydrogento~"B"Recombiner 11PilotContainment SIVMVOxygenMakeUptoContain-11mentPIVOxygenMakeUptoContain-11mentSIV(ARecombiner)
OxygenMakeUptoContain-11mentSIV(BRecombiner)
MVHydrogento"A"Recombiner 11MainBurnerContainment PIVStrokeLeakStrokeLeakStrokeLeakStrokeLeak,StrokeLeakStrokeLeakIV-5A1084BSOVHydrogento"A"Recombiner 11MainBurnerContainment SIVHydrogento';"B"Recombiner
'11MainBurner'ontainment PIVStrokeLeakStrokeLeak'!IV-5B159615971598159917131721SOVHydrogento"B"Recombiner 11MainBurnerContainment SIVMVRadiation MonitorSupplyAOVRadiation MonitorSupplyAOVRadiation MonitorExhaustCVRadiation MonitorExhaustInsideContainment CVN2toRCDTCheckAOVSuctionlinetoRCDTStrokeLeakStrokeQLeakRStrokeQLeak.RStrokeQLeakRStrokeQLeakRStrokeQLeakRStroke9LeakR g~~~'I~~,\
QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramfDATE2/1/81PAGE12OF4252C28ValveI~TeDescritionNoteTestFree172317281786AOVAContainment SumpDischStoptoWasteHoldupTankAOVAContainment SumpDischStoptoWasteHoldupTankAOVRCDTtoVH21StrokeQLeakRStrokeQLeakRStrokeQLeakR178717895392539357355736AOVRCDTtoVHAOVRCDTtoGAContainment.
Isolation AOVInstrument AirtoContain-19mentIsolation CVInstrument toContainment 19Isolation AOV"A"S/GBlowdownSampleIsolation AOV"B"S/GBlowdownSampleIsolation StrokeQLeakRStrokeQLeakRStrokeRLeakRStrokeRLeakRStrokeQLeakRStrokeLeak5737AOV"B"S/GBlowdownIsolation StrokeLeakQR5738AOV"A"S/GBlowdownIsolation
.StrokeLeakQR5869APVContainment PurgeSupply22Isolation StrokeLeak5870APVContainment PurgeSupply22Isolation StrokeLeak58785879APVContainment, PurgeExhaust22Isolation APVContainment PurgeExhaust22Isolation StrokeLeakStrokeLeak*-SeeNote22 0~~
~lQUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE13OF4252C28Valve5~Te'oteTestFreer6151MVHeatingSteamtoContainment StrokeLeak617571417226MVMVCVCondensate ReturnfromContainment ServiceAirIsolation OutsideContainment ServiceAirIsolation InsideContainment StrokeLeakStroke'eakStrokeLeak74437444MOVContainment AirTestSupplyMOVContainment AirTestVent11StrokeLeakStrokeLeak7445MOVContainment, AirTestVent11StrokeLeak7970797184188419AOVContainment Depressuri-zationValve,AOVContainment Depressuri-zationValveAOVDemin.WatertoContain-mentIs'olation CVDemin.WatertoContain-mentIsolation StrokeLeakStrokeLeakStrokeLeakStrokeLeak4.8CategoryBValvesVa1ve0~TeDescritionNoteTestFree014017RCVAuxBuildingGDTReleaseRCVCompCoolSurgeTankVentStrokeQhStroke QUALITYASSURANCE MANUALGINNASTATIONTITLE>APPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE1428OF081APV082APVValveN~TeDescritionControlRoomVentilation DamperControlRoomVentilation DamperNoteTest~FreStrokeQStrokeQ083084085086APVAPVAPVAPVControlRoomVentilation DamperControlRoomVentilation DamperControlRoomVentilation DamperControlRoomVentilation DamperStrokeQStrokeQStrokeQStroke112B112C427430LCVLCVEmergency MakeupRWSTtoChargingPurqpeI'CTOutletAOVLetdownFromLoopBPORVReactorCoolantSystemPressureRelief16StrokeQStrokeQStrokeC/RStrokeC/R431CPORVReactorCoolantSystemPressureRelief16StrokeC/R624625626700701704AHCV1-BRHRHXOutletHCV1-ARHRHXOutletFCVRHRLoopReturnMOVSuctionStopFromLoopAtoRHRPumpsMOVSuctionStopFromLoopAtoRHRPumpsMOVSuction1-ARHRPumpStrokeQStrokeQStrokeQStrokeC/RStrokeC/RStrokeQ
~~''T
~4.,~1IQUALITYASSURANCE MANUALGINNASTATIONTITLEtAPPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE1528OFValve&#xb9;~TpeDescrition704B720MOVSuction.l-B RHRPumpIIIMOV10"-Discharge toBLoopFromRHRPumpsNoteTestFreerStrokeQ8StrokeC/R721MOV10"DischtoBLoopFromRHRPumps8StrokeC/R738A738B825A825B826A826B826C826D836A836B850A850B852A852B856857AMOVCCtol-ARHRHXMOVCCtol-BRHRHXMOVSIPumpSuctionFromRWST9MOVSIPumpSuctionFromRWST9MOVSIPumpSuctionFromBATankMOVSIPumpSuctionFromBATankMOVSIPumpSuctionFromBATankMOVSIPumpSuctionFromBATank-HCVSprayAdditiveTankDis-17chargeHCVSprayAdditiveTankDis-17chargeMOVSumpBtoRHRPumpsMOVSumpBtoRHRPumpsMOVRHRPumpstoReactorVessel18MOVRHRPumpstoReactorVessel18MOVRWSTtoRHR-Pumps MOVIsolatelBRHRHXFromCSandSIPumpsStrokeQStrokeQStrokeC/RStrokeC/RStrokeQStrokeQStrokeQStrokePStrokeQStrokeQStrokeQStrokeQStrokeC/RStrokeC/RStrokeC/RStrokeQ r~~~QUALITYASSURANCE MANUALGINNASTATIONTITLEiAPPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE1628OFVa1ve1~TeDescritionNoteTestFreq857B857C860AMOVIsolatelARHRHXFromCSandSIPumpsMOVIsolatelARHRHXFromCSandSIPumpsMOVParallelDischarge MOV'From1-ACSPStrokeQStroke-QStrokeQ860B860CMOVParallelDischarge MOVFrom1-ACSPMOVParallelDischarge MOVFrom1-BCSPStrokeQStrokeQ860D871A871B875A875B876A876B896A896B951953MOVParallelDischarge MOVFrom1-BCSPMOV1-Ato1-CSIPumpDischarge MOV1-Bto1-CSIPumpDischarge MOVParallelMOVFromCSPumpsto1ACharcoalFilterDelugeMOVParallelMOVFromCSPumpsto1ACharcoalFilterDelugeMOVParallelMOVFromCSPumpsto1BCharcoalFilterDelugeMOVParallelMOVFromCSPumpsto1BCharcoalFilterDelugeMOVRWSTtoCSandSIPumpsMOVRWSTtoCSandSIPumpsAOVPressurizer, SteamSpaceSampleAOVPressurizer LiquidSpaceSampleStrokeQStrokeQStroke9Stroke9StrokeQStrokeQStrokeQ9StrokeC/R9StrokeC/RStrokeQStrokeQ


==0.0 QUALITYASSURANCE==
r.s e
MANUALGINNASTATION7ITLEiAPPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE1728OFValveNTvVeDescritionNoteTest,Freer955959AOVAOV"B"LoopHotLegSampleRHRLoopSampleStrokeQ20'trokeC/R1811A1811B1815Al815B3504MOVMainSteamtoTAFPFroml-BS/GReatorCoolantDrainTank11Isolation toRHRSystemReactorCoolantDrainTank11Isolation toRHRSystemMOVC-SIPumpSuctionFromRWSTMOVC-SIPumpSuctionFromRWSTStrokeQStrokeQStrokeQ3505MOVMainSteamtoTAFPFroml-AS/GStrokeQ3652MVMainSteamThrottleValvetoTAFPStrokeQ39964000A4000B400740084013MOVTAFPDischarge MOVCrossOverValveForMAFPMOVCrossOverValveForMAFPMOVl-AMAFPDischarge MOVl-BMAFPDischarge MOVTAFPServiceWaterSupplyIsolation StrokeQStrokeQStrokeQStrokeQStrokeQStrokeQ4027MOV1-AMAFPServiceWaterIsolation StrokeQ40284291MOVl-BMAFPServiceWaterIsolation AOVTAFPRecir.LineStrokeQStrokeQ4297AOVTAFPDischarge to1-AS/G-StrokeQ 00I~I QUALITYASSURANCE MANUALGINNASTATIONTITLEtAPPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE1828OF4298AOV4304.AOVValveN~TeDescritionTAFPDischarge to-1-BS/G1-AMAFPRecirculation ControlNoteTestPrepStrokeQStrokeQ4310AOV.,1-BMAFPRecirculation ControlStrokeQ456145624609AOVAOVMOVContainment VentRecirc.FansDischarge FlowCon-trolContainment VentRecirc.FansDischarge FlowCon-trolBypasslA1'creen HouseSW'solation StrokeQStrokeQStrokeQ46134614MOVMOV1B2Turbine<Building SWIsolation lAlTurbineBuildingSW.Isolation StrokeQStrokeQ4615MOVlBlAux.BuildingSWIsolation Strokeg4616MOV1AlAux.BuildingSWIsolation StrokeQ466346644670MOVlA1AirCond.ChillersSWIsolation MOV1A2TurbineBuildingSWIsolation MOV1B1TurbineBuildingSWIsolation StrokeQStrokeQStrokeQ47334734MOV1A2AirCond.ChillersSWIsolation MOV1B2Aux.Build.SWIsolation-StrokeQStrokeQ
  ~,
'10 QUALITYASSURANCE MANUALGINNASTATIONTITLE)APPENDIXCPumpandValveTestingProgramDATE2/1/814252CPAGE1928OFValve1~TeDescritionIJoteTestFreq47354780MOVMOV1A2Aux.Build.SWIsolation 1A2ScreenHouseSWIsolation StrokeStroke51715871587258735874587558769629AMOVAPVAPVAPVAPVAPVAPVMOVTurbineBuild.FireWaterLoopSupplyIsolation Containment PostAccidentFilterDamperContainment PostAccidentFilterDamperContainment.
0  . j ( ~
PostAccidentFilterDamperContainment Post.AccidentFilterDamperContainment; Post,AccidentFilterDamperContainment PostAccidentFilterDamper1CSAFPServi'ce.
42 ~ 5R C TITLE:                            DATE QUALITY                                              2/1/81 ASSURANCE                APPENDIX C MANUAL                Pump and Valve            PAGE GINNA STATXON            Testing Program                  2 OF 28 Xntroduction This appendix to the Quality Assurance Manual defines the Inservice Pump and~Valve( Testing Program for the ten year period starting January 1, 1981 through December 31, 1990. Included in this program are the Quality Groups A, B and C Pumps which are provided with a'n emergency power source and those Quality Groups A, B and C Valves which are required to shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition.
WaterIsolation StrokeStrokeStrokeStrokeStrokeStrokeStrokeStrokeQ9629BMOV1DSAFPServiceWaterIsolation StrokeQ9701A9701B9703A9703BMOV9704AMOVSAFPCrossOver1CSAFPContainment Isolation MOV1CSAFPDischarge MOV1DSAFPDischarge MOVSAFPCrossOverStrokeQStrokeQStrokeQStrokeQStrokeQ9704BMOV1DSAFPContainment Isolation StrokeQ
This program has been developed as required by Section
              *50.55a(g) of 10CFR50 following the guidance of the ASME Boiler and Pressure Vessel Code Section XI  "Rules for Inservice Inspection of Nuclear Power Plant Components,"
(hereafter referred to as the "Code" ) excluding the controls of the Authorized Inspector, Enforcement Authority, Report-ing Systems and N-Stamp Symbol. The inservice testing pro-gram shall be controlled by the Ginna Station Quality Assur-ance Program for Station Operation. Quality Groups A, B and C components correspond to those defined in NRC Regula-tory  Guide 1.26.
Further addenda and editions of Section XI of the Code shall be used for clarification of test requirements and performance.
The Inservice Pump and Valve Testing Program does not affect the pump and valve surveillance program required by Technical Specifications. Technical Specification re-quirements shall continue to be implemented at the required frequency.
 
0 5
4
    'f
 
42 52C TITLEs                            DATE QUALITY                                          2/1/81 ASSURANCE              APPENDIX  C MANUAL                Pump and  Valve        PAGE GINNA STATION          Testing Program                3 OF 28 Definitions AFP          Auxiliary Feedwater Pump AOV,        Air Operated Valve APV          Air Operated Piston Valve .
BA          Boric Acid Code        American Society of Mechanical E ngxneers Boiler and Pressure'Vessel Code CC          Component Cooling CS          Containment Spray CSP          Containment Spray Pump CV          Check Valve C/R          Cold Shutdown and Refueling ECCS        Emergency Core Cooling System FCV          Flow Control Valve GA          Gas Analyzer GDT          Gas Decay Tank HCV          Hand    Control Valve HX          Heat Exchanger LCV          Level Control. Valve MAFP        Motor Driven Auxiliary Feedwater Pump MOV          Motor Operated Valve
. MV          Manual Valve PCV          Pressure Control Valve PIV          Primary Isolation Valve PORV        Power Operated Relief Valve PRT          Pressurizer Relief Tank PRV          Pressure  Relief Valve PVT          Pump and Valve Testing Q            Quarterly R            Refueling Outage RCDT        Reactor Coolant Drain Tank RCP          Reactor Coolant Pump RCV          Radiation Control Valve RHR          Residual Heat Removal RMW          Reactor Makeup Water RV          Relief Valve RWST        Refueling Water Storage Tank RX          Reactor Vessel S/G          Steam Generator SAFWP        Standby Auxiliary Feedwater Pump SI          Safety Injection SIV          Secondary Isolation Valve SOV          Solenoid Operated Valve SW          Service Water
 
    '  I l
      )
l f
 
42 52C TITLE:                            DATE QUALITY                                          2/1/81 ASSURANCE            APPENDIX  C PAGE MANUAL            Pump and Valve GINNA STATION        Testing Program                  4  DP 28 Definitions TAFP        Turbine Driven Auxiliary Feedwater  Pump VC          Volume Control VCT          Volume Control Tank VH          Vent Header
 
'e l ~ ~
42 52C TITLE:                              DATE QUALITY                                                    2/1/81 ASSURANCE                    APPENDIX, C PAGE MANUAL                      Pump and Valve GINNA STATION                  Testing Program                  5  DP 28 PVT  1.0 'co        Pum  and Valve e and Res Testin onsibilit Pro ram The inservice testing program defines the testing program for Quality Groups A, B and C Pumps and Valves in accordance with the requirements of Articles IWP and IWV of Section XI of the Code.
The results of these tests are to assure the operational readiness of      pumps and valves.
1.2        It is the responsibility of the Ginna Station Test and Results Supervisor to implement this test program and develop inservice test proce-dures which will outline the specific test for each pump.and valve included in the program.
1.3        When a valve, pump or its control system has been replaced or repaired or has undergone maintenance that could affect its performance, and prior to
              =
the time    it is returned to service,  it  shall be tested as necessary to demonstrate that the per-formance parameters which could have been affected by the replacement, repair, or maintenance are within acceptable limits.
PVT  2.0        Code Edition and Testin Interval 2.1        The Inservice Pump and Valve Testing Program for the ten (10) year period starting January 1, 1981 through December 31, 1990 was developed utilizing the 1977 Edition of Section XI of the Code through the Summer 1978 Addenda.
PVT  3.0        Inservice Pum Testinq Pro ram 3.1        The.Inservice Pump Testing Program was developed in accordance with the requirements of Article IWP of Section XI of the Code.      This program includes all Quality Group A, B and C pumps which are provided with an emergency power source and are required'to perform a specific function in shutting down a reactor or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition.
 
~
    ~
l ~
  )      ~
 
42 52C TITLE:                              DATE QUALITY                                                2/1/81 ASSURANCE                    APPENDIX  C MANUAL                    Pump and Valve            PAGE GINNA STATION              Testing Program                  6 OF 28 3.2      The  following pumps shall be tested in accord-ance  with Article IWP of Section XI:
(a)  lA Component Cooling (b)  1B Component Cooling (c)  1A  Safety Injection (d)  lB Safety  Injection (e)  1C  Safety Injection (f)  lA Residual Heat Removal (g)  lB Residual Heat Removal (h)  lA Containment Spray (i)  1B Containment Spray (j)  lA Motor Driven Auxiliary Feedwater (k)  1B Motor Driven Auxiliary Feedwater (1)  Turbine Driven Auxiliary Feedwater (m)  1A Service Water (n)  1B Service Water (o)  1C Service Water (p)  1D Service Water (q)  1C Standby Auxiliary Feedwater (r)  1D Standby Auxiliary Feedwater 3.3        Flow rates will not be accurate for the residual heat removal pumps because the bypass test loop can'only pass 200 gpm. This bypass test loop is a fixed resistance    system; therefore, hydraulic resistance remains unchanged from test to test.
3.4      Bearing temperatures will not be available for the Service Water pumps. These pumps and their bearings are submersed in forty feet of water, making it, impossible to take measurements.      Be-cause they are submersed, the bearing    temperatures stay very close to the temperature of the intake water.
PVT 4.0        Inservice-Valve Testin Pro ram 4.1        The Inservice Valve Testing Program was developed in accordance with the requirements of Article
            'IWV of Section XI of the Code. All those valves that are required to perform a specific function either to shut down the reactor to the cold shut-down condition or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition are included in the program.
 
  ~    <<'I
'  ) i    ~
 
42 52C TlTLEt                              DATE QUALITY                                                  2/1/81 ASSURANCE                APPENDIX  C MANUAL                  Pump and  Valve            PAGE GINNA STATION            Testing Program                    7 OF 28 4.2      The  Inservice Valve Testing Program Requirements for  Category  A and B Valves are in Tables PVT 4.7 and 4.8, respectively.      Category C Valves are broken down into two categories, Check Valves and Relief Valves, which are in Tables PVT 4.9 and 4.10, respectively. Category D Valves are not included in this testing program because there are none included in Ginna Station design.
4.3      Some exceptions and exemptions to the testing re-quirements of Article I07V have been taken based on operational interference, placing the plant in an unsafe condition and Technical Specification requirements. All exceptions and exemptions are listed on the, valve tables and explained in the referenced notes,    PVT .4.11.
4.4      The  exercising program for Category A and B Valves, with the exception of check valves, shall require a complete stroking of each valve per the valve testing tables. All check valves, including Category C Valves, shall be exercised to the posi-tion required to fulfilltheir function. These functional tests shall be verified by the operation of the required system.
4.5      Category A and B valves operation shall be timed each time they are stroked utilizing switch initiation and the position indicators, which are accessible during plant operation. During each refueling outage a visual verification shall be made to confirm direct correspondence between valve operators and the position indicators.
 
0
      ,)    ~
: a. ~
    '      >  l    ~
 
42 5RC TITLE:                                DATE QUALITY                                                    2/1/81 ASSURANCE                  APPEl'3DlX C MANUAL                    Pump and Valve              PAGE
. GINNA STATION              Testing Program                    8 OF 28 4.6      The  testing of valves required at cold shutdown and  refueling outages will normally take four (4) days to complete. When cold shutdowns are of a shorter duration (2-3 days), test personnel shall attempt to test as many valves as possible without holding up the startup of the unit with testing'eginning no longer than 48 hours after the plant reaches cold shutdown (as defined in Technical Specification 1.2). For very short cold shutdowns (less than 48 hours), it would be impossible to mobilize test personnel to implement the testing program under the required procedural controls, therefore no valves would be tested.
It is possible that,load  during a four (4) day cold on test personnel may shutdown, the work preclude their completion of all the required valve tests prior to startup. Valve testing during cold shutdowns need not be more frequent than one test per quarter for each valve in the test program.
4.7      Category    A Valves Valve &#xb9;    ~Te                                  Note  'est        Freer 304A      CV    1-A  RCP  Seal  Injection        1    Stroke    C/R Leak          R 304B    'V      1-B  RCP  Seal  Injection        1    Stroke Leak C/R R
313        MOV  Seal Water Return                1    Stroke    C/R Isolation                              Leak          R 370B      CV    Charging Line    Isolation        2    Stroke    C/R Leak          R 371        AOV  Letdown  Isolation              3    Stroke    C/R Leak          R 383B      CV    Alternate Charging Line                Stroke    C/R Leak          R 508        AOV  RMW  to Containment Vessel            Stroke        Q Stop                                  Leak          R
 
J 0
        'P a
      ~    l i ~
E r
 
42 52C TITLE:                          DATE QUALITY                                            2/1/81 ASSURANCE                  APPENDIX C MANUAL                  Pump and  Valve      PAGE GINNA STATION              Testing Program                          28 OF Note  Test    Freer 528        CV  N  Supply to  PRT              Stroke        Q Leak          R 529        CV  RMW  to  PRT                      Stroke        Q Leak          R 539        AOV PRT  Stop Valve    to Gas        Stroke        Q Analyzer                          Leak          R 743        CV  CC  From Excess Letdown HX.       Stroke        Q Leak          R 745        AOV Return From Excess Let-          Stroke        0 down HX.                          Leak          R 750A        CV  CC,to  A RCP                    Stroke    C/R Leak          R 750B        CV  CC  to  B RCP                    Stroke    C/R Leak          R 7 59A      MOV Containment'top      CC From      Stroke    C/R Loop A  RCP                      Leak          R 7 59B      MOV  Containment Stop    CC From      Stroke    C/R Loop  B RCP                      Leak        R 813        MOV  Supply  CC  to RX  Support      Stroke    C/R Coolers                          Leak        R 814        MOV  Return CC to    RX  Support      Stroke    C/R Coolers                          Leak        R 846        AOV  N2  Supply to Accumulators        Stroke      Q Leak        R 862A      CV  1-A CSP Disch                    Stroke      Q Leak        R 862B      CV  1-B CSP Disch                    Stroke Leak
 
t
~ I y ~
 
42 52C TITLE:                            DATE QUALITY                                                2/1/81 ASSURANCE                  APPENDIX    C MANUAL                  Pump and    Valve        PAGE GINNA STATION              Testing Program                10 OF 28 Va 1ve I    ~Te            Descri tion          Note  Test    Freer 870A        CV  1-A  to  1-C SI Pump Disch          Stroke        Q Leak          R 870B        CV  .1-B to 1-C SI    Pump  Disch      Stroke        Q Leak          R 879        MV  SI Test Line    Isolation          Stroke Leak 8 89A      CV  1-A SI Pump Disch                  Stroke        Q Leak          R 889B        CV  1-B SI Pump Disch                  Stroke Leak 956A        MV  Pressurizer Liquid      Space      Stroke Containment    Isolation            Leak 956B            Loop  A and Loop  B  Hot Leg      Stroke Containment, Isolation              Leak 956C        MV  Pressurizer'team Space              Stroke Containment Isolation              Leak 966A        AOV  Pressurizer    Steam Space          Stroke Containment    Isolation            Leak 96 6B      AOV  Pressurizer Liquid      Space      Stroke Containment    Isolation            Leak 966C        AOV  Loop A and  B  Hot Leg            Stroke Containment    Isolation            Leak 1003A      LCV  1-A  RCDT Pump    Suction          Stroke      Q Leak          R 1003B      LCV  1-B RCDT Pump Suction              Stroke      Q Leak        R 1076A      MV    Hydrogen to", "A" Recombiner    11  Stroke Pilot  Containment Isolation      Leak IV-3A      SOV  Hydrogen to "A" Recombiner 11      Stroke Pilot Containment SIV              Leak
 
v J'
          ~ ~
l h
f I
4 II"
 
I TITLE:                            DATE QUALITY                                              2/1/81 ASSURANCE                  APPENDIX C MANUAL                  Pump and Valve          PAGE GINNA STATION            Testing Program                11 OF 28 Valve 1    ~Te                              Note  Test    Fr~cr 1076B      MV  Hydrogen  to "B" Recombiner  11  Stroke Pilot Containment Isolation        Leak IV-3B      SOV Hydrogen to~ "B" Recombiner    11  Stroke Pilot Containment SIV              Leak 1080A      MV  Oxygen Make Up    to Contain-  11  Stroke ment PIV                          Leak IV-2A          Oxygen Make Up to Contain-    11  Stroke ment SIV (A Recombiner)            Leak, IV-2B          Oxygen Make Up to Contain-    11  Stroke ment SIV (B Recombiner)            Leak 1084A      MV  Hydrogen to "A" Recombiner 11      Stroke Main Burner Containment PIV        Leak IV-5A      SOV Hydrogen to "A" Recombiner 11      Stroke Main Burner Containment SIV        Leak 1084B          Hydrogen to'; "B" Recombiner '11  Stroke Main Burner'ontainment PIV        Leak IV-5B      SOV Hydrogen to "B" Recombiner 11      Stroke Main Burner Containment SIV        Leak 1596      MV  Radiation Monitor Supply          Stroke        Q Leak          R 1597      AOV Radiation Monitor Supply          Stroke        Q Leak    . R 1598      AOV Radiation Monitor Exhaust          Stroke        Q Leak          R 1599      CV  Radiation Monitor Exhaust          Stroke      Q Inside Containment                Leak          R 1713      CV  N2  to  RCDT  Check                Stroke      Q Leak        R 1721      AOV Suction line to    RCDT          Stroke      9 Leak        R
 
  ~
g
      ' ~ ~
I
  ~    ~
,\
 
42 52C TITLE:                            DATE QUALITY                                                  2/1/81 ASSURANCE                    APPENDIX  C MANUAL                      Pump and  Valve        PAGE GINNA STATION                Testing Program                12        28 f                OF Va lve  I    ~Te            Descri tion          Note  Test    Free 1723          AOV  A  Containment Sump Disch          Stroke      Q Stop to Waste Holdup Tank          Leak        R 1728          AOV  A  Containment Sump Disch          Stroke      Q Stop to Waste Holdup Tank          Leak        R 1786          AOV  RCDT  to VH                    21 Stroke      Q Leak        R 1787          AOV  RCDT  to VH                        Stroke      Q Leak        R 1789          AOV  RCDT  to GA  Containment.          Stroke      Q Isolation                          Leak        R 5392          AOV  Instrument Air to Contain-      19 Stroke      R ment  Isolation                    Leak        R 5393          CV  Instrument to Containment        19 Stroke      R Isolation                          Leak        R 5735          AOV  "A" S/G Blowdown Sample            Stroke      Q Isolation                          Leak        R 5736          AOV  "B" S/G Blowdown Sample            Stroke Isolation                          Leak 5737          AOV  "B" S/G Blowdown    Isolation      Stroke      Q Leak        R 5738          AOV  "A" S/G Blowdown    Isolation . Stroke      Q Leak        R 5869          APV  Containment Purge Supply        22 Stroke Isolation                          Leak 5870          APV  Containment Purge Supply        22 Stroke Isolation                          Leak 5878          APV  Containment, Purge Exhaust      22 Stroke Isolation                          Leak 5879          APV  Containment Purge Exhaust        22 Stroke Isolation                          Leak
* See Note 22
 
0 ~ ~
~
l 42 52C TITLE:                          DATE QUALITY                                            2/1/81 APPENDIX
                      'ote ASSURANCE                            C MANUAL                    Pump and  Valve      PAGE GINNA STATION              Testing Program              13            28 OF Valve  5  ~Te                                    Te st        Freer 6151      MV    Heating Steam to                Stroke Containment                      Leak 6175      MV    Condensate Return from          Stroke Containment                      Leak 7141      MV    Service Air Isolation            Stroke Outside Containment                        'eak 7226      CV    Service Air Isolation            Stroke Inside Containment              Leak 7443      MOV  Containment  Air Test          Stroke Supply                          Leak 7444      MOV  Containment  Air Test Vent  11  Stroke Leak 7445      MOV  Containment,  Air Test Vent  11  Stroke Leak 7970      AOV  Containment Depressuri-          Stroke zation Valve,                    Leak 7971      AOV  Containment Depressuri-          Stroke zation Valve                    Leak 8418      AOV  Demin. Water to Contain-        Stroke ment Is'olation                  Leak 8419      CV    Demin. Water to Contain-        Stroke ment Isolation                  Leak 4.8    Category  B Valves Va 1ve  0  ~Te            Descri tion      Note  Test          Free 014        RCV  Aux  Building  GDT Release      Stroke            Q h
017        RCV  Comp  Cool Surge Tank Vent      Stroke
 
TITLE>                              DATE QUALITY                                                2/1/81 ASSURANCE                  APPENDIX      C MANUAL                  Pump and      Valve        PAGE GINNA STATION            Testing Program                  14 OF 28 Valve N    ~Te          Descri tion            Note  Test    ~Fre 081        APV  Control  Room      Ventilation      Stroke      Q Damper 082        APV  Control  Room      Ventilation      Stroke      Q Damper 083        APV  Control  Room      Ventilation      Stroke      Q Damper 084        APV  Control  Room      Ventilation      Stroke      Q Damper 085        APV  Control  Room      Ventilation      Stroke      Q Damper 086        APV  Control  Room      Ventilation      Stroke Damper 112B      LCV  Emergency Makeup        RWST  to      Stroke      Q Charging  Purqp e
112C      LCV      Outlet  I'CT Stroke      Q 427        AOV  Letdown From Loop        B            Stroke  C/R 430        PORV Reactor Coolant System            16  Stroke  C/R Pressure Relief 431C      PORV Reactor Coolant System            16  Stroke  C/R Pressure Relief 624        HCV  1-B RHR  HX  Outlet                  Stroke      Q 625        HCV  1-A  RHR HX  Outlet                  Stroke      Q 626        FCV  RHR  Loop Return                      Stroke      Q 700        MOV  Suction Stop From Loop        A      Stroke  C/R to  RHR Pumps 701        MOV  Suction Stop From Loop        A      Stroke  C/R to  RHR Pumps 704A      MOV  Suction 1-A        RHR Pump          Stroke      Q
 
    ~
      ~
'T
 
~
  ~
4.,
1 I
TITLEt                                DATE QUALITY                                                  2/1/81 ASSURANCE                    APPENDIX    C MANUAL                    Pump and    Valve          PAGE GINNA STATION              Testing Program                    15 OF 28 Valve &#xb9;    ~T pe          Descri tion            Note    Test    Freer 704B      MOV  Suction.l-B  II RHR Pump              Stroke        Q I
720        MOV  10"-Discharge to      B  Loop      8  Stroke    C/R From RHR Pumps 721        MOV  10" Disch    to  B Loop From      8  Stroke    C/R RHR Pumps 738A      MOV  CC  to l-A  RHR HX                    Stroke        Q 738B      MOV  CC  to l-B  RHR HX                    Stroke        Q 825A      MOV  SI  Pump  Suction From    RWST    9  Stroke    C/R 825B      MOV  SI  Pump  Suction From    RWST    9  Stroke    C/R 826A      MOV  SI  Pump  Suction From    BA Tank    Stroke        Q 826B      MOV  SI  Pump  Suction From    BA Tank    Stroke        Q 826C      MOV  SI  Pump  Suction From    BA Tank    Stroke        Q 826D      MOV  SI  Pump  Suction From    BA Tank    Stroke      P 836A      HCV  Spray Additive Tank Dis-          17  Stroke        Q charge 836B      HCV  Spray Additive Tank Dis-          17  Stroke      Q charge 850A      MOV  Sump B  to  RHR Pumps                Stroke      Q 850B      MOV  Sump B  to  RHR Pumps                Stroke      Q 852A      MOV  RHR Pumps    to Reactor Vessel      18 Stroke    C/R 852B      MOV  RHR Pumps    to Reactor Vessel      18 Stroke    C/R 856        MOV  RWST  to RHR-Pumps                  Stroke    C/R 857A      MOV  Isolate lB RHR HX      From            Stroke      Q CS  and SI Pumps
 
~
r ~
  ~
TITLEi                          DATE QUALITY                                            2/1/81 ASSURANCE                APPENDIX  C MANUAL                  Pump and Valve          PAGE GINNA STATION            Testing Program              16 OF 28 Va 1ve 1  ~Te          Descri tion        Note  Test      Freq 857B      MOV  Isolate lA  RHR HX  From          Stroke        Q CS  and SI Pumps 857C      MOV  Isolate lA  RHR HX  From          Stroke Q
CS  and SI Pumps 860A      MOV  Parallel Discharge  MOV          Stroke        Q
                      'From 1-A  CSP 860B      MOV  Parallel Discharge  MOV          Stroke        Q From 1-A CSP 860C      MOV  Parallel Discharge  MOV          Stroke        Q From 1-B CSP 860D      MOV  Parallel Discharge  MOV          Stroke        Q From 1-B CSP 871A      MOV  1-A  to 1-C SI Pump Discharge    Stroke        Q 871B      MOV  1-B to 1-C SI Pump Discharge      Stroke        9 875A      MOV  Parallel MOV From CS Pumps        Stroke        9 to 1A Charcoal Filter Deluge 875B      MOV  Parallel MOV From CS Pumps        Stroke        Q to 1A Charcoal Filter Deluge 876A      MOV  Parallel MOV From CS Pumps        Stroke        Q to 1B Charcoal Filter Deluge 876B      MOV  Parallel MOV From CS Pumps        Stroke        Q to 1B Charcoal Filter Deluge 896A      MOV  RWST to CS and SI Pumps        9  Stroke    C/R 896B      MOV  RWST to CS and SI Pumps        9  Stroke    C/R 951        AOV  Pressurizer, Steam Space          Stroke        Q Sample 953        AOV  Pressurizer Liquid  Space        Stroke        Q Sample
 
0 .0 7ITLEi                                DATE QUALITY                                                    2/1/81 ASSURANCE                    APPENDIX  C MANUAL                    Pump and  Valve            PAGE GINNA STATION              Testing Program                    17 OF 28 Valve N    TvVe            Descri tion            Note  Test,    Freer 955        AOV  "B" Loop Hot Leg Sample                Stroke        Q 959        AOV  RHR  Loop Sample                  20  'troke      C/R 1811A          Reator Coolant Drain Tank          11 Isolation to      RHR System 1811B          Reactor Coolant Drain Tank        11 Isolation to      RHR System 1815A      MOV  C-SI    Pump  Suction From  RWST      Stroke        Q l815B      MOV  C-SI    Pump  Suction From  RWST      Stroke        Q 3504      MOV  Main Steam    to  TAFP From  l-B      Stroke        Q S/G 3505      MOV  Main Steam    to  TAFP From  l-A      Stroke        Q S/G 3652      MV  Main Steam    Throttle Valve          Stroke        Q to  TAFP 3996      MOV  TAFP  Discharge                        Stroke        Q 4000A      MOV  Cross Over Valve For      MAFP        Stroke        Q 4000B      MOV  Cross Over Valve For      MAFP        Stroke        Q 4007      MOV  l-A  MAFP    Discharge                  Stroke        Q 4008      MOV  l-B  MAFP    Discharge                  Stroke        Q 4013      MOV  TAFP  Service Water Supply            Stroke        Q Isolation 4027      MOV  1-A  MAFP    Service Water              Stroke        Q Isolation 4028      MOV  l-B  MAFP    Service Water              Stroke        Q Isolation 4291      AOV  TAFP  Recir. Line                      Stroke        Q 4297      AOV  TAFP  Discharge to 1-A S/G            Stroke        Q
 
0 0  I ~
I
 
TITLEt                                      DATE QUALITY                                                          2/1/81 ASSURANCE                    APPENDIX C MANUAL                    Pump and Valve                    PAGE GINNA STATION                Testing Program                          18 OF 28 Va lve N    ~Te            Descri tion                    Note  Test    Prep 4298        AOV  TAFP  Discharge to- 1-B S/G                  Stroke      Q 4304      . AOV  1-A  MAFP  Recirculation                      Stroke      Q Control 4310        AOV .,1-B MAFP  Recirculation                      Stroke      Q Control 4561        AOV  Containment Vent Recirc.                     Stroke      Q Fans Discharge Flow Con-trol 4562        AOV  Containment Vent Recirc.                     Stroke      Q Fans Discharge Flow Con-trol  Bypass 4609        MOV  lA1'creen   House  SW                        Stroke      Q
                                            'solation 4613        MOV  1B2  Turbine <Building             SW        Stroke      Q Isolation 4614        MOV  lAl Turbine Building              SW  .     Stroke      Q Isolation 4615        MOV  lBl Aux. Building SW                          Stroke      g Isolation 4616        MOV  1Al Aux. Building  SW                      Stroke      Q Isolation 4663        MOV  lA1 Air Cond. Chillers                SW      Stroke      Q Isolation 4664        MOV  1A2  Turbine Building              SW        Stroke      Q Isolation 4670        MOV  1B1  Turbine Building              SW        Stroke      Q Isolation 4733        MOV  1A2 Air Cond. Chillers                SW      Stroke      Q Isolation 4734        MOV  1B2  Aux. Build. SW  Isolation            Stroke      Q
 
  ' 1 0
 
42 52C TITLE)                                 DATE QUALITY                                                  2/1/81 ASSURANCE                  APPENDIX    C MANUAL                  Pump and Valve              PAGE GINNA STATION              Testing Program                    19 OF 28 Valve  1 ~Te            Descri tion            IJote  Test    Freq 4735      MOV 1A2  Aux. Build. SW  Isolation      Stroke 4780      MOV 1A2  Screen House    SW                Stroke Isolation 5171      MOV Turbine Build. Fire Water              Stroke Loop Supply    Isolation 5871    APV  Containment Post Accident              Stroke Filter  Damper 5872    APV  Containment Post Accident              Stroke Filter  Damper 5873    APV  Containment. Post Accident            Stroke Filter  Damper 5874    APV  Containment Post. Accident            Stroke Filter  Damper 5875    APV  Containment; Post, Accident            Stroke Filter  Damper 5876    APV  Containment Post Accident              Stroke Filter  Damper 9629A    MOV  1C SAFP    Servi'ce. Water            Stroke        Q Isolation 9629B    MOV  1D SAFP    Service Water              Stroke        Q Isolation 9701A    MOV  1C SAFP    Discharge                  Stroke        Q 9701B    MOV  1D SAFP    Discharge                  Stroke        Q 9703A    MOV  SAFP  Cross Over                      Stroke      Q 970 3B  MOV  SAFP  Cross Over                      Stroke        Q 9704A    MOV  1C SAFP    Containment                Stroke      Q Isolation 9704B    MOV  1D SAFP  Containment                  Stroke      Q Isolation
 
TITLE:                                DATE QUALITY                                                  2/1/81 ASSURANCE                    APPENDIX    C MANUAL                    Pump and    Valve        PAGE GINNA STATION                Testing Program                  20 OF 28 Valve  I  ~Te                                    Note  Test    Frea I  971 0A    AOV    1C 'SAFP  Recirc. Control            Stroke 9710a      AOV    1D SAFP    Recirc. Control            Stroke 4.9    Category  C  Check Valves Valve  0  ~T pe                                  Note  Test    Freer 710A        CV    1-A  RHR Pump      Discharge          Stroke      Q 710B        CV    1-B  RHR Pump      Discharge          Stroke      Q 723A        CV    1-A  CC Pump      Discharge            Stroke      Q 723B        CV-. 1-B  CC Pump      Discharge            Stroke      Q 842A        CV    First  Check Valve in Loop            Stroke      Q A  Accumulator Dump Line 842B        CV    First  Check<Valve      in Loop      Stroke      Q B  Accumulator      Dump  Line 847A        CV    A-CSP From Spray      Additive        Stroke      Q Tank  to Eductor 847B        CV    B-CSP From Spray      Additive        Stroke      9 Tank  to Eductor 853A        CV    Core Deluge Check                10  Stroke  C/R 853B        CV    Core Deluge Check                10  Stroke  C/R 854        CV    RWST  to  RHR Pump    Check          Stroke      Q 8 66A      CV    CS  Pump  1-A    to Charcoal    12  Stroke  C/R Filter    Deluge 866B        CV    CS  Pump 1-B      to Charcoal          Stroke      Q Filter    Deluge
                                    'f 3
867A        CV    Accumulator.- Dump and SI        13  Stroke      R to Cold Leg Loop B 867B        CV    Accumulator      Dump and SI    13  Stroke      R to Cold    Leg Loop A
 
t 4i ~
I ~
TITLE                            DATE QUALITY                                            2/1/81 ASSURANCE                  APPENDIX  C MANUAL                  Pump and Valve        PAGE GINNA STATION              Testing Program              21        28 OF Va 1ve 0  ape            Descri tion      Note    Test    Freq 878G      CV  1-A SI Pump to Cold Leg      13    Stroke      R Loop B After MOV 878B 878J      CV  l-B SI    Pump to Cold Leg  13    Stroke      R Loop A    After MOV 878D 3516      CV  1B S/G Main Steam Swing      14  , Stroke  Start-Check Stop Valve                            up 3517      CV  lA S/G Main Steam Swing      14    Stroke  Start-Check Stop Valve                            up 3998      CV  TAFP  Discharge Check            Stroke      Q 4000C      CV  lA  MAFP  Discharge              Stroke      Q Downstream MOV-4007 4000D      CV  lB  MAFP  Discharge              Stroke      .Q Downstream MOV-4008 4003      CV  TAFP  to  S/G lA                  Stroke      Q 4004      CV  TAFP  to  S/G lB                  Stroke 4009      CV  lA  MAFP  to  S/G lA              Stroke      Q 4010      CV  1B MAFP    to  S/G 1B              Stroke      Q 4014      CV  TAFP  Condensate  Suction        Stroke      Q 4016      CV  1B MAFP    Suction                Stroke      9 4017      CV  1A MAFP    Suction                Stroke      Q 4023      CV  TAFP  Recirculation              Stroke      Q 4601      CV  lA Service Water      Pump        Stroke      Q Discharge 4602      CV  1B Service Water      Pump        Stroke      Q Discharge
 
      'I 1
I' t'
 
42 52C TITLE:                            DATE QUALITY                                                2/1/81 ASSURANCE                    APPENDIX  C MANUAL                    Pump and  Valve        PAGE GINNA STATION                Testing Program              22          28 OF Valve &#xb9;    ~Te                                Note  Test    Frey 4603        CV    1C Service Mater    Pump          Stroke Discharge 4604        CV    1D Service Water    Pump          Stroke      Q Discharge 5133        CV    Diesel Fire    Pump  Disch.        Stroke      Q 5136        CV    Motor Fire    Pump  Discharge      Stroke      Q 9627A      CV    1C SAFP SW    Suction              Stroke      Q 9627B      CV    1D SAFP  Slf Suction              Stroke      Q 9700A      CV    1C SAFP  Discharge                Stroke      Q 9700B      CV 'D    SAFP  Discharge                Stroke      Q 9705A      CV    1C SAFP  to S/G 1A                Stroke    ,
Q 9705B      CV    1D SAFP  to S/G 1B                Stroke      0 4.10    Category  C Relief Valve Va lve  &#xb9;  ~Te            Descri tion        Note  Test    Freer 203        RV    Letdown High Pressure          15 Safety Relief 209        RV    Letdown Low Pressure          15 Safety Relief 434        RV    Pressurizer Safety Relief      15 435        RV    Pressurizer Safety Relief      15 732        RV    CC  Surge Tank  Relief        15
 
0 I ~
ir
 
42 $ 2C TITLE:                            DATE QUALITY                                              2/1/81 ASSURANCE                APPENDIX    C MANUAL                Pump and    Valve        PAGE GINNA STATION            Testing Program                23 OF 28 Va lve I  ~Te          Descri tion          Note  Test    Freer 744        RV  CC  From Excess Letdown        15 Heat Exchan er 755A      RV  CC  From A  RCP  Thermal      15 Barrier 755B      RV  CC  From  B RCP  Thermal      15 Barrier 758A      RV  CC  From A-RCP    Oil Coolers  15 758B      RV  CC  From B-RCP    Oil Coolers  15 818        RV  CC  From Reactor Support        15 Coolers 861        RV  1-B  CS  Pump  Suction Relief  15 887        RV  SI Test Line Inside            15 ContainmentI Relief 1817      RV  Alternate Suction From          15 RHR Pump to C SI Pump 3508      RV  1-B S/G PRV                    15 3509      RV  1-A S/G PRV                    15 3510      RV  1-B S/G PRV                    15 3511      RV  1-A S/G  PRV                  15 3512      RV  1-A S/G PRV                    15 3513      RV  1-A S/G  PRV 3514      RV  1-B S/G PRV                    15 3515      RV  1-A S/G PRV,                    15 4
4653      RV  Service Water Relief            15 4654      RV  Service Water Relief            15
 
g, 0 7
    . ~
l
        \
 
TITLE                              DATE QUALITY                                                2/1/81 ASSURANCE                  APPENDIX  C MANUAL                    Pump and Valve            PAGE GINNA STATION              Testing Program                24 OF 28 Valve  I  ~Te                                  Note  Test    Freer 4657      RV    Service Water Relief            15 5134      RV    Diesel Fire  Pump  Disch R.V. 15 5135      RV    Motor Fire  Pump  Disch R.V. 15 4.11    Inservice Valve Testing Notes Note  1  Valves  304A, 304B and 313 cannot be stroked during normal plant operation on a quarterly basis because they would interrupt coolant flow to the reactor coolant pump seals. These valves will be stroked at cold shutdowns and refuel-ing outages.
Note  2  Valve 370B cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt charging pump flow. This valve will be stroked at cold shutdowns and refueling outages.
Note  3  Valves 371 and 427 cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt the letdown (CVCS) system. These valves will be stroked at cold shutdowns and refueling outages.
Note  4  Valve 383B  cannot be stroked during normal plant operation on a quarterly basis because this test would result in substantial radiation exposure,to test personnel. Surveys in the area of the test connection during plant operation indicate neutron fields of approximately 500 mr/hr and a gamma fields of 250 mr/hr.
Total whole body dosage to test personnel is estimated to be 375 mrem. This valve will be stroked at cold shutdowns and refueling outages.
 
0 c' 0
a C
              ,y h
l'II
 
l ~
    'UALITY            TITLE:
2/1/81 RE V.
ASSURANCE                  APPENDIX  C MANUAL                  Pump and  Valve          PAGE GINNA STATION              Testing Program                  25  OP 28 Note  5Valves      750A, 750B, 759A and 759B cannot be stroked during normal plant operation on a quarterly basis because this test would require the reactor coolant. pumps to  be shut down to eliminate the flow through these checks and MOVs. These valves will be stroked at, cold shutdowns and refueling outages.
Note  6-  Valves 813 and 814 cannot be stroked during normal plant operation on a quarterly basis because this test would remove the coolant to the reactor vessel supports and cavity wall. These valves will be stroked at cold shutdowns and refueling outages.
Note  7Valve 879 is a manual valve in the safety injection test line and is kept locked shut. This valve is not required to change position to perform a safety func-tion. The only requirement is that leak-age through valve 879 be acceptably 1'ow.
Therefore, the quarterly stroke test has been deleted. This passive valve will be only leak tested at refueling outages consistent with IWV-3700-1.
Note  8 Valves 700 and 721 cannot be stroked during normal plant operation on a quarterly basis because there is an interlock system which. prevents these valves from opening when the primary system is at operating pressure.      Valves 700, 701, 720,and 721 separate a high pressure system from a low pressure system. These valves will be stroked at cold shutdowns and refueling outages.
Note  9    Valves 825A, 825B, 856, 896A, and 896B should not be stroked during normal opera-tion on a quarterly basis because this would cause a temporary los's of system function of the ECCS. These valves pro-vide the suction from the refueling water
 
TITLE:                                              RE Y.
QUALITY                                                  2/1/81 AS SURANCE                APPENDIX  C MANUAL                  Pump and Valve              PAGE GINNA STATION              Testing Program                    26  OP 28 storage tank to the safety injection and residual heat removal pumps. These valves will be stroked at cold shutdowns and re-fueling outages.
Note 10- Valves 853A and 853B cannot be stroked during normal plant operation on a quarterly basis because this test, require would pressurizing the RHR system to the primary system operation pressure. These valves will be stroked at refueling outages.
Note  ll- Valves    1076A, IV-3A, IV-3B, 1076B, 1080A, 1084A, 1084B, IV-5A, IV-5B, IV-2A, IV-2B, 1811A, 1811B, 6151, 6175, 7141, 7226, 7443 7444, 7445, 8418 and 8419 are considered passive valves which are not required to change position to acccomplish their specific function. Stroking these valves would serve no useful function and will therefore not be done as per IWV-3700-1.
Note 12- Valve 866A cannot be stroke tested during normal plant operation on a quarterly basis because this test. would result in a substantial radiation expo-sure to test personnel.      Stroke testing at this location resulted in approxi-mately 400 mrem whole body exposure to the test personnel. This valve will be stroked at cold shutdowns and refueling outages.
Note 13- Valves 867A, 867B, 878G, and 878J cannot be stroked during normal operation on a quarterly basis or at cold shutdown condition when the primary system is full. This test may only be done when the plant is in a refueling shutdown condition with a partially    full primary system in order to prevent    an  over-pressurization.
 
v l ~
                    ~
I
'1 P l,f
      'I!
 
TITLE:                                                RE V.
QUALITY                                                      2/1/81 ASSURANCE                        APPENDIX  C MANUAL                      Pump and    Valve          PAGE GINNA STATION                Testing Program                    27  OP 28 C
Note 14- Valves 3516 and 3517 cannot be stroked during normal plant operation on a quarterly basis because they are the main steam swing check stop valves.
These valves 'are stroked during each plant startup.
Note 15- Category C Reli'ef Valves shall be tested in accordance with the extent and fre-quency requirements of Paragraph IWV-3510 of Article IWV of Section XI of the Code.
No te  l6-    Valves 430 and 43lC are the power operated relief valves associated with the overpressurization system. These valves shall not be stroked quarterly as they need not. be operable when the plant is at, normal system pressure.
Operability of these valves shall be verified as follows:
(1) Full stroke exercising during cool down prior to achieving water solid condition in Ne pressurizer and during cold shutdown prior to heat up.
(2)    Stroke timing to be performed as a minimum once each refueling cycle as a part of the channel calibration specified by Technical Specifications 4.16.1b.
(3) Fail safe actuation testing is permitted by the code to be per-formed at each cold shutdown    if valve cannot be tested during power operation.
(4) Technical specification 4.16.1a and 4.16.1c delineate additional re-quirements for operability verifi-cation of the PORV actuation channel and valve position.
Note 17- Valve stroking will be'normally ac-complished monthly, except during cold and refueling shutdowns, consistent with the monthly Technical Specification requirement.


QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE2028OFValveI~TeNoteTestFreaI9710A9710a4.9AOV1C'SAFPRecirc.ControlAOV1DSAFPRecirc.ControlCategoryCCheckValvesStrokeStrokeValve0~TpeNoteTestFreer710A710B723A723B842A842B847A847B853A853B854866ACV1-ARHRPumpDischarge CV1-BRHRPumpDischarge CV1-ACCPumpDischarge CV-.1-BCCPumpDischarge CVFirstCheckValveinLoopAAccumulator DumpLineCVFirstCheck<Valve inLoopBAccumulator DumpLineCVA-CSPFromSprayAdditiveTanktoEductorCVB-CSPFromSprayAdditiveTanktoEductorCVCoreDelugeCheckCVCoreDelugeCheckCVRWSTtoRHRPumpCheckCVCSPump1-AtoCharcoalFilterDelugeStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStroke912StrokeQStrokeC/R10StrokeC/R10StrokeC/R866B867ACVCVCSPump1-BtoCharcoalFilterDeluge'f3Accumulator.-
DumpandSItoColdLegLoopBStrokeQ13StrokeR867BCVAccumulator DumpandSItoColdLegLoopA13StrokeR t4i~I~QUALITYASSURANCE MANUALGINNASTATIONTITLEAPPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE21OF28Va1ve0ape878GCVDescrition1-ASIPumptoColdLegLoopBAfterMOV878BNoteTestFreq13StrokeR878J3516CVCVl-BSIPumptoColdLegLoopAAfterMOV878D1BS/GMainSteamSwingCheckStopValve13StrokeR14,StrokeStart-up351739984000CCVlAMAFPDischarge Downstream MOV-4007CVlAS/GMainSteamSwingCheckStopValveCVTAFPDischarge Check14StrokeStart-upStrokeQStrokeQ4000DCVlBMAFPDischarge Downstream MOV-4008Stroke.Q400340044009401040144016401740234601CVCV1AMAFPSuctionTAFPRecirculation CVlAServiceWaterPumpDischarge CVTAFPtoS/GlACVTAFPtoS/GlBCVlAMAFPtoS/GlACV1BMAFPtoS/G1BCVTAFPCondensate SuctionCV1BMAFPSuctionStrokeQStrokeStrokeQStrokeQStrokeQStroke9StrokeQStrokeQStrokeQ4602CV1BServiceWaterPumpDischarge StrokeQ
'I1I't' QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE22OF4252C28Valve&#xb9;~TeNoteTestFrey46034604CV1CServiceMaterPumpDischarge CV1DServiceWaterPumpDischarge StrokeStrokeQ513351369627A9627B9700A9700BCVDieselFirePumpDisch.CVMotorFirePumpDischarge CV1CSAFPSWSuctionCV1DSAFPSlfSuctionCV1CSAFPDischarge CV'DSAFPDischarge 9705BCV1DSAFPtoS/G1B4.10CategoryCReliefValve9705ACV1CSAFPtoS/G1AStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStroke,QStroke0Valve&#xb9;~Te203RVDescritionLetdownHighPressureSafetyReliefNote15TestFreer209RVLetdownLowPressureSafetyRelief15434435RVPressurizer SafetyRelief15RVPressurizer SafetyRelief15732RVCCSurgeTankRelief15 0~irI QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE2/1/8142$2CPAGE2328OFValveI~TeDescritionNoteTestFreer744755ARVRVCCFromExcessLetdownHeatExchanerCCFromARCPThermalBarrier1515755BRVCCFromBRCPThermalBarrier15758A758BRVCCFromA-RCPOilCoolers15RVCCFromB-RCPOilCoolers15818RVCCFromReactorSupport15Coolers861RV1-BCSPumpSuctionRelief158871817RVRVSITestLineInsideContainmentI ReliefAlternate SuctionFromRHRPumptoCSIPump15153508350935103511351235133514351546534654RV1-BS/GPRVRV1-AS/GPRVRV1-BS/GPRVRV1-AS/GPRVRV1-AS/GPRVRV1-AS/GPRVRV1-BS/GPRVRV1-AS/GPRV,4RVServiceWaterReliefRVServiceWaterRelief151515151515151515
.~g,07l\
QUALITYASSURANCE MANUALGINNASTATIONTITLEAPPENDIXCPumpandValveTestingProgramDATE2/1/81PAGE24OF28ValveI~TeNoteTestFreer4657RVServiceWaterRelief155134RVDieselFirePumpDischR.V.155135RVMotorFirePumpDischR.V.154.11Inservice ValveTestingNotesNote1-Valves304A,304Band313cannotbestrokedduringnormalplantoperation onaquarterly basisbecausetheywouldinterrupt coolantflowtothereactorcoolantpumpseals.Thesevalveswillbestrokedatcoldshutdowns andrefuel-ingoutages.Note2-Valve370Bcannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistestwouldinterrupt chargingpumpflow.Thisvalvewillbestrokedatcoldshutdowns andrefueling outages.Note3-Valves371and427cannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistestwouldinterrupt theletdown(CVCS)system.Thesevalveswillbestrokedatcoldshutdowns andrefueling outages.Note4-Valve383Bcannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistestwouldresultinsubstantial radiation exposure,to testpersonnel.
Surveysintheareaofthetestconnection duringplantoperation indicateneutronfieldsofapproximately 500mr/hrandagammafieldsof250mr/hr.Totalwholebodydosagetotestpersonnel isestimated tobe375mrem.Thisvalvewillbestrokedatcoldshutdowns andrefueling outages.
0a0,yc'Chl'II l~'UALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramPAGE2/1/81REV.25OP28Note5-Note6-Note7-Valves750A,750B,759Aand759Bcannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistestwouldrequirethereactorcoolant.pumpstobeshutdowntoeliminate theflowthroughthesechecksandMOVs.Thesevalveswillbestrokedat,coldshutdowns andrefueling outages.Valves813and814cannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistestwouldremovethecoolanttothereactorvesselsupportsandcavitywall.Thesevalveswillbestrokedatcoldshutdowns andrefueling outages.Valve879isamanualvalveinthesafetyinjection testlineandiskeptlockedshut.Thisvalveisnotrequiredtochangepositiontoperformasafetyfunc-tion.Theonlyrequirement isthatleak-agethroughvalve879beacceptably 1'ow.Therefore, thequarterly stroketesthasbeendeleted.Thispassivevalvewillbeonlyleaktestedatrefueling outagesconsistent withIWV-3700-1.
Note8-Note9Valves700and721cannotbestrokedduringnormalplantoperation onaquarterly basisbecausethereisaninterlock systemwhich.preventsthesevalvesfromopeningwhentheprimarysystemisatoperating pressure.
Valves700,701,720,and721separateahighpressuresystemfromalowpressuresystem.Thesevalveswillbestrokedatcoldshutdowns andrefueling outages.Valves825A,825B,856,896A,and896Bshouldnotbestrokedduringnormalopera-tiononaquarterly basisbecausethiswouldcauseatemporary los'sofsystemfunctionoftheECCS.Thesevalvespro-videthesuctionfromtherefueling water QUALITYASSURANCEMANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramPAGE2/1/81REY.26OP28Note10-Notell-Note12-Note13-storagetanktothesafetyinjection andresidualheatremovalpumps.Thesevalveswillbestrokedatcoldshutdowns andre-fuelingoutages.Valves853Aand853Bcannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistest,requirewouldpressurizing theRHRsystemtotheprimarysystemoperation pressure.
Thesevalveswillbestrokedatrefueling outages.Valves1076A,1076B,1080A,1084A,1084B,IV-3A,IV-3B,IV-5A,IV-5B,IV-2A,IV-2B,1811A,1811B,6151,6175,7141,7226,74437444,7445,8418and8419areconsidered passivevalveswhicharenotrequiredtochangepositiontoacccomplish theirspecificfunction.
Strokingthesevalveswouldservenousefulfunctionandwilltherefore notbedoneasperIWV-3700-1.
Valve866Acannotbestroketestedduringnormalplantoperation onaquarterly basisbecausethistest.wouldresultinasubstantial radiation expo-suretotestpersonnel.
Stroketestingatthislocationresultedinapproxi-mately400mremwholebodyexposuretothetestpersonnel.
Thisvalvewillbestrokedatcoldshutdowns andrefueling outages.Valves867A,867B,878G,and878Jcannotbestrokedduringnormaloperation onaquarterly basisoratcoldshutdowncondition whentheprimarysystemisfull.Thistestmayonlybedonewhentheplantisinarefueling shutdowncondition withapartially fullprimarysysteminordertopreventanover-pressurization.
~v~lI'1Pl,f''I!
QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgram2/1/81REV.PAGE27OP28CNote14-Valves3516and3517cannotbestrokedduringnormalplantoperation onaquarterly basisbecausetheyarethemainsteamswingcheckstopvalves.Thesevalves'arestrokedduringeachplantstartup.Note15-CategoryCReli'efValvesshallbetestedinaccordance withtheextentandfre-quencyrequirements ofParagraph IWV-3510ofArticleIWVofSectionXIoftheCode.Notel6-Valves430and43lCarethepower"operatedreliefvalvesassociated withtheoverpressurization system.Thesevalvesshallnotbestrokedquarterly astheyneednot.beoperablewhentheplantisat,normalsystempressure.
Operability ofthesevalvesshallbeverifiedasfollows:(1)Fullstrokeexercising duringcooldownpriortoachieving watersolidcondition inNepressurizer andduringcoldshutdownpriortoheatup.(2)Stroketimingtobeperformed asaminimumonceeachrefueling cycleasapartofthechannelcalibration specified byTechnical Specifications 4.16.1b.(3)Failsafeactuation testingispermitted bythecodetobeper-formedateachcoldshutdownifvalvecannotbetestedduringpoweroperation.
(4).Technical specification 4.16.1aand4.16.1cdelineate additional re-quirements foroperability verifi-cationofthePORVactuation channelandvalveposition.
Note17-Valvestrokingwillbe'normally ac-complished monthly,exceptduringcoldandrefueling shutdowns, consistent withthemonthlyTechnical Specification requirement.
I'(
I'(
QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATEPAGE2/1/8128DP28Note18-Valves852Aand852Bcannotbestrokedduringnormalplantoperation asthesevalves,whencycled,couldsubjecttheResidualHeatRemovalSystemtoapressureinexcessofitsdesignpressure.
TITLE:                                 DATE QUALITY                                                  2/1/81 ASSURANCE                  APPENDIX C PAGE MANUAL                    Pump and  Valve GINNA STATION              Testing Program                  28  DP 28 Note 18- Valves 852A and 852B cannot be stroked during normal plant operation as these valves,   when  cycled, could subject the Residual Heat Removal System to a pressure in excess of its design pressure. These valves will be stroked at cold shutdowns and  refueling outages.
Thesevalveswillbestrokedatcoldshutdowns andrefueling outages.Note19-StrokingValves5392and5393duringoperation andcoldshutdownwouldinter-ruptinstrument airtocontainment andbedisruptive toairoperatedvalvesinside.Thesevalveswillbestrokedatrefueling outages.Note20-Note21-Note22-PVT5.0RecordsValve959isnormallyclosedandinthecontainment isolating positionduringnormaloperation.
Note 19- Stroking Valves 5392 and 5393 during operation and cold shutdown would inter-rupt instrument air to containment and be  disruptive to air operated valves inside. These valves will be stroked at refueling outages.
Thesevalveswillbestrokedatcoldshutdownandrefueling outages.Valve1786isnotrequiredtofunctionperFSARChapter5butvalvereceivesa"T"iSignal.CategoryAvalves5869,5870,5878and5879arenormallyclosedandinthecontainment isolating positionduringnormaloperation.
Note 20- Valve 959 is normally closed and in the containment isolating position during normal operation. These valves will be stroked at cold shutdown and refueling outages.
Leaktightness ofthesevalvesisreverified following reclosure aftereachuseinaccordance withSection4.4.2.4ofTechnical Speci-fications.
Note 21- Valve 1786 is not required to function per FSAR Chapter 5 but valve receives a "T"i Signal.
Thevalvesshallbestrokedatleasteachcoldshutdown.
Note 22- Category A valves 5869, 5870, 5878 and 5879 are normally closed and in the containment isolating position during normal operation. Leak tightness of these valves is reverified following reclosure after each use in accordance with Section 4.4.2.4 of Technical Speci-fications. The valves shall be stroked at least each cold shutdown. In addition, if  the valves are opened for purging, they shall be stroked at least once each quarter during which they have been opened.
Inaddition, ifthevalvesareopenedforpurging,theyshallbestrokedatleastonceeachquarterduringwhichtheyhavebeenopened.5.1IIRecordsfortheInservice PumpTestingProgramshallbedeveloped andmaintained inaccordance withArticleIWP-6000ofSectionXIoftheCode.5.2RecordsfortheInservice ValveTestingProgramshallbedeveloped andmaintained
PVT  5.0    Records II 5.1    Records    for the Inservice Pump Testing Program shall be developed and maintained in accordance with Article IWP-6000 of Section XI of the Code.
'inaccordance withArticleIWV-6000ofSectionXIoftheCode.
5.2    Records for the Inservice Valve Testing Program shall be developed and maintained 'in accordance with Article IWV-6000 of Section XI of the Code.
h~V,NR4h*NrhV,h~VI)hhRI}}
 
h ~
V
        , N R
4 h
N r
h V,               h I ) hh V
R I
~}}

Latest revision as of 10:11, 4 February 2020

to App C-Ginna Station Inservice Pump & Valve Testing Program for 810101 Through 901230.
ML17258A746
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/29/1981
From: Anderson C
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17258A745 List:
References
NUDOCS 8102030272
Download: ML17258A746 (51)


Text

'UALITY

.c ASSURANCE ltANUAL RE Y. PAGE GINNA STATION 1 DF 28 EFFECTIVE DATE.

OCHESTER GAS 6 ELECTRIC CORPORATION 5'ebruary 1, 1981 SIGNATURE DATE TITLE: PREPARED BY Appendix C Ginna Station Inservice Pump and Valve Testing Program for the January 1, 1981 REVIEW through December 31, 1990 Period APPROVED BY Program Table of Contents ntroduction: Discussion efinitions:

rogram: PVT 1.0 Scope and Responsibility PVT 2.0 Code Edition and Testing Interval PVT 3.0 Inseryice Pump Testing Program PVT 4.0 Inservice Valve Testing Program PVT 5.0 Records 810 '.0 8077k,

r.s e

~,

0 . j ( ~

42 ~ 5R C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATXON Testing Program 2 OF 28 Xntroduction This appendix to the Quality Assurance Manual defines the Inservice Pump and~Valve( Testing Program for the ten year period starting January 1, 1981 through December 31, 1990. Included in this program are the Quality Groups A, B and C Pumps which are provided with a'n emergency power source and those Quality Groups A, B and C Valves which are required to shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition.

This program has been developed as required by Section

  • 50.55a(g) of 10CFR50 following the guidance of the ASME Boiler and Pressure Vessel Code Section XI "Rules for Inservice Inspection of Nuclear Power Plant Components,"

(hereafter referred to as the "Code" ) excluding the controls of the Authorized Inspector, Enforcement Authority, Report-ing Systems and N-Stamp Symbol. The inservice testing pro-gram shall be controlled by the Ginna Station Quality Assur-ance Program for Station Operation. Quality Groups A, B and C components correspond to those defined in NRC Regula-tory Guide 1.26.

Further addenda and editions of Section XI of the Code shall be used for clarification of test requirements and performance.

The Inservice Pump and Valve Testing Program does not affect the pump and valve surveillance program required by Technical Specifications. Technical Specification re-quirements shall continue to be implemented at the required frequency.

0 5

4

'f

42 52C TITLEs DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 3 OF 28 Definitions AFP Auxiliary Feedwater Pump AOV, Air Operated Valve APV Air Operated Piston Valve .

BA Boric Acid Code American Society of Mechanical E ngxneers Boiler and Pressure'Vessel Code CC Component Cooling CS Containment Spray CSP Containment Spray Pump CV Check Valve C/R Cold Shutdown and Refueling ECCS Emergency Core Cooling System FCV Flow Control Valve GA Gas Analyzer GDT Gas Decay Tank HCV Hand Control Valve HX Heat Exchanger LCV Level Control. Valve MAFP Motor Driven Auxiliary Feedwater Pump MOV Motor Operated Valve

. MV Manual Valve PCV Pressure Control Valve PIV Primary Isolation Valve PORV Power Operated Relief Valve PRT Pressurizer Relief Tank PRV Pressure Relief Valve PVT Pump and Valve Testing Q Quarterly R Refueling Outage RCDT Reactor Coolant Drain Tank RCP Reactor Coolant Pump RCV Radiation Control Valve RHR Residual Heat Removal RMW Reactor Makeup Water RV Relief Valve RWST Refueling Water Storage Tank RX Reactor Vessel S/G Steam Generator SAFWP Standby Auxiliary Feedwater Pump SI Safety Injection SIV Secondary Isolation Valve SOV Solenoid Operated Valve SW Service Water

' I l

)

l f

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 4 DP 28 Definitions TAFP Turbine Driven Auxiliary Feedwater Pump VC Volume Control VCT Volume Control Tank VH Vent Header

'e l ~ ~

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX, C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 5 DP 28 PVT 1.0 'co Pum and Valve e and Res Testin onsibilit Pro ram The inservice testing program defines the testing program for Quality Groups A, B and C Pumps and Valves in accordance with the requirements of Articles IWP and IWV of Section XI of the Code.

The results of these tests are to assure the operational readiness of pumps and valves.

1.2 It is the responsibility of the Ginna Station Test and Results Supervisor to implement this test program and develop inservice test proce-dures which will outline the specific test for each pump.and valve included in the program.

1.3 When a valve, pump or its control system has been replaced or repaired or has undergone maintenance that could affect its performance, and prior to

=

the time it is returned to service, it shall be tested as necessary to demonstrate that the per-formance parameters which could have been affected by the replacement, repair, or maintenance are within acceptable limits.

PVT 2.0 Code Edition and Testin Interval 2.1 The Inservice Pump and Valve Testing Program for the ten (10) year period starting January 1, 1981 through December 31, 1990 was developed utilizing the 1977 Edition of Section XI of the Code through the Summer 1978 Addenda.

PVT 3.0 Inservice Pum Testinq Pro ram 3.1 The.Inservice Pump Testing Program was developed in accordance with the requirements of Article IWP of Section XI of the Code. This program includes all Quality Group A, B and C pumps which are provided with an emergency power source and are required'to perform a specific function in shutting down a reactor or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition.

~

~

l ~

) ~

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 6 OF 28 3.2 The following pumps shall be tested in accord-ance with Article IWP of Section XI:

(a) lA Component Cooling (b) 1B Component Cooling (c) 1A Safety Injection (d) lB Safety Injection (e) 1C Safety Injection (f) lA Residual Heat Removal (g) lB Residual Heat Removal (h) lA Containment Spray (i) 1B Containment Spray (j) lA Motor Driven Auxiliary Feedwater (k) 1B Motor Driven Auxiliary Feedwater (1) Turbine Driven Auxiliary Feedwater (m) 1A Service Water (n) 1B Service Water (o) 1C Service Water (p) 1D Service Water (q) 1C Standby Auxiliary Feedwater (r) 1D Standby Auxiliary Feedwater 3.3 Flow rates will not be accurate for the residual heat removal pumps because the bypass test loop can'only pass 200 gpm. This bypass test loop is a fixed resistance system; therefore, hydraulic resistance remains unchanged from test to test.

3.4 Bearing temperatures will not be available for the Service Water pumps. These pumps and their bearings are submersed in forty feet of water, making it, impossible to take measurements. Be-cause they are submersed, the bearing temperatures stay very close to the temperature of the intake water.

PVT 4.0 Inservice-Valve Testin Pro ram 4.1 The Inservice Valve Testing Program was developed in accordance with the requirements of Article

'IWV of Section XI of the Code. All those valves that are required to perform a specific function either to shut down the reactor to the cold shut-down condition or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition are included in the program.

~ <<'I

' ) i ~

42 52C TlTLEt DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 7 OF 28 4.2 The Inservice Valve Testing Program Requirements for Category A and B Valves are in Tables PVT 4.7 and 4.8, respectively. Category C Valves are broken down into two categories, Check Valves and Relief Valves, which are in Tables PVT 4.9 and 4.10, respectively. Category D Valves are not included in this testing program because there are none included in Ginna Station design.

4.3 Some exceptions and exemptions to the testing re-quirements of Article I07V have been taken based on operational interference, placing the plant in an unsafe condition and Technical Specification requirements. All exceptions and exemptions are listed on the, valve tables and explained in the referenced notes, PVT .4.11.

4.4 The exercising program for Category A and B Valves, with the exception of check valves, shall require a complete stroking of each valve per the valve testing tables. All check valves, including Category C Valves, shall be exercised to the posi-tion required to fulfilltheir function. These functional tests shall be verified by the operation of the required system.

4.5 Category A and B valves operation shall be timed each time they are stroked utilizing switch initiation and the position indicators, which are accessible during plant operation. During each refueling outage a visual verification shall be made to confirm direct correspondence between valve operators and the position indicators.

0

,) ~

a. ~

' > l ~

42 5RC TITLE: DATE QUALITY 2/1/81 ASSURANCE APPEl'3DlX C MANUAL Pump and Valve PAGE

. GINNA STATION Testing Program 8 OF 28 4.6 The testing of valves required at cold shutdown and refueling outages will normally take four (4) days to complete. When cold shutdowns are of a shorter duration (2-3 days), test personnel shall attempt to test as many valves as possible without holding up the startup of the unit with testing'eginning no longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after the plant reaches cold shutdown (as defined in Technical Specification 1.2). For very short cold shutdowns (less than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />), it would be impossible to mobilize test personnel to implement the testing program under the required procedural controls, therefore no valves would be tested.

It is possible that,load during a four (4) day cold on test personnel may shutdown, the work preclude their completion of all the required valve tests prior to startup. Valve testing during cold shutdowns need not be more frequent than one test per quarter for each valve in the test program.

4.7 Category A Valves Valve ¹ ~Te Note 'est Freer 304A CV 1-A RCP Seal Injection 1 Stroke C/R Leak R 304B 'V 1-B RCP Seal Injection 1 Stroke Leak C/R R

313 MOV Seal Water Return 1 Stroke C/R Isolation Leak R 370B CV Charging Line Isolation 2 Stroke C/R Leak R 371 AOV Letdown Isolation 3 Stroke C/R Leak R 383B CV Alternate Charging Line Stroke C/R Leak R 508 AOV RMW to Containment Vessel Stroke Q Stop Leak R

J 0

'P a

~ l i ~

E r

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 28 OF Note Test Freer 528 CV N Supply to PRT Stroke Q Leak R 529 CV RMW to PRT Stroke Q Leak R 539 AOV PRT Stop Valve to Gas Stroke Q Analyzer Leak R 743 CV CC From Excess Letdown HX. Stroke Q Leak R 745 AOV Return From Excess Let- Stroke 0 down HX. Leak R 750A CV CC,to A RCP Stroke C/R Leak R 750B CV CC to B RCP Stroke C/R Leak R 7 59A MOV Containment'top CC From Stroke C/R Loop A RCP Leak R 7 59B MOV Containment Stop CC From Stroke C/R Loop B RCP Leak R 813 MOV Supply CC to RX Support Stroke C/R Coolers Leak R 814 MOV Return CC to RX Support Stroke C/R Coolers Leak R 846 AOV N2 Supply to Accumulators Stroke Q Leak R 862A CV 1-A CSP Disch Stroke Q Leak R 862B CV 1-B CSP Disch Stroke Leak

t

~ I y ~

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 10 OF 28 Va 1ve I ~Te Descri tion Note Test Freer 870A CV 1-A to 1-C SI Pump Disch Stroke Q Leak R 870B CV .1-B to 1-C SI Pump Disch Stroke Q Leak R 879 MV SI Test Line Isolation Stroke Leak 8 89A CV 1-A SI Pump Disch Stroke Q Leak R 889B CV 1-B SI Pump Disch Stroke Leak 956A MV Pressurizer Liquid Space Stroke Containment Isolation Leak 956B Loop A and Loop B Hot Leg Stroke Containment, Isolation Leak 956C MV Pressurizer'team Space Stroke Containment Isolation Leak 966A AOV Pressurizer Steam Space Stroke Containment Isolation Leak 96 6B AOV Pressurizer Liquid Space Stroke Containment Isolation Leak 966C AOV Loop A and B Hot Leg Stroke Containment Isolation Leak 1003A LCV 1-A RCDT Pump Suction Stroke Q Leak R 1003B LCV 1-B RCDT Pump Suction Stroke Q Leak R 1076A MV Hydrogen to", "A" Recombiner 11 Stroke Pilot Containment Isolation Leak IV-3A SOV Hydrogen to "A" Recombiner 11 Stroke Pilot Containment SIV Leak

v J'

~ ~

l h

f I

4 II"

I TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 11 OF 28 Valve 1 ~Te Note Test Fr~cr 1076B MV Hydrogen to "B" Recombiner 11 Stroke Pilot Containment Isolation Leak IV-3B SOV Hydrogen to~ "B" Recombiner 11 Stroke Pilot Containment SIV Leak 1080A MV Oxygen Make Up to Contain- 11 Stroke ment PIV Leak IV-2A Oxygen Make Up to Contain- 11 Stroke ment SIV (A Recombiner) Leak, IV-2B Oxygen Make Up to Contain- 11 Stroke ment SIV (B Recombiner) Leak 1084A MV Hydrogen to "A" Recombiner 11 Stroke Main Burner Containment PIV Leak IV-5A SOV Hydrogen to "A" Recombiner 11 Stroke Main Burner Containment SIV Leak 1084B Hydrogen to'; "B" Recombiner '11 Stroke Main Burner'ontainment PIV Leak IV-5B SOV Hydrogen to "B" Recombiner 11 Stroke Main Burner Containment SIV Leak 1596 MV Radiation Monitor Supply Stroke Q Leak R 1597 AOV Radiation Monitor Supply Stroke Q Leak . R 1598 AOV Radiation Monitor Exhaust Stroke Q Leak R 1599 CV Radiation Monitor Exhaust Stroke Q Inside Containment Leak R 1713 CV N2 to RCDT Check Stroke Q Leak R 1721 AOV Suction line to RCDT Stroke 9 Leak R

~

g

' ~ ~

I

~ ~

,\

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 12 28 f OF Va lve I ~Te Descri tion Note Test Free 1723 AOV A Containment Sump Disch Stroke Q Stop to Waste Holdup Tank Leak R 1728 AOV A Containment Sump Disch Stroke Q Stop to Waste Holdup Tank Leak R 1786 AOV RCDT to VH 21 Stroke Q Leak R 1787 AOV RCDT to VH Stroke Q Leak R 1789 AOV RCDT to GA Containment. Stroke Q Isolation Leak R 5392 AOV Instrument Air to Contain- 19 Stroke R ment Isolation Leak R 5393 CV Instrument to Containment 19 Stroke R Isolation Leak R 5735 AOV "A" S/G Blowdown Sample Stroke Q Isolation Leak R 5736 AOV "B" S/G Blowdown Sample Stroke Isolation Leak 5737 AOV "B" S/G Blowdown Isolation Stroke Q Leak R 5738 AOV "A" S/G Blowdown Isolation . Stroke Q Leak R 5869 APV Containment Purge Supply 22 Stroke Isolation Leak 5870 APV Containment Purge Supply 22 Stroke Isolation Leak 5878 APV Containment, Purge Exhaust 22 Stroke Isolation Leak 5879 APV Containment Purge Exhaust 22 Stroke Isolation Leak

  • See Note 22

0 ~ ~

~

l 42 52C TITLE: DATE QUALITY 2/1/81 APPENDIX

'ote ASSURANCE C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 13 28 OF Valve 5 ~Te Te st Freer 6151 MV Heating Steam to Stroke Containment Leak 6175 MV Condensate Return from Stroke Containment Leak 7141 MV Service Air Isolation Stroke Outside Containment 'eak 7226 CV Service Air Isolation Stroke Inside Containment Leak 7443 MOV Containment Air Test Stroke Supply Leak 7444 MOV Containment Air Test Vent 11 Stroke Leak 7445 MOV Containment, Air Test Vent 11 Stroke Leak 7970 AOV Containment Depressuri- Stroke zation Valve, Leak 7971 AOV Containment Depressuri- Stroke zation Valve Leak 8418 AOV Demin. Water to Contain- Stroke ment Is'olation Leak 8419 CV Demin. Water to Contain- Stroke ment Isolation Leak 4.8 Category B Valves Va 1ve 0 ~Te Descri tion Note Test Free 014 RCV Aux Building GDT Release Stroke Q h

017 RCV Comp Cool Surge Tank Vent Stroke

TITLE> DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 14 OF 28 Valve N ~Te Descri tion Note Test ~Fre 081 APV Control Room Ventilation Stroke Q Damper 082 APV Control Room Ventilation Stroke Q Damper 083 APV Control Room Ventilation Stroke Q Damper 084 APV Control Room Ventilation Stroke Q Damper 085 APV Control Room Ventilation Stroke Q Damper 086 APV Control Room Ventilation Stroke Damper 112B LCV Emergency Makeup RWST to Stroke Q Charging Purqp e

112C LCV Outlet I'CT Stroke Q 427 AOV Letdown From Loop B Stroke C/R 430 PORV Reactor Coolant System 16 Stroke C/R Pressure Relief 431C PORV Reactor Coolant System 16 Stroke C/R Pressure Relief 624 HCV 1-B RHR HX Outlet Stroke Q 625 HCV 1-A RHR HX Outlet Stroke Q 626 FCV RHR Loop Return Stroke Q 700 MOV Suction Stop From Loop A Stroke C/R to RHR Pumps 701 MOV Suction Stop From Loop A Stroke C/R to RHR Pumps 704A MOV Suction 1-A RHR Pump Stroke Q

~

~

'T

~

~

4.,

1 I

TITLEt DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 15 OF 28 Valve ¹ ~T pe Descri tion Note Test Freer 704B MOV Suction.l-B II RHR Pump Stroke Q I

720 MOV 10"-Discharge to B Loop 8 Stroke C/R From RHR Pumps 721 MOV 10" Disch to B Loop From 8 Stroke C/R RHR Pumps 738A MOV CC to l-A RHR HX Stroke Q 738B MOV CC to l-B RHR HX Stroke Q 825A MOV SI Pump Suction From RWST 9 Stroke C/R 825B MOV SI Pump Suction From RWST 9 Stroke C/R 826A MOV SI Pump Suction From BA Tank Stroke Q 826B MOV SI Pump Suction From BA Tank Stroke Q 826C MOV SI Pump Suction From BA Tank Stroke Q 826D MOV SI Pump Suction From BA Tank Stroke P 836A HCV Spray Additive Tank Dis- 17 Stroke Q charge 836B HCV Spray Additive Tank Dis- 17 Stroke Q charge 850A MOV Sump B to RHR Pumps Stroke Q 850B MOV Sump B to RHR Pumps Stroke Q 852A MOV RHR Pumps to Reactor Vessel 18 Stroke C/R 852B MOV RHR Pumps to Reactor Vessel 18 Stroke C/R 856 MOV RWST to RHR-Pumps Stroke C/R 857A MOV Isolate lB RHR HX From Stroke Q CS and SI Pumps

~

r ~

~

TITLEi DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 16 OF 28 Va 1ve 1 ~Te Descri tion Note Test Freq 857B MOV Isolate lA RHR HX From Stroke Q CS and SI Pumps 857C MOV Isolate lA RHR HX From Stroke Q

CS and SI Pumps 860A MOV Parallel Discharge MOV Stroke Q

'From 1-A CSP 860B MOV Parallel Discharge MOV Stroke Q From 1-A CSP 860C MOV Parallel Discharge MOV Stroke Q From 1-B CSP 860D MOV Parallel Discharge MOV Stroke Q From 1-B CSP 871A MOV 1-A to 1-C SI Pump Discharge Stroke Q 871B MOV 1-B to 1-C SI Pump Discharge Stroke 9 875A MOV Parallel MOV From CS Pumps Stroke 9 to 1A Charcoal Filter Deluge 875B MOV Parallel MOV From CS Pumps Stroke Q to 1A Charcoal Filter Deluge 876A MOV Parallel MOV From CS Pumps Stroke Q to 1B Charcoal Filter Deluge 876B MOV Parallel MOV From CS Pumps Stroke Q to 1B Charcoal Filter Deluge 896A MOV RWST to CS and SI Pumps 9 Stroke C/R 896B MOV RWST to CS and SI Pumps 9 Stroke C/R 951 AOV Pressurizer, Steam Space Stroke Q Sample 953 AOV Pressurizer Liquid Space Stroke Q Sample

0 .0 7ITLEi DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 17 OF 28 Valve N TvVe Descri tion Note Test, Freer 955 AOV "B" Loop Hot Leg Sample Stroke Q 959 AOV RHR Loop Sample 20 'troke C/R 1811A Reator Coolant Drain Tank 11 Isolation to RHR System 1811B Reactor Coolant Drain Tank 11 Isolation to RHR System 1815A MOV C-SI Pump Suction From RWST Stroke Q l815B MOV C-SI Pump Suction From RWST Stroke Q 3504 MOV Main Steam to TAFP From l-B Stroke Q S/G 3505 MOV Main Steam to TAFP From l-A Stroke Q S/G 3652 MV Main Steam Throttle Valve Stroke Q to TAFP 3996 MOV TAFP Discharge Stroke Q 4000A MOV Cross Over Valve For MAFP Stroke Q 4000B MOV Cross Over Valve For MAFP Stroke Q 4007 MOV l-A MAFP Discharge Stroke Q 4008 MOV l-B MAFP Discharge Stroke Q 4013 MOV TAFP Service Water Supply Stroke Q Isolation 4027 MOV 1-A MAFP Service Water Stroke Q Isolation 4028 MOV l-B MAFP Service Water Stroke Q Isolation 4291 AOV TAFP Recir. Line Stroke Q 4297 AOV TAFP Discharge to 1-A S/G Stroke Q

0 0 I ~

I

TITLEt DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 18 OF 28 Va lve N ~Te Descri tion Note Test Prep 4298 AOV TAFP Discharge to- 1-B S/G Stroke Q 4304 . AOV 1-A MAFP Recirculation Stroke Q Control 4310 AOV .,1-B MAFP Recirculation Stroke Q Control 4561 AOV Containment Vent Recirc. Stroke Q Fans Discharge Flow Con-trol 4562 AOV Containment Vent Recirc. Stroke Q Fans Discharge Flow Con-trol Bypass 4609 MOV lA1'creen House SW Stroke Q

'solation 4613 MOV 1B2 Turbine <Building SW Stroke Q Isolation 4614 MOV lAl Turbine Building SW . Stroke Q Isolation 4615 MOV lBl Aux. Building SW Stroke g Isolation 4616 MOV 1Al Aux. Building SW Stroke Q Isolation 4663 MOV lA1 Air Cond. Chillers SW Stroke Q Isolation 4664 MOV 1A2 Turbine Building SW Stroke Q Isolation 4670 MOV 1B1 Turbine Building SW Stroke Q Isolation 4733 MOV 1A2 Air Cond. Chillers SW Stroke Q Isolation 4734 MOV 1B2 Aux. Build. SW Isolation Stroke Q

' 1 0

42 52C TITLE) DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 19 OF 28 Valve 1 ~Te Descri tion IJote Test Freq 4735 MOV 1A2 Aux. Build. SW Isolation Stroke 4780 MOV 1A2 Screen House SW Stroke Isolation 5171 MOV Turbine Build. Fire Water Stroke Loop Supply Isolation 5871 APV Containment Post Accident Stroke Filter Damper 5872 APV Containment Post Accident Stroke Filter Damper 5873 APV Containment. Post Accident Stroke Filter Damper 5874 APV Containment Post. Accident Stroke Filter Damper 5875 APV Containment; Post, Accident Stroke Filter Damper 5876 APV Containment Post Accident Stroke Filter Damper 9629A MOV 1C SAFP Servi'ce. Water Stroke Q Isolation 9629B MOV 1D SAFP Service Water Stroke Q Isolation 9701A MOV 1C SAFP Discharge Stroke Q 9701B MOV 1D SAFP Discharge Stroke Q 9703A MOV SAFP Cross Over Stroke Q 970 3B MOV SAFP Cross Over Stroke Q 9704A MOV 1C SAFP Containment Stroke Q Isolation 9704B MOV 1D SAFP Containment Stroke Q Isolation

TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 20 OF 28 Valve I ~Te Note Test Frea I 971 0A AOV 1C 'SAFP Recirc. Control Stroke 9710a AOV 1D SAFP Recirc. Control Stroke 4.9 Category C Check Valves Valve 0 ~T pe Note Test Freer 710A CV 1-A RHR Pump Discharge Stroke Q 710B CV 1-B RHR Pump Discharge Stroke Q 723A CV 1-A CC Pump Discharge Stroke Q 723B CV-. 1-B CC Pump Discharge Stroke Q 842A CV First Check Valve in Loop Stroke Q A Accumulator Dump Line 842B CV First Check<Valve in Loop Stroke Q B Accumulator Dump Line 847A CV A-CSP From Spray Additive Stroke Q Tank to Eductor 847B CV B-CSP From Spray Additive Stroke 9 Tank to Eductor 853A CV Core Deluge Check 10 Stroke C/R 853B CV Core Deluge Check 10 Stroke C/R 854 CV RWST to RHR Pump Check Stroke Q 8 66A CV CS Pump 1-A to Charcoal 12 Stroke C/R Filter Deluge 866B CV CS Pump 1-B to Charcoal Stroke Q Filter Deluge

'f 3

867A CV Accumulator.- Dump and SI 13 Stroke R to Cold Leg Loop B 867B CV Accumulator Dump and SI 13 Stroke R to Cold Leg Loop A

t 4i ~

I ~

TITLE DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 21 28 OF Va 1ve 0 ape Descri tion Note Test Freq 878G CV 1-A SI Pump to Cold Leg 13 Stroke R Loop B After MOV 878B 878J CV l-B SI Pump to Cold Leg 13 Stroke R Loop A After MOV 878D 3516 CV 1B S/G Main Steam Swing 14 , Stroke Start-Check Stop Valve up 3517 CV lA S/G Main Steam Swing 14 Stroke Start-Check Stop Valve up 3998 CV TAFP Discharge Check Stroke Q 4000C CV lA MAFP Discharge Stroke Q Downstream MOV-4007 4000D CV lB MAFP Discharge Stroke .Q Downstream MOV-4008 4003 CV TAFP to S/G lA Stroke Q 4004 CV TAFP to S/G lB Stroke 4009 CV lA MAFP to S/G lA Stroke Q 4010 CV 1B MAFP to S/G 1B Stroke Q 4014 CV TAFP Condensate Suction Stroke Q 4016 CV 1B MAFP Suction Stroke 9 4017 CV 1A MAFP Suction Stroke Q 4023 CV TAFP Recirculation Stroke Q 4601 CV lA Service Water Pump Stroke Q Discharge 4602 CV 1B Service Water Pump Stroke Q Discharge

'I 1

I' t'

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 22 28 OF Valve ¹ ~Te Note Test Frey 4603 CV 1C Service Mater Pump Stroke Discharge 4604 CV 1D Service Water Pump Stroke Q Discharge 5133 CV Diesel Fire Pump Disch. Stroke Q 5136 CV Motor Fire Pump Discharge Stroke Q 9627A CV 1C SAFP SW Suction Stroke Q 9627B CV 1D SAFP Slf Suction Stroke Q 9700A CV 1C SAFP Discharge Stroke Q 9700B CV 'D SAFP Discharge Stroke Q 9705A CV 1C SAFP to S/G 1A Stroke ,

Q 9705B CV 1D SAFP to S/G 1B Stroke 0 4.10 Category C Relief Valve Va lve ¹ ~Te Descri tion Note Test Freer 203 RV Letdown High Pressure 15 Safety Relief 209 RV Letdown Low Pressure 15 Safety Relief 434 RV Pressurizer Safety Relief 15 435 RV Pressurizer Safety Relief 15 732 RV CC Surge Tank Relief 15

0 I ~

ir

42 $ 2C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 23 OF 28 Va lve I ~Te Descri tion Note Test Freer 744 RV CC From Excess Letdown 15 Heat Exchan er 755A RV CC From A RCP Thermal 15 Barrier 755B RV CC From B RCP Thermal 15 Barrier 758A RV CC From A-RCP Oil Coolers 15 758B RV CC From B-RCP Oil Coolers 15 818 RV CC From Reactor Support 15 Coolers 861 RV 1-B CS Pump Suction Relief 15 887 RV SI Test Line Inside 15 ContainmentI Relief 1817 RV Alternate Suction From 15 RHR Pump to C SI Pump 3508 RV 1-B S/G PRV 15 3509 RV 1-A S/G PRV 15 3510 RV 1-B S/G PRV 15 3511 RV 1-A S/G PRV 15 3512 RV 1-A S/G PRV 15 3513 RV 1-A S/G PRV 3514 RV 1-B S/G PRV 15 3515 RV 1-A S/G PRV, 15 4

4653 RV Service Water Relief 15 4654 RV Service Water Relief 15

g, 0 7

. ~

l

\

TITLE DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 24 OF 28 Valve I ~Te Note Test Freer 4657 RV Service Water Relief 15 5134 RV Diesel Fire Pump Disch R.V. 15 5135 RV Motor Fire Pump Disch R.V. 15 4.11 Inservice Valve Testing Notes Note 1 Valves 304A, 304B and 313 cannot be stroked during normal plant operation on a quarterly basis because they would interrupt coolant flow to the reactor coolant pump seals. These valves will be stroked at cold shutdowns and refuel-ing outages.

Note 2 Valve 370B cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt charging pump flow. This valve will be stroked at cold shutdowns and refueling outages.

Note 3 Valves 371 and 427 cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt the letdown (CVCS) system. These valves will be stroked at cold shutdowns and refueling outages.

Note 4 Valve 383B cannot be stroked during normal plant operation on a quarterly basis because this test would result in substantial radiation exposure,to test personnel. Surveys in the area of the test connection during plant operation indicate neutron fields of approximately 500 mr/hr and a gamma fields of 250 mr/hr.

Total whole body dosage to test personnel is estimated to be 375 mrem. This valve will be stroked at cold shutdowns and refueling outages.

0 c' 0

a C

,y h

l'II

l ~

'UALITY TITLE:

2/1/81 RE V.

ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 25 OP 28 Note 5Valves 750A, 750B, 759A and 759B cannot be stroked during normal plant operation on a quarterly basis because this test would require the reactor coolant. pumps to be shut down to eliminate the flow through these checks and MOVs. These valves will be stroked at, cold shutdowns and refueling outages.

Note 6- Valves 813 and 814 cannot be stroked during normal plant operation on a quarterly basis because this test would remove the coolant to the reactor vessel supports and cavity wall. These valves will be stroked at cold shutdowns and refueling outages.

Note 7Valve 879 is a manual valve in the safety injection test line and is kept locked shut. This valve is not required to change position to perform a safety func-tion. The only requirement is that leak-age through valve 879 be acceptably 1'ow.

Therefore, the quarterly stroke test has been deleted. This passive valve will be only leak tested at refueling outages consistent with IWV-3700-1.

Note 8 Valves 700 and 721 cannot be stroked during normal plant operation on a quarterly basis because there is an interlock system which. prevents these valves from opening when the primary system is at operating pressure. Valves 700, 701, 720,and 721 separate a high pressure system from a low pressure system. These valves will be stroked at cold shutdowns and refueling outages.

Note 9 Valves 825A, 825B, 856, 896A, and 896B should not be stroked during normal opera-tion on a quarterly basis because this would cause a temporary los's of system function of the ECCS. These valves pro-vide the suction from the refueling water

TITLE: RE Y.

QUALITY 2/1/81 AS SURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 26 OP 28 storage tank to the safety injection and residual heat removal pumps. These valves will be stroked at cold shutdowns and re-fueling outages.

Note 10- Valves 853A and 853B cannot be stroked during normal plant operation on a quarterly basis because this test, require would pressurizing the RHR system to the primary system operation pressure. These valves will be stroked at refueling outages.

Note ll- Valves 1076A, IV-3A, IV-3B, 1076B, 1080A, 1084A, 1084B, IV-5A, IV-5B, IV-2A, IV-2B, 1811A, 1811B, 6151, 6175, 7141, 7226, 7443 7444, 7445, 8418 and 8419 are considered passive valves which are not required to change position to acccomplish their specific function. Stroking these valves would serve no useful function and will therefore not be done as per IWV-3700-1.

Note 12- Valve 866A cannot be stroke tested during normal plant operation on a quarterly basis because this test. would result in a substantial radiation expo-sure to test personnel. Stroke testing at this location resulted in approxi-mately 400 mrem whole body exposure to the test personnel. This valve will be stroked at cold shutdowns and refueling outages.

Note 13- Valves 867A, 867B, 878G, and 878J cannot be stroked during normal operation on a quarterly basis or at cold shutdown condition when the primary system is full. This test may only be done when the plant is in a refueling shutdown condition with a partially full primary system in order to prevent an over-pressurization.

v l ~

~

I

'1 P l,f

'I!

TITLE: RE V.

QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 27 OP 28 C

Note 14- Valves 3516 and 3517 cannot be stroked during normal plant operation on a quarterly basis because they are the main steam swing check stop valves.

These valves 'are stroked during each plant startup.

Note 15- Category C Reli'ef Valves shall be tested in accordance with the extent and fre-quency requirements of Paragraph IWV-3510 of Article IWV of Section XI of the Code.

No te l6- Valves 430 and 43lC are the power operated relief valves associated with the overpressurization system. These valves shall not be stroked quarterly as they need not. be operable when the plant is at, normal system pressure.

Operability of these valves shall be verified as follows:

(1) Full stroke exercising during cool down prior to achieving water solid condition in Ne pressurizer and during cold shutdown prior to heat up.

(2) Stroke timing to be performed as a minimum once each refueling cycle as a part of the channel calibration specified by Technical Specifications 4.16.1b.

(3) Fail safe actuation testing is permitted by the code to be per-formed at each cold shutdown if valve cannot be tested during power operation.

(4) Technical specification 4.16.1a and 4.16.1c delineate additional re-quirements for operability verifi-cation of the PORV actuation channel and valve position.

Note 17- Valve stroking will be'normally ac-complished monthly, except during cold and refueling shutdowns, consistent with the monthly Technical Specification requirement.

I'(

TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 28 DP 28 Note 18- Valves 852A and 852B cannot be stroked during normal plant operation as these valves, when cycled, could subject the Residual Heat Removal System to a pressure in excess of its design pressure. These valves will be stroked at cold shutdowns and refueling outages.

Note 19- Stroking Valves 5392 and 5393 during operation and cold shutdown would inter-rupt instrument air to containment and be disruptive to air operated valves inside. These valves will be stroked at refueling outages.

Note 20- Valve 959 is normally closed and in the containment isolating position during normal operation. These valves will be stroked at cold shutdown and refueling outages.

Note 21- Valve 1786 is not required to function per FSAR Chapter 5 but valve receives a "T"i Signal.

Note 22- Category A valves 5869, 5870, 5878 and 5879 are normally closed and in the containment isolating position during normal operation. Leak tightness of these valves is reverified following reclosure after each use in accordance with Section 4.4.2.4 of Technical Speci-fications. The valves shall be stroked at least each cold shutdown. In addition, if the valves are opened for purging, they shall be stroked at least once each quarter during which they have been opened.

PVT 5.0 Records II 5.1 Records for the Inservice Pump Testing Program shall be developed and maintained in accordance with Article IWP-6000 of Section XI of the Code.

5.2 Records for the Inservice Valve Testing Program shall be developed and maintained 'in accordance with Article IWV-6000 of Section XI of the Code.

h ~

V

, N R

4 h

N r

h V, h I ) hh V

R I

~