{{#Wiki_filter:Attachment II Marked Up Copy of R.E.Ginna Nuclear Power Plant Technical Specifications Instructions:
{{#Wiki_filter:Attachment II Marked Up Copy of R.E. Ginna Nuclear Power Plant Technical Specifications Instructions:
Remove pages 3.3-18 and 3.3-19 and replace with the attached pages.l'PbOb0b0149 9b0b03 PDR ADQCK 05000244 p PDR O RTS Instrumentation
Remove pages 3.3-18 and 3.3-19 and replace with the attached pages.
  'PbOb0b0149 9b0b03 PDR     ADQCK 05000244 l p                   PDR


====3.3.1 Table====
O                                                    RTS    Instrumentation 3.3.1 Table 3.3. 1-1 (page 5 of 6)
3.3.1-1 (page 5 of 6)Reactor Trip System Instrumentation Note 1: Overtem erature sT The Overtemperature aT Function Trip Setpoint is defined by: 1+r,s Overtemperature h T dh T~K,+K~(P-P')-K (T"T')-f(h I)1+t'~s Where: aT is measured RCS aT, F.aTo is the indicated zT at RTP, F.s is the Laplace transform operator, sec'T is the measured RCS average temperature, F.T is the nominal T., at RTP, F.P is the measured pressurizer pressure, psig.P is the nominal RCS operating pressure, psig.K, is the Overtemperature aT reactor trip setpoint, 1.20.K~is the Overtemperature aT reactor trip depressurization setpoint penalty coeffi ci ent, 0.000900~t/~Ps'.
Reactor Trip System Instrumentation Note 1:       Overtem erature sT The Overtemperature         aT Function     Trip Setpoint is defined by:
K, is the Overtemperature zT reactor trip heatup setpoint penalty ceei'i'i cient, 0.0209~g r, is the measured lead/lag time constant, 25 seconds.e r, is the measured lead/lag time constant, 5 seconds.f(aI)'s.a function of the indicated difference between the top and bottom detectors of the Power Range Neutron Flux channels where q, and q, are the percent power in the top and bottom halves of the core, respectively, and q,+g is the total THERMAL POWER in percent RTP.t$b f(/II)=0 when q,-qb is 8+13'i RTP f(E I)=1.3 ((q,-q)-13j when q,-q, is>+13%RTP R.E.Ginna Nuclear Power Plant 3.3-18 Amendment No.61 RTS Instrumentation
                                                          -P') -K      "T') 1 + r,s - f(h I)
Overtemperature   h T dh T~ K,+K~ (P           ( T 1 + t'~s Where:
aT   is measured RCS aT, F.
aTo is the indicated zT at             RTP,   F.
s is the Laplace transform operator, sec' T is the measured RCS average temperature,                   F.
T   is the nominal T., at RTP, F.
P is the measured pressurizer pressure, psig.
P   is the nominal RCS operating pressure, psig.
K,   is the Overtemperature aT reactor trip setpoint, 1.20.
K~ is the Overtemperature aT reactor trip depressurization setpoint penalty coeffi ci ent, 0.000900~t/~Ps'.
K, is the Overtemperature zT reactor trip heatup setpoint penalty ceei'i'i cient, 0.0209~g r, is the     measured     lead/lag time constant,         25 seconds.
e r, is     the measured lead/lag time constant,             5 seconds.
f(aI)'s .a       function of the indicated difference between the top and bottom detectors of the Power Range Neutron Flux channels where q, and q, are the percent power in the top and bottom halves of the core, respectively, and q,t + g is the total THERMAL POWER in percent RTP.
          $b                                                                               -    is 8+13'i RTP f(/II)   = 0                                                 when     q,     qb f(E I)   = 1.3 ( (q, - q ) - 13j                           when q, - q,       is > +13% RTP R.E. Ginna Nuclear Power Plant                     3.3-18                               Amendment No. 61


====3.3.1 Table====
RTS  Instrumentation 3.3.1 Table 3.3.1-1 (page 6 of 6)
3.3.1-1 (page 6 of 6)Reactor Trip System Instrumentation Note 2: Over ower zT The Overpower aT Function Trip Setpoint is defined by: w~sT Overpower h T 8a T K,-K~(T"T')-Kz-f(h 1)res+1 Where: aT is measured RCS zT, F.aTO is the indicated aT at RTP, F.s.is the Laplace transform operator, sec'T is the measured RCS average temperature,'F.T is the nominal T,, at RTP, F.(/'s f(aI)is a function of the indicated difference between the top and bottom detectors of the Power Range Neutron Flux channels where q, and qare the percent power in the top and bottom halves of the core, respectively, and q,+q, is the total THERMAL POWER in percent RTP.C f(a,I)=0 when q,-q, is+13%RTP'f(aI)=1.3 I (q,-q,)-13I when q,-qb is>+13%RTP K4 is the Overpower bT reactor trip setpoint, 1.077.Ks is the Overpower zT reactor trip heatup setpoint penalty coefficient which is: 0.0 for T<T~and;0.0011 for T~K6 is t e Overpower aT reactor trip thermal time delay setpoint penalty~~~which is:/ap.026 f'r increasing T and;0.0 for decreasing T.r, is the measured lead/lag time constant, 10 seconds.R.E.Ginna Nuclear Power Plant 3.3-19 Amendment No.61 Attachment III Proposed Technical Specifications Instructions:
Reactor Trip System Instrumentation Note 2:     Over ower zT The Overpower aT Function         Trip Setpoint is defined by:
w~sT Overpower   h T 8a T K,-K~ ( T "T') -Kz       f(h 1) res+1 Where:
aT   is measured RCS zT, F.
aTO is the indicated aT at           RTP,   F.
s .is the Laplace transform operator, sec' T is the measured RCS average temperature,               'F.
T   is the nominal T,, at RTP, F.
K4  is the Overpower bT reactor trip setpoint, 1.077.
Ks  is the Overpower zT reactor trip heatup setpoint penalty coefficient                      which  is:
  /'s          0.0 for T < T~and;
(             0.0011 for T ~
K6  is t e Overpower aT reactor trip thermal time delay setpoint penalty
                  ~
which  is:
  /ap          .026    f'r increasing T        and; 0.0 for decreasing T.      ~
r, is the measured lead/lag time constant, 10 seconds.
f(aI) is a function of the indicated difference between                   the top and bottom detectors of the     Power Range Neutron Flux channels where q, and q are the percent power in the top     and bottom halves of the core, respectively, and q, + q, is the total   THERMAL POWER     in percent   RTP.                                         C f(a,I) = 0                                                 when q, - q,   is   +13% RTP
                    'f(aI) = 1.3   I (q, - q,) - 13I                           when q, - qb   is > +13% RTP R.E. Ginna Nuclear Power Plant                   3.3-19                             Amendment No. 61
 
Attachment III Proposed Technical Specifications Instructions:
Remove pages 3.3-18 and 3.3-19 and replace with the attached pages.
Remove pages 3.3-18 and 3.3-19 and replace with the attached pages.
e RTS Instrumentation


====3.3.1 Table====
e    RTS  Instrumentation 3.3.1 Table 3.3.1-1 (page 5 of 6)
3.3.1-1 (page 5 of 6)Reactor Trip System Instrumentation Note 1: Overtem erature aT The Overtemperature aT Function Trip Setpoint is defined by: 1+r,s Overtenperature h T Sh T K+K (P-P')-K (T-T')'f(h I)0 1 2 1+rs 2 Where: aT is measured RCS aT,'F.aTo is the indicated aT at RTP, F.s is the Laplace transform operator, sec'T is the measured RCS average temperature, F.T is the nominal T,, at RTP,'F.P is the measured pressurizer pressure, psig.P is the nominal RCS operating pressure, psig.K, is the Overtemperature aT reactor trip setpoint, 1.20.K2 is the Overtemperature aT reactor trip depressurization setpoint penalty coefficient, 0.000900/psi.
Reactor Trip System Instrumentation Note 1:     Overtem erature     aT The Overtemperature       aT Function       Trip Setpoint is defined by:
Ks is the Overtemperature aT reactor trip heatup setpoint penalty coefficient, 0.0209/F.r, is the measured lead/lag time constant, 25 seconds.r, is the measured lead/lag time constant, 5 seconds.f(aI)is a function of the indicated difference between the top and bottom detectors of the Power Range Neutron Flux channels where q, and q, are the percent power in the top and bottom halves of the core, respectively, and q,+q, is the total THERMAL POWER in percent RTP.f(61)=0 f(BI)1.3 ((q,-q)-13}when q,-q, is z+13%RTP when q,-q, is>+13%RTP R.E.Ginna Nuclear Power Plant 3.3-18 Amendment No.g i RTS Instrumentation
                                                            -P') -K      - T')  1 +r,s Overtenperature   h T Sh T0  K1 +K2 (P           ( T               f(h I) 1 +rs2 Where:
aT   is measured RCS aT, 'F.
aTo is the indicated aT at             RTP,   F.
s is the Laplace transform operator, sec' T is the measured RCS average temperature,                   F.
T   is the nominal T,, at RTP, 'F.
P is the measured pressurizer pressure, psig.
P   is the nominal RCS operating pressure, psig.
K,   is the Overtemperature aT reactor trip setpoint, 1.20.
K2   is the Overtemperature aT reactor trip depressurization setpoint penalty coefficient, 0.000900/psi.
Ks   is the Overtemperature aT reactor trip heatup setpoint penalty coefficient, 0.0209/ F.
r, is the   measured     lead/lag time constant,           25 seconds.
r, is the measured lead/lag time constant, 5 seconds.
f(aI) is a function of the indicated difference between                         the top and bottom detectors of   the   Power     Range Neutron     Flux   channels     where   q, and q, are the percent power in the top and bottom halves of                     the   core, respectively, and q, + q, is the total THERMAL POWER in percent                   RTP.
f(61)   = 0                                                       when q,  - q, is z  +13% RTP f(BI)     1.3   ( (q, - q ) - 13}                               when q, - q,   is > +13% RTP R.E. Ginna Nuclear Power Plant                      3.3-18                              Amendment No. g
 
i    RTS  Instrumentation 3.3.1 Table 3.3.1-1 (page 6 of 6)
Reactor Trip System Instrumentation Note 2:    Over ower aT The Overpower aT Function        Trip Setpoint is defined by:
Overpower  h T 6h To  K,-Ks(T-T') -K,    r>sT s        -f(hi)
                                                                    '3
                                                                        'here:
aT  is measured RCS sT, F.
aTo  is the indicated aT at          RTP,  'F.
s  is the Laplace transform operator, sec' T  is the measured RCS average temperature,                F.
T  is the nominal T., at RTP, 'F.
K4  is the Overpower      sT  reactor    trip setpoint, 1.077.
K~  is the Overpower      sT  reactor    trip heatup setpoint penalty coefficient              which  is:
0.0/'F for T <    T and; 0.0011/'F for T z T.
K,  is  the Overpower aT reactor          trip  thermal time delay setpoint penalty which  is:
0.0262/'F for increasing T            andt 0.00/'F for decreasing T.
f3  is the  measured    lead/lag time constant,        10  seconds.
f(aI) is    a  function of the indicated difference              between the top and bottom detectors of the      Power Range Neutron Flux channels where q, and q, are the percent power in the top      and bottom halves of the core, respectively, and q, + q, is the total  THERMAL POWER      in percent    RTP.
f(zI) =  0                                                      when q, - qb  is ~ +13% RTP f(LI) =  1.3  ( (q, - qb) - 13)                                when q, - q,   is > +13% RTP R.E. Ginna Nuclear Power Plant                   3.3-19                                Amendment No. g


====3.3.1 Table====
0     0                   t ll I
3.3.1-1 (page 6 of 6)Reactor Trip System Instrumentation Note 2: Over ower aT The Overpower aT Function Trip Setpoint is defined by: r>sT Overpower h T 6h To K,-Ks(T-T')-K, s-f(hi)'3'here: aT is measured RCS sT, F.aTo is the indicated aT at RTP,'F.s is the Laplace transform operator, sec'T is the measured RCS average temperature, F.T is the nominal T., at RTP,'F.K4 is the Overpower sT reactor K~is the Overpower sT reactor 0.0/'F for T<T and;0.0011/'F for T z T.K, is the Overpower aT reactor which is: 0.0262/'F for increasing T 0.00/'F for decreasing T.trip setpoint, 1.077.trip heatup setpoint penalty coefficient which is: trip thermal time delay setpoint penalty andt f3 is the measured lead/lag time constant, 10 seconds.f(aI)is a function of the indicated difference between the top and bottom detectors of the Power Range Neutron Flux channels where q, and q, are the percent power in the top and bottom halves of the core, respectively, and q,+q, is the total THERMAL POWER in percent RTP.f(zI)=0 f(LI)=1.3 ((q,-qb)-13)when q,-qb is~+13%RTP when q,-q, is>+13%RTP R.E.Ginna Nuclear Power Plant 3.3-19 Amendment No.g 0 0 t ll I l 4%5l+$p*" Iy}}
l 4% 5l+$ p* " Iy}}

Latest revision as of 10:24, 4 February 2020

Proposed Tech Specs Re Update to Correction of Typographical Error Request
ML17264A530
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/03/1996
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17264A529 List:
References
NUDOCS 9606060149
Download: ML17264A530 (7)


Text

Attachment II Marked Up Copy of R.E. Ginna Nuclear Power Plant Technical Specifications Instructions:

Remove pages 3.3-18 and 3.3-19 and replace with the attached pages.

'PbOb0b0149 9b0b03 PDR ADQCK 05000244 l p PDR

O RTS Instrumentation 3.3.1 Table 3.3. 1-1 (page 5 of 6)

Reactor Trip System Instrumentation Note 1: Overtem erature sT The Overtemperature aT Function Trip Setpoint is defined by:

-P') -K "T') 1 + r,s - f(h I)

Overtemperature h T dh T~ K,+K~ (P ( T 1 + t'~s Where:

aT is measured RCS aT, F.

aTo is the indicated zT at RTP, F.

s is the Laplace transform operator, sec' T is the measured RCS average temperature, F.

T is the nominal T., at RTP, F.

P is the measured pressurizer pressure, psig.

P is the nominal RCS operating pressure, psig.

K, is the Overtemperature aT reactor trip setpoint, 1.20.

K~ is the Overtemperature aT reactor trip depressurization setpoint penalty coeffi ci ent, 0.000900~t/~Ps'.

K, is the Overtemperature zT reactor trip heatup setpoint penalty ceei'i'i cient, 0.0209~g r, is the measured lead/lag time constant, 25 seconds.

e r, is the measured lead/lag time constant, 5 seconds.

f(aI)'s .a function of the indicated difference between the top and bottom detectors of the Power Range Neutron Flux channels where q, and q, are the percent power in the top and bottom halves of the core, respectively, and q,t + g is the total THERMAL POWER in percent RTP.

$b - is 8+13'i RTP f(/II) = 0 when q, qb f(E I) = 1.3 ( (q, - q ) - 13j when q, - q, is > +13% RTP R.E. Ginna Nuclear Power Plant 3.3-18 Amendment No. 61

RTS Instrumentation 3.3.1 Table 3.3.1-1 (page 6 of 6)

Reactor Trip System Instrumentation Note 2: Over ower zT The Overpower aT Function Trip Setpoint is defined by:

w~sT Overpower h T 8a T K,-K~ ( T "T') -Kz f(h 1) res+1 Where:

aT is measured RCS zT, F.

aTO is the indicated aT at RTP, F.

s .is the Laplace transform operator, sec' T is the measured RCS average temperature, 'F.

T is the nominal T,, at RTP, F.

K4 is the Overpower bT reactor trip setpoint, 1.077.

Ks is the Overpower zT reactor trip heatup setpoint penalty coefficient which is:

/'s 0.0 for T < T~and;

( 0.0011 for T ~

K6 is t e Overpower aT reactor trip thermal time delay setpoint penalty

~

which is:

/ap .026 f'r increasing T and; 0.0 for decreasing T. ~

r, is the measured lead/lag time constant, 10 seconds.

f(aI) is a function of the indicated difference between the top and bottom detectors of the Power Range Neutron Flux channels where q, and q are the percent power in the top and bottom halves of the core, respectively, and q, + q, is the total THERMAL POWER in percent RTP. C f(a,I) = 0 when q, - q, is +13% RTP

'f(aI) = 1.3 I (q, - q,) - 13I when q, - qb is > +13% RTP R.E. Ginna Nuclear Power Plant 3.3-19 Amendment No. 61

Attachment III Proposed Technical Specifications Instructions:

Remove pages 3.3-18 and 3.3-19 and replace with the attached pages.

e RTS Instrumentation 3.3.1 Table 3.3.1-1 (page 5 of 6)

Reactor Trip System Instrumentation Note 1: Overtem erature aT The Overtemperature aT Function Trip Setpoint is defined by:

-P') -K - T') 1 +r,s Overtenperature h T Sh T0 K1 +K2 (P ( T f(h I) 1 +rs2 Where:

aT is measured RCS aT, 'F.

aTo is the indicated aT at RTP, F.

s is the Laplace transform operator, sec' T is the measured RCS average temperature, F.

T is the nominal T,, at RTP, 'F.

P is the measured pressurizer pressure, psig.

P is the nominal RCS operating pressure, psig.

K, is the Overtemperature aT reactor trip setpoint, 1.20.

K2 is the Overtemperature aT reactor trip depressurization setpoint penalty coefficient, 0.000900/psi.

Ks is the Overtemperature aT reactor trip heatup setpoint penalty coefficient, 0.0209/ F.

r, is the measured lead/lag time constant, 25 seconds.

r, is the measured lead/lag time constant, 5 seconds.

f(aI) is a function of the indicated difference between the top and bottom detectors of the Power Range Neutron Flux channels where q, and q, are the percent power in the top and bottom halves of the core, respectively, and q, + q, is the total THERMAL POWER in percent RTP.

f(61) = 0 when q, - q, is z +13% RTP f(BI) 1.3 ( (q, - q ) - 13} when q, - q, is > +13% RTP R.E. Ginna Nuclear Power Plant 3.3-18 Amendment No. g

i RTS Instrumentation 3.3.1 Table 3.3.1-1 (page 6 of 6)

Reactor Trip System Instrumentation Note 2: Over ower aT The Overpower aT Function Trip Setpoint is defined by:

Overpower h T 6h To K,-Ks(T-T') -K, r>sT s -f(hi)

'3

'here:

aT is measured RCS sT, F.

aTo is the indicated aT at RTP, 'F.

s is the Laplace transform operator, sec' T is the measured RCS average temperature, F.

T is the nominal T., at RTP, 'F.

K4 is the Overpower sT reactor trip setpoint, 1.077.

K~ is the Overpower sT reactor trip heatup setpoint penalty coefficient which is:

0.0/'F for T < T and; 0.0011/'F for T z T.

K, is the Overpower aT reactor trip thermal time delay setpoint penalty which is:

0.0262/'F for increasing T andt 0.00/'F for decreasing T.

f3 is the measured lead/lag time constant, 10 seconds.

f(aI) is a function of the indicated difference between the top and bottom detectors of the Power Range Neutron Flux channels where q, and q, are the percent power in the top and bottom halves of the core, respectively, and q, + q, is the total THERMAL POWER in percent RTP.

f(zI) = 0 when q, - qb is ~ +13% RTP f(LI) = 1.3 ( (q, - qb) - 13) when q, - q, is > +13% RTP R.E. Ginna Nuclear Power Plant 3.3-19 Amendment No. g

0 0 t ll I

l 4% 5l+$ p* " Iy