{{#Wiki_filter:EOP:P-ELEC.1TITLE:LOSSOF12AAND/OR12B-BUSSESREV14PAGE1of22ROCHESTERGASANDELECTRICCORPORATIONGINNASTATIONCONTROLLEDCOPYNUMBERRESPONSIBLEAGEREFFECTIVEDATECATEGORY1.0REVIEWEDBY:q708i30iih970805PDRADOCK05000244FPDR EOP:P-ELEC.1LOSSOF12AAND/OR12BBUSSESREV:14PAGE2of22A.PURPOSE-Thisprocedureprovidesactionstorespondtoalossof12Aand/or12BBussesfromHSDoratpowerconditions.B.ENTRYCONDITIONS/SYMPTOMS1.ENTRYCONDITIONS-Thisproceduremaybeenteredfrom:a.AP-TURB.2,TURBINELOADREJECTION,whenbusses12Aand/or12Barefoundtobedeenergized.2.SYMPTOMS-Thesymptomsoflossofg12Aor12BSSTransformerare:a.AnnunciatorL-20,12AXFMROR12ABUSTROUBLE,lit,orb.AnnunciatorL-28,12BXFMROR12BBUSTROUBLE,lit.
{{#Wiki_filter:EOP:         TITLE:
REV  14 P-ELEC.1                LOSS OF 12A AND/OR 12B- BUSSES PAGE 1  of 22 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER RESPONSIBLE    AGER EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:
q708i30iih 970805 05000244 PDR    ADOCK F                  PDR


EOP:P-ELEC.1T!TLELOSSOF12AAND/OR12BBUSSESREV14PAGE3of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDCAUTIONoIF,ATANYTIMEDURINGTHISPROCEDURE,AREACTORTRIPORSIOCCURS,E-O,REACTORTRIPORSAFETYINJECTION,SHALLBEPERFORMED.oIF'CSTEMPERATUREIS<350'F,THENAP-ELEC.3,LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)SHOULDBEPERFORMED.oIFATURBINERUNBACKHASOCCURRED,THENAP-TURB.2,TURBINELOADREJECTION,SHOULDBEPERFORMED.oIFANYRADIOACTIVERELEASEINPROGRESS,THENITSHOULDBETERMINATEDUNTILSUPPORTCONDITIONSAREEVALUATED.oOBSERVED/GLOADINGLIMITSOF2300KWFOR1/2HOUR,2250KWFOR2HOURS,AND1950KWFORCONTINUOUSSERVICE.oDONOTATTEMPTTOENERGIZEABUSTHATISPOTENTIALLYFAULTED.NOTE:oConditionsshouldbeevaluatedforsitecontingencyreporting(RefertoEPIP-1.0,GINNASTATIONEVENTEVALUATIONANDCLASSIFICATION).oAP-ELEC.14/16,LOSSOFSAFEGUARDSBUS14/16ANDAP-ELEC.17/18,LOSSOFSAFEGUARDSBUS17/18provideadditionalguidanceforthelossofsafeguardsbusses.1EstablishManualRodControla,PlaceRodControlBankSelectorSwitchtoMANUALb.Verifycontrolrodmotionstopsb.ManuallytripthereactorandgotoE-O,REACTORTRIPORSAFETYINJECTION.c.Manuallymovecontrolrodsasnecessary EOP:P-ELEC.lLOSSOF12AAND/OR12BBUSSESREV:14PAGE4of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED2VerifyEmergencyD/GAssociatedWithDeadBus-RUNNINGoBus12A-D/GAoBus12B-D/GBIFappropriateemergencyD/G(s)NOTrunning,THENattempttostartmanually.(RefertoER-D/G.l,RESTORATIONOFAFAILEDD/G.)3VerifyBothTrainsOfACEmergencyBussesEnergizedToAtLeast420VOLTS:oBus14andbus18oBus16andbus17TrytorestorepowertoallACemergencybusses.IFpowercanNOTberestoredtoatleastonetrain,THENrefertoECA-O.O,LOSSOFALLACPOWER,Step1.4VerifyServiceWaterSystemOperation:a.SWpumps-ATLEASTONERUNNINGINEACHLOOPb.SWheaderpressure-GREATERTHAN40PSIGINEACHLOOP.a.VerifyselectedSWpumpsstartonatimer(40sec)afterD/Gstart.IFNOT,THENmanuallystartpumpsasnaaassary(258kueach),b.Manuallyalignvalvesasnecessary.5CheckCCWPumpStatus:a.AtleastoneCCWpump-RUNNINGb.AnnunciatorA-22,CCWPUMPDISCHARGELOPRESS60,PSIGEXTINGUISHEDa.StartoneCCWpump(124kw).b,StartsecondCCWpump(124kw).
EOP:
EOP:P-ELEC.1LOSSOF12AAND/OR12BBUSSESREV'4PAGE5of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED'6VerifyBus11AAnd11BNormalFeedBreakers-CLOSEDIFturbinetriphasoccurredfrompowerlessthan50%,THENgotoAP-TURB.1,TURBINETRIPWITHOUTRXTRIPREQUIRED,Stepl.IFturbinestopvalvesopen,THENtripturbineandgotoAP-TURB.1,TURBINETRIPWITHOUTRXTRIPREQUIRED,Step1.IFturbineNOTpreviouslylatched,THENperformthefollowing:a.Ensurereactorpowerlessthan8a.b.GotoStep16.7VerifyAnnunciatorH-16,INSTRUMENTAIRCOMPEXTINGUISHEDDispatchAOtolocallyresetandstartIAcompressorsasnecessary.8MonitorS/GLevelControl:oS/Glevel-TRENDINGTO52%oMFWregulatingvalvesCONTROLLINGINAUTOPlaceMFWregulatingvalvesinMANUALandcontrolfeedflowasnecessary.
REV: 14 P-ELEC.1            LOSS OF 12A AND/OR 12B BUSSES PAGE 2  of 22 A. PURPOSE  - This procedure provides actions to respond to a loss of 12A  and/or 12B Busses from HSD or at power conditions.
EOP:P-ELEC.1TlTLELOSSOF12AAND/OR12BBUSSESREV:14PAGE6of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDNOTE:Whenrestartingequipmentforrecovery,itispreferabletostartequipmentonbussesbeingsuppliedfromoffsitepower,ifpossible.9CheckCVCSOperation:a.Chargingpumps-ATLEASTONERUNNING'.Checkletdownindications:oCheckPRZRlevel-GREATERTHAN13%oLetdownflow-APPROXIMATELY40GPMoLetdownflow-STABLEc.AdjustchargingpumpspeedandHCV-142asnecessarytorestorePRZRlevelandlabyrinthsealD/Pd.GotoSteplla.Perforlnthefollowing:1)CloseloopBcoldlegtoREGENHx,AOV-427.2)'tartchargingpumpsasnecessary.3)Establishgreaterthan20gpmcharginglineflow.b.Performthefollowing:1)CloseloopBcoldlegtoREGENHx,AOV-427.2)Closeletdownorificevalves(AOV-200A,AOV-200B,andAOV-202)3)IFPRZRlevelgreaterthan13%,THENgotoStep10.IFNOT,THENcontinuewithStep12.WHENPRZRlevelgreaterthan13$,THENdoSteps10and11.  
B. ENTRY CONDITIONS/SYMPTOMS
: 1. ENTRY CONDITIONS  This    procedure may be entered from:
: a. AP-TURB.2, TURBINE LOAD REJECTION, when busses    12A and/or 12B are found to be deenergized.
: 2. SYMPTOMS  The  symptoms  of loss of g12A or 12B SS Transformer are:
: a. Annunciator L-20,   12A XFMR OR 12A BUS TROUBLE, lit, or
: b. Annunciator  L-28, 12B XFMR OR 12B BUS TROUBLE, lit.


EOP:P-ELEC.1TITLE:LOSSOF12AAND/OR12BBUSSESREV'4PAGE7of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDNOTE:Steps10and11maybeperformedconcurrently.10EstablishNormalLetdown:a.EstablishcharginglineflowtoREGENHx-GREATERTHAN20GPMb.VerifythefollowingswitchesinCLOSE:~Letdownorificevalve(AOV-200A,AOV-200B,andAOV-202)~LoopBcoldlegtoREGENHxAOV-427c.PlaceletdowncontrollersinMANUALat40%open~TCV-130~PCV-135d.OpenAOV-427e.Openletdownorificevalvesasnecessaryf.PlaceTCV-130inAUTOat105'F.g,PlacePCV-135inAUTOat250psigh.AdjustchargingpumpspeedandHCV-142asnecessaryPerformthefollowingstepsinsequencetoestablishexcessletdown:oPlaceexcessletdowndivertvalve,AOV-312,toNORMALoEnsureCCWfromexcessletdownopen,AOV-745oEnsureRCPsealreturnisolationvalveopen,MOV-313oOpenexcessletdownisolationvalve,AOV-310oSlowlyopenHCV-123tomaintainexcessletdowntemperaturelessthan195'Fandpressurelessthan100psig EOP:P-ELEC.171TLE:LOSSOF12AAND/OR12BBUSSESREV:14PAGE8of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED11VerifyPRZRHeatersRestored:oPRZRproportionalheaterbreakerCLOSEDoPRZRbackupheaterbreaker-RESET/INAUTOIFadequateD/GcapacityavailableforPRZRheaters(400kweachbank),THENperformthefollowing:a.ResetandclosePRZRproportionalheaterbreakerifnecessary,b.ResetPRZRbackupheaterbreakerandreturntoAUTOifnecessary.rIFadequateD/GcapacityNOTavailable,THENrefertoER-PRZR.1.12VerifyNormalRodControlRestored:a.AnnunciatorC-5,PPCSRODSEQUENCEORRODDEVIATIONEXTINGUISHEDa.GotoAP-RCC.2,RCC/RPIMALFUNCTION.b.AnnunciatorE-28,POWERRANGERODDROPRODSTOP-EXTINGUISHEDb.Performthefollowing:1)PlacerodcontrolbankselectorswitchinMANUAL.c.AnnunciatorF-15,RCSTAVGDEV4'F-EXTINGUISHED2)ResetNISroddroprodstopsignals(atNISracks)asnecessary,c.Gotostep13.d.PlacerodcontrolbankselectorswitchinAUTOifdesired EOP:P-ELEC.1TITLE:LOSSOF12A'ND/OR12BBUSSESREV:14PAGE9of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED13EstablishStablePlantConditions:a.CheckTavg-TRENDINGTOTREFb.CheckPRZRpressure-TRENDINGTO2235PSIGa.Insertcontrolrodsor,ifnecessary,decreaseturbineloadtomatchTavgtoTref.b.VerifyproperoperationofPRZRheatersandsprayortakemanualcontrolofPRZRpressurecontroller431K.c.CheckPRZRlevel-TRENDINGTOPROGRAMc.VerifyproperoperationofchargingpumpspeedcontrollersortakemanualcontrolofspeedcontrollerstocontrolPRZRlevel.NOTE:PoweroperationmaycontinueifconditionsrequiredbyITSsection3.8aremet.14RestoreNormalElectricSystemAlignment:a.Verifycircuit767and/or751-AVAILABLEb.Restorepowerto12Aand/or12Bbus(RefertoER-ELEC.1,RESTORATIONOFOFFSITEPOWER)a.ContinuewithStep15.WHENoffsitepoweravailable,THENdoSteps14b,candd.c.VerifyallemergencyACbusnormalfeedbreakers-CLOSED~Bus14~Bus16~Bus17~Bus18c.RestoreemergencyACbussestonormalpowersupply(RefertoER-ELEC.1,RESTORATIONOFOFFSITEPOWER)d.StopanyunloadedemergencyD/Gandplaceinstandby(RefertoAttachmentD/GSTOP)
EOP:             T!TLE REV  14 P-ELEC. 1                  LOSS OF 12A AND/OR 12B BUSSES PAGE 3  of 22 STEP      ACTION/EXPECTED RESPONSE                RESPONSE NOT OBTAINED CAUTION    o  IF, AT ANY TIME DURING THIS PROCEDURE, A REACTOR TRIP OR    SI OCCURS, E-O, REACTOR  TRIP OR SAFETY INJECTION, SHALL BE PERFORMED.
EOP:P-ELEC.1LOSSOF12AAND/OR12BBUSSESREV14PAGE10of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED15EstablishNormalPlantConditions:a.VerifyEHcontrolinOPERPANandIMPINa.IFconditionsrequiringrunbackhavecleared,THENplaceEHinOPERPANandIMPIN.b.Ensuresteamdumpcontroller,HC-484,inAUTOat1005psigc.VerifyannunciatorG-15,STEAMDUMPARMED-EXTINGUISHEDc.IFTavgwithin5'FofTref,THENperformthefollowing:1)Ensuresteamdumpvalvesclosed.2)Resetsteamdump.d.Verify2chargingpumps-RUNNINGd.Performthefollowing:1)Manuallystartchargingpumpsasnecessary.2)PlaceselectedchargingpumpspeedcontrollerinAUTOifdesired.e.VerifyRodControlSelectorSwitchinAUTOe.PlaceRodControlSelectorSwitchinAUTOifdesired,f.GotoStep29 EN>:P-ELEC.1LOSSOF12AAND/OR12BBUSSESREV'4PAGE11of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDNOTE:oFollowingRCPtrip,adecreaseinidleS/Glevelmayoccur.Also,swellmaybeanticipatedintheoperatingS/GduetoloadpickupfroIntheidleloop.oTemperaturesintheloopwiththestoppedRCPwillnotbeindicativeoftrueTavgandhTvalues.oIfonlyoneRCPisoperating,refertoAP-RCS.2,LOSSOFREACTORCOOLANTFLOW.oAttemptstorestoreoffsitepowershouldcontinue(RefertoER-ELEC.l>RESTORATIONOFOFFSITEPOWER'.)16CheckSecondaryHeatSinkStatus:a.Anymainfeedpump-RUNNINGb.VerifyS/Glevels-TRENDINGTO52%a.Performthefollowing:l)VerifyMDAFWpumpsrunningasnecessary.2)VerifyTDAFWpumprunningifnecessary.3)EnsureRxpowerlessthan2S.b.ControlfeedflowasnecessarytorestoreS/Glevel.
o  IF'CS  TEMPERATURE  IS < 350'F, THEN  AP-ELEC.3, LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW  350'F) SHOULD BE PERFORMED.
4 P-ELEC.1TITLE:LOSSOF12AAND/OR12BBUSSESREV'4PAGE12of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED17CheckTDAFW-PumpStatus:a.TDAFVpump-RUNNINGb.CheckS/GstatusoAtleastoneS/Glevel-GREATERTHAN17%a.GotoStep18.b.GotoStep18.-OR-oBothMDAFWpumps-OPERABLEc.PullstopTDAFWpumpsteamsupplyvalves~MOV-3504A~MOV-3505A18CheckAnyRCP-RUNNINGVerifynaturalcirculation.(RefertoAttachmentNC.)IFnatural"circulationcanNOTbeverified,THENincreasedumpingsteam.19EstablishCondenserSteamDumpPressureControl:.a.Verifycondenseravailable:oAnyMSIV-OPENoAnnunciatorG-15,STEAMDUMPARMED-LITb.AdjustcondensersteamdumpcontrollerHC-484to1005psiginAUTOa.Performthefollowing:1)PlaceS/GARVcontrollersinAUTOat1005psigandverifyproperoperation.IFS/GARVsNOTcontrollinginAUTO,THENcontrolS/GARVsmanually.2)GotoStep20.c.PlacesteamdumpmodeselectorswitchtoMANUAL EOP:P-ELEC.1T1TLE:LOSSOF12AAND/OR12BBUSSESREV14PAGE13of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED20RestoreNon-SafeguardsBussesAsFollows:a.VerifyBus13and15-ENERGIZEDb.VerifyMCCA-ENERGIZEDc.VerifyMCCB-ENERGIZEDd.VerifyannunciatorJ-8,480VMCCSUPPLYBREAKERTRIPEXTINGUISHEDe.Resetcontrolroomlightingifnecessaryf.ResetMAINXFMRAUXPWRSUPPLYbreakersasnecessary~Bus13~Bus15a.IFoffsitepoweravailable,THENattempttorestoreoffsitepowerandnormalfeedtoBus13/15(RefertoER-ELEC.1,RESTORATIONOFOFFSITEPOWER).1)IFoffsitepowerisNOTavailable,THENperformthefollowing:oCloseBus13toBus14tiebreakeroCloseBus15toBus16tiebreakerb.Performthefollowing:1)EnsurethefollowingpumpsinPULLSTOP:~EHpumpA~Turninggearoil.pump~HPsealoilbackuppump2)CloseMCCAsupplybreakerfrombus13.c.Performthefollowing:1)EnsureEHpumpBinPULLSTOP.2)CloseMCCBsupplybreakerfrombus15.d.RestorepowertootherMCCsasD/Gloadingpermits.
o    IF A TURBINE RUNBACK HAS OCCURRED, THEN AP-TURB.2, TURBINE LOAD REJECTION, SHOULD BE PERFORMED.
EOP:P-ELEC.1LOSSOF12AAND/OR12BBUSSESREV14PAGE14of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDNOTE:Whenrestartingequipmentforrecovery,itispreferabletostartequipmentonbussesbeingsuppliedfromoffsitepower,ifpossible.21CheckIASystem:a.Verifyatleast2aircompressors-RUNNINGb.CheckIAsupplyoPressure-GREATERTHAN60PSIGoPressure-STABLEORINCREASING,a.Manuallystartaircompressorsasnecessary(75kweach).b.DispatchanAOtolocallyresetandstartIAcompressors(75kweach).IFIAcanNOTbeestablished,THENrefertoAP-IA.1,LOSSOFINSTRUMENTAIR.22VerifyInstrumentBusD-ENERGIZEDEnergizeMCCB.IFMCCBNOTavailable,THENperformthefollowing:a.VerifyMCCAenergized.b.PlaceinstrumentbusDonmaintenancesupply.
o    IF ANY RADIOACTIVE RELEASE IN PROGRESS, THEN IT SHOULD BE TERMINATED UNTIL SUPPORT CONDITIONS ARE EVALUATED.
EOP$P-ELEC.1TITLE$LOSSOF12AAND/OR12BBUSSESREV14PAGE15of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED23CheckCVCSOperation:a.Chargingpumps-ATLEASTONERUNNINGb,Checkletdownindications:oCheckPRZRlevel-GREATERTHAN13%oLetdownflow-APPROXIMATELY40GPMoLetdownflow-STABLEc.AdjustchargingpumpspeedandHCV-142asnecessarytorestorePRZRlevelandlabyrinthsealD/Pd.GotoStep25a.Performthefollowing:1)CloseloopBcoldlegtoREGENHx,AOV-427.2)Startchargingpumpsasnecessary.3)Establishgreaterthan20gpmcharginglineflow.b.Performthefollowing:1)CloseloopBcoldlegtoREGENHx,AOV-427.2)Closeletdownorificevalves(AOV-200A,AOV-200B,andAOV-202)3)IFPRZRlevelgreaterthan13%,THENgotoStep24.IFNOT,THENcontinuewithStep26.WHENPRZRlevelgreaterthan13%,THENdoSteps24and25.  
o    OBSERVE D/G LOADING LIMITS OF 2300 KW FOR 1/2 HOUR, 2250 KW FOR 2 HOURS, AND 1950 KW FOR CONTINUOUS SERVICE.
o    DO NOT ATTEMPT TO  ENERGIZE A BUS THAT  IS POTENTIALLY FAULTED.
NOTE:   o  Conditions should be evaluated for site contingency reporting (Refer to EPIP-1.0, GINNA STATION EVENT EVALUATION AND CLASSIFICATION).
o  AP-ELEC.14/16,     LOSS OF SAFEGUARDS BUS 14/16 AND  AP-ELEC.17/18, LOSS OF SAFEGUARDS BUS 17/18 provide additional      guidance for the loss of safeguards busses.
1 Establish Manual        Rod  Control a, Place Rod Control Bank Selector Switch to    MANUAL
: b. Verify control rod motion stops            b. Manually trip the reactor and go to E-O, REACTOR TRIP OR SAFETY INJECTION.
: c. Manually move control rods as necessary


EOP:P-ELEC.1TITLE:LOSSOF12AAND/OR12BBUSSESREV:14PAGE16of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDNOTE:Steps24and25maybeperformedconcurrently.24EstablishNormalLetdown:a.EstablishcharginglineflowtoREGENHx-GREATERTHAN20GPM.b.VerifythefollowingswitchesinCLOSE'Letdownorificevalve(AOV-200A,AOV-200B,andAOV-202)~LoopBcoldlegtoREGENHxAOV-427c.PlaceletdowncontrollersinMANUALat40%open~TCV-130~PCV-135d.OpenAOV-427.e.Openletdownorificevalvesasnecessary.f.PlaceTCV-130inAUTOat105'F.Performthefollowingstepsinsequencetoestablishexcessletdown:oPlaceexcessletdowndivertvalve,AOV-312,toNORMALoEnsureCCWfromexcessletdownopen,AOV-745oEnsureRCPsealreturnisolationvalveopen,MOV-313oOpenexcessletdownisolationvalve,AOV-310oSlowlyopenHCV-123tomaintainexcessletdowntemperaturelessthan195'Fandpressurelessthan100psigg.PlacePCV-135inAUTOat250psig,h.AdjustchargingpumpspeedandHCV-142asnecessary.
EOP:
EOP:P-ELEC.1TITLE:LOSSOF12AAND/OR12BBUSSESREV:14PAGE17of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED25VerifyPRZRHeatersRestored:oPRZRproportionalheaterbreakerCLOSEDoPRZRbackupheaterbreaker-RESET/INAUTOIFadequateD/GcapacityavailableforPRZRheaters(400kweachbank),THENperformthefollowing:a.ResetandclosePRZRproportionalheaterbreakerifnecessary.b.ResetPRZRbackupheaterbreakerandreturntoAUTOifnecessary.IFadequateD/GcapacityNOTavailable,THENrefertoER-PRZR.1.26EstablishStablePlantConditions:a.CheckRxpower-=LESSTHAN2.5x106AMPSa.EnsurerodcontrolbankselectorinMANUALandinsertrodstoreduceRxpowerasnecessary.b.CheckPRZRpressure-TRENDINGTO2235PSIG-b.VerifyproperoperationofPRZRheatersandsprayortakemanualcontrolofPRZRpressurecontroller431K,c.Verify2chargingpumps-RUNNINGc.Performthefollowing:1)Manuallystartchargingpumpsasnecessary.2)PlaceselectedchargingpumpspeedcontrollerinAUTOifdesired.d.CheckPRZRlevel-between35%and40%d.Controlchargingasnecessary.e.CheckS/Glevels-'RENDINGTO52%e.ControlfeedflowasnecessarytorestorebothS/Glevelsto52%.f.CheckRCSTavg-GREATERTHAN540'Ff.Cont'roldumpingsteamasnecessary.IFcooldowncontinues,THENclosebothMSIVs.
REV: 14 P-ELEC.l                  LOSS OF 12A AND/OR 12B BUSSES PAGE 4    of 22 STEP      ACTION/EXPECTED RESPONSE          RESPONSE NOT OBTAINED 2 Verify Emergency        D/G            IF appropriate emergency D/G(s)      NOT Associated With        Dead  Bus-     running, THEN attempt to start RUNNING                                manually. (Refer to ER-D/G.l, RESTORATION OF A FAILED      D/G.)
o  Bus 12A - D/G A o  Bus 12B - D/G B 3 Verify Both Trains        Of AC      Try to restore power to      all  AC Emergency Busses Energized To          emergency busses.       IF power can NOT At Least      420 VOLTS:               be restored to at      least one train, THEN  refer to  ECA-O.O, LOSS OF ALL o  Bus 14 and bus 18                  AC POWER,     Step 1.
o  Bus 16 and bus 17 4 Verify Service Water          System Operation:
: a. SW  pumps - AT LEAST ONE RUNNING  a. Verify selected      SW pumps  start IN  EACH LOOP                          on a  timer (40 sec) after D/G start. IF NOT, THEN manually start  pumps as  naaassary  (258 ku each),
: b. SW header pressure -    GREATER  b. Manually align valves as THAN 40 PSIG  IN EACH  LOOP .       necessary.
5 Check    CCW Pump    Status:
: a. At  least  one CCW  pump - RUNNING a. Start    one CCW  pump (124  kw).
: b. Annunciator A-22,    CCW PUMP      b, Start second      CCW  pump (124  kw).
DISCHARGE LO PRESS    60,PSIG EXTINGUISHED


EOP:P-ELEC.1LOSSOF12AAND/OR12BBUSSESREV14PAGE18of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDCAUTIONANYTIMEEMERGENCYD/GSARETHEONLYSOURCEOFACPOWERTOTHEPLANT,PERSONNELSHOULDBEASSIGNEDTOMAINTAINSURVEILLANCEOFTHED/GS.27RestoreNormalElectricSystemAlignment:a.Verifycircuit767and/or751AVAILABLEb.Restorepowerto12Aand/or12Bbusifnecessary(RefertoER-ELEC.1,RESTORATIONOFOFFSITEPOWER)a.ContinuewithStep28;WHENoffsitepoweravailable,THENdoSteps27b,candd.c.VerifyallemergencyACbusnormalfeedbreakers-CLOSED~Bus14~Bus16~Bus17~Bus18c.RestoreemergencyACbussestonormalpowersupply(RefertoER-ELEC.1,RESTORATIONOFOFFSITEPOWER)d.StopanyunloadedemergencyD/Gandplaceinstandby(RefertoAttachmentD/GSTOP) 0t' EOP:P-ELEC.1LOSSOF12AAND/OR12BBUSSESREV14PAGE19of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDNOTE:Evaluateconditionstodetermineifturbineshouldbeplacedonturninggear,28EstablishNormalShutdownAlignment:a.Verifyturninggearoilpump-RUNNINGa.Performthefollowing:1)Manuallystartturninggearoilpump(42kw).2)Breakvacuumtoaccelerateturbinecoastdown.'b.VerifyadequateRxheadcooling:3)ContinuewithStep28b.WHENshaftstops,THENdispatchAOtoplaceturbineonturninggear.l)Verifyatleastonecontrolrodshroudfan-RUNNINGl)Manuallystartonefanaspowersupplypermits(45kw).2)VerifyoneRxcompartmentcoolingfan-RUNNING2)Manuallystartonefanaspowersupplypermits(23kw).c.DispatchAOtostartwastegascompressorasnecessaryd.DispatchAOtorestoreSFPcoolingasnecessary
EOP:
REV'4 P-ELEC. 1                LOSS OF 12A AND/OR 12B BUSSES PAGE 5  of 22 STEP      ACTION/EXPECTED RESPONSE        RESPONSE NOT OBTAINED
    '6 Verify Bus    11A And 11B Normal    IF turbine trip has occurred from Feed Breakers  CLOSED                power less than 50%, THEN go to AP-TURB.1, TURBINE TRIP WITHOUT RX TRIP REQUIRED, Step    l.
IF turbine stop valves open, THEN trip turbine and go to AP-TURB.1, TURBINE TRIP WITHOUT RX TRIP REQUIRED, Step 1.
IF turbine    NOT previously latched, THEN  perform the following:
: a. Ensure reactor power less than 8a.
: b. Go  to Step 16.
7 Verify Annunciator H-16,             Dispatch AO to locally reset and INSTRUMENT    AIR  COMP              start IA compressors as necessary.
EXTINGUISHED 8 Monitor S/G Level Control:            Place  MFW  regulating valves in MANUAL and    control feed flow as o S/G  level  - TRENDING TO 52%      necessary.
o MFW  regulating valves CONTROLLING  IN AUTO


EOP:P-ELEC.1LOSSOF12AAND/OR12BBUSSESREV:14PAGE20of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED29CheckStatusOfDCSystemLoads:a.VerifyturbemergencyDClubeoilpump-OFFb.VerifyTDAFVpumpDCoilpump-OFFINAUTOc.VerifybothMFWpumpDCoilpumps-OFFa.ManuallystopemergencyDClubeoilpump.b.Performthefollowing:1)EnsureTDAFVACoilpumprunning.2)StopTDAFVpumpDCoilpump.c.Performthefollowing:1)EnsureassociatedMFVpumpACoilpumprunning.2)StopMFWpumpDCoilpumpandplaceinAUTO EOP:P-ELEC.1TITLE:LOSSOF12AAND/OR12BBUSSESREV:14PAGE21of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED30RestoreEquipmentAlignment:a.Verifyatleast2CNMTrecircfans-RUNNINGb.CheckCCWpumps-ONLYONERUNNINGc.Checkradiationmonitoringsystems:oCNMTventsamplepump-RUNNINGa.StartCNMTrecircfansasnecessary(240kweach).b.IFtwoCCWpumpsrunning,THENmanuallystoponepump.c.Restoresamplepumpsandradiationmonitorsasnecessary.oPlantventsamplepump-RUNNINGoAllareaandprocessmonitorsoperatingasrequiredd.DispatchAOtoverifyproperoperationofsealoilsysteme.Verifymotorfirepumpbreaker-CLOSEDe.Closemotorfirepumpbreaker.f.VerifyannunciatorL-l,AUXBLDGVENTSYSTEMCONTROLPANEL-EXTINGUISHEDg.Verifyserviceaircompressor-RUNNINGh.VerifyMCCG-ENERGIZEDi.Checkcontrolboardannunciatorpanels'--ADLRMSTATUSVALIDFORPLANTCONDITIONSf.IFbus11Aor11Benergized,THENdispatchAOtorestoreAUXBLDGventilation(RefertoT-35A,AUXANDINTERMEDIATEBUILDINGVENTILATIONSTARTUPANDSHUTDOWN)g.DispatchAOtolocallystartserviceaircompressor.h.Manuallyclosebreaker.i.Performalarmresponseproceduresforunexpectedalarms.j.Verifycontrolboardvalvealignment-NORMAL(Referto0-6.13,DAILYSURVEILLANCELOG)),Manuallyalignvalvesasnecessary.  
EOP:             TlTLE REV: 14 P-ELEC. 1                  LOSS OF 12A AND/OR 12B BUSSES PAGE 6  of 22 STEP      ACTION/EXPECTED RESPONSE              RESPONSE NOT OBTAINED NOTE:  When  restarting equipment for recovery,  it is  preferable to start equipment on busses being supplied from    offsite  power,  if possible.
9 Check  CVCS    Operation:
: a. Charging pumps - AT LEAST    ONE    a. Perforln the following:
RUNNING
: 1) Close loop B cold leg to REGEN Hx, AOV-427.
2)'tart  charging pumps as necessary.
: 3) Establish greater than    20 gpm charging line flow.
Check letdown    indications:         b. Perform the following:
o  Check PRZR    level - GREATER          1) Close loop B cold leg to THAN 13%                                  REGEN Hx, AOV-427.
o  Letdown flow - APPROXIMATELY            2) Close letdown  orifice valves 40  GPM                                  (AOV-200A, AOV-200B, and AOV-202) o  Letdown flow - STABLE
: 3) IF  PRZR level greater than 13%, THEN go to Step 10. IF NOT, THEN continue with Step 12. WHEN PRZR  level greater than  13$ , THEN do Steps 10 and 11.
: c. Adjust charging pump speed and HCV-142 as necessary to restore PRZR level and labyrinth seal D/P
: d. Go to Step    ll


EOP:P-ELEC.1LOSSOF12AAND/OR12BBUSSESREV:14PAGE22of22STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED31ResetUVRelayTargetsOnUndervoltageCabinets~Bus14'Bus16~Bus17~Bus18NOTE:Referto0-9.3,NRCIMMEDIATENOTIFICATION,forreportingrequirements.32NotifyHigherSupervision33ReturnToProcedureOrGuidanceInEffect-END-EOP:P-ELEC.1LOSSOF12AAND/OR12BBUSSESREV:14PAGE1of1AP-ELEC.1APPENDIXLISTTITLEPAGES1)FIGUREMINSUBCOOLING2)ATTACHMENTNC3)ATTACHMENTD/GSTOP EOP:P-ELEC.1TITLE:LOSSOF12AAND/OR12BBUSSESREV14PAGE1of1FIGUREMINSUBCOOLINGNOTE:SubcoolingMargin=SaturationTemperatureFromFigureBelow[-]CoreExitT/CIndicationRC250024002300220021002000190018001700;16001500140013001200110010009008007006005004003002001000SPRESSURE(PSIG)RCSPRESSUREINCREHENTS20PSIGSUBCOOLEDREGIONADVERSECNHTNORHALCNHTINADEQUATESUBCOOLINGREGIONTEHPERATUREINCREHENTS10'F0200250300350400450500550600650700COREEXITSATURATIONTEHPERATURE(')
EOP:             TITLE:
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV:3PAGE1of20ROCHESTERGASANDELECTRICCORPORATIONGINNASTATIONCONTROLLEDCOPYNUMBER~5RESPONSIBLEAGEREFFECTIVEDATECATEGORY1.0REVIEWEDBY:
REV'4 P-ELEC. 1                  LOSS OF 12A AND/OR 12B BUSSES PAGE 7  of 22 STEP      ACTION/EXPECTED RESPONSE            RESPONSE NOT OBTAINED NOTE:   Steps 10 and 11 may be performed concurrently.
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV3PAGE2of20A.PURPOSE-Thisprocedureprovidesactionstorespondtoalossof12Aor12BSSTransformerwhenRCStemperatureislessthan350'F.B.ENTRYCONDITIONS/SYMPTOMS1.ENTRYCONDITIONS-Thisproceduremaybeenteredfrom:a.AP-ELEC.1,LOSSOF12AAND/OR12BBUSSES,whenbusses12Aand/or12BarefoundtobedeenergizedandRCStemperatureislessthan350'F.2.SYMPTOMS-ThesymptomsoflossofN12Aor12BSSTransformerare:a.AnnunciatorL-20,12AXFMROR12ABUSTROUBLE,lit,orb.AnnunciatorL-28,12BXFMROR12BBUSTROUBLE,lit.
10  Establish Normal Letdown:                 Perform the following steps    in sequence to establish excess
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV3PAGE3of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDCAUTIONoIFTHERCSISWATERSOLID,THENANYINCREASEINRCSTEMPERATUREMAYRESULTINASIGNIFICANTRCSPRESSUREINCREASE.RCSHEATUPSHOULDBEPREVENTED.oOBSERVED/GLOADINGLIMITSOF2300KWFOR1/2HOUR,2250KWFOR2HOURS,AND1950KWFORCONTINUOUSSERVICE.oANYTIMEEMERGENCYD/GSARETHEONLYSOURCEOFACPOWERTOTHEPLANT,PERSONNELSHOULDBEASSIGNEDTOMAINTAINSURVEILLANCEOFTHED/GS.oIFANYRADIOACTIVERELEASEINPROGRESS,THENITSHOULDBETERMINATEDUNTILSUPPORTCONDITIONSAREEVALUATED.*****************************************NOTE:Conditionsshouldbeevaluatedforsitecontingencyreporting(RefertoEPIP-1.0,GINNASTATIONEVENTEVALUATIONANDCLASSIFICATION).1VerifyEmergencyD/GAssociatedWithDeadBus-RUNNINGoBus12A-D/GAoBus12B-D/GBIFappropriateemergencyD/G(s)NOTrunning,THENattempttostartmanually.(RefertoER-D/G.l,RESTORATIONOFAFAILEDD/G.)2VerifyBothTrainsOfACEmergencyBussesEnergizedToAtLeast420VOLTS:oBus14andbus18oBus16andbus17TrytorestorepowertoallACemergencybusses.IFpowercanNOTberestoredtoatleastonetrain,THENrefertoECA-O.O,LOSSOFALLACPOWER.
: a. Establish charging    line flow to    letdown:
EOP:P-ELEC.3T!jLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV'PAGE4of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDNOTE:Whenrestartingequipmentforrecovery,itispreferabletostartequipmentonbussesbeingsuppliedfromoffsitepower,ifpossible.3VerifyServiceWaterSystemOperation:a.SWpumps-ATLEASTONERUNNINGINEACHLOOPb.SWheaderpressure-GREATERTHAN40PSIGINEACHLOOPa.VerifyselectedSWpumpsstartonatimer(40sec)afterD/Gstart.IFNOT,THENmanuallystartpumpsasconditionspermit(258kweach).b.Manuallyalignvalvesasnecessary.4CheckCCWPumpStatus:a.AtleastoneCCWpump-RUNNINGb.AnnunciatorA-22,CCWPUMPDISCHARGELOPRESS60PSIGEXTINGUISHEDa.StartoneCCWpump(124kw).b.StartsecondCCWpump(124kw).
REGEN Hx    - GREATER THAN 20 GPM o  Place excess letdown  divert
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV3PAGE5of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED5CheckRCSTemperature-STABLEIFRCStemperatureincreasing,THENstabilizetemperatureusingavailablemethod.~RHRnormalcooling~Dumpsteamandfeed~BlowdownandfeedIFRCStemperaturedecreasing,THENperformthefollowing:a.StopdumpingsteamorcontrolRHRnormalcooling.b.IFcooldowncontinues,THENperformthefollowing:l)IFeitherMDAFWpumpoperable,THENensureTDAFWpumpsteamsupplyvalvesinPULLSTOP.2)WHENS/Glevelgreaterthan5%inoneS/G,THENlimitfeedflowtothatrequiredtomaintainS/Glevel.
: b. Verify the following switches in          valve, AOV-312, to  NORMAL CLOSE:
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV3PAGE6of20STEPACTION/EXPECTEDRESPONSERESPONSE,NOTOBTAINEDCAUTIONIFREFUELINGINPROGRESS,THENSTOPREFUELINGOPERATIONS(NOTIFYREFUELINGSRO).*****************************************6RestoreNon-SafeguardsBussesAsFollows:a.Verifynon-safeguardsbusses-ENERGIZED~Bus13~Bus15b.VerifyMCC'A-ENERGIZEDc.VerifyMCCB;ENERGIZEDd.CheckCNMTventsample'pump-RUNNINGe.VerifyannunciatorJ-8,480VMCCSUPPLYBREAKERTRIPEXTINGUISHEDf.Resetcontrolroomlightingifnecessarya.Closenon-safeguardsbustiebreakerforaffectedbus(ses)ifpossible:~Bus13tobus14tie~Bus15tobus16tieb.Performthefollowing;1)EnsurethefollowingpumpsinPULLSTOP:~EHpumpA~Turninggearoilpump~HPsealoilbackuppump2)CloseMCCAsupplybreakerfrombus13;c.Performthefollowing:1)EnsureEHpumpBinPULLSTOP.2)CloseMCCBsupplybreakerfrombus15.d.IFCNMTpurgeormini-purgeinprogress,THENsecurepurging.e.RestorepowertootherMCCsasD/Gloadingpermits.~MCCE~MCCF~MCCG
o  Ensure CCW from excess  letdown
          ~  Letdown  orifice valve                open, AOV-745 (AOV-200A, AOV-200B, and AOV-202)                           o  Ensure RCP  seal return isolation
          ~  Loop B cold leg to REGEN Hx            valve open, MOV-313 AOV-427 o  Open excess letdown  isolation
: c. Place letdown controllers in              valve, AOV-310 MANUAL at 40% open o  Slowly open HCV-123 to maintain
          ~ TCV-130                                excess letdown temperature less
          ~ PCV-135                                than 195'F and pressure less than 100 psig
: d. Open AOV-427
: e. Open letdown    orifice valves  as necessary
: f. Place TCV-130    in AUTO at 105'F .
g, Place PCV-135    in AUTO at 250  psig
: h. Adjust charging pump speed and HCV-142 as necessary


EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV'PAGE7of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED7CheckIASystem:a.Verifyatleast2aircompressors-RUNNINGb.CheckIAsupplyoPressure-GREATERTHAN60PSIGoPressure-STABLEORINCREASINGa.Manuallystartaircompressorsasnecessary(75kweach).b.DispatchanAOtolocallyresetandstartaircompressorsasnecessary(75kweach).IFIAcanNOTbeestablished,THENrefertoAP-IA.l,LOSSOFINSTRUMENTAIR.8CheckRCSCooling:a.RHRsystem-PREVIOUSLYALIGNEDFORRHRNORMALCOOLINGb.CheckRHRpumps-ANYRUNNINGc.GotoStep11a.GotoStep18.b.IFRHRnormalcoolingpreviouslyinservice,THENgotoStep9.IFRHRnormalcoolingNOTrequired,THENgotoStep18.
EOP:             71TLE:
EOP:P-ELEC.3TlTLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV3PAGE8of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED9EstablishConditionsToStartRHR'ump:a.AnyRHRpump-AVAILABLEa.IFRCSlevelgreaterthan64inches,THENgotoAP-RHR.l,LOSSOFRHR.IFNOT,THENgotoAP-RHR.2,LOSSOFRHR.WHILEOPERATINGATRCSREDUCEDINVENTORYCONDITIONS.b.VerifyCCWcoolingtoRHRsysteminserviceoCCWpumps-ATLEASTONERUNNINGoCCWtoRHRHxs,MOV-738AANDMOV-738B-OPENASNECESSARYc.PlaceRHRHxbypassvalve,HCV-626,toMANUALandclosevalveb.Performthefollowing:l)EnsureatleastoneCCWpumprunning.2)OpenMOV-738AandMOV-738Basnecessary.IFCCWcanNOTberestored,THENcontinueattemptstorestoreCCW(RefertoAP-CCW.3,LOSSOFCCWPLANTSHUTDOWN).
REV: 14 P-ELEC. 1                  LOSS OF 12A AND/OR 12B BUSSES PAGE 8    of 22 STEP      ACTION/EXPECTED RESPONSE            RESPONSE    NOT OBTAINED 11  Verify PRZR Heaters Restored:           IF adequate D/G capacity available for PRZR heaters (400 kw each o  PRZR proportional    heater breaker bank), THEN perform the following:
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV:3PAGE9of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDCAUTIONoSTARTINGANRHRPUMPMAYRESULTINANRCSLEVELORPRESSUREDECREASEDUETOSHRINKORVOIDCOLLAPSEoTHERHRHXOUTLETVALVES(HCV-624ANDHCV-625)WILLFAILOPENONLOSSOFINSTRUMENTAIRPRESSURE.10'RestoreRHRFlow:a.StartoneRHRpumpb.AtleastoneRHRpump-RUNNINGc.EstablishRHRflow-WITHINLIMITSOFTABLEBELOWb.GotoStep10d.c.ManuallyadjustRHRflowasnecessary.BLOOPLEVEL100-70inches<70-30inches<30-16inches<16-10inches<10-6inchesRHRFLOW<3000gpm1400gpm51000gpm800gpm500gpmd.RHRflow-RESTOREDd.IFRCSlevelgreaterthan64inches,THENgotoAP-RHR.l,LOSSOFRHR.IFNOT,THENgotoAP-RHR.2,LOSSOFRHRWHILEOPERATINGATRCSREDUCEDINVENTORYCONDITIONS.e.PlaceRHRHxbypassvalve,HCV-626,controllerinAUTOatdesiredflowrateThisStepcontinuedonthenextpage.
CLOSED
EOP:P-ELEC.3TITLELOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV:3PAGE10of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED(Step10continuedfrompreviouspage)f.OpenRHRpumpflowcontrolvalvesasnecessarytostabilizeRCStemperature~HCV-624~HCV-625g.CheckcoreexitT/Cs,-STABLEORDECREASINGgStartanotherRHRpumporincreaseRHRflowtoestablishrequiredRCScooling.,DONOTexceedRHRflowlimitsfromtableabove.11CheckAFWPumpStatus:a.AFWpumps-ANYRUNNINGb.BothS/Glevels-ATDESIREDLEVELc.StoprunningAFWpumpsandplaceswitchesinPULLSTOPa.GotoStep12.b.ContinuewithStep12.WHENdesiredS/Glevelsestablished,THENdoStepllc.12EvaluateRCSConditions:a.CheckRCSstatus:oRCS-CLOSEDoRCSpressure-GREATERTHANATMOSPHERICa.IFRCSisopentoatmosphere,THENgotoStep17.b.VerifyRCP81sealD/PsGREATERTHAN220PSIDb.IFanyRCPrunningwithClsealD/Plessthan220psid,THENstopaffectedRCP.  
: a. Reset and close      PRZR o  PRZR  backup heater    breaker-           proportional heater breaker      if RESET/IN AUTO                            necessary,
: b. Reset    PRZR backup heater breaker and  return to  AUTO  if necessary.
r IF adequate    D/G  capacity  NOT available,     THEN  refer to  ER-PRZR.1.
12  Verify Normal        Rod  Control Restored:
: a. Annunciator C-5,     PPCS ROD        a. Go  to AP-RCC.2,   RCC/RPI SEQUENCE OR ROD DEVIATION                MALFUNCTION.
EXTINGUISHED
: b. Annunciator E-28,     POWER RANGE    b. Perform the following:
ROD DROP ROD STOP    - EXTINGUISHED
: 1) Place rod    control bank selector switch in MANUAL.
: 2) Reset NIS rod drop rod stop signals (at  NIS racks) as necessary,
: c. Annunciator F-15,    RCS TAVG DEV  c. Go  to step 13.
4'F - EXTINGUISHED
: d. Place rod control bank selector switch in    AUTO if desired


EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV:3PAGE11of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED13CheckChargingPumpSuctionAlignedToVCT:a.VCTlevel-GREATERTHAN20%'.IFVCTlevelcanNOTbemaintainedgreaterthan5%,THENperformthefollowing:1)EnsurechargingpumpsuctionalignedtoRWSToLCV-112BopenoLCV-112Cclosedb.Verifycha'rgingpumpsalignedtoVCToLCV-112CopenoLCV-112Bclosed2)ContinuewithStep14.WHENVCTlevelgreaterthan20%,THENdoStep13b.b.Manuallyalignvalvesasnecessary.14CheckChargingPumps-ANYCHARGINGPUMPRUNNINGIFchargingpumpsrequired,THENperformthefollowing:a.VerifychargingtoloopBcoldleg,AOV-294,open.b.Verifycharging.flowcontrolvalve,HCV-142,openasnecessary.c.IFdesired,THENplaceletdownpressurecontroller,PCV-135,inMANUAL.d.Startonechargingpump(75kweachpump).e.IncreasechargingpumpspeedandcontrolPCV-135asnecessarytocontrolPRZRpressureorlevel.
EOP:             TITLE:
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV'PAGE12of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED15MonitorRCSPressure:a.Pressure-LESSTHAN390PSIGb.Pressure-STABLEa.IFRCSissolid,THENcontrolchargingandletdownpressurecontrolvalve(PCV-135)asnecessarytostabilizeRCSpressure.IFPRZRbubbleestablished,THENoperatenormalorauxiliaryspraytodecreasepressure.b.StabilizeRCSpressureusingappropriatemeans.~Charging~Letdown~PCV-135(solid)~Normalspray~Auxiliaryspray~PRZRheaters16CheckPRZRLevel:a.Narrowrangelevel-ONSCALEb.Level-TRENDINGTOPROGRAMa.IFRCSissolid,THENgotoStep17.b.AdjustchargingpumpspeedasnecessarytocontrolPRZRlevel.17MonitorRCSTemperaturea.CoreexitT/Cs-STABLEORDECREASINGa.AdjustRCScoolingasnecessaryandreturntoStep3.~S/Gsteaming~S/Gfeeding~RHRcoolingb.GotoStep26 EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV3PAGE13of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED18CheckAFWSystemStatus:a.VerifyTDAFWpumpsteamsupplyvalvesinPULLSTOPb.VerifyMDAFWpumpcrosstievalvesclosed~MOV-4000A~MOV-4000Ba.IFS/Gsprovidingheatsink,THENperformthefollowing:l)VerifyadequateMDAFWflow.2)PullstopTDAFWpump.3)AdjustAFWflowasnecessarytostabilizeS/GlevelandRCStemperature.b.EnsureatleastoneMDAFWpumpoff.IFtwopumpsrequired,THENclosebothMDAFWpumpcrosstievalves.19CheckAnyS/G.Level-GREATERTHAN174'tartMDAFWpumpsasnecessarytorestore<<S/Glevel.20CheckRCSPressure-GREATERTHAN300PSIGIncreaseRCSpressuretogreaterthan300psig.IFRCP@1sealD/PcanNOTbemaintainedgreaterthan220psid,THENtripanyrunningRCP.21CheckRCPStatus-ANYRCPRUNNINGVerifynaturalcirculation(RefertoAttachmentNC).IFnaturalcirculationNOTverified,THENincreasedumpingsteam, EOP:P-ELEC.3T!TLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV:3PAGE14of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED22MonitorRCSTemperature-STABLEORDECREASINGControlS/GARVstostabilizeRCStemperature.IFS/GARVsdoNOTprovideadequatecooling,THENperformthefollowing:a.InitiateS/GblowdownfrombothS/Gs.b.MaintainbothS/GlevelsstablebycontrollingAFWflow.23.CheckCVCSOperation:a.Chargingpumps-ATLEASTONERUNNINGb.Checkletdownindications:oCheckPRZRlevel-GREATERTHAN13%oLetdownflow-APPROXIMATELY40GPMoLetdownflow-STABLEc.AdjustchargingpumpspeedandHCV-142asnecessarytorestorePRZRlevelandlabyrinthsealD/Pd.GotoStep25a.Performthefollowing:1)Startchargingpumpsasnecessary.2)Establishgreaterthan20gpmcharginglineflow.b.Performthefollowing:1)CloseloopBcoldlegtoREGENHxIAOV-427.2)Closeletdownorificevalves(AOV-200A,AOV-200B,andAOV-202)3)IFPRZRlevelgreaterthan13%,THENgotoStep24.IFNOT,THENcontinuewithStep26.WHENPRZRlevelgreaterthan13%,THENdoSteps24and25.
REV: 14 P-ELEC. 1                   LOSS OF    12A'ND/OR 12B      BUSSES PAGE 9  of 22 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED 13  Establish Stable Plant Conditions:
EOP:P-ELEC.3T1TLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV:3PAGE15of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDNOTE:Steps24and25maybeperformedconcurrently.24EstablishNormalLetdown:a.EstablishcharginglineflowtoREGENHx-GREATERTHAN20GPMb.VerifythefollowingswitchesinCLOSE'Letdownorificevalve(AOV-200A,AOV-200B,andAOV-202)~LoopBcoldlegtoREGENHxAOV-427c.PlaceletdowncontrollersinMANUALat40%open~TCV-130~PCV-135d.OpenAOV-427e.Openletdownorificevalvesasnecessaryf.PlaceTCV-130inAUTOat105'Fg.PlacePCV-135inAUTO.at250psigh.AdjustchargingpumpspeedandHCV-142asnecessaryPerformthefollowingstepsinsequencetoestablishexcessletdown:oPlaceexcessletdowndivertvalve,AOV-312,toNORMALoEnsureCCVfromexcessletdownopen,AOV-745oEnsureRCPsealreturnisolationvalveopen,MOV-313oOpenexcessletdownisolationvalve,AOV-310oSlowlyopenHCV-123tomaintainexcessletdowntemperaturelessthan195'Fandpressurelessthan100psig EOP:P-ELEC.3T1TLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV43PAGE16of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED25VerifyPRZRHeatersRestored:oPRZRproportionalheaterbreakerCLOSED.oPRZRbackupheaterbreaker-RESET/INAUTOIFPRZRheatersrequired,THENperformthefollowing:a.VerifyadequateD/GcapacityavailableforPRZRheaters(400kweachbank).b.ResetandclosePRZRproportionalheaterbreakerifnec'essary.c.ResetPRZRbackupheaterbreakerandreturntoAUTOifnecessary.IFatleast100kwofPRZRheaterscanNOTberestored,THENrefertoITS3.4.9.NOTE:CheckITSsection3.8forlimitingconditionsforoperation.26RestoreNormalElectricSystemAlignment:a.Verifycircuit767and/or751-AVAILABLEb.Restorepowerto12Aand/or12Bbus(RefertoER-ELEC.1,RESTORATIONOFOFFSITE'POWER)c.VerifyallemergencyACbusnormalfeedbreakers-CLOSED~Bus14~Bus16~Bus17~Bus18a.ContinuewithStep28.WHENoffsitepoweravailable,THENdoSteps26b,c,dand27.c.RestoreemergencyACbussestonormalpowersupply(RefertoER-ELEC.1,RESTORATIONOFOFFSITEPOWER)d.StopanyunloadedemergencyD/Gandplaceinstandby(RefertoAttachmentD/GSTOP)  
: a. Check Tavg -   TRENDING TO TREF          a. Insert control rods or,   if necessary,   decrease turbine load to match Tavg to Tref.
: b. Check  PRZR pressure  - TRENDING        b. Verify proper operation of PRZR TO 2235 PSIG                                  heaters and spray or take manual control of PRZR pressure controller  431K.
: c. Check  PRZR level  - TRENDING TO        c. Verify proper operation of PROGRAM                                      charging pump speed controllers or take manual control of speed controllers to control PRZR level.
NOTE:   Power  operation 3.8 are met.
may  continue  if conditions  required by ITS section 14  Restore Normal Electric System Alignment:
: a. Verify circuit    767  and/or 751-       a. Continue with Step 15. WHEN AVAILABLE                                    offsite  power available, THEN do Steps 14b, c and d.
: b. Restore power to 12A and/or      12B bus (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER)
: c. Verify all emergency AC bus              c. Restore emergency AC busses to normal feed breakers - CLOSED               normal power supply (Refer to ER-ELEC.1, RESTORATION OF
          ~ Bus  14                                  OFFSITE POWER)
          ~ Bus  16
          ~ Bus  17
          ~ Bus  18
: d. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)


EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV3PAGE17of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED27CheckIfAnRCPShouldBeStarted:a.Checkthefollowing:oBothRCPs-OFFa.GotoStep28.oRCPoperation-.DESIRED~b.RCSpressure-APPROXIMATELY325PSIGc.CheckPRZRlevel-LESSTHAN38%d.TrytostartanRCP1)EstablishconditionsforstartinganRCPa)BusllAor11Benergizedb)RefertoAttachmentRCPSTARTb.ControlPRZRheatersand/orchargingpumpspeedasnecessarytorestoreRCSpressure.c.VerifyS/Gtemperature(obtainedlocallyinCNMTatS/Ghandhole)lesstha'nRCScoldlegtemperature.IFNOT,THENgotoStep28.d.IFanRCPcanNOTbestarted,THENcontinuetomonitornaturalcirculationconditions(RefertoAttachmentNC),.2)StartoneRCP28CheckRCSTemperature-STABLEORDECREASINGAdjustRCScoolingasnecessary.~S/Gsteaming~S/Gfeeding~RHRcooling EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV'PAGE18of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED29EstablishNormalShutdownAlignment:a,Verifyturninggearoilpump-RUNNINGa.IFturbineoilsystemoperationrequired,THENperformthefollowing:1)Manuallystartturninggearoilpump(42kw).2)DispatchAOtoplaceturbineonturninggearifdesired.b.Verifymaingenerator-DEPRESSURIZEDb.Performthefollowing:1)ManuallystarttheHPsealoilbackuppump2)DispatchAOtolocallyperformthefollowing:oVerifyproperoperationofthesealoilsystem(RefertoT-34B,GENERATORSEALOILSYSTEMNORMALOPERATION).oEnsurebearingdrainvaporextractorrunning.c.CheckRCStemperature-LESSTHAN135'FoEnsuremainlubeoilreservoirvaporextractorrunning.c.Performthefollowing:1)EnsureoneRxcompartmentcoolingfanrunning(23kw).d.DispatchAOtostartwastegascompressorasnecessary2)Ensureonecontrolrodshroudfanrunning(45kw).  
EOP:
REV  14 P-ELEC. 1                  LOSS OF 12A AND/OR 12B BUSSES PAGE 10  of 22 STEP      ACTION/EXPECTED RESPONSE            RESPONSE NOT OBTAINED 15  Establish Normal Plant Conditions:
: a. Verify EH control in    OPER PAN    a. IF conditions requiring runback and IMP IN                              have cleared, THEN place EH in OPER PAN and IMP IN.
: b. Ensure steam  dump  controller, HC-484,  in AUTO  at  1005 psig
: c. Verify annunciator G-15,    STEAM    c. IF Tavg within 5'F of Tref,   THEN DUMP ARMED  - EXTINGUISHED              perform the following:
: 1) Ensure steam dump valves closed.
: 2) Reset steam dump.
: d. Verify 2 charging    pumps - RUNNING d. Perform the following:
: 1) Manually  start charging pumps as necessary.
: 2) Place selected charging pump speed controller in AUTO desired.
if
: e. Verify Rod Control Selector          e. Place Rod Control Selector Switch in AUTO                          Switch  in  AUTO if desired,
: f. Go to Step  29


EOP:P-ELEC.3T!TLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV3PAGE19of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED30RestoreEquipmentAlignment:a.Verifyatleast1CNMTrecircfan-RUNNINGb.VerifyannunciatorL-l,AUXBLDGVENTSYSTEMCONTROLPANEL-EXTINGUISHEDc.Checkradiationmonitoringsystems:oCNMTventsamplepumpRUNNINGoPlantventsamplepumpRUNNINGoAllareaandprocessmonitorsoperatingasrequiredd.Verifyserviceaircompressor-RUNNINGe.Verifymotorfirepumpbreaker-CLOSEDa.StartCNMTrecircfansasnecessary(240kweach).b.IFbusllAor11Benergized,THENdispatchAOtorestoreAUXBLDGventillation(RefertoT-35A,AUXANDINTERMEDIATEBUILDINGVENTILLATIONSTARTUPANDSHUTDOWN)c.Performthefollowing:1)Restoresamplepumpsandradiationmonitorsasnecessary.2)RestartCNMTpurgeormini-purgeifdesired.d.DispatchAOtolocallystartserviceaircompressorifdesired.Pe.Closemotorfirepumpbreaker.f.Checkcontrolboardannunciatorpanels-ALARMSTATUSVALIDFORPLANTCONDITIONSf.Performalarmresponseproceduresforunexpectedalarms.g.Verifycontrolboardvalvealignment-NORMAL(Referto0-6.13,DAILYSURVEILLANCELOG)g.Manuallyalignvalvesasnecessary.
EN>:
EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV:3PAGE20of20STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED31CheckStatusOfDCSystemLoads:a.VerifyemergencyDClubeoilpump-OFFb.VerifyTDAFWpumpDCoilpump-OFFc.VerifybothMFWpumpDCoilpumps-OFFa.ManuallystopemergencyDClubeoilpump,b.Performthefollowing:1)EnsureTDAFWACoilpumprunning.2)StopTDAFWpumpDCoilpump.c.StopMFWpumpDCoilpumps.32VerifyOffsitePower-RESTOREDContinueattemptstorestoreoffsitepower(RefertoER-ELEC.1,RESTORATIONOFOFFSITEPOWER).33NotifyHigherSupervisionNOTE:Referto0-9.3,NRCIMMEDIATENOTIFICATION,forreportingrequirements.34ReturnToProcedureOrGuidance.InEffect-END-
REV'4 P-ELEC. 1                LOSS OF 12A AND/OR 12B BUSSES PAGE 11    of 22 STEP      ACTION/EXPECTED RESPONSE            RESPONSE NOT OBTAINED NOTE:   o  Following RCP trip, a decrease in idle S/G level may occur. Also, swell may be anticipated in the operating S/G due to load pickup froIn the idle loop.
o  Temperatures  in the loop with the stopped  RCP  will not be indicative of true Tavg and hT values.
o  If  only one RCP is operating, refer to  AP-RCS.2, LOSS OF REACTOR COOLANT FLOW.
o  Attempts to restore  offsite power should continue (Refer    to ER-ELEC.l> RESTORATION OF OFFSITE POWER'.)
16 Check Secondary        Heat Sink Status:
: a. Any main feed pump - RUNNING          a. Perform the following:
l) Verify MDAFW pumps    running as necessary.
: 2) Verify TDAFW necessary.
pump  running  if
: 3) Ensure Rx power less than 2S.
: b. Verify S/G levels -   TRENDING TO      b. Control feed flow as necessary 52%                                      to restore S/G level.


EOP:P-ELEC.3TITLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV:3PAGE1of1AP-ELEC.3APPENDIXLISTTITLE1)FIGUREMINSUBCOOLING2)ATTACHMENTRCPSTART3)ATTACHMENTNC4)ATTACHMENTD/GSTOPPAGES
4 TITLE:
REV'4 P-ELEC.1                  LOSS OF 12A AND/OR 12B BUSSES PAGE 12  of 22 STEP      ACTION/EXPECTED RESPONSE          RESPONSE    NOT OBTAINED 17 Check TDAFW- Pump      Status:
: a. TDAFV pump -  RUNNING              a. Go  to Step 18.
: b. Check S/G status                    b. Go  to Step 18.
o  At least  one S/G  level-GREATER THAN 17%
                    -OR-o  Both  MDAFW pumps  - OPERABLE
: c. Pull stop TDAFW    pump steam supply valves
        ~ MOV-3504A
        ~ MOV-3505A 18 Check Any RCP  RUNNING                Verify natural circulation.        (Refer to Attachment NC.)       IF natural" circulation    can  NOT be verified, THEN    increase dumping steam.
19 Establish Condenser Steam Dump Pressure Control:.
: a. Verify condenser available:        a. Perform the following:
o  Any MSIV -  OPEN                    1) Place S/G ARV    controllers in AUTO  at  1005 psig and verify o  Annunciator G-15,  STEAM DUMP          proper operation. IF S/G ARMED - LIT                              ARVs NOT controlling in AUTO, THEN control S/G ARVs manually.
: 2) Go  to Step 20.
: b. Adjust condenser steam dump controller HC-484 to 1005 psig in AUTO
: c. Place steam dump mode selector switch to MANUAL


EOP:P-ELEC.3T!TLE:LOSSOF12AAND/OR12BTRANSFORMER(BELOW350'F)REV:3PAGE1of1FIGURE'MINSUBCOOLINGNOTE:SubcoolingMargin=SaturationTemperatureFromFigureBelowt'-]CoreExitT/CIndicationRC250024002300220021002000190018001700160014001300120011001000900'007006005004003002001000SPRESSURE(PSIG).RCSPRESSUREINCREMENTS20PSIGSUBCOOLEDREGIONADVECNMERSNORMALCNMTINADEQUATESUBCOOLINGREGIONTEMPERATUREINCREMENTS10'F200250300350400450500550600650700COREEXITSATURATIONTEMPERATURE('F)  
EOP:             T1TLE:
}}
REV  14 P-ELEC. 1                  LOSS OF 12A AND/OR 12B BUSSES PAGE 13    of 22 STEP      ACTION/EXPECTED RESPONSE          RESPONSE NOT OBTAINED 20  Restore Non-Safeguards        Busses As  Follows:
: a. Verify Bus 13 and 15 -  ENERGIZED  a. IF  offsite  power  available, THEN attempt to restore offsite power and normal feed to Bus 13/15 (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER).
: 1) IF  offsite  power  is  NOT available,  THEN  perform the following:
o  Close Bus 13 to Bus 14    tie breaker o  Close Bus 15 to Bus 16    tie breaker
: b. Verify MCC  A - ENERGIZED          b. Perform the following:
: 1) Ensure the    following pumps in PULL STOP:
                                                      ~ EH  pump A
                                                      ~  Turning gear oil.pump
                                                      ~  HP seal oil backup pump
: 2) Close  MCC  A supply breaker from bus 13.
: c. Verify MCC  B - ENERGIZED          c. Perform the following:
: 1) Ensure  EH pump B  in PULL STOP.
: 2) Close    MCC B  supply breaker from bus 15.
: d. Verify annunciator J-8,  480V  MCC d. Restore power to other      MCCs as SUPPLY BREAKER TRIP                    D/G    loading permits.
EXTINGUISHED
: e. Reset control room necessary lighting  if
: f. Reset MAIN XFMR  AUX PWR SUPPLY breakers as necessary
          ~ Bus 13
          ~ Bus 15
 
EOP:
REV  14 P-ELEC. 1                  LOSS OF 12A AND/OR 12B BUSSES PAGE 14  of 22 STEP      ACTION/EXPECTED RESPONSE              RESPONSE NOT OBTAINED NOTE:  When  restarting equipment for recovery,  it is  preferable to start equipment on busses being supplied from    offsite  power,  if possible.
21 Check    IA System:
: a. Verify at least  2 air              a. Manually    start air  compressors compressors  - RUNNING                    as necessary    (75 kw each).
: b. Check IA supply                      b. Dispatch an AO to locally reset and start IA compressors (75 kw o  Pressure  - GREATER THAN              each).
60 PSIG IF IA can NOT be established, o  Pressure  - STABLE  OR                THEN  refer  to AP-IA.1, LOSS OF INCREASING,                            INSTRUMENT AIR.
22  Verify Instrument      Bus    D-        Energize    MCC  B. IF MCC B NOT ENERGIZED                                available,    THEN  perform the following:
: a. Verify MCC  A energized.
: b. Place instrument bus      D on maintenance supply.
 
EOP $            TITLE$
REV  14 P-ELEC. 1                  LOSS OF 12A AND/OR 12B BUSSES PAGE 15  of 22 STEP      ACTION/EXPECTED RESPONSE          RESPONSE NOT OBTAINED 23 Check CVCS      Operation:
: a. Charging pumps - AT LEAST  ONE    a. Perform the following:
RUNNING
: 1) Close loop B cold leg to REGEN Hx, AOV-427.
: 2) Start charging pumps as necessary.
: 3) Establish greater than 20 gpm charging line flow.
b, Check letdown indications:        b. Perform the following:
o  Check PRZR  level - GREATER        1) Close loop B cold leg to THAN 13%                              REGEN Hx, AOV-427.
o  Letdown flow - APPROXIMATELY        2) Close letdown  orifice valves 40  GPM                              (AOV-200A, AOV-200B, and AOV-202) o  Letdown flow - STABLE
: 3) IF  PRZR level greater than 13%, THEN go to Step 24. IF NOT,  THEN continue  with Step 26. WHEN PRZR level greater than 13%, THEN do Steps 24 and 25.
: c. Adjust charging pump speed and HCV-142 as necessary to restore PRZR level and labyrinth seal D/P
: d. Go to Step  25
 
EOP:            TITLE:
REV: 14 P-ELEC.1                    LOSS OF 12A AND/OR 12B BUSSES PAGE 16  of 22 STEP      ACTION/EXPECTED RESPONSE            RESPONSE NOT OBTAINED NOTE:  Steps 24 and 25 may be performed concurrently.
24  Establish Normal Letdown:                Perform the following steps in sequence    to establish excess
: a. Establish charging    line flow to  letdown:
REGEN Hx    - GREATER THAN 20  GPM.
o    Place excess letdown  divert
: b. Verify the following switches in          valve, AOV-312, to  NORMAL CLOSE' o    Ensure CCW from excess  letdown Letdown    orifice valve              open, AOV-745 (AOV-200A, AOV-200B, and AOV-202)                          o    Ensure  RCP seal return isolation
          ~ Loop B cold leg to REGEN Hx            valve open,  MOV-313 AOV-427 o    Open excess letdown  isolation
: c. Place letdown controllers in              valve,  AOV-310 MANUAL at 40% open o    Slowly open HCV-123 to maintain
          ~ TCV-130                                excess letdown temperature less
          ~ PCV-135                                than 195'F and pressure less than 100 psig
: d. Open AOV-427.
: e. Open letdown    orifice valves  as necessary.
: f. Place TCV-130    in AUTO at 105'F.
: g. Place PCV-135    in AUTO at 250  psig,
: h. Adjust charging pump speed and HCV-142 as necessary.
 
EOP:            TITLE:
REV: 14 P-ELEC. 1                  LOSS OF 12A AND/OR 12B BUSSES PAGE 17    of 22 STEP      ACTION/EXPECTED RESPONSE            RESPONSE NOT OBTAINED 25  Verify PRZR Heaters Restored:              IF adequate    D/G  capacity available for  PRZR heaters (400 kw each o  PRZR proportional      heater breaker  bank), THEN perform the following:
CLOSED
: a. Reset and close    PRZR o  PRZR  backup heater breaker-              proportional heater breaker      if RESET/IN AUTO                              necessary.
: b. Reset    PRZR backup heater breaker and  return to  AUTO  if necessary.
IF adequate    D/G  capacity  NOT available,    THEN  refer to  ER-PRZR.1.
26  Establish Stable Plant Conditions:
: a. Check Rx power    -= LESS THAN        a. Ensure rod control bank selector 2.5x10 6 AMPS                              in MANUAL and insert rods to reduce Rx power as necessary.
: b. Check  PRZR  pressure  - TRENDING    b. Verify proper operation of PRZR TO  2235 PSIG-                            heaters and spray or take manual control of PRZR pressure controller  431K,
: c. Verify  2  charging  pumps - RUNNING c. Perform the following:
: 1) Manually    start charging  pumps as necessary.
: 2) Place selected charging pump speed controller in AUTO    if desired.
: d. Check  PRZR  level  - between 35%    d. Control charging as necessary.
and 40%
: e. Check S/G levels -'RENDING      TO    e. Control feed flow as necessary 52%                                        to restore both    S/G  levels to 52%.
: f. Check  RCS  Tavg - GREATER THAN      f. Cont'rol dumping steam as 540'F                                    necessary. IF cooldown continues, THEN close both MSIVs.
 
EOP:
REV    14 P-ELEC. 1                  LOSS OF 12A AND/OR 12B BUSSES PAGE 18  of 22 STEP      ACTION/EXPECTED RESPONSE            RESPONSE NOT OBTAINED CAUTION    ANYTIME EMERGENCY D/GS ARE THE ONLY SOURCE OF AC POWER TO THE PLANT, PERSONNEL SHOULD BE ASSIGNED TO MAINTAIN SURVEILLANCE OF THE D/GS.
27  Restore Normal Electric System Alignment:
: a. Verify circuit    767  and/or 751    a. Continue with Step 28;    WHEN AVAILABLE                                offsite power available,  THEN do Steps 27b, c and d.
: b. Restore power to    12A  and/or 12B bus  if necessary    (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER)
: c. Verify all emergency AC bus          c. Restore emergency AC busses to normal feed breakers - CLOSED            normal power supply (Refer to ER-ELEC.1, RESTORATION OF
          ~ Bus  14                                OFFSITE POWER)
          ~ Bus  16
          ~ Bus  17
          ~ Bus  18
: d. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)
 
t' 0
 
EOP:
REV  14 P-ELEC. 1                LOSS OF 12A AND/OR 12B BUSSES PAGE 19  of 22 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED NOTE:  Evaluate conditions to determine turning gear, if turbine  should be placed on 28  Establish Normal Shutdown Alignment:
: a. Verify turning gear oil pump-          a. Perform the following:
RUNNING
: 1) Manually  start turning gear oil pump  (42 kw).
: 2) Break vacuum to accelerate turbine coastdown.
: 3) Continue  with Step 28b. WHEN shaft stops, THEN dispatch AO to place turbine on turning gear.
      'b. Verify adequate  Rx head  cooling:
l) Verify at  least  one control          l) Manually start one fan as rod shroud fan  - RUNNING                  power supply permits (45 kw).
: 2) Verify one  Rx compartment              2) Manually start one fan as cooling fan  - RUNNING                    power supply permits (23 kw).
: c. Dispatch AO to start waste gas compressor as necessary
: d. Dispatch  AO to restore  SFP cooling  as necessary
 
EOP:
REV: 14 P-ELEC. 1                LOSS OF 12A AND/OR 12B BUSSES PAGE 20    of 22 STEP      ACTION/EXPECTED RESPONSE        RESPONSE NOT OBTAINED 29 Check    Status Of    DC  System Loads:
: a. Verify turb  emergency  DC  lube  a. Manually stop emergency    DC lube oil pump  - OFF                      oil pump.
: b. Verify TDAFV pump DC  oil pump-  b. Perform the following:
OFF IN AUTO
: 1) Ensure TDAFV  AC  oil pump running.
: 2) Stop TDAFV pump  DC  oil pump.
: c. Verify both  MFW pump DC  oil    c. Perform the following:
pumps - OFF
: 1) Ensure associated  MFV pump AC oil pump running.
: 2) Stop MFW pump DC  oil pump  and place in AUTO
 
EOP:            TITLE:
REV: 14 P-ELEC. 1                    LOSS OF 12A AND/OR 12B BUSSES PAGE 21  of 22 STEP      ACTION/EXPECTED RESPONSE            RESPONSE NOT OBTAINED 30  Restore Equipment Alignment:
: a. Verify at least    2 CNMT  recirc    a. Start  CNMT  recirc fans  as fans -  RUNNING                          necessary  (240 kw each).
: b. Check  CCW  pumps - ONLY ONE        b. IF two CCW pumps running,      THEN RUNNING                                    manually stop one pump.
: c. Check radiation monitoring            c. Restore sample pumps and systems:                                  radiation monitors as necessary.
o  CNMT  vent sample pump-RUNNING o  Plant vent sample pump-RUNNING o  All area    and process monitors operating    as required
: d. Dispatch    AO to verify proper operation of seal oil system
: e. Verify motor fire    pump breaker-  e. Close motor    fire  pump  breaker.
CLOSED
: f. Verify annunciator L-l,      AUX BLDG f. IF bus 11A or  11B  energized, VENT SYSTEM CONTROL    PANEL-            THEN  dispatch  AO  to restore  AUX EXTINGUISHED                              BLDG  ventilation (Refer to T-35A, AUX AND INTERMEDIATE BUILDING VENTILATION STARTUP AND SHUTDOWN)
: g. Verify service air compressor-        g. Dispatch    AO  to locally start RUNNING                                  service  air  compressor.
: h. Verify MCC    G  - ENERGIZED          h. Manually close breaker.
: i. Check  control board annunciator      i. Perform alarm response panels'--  ADLRM STATUS VALID FOR        procedures for unexpected alarms.
PLANT CONDITIONS
: j. Verify control board valve            ),  Manually align valves as alignment - NORMAL (Refer to              necessary.
0-6.13, DAILY SURVEILLANCE LOG)
 
EOP:
REV: 14 P-ELEC. 1                LOSS OF 12A AND/OR 12B BUSSES PAGE 22 of 22 STEP      ACTION/EXPECTED RESPONSE            RESPONSE NOT OBTAINED 31 Reset UV Relay      Targets  On Undervoltage Cabinets
        ~ Bus 14 Bus 16
        ~ Bus 17
        ~ Bus 18 NOTE:    Refer to 0-9.3,  NRC IMMEDIATE NOTIFICATION, for reporting requirements.
32  Notify Higher Supervision 33  Return To Procedure Or Guidance    In Effect
                                            -END-
 
EOP:
REV: 14 P-ELEC.1          LOSS OF 12A AND/OR 12B BUSSES PAGE 1  of 1 AP-ELEC. 1 APPENDIX LIST TITLE                            PAGES
: 1) FIGURE MIN SUBCOOLING
: 2) ATTACHMENT NC
: 3) ATTACHMENT D/G STOP
 
EOP:            TITLE:
REV  14 P-ELEC.1                LOSS OF 12A AND/OR 12B BUSSES PAGE 1  of  1 FIGURE MIN SUBCOOLING NOTE:    Subcooling Margin = Saturation Temperature From Figure Below  [-]  Core Exit  T/C  Indication RC S PRESSURE  (PSIG) 2500 2400 RCS PRESSURE 2300 INCREHENTS 20 PSIG 2200 2100 2000 1900 1800 1700; 1600 1500 1400 SUBCOOLED 1300                          REGION 1200 1100 1000 900 800 700                                                                INADEQUATE SUBCOOLING 600                                                                  REGION ADVERSE CNHT 500 400 300 200                                        NORHAL CNHT                    TEHPERATURE INCREHENTS 10'F 100 0
200      250      300    350      400    450    500    550      600    650    700 CORE  EXIT SATURATION TEHPERATURE  (')
0
 
EOP:          TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 3 P-ELEC.3                            350'F)                  PAGE 1 of 20 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER ~5 RESPONSIBLE    AGER EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:
 
EOP:        TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW        REV  3 P-ELEC.3 350'F)                  PAGE 2 of 20 A. PURPOSE    This  procedure provides actions to respond to a loss of 12A  or  12B SS  Transformer when RCS temperature is less than 350'F.
B. ENTRY CONDITIONS/SYMPTOMS
: 1. ENTRY CONDITIONS  This      procedure may be entered from:
: a. AP-ELEC.1, LOSS OF 12A AND/OR 12B BUSSES, when busses 12A and/or 12B are found to be deenergized and RCS temperature is less than 350'F.
: 2. SYMPTOMS    -  The symptoms  of loss of N12A or 12B SS Transformer are:
: a. Annunciator L-20,    12A XFMR OR 12A BUS TROUBLE, lit,  or
: b. Annunciator    L-28,  12B XFMR OR 12B BUS TROUBLE, lit.
 
EOP:              TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                REV  3 P-ELEC.3 350'F)                        PAGE 3  of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE NOT OBTAINED CAUTION    o    IF THE RCS IS WATER SOLID, THEN ANY INCREASE IN RCS TEMPERATURE MAY RESULT IN A SIGNIFICANT RCS PRESSURE INCREASE. RCS HEATUP SHOULD BE PREVENTED.
o    OBSERVE D/G LOADING LIMITS OF 2300 KW FOR 1/2 HOUR, 2250 KW FOR 2 HOURS, AND 1950 KW FOR CONTINUOUS SERVICE.
o    ANYTIME EMERGENCY D/GS ARE THE ONLY SOURCE OF AC POWER TO THE PLANT, PERSONNEL SHOULD BE ASSIGNED TO MAINTAIN SURVEILLANCE OF THE D/GS.
o    IF ANY RADIOACTIVE RELEASE IN PROGRESS, THEN IT SHOULD BE TERMINATED UNTIL SUPPORT CONDITIONS ARE EVALUATED.
NOTE:    Conditions should be evaluated for site contingency reporting (Refer to EPIP-1.0, GINNA STATION EVENT EVALUATION AND CLASSIFICATION).
1 Verify Emergency        D/G                IF appropriate emergency D/G(s)  NOT Associated With        Dead Bus-          running, THEN attempt to start RUNNING                                    manually. (Refer to ER-D/G.l, RESTORATION OF A FAILED  D/G.)
o  Bus 12A - D/G A o  Bus 12B - D/G B 2 Verify Both Trains        Of AC            Try to restore power to all AC Emergency Busses Energized To              emergency busses. IF power can NOT At Least 420 VOLTS:                        be restored to at least one train, THEN refer to ECA-O.O, LOSS OF ALL o  Bus 14 and bus 18                      AC POWER.
o  Bus 16 and bus 17
 
EOP:            T!jLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                      REV' P-ELEC.3 350'F)                              PAGE 4    of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE NOT OBTAINED NOTE:  When  restarting equipment for recovery,    it is  preferable to start equipment on busses being supplied from    offsite  power,  if  possible.
3 Verify Service Water        System Operation:
: a. SW  pumps - AT LEAST ONE RUNNING      a. Verify selected    SW  pumps  start IN  EACH LOOP                              on a  timer (40 sec) after D/G start. IF NOT, THEN manually start pumps as conditions permit (258 kw each).
: b. SW header pressure -  GREATER        b. Manually align valves as THAN 40 PSIG  IN EACH LOOP                necessary.
4 Check    CCW Pump    Status:
: a. At  least  one CCW pump - RUNNING      a. Start  one  CCW  pump (124    kw).
: b. Annunciator A-22,  CCW PUMP          b. Start second      CCW  pump (124  kw).
DISCHARGE LO PRESS  60 PSIG EXTINGUISHED
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                REV    3 P-ELEC. 3 350'F)                                      of PAGE 5      20 STEP      ACTION/EXPECTED RESPONSE          RESPONSE NOT OBTAINED 5  Check  RCS  Temperature    STABLE    IF  RCS  temperature increasing,    THEN stabilize temperature using available method.
                                              ~ RHR  normal cooling
                                              ~  Dump  steam and feed
                                              ~  Blowdown and feed IF RCS temperature decreasing,      THEN perform the following:
: a. Stop dumping steam or control RHR normal cooling.
: b. IF cooldown continues,      THEN perform the following:
l)  IF either  MDAFW pump operable,  THEN ensure  TDAFW pump steam  supply valves in PULL STOP.
: 2)  WHEN  S/G level greater  than 5%  in one S/G, THEN  limit feed flow to that required to maintain S/G level.
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                    REV  3 P-ELEC.3 350'F)
PAGE 6  of  20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE,NOT OBTAINED CAUTION    IF REFUELING IN PROGRESS,    THEN STOP REFUELING OPERATIONS (NOTIFY REFUELING SRO).
6 Restore Non-Safeguards Busses As  Follows:
: a. Verify non-safeguards busses-            a. Close non-safeguards bus tie ENERGIZED                                  breaker for affected bus(ses) possible:
if
            ~ Bus 13
            ~ Bus 15                                    ~ Bus 13  to bus 14  tie
                                                        ~ Bus 15  to bus 16  tie
: b. Verify MCC  'A - ENERGIZED              b. Perform the following;
: 1) Ensure the  following pumps in PULL STOP:
                                                          ~ EH  pump A
                                                          ~  Turning gear oil pump
                                                          ~  HP seal oil backup pump
: 2) Close  MCC A  supply breaker from bus 13;
: c. Verify MCC  B  ; ENERGIZED              c. Perform the following:
: 1) Ensure  EH pump B  in PULL STOP.
: 2) Close  MCC B  supply breaker from bus 15.
: d. Check  CNMT  vent sample 'pump-          d. IF  CNMT purge or mini-purge in RUNNING                                    progress, THEN secure purging.
: e. Verify annunciator J-8,    480V  MCC    e. Restore power to other MCCs as SUPPLY BREAKER TRIP                        D/G loading permits.
EXTINGUISHED
                                                        ~ MCC E
                                                        ~ MCC F
                                                        ~ MCC G
: f. Reset control room necessary lighting  if
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                  REV' P-ELEC.3 350'F)
PAGE 7  of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED 7  Check IA System:
: a. Verify at least    2 air              a. Manually start air compressors compressors    - RUNNING                  as necessary (75 kw each).
: b. Check IA supply                      b. Dispatch an    AO  to locally reset and  start air  compressors  as o  Pressure    - GREATER THAN              necessary  (75 kw each).
60 PSIG IF IA can NOT be established, o  Pressure    - STABLE OR                THEN  refer  to AP-IA.l, LOSS OF INCREASING                              INSTRUMENT AIR.
8 Check  RCS    Cooling:
: a. RHR system - PREVIOUSLY ALIGNED      a. Go  to Step 18.
FOR RHR NORMAL COOLING
: b. Check  RHR pumps  - ANY RUNNING      b. IF    RHR normal cooling previously in service,  THEN go to Step 9.
IF RHR normal cooling NOT required, THEN go to Step 18.
: c. Go to Step  11
 
EOP:            TlTLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                    REV    3 P-ELEC. 3 350'F)                            PAGE 8  of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED 9 Establish Conditions          To  Start RHR'ump:
: a. Any  RHR pump    - AVAILABLE              a. IF  RCS level greater than 64  inches,  THEN go to AP-RHR.l, LOSS OF RHR. IF NOT, THEN go to AP-RHR.2, LOSS OF RHR.WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS.
: b. Verify  CCW  cooling to  RHR system      b. Perform the following:
in service
                            - AT LEAST ONE l)  Ensure  at least one  CCW pump o  CCW  pumps                                    running.
RUNNING
: 2) Open MOV-738A and MOV-738B as o  CCW  to  RHR  Hxs, MOV-738A AND              necessary.
MOV-738B - OPEN AS NECESSARY IF CCW can NOT be restored,    THEN continue attempts to restore    CCW (Refer to AP-CCW.3, LOSS OF    CCW PLANT SHUTDOWN).
: c. Place  RHR Hx bypass valve, HCV-626,    to MANUAL and close valve
 
EOP:              TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                    REV:  3 P-ELEC.3 350'F)                          PAGE 9  of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED CAUTION    o  STARTING AN RHR PUMP MAY RESULT IN AN RCS LEVEL OR PRESSURE DECREASE DUE TO SHRINK OR VOID COLLAPSE o  THE RHR HX OUTLET VALVES (HCV-624 AND HCV-625) WILL      FAIL OPEN  ON LOSS OF INSTRUMENT AIR PRESSURE.
10'Restore      RHR  Flow:
: a. Start    one RHR pump
: b. At least one    RHR pump  - RUNNING      b. Go  to Step 10d.
: c. Establish    RHR flow - WITHIN          c. Manually adjust  RHR  flow as LIMITS    OF TABLE BELOW                      necessary.
B LOOP  LEVEL          RHR FLOW 100 - 70 inches      < 3000 gpm
                            < 70 - 30 inches          1400 gpm
                            < 30 - 16 inches        5 1000 gpm
                            < 16 - 10 inches            800 gpm
                            < 10 -  6 inches          500 gpm
: d. RHR  flow  -  RESTORED                  d. IF  RCS  level greater than 64 inches,  THEN go to AP-RHR.l, LOSS OF RHR. IF NOT, THEN go to AP-RHR.2, LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS.
: e. Place  RHR Hx  bypass valve, HCV-626,    controller in  AUTO at desired flowrate This Step continued on the next page.
 
EOP:              TITLE LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                      REV: 3 P-ELEC.3 350'F)                            PAGE 10  of 20 STEP        ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED (Step 10 continued from previous page)
: f. Open RHR pump flow control valves as necessary to stabilize RCS temperature
              ~ HCV-624
              ~ HCV-625
: g. Check core      exit  T/Cs, - STABLE OR    g    Start another    RHR pump or DECREASING                                      increase  RHR flow to establish required RCS cooling. ,DO NOT exceed RHR flow    limits from table above.
11 Check AFW Pump            Status:
: a. AFW pumps    - ANY RUNNING                a. Go  to Step 12.
: b. Both S/G levels - AT        DESIRED        b. Continue with Step 12.      WHEN LEVEL                                          desired  S/G  levels established, THEN do  Step  llc.
: c. Stop running AFW pumps and place switches in PULL STOP 12  Evaluate        RCS  Conditions:
: a. Check      RCS  status:                      a. IF  RCS  is  open to atmosphere, THEN go  to Step 17.
o  RCS  - CLOSED o  RCS  pressure    - GREATER THAN ATMOSPHERIC
: b. Verify RCP 81 seal D/Ps                      b. IF any    RCP running with Cl seal GREATER THAN 220 PSID                          D/P  less than 220 psid, THEN stop affected    RCP.
 
EOP:            TITLE:
REV: 3 LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW P-ELEC.3                                  350'F)                            PAGE 11    of 20 STEP      ACTION/EXPECTED RESPONSE            RESPONSE NOT OBTAINED 13 Check    Charging    Pump  Suction Aligned    To VCT:
: a. VCT level  - GREATER THAN 20%            IF VCT  level  can  NOT be maintained greater than    5%, THEN perform the following:
: 1) Ensure charging pump suction aligned to  RWST o  LCV-112B open o  LCV-112C  closed
: 2) Continue    with Step 14. WHEN VCT level greater    than  20%,
THEN do Step 13b.
: b. Verify cha'rging pumps aligned to    b. Manually align valves as VCT                                      necessary.
o  LCV-112C open o  LCV-112B closed 14 Check Charging Pumps  ANY                IF charging pumps required,      THEN CHARGING PUMP RUNNING                    perform the following:
: a. Verify charging to loop    B  cold leg,  AOV-294, open.
: b. Verify charging. flow control valve, HCV-142, open as necessary.
: c. IF desired, THEN place letdown pressure controller, PCV-135, in MANUAL.
: d. Start  one charging  pump (75 kw each pump).
: e. Increase charging pump speed and control PCV-135 as necessary to control  PRZR  pressure or level.
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                    REV' P-ELEC. 3 350'F)                            PAGE 12  of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE NOT OBTAINED 15  Monitor    RCS    Pressure:
: a. Pressure    - LESS THAN 390 PSIG      a. IF  RCS  is solid,  THEN control charging and letdown pressure control valve (PCV-135) as necessary to stabilize RCS pressure.
IF PRZR bubble established,    THEN operate normal or auxiliary spray to decrease pressure.
: b. Pressure    - STABLE                    b. Stabilize    RCS  pressure using appropriate means.
                                                      ~ Charging
                                                      ~ Letdown
                                                      ~ PCV-135    (solid)
                                                      ~ Normal spray
                                                      ~ Auxiliary spray
                                                      ~ PRZR  heaters 16 Check PRZR          Level:
: a. Narrow range      level - ON SCALE      a. IF RCS is    solid,  THEN go to Step 17.
: b. Level -    TRENDING TO PROGRAM          b. Adjust charging pump speed as necessary to control PRZR level.
17  Monitor RCS Temperature
: a. Core exit T/Cs - STABLE OR              a. Adjust  RCS cooling as necessary DECREASING                                and  return to Step 3.
                                                      ~  S/G steaming
                                                      ~  S/G feeding
                                                      ~  RHR  cooling
: b. Go to Step    26
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                  REV    3 P-ELEC. 3 350'F)                            PAGE 13  of 20 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 18 Check AFW System      Status:
: a. Verify TDAFW pump steam supply        a. IF S/Gs providing heat sink, valves in PULL STOP                      THEN perform the following:
l) Verify adequate    MDAFW  flow.
: 2) Pull stop  TDAFW pump.
: 3) Adjust AFW flow as necessary to stabilize S/G level and RCS  temperature.
: b. Verify MDAFW pump crosstie          b. Ensure at least one      MDAFW pump valves closed                            off. IF    two pumps  required, THEN close both  MDAFW pump
          ~  MOV-4000A                              crosstie valves.
174'tart
          ~  MOV-4000B 19 Check Any S/G.      Level  GREATER              MDAFW  pumps as  necessary  to THAN                                    restore<<S/G level.
20 Check RCS Pressure          GREATER      Increase RCS pressure to greater THAN 300 PSIG                            than 300 psig. IF RCP @1 seal D/P can NOT be maintained greater than 220 psid, THEN trip any running RCP.
21 Check RCP      Status  ANY RCP          Verify natural circulation (Refer RUNNING                                  to Attachment NC). IF natural circulation NOT verified, THEN increase dumping steam,
 
EOP:            T!TLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                  REV: 3 P-ELEC.3 350'F)                             PAGE 14  of 20 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 22  Monitor    RCS  Temperature            Control S/G ARVs to stabilize RCS STABLE OR DECREASING                      temperature. IF S/G ARVs do NOT provide adequate cooling, THEN perform the following:
: a. Initiate  S/G blowdown from  both S/Gs.
: b. Maintain both S/G levels stable by controlling    AFW  flow.
23 .Check CVCS      Operation:
: a. Charging pumps - AT LEAST    ONE      a. Perform the following:
RUNNING
: 1) Start charging pumps as necessary.
: 2) Establish greater than    20 gpm charging line flow.
: b. Check letdown indications:            b. Perform the following:
o  Check PRZR    level - GREATER          1) Close loop B cold leg to THAN 13%                                  REGEN HxI AOV-427.
o  Letdown flow - APPROXIMATELY          2) Close letdown orifice valves 40  GPM                                  (AOV-200A, AOV-200B, and AOV-202) o  Letdown flow - STABLE
: 3) IF  PRZR level greater than 13%, THEN go to Step 24.      IF NOT, THEN continue with Step 26. WHEN PRZR  level greater than    13%, THEN do Steps 24 and 25.
: c. Adjust charging pump speed and HCV-142 as necessary to restore PRZR level and labyrinth seal D/P
: d. Go to Step    25
 
EOP:            T1TLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                      REV: 3 P-ELEC.3 350'F)                          PAGE 15  of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE NOT OBTAINED NOTE:   Steps 24 and 25 may be performed concurrently.
24  Establish Normal Letdown:                      Perform the following steps    in sequence  to establish excess
: a. Establish charging    line flow to        letdown:
REGEN Hx    - GREATER THAN 20  GPM o  Place excess letdown  divert
: b. Verify the following switches in              valve, AOV-312, to  NORMAL CLOSE '
o  Ensure CCV from excess  letdown Letdown    orifice valve                    open, AOV-745 (AOV-200A, AOV-200B, and AOV-202)                                o  Ensure  RCP seal return isolation
          ~  Loop B cold leg to REGEN Hx                valve open,  MOV-313 AOV-427 o  Open excess letdown  isolation
: c. Place letdown controllers in                  valve,  AOV-310 MANUAL at 40%    open o  Slowly open HCV-123 to maintain
          ~ TCV-130                                      excess letdown temperature less
          ~ PCV-135                                      than 195'F and pressure less than 100 psig
: d. Open AOV-427
: e. Open letdown    orifice valves  as necessary
: f. Place TCV-130    in AUTO  at 105'F
: g. Place PCV-135    in AUTO. at 250  psig
: h. Adjust charging pump speed and HCV-142 as necessary
 
EOP:              T1TLE:
REV4 3 P-ELEC.            LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW 3
350'F)
PAGE 16    of 20 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE    NOT OBTAINED 25  Verify PRZR Heaters Restored:                  IF  PRZR heaters required,      THEN perform the following:
o  PRZR proportional      heater breaker CLOSED.                                  a. Verify adequate D/G capacity available for PRZR heaters (400 o  PRZR  backup heater    breaker-              kw each  bank).
RESET/IN AUTO
: b. Reset and close      PRZR proportional heater breaker nec'essary.
if
: c. Reset    PRZR  backup heater breaker and  return to  AUTO  if necessary.
IF at least    100 kw  of PRZR  heaters can  NOT  be  restored,  THEN  refer to ITS  3.4.9.
NOTE:    Check ITS    section 3.8 for limiting conditions for operation.
26  Restore Normal Electric System Alignment:
: a. Verify circuit      767  and/or 751-        a. Continue with Step 28.        WHEN AVAILABLE                                      offsite power available,      THEN do Steps 26b, c, d and 27.
: b. Restore power to 12A and/or        12B bus (Refer to ER-ELEC.1, RESTORATION OF OFFSITE 'POWER)
: c. Verify all emergency AC bus                  c. Restore emergency AC busses to normal feed breakers - CLOSED                  normal power supply (Refer to ER-ELEC.1, RESTORATION OF
          ~  Bus  14                                      OFFSITE POWER)
          ~  Bus  16
          ~  Bus  17
          ~  Bus  18
: d. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G    STOP)
 
EOP:              TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                        REV    3 P-ELEC.3 350'F)
PAGE 17    of 20 STEP        ACTION/EXPECTED RESPONSE                RESPONSE    NOT OBTAINED 27 Check Started:
If An RCP      Should    Be
: a. Check the following:                      a. Go  to Step 28.
o  Both  RCPs  - OFF o  RCP  operation  -. DESIRED
      ~  b. RCS  pressure -    APPROXIMATELY          b. Control PRZR heaters and/or 325 PSIG                                        charging pump speed as necessary to restore RCS pressure.
: c. Check  PRZR  level  - LESS THAN 38%      c. Verify S/G temperature        (obtained locally in  CNMT  at  S/G handhole) less tha'n  RCS cold  leg temperature. IF  NOT, THEN go  to Step 28.
: d. Try to  start  an  RCP                  d. IF an    RCP  can  NOT  be started, THEN  continue to monitor natural
: 1) Establish conditions      for              circulation conditions (Refer to starting an RCP                            Attachment    NC),.
a) Bus  llA or  11B  energized b) Refer to Attachment      RCP START
: 2)  Start  one RCP 28 Check RCS Temperature                            Adjust    RCS cooling  as necessary.
STABLE OR DECREASING
                                                        ~  S/G steaming
                                                        ~  S/G feeding
                                                        ~  RHR  cooling
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                REV' P-ELEC.3 350'F)
PAGE 18  of 20 STEP      ACTION/EXPECTED RESPONSE          RESPONSE NOT OBTAINED 29  Establish Normal Shutdown Alignment:
a, Verify turning gear oil pump-        a. IF turbine    oil system operation RUNNING                                required,  THEN  perform the following:
: 1) Manually  start turning  gear oil pump  (42 kw).
: 2) Dispatch  AO to place turbine on  turning gear  if desired.
: b. Verify main generator-              b. Perform the following:
DEPRESSURIZED
: 1) Manually start the    HP seal oil backup pump
: 2) Dispatch  AO to locally perform the following:
o  Verify proper operation of the seal oil system (Refer to T-34B, GENERATOR SEAL OIL  SYSTEM NORMAL OPERATION).
o  Ensure bearing  drain vapor extractor running.
o  Ensure main lube    oil reservoir vapor extractor running.
: c. Check  RCS  temperature - LESS      c. Perform the following:
THAN  135'F
: 1) Ensure one Rx compartment cooling fan running (23 kw).
: 2) Ensure one    control rod shroud fan running (45 kw).
: d. Dispatch AO to start waste gas compressor as necessary
 
EOP:            T!TLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                      REV    3 P-ELEC. 3 350'F)
PAGE 19  of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE NOT OBTAINED 30  Restore Equipment Alignment:
: a. Verify at least    1 CNMT  recirc        a. Start CNMT recirc fans as fan  - RUNNING                                necessary (240 kw each).
: b. Verify annunciator    L-l,  AUX BLDG    b. IF bus  llA or  11B  energized, VENT SYSTEM CONTROL    PANEL-                THEN  dispatch  AO  to restore  AUX EXTINGUISHED                                  BLDG ventillation (Refer to T-35A, AUX  AND INTERMEDIATE BUILDING VENTILLATION STARTUP AND SHUTDOWN)
: c. Check radiation monitoring                c. Perform the following:
systems:
: 1) Restore sample pumps and o  CNMT  vent sample  pump                    radiation monitors    as RUNNING                                      necessary.
o  Plant vent sample                        2) Restart                or ifpurge pump                              CNMT RUNNING                                      mini-purge      desired.
o  All area  and process monitors operating  as required
: d. Verify service air compressor-            d. Dispatch  AO  to locally start RUNNING                                      service desired.
air  compressor    if P
: e. Verify motor fire    pump  breaker-      e. Close motor    fire  pump  breaker.
CLOSED
: f. Check  control board annunciator          f. Perform alarm response panels -  ALARM STATUS VALID FOR            procedures for unexpected alarms.
PLANT CONDITIONS
: g. Verify control board valve                g. Manually  align valves    as alignment - NORMAL (Refer to                necessary.
0-6.13, DAILY SURVEILLANCE LOG)
 
EOP:            TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW                  REV:  3 P-ELEC. 3 350'F)
PAGE 20    of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED 31 Check    Status Of    DC  System Loads:
: a. Verify emergency  DC  lube  oil        a. Manually stop emergency  DC  lube pump - OFF                                  oil pump,
: b. Verify  TDAFW pump DC  oil pump-      b. Perform the following:
OFF
: 1) Ensure  TDAFW AC oil pump running.
: 2) Stop  TDAFW pump DC oil pump.
: c. Verify both  MFW pump DC  oil        c. Stop  MFW  pump DC oil pumps.
pumps - OFF 32  Verify Offsite Power                      Continue attempts to restore RESTORED                                    offsite  power (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER).
33  Notify Higher Supervision NOTE:    Refer to 0-9.3,  NRC IMMEDIATE NOTIFICATION,  for reporting requirements.
34  Return To Procedure Or Guidance .In    Effect
                                            -END-
 
EOP:      TITLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW    REV: 3 P-ELEC.3                          350'F)                PAGE 1 of 1 AP-ELEC. 3 APPENDIX LIST TITLE                            PAGES
: 1) FIGURE MIN SUBCOOLING
: 2) ATTACHMENT RCP START
: 3) ATTACHMENT NC
: 4) ATTACHMENT D/G STOP
 
EOP:            T!TLE:
LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW              REV: 3 P-ELEC.3 350'F)
PAGE 1  of  1 FIGURE 'MIN SUBCOOLING NOTE:    Subcooling Margin = Saturation Temperature From Figure Below  t'-] Core Exit T/C Indication RC S PRESSURE  (PSIG) .
2500 2400 2300            RCS PRESSURE INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1400 SUBCOOLED 1300                          REGION 1200 1100 1000 900
'00 700                                                              INADEQUATE SUBCOOL ING 600                                                                REGION ADVERS E CNM 500 400 300 200                                        NORMAL CNMT                  TEMPERATURE 100                                                                    INCREMENTS 10'F 0
200      250      300    350      400    450      500  550      600    650    700 CORE  EXIT SATURATION TEMPERATURE ('F)}}

Latest revision as of 10:19, 4 February 2020

Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses.
ML17264A975
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/05/1997
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17264A976 List:
References
AP-ELEC.1, NUDOCS 9708130116
Download: ML17264A975 (60)


Text

EOP: TITLE:

REV 14 P-ELEC.1 LOSS OF 12A AND/OR 12B- BUSSES PAGE 1 of 22 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER RESPONSIBLE AGER EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:

q708i30iih 970805 05000244 PDR ADOCK F PDR

EOP:

REV: 14 P-ELEC.1 LOSS OF 12A AND/OR 12B BUSSES PAGE 2 of 22 A. PURPOSE - This procedure provides actions to respond to a loss of 12A and/or 12B Busses from HSD or at power conditions.

B. ENTRY CONDITIONS/SYMPTOMS

1. ENTRY CONDITIONS This procedure may be entered from:
a. AP-TURB.2, TURBINE LOAD REJECTION, when busses 12A and/or 12B are found to be deenergized.
2. SYMPTOMS The symptoms of loss of g12A or 12B SS Transformer are:
a. Annunciator L-20, 12A XFMR OR 12A BUS TROUBLE, lit, or
b. Annunciator L-28, 12B XFMR OR 12B BUS TROUBLE, lit.

EOP: T!TLE REV 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 3 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION o IF, AT ANY TIME DURING THIS PROCEDURE, A REACTOR TRIP OR SI OCCURS, E-O, REACTOR TRIP OR SAFETY INJECTION, SHALL BE PERFORMED.

o IF'CS TEMPERATURE IS < 350'F, THEN AP-ELEC.3, LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW 350'F) SHOULD BE PERFORMED.

o IF A TURBINE RUNBACK HAS OCCURRED, THEN AP-TURB.2, TURBINE LOAD REJECTION, SHOULD BE PERFORMED.

o IF ANY RADIOACTIVE RELEASE IN PROGRESS, THEN IT SHOULD BE TERMINATED UNTIL SUPPORT CONDITIONS ARE EVALUATED.

o OBSERVE D/G LOADING LIMITS OF 2300 KW FOR 1/2 HOUR, 2250 KW FOR 2 HOURS, AND 1950 KW FOR CONTINUOUS SERVICE.

o DO NOT ATTEMPT TO ENERGIZE A BUS THAT IS POTENTIALLY FAULTED.

NOTE: o Conditions should be evaluated for site contingency reporting (Refer to EPIP-1.0, GINNA STATION EVENT EVALUATION AND CLASSIFICATION).

o AP-ELEC.14/16, LOSS OF SAFEGUARDS BUS 14/16 AND AP-ELEC.17/18, LOSS OF SAFEGUARDS BUS 17/18 provide additional guidance for the loss of safeguards busses.

1 Establish Manual Rod Control a, Place Rod Control Bank Selector Switch to MANUAL

b. Verify control rod motion stops b. Manually trip the reactor and go to E-O, REACTOR TRIP OR SAFETY INJECTION.
c. Manually move control rods as necessary

EOP:

REV: 14 P-ELEC.l LOSS OF 12A AND/OR 12B BUSSES PAGE 4 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 2 Verify Emergency D/G IF appropriate emergency D/G(s) NOT Associated With Dead Bus- running, THEN attempt to start RUNNING manually. (Refer to ER-D/G.l, RESTORATION OF A FAILED D/G.)

o Bus 12A - D/G A o Bus 12B - D/G B 3 Verify Both Trains Of AC Try to restore power to all AC Emergency Busses Energized To emergency busses. IF power can NOT At Least 420 VOLTS: be restored to at least one train, THEN refer to ECA-O.O, LOSS OF ALL o Bus 14 and bus 18 AC POWER, Step 1.

o Bus 16 and bus 17 4 Verify Service Water System Operation:

a. SW pumps - AT LEAST ONE RUNNING a. Verify selected SW pumps start IN EACH LOOP on a timer (40 sec) after D/G start. IF NOT, THEN manually start pumps as naaassary (258 ku each),
b. SW header pressure - GREATER b. Manually align valves as THAN 40 PSIG IN EACH LOOP . necessary.

5 Check CCW Pump Status:

a. At least one CCW pump - RUNNING a. Start one CCW pump (124 kw).
b. Annunciator A-22, CCW PUMP b, Start second CCW pump (124 kw).

DISCHARGE LO PRESS 60,PSIG EXTINGUISHED

EOP:

REV'4 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 5 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

'6 Verify Bus 11A And 11B Normal IF turbine trip has occurred from Feed Breakers CLOSED power less than 50%, THEN go to AP-TURB.1, TURBINE TRIP WITHOUT RX TRIP REQUIRED, Step l.

IF turbine stop valves open, THEN trip turbine and go to AP-TURB.1, TURBINE TRIP WITHOUT RX TRIP REQUIRED, Step 1.

IF turbine NOT previously latched, THEN perform the following:

a. Ensure reactor power less than 8a.
b. Go to Step 16.

7 Verify Annunciator H-16, Dispatch AO to locally reset and INSTRUMENT AIR COMP start IA compressors as necessary.

EXTINGUISHED 8 Monitor S/G Level Control: Place MFW regulating valves in MANUAL and control feed flow as o S/G level - TRENDING TO 52% necessary.

o MFW regulating valves CONTROLLING IN AUTO

EOP: TlTLE REV: 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 6 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: When restarting equipment for recovery, it is preferable to start equipment on busses being supplied from offsite power, if possible.

9 Check CVCS Operation:

a. Charging pumps - AT LEAST ONE a. Perforln the following:

RUNNING

1) Close loop B cold leg to REGEN Hx, AOV-427.

2)'tart charging pumps as necessary.

3) Establish greater than 20 gpm charging line flow.

Check letdown indications: b. Perform the following:

o Check PRZR level - GREATER 1) Close loop B cold leg to THAN 13% REGEN Hx, AOV-427.

o Letdown flow - APPROXIMATELY 2) Close letdown orifice valves 40 GPM (AOV-200A, AOV-200B, and AOV-202) o Letdown flow - STABLE

3) IF PRZR level greater than 13%, THEN go to Step 10. IF NOT, THEN continue with Step 12. WHEN PRZR level greater than 13$ , THEN do Steps 10 and 11.
c. Adjust charging pump speed and HCV-142 as necessary to restore PRZR level and labyrinth seal D/P
d. Go to Step ll

EOP: TITLE:

REV'4 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 7 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Steps 10 and 11 may be performed concurrently.

10 Establish Normal Letdown: Perform the following steps in sequence to establish excess

a. Establish charging line flow to letdown:

REGEN Hx - GREATER THAN 20 GPM o Place excess letdown divert

b. Verify the following switches in valve, AOV-312, to NORMAL CLOSE:

o Ensure CCW from excess letdown

~ Letdown orifice valve open, AOV-745 (AOV-200A, AOV-200B, and AOV-202) o Ensure RCP seal return isolation

~ Loop B cold leg to REGEN Hx valve open, MOV-313 AOV-427 o Open excess letdown isolation

c. Place letdown controllers in valve, AOV-310 MANUAL at 40% open o Slowly open HCV-123 to maintain

~ TCV-130 excess letdown temperature less

~ PCV-135 than 195'F and pressure less than 100 psig

d. Open AOV-427
e. Open letdown orifice valves as necessary
f. Place TCV-130 in AUTO at 105'F .

g, Place PCV-135 in AUTO at 250 psig

h. Adjust charging pump speed and HCV-142 as necessary

EOP: 71TLE:

REV: 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 8 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 11 Verify PRZR Heaters Restored: IF adequate D/G capacity available for PRZR heaters (400 kw each o PRZR proportional heater breaker bank), THEN perform the following:

CLOSED

a. Reset and close PRZR o PRZR backup heater breaker- proportional heater breaker if RESET/IN AUTO necessary,
b. Reset PRZR backup heater breaker and return to AUTO if necessary.

r IF adequate D/G capacity NOT available, THEN refer to ER-PRZR.1.

12 Verify Normal Rod Control Restored:

a. Annunciator C-5, PPCS ROD a. Go to AP-RCC.2, RCC/RPI SEQUENCE OR ROD DEVIATION MALFUNCTION.

EXTINGUISHED

b. Annunciator E-28, POWER RANGE b. Perform the following:

ROD DROP ROD STOP - EXTINGUISHED

1) Place rod control bank selector switch in MANUAL.
2) Reset NIS rod drop rod stop signals (at NIS racks) as necessary,
c. Annunciator F-15, RCS TAVG DEV c. Go to step 13.

4'F - EXTINGUISHED

d. Place rod control bank selector switch in AUTO if desired

EOP: TITLE:

REV: 14 P-ELEC. 1 LOSS OF 12A'ND/OR 12B BUSSES PAGE 9 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 13 Establish Stable Plant Conditions:

a. Check Tavg - TRENDING TO TREF a. Insert control rods or, if necessary, decrease turbine load to match Tavg to Tref.
b. Check PRZR pressure - TRENDING b. Verify proper operation of PRZR TO 2235 PSIG heaters and spray or take manual control of PRZR pressure controller 431K.
c. Check PRZR level - TRENDING TO c. Verify proper operation of PROGRAM charging pump speed controllers or take manual control of speed controllers to control PRZR level.

NOTE: Power operation 3.8 are met.

may continue if conditions required by ITS section 14 Restore Normal Electric System Alignment:

a. Verify circuit 767 and/or 751- a. Continue with Step 15. WHEN AVAILABLE offsite power available, THEN do Steps 14b, c and d.
b. Restore power to 12A and/or 12B bus (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER)
c. Verify all emergency AC bus c. Restore emergency AC busses to normal feed breakers - CLOSED normal power supply (Refer to ER-ELEC.1, RESTORATION OF

~ Bus 14 OFFSITE POWER)

~ Bus 16

~ Bus 17

~ Bus 18

d. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)

EOP:

REV 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 10 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 15 Establish Normal Plant Conditions:

a. Verify EH control in OPER PAN a. IF conditions requiring runback and IMP IN have cleared, THEN place EH in OPER PAN and IMP IN.
b. Ensure steam dump controller, HC-484, in AUTO at 1005 psig
c. Verify annunciator G-15, STEAM c. IF Tavg within 5'F of Tref, THEN DUMP ARMED - EXTINGUISHED perform the following:
1) Ensure steam dump valves closed.
2) Reset steam dump.
d. Verify 2 charging pumps - RUNNING d. Perform the following:
1) Manually start charging pumps as necessary.
2) Place selected charging pump speed controller in AUTO desired.

if

e. Verify Rod Control Selector e. Place Rod Control Selector Switch in AUTO Switch in AUTO if desired,
f. Go to Step 29

EN>:

REV'4 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 11 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o Following RCP trip, a decrease in idle S/G level may occur. Also, swell may be anticipated in the operating S/G due to load pickup froIn the idle loop.

o Temperatures in the loop with the stopped RCP will not be indicative of true Tavg and hT values.

o If only one RCP is operating, refer to AP-RCS.2, LOSS OF REACTOR COOLANT FLOW.

o Attempts to restore offsite power should continue (Refer to ER-ELEC.l> RESTORATION OF OFFSITE POWER'.)

16 Check Secondary Heat Sink Status:

a. Any main feed pump - RUNNING a. Perform the following:

l) Verify MDAFW pumps running as necessary.

2) Verify TDAFW necessary.

pump running if

3) Ensure Rx power less than 2S.
b. Verify S/G levels - TRENDING TO b. Control feed flow as necessary 52% to restore S/G level.

4 TITLE:

REV'4 P-ELEC.1 LOSS OF 12A AND/OR 12B BUSSES PAGE 12 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 17 Check TDAFW- Pump Status:

a. TDAFV pump - RUNNING a. Go to Step 18.
b. Check S/G status b. Go to Step 18.

o At least one S/G level-GREATER THAN 17%

-OR-o Both MDAFW pumps - OPERABLE

c. Pull stop TDAFW pump steam supply valves

~ MOV-3504A

~ MOV-3505A 18 Check Any RCP RUNNING Verify natural circulation. (Refer to Attachment NC.) IF natural" circulation can NOT be verified, THEN increase dumping steam.

19 Establish Condenser Steam Dump Pressure Control:.

a. Verify condenser available: a. Perform the following:

o Any MSIV - OPEN 1) Place S/G ARV controllers in AUTO at 1005 psig and verify o Annunciator G-15, STEAM DUMP proper operation. IF S/G ARMED - LIT ARVs NOT controlling in AUTO, THEN control S/G ARVs manually.

2) Go to Step 20.
b. Adjust condenser steam dump controller HC-484 to 1005 psig in AUTO
c. Place steam dump mode selector switch to MANUAL

EOP: T1TLE:

REV 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 13 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 20 Restore Non-Safeguards Busses As Follows:

a. Verify Bus 13 and 15 - ENERGIZED a. IF offsite power available, THEN attempt to restore offsite power and normal feed to Bus 13/15 (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER).
1) IF offsite power is NOT available, THEN perform the following:

o Close Bus 13 to Bus 14 tie breaker o Close Bus 15 to Bus 16 tie breaker

b. Verify MCC A - ENERGIZED b. Perform the following:
1) Ensure the following pumps in PULL STOP:

~ EH pump A

~ Turning gear oil.pump

~ HP seal oil backup pump

2) Close MCC A supply breaker from bus 13.
c. Verify MCC B - ENERGIZED c. Perform the following:
1) Ensure EH pump B in PULL STOP.
2) Close MCC B supply breaker from bus 15.
d. Verify annunciator J-8, 480V MCC d. Restore power to other MCCs as SUPPLY BREAKER TRIP D/G loading permits.

EXTINGUISHED

e. Reset control room necessary lighting if
f. Reset MAIN XFMR AUX PWR SUPPLY breakers as necessary

~ Bus 13

~ Bus 15

EOP:

REV 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 14 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: When restarting equipment for recovery, it is preferable to start equipment on busses being supplied from offsite power, if possible.

21 Check IA System:

a. Verify at least 2 air a. Manually start air compressors compressors - RUNNING as necessary (75 kw each).
b. Check IA supply b. Dispatch an AO to locally reset and start IA compressors (75 kw o Pressure - GREATER THAN each).

60 PSIG IF IA can NOT be established, o Pressure - STABLE OR THEN refer to AP-IA.1, LOSS OF INCREASING, INSTRUMENT AIR.

22 Verify Instrument Bus D- Energize MCC B. IF MCC B NOT ENERGIZED available, THEN perform the following:

a. Verify MCC A energized.
b. Place instrument bus D on maintenance supply.

EOP $ TITLE$

REV 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 15 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 23 Check CVCS Operation:

a. Charging pumps - AT LEAST ONE a. Perform the following:

RUNNING

1) Close loop B cold leg to REGEN Hx, AOV-427.
2) Start charging pumps as necessary.
3) Establish greater than 20 gpm charging line flow.

b, Check letdown indications: b. Perform the following:

o Check PRZR level - GREATER 1) Close loop B cold leg to THAN 13% REGEN Hx, AOV-427.

o Letdown flow - APPROXIMATELY 2) Close letdown orifice valves 40 GPM (AOV-200A, AOV-200B, and AOV-202) o Letdown flow - STABLE

3) IF PRZR level greater than 13%, THEN go to Step 24. IF NOT, THEN continue with Step 26. WHEN PRZR level greater than 13%, THEN do Steps 24 and 25.
c. Adjust charging pump speed and HCV-142 as necessary to restore PRZR level and labyrinth seal D/P
d. Go to Step 25

EOP: TITLE:

REV: 14 P-ELEC.1 LOSS OF 12A AND/OR 12B BUSSES PAGE 16 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Steps 24 and 25 may be performed concurrently.

24 Establish Normal Letdown: Perform the following steps in sequence to establish excess

a. Establish charging line flow to letdown:

REGEN Hx - GREATER THAN 20 GPM.

o Place excess letdown divert

b. Verify the following switches in valve, AOV-312, to NORMAL CLOSE' o Ensure CCW from excess letdown Letdown orifice valve open, AOV-745 (AOV-200A, AOV-200B, and AOV-202) o Ensure RCP seal return isolation

~ Loop B cold leg to REGEN Hx valve open, MOV-313 AOV-427 o Open excess letdown isolation

c. Place letdown controllers in valve, AOV-310 MANUAL at 40% open o Slowly open HCV-123 to maintain

~ TCV-130 excess letdown temperature less

~ PCV-135 than 195'F and pressure less than 100 psig

d. Open AOV-427.
e. Open letdown orifice valves as necessary.
f. Place TCV-130 in AUTO at 105'F.
g. Place PCV-135 in AUTO at 250 psig,
h. Adjust charging pump speed and HCV-142 as necessary.

EOP: TITLE:

REV: 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 17 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 25 Verify PRZR Heaters Restored: IF adequate D/G capacity available for PRZR heaters (400 kw each o PRZR proportional heater breaker bank), THEN perform the following:

CLOSED

a. Reset and close PRZR o PRZR backup heater breaker- proportional heater breaker if RESET/IN AUTO necessary.
b. Reset PRZR backup heater breaker and return to AUTO if necessary.

IF adequate D/G capacity NOT available, THEN refer to ER-PRZR.1.

26 Establish Stable Plant Conditions:

a. Check Rx power -= LESS THAN a. Ensure rod control bank selector 2.5x10 6 AMPS in MANUAL and insert rods to reduce Rx power as necessary.
b. Check PRZR pressure - TRENDING b. Verify proper operation of PRZR TO 2235 PSIG- heaters and spray or take manual control of PRZR pressure controller 431K,
c. Verify 2 charging pumps - RUNNING c. Perform the following:
1) Manually start charging pumps as necessary.
2) Place selected charging pump speed controller in AUTO if desired.
d. Check PRZR level - between 35% d. Control charging as necessary.

and 40%

e. Check S/G levels -'RENDING TO e. Control feed flow as necessary 52% to restore both S/G levels to 52%.
f. Check RCS Tavg - GREATER THAN f. Cont'rol dumping steam as 540'F necessary. IF cooldown continues, THEN close both MSIVs.

EOP:

REV 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 18 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION ANYTIME EMERGENCY D/GS ARE THE ONLY SOURCE OF AC POWER TO THE PLANT, PERSONNEL SHOULD BE ASSIGNED TO MAINTAIN SURVEILLANCE OF THE D/GS.

27 Restore Normal Electric System Alignment:

a. Verify circuit 767 and/or 751 a. Continue with Step 28; WHEN AVAILABLE offsite power available, THEN do Steps 27b, c and d.
b. Restore power to 12A and/or 12B bus if necessary (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER)
c. Verify all emergency AC bus c. Restore emergency AC busses to normal feed breakers - CLOSED normal power supply (Refer to ER-ELEC.1, RESTORATION OF

~ Bus 14 OFFSITE POWER)

~ Bus 16

~ Bus 17

~ Bus 18

d. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)

t' 0

EOP:

REV 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 19 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Evaluate conditions to determine turning gear, if turbine should be placed on 28 Establish Normal Shutdown Alignment:

a. Verify turning gear oil pump- a. Perform the following:

RUNNING

1) Manually start turning gear oil pump (42 kw).
2) Break vacuum to accelerate turbine coastdown.
3) Continue with Step 28b. WHEN shaft stops, THEN dispatch AO to place turbine on turning gear.

'b. Verify adequate Rx head cooling:

l) Verify at least one control l) Manually start one fan as rod shroud fan - RUNNING power supply permits (45 kw).

2) Verify one Rx compartment 2) Manually start one fan as cooling fan - RUNNING power supply permits (23 kw).
c. Dispatch AO to start waste gas compressor as necessary
d. Dispatch AO to restore SFP cooling as necessary

EOP:

REV: 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 20 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 29 Check Status Of DC System Loads:

a. Verify turb emergency DC lube a. Manually stop emergency DC lube oil pump - OFF oil pump.
b. Verify TDAFV pump DC oil pump- b. Perform the following:

OFF IN AUTO

1) Ensure TDAFV AC oil pump running.
2) Stop TDAFV pump DC oil pump.
c. Verify both MFW pump DC oil c. Perform the following:

pumps - OFF

1) Ensure associated MFV pump AC oil pump running.
2) Stop MFW pump DC oil pump and place in AUTO

EOP: TITLE:

REV: 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 21 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 30 Restore Equipment Alignment:

a. Verify at least 2 CNMT recirc a. Start CNMT recirc fans as fans - RUNNING necessary (240 kw each).
b. Check CCW pumps - ONLY ONE b. IF two CCW pumps running, THEN RUNNING manually stop one pump.
c. Check radiation monitoring c. Restore sample pumps and systems: radiation monitors as necessary.

o CNMT vent sample pump-RUNNING o Plant vent sample pump-RUNNING o All area and process monitors operating as required

d. Dispatch AO to verify proper operation of seal oil system
e. Verify motor fire pump breaker- e. Close motor fire pump breaker.

CLOSED

f. Verify annunciator L-l, AUX BLDG f. IF bus 11A or 11B energized, VENT SYSTEM CONTROL PANEL- THEN dispatch AO to restore AUX EXTINGUISHED BLDG ventilation (Refer to T-35A, AUX AND INTERMEDIATE BUILDING VENTILATION STARTUP AND SHUTDOWN)
g. Verify service air compressor- g. Dispatch AO to locally start RUNNING service air compressor.
h. Verify MCC G - ENERGIZED h. Manually close breaker.
i. Check control board annunciator i. Perform alarm response panels'-- ADLRM STATUS VALID FOR procedures for unexpected alarms.

PLANT CONDITIONS

j. Verify control board valve ), Manually align valves as alignment - NORMAL (Refer to necessary.

0-6.13, DAILY SURVEILLANCE LOG)

EOP:

REV: 14 P-ELEC. 1 LOSS OF 12A AND/OR 12B BUSSES PAGE 22 of 22 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 31 Reset UV Relay Targets On Undervoltage Cabinets

~ Bus 14 Bus 16

~ Bus 17

~ Bus 18 NOTE: Refer to 0-9.3, NRC IMMEDIATE NOTIFICATION, for reporting requirements.

32 Notify Higher Supervision 33 Return To Procedure Or Guidance In Effect

-END-

EOP:

REV: 14 P-ELEC.1 LOSS OF 12A AND/OR 12B BUSSES PAGE 1 of 1 AP-ELEC. 1 APPENDIX LIST TITLE PAGES

1) FIGURE MIN SUBCOOLING
2) ATTACHMENT NC
3) ATTACHMENT D/G STOP

EOP: TITLE:

REV 14 P-ELEC.1 LOSS OF 12A AND/OR 12B BUSSES PAGE 1 of 1 FIGURE MIN SUBCOOLING NOTE: Subcooling Margin = Saturation Temperature From Figure Below [-] Core Exit T/C Indication RC S PRESSURE (PSIG) 2500 2400 RCS PRESSURE 2300 INCREHENTS 20 PSIG 2200 2100 2000 1900 1800 1700; 1600 1500 1400 SUBCOOLED 1300 REGION 1200 1100 1000 900 800 700 INADEQUATE SUBCOOLING 600 REGION ADVERSE CNHT 500 400 300 200 NORHAL CNHT TEHPERATURE INCREHENTS 10'F 100 0

200 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEHPERATURE (')

0

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 3 P-ELEC.3 350'F) PAGE 1 of 20 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER ~5 RESPONSIBLE AGER EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 3 P-ELEC.3 350'F) PAGE 2 of 20 A. PURPOSE This procedure provides actions to respond to a loss of 12A or 12B SS Transformer when RCS temperature is less than 350'F.

B. ENTRY CONDITIONS/SYMPTOMS

1. ENTRY CONDITIONS This procedure may be entered from:
a. AP-ELEC.1, LOSS OF 12A AND/OR 12B BUSSES, when busses 12A and/or 12B are found to be deenergized and RCS temperature is less than 350'F.
2. SYMPTOMS - The symptoms of loss of N12A or 12B SS Transformer are:
a. Annunciator L-20, 12A XFMR OR 12A BUS TROUBLE, lit, or
b. Annunciator L-28, 12B XFMR OR 12B BUS TROUBLE, lit.

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 3 P-ELEC.3 350'F) PAGE 3 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION o IF THE RCS IS WATER SOLID, THEN ANY INCREASE IN RCS TEMPERATURE MAY RESULT IN A SIGNIFICANT RCS PRESSURE INCREASE. RCS HEATUP SHOULD BE PREVENTED.

o OBSERVE D/G LOADING LIMITS OF 2300 KW FOR 1/2 HOUR, 2250 KW FOR 2 HOURS, AND 1950 KW FOR CONTINUOUS SERVICE.

o ANYTIME EMERGENCY D/GS ARE THE ONLY SOURCE OF AC POWER TO THE PLANT, PERSONNEL SHOULD BE ASSIGNED TO MAINTAIN SURVEILLANCE OF THE D/GS.

o IF ANY RADIOACTIVE RELEASE IN PROGRESS, THEN IT SHOULD BE TERMINATED UNTIL SUPPORT CONDITIONS ARE EVALUATED.

NOTE: Conditions should be evaluated for site contingency reporting (Refer to EPIP-1.0, GINNA STATION EVENT EVALUATION AND CLASSIFICATION).

1 Verify Emergency D/G IF appropriate emergency D/G(s) NOT Associated With Dead Bus- running, THEN attempt to start RUNNING manually. (Refer to ER-D/G.l, RESTORATION OF A FAILED D/G.)

o Bus 12A - D/G A o Bus 12B - D/G B 2 Verify Both Trains Of AC Try to restore power to all AC Emergency Busses Energized To emergency busses. IF power can NOT At Least 420 VOLTS: be restored to at least one train, THEN refer to ECA-O.O, LOSS OF ALL o Bus 14 and bus 18 AC POWER.

o Bus 16 and bus 17

EOP: T!jLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV' P-ELEC.3 350'F) PAGE 4 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: When restarting equipment for recovery, it is preferable to start equipment on busses being supplied from offsite power, if possible.

3 Verify Service Water System Operation:

a. SW pumps - AT LEAST ONE RUNNING a. Verify selected SW pumps start IN EACH LOOP on a timer (40 sec) after D/G start. IF NOT, THEN manually start pumps as conditions permit (258 kw each).
b. SW header pressure - GREATER b. Manually align valves as THAN 40 PSIG IN EACH LOOP necessary.

4 Check CCW Pump Status:

a. At least one CCW pump - RUNNING a. Start one CCW pump (124 kw).
b. Annunciator A-22, CCW PUMP b. Start second CCW pump (124 kw).

DISCHARGE LO PRESS 60 PSIG EXTINGUISHED

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 3 P-ELEC. 3 350'F) of PAGE 5 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 5 Check RCS Temperature STABLE IF RCS temperature increasing, THEN stabilize temperature using available method.

~ RHR normal cooling

~ Dump steam and feed

~ Blowdown and feed IF RCS temperature decreasing, THEN perform the following:

a. Stop dumping steam or control RHR normal cooling.
b. IF cooldown continues, THEN perform the following:

l) IF either MDAFW pump operable, THEN ensure TDAFW pump steam supply valves in PULL STOP.

2) WHEN S/G level greater than 5% in one S/G, THEN limit feed flow to that required to maintain S/G level.

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 3 P-ELEC.3 350'F)

PAGE 6 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE,NOT OBTAINED CAUTION IF REFUELING IN PROGRESS, THEN STOP REFUELING OPERATIONS (NOTIFY REFUELING SRO).

6 Restore Non-Safeguards Busses As Follows:

a. Verify non-safeguards busses- a. Close non-safeguards bus tie ENERGIZED breaker for affected bus(ses) possible:

if

~ Bus 13

~ Bus 15 ~ Bus 13 to bus 14 tie

~ Bus 15 to bus 16 tie

b. Verify MCC 'A - ENERGIZED b. Perform the following;
1) Ensure the following pumps in PULL STOP:

~ EH pump A

~ Turning gear oil pump

~ HP seal oil backup pump

2) Close MCC A supply breaker from bus 13;
c. Verify MCC B  ; ENERGIZED c. Perform the following:
1) Ensure EH pump B in PULL STOP.
2) Close MCC B supply breaker from bus 15.
d. Check CNMT vent sample 'pump- d. IF CNMT purge or mini-purge in RUNNING progress, THEN secure purging.
e. Verify annunciator J-8, 480V MCC e. Restore power to other MCCs as SUPPLY BREAKER TRIP D/G loading permits.

EXTINGUISHED

~ MCC E

~ MCC F

~ MCC G

f. Reset control room necessary lighting if

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV' P-ELEC.3 350'F)

PAGE 7 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 7 Check IA System:

a. Verify at least 2 air a. Manually start air compressors compressors - RUNNING as necessary (75 kw each).
b. Check IA supply b. Dispatch an AO to locally reset and start air compressors as o Pressure - GREATER THAN necessary (75 kw each).

60 PSIG IF IA can NOT be established, o Pressure - STABLE OR THEN refer to AP-IA.l, LOSS OF INCREASING INSTRUMENT AIR.

8 Check RCS Cooling:

a. RHR system - PREVIOUSLY ALIGNED a. Go to Step 18.

FOR RHR NORMAL COOLING

b. Check RHR pumps - ANY RUNNING b. IF RHR normal cooling previously in service, THEN go to Step 9.

IF RHR normal cooling NOT required, THEN go to Step 18.

c. Go to Step 11

EOP: TlTLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 3 P-ELEC. 3 350'F) PAGE 8 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 9 Establish Conditions To Start RHR'ump:

a. Any RHR pump - AVAILABLE a. IF RCS level greater than 64 inches, THEN go to AP-RHR.l, LOSS OF RHR. IF NOT, THEN go to AP-RHR.2, LOSS OF RHR.WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS.
b. Verify CCW cooling to RHR system b. Perform the following:

in service

- AT LEAST ONE l) Ensure at least one CCW pump o CCW pumps running.

RUNNING

2) Open MOV-738A and MOV-738B as o CCW to RHR Hxs, MOV-738A AND necessary.

MOV-738B - OPEN AS NECESSARY IF CCW can NOT be restored, THEN continue attempts to restore CCW (Refer to AP-CCW.3, LOSS OF CCW PLANT SHUTDOWN).

c. Place RHR Hx bypass valve, HCV-626, to MANUAL and close valve

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 3 P-ELEC.3 350'F) PAGE 9 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION o STARTING AN RHR PUMP MAY RESULT IN AN RCS LEVEL OR PRESSURE DECREASE DUE TO SHRINK OR VOID COLLAPSE o THE RHR HX OUTLET VALVES (HCV-624 AND HCV-625) WILL FAIL OPEN ON LOSS OF INSTRUMENT AIR PRESSURE.

10'Restore RHR Flow:

a. Start one RHR pump
b. At least one RHR pump - RUNNING b. Go to Step 10d.
c. Establish RHR flow - WITHIN c. Manually adjust RHR flow as LIMITS OF TABLE BELOW necessary.

B LOOP LEVEL RHR FLOW 100 - 70 inches < 3000 gpm

< 70 - 30 inches 1400 gpm

< 30 - 16 inches 5 1000 gpm

< 16 - 10 inches 800 gpm

< 10 - 6 inches 500 gpm

d. RHR flow - RESTORED d. IF RCS level greater than 64 inches, THEN go to AP-RHR.l, LOSS OF RHR. IF NOT, THEN go to AP-RHR.2, LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS.
e. Place RHR Hx bypass valve, HCV-626, controller in AUTO at desired flowrate This Step continued on the next page.

EOP: TITLE LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 3 P-ELEC.3 350'F) PAGE 10 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED (Step 10 continued from previous page)

f. Open RHR pump flow control valves as necessary to stabilize RCS temperature

~ HCV-624

~ HCV-625

g. Check core exit T/Cs, - STABLE OR g Start another RHR pump or DECREASING increase RHR flow to establish required RCS cooling. ,DO NOT exceed RHR flow limits from table above.

11 Check AFW Pump Status:

a. AFW pumps - ANY RUNNING a. Go to Step 12.
b. Both S/G levels - AT DESIRED b. Continue with Step 12. WHEN LEVEL desired S/G levels established, THEN do Step llc.
c. Stop running AFW pumps and place switches in PULL STOP 12 Evaluate RCS Conditions:
a. Check RCS status: a. IF RCS is open to atmosphere, THEN go to Step 17.

o RCS - CLOSED o RCS pressure - GREATER THAN ATMOSPHERIC

b. Verify RCP 81 seal D/Ps b. IF any RCP running with Cl seal GREATER THAN 220 PSID D/P less than 220 psid, THEN stop affected RCP.

EOP: TITLE:

REV: 3 LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW P-ELEC.3 350'F) PAGE 11 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 13 Check Charging Pump Suction Aligned To VCT:

a. VCT level - GREATER THAN 20% IF VCT level can NOT be maintained greater than 5%, THEN perform the following:
1) Ensure charging pump suction aligned to RWST o LCV-112B open o LCV-112C closed
2) Continue with Step 14. WHEN VCT level greater than 20%,

THEN do Step 13b.

b. Verify cha'rging pumps aligned to b. Manually align valves as VCT necessary.

o LCV-112C open o LCV-112B closed 14 Check Charging Pumps ANY IF charging pumps required, THEN CHARGING PUMP RUNNING perform the following:

a. Verify charging to loop B cold leg, AOV-294, open.
b. Verify charging. flow control valve, HCV-142, open as necessary.
c. IF desired, THEN place letdown pressure controller, PCV-135, in MANUAL.
d. Start one charging pump (75 kw each pump).
e. Increase charging pump speed and control PCV-135 as necessary to control PRZR pressure or level.

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV' P-ELEC. 3 350'F) PAGE 12 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 15 Monitor RCS Pressure:

a. Pressure - LESS THAN 390 PSIG a. IF RCS is solid, THEN control charging and letdown pressure control valve (PCV-135) as necessary to stabilize RCS pressure.

IF PRZR bubble established, THEN operate normal or auxiliary spray to decrease pressure.

b. Pressure - STABLE b. Stabilize RCS pressure using appropriate means.

~ Charging

~ Letdown

~ PCV-135 (solid)

~ Normal spray

~ Auxiliary spray

~ PRZR heaters 16 Check PRZR Level:

a. Narrow range level - ON SCALE a. IF RCS is solid, THEN go to Step 17.
b. Level - TRENDING TO PROGRAM b. Adjust charging pump speed as necessary to control PRZR level.

17 Monitor RCS Temperature

a. Core exit T/Cs - STABLE OR a. Adjust RCS cooling as necessary DECREASING and return to Step 3.

~ S/G steaming

~ S/G feeding

~ RHR cooling

b. Go to Step 26

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 3 P-ELEC. 3 350'F) PAGE 13 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 18 Check AFW System Status:

a. Verify TDAFW pump steam supply a. IF S/Gs providing heat sink, valves in PULL STOP THEN perform the following:

l) Verify adequate MDAFW flow.

2) Pull stop TDAFW pump.
3) Adjust AFW flow as necessary to stabilize S/G level and RCS temperature.
b. Verify MDAFW pump crosstie b. Ensure at least one MDAFW pump valves closed off. IF two pumps required, THEN close both MDAFW pump

~ MOV-4000A crosstie valves.

174'tart

~ MOV-4000B 19 Check Any S/G. Level GREATER MDAFW pumps as necessary to THAN restore<<S/G level.

20 Check RCS Pressure GREATER Increase RCS pressure to greater THAN 300 PSIG than 300 psig. IF RCP @1 seal D/P can NOT be maintained greater than 220 psid, THEN trip any running RCP.

21 Check RCP Status ANY RCP Verify natural circulation (Refer RUNNING to Attachment NC). IF natural circulation NOT verified, THEN increase dumping steam,

EOP: T!TLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 3 P-ELEC.3 350'F) PAGE 14 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 22 Monitor RCS Temperature Control S/G ARVs to stabilize RCS STABLE OR DECREASING temperature. IF S/G ARVs do NOT provide adequate cooling, THEN perform the following:

a. Initiate S/G blowdown from both S/Gs.
b. Maintain both S/G levels stable by controlling AFW flow.

23 .Check CVCS Operation:

a. Charging pumps - AT LEAST ONE a. Perform the following:

RUNNING

1) Start charging pumps as necessary.
2) Establish greater than 20 gpm charging line flow.
b. Check letdown indications: b. Perform the following:

o Check PRZR level - GREATER 1) Close loop B cold leg to THAN 13% REGEN HxI AOV-427.

o Letdown flow - APPROXIMATELY 2) Close letdown orifice valves 40 GPM (AOV-200A, AOV-200B, and AOV-202) o Letdown flow - STABLE

3) IF PRZR level greater than 13%, THEN go to Step 24. IF NOT, THEN continue with Step 26. WHEN PRZR level greater than 13%, THEN do Steps 24 and 25.
c. Adjust charging pump speed and HCV-142 as necessary to restore PRZR level and labyrinth seal D/P
d. Go to Step 25

EOP: T1TLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 3 P-ELEC.3 350'F) PAGE 15 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Steps 24 and 25 may be performed concurrently.

24 Establish Normal Letdown: Perform the following steps in sequence to establish excess

a. Establish charging line flow to letdown:

REGEN Hx - GREATER THAN 20 GPM o Place excess letdown divert

b. Verify the following switches in valve, AOV-312, to NORMAL CLOSE '

o Ensure CCV from excess letdown Letdown orifice valve open, AOV-745 (AOV-200A, AOV-200B, and AOV-202) o Ensure RCP seal return isolation

~ Loop B cold leg to REGEN Hx valve open, MOV-313 AOV-427 o Open excess letdown isolation

c. Place letdown controllers in valve, AOV-310 MANUAL at 40% open o Slowly open HCV-123 to maintain

~ TCV-130 excess letdown temperature less

~ PCV-135 than 195'F and pressure less than 100 psig

d. Open AOV-427
e. Open letdown orifice valves as necessary
f. Place TCV-130 in AUTO at 105'F
g. Place PCV-135 in AUTO. at 250 psig
h. Adjust charging pump speed and HCV-142 as necessary

EOP: T1TLE:

REV4 3 P-ELEC. LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW 3

350'F)

PAGE 16 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 25 Verify PRZR Heaters Restored: IF PRZR heaters required, THEN perform the following:

o PRZR proportional heater breaker CLOSED. a. Verify adequate D/G capacity available for PRZR heaters (400 o PRZR backup heater breaker- kw each bank).

RESET/IN AUTO

b. Reset and close PRZR proportional heater breaker nec'essary.

if

c. Reset PRZR backup heater breaker and return to AUTO if necessary.

IF at least 100 kw of PRZR heaters can NOT be restored, THEN refer to ITS 3.4.9.

NOTE: Check ITS section 3.8 for limiting conditions for operation.

26 Restore Normal Electric System Alignment:

a. Verify circuit 767 and/or 751- a. Continue with Step 28. WHEN AVAILABLE offsite power available, THEN do Steps 26b, c, d and 27.
b. Restore power to 12A and/or 12B bus (Refer to ER-ELEC.1, RESTORATION OF OFFSITE 'POWER)
c. Verify all emergency AC bus c. Restore emergency AC busses to normal feed breakers - CLOSED normal power supply (Refer to ER-ELEC.1, RESTORATION OF

~ Bus 14 OFFSITE POWER)

~ Bus 16

~ Bus 17

~ Bus 18

d. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 3 P-ELEC.3 350'F)

PAGE 17 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 27 Check Started:

If An RCP Should Be

a. Check the following: a. Go to Step 28.

o Both RCPs - OFF o RCP operation -. DESIRED

~ b. RCS pressure - APPROXIMATELY b. Control PRZR heaters and/or 325 PSIG charging pump speed as necessary to restore RCS pressure.

c. Check PRZR level - LESS THAN 38% c. Verify S/G temperature (obtained locally in CNMT at S/G handhole) less tha'n RCS cold leg temperature. IF NOT, THEN go to Step 28.
d. Try to start an RCP d. IF an RCP can NOT be started, THEN continue to monitor natural
1) Establish conditions for circulation conditions (Refer to starting an RCP Attachment NC),.

a) Bus llA or 11B energized b) Refer to Attachment RCP START

2) Start one RCP 28 Check RCS Temperature Adjust RCS cooling as necessary.

STABLE OR DECREASING

~ S/G steaming

~ S/G feeding

~ RHR cooling

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV' P-ELEC.3 350'F)

PAGE 18 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 29 Establish Normal Shutdown Alignment:

a, Verify turning gear oil pump- a. IF turbine oil system operation RUNNING required, THEN perform the following:

1) Manually start turning gear oil pump (42 kw).
2) Dispatch AO to place turbine on turning gear if desired.
b. Verify main generator- b. Perform the following:

DEPRESSURIZED

1) Manually start the HP seal oil backup pump
2) Dispatch AO to locally perform the following:

o Verify proper operation of the seal oil system (Refer to T-34B, GENERATOR SEAL OIL SYSTEM NORMAL OPERATION).

o Ensure bearing drain vapor extractor running.

o Ensure main lube oil reservoir vapor extractor running.

c. Check RCS temperature - LESS c. Perform the following:

THAN 135'F

1) Ensure one Rx compartment cooling fan running (23 kw).
2) Ensure one control rod shroud fan running (45 kw).
d. Dispatch AO to start waste gas compressor as necessary

EOP: T!TLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV 3 P-ELEC. 3 350'F)

PAGE 19 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 30 Restore Equipment Alignment:

a. Verify at least 1 CNMT recirc a. Start CNMT recirc fans as fan - RUNNING necessary (240 kw each).
b. Verify annunciator L-l, AUX BLDG b. IF bus llA or 11B energized, VENT SYSTEM CONTROL PANEL- THEN dispatch AO to restore AUX EXTINGUISHED BLDG ventillation (Refer to T-35A, AUX AND INTERMEDIATE BUILDING VENTILLATION STARTUP AND SHUTDOWN)
c. Check radiation monitoring c. Perform the following:

systems:

1) Restore sample pumps and o CNMT vent sample pump radiation monitors as RUNNING necessary.

o Plant vent sample 2) Restart or ifpurge pump CNMT RUNNING mini-purge desired.

o All area and process monitors operating as required

d. Verify service air compressor- d. Dispatch AO to locally start RUNNING service desired.

air compressor if P

e. Verify motor fire pump breaker- e. Close motor fire pump breaker.

CLOSED

f. Check control board annunciator f. Perform alarm response panels - ALARM STATUS VALID FOR procedures for unexpected alarms.

PLANT CONDITIONS

g. Verify control board valve g. Manually align valves as alignment - NORMAL (Refer to necessary.

0-6.13, DAILY SURVEILLANCE LOG)

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 3 P-ELEC. 3 350'F)

PAGE 20 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 31 Check Status Of DC System Loads:

a. Verify emergency DC lube oil a. Manually stop emergency DC lube pump - OFF oil pump,
b. Verify TDAFW pump DC oil pump- b. Perform the following:

OFF

1) Ensure TDAFW AC oil pump running.
2) Stop TDAFW pump DC oil pump.
c. Verify both MFW pump DC oil c. Stop MFW pump DC oil pumps.

pumps - OFF 32 Verify Offsite Power Continue attempts to restore RESTORED offsite power (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER).

33 Notify Higher Supervision NOTE: Refer to 0-9.3, NRC IMMEDIATE NOTIFICATION, for reporting requirements.

34 Return To Procedure Or Guidance .In Effect

-END-

EOP: TITLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 3 P-ELEC.3 350'F) PAGE 1 of 1 AP-ELEC. 3 APPENDIX LIST TITLE PAGES

1) FIGURE MIN SUBCOOLING
2) ATTACHMENT RCP START
3) ATTACHMENT NC
4) ATTACHMENT D/G STOP

EOP: T!TLE:

LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW REV: 3 P-ELEC.3 350'F)

PAGE 1 of 1 FIGURE 'MIN SUBCOOLING NOTE: Subcooling Margin = Saturation Temperature From Figure Below t'-] Core Exit T/C Indication RC S PRESSURE (PSIG) .

2500 2400 2300 RCS PRESSURE INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1400 SUBCOOLED 1300 REGION 1200 1100 1000 900

'00 700 INADEQUATE SUBCOOL ING 600 REGION ADVERS E CNM 500 400 300 200 NORMAL CNMT TEMPERATURE 100 INCREMENTS 10'F 0

200 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEMPERATURE ('F)