{{#Wiki_filter:ATTACHMENT 2TOAEP:NRC:0896K PROPOSEDREVISEDTECHNICAL SPECIFICATION PAGES9f20400i889ff28PDRADOCK050003f5PDC
{{#Wiki_filter:ATTACHMENT 2 TO AEP:NRC:0896K PROPOSED  REVISED TECHNICAL SPECIFICATION PAGES 9f 20400i8 89f f 28 PDR  ADOCK  050003f5 PDC
>~
 
34.8ELECTRICAL POWERSYSTEMS34,8,1A.C.SOURCESOPERATING LIMITINGCONDITION FOROPERATION 3.8.1.1Asaminimum,thefollowing A,C.electrical powersourcesshallbeOPERABLE:
> ~
a.Twophysically independent circuitsbetweentheoffsitetrans-missionnetworkandtheonsiteClass1Edistribution system,andb.Twoseparateandindependent dieselgenerators, eachwith:1.Aseparatedayfueltankcontaining aminimumof70gallonsoffuel,2.Aseparatefuelstoragesystemscontaining aminimumindicated volumeof46,000gallonsoffuel,and3.Aseparatefueltransferpump.APPLICABILITY:
3 4.8 ELECTRICAL  POWER SYSTEMS 3 4,8,1 A.C. SOURCES OPERATING LIMITING CONDITION  FOR OPERATION 3.8.1.1 As a minimum, the    following A,C. electrical power sources shall be OPERABLE:
MODES1,2,3and4.ACTION:a.WithanoffsitecircuitoftheaboverequiredA.C.electrical powersourcesinoperable, demonstrate theOPERABILITY oftheremaining A.C.offsitesourcebyperforming Surveillance Requirement 4.8.1.1.1.a within1hourandatleastonceper8hoursthereafter; andSurveillance Requirement 4.8.1.1.2.a.4 within24hours;restoreatleasttwooffsitecircuitsandtwodieselgenerators toOPERABLEstatuswithin72hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.b.Withadieselgenerator oftheaboverequiredA.CDelectrical powersourcesinoperable, demonstrate theOPERABILITY oftheA.C.offsitesourcesbyperforming Surveillance Requirement 4.8.1.1.1.a within1hourandatleastonceper8hoursthereafter; andifthedieselgenerator becameinoperable
: a. Two  physically independent circuits between the offsite trans-mission network and the onsite Class      1E  distribution  system, and
'duetoanycauseotherthanpreplanned preventive maintenance ortesting,demonstrate theOPERABILITY oftheremaining OPERABLEdieselgenerator byperforming Surveillance Requirement 4.8,1,1.2.a.4 within24hours;restoredieselgenerators toOPERABLEstatuswithin72hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.Atthenumberoffailuresfortheinoperable dieselindicated inTable4.8-1performtheAdditional Reliability Actionsprescribed inTable4.8-1.+TanksareseparatebetweendieselsbutsharedbetweenUnits1and2.COOKNUCLEARPLANT-UNIT13/48-1AMENDMENT NO,  
: b. Two  separate and independent diesel generators,     each with:
~~
: 1. A separate  day  fuel tank containing  a minimum of  70  gallons of fuel,
ELECTRICAL POWERSYSTEMSSHUTDOWNLIMITINGCONDITION FOROPERATION 3.8.1.2Asaminimum,thefollowing A.C.electrical powersourcesshallbeOPERABLE:
: 2. A separate  fuel storage  systems containing a minimum indicated volume  of 46,000 gallons of fuel,   and
a.Onecircuitbetweentheoffsitetransmission networkandtheonsiteClass1Edistribution system,andb.Onedieselgenerator with:1.Adayfueltankcontaining aminimumof70gallonsoffuel,2.Afuelstoragesystemcontaining aminimumindicated volumeof46,000gallonsoffuel,and3.Afueltransferpump.APPLICABILITY:
: 3. A separate  fuel transfer  pump.
MODES5and6.ACTION:WithlessthantheaboveminimumrequiredA.C.electrical power'ources
APPLICABILITY:   MODES  1, 2, 3 and 4.
: OPERABLE, suspendalloperations involving COREALTERATIONS positivereactivity changes*untiltheminimumrequiredA.C.electrical powersourcesarerestoredtoOPERABLEstatus.SURVEILLANCE REUIREMENTS 4.8.1.2TheaboverequiredA.C.electrical powersourcesshallbedemonstrated OPERABLEbytheperformance ofeachoftheSurveillance Requirements of4'.1.1.1and4.8.1.1.2 exceptforrequirement 4.8.1.1.2.a.5.
ACTION:
*Forpurposesofthisspecification, additionofwaterfromtheRWSTdoesnotconstitute apositivereactivity additionprovidedtheboronconcentration intheRWSTisgreaterthantheminimumrequiredbySpecification 3.1.2.7.b.2.
: a. With an offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafter; and Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours; restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
COOKNUCLEARPLANT-UNIT13/48-9AMENDMENT NO.
: b. With a diesel generator of the above required A.CD electrical power sources inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafter; and      if  the diesel generator became inoperable 'due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8,1,1.2.a.4 within 24 hours; restore diesel generators to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours. At the number of failures for the inoperable diesel indicated in Table 4.8-1 perform the Additional Reliability Actions prescribed in Table 4.8-1.
s ELECTRICAL POWERSYSTEMSContinued BASESRemovalofaccumulated waterasrequiredby4.8.1.1.2.b,2 isperformed bydrawingthecontentsoffthebottomofthetankuntilacceptable resultsareobtainedforeitheratapetestorawaterandsedimenttest.Anacceptable resultforthewaterandsedimentcontentisa'easured valuelessthan0.05percentvolume.Thesamplespecified in4.8.1.1.2.c.4 issentoffsitefortesting.Aseriousattemptwillbemadetomeetthe31-daylimitontheoffsitetests;however,ifforsomereasonthislimitisnotmet(e.g.,ifthesampleislostorbrokenoriftheresultsarenotreceivedin31days),thedieselgenerators shouldnotbeconsidered inoperable.
+Tanks are separate  between diesels but shared between Units 1 and 2.
Ifthesmapleislost,broken,orfailstheoffsitetestsandthenewoilhasalreadybeenputintothestoragetank,theoffsitetestswillbeperformed onasampletakenfromthestoragetank.Iftheresultsonthesubsequent storagetanksamplearenotwithinspecified limits,thedieselgenerators shouldbeconsidered OPERABLEandtheout-of-spec properties shouldbereturnedtowithinspecification assoonaspossible.
COOK NUCLEAR PLANT  - UNIT  1          3/4 8-1              AMENDMENT NO,
Ifthemonthlystoragetanksampletakeninaccordance withSpecification 4.8.1.1.2.d failstheparticulate contamination test,thedieselgenerators shouldbeconsidered OPERABLEandthecontamination levelshouldberestoredtobelow10mg/literassoonaspossible.
 
Theprecision leak-detection testdescribed inSurveillance Requirement 4.8.1,1.2.f.2 shouldbeperformed asdescribed inNFPA(National FireProtection Association)
  ~
-329.AsNFPA-329isrevised,theprecision leak-detection testmaybemodifiedtoincorporate changestothetestasdescribed intherevisions toNFPA-329.
~
Theminimumrequireddieselfueloilvolumeis43,240gallons.Thisvolumeisconsistent withoperation ofonedieselgenerator continuously for7daysatratedload,asrecommended inRegulatory Guide1.137,entitled"FuelOilSystemforStandbyDieselGenerators."
 
TheTechnical Specifications requireaminimumof46,000gallonsoffuel.The46,000gallonsisanindicated volume,Thisamountincludesmarginforcharacteristics suchaslocationofthetankdischarge pipesandslopeofthetanks.COOKNUCLEARPLANT-UNIT1B3/48-2AMENDMENT NO.
ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION    FOR OPERATION 3.8.1.2  As a minimum,   the following A.C. electrical power sources shall be OPERABLE:
34'ELECTRICAL POWERSYSTEMS34.8.1A.C.SOURCESOPERATING LIMITINGCONDITION FOROPERATION 3.8.1.1Asaminimum,thefollowing A.C.electrical powersourcesshallbeOPERABLE:
: a. One  circuit  between the offsite transmission network and the onsite Class  1E  distribution    system, and
a.Twophysically independent circuitsbetweentheoffsitetrans-missionnetworkandtheonsiteClass1Edistribution system,andb.Twoseparateandindependent dieselgenerators, eachwith:Aseparatedayfueltankcontaining aminimumof70gallonsoffuel,2.Aseparatefuelstoragesystem+containing aminimumindicated volumeof46,000gallonsoffuel,and3.Aseparatefueltransferpump.APPLICABILITY:
: b. One  diesel generator with:
MODES1,2,3and4.ACTION:a.b.WithanoffsitecircuitoftheaboverequiredA.C.electrical powersourcesinoperable, demonstrate theOPERABILITY oftheremaining A.C.offsitesourcebyperforming, Surveillance Requirement 4.8.1,1.1.a within1hourandatleastonceper8hoursthereafter; andSurveillance Requirement 4.8.1.1.2,a.4 within24hours;restoreatleasttwooffsitecircuitsandtwodieselgenerators toOPERABLEstatuswithin72hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.IWithadieselgenerator oftheaboverequiredA.C.electrical powersourcesinoperable, demonstrate theOPERABILITY oftheA.C.offsitesourcesbyperforming Surveillance Requirement 4.8.1.1.1.a within1hourandatleastonceper8hoursthereafter; andifthedieselgenerator becameinoperable duetoanycauseotherthanpreplanned preventive maintenance oxtesting,demonstrate theOPERABILITY oftheremaining OPERABLEdieselgenerator byperforming Surveillance Requirement 4.8.1.1.2.a.4 within24hours;restoredieselgenerators toOPERABLEstatuswithin72hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.Atthenumberoffailuresfortheinoperable dieselindicated inTable4.8-1performtheAdditional Reliability Actionsprescribed inTable4.8-1.*TanksareseparatebetweendieselsbutsharedbetweenUnits1and2.COOKNUCLEARPLANT-UNIT23/48-1AMENDMENT NO~
: 1. A day  fuel tank containing    a minimum  of 70 gallons of fuel,
ELECTRICAL POWERSYSTEMSSHUTDOWNLIMITINGCONDITION FOROPERATION 3.8.1.2Asaminimum,thefollowing A.C.electrical powersourcesshallbeOPERABLE:
: 2. A  fuel storage system containing a minimum indicated volume of 46,000 gallons of fuel, and
'.Onecircuitbetweentheoffsitetransmission networkandtheonsiteClass1Edistribution system,andb.Onedieselgenerator with:1.Adayfueltankcontaining aminimumof70gallonsoffuel,2.Afuelstoragesystemcontaining aminimumindicated volumeof46,000gallonsoffuel,and3.Afueltransferpump.APPLICABILITY:
: 3. A  fuel transfer    pump.
MODES5and6.ACTION:WithlessthantheaboveminimumrequiredA,C,electrical powersourcesOPERABLE, suspendalloperations involving COREALTERATIONS orpositivereactivity changes*untiltheminimumrequiredA.C.electrical powersourcesarerestoredtoOPERABLEstatus.SURVEILLANCE REUIREMENTS 4.8.1,2TheaboverequiredA.C.electrical powersourcesshallbedemonstrated OPERABLEbytheperformance ofeachoftheSurveillance Requirements of4.8.1.1.1 and4.8.1.1.2 exceptforrequirement 4.8.1.1.2,a,5.
APPLICABILITY:   MODES 5  and 6.
*Forpurposesofthisspecification, additionofwaterfromtheRWSTdoesnotconstitute apositivereactivity additionprovidedtheboronconcentration intheRWSTisgreaterthantheminimumrequiredbySpecification 3.1.2.7.b.2.
ACTION:
COOKNUCLEARPLANT-UNIT23/48-9AMENDMENT NO.
With less than the above minimum required A.C.         electrical power'ources OPERABLE, suspend all operations involving CORE ALTERATIONS positive reactivity changes* until the minimum required A.C. electrical power sources are restored to  OPERABLE  status.
ELECTRICAL POWERSYSTEMSContinued BASESRemovalofaccumulated waterasrequiredby4.8.1,1.2.b.2 isperformed bydrawingthecontentsoffthebottomofthetankuntilacceptable resultsareobtainedforeitheratapetestorawaterandsedimenttest.Anacceptable resultforthewaterandsedimentcontentisameasuredvaluelessthan0.05percentvolume.Thesamplespecified in4.8.1.1.2.c.4 issentoffsitefortesting.Aseriousattemptwillbemadetomeetthe31-daylimitontheoffsitetests;however,ifforsomereasonthislimitisnotmet(e.g.,ifthesampleislostorbrokenoriftheresultsarenotreceivedin31days),thedieselgenerators shouldnotbeconsidered inoperable.
SURVEILLANCE RE UIREMENTS 4.8.1.2  The above  required A.C. electrical power sources shall be demonstrated  OPERABLE  by the performance of each of the Surveillance Requirements   of 4 '.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.
Ifthesmapleislost,broken,orfailstheoffsitetestsandthenewoilhasalreadybeenputintothestoragetank,theoffsitetestswillbeperformed onasampletakenfromthestoragetank.Iftheresultsonthesubsequent storage'ank samplearenotwithinspecified limits,thedieselgenerators shouldbeconsidered OPERABLEandtheout-of-spec properties shouldbereturnedtowithinspecification assoonaspossible.
*For purposes of this specification, addition of water from the RWST does not constitute a positive reactivity addition provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2.
Ifthemonthlystoragetanksampletakeninaccordance withSpecification 4.8.1.1.2.d failstheparticulate contamination test,thedieselgenerators shouldbeconsidered OPERABLEandthecontamination levelshouldberestoredtobelow10mg/literassoonaspossible.
COOK NUCLEAR PLANT    - UNIT 1              3/4 8-9            AMENDMENT NO.
Theprecision leak-detection testdescribed inSurveillance Requirement 4.8.1,1.2.f.2 shouldbeperformed asdescribed inNFPA(National FireProtection Association)
 
-329.AsNFPA-329isrevised,theprecision leak-detection testmaybemodifiedtoincorporate changestothetestasdescribed intherevisions toNFPA-329.
s ELECTRICAL POWER SYSTEMS    Continued BASES Removal  of accumulated water as required by 4.8.1.1.2.b,2 is performed by drawing the contents off the bottom of the tank until acceptable results are obtained for either a tape test or a water and sediment test. An acceptable result for the water and sediment content is a'easured value less than 0.05 percent volume.
Theminimumrequireddieselfueloilvolumeis43,240gallons.Thisvolumeisconsistent withoperation ofonedieselgenerator continuously for7daysatratedload,asrecommended inRegulatory Guide1.137,entitled"FuelOilSystemforStandbyDieselGenerators."
The sample  specified in 4.8.1.1.2.c.4 is sent offsite for testing. A serious attempt will be made to meet the 31-day limit on the offsite tests; however, if for some reason this limit    is not met (e.g., if the sample is lost or broken or  if the results are not received in 31 days), the diesel generators should not be considered inoperable. If the smaple is lost, broken, or fails the offsite tests and the new oil has already been put into the storage tank, the offsite tests will be performed on a sample taken from the storage tank.
TheTechnical Specifications requireaminimumof46,000gallonsoffuel.The46,000gallonsisanindicated volume.Thisamountincludesmarginforcharacteristics suchaslocationofthetankdischarge pipesandslopeofthetanks.COOKNUCLEARPLANT-UNIT2B3/48-2AMENDMENT NO.
If the results on the subsequent storage tank sample are not within specified limits, the diesel generators should be considered OPERABLE and the out-of-spec properties should be returned to within specification as soon as possible.
Nhr,(~h}}
If the monthly storage tank sample taken in accordance with Specification 4.8.1.1.2.d fails the particulate contamination test, the diesel generators should be considered OPERABLE and the contamination level should be restored to below 10 mg/liter as soon as possible.
The  precision leak-detection test described in Surveillance Requirement 4.8.1,1.2.f.2 should    be performed as described in NFPA (National Fire Protection Association) - 329. As NFPA-329 is revised, the precision leak-detection test may be modified to incorporate changes to the test      as described in the revisions to NFPA-329.
The minimum  required diesel fuel oil volume is 43,240 gallons. This volume is consistent with operation of one diesel generator continuously for 7 days at rated load, as recommended in Regulatory Guide 1.137, entitled "Fuel Oil System  for  Standby Diesel Generators."   The Technical Specifications require a minimum  of 46,000 gallons of fuel. The 46,000 gallons is an indicated volume,   This amount includes  margin for characteristics such as location of the tank discharge pipes and slope of the tanks.
COOK NUCLEAR PLANT    - UNIT 1        B 3/4 8-2            AMENDMENT NO.
 
3 4'   ELECTRICAL POWER SYSTEMS 3 4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION    FOR OPERATION 3.8.1.1  As a minimum,   the following A.C. electrical   power sources    shall be OPERABLE:
: a. Two  physically independent circuits between the offsite trans-mission network and the onsite Class      1E  distribution    system, and
: b. Two  separate  and independent  diesel generators,     each with:
A separate  day  fuel tank containing  a minimum  of  70  gallons of fuel,
: 2. A separate  fuel storage  system+ containing a minimum indicated volume  of 46,000 gallons of fuel,   and
: 3. A separate  fuel transfer  pump.
APPLICABILITY:   MODES  1, 2, 3 and 4.
ACTION:
: a. With an offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. offsite source by performing, Surveillance Requirement 4.8.1,1.1.a within 1 hour and at least once per 8 hours thereafter; and Surveillance Requirement 4.8.1.1.2,a.4 within 24 hours; restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
I
: b. With a diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafter; and          if  the diesel generator became inoperable due to any cause other than preplanned preventive maintenance ox testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours; restore diesel generators to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours. At the number of failures for the inoperable diesel indicated in Table 4.8-1 perform the Additional Reliability Actions prescribed in Table 4.8-1.
*Tanks are separate    between diesels but shared between Units 1 and 2.
COOK NUCLEAR PLANT    - UNIT  2          3/4 8-1              AMENDMENT NO   ~
 
ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION      FOR OPERATION 3.8.1.2  As a minimum,     the following A.C.     electrical power sources shall be OPERABLE:
One  circuit  between the offsite transmission network and the onsite Class  1E  distribution    system, and
: b.     One  diesel generator with:
: 1. A day  fuel tank containing      a minimum  of 70 gallons of fuel,
: 2. A fuel storage    system containing a minimum indicated volume      of 46,000 gallons    of fuel,   and
: 3. A fuel transfer    pump.
APPLICABILITY:       MODES 5  and 6.
ACTION:
With less than the above minimum required A,C,             electrical power sources OPERABLE,     suspend all operations involving CORE ALTERATIONS or positive reactivity changes* until the minimum required A.C. electrical power sources are restored to      OPERABLE  status.
SURVEILLANCE RE UIREMENTS 4.8.1,2  The above    required A.C. electrical power sources shall be demonstrated      OPERABLE  by the performance of each of the Surveillance Requirements     of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2,a,5.
*For purposes of this specification, addition of water from the RWST does not constitute a positive reactivity addition provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2.
COOK NUCLEAR PLANT      - UNIT  2            3/4 8-9              AMENDMENT NO.
 
ELECTRICAL POWER SYSTEMS    Continued BASES Removal  of accumulated water as required by 4.8.1,1.2.b.2 is performed by drawing the contents off the bottom of the tank until acceptable results are obtained for either a tape test or a water and sediment test. An acceptable result for the water and sediment content is a measured value less than 0.05 percent volume.
The sample  specified in 4.8.1.1.2.c.4 is sent offsite for testing. A serious attempt  will be  made to meet the 31-day limit on the offsite tests; however, if for some reason this limit is not met (e.g., if the sample    is lost or broken or  if the results are not received in 31 days), the diesel generators should not be considered inoperable. If the smaple is lost, broken, or fails the offsite tests and the new oil has already been put into the storage tank, the offsite tests will be performed on a sample taken from the storage tank.
If the results on the subsequent storage'ank sample are not within specified limits, the diesel generators should be considered OPERABLE and the out-of-spec properties should be returned to within specification as soon as possible.
If the monthly storage tank sample taken in accordance with Specification 4.8.1.1.2.d fails the particulate contamination test, the diesel generators should be considered OPERABLE and the contamination level should be restored to below 10 mg/liter as soon as possible.
The  precision leak-detection test described in Surveillance Requirement 4.8.1,1.2.f.2 should    be performed as described in NFPA (National Fire Protection Association) - 329. As NFPA-329 is revised, the precision leak-detection test may be modified to incorporate changes to the test    as described in the revisions to NFPA-329.
The minimum  required diesel fuel oil volume is 43,240 gallons. This volume is consistent with operation of one diesel generator continuously for 7 days at rated load, as recommended in Regulatory Guide 1.137, entitled "Fuel Oil System for Standby Diesel Generators."     The Technical Specifications require a minimum of 46,000 gallons of fuel. The 46,000 gallons is an indicated volume. This amount includes margin for characteristics such as location of the tank discharge pipes and slope of the tanks.
COOK NUCLEAR PLANT    - UNIT 2        B 3/4 8-2          AMENDMENT NO.
 
N h    r
      ~
  ,(
h}}

Latest revision as of 02:14, 4 February 2020

Proposed Tech Specs Revising Required Min Vol of Diesel Generator Fuel Storage Tanks from 42,000 Gallons to 46,000 Gallons of Fuel
ML17325B346
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/28/1989
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17325B345 List:
References
NUDOCS 8912040018
Download: ML17325B346 (11)


Text

ATTACHMENT 2 TO AEP:NRC:0896K PROPOSED REVISED TECHNICAL SPECIFICATION PAGES 9f 20400i8 89f f 28 PDR ADOCK 050003f5 PDC

> ~

3 4.8 ELECTRICAL POWER SYSTEMS 3 4,8,1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A,C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite trans-mission network and the onsite Class 1E distribution system, and
b. Two separate and independent diesel generators, each with:
1. A separate day fuel tank containing a minimum of 70 gallons of fuel,
2. A separate fuel storage systems containing a minimum indicated volume of 46,000 gallons of fuel, and
3. A separate fuel transfer pump.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

a. With an offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With a diesel generator of the above required A.CD electrical power sources inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and if the diesel generator became inoperable 'due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8,1,1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. At the number of failures for the inoperable diesel indicated in Table 4.8-1 perform the Additional Reliability Actions prescribed in Table 4.8-1.

+Tanks are separate between diesels but shared between Units 1 and 2.

COOK NUCLEAR PLANT - UNIT 1 3/4 8-1 AMENDMENT NO,

~

~

ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. One circuit between the offsite transmission network and the onsite Class 1E distribution system, and
b. One diesel generator with:
1. A day fuel tank containing a minimum of 70 gallons of fuel,
2. A fuel storage system containing a minimum indicated volume of 46,000 gallons of fuel, and
3. A fuel transfer pump.

APPLICABILITY: MODES 5 and 6.

ACTION:

With less than the above minimum required A.C. electrical power'ources OPERABLE, suspend all operations involving CORE ALTERATIONS positive reactivity changes* until the minimum required A.C. electrical power sources are restored to OPERABLE status.

SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4 '.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.

  • For purposes of this specification, addition of water from the RWST does not constitute a positive reactivity addition provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2.

COOK NUCLEAR PLANT - UNIT 1 3/4 8-9 AMENDMENT NO.

s ELECTRICAL POWER SYSTEMS Continued BASES Removal of accumulated water as required by 4.8.1.1.2.b,2 is performed by drawing the contents off the bottom of the tank until acceptable results are obtained for either a tape test or a water and sediment test. An acceptable result for the water and sediment content is a'easured value less than 0.05 percent volume.

The sample specified in 4.8.1.1.2.c.4 is sent offsite for testing. A serious attempt will be made to meet the 31-day limit on the offsite tests; however, if for some reason this limit is not met (e.g., if the sample is lost or broken or if the results are not received in 31 days), the diesel generators should not be considered inoperable. If the smaple is lost, broken, or fails the offsite tests and the new oil has already been put into the storage tank, the offsite tests will be performed on a sample taken from the storage tank.

If the results on the subsequent storage tank sample are not within specified limits, the diesel generators should be considered OPERABLE and the out-of-spec properties should be returned to within specification as soon as possible.

If the monthly storage tank sample taken in accordance with Specification 4.8.1.1.2.d fails the particulate contamination test, the diesel generators should be considered OPERABLE and the contamination level should be restored to below 10 mg/liter as soon as possible.

The precision leak-detection test described in Surveillance Requirement 4.8.1,1.2.f.2 should be performed as described in NFPA (National Fire Protection Association) - 329. As NFPA-329 is revised, the precision leak-detection test may be modified to incorporate changes to the test as described in the revisions to NFPA-329.

The minimum required diesel fuel oil volume is 43,240 gallons. This volume is consistent with operation of one diesel generator continuously for 7 days at rated load, as recommended in Regulatory Guide 1.137, entitled "Fuel Oil System for Standby Diesel Generators." The Technical Specifications require a minimum of 46,000 gallons of fuel. The 46,000 gallons is an indicated volume, This amount includes margin for characteristics such as location of the tank discharge pipes and slope of the tanks.

COOK NUCLEAR PLANT - UNIT 1 B 3/4 8-2 AMENDMENT NO.

3 4' ELECTRICAL POWER SYSTEMS 3 4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite trans-mission network and the onsite Class 1E distribution system, and
b. Two separate and independent diesel generators, each with:

A separate day fuel tank containing a minimum of 70 gallons of fuel,

2. A separate fuel storage system+ containing a minimum indicated volume of 46,000 gallons of fuel, and
3. A separate fuel transfer pump.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

a. With an offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. offsite source by performing, Surveillance Requirement 4.8.1,1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and Surveillance Requirement 4.8.1.1.2,a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

I

b. With a diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and if the diesel generator became inoperable due to any cause other than preplanned preventive maintenance ox testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. At the number of failures for the inoperable diesel indicated in Table 4.8-1 perform the Additional Reliability Actions prescribed in Table 4.8-1.
  • Tanks are separate between diesels but shared between Units 1 and 2.

COOK NUCLEAR PLANT - UNIT 2 3/4 8-1 AMENDMENT NO ~

ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

One circuit between the offsite transmission network and the onsite Class 1E distribution system, and

b. One diesel generator with:
1. A day fuel tank containing a minimum of 70 gallons of fuel,
2. A fuel storage system containing a minimum indicated volume of 46,000 gallons of fuel, and
3. A fuel transfer pump.

APPLICABILITY: MODES 5 and 6.

ACTION:

With less than the above minimum required A,C, electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes* until the minimum required A.C. electrical power sources are restored to OPERABLE status.

SURVEILLANCE RE UIREMENTS 4.8.1,2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2,a,5.

  • For purposes of this specification, addition of water from the RWST does not constitute a positive reactivity addition provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2.

COOK NUCLEAR PLANT - UNIT 2 3/4 8-9 AMENDMENT NO.

ELECTRICAL POWER SYSTEMS Continued BASES Removal of accumulated water as required by 4.8.1,1.2.b.2 is performed by drawing the contents off the bottom of the tank until acceptable results are obtained for either a tape test or a water and sediment test. An acceptable result for the water and sediment content is a measured value less than 0.05 percent volume.

The sample specified in 4.8.1.1.2.c.4 is sent offsite for testing. A serious attempt will be made to meet the 31-day limit on the offsite tests; however, if for some reason this limit is not met (e.g., if the sample is lost or broken or if the results are not received in 31 days), the diesel generators should not be considered inoperable. If the smaple is lost, broken, or fails the offsite tests and the new oil has already been put into the storage tank, the offsite tests will be performed on a sample taken from the storage tank.

If the results on the subsequent storage'ank sample are not within specified limits, the diesel generators should be considered OPERABLE and the out-of-spec properties should be returned to within specification as soon as possible.

If the monthly storage tank sample taken in accordance with Specification 4.8.1.1.2.d fails the particulate contamination test, the diesel generators should be considered OPERABLE and the contamination level should be restored to below 10 mg/liter as soon as possible.

The precision leak-detection test described in Surveillance Requirement 4.8.1,1.2.f.2 should be performed as described in NFPA (National Fire Protection Association) - 329. As NFPA-329 is revised, the precision leak-detection test may be modified to incorporate changes to the test as described in the revisions to NFPA-329.

The minimum required diesel fuel oil volume is 43,240 gallons. This volume is consistent with operation of one diesel generator continuously for 7 days at rated load, as recommended in Regulatory Guide 1.137, entitled "Fuel Oil System for Standby Diesel Generators." The Technical Specifications require a minimum of 46,000 gallons of fuel. The 46,000 gallons is an indicated volume. This amount includes margin for characteristics such as location of the tank discharge pipes and slope of the tanks.

COOK NUCLEAR PLANT - UNIT 2 B 3/4 8-2 AMENDMENT NO.

N h r

~

,(

h