{{#Wiki_filter:Attachment toAEP:NRC:0692CL DonaldC.CookNuclearPlantUnits1and2Technical Specifications 9302020075 930127'PDRADOCK050003i5PPDRj
{{#Wiki_filter:Attachment to AEP:NRC:0692CL Donald C. Cook Nuclear Plant Units  1 and 2 Technical Specifications 9302020075 930127
'I'hc~
'PDR  ADOCK 050003i5 P              PDR  j
PLANTSYSTEMS34.7.9FIRESUPPRESSION SYSTEMSFIRESUPPRESSION WATERSYSTEMLIMITINGCONDITION FOROPERATION 3.7.9.1Thefiresuppression watersystemshallbeconsidered tobeOPERABLEwith:a.Threefiresuppression systempumps,'achwithacapacityof2500gpm,withtheirdischarge alignedtothefiresuppression header,b.Twofirewatertanks,'achwithaminimumusablevolumeof565,000gallons(34.0feetlevelindication).
CeAnOPERABLEflowpathcapableoftakingsuctionfromeitheroneofthefirewatertanksandtransferring thewaterthroughdistribution piping(withOPERABLEsectionalizing valves)uptotheyardhydrantcurbcontrolvalves,tothehosestationvalve(s)andwatersuppression systemcontrolling valve(s).
Thehosestationvalve(s)andthewatersuppression systemcontrolling valve(s)thatarerequiredtobein.theflowpatharegiveninSpecifications 3.7.9.5and3.7.9.2,respectively.
APPLICABILITY:
Atalltimes.ACTION:a.Withonepumpinoperable, restoretheinoperable pumptoOPERABLEstatuswithin7daysorprovideanalternate backuppump.b.Withonefirewatertankinoperable, restoretheinoperable tanktoOPERABLEstatuswithin30daysorestablish abackupwatersystemsupply.ceWiththefiresuppression watersystemotherwise inoperable:
1.Restorethefiresuppression waterdistribution systemtoOPERABLEstatuswithin24hours,or2.Establish abackupfiresuppression watersystemwithin24hours.d,Theprovisions ofSpecifications 3.0.3and3.0.4arenotapplicable.
+ThesepumpsandtanksaresharedbetweenUnits1and2.COOKNUCLEARPLANT-UNIT13/47-41AMENDMENT NO.
PLANTSYSTEMSSURVEILLANCE REUIREMENTS 4'.9.1.1Thefiresuppression
~atersystemshallbedemonstrated OPERABLE:
a.Atleastonceper7daysbyverifying thewatersupplycontained inthefirewatertanks.Atleastonceper31daysonaSTAGGERED TESTBASISbystartingeachpumpandoperating itforatleast15minutesonrecirculation flow.c~Atleastonceper31daysbyverifying thateachvalve(manual,poweroperated, orautomatic) intheflowpaththatisnotlocked,sealed,orotherwise securedinposition, isinitscorrectposition.
d.Atleastonceper6monthsbyperformance ofasystemflushofabovegroundinternaldistribution headersandfirehydrants.
e.Atleastonceper12monthsbycyclingeachtestablevalveintheflowpaththroughatleastonecompletecycleoffulltravel.Atleastonceper18monthsbyperforming asystemfunctional test.whichincludessimulated automatic actuation ofthesystemthroughout itsoperating
: sequence, and:1.Verifying thateachautomatic valveintheflowpathactuatestoitscorrectposition, 2.Verifying thateachpumpdevelopsaflowofatleast2500gpmatasystemheadofatleast300feetofwaterbyobserving threepoints(minimum, rated,andpeak)onthepump'sperformance curve,3.Cyclingeachvalveintheflowpaththatisnottestableduringplantoperation throughatleastonecompletecycleoffulltravel,and4.Verifying thateachpumpstartsinitspreplanned sequencetomaintainthefiresuppression watersystempressuregreaterthanorequalto100psig.goAtleastonceper3yearsbyperforming aseriesofflowtestssothateveryfiremainsegment(excluding individual systemsupplies) hasbeenverifiedtobeclearofobstruction byafullflowtest.COOKNUCLEARPLANT-UNIT13/47-42AMENDMENT NO.


PLANTSYSTEMSSURVEILLANCE REUIREMENTS Continued 4,7.9.1.2 Thefirepumpdieselenginesshallbedemonstrated OPERABLE:
I
a.Atleastonceper31daysbyverifying:
      'h c ~
1.Thefuelstoragetankscontainatleast160gallonsoffuel,and2.Thedieselsstartfromambientconditions andoperateforatleast30minutes.b.Atleastonceper92daysbyverifying thatasampleofdieselfuelfromthefuelstoragetanksobtainedinaccordance withASTM-D4057-81iswithintheacceptable limitsspecified inTable1ofASTM-D975-81whencheckedforviscosity, waterandsediment.
 
coAtleastonceper18monthsbysubjecting thedieselstoaninspection inaccordance withprocedures preparedinconjunction withthemanufacturer's recommendations forthisclassofstandbyservice.4.7,9.1.3 Thefirepumpdieselstartingbatterybanksandchargersshallbedemonstrated OPERABLE:
PLANT SYSTEMS 3 4.7.9  FIRE SUPPRESSION SYSTEMS FIRE SUPPRESSION WATER SYSTEM LIMITING CONDITION  FOR OPERATION 3.7.9.1   The  fire  suppression water system shall be considered to be      OPERABLE with:
a.Atleastonceper7daysbyverifying that;1.Theelectrolyte levelofeachbatteryisabovetheplates,and2.Theoutputbatteryvoltageofeachbankisgreaterthan24volts.b.Atleastonceper92daysbyverifying thatthespecificgravityisappropriate forcontinued serviceofeachbattery.coAtleastonceper18monthsbyverifying that:1.Thebatteries, cellplatesandbatterypacksshownovisualindication ofphysicaldamageorabnormaldeterioration, and2.Thebattery-to-battery andterminalconnections areclean,tight,freeofcorrosion, andcoatedwithanti-corrosion material.
: a. Three  fire  suppression system pumps,     'ach  with a capacity of  2500 gpm,  with their discharge aligned to the      fire suppression header,
COOKNUCLEARPLANT-UNIT13/47-43AMENDMENT NO.
: b. Two  fire water  tanks, 'ach    with a minimum usable volume  of 565,000 gallons (34.0 feet level indication).
kHf~~tII~lN~INPk'I1IIf~
Ce  An OPERABLE  flow path capable of taking suction from either one of the  fire water  tanks and transferring the water through distribution piping (with OPERABLE sectionalizing valves) up to the yard hydrant curb control valves, to the hose station valve(s) and water suppression system controlling valve(s). The hose station valve(s) and the water suppression system controlling valve(s) that are required to be in .the flow path are given in Specifications 3.7.9.5 and 3.7.9.2, respectively.
BASES34.7.9FIRESUPPRESSION SYSTEMSTheOPERABILITY ofthefiresuppression systemsensuresthatadequatefiresuppression capability isavailable toconfineandextinguish firesoccurring inanyportionofthefacilitywheresafetyrelatedequipment islocated.Thefiresuppression systemsconsistofthewatersystem,sprayand/orsprinklers, CO,Halonandfirehosestations.
APPLICABILITY: At  all  times.
Thecollective capability ofthefiresuppression systemsisadequatetominimizepotential damagetosafety-related equipment andisamajorelementinthefacilityfireprotection program.IntheeventthatoneormoreC02suppression systemsrequiring automatic actuation mustbeisolatedforpersonalprotection topermitentryforroutinetours,maintenance, construction, orsurveillance testingintheprotected area,thefiredetection system(s) requiredtobeOPERABLEbySpecification 3.3.3.7shallbeverifiedtobeOPERABLE.
ACTION:
Isolation ofanautomatic C02suppression systemtemporarily putsthissysteminamanualactuation mode.Relianceonthefiredetection system,inconjunction withtheabilitytomanuallydischarge theCOsuppression systemwillprovideadequatefireprotection forperiodswhenpersonnel arerequiredtoworkintheseareas.Intheeventthatportionsofthefiresuppression systemsareinoperable, alternate backupfirefightingequipment isrequiredtobemadeavailable intheaffectedareasuntiltheinoperable equipment isrestoredtoservice.Whentheinoperable firefightingequipment isintendedforuseasabackupmeansoffiresuppression, alongerperiodoftimeisallowedtoprovideanalternate meansoffirefightingthaniftheinoperable equipment istheprimarymeansoffiresuppression.
: a. With one  pump  inoperable, restore the inoperable pump to OPERABLE status within  7 days or provide an alternate backup pump.
Backupfireprotection equipment willnormallytak'etheformofpermanently mountedfireextinguishers and/orfirehosestationsinornearthearea,orfirehosesroutedtotheaffectedarea.Intheeventthatthefirewatertanksbecomeinoperable, LakeMichiganmayserveastheirbackup.Twomanual,diesel-engine driven,vertical-turbine firepumpsratedat2000gpm,whichtakesuctionoffofLakeMichiganandprovidewatertothefiresuppression header,areadministratively controlled, Oneofthesepumpsmayserveasabackuptooneofthefiresuppression pumpsthattakesuctionoffofthetanks.However,itisnotourintenttorelyonbackupsystemsorothercompensatory measuresforanextendedperiodoftimeandactionwillbetakentorestoretheinoperable portionsofthefiresuppression systemtoOPERABLEstatuswithinareasonable period.Thesurveillance requirements provideassurance thattheminimumOPERABILITY requirements ofthefiresuppression systemsaremet.Whileperforming thesurveillances specified in4.7.9.1thefiresuppression watersystemisstillcapableofperforming itsintendedfunction.
: b. With one  fire water  tank inoperable, restore the inoperable tank to OPERABLE  status within 30 days or establish a backup water system supply.
Consequently, itisnotnecessary toentertheACTIONSTATEMENT specified in3.7.9.1whiletheSURVEILLANCES specified in4.7.9.1.1 arebeingperformed, unlessthetestedequipment failstheSURVEILLANCE.
ce  With the  fire  suppression water system otherwise inoperable:
Inaddition, anallowance ismadeforensuringasufficient volumeofHalonandCOiintheHalonandCOistoragetanksbyverifying eithertheweight,level,orpressureofthetanks.COOKNUCLEARPLANT-UNIT1B3/47-7AMENDMENT NO68"')gg8I 1tr*VaVSatPlIfI!
: 1. Restore the  fire  suppression water distribution system to OPERABLE  status within    24 hours, or
BASES34.4.7.9Continued Thefiresuppression watersystemhasthreefirepumpscommontobothunitswhichdischarge intounderground ringheaders,Thereisonemotor-driven horizontal centrifugal firepumpratedat2500gpmthattakessuctionfromthefirewaterstoragetanks;andtwodiesel-engine-driven horizontal centrifugal firepumpsratedat2500gpmthattakesuctionfromthefirewaterstoragetanks.Havingacombination ofdiesel-driven andelectricmotor-driven pumpsinthesystemdesignisconsistent withNRCBranchTechnical PositionAPSCB9.5-1.TheflowpathscapableoftakingsuctionfromLakeMichiganarenormallyisolatedtoprecludezebramusselinfestation ofthesystem.Thepurposeofthecharcoalfilterfiresuppression T/Sistoaccountfordetection andsuppression offiresinthecharcoalfilters.Manualoperation ofthesesystemsisallowedbecausetwo-point heatdetection withcontrolroomandlocalannunciation oftroubleconditions isprovidedforthecharcoalfilters.TheOPERABILITY ofthefiresuppression systemprotecting thecharcoalfiltersisonlyrequiredwhenthereischarcoalinthefilters.Actuation ofspraywaterontothecharcoalfiltersrequiresboththemanualopeningofthesystemisolation valveandreachingthehightemperature alarmsetpointfortheautomatic openingofthesystemdelugevalve.Becauseoftheinaccessibility ofthelowercontainment topersonnel duringoperation duetoALARAradiation exposureconcerns, theuseofoneormoreCCTVsinthelowercontainment, tomonitorforfireandsmoke,isanacceptable substitute toanhourlyfirewatch,ifthefiresuppression systembecomesinoperable.
: 2. Establish  a backup  fire  suppression water system within 24 hours.
Allhourlyfirewatchpatrolsareperformed atintervals ofsixtyminuteswithamarginoffifteenminutes.Acontinuous firewatchrequiresthatatrainedindividual beinthespecified areaatalltimesandthateachfirezonewithinthespecified areabepatrolled atleastonceeveryfifteenminuteswithamarginoffiveminutes.COOKNUCLEARPLANT-UNIT1B3/47-8AMENDMENT NO,480,484 4."ttr~~IIJv BASES34.7.9Continued Acontrolvalveisdefinedasavalvethatwhencloseddoesnotleaveanalternate openflowpathtoasystem.Asectionalizing valveisdefinedasavalvethatwhencloseddoesnotpreventanalternate openflowpathtoasystemandhencedoesnotmakethefiresuppression watersysteminoperable.
d, The  provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
Undercertainsituations, theclosureofasectionalizing valvefollowedbytheclosureofasecondvalvewillnotleaveanopenflowpathtooneofthespecified systems.Inthisinstance, ActionStatement cofSpecification 3.7.9.1isapplicable.
+ These pumps and tanks are shared between Units 1 and 2.
Manualactuation ofCOfiresuppression systemsprovidesadequatefireprotection fortheprospected areasbasedonOPERABLEfiredetection inthearea,lowcombustible
COOK NUCLEAR PLANT  - UNIT 1          3/4 7-41                AMENDMENT NO.
: loadings, andpromptfirebrigaderesponsetoalarms.ManyoftheActionStatements takecreditforOPERABLEfiredetection inlieuofafirewatchwhenafireprotection systemisinoperable.
 
OPERABLEfiredetection providessufficient earlywarningcapability ofafiretotheappropriate ControlRoom.DuringSurveillance TestingofaLowPressureCOSystemwiththesysteminoperable, therequirement foracontinuous firewatchmaybesuspended duringportionsofthetestwhichresultormayresultinadischarge intotheCOprotected area.Similarly, ifaCOactuation occurswhichresultsintheneedtohavetheLowPressureC02Systemmadeinoperable, therequirement foracontinuous firewatchmaybesuspended.
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4 '.9.1.1  The  fire  suppression ~ater system shall be demonstrated      OPERABLE:
Ineithercase,theareaaffectedshallberestoredtohabitability assoonaspracticable, afterwhichthecontinuous firewatchistobere-established ifthesystemisstillinoperable.
: a. At least once per 7 days by verifying the water supply contained in the fire water tanks.
34.7.10FIRERATEDASSEMBLIES TheOPERABILITY ofthefirebarriersandbarrierpenetrations ensurethatfiredamagewillbelimited.Thesedesignfeaturesminimizethepossibility ofasinglefireinvolving morethanonefireareapriortodetection andextinguishment.
At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating    it  for at least 15 minutes on recirculation flow.
Thefirebarriersandfirebarrierpenetration sealingdevicesareperiodically inspected toverifytheirOPERABILITY.
c ~ At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
Thefunctional testingofthefiredampersisprovidedtoensurethatthedampersremainfunctional.
: d. At least once per    6  months by performance  of a system  flush of  above ground  internal distribution headers    and fire hydrants.
Theventilation sealsareasealsaroundventilation ductworkpenetrating firebarriers.
: e. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
Itisnotourintenttorelyonbackupsystemsorothercompensatory measuresforanextendedperiodoftimeandactionwillbetakentorestoretheinoperable portionsofthefireratedassemblytoOPERABLEstatuswithinareasonable period.Forthepurposeofdetermining OPERABILITY, anOPERABLEfireratedassemblyand/orsealingdeviceisonethatiscapableofperforming itsintendedsafetyfunction.
At least once per 18 months by performing a system functional test.
COOKNUCLEARPLANT-UNIT1B3/47-9AMENDMENT NO,480, f~,014-IkkII~$IIII,I4h,A PLANTSYSTEMS34.7.9PIRESUPPRESSION SYSTEMSPIRESUPPRESSION WATERSYSTEMLIMITINGCONDITION FOROPERATION 3,7.9.1Thefiresuppression watersystemshallbeconsidered tobeOPERABLEwith:a.Threefiresuppression systempumps,'achwithacapacityof2500gpm,withtheirdischarge alignedtothefiresuppression header,b.Twofirewatertanks,eachwithaminimumusablevolumeof565,000gallons.(34.0feetlevelindication) c~AnOPERABLEflowpathcapableoftakingsuctionfromeitheroneofthefirewatertanksandtransferring thewaterthroughdistribution piping(withOPERABLEsectionalizing valves)uptotheyardhydrantcurbcontrolvalves,tothehosestationvalve(s)andwatersuppression systemcontrolling valve(s).
which includes simulated automatic actuation of the system throughout its operating sequence, and:
Thehosestationvalve(s)andthewatersuppression systemcontrolling valve(s)thatarerequiredtobeintheflowpatharegiveninSpecifications 3.7.9.5and3.7.9.2,respectively.
: 1. Verifying that each automatic valve in the flow path actuates to its correct position,
APPLICABILITY:
: 2. Verifying that each pump develops a flow of at least 2500 gpm at a system head of at least 300 feet of water by observing three points (minimum, rated, and peak) on the pump's performance curve,
Atalltimes.ACTION:a.Withonepumpinoperable, restoretheinoperable pumptoOPERABLEstatuswithin7daysorprovideanalternate backuppump.b.Withonefirewatertankinoperable, restoretheinoperable tanktoOPERABLEstatuswithin30daysorestablish abackupwatersystemsupply.c>>Withthefiresuppression watersystemotherwise inoperable:
: 3. Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel, and
1.Restorethefiresuppression waterdistribution systemtoOPERABLEstatuswithin24hours,or2.Establish abackupfiresuppression watersystemwithin24hours.d.Theprovisions ofSpecifications 3.0.3and3.0.4arenotapplicable.
: 4. Verifying that    each pump  starts in its preplanned  sequence  to maintain the fire suppression water system pressure greater than or equal to 100 psig.
+ThesepumpsandtanksaresharedbetweenUnits1and2.COOKNUCLEARPLANT-UNIT23/47-36AMENDMENT NO.
go  At least once per    3 years by performing a series of flow tests so that every fire    main segment (excluding individual system supplies) has been verified to be clear of obstruction by a      full flow test.
C.PI~~Vyal PLANTSYSTEMSSURVEILLANCE REUIREMENTS 4.7.9.1.1 Thefiresuppression watersystemshallbedemonstrated OPERABLE:
COOK NUCLEAR PLANT  - UNIT  1          3/4 7-42              AMENDMENT NO.
a.Atleastonceper7daysbyverifying thewatersupplycontained inthefirewatertanks.b.Atleastonceper31daysonaSTAGGERED TESTBASISbystartingeachpumpandoperating itforatleast15minutesonrecirculation flow.c~Atleastonceper31daysbyverifying thateachvalve(manual,poweroperated, orautomatic) intheflowpaththatisnotlocked,sealed,orotherwise securedinposition, isinitscorrectposition.
 
d.Atleastonceper6monthsbyperformance ofasystemflushofabovegroundinternaldistribution headersandfirehydrants.
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS        Continued 4,7.9.1.2    The  fire  pump  diesel engines shall  be demonstrated  OPERABLE:
e.Atleastonceper12monthsbycyclingeachtestablevalveintheflowpaththroughatleastonecompletecycleoffulltravel.Atleastonceper18monthsbyperforming asystemfunctional testwhichincludessimulated automatic actuation ofthesystemthroughout itsoperating
: a. At least once per      31 days by verifying:
: sequence, and:1.Verifying thateachautomatic valveintheflowpathactuatestoitscorrectposition, 2.Verifying thateachpumpdevelopsaflowofatleast2500gpmatasystemheadofatleast300feetofwaterbyobserving threepoints(minimum, rated,andpeak)onthepump'sperformance curve,3.Cyclingeachvalveintheflowpaththatisnottestableduringplantoperation throughatleastonecompletecycleoffulltravel,and4.Verifying thateachpumpstartsinitspreplanned sequencetomaintainthefiresuppression watersystempressuregreaterthanorequalto100psig.goAtleastonceper3yearsbyperforming aseriesofflowtestssothateveryfiremainsegment(excluding individual systemsupplies) hasbeenverifiedtobeclearofobstruction byafullflowtest.COOKNUCLEARPLANT-UNIT23/47-37AMENDMENT NO.44,445
: 1. The  fuel storage tanks contain at least    160 gallons of fuel, and
~~II~
: 2. The  diesels start from ambient conditions and operate for at least  30  minutes.
PLANTSYSTEMSSURVEILLANCE REUIREMENTS Continued 4.7.9.1.2 Thefirepumpdieselenginesshallbedemonstrated OPERABLE:
: b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tanks obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.
a.Atleastonceper31daysbyverifying:
co    At least once per 18 months by subjecting the diesels to an inspection in accordance with procedures prepared in conjunction with the manufacturer's recommendations for this class of standby service.
1,Thefuelstoragetankscontainatleast160gallonsoffuel,and2.Thedieselsstartfromambientconditions andoperateforatleast30minutes.b.Atleastonceper92daysbyverifying thatasampleofdieselfuelfromthefuelstoragetanksobtainedinaccordance withASTM-D4057-81iswithintheacceptable limitsspecified inTable1ofASTM-D975-81whencheckedforviscosity, waterandsediment.
4.7,9.1.3  The  fire pump  diesel starting battery banks  and chargers  shall  be demonstrated  OPERABLE:
c>>Atleastonceper18monthsbysubjecting thedieselstoaninspection inaccordance withprocedures preparedinconjunction withthemanufacturer's recommendations forthisclassofstandbyservice.4.7.9.1.3 Thefirepumpdieselstartingbatterybanksandchargersshallbedemonstrated OPERABLE:
: a. At least once per      7 days by verifying that;
a.Atleastonceper7daysbyverifying that:1.Theelectrolyte levelofeachbatteryisabovetheplates,and2.Theoutputbatteryvoltageofeachbankisgreaterthan24volts.b.Atleastonceper92daysbyverifying thatthespecificgravityisappropriate forcontinued serviceofeachbattery.c~Atleastonceper18monthsbyverifying that:1.Thebatteries, cellplatesandbatterypacksshownovisualindication ofphysicaldamageorabnormaldeterioration, and2.Thebattery-to-battery andterminalconnections areclean,tight,freeofcorrosion, andcoatedwithanti-corrosion material.
: 1. The electrolyte level of    each battery is  above the plates,   and
COOKNUCLEARPLANT-UNIT23/47-38AMENDMENT NO.44,,'I ek1llItL~J'y)'I~l\~
: 2. The output battery voltage of each bank is greater than      24 volts.
PLANTSYSTEMSBASESTheservicelifeofasnubberisevaluated viamanufacturer's inputandinformation throughconsideration ofthesnubberserviceconditions andassociated installation andmaintenance records(newlyinstalled snubber,sealreplaced, springreplaced, inhighradiation area,inhightemperature area,etc...).Therequirement tomonitorthesnubberservicelifeisincludedtoensurethatthesnubbersperiodically undergoaperformance evaluation inviewoftheirageandoperating conditions.
: b. At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.
Theserecordswillprovidestatistical basesforfutureconsideration ofsnubberservicelife.Therequirements forthemaintenance ofrecordsandthesnubberservicelifereviewarenotintendedtoaffectplantoperation.
co    At least once per      18 months by  verifying that:
Thenumberofsnubberstobefunctionally testedduringeachsurveillance isbasedoncalculations performed toallowextension ofthesurveillance intervalfrom18monthsto24months,andtherefore, thenumberofsnubbersfunctionally testeddeviatesfromthenumberrequiredbytheWestinghouse StandardTechnical Specifications (NUREG-0452, Revision4).34.7.8SEALEDSOURCECONTAMINATION Thelimitations onremovable contamination forsourcesrequiring leaktesting,including alphaemitters, isbasedon10CPR70.39(c)limitsforplutonium.
: 1. The batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and
Thislimitation willensurethatleakagefrombyproduct, source,andspecialnuclearmaterialsourceswillnotexceedallowable intakevalues.34.7.9PIRESUPPRESSION SYSTEMSTheOPERABILITY ofthefiresuppression systemsensuresthatadequatefiresuppression capability isavailable toconfineandextinguish firesoccurring inanyportionofthefacilitywheresafety-related equipment islocated.Thefiresuppression systemconsistsofthewatersystem,sprayand/orsprinklers, CO2,halonandfirehosestations.
: 2. The battery-to-battery    and  terminal connections are clean, tight, free of corrosion,     and coated with anti-corrosion material.
Thecollective capability ofthefiresuppression systemsisadequatetominimizepotential damagetosafety-related equipment andisamajorelementinthefacilityfireprotection program.IntheeventthatoneormoreC02suppression systemsrequiring automatic actuation mustbeisolatedforpersonalprotection topermitentryforroutinetours,maintenance, construction, orsurveillance testingintheprotected area,thefiredetection system(s) requiredtobeOPERABLEbySpecification 3.3.3.7shallbeverifiedtobeOPERABLE.
COOK NUCLEAR PLANT    - UNIT  1        3/4 7-43                AMENDMENT NO.
Isolation ofanautomatic C02suppression syst:emtemporarily putsthissysteminamanualactuation mode.Relianceonthefiredetection system,inconjunction withtheabilitytomanuallydischarge theCOsuppression system,willprovideadequatefireprotection forperiodswhenpersonnel arerequiredtoworkintheseareas,COOKNUCLEARPLANT-UNIT2B3/47-6AMENDMENT NO.6k,  
 
'I~4 PLANTSYSTEMSBASES34.7.9Continued Intheeventthatportionsofthefiresuppression systemsareinoperable, alternate backupfirefightingequipment isrequiredtobemadeavailable intheaffectedareasuntiltheinoperable equipment isrestoredtoservice.Whentheinoperable fire-fighting equipment isintendedforuseasabackupmeansoffiresuppression, alongerperiodoftimeisallowedtoprovideanalternate meansoffirefightingthaniftheinoperable equipment istheprimarymeansoffiresuppression.
k H f
Backupfireprotection equipment willnormallytaketheformofpermanently mountedfireextinguishers and/orfirehosestationsinornearthearea,orfirehosesroutedtotheaffectedarea.Intheeventthatthefirewatertanksbecomeinoperable, LakeMichiganmayserveastheirbackup.Twomanual,diesel-engine driven,vertical-turbine firepumpsratedat2000gpm,whichtakesuctionoffofLakeMichiganandprovidewatertothefiresuppression header,areadministratively controlled.
            ~ ~ t  II
Oneofthesepumpsmayserveasabackuptooneofthefiresuppression pumpsthattakesuctionoffofthetanks.However,itisnotourintenttorelyonbackupsystemsorothercompensatory measuresforanextendedperiodoftimeandactionwillbetakentorestoretheinoperable portionsofthefiresuppression systemtoOPERABLEstatuswithinareasonable period.Thesurveillance requirements provideassurance thattheminimumOPERABILITY requirements ofthefiresuppression systemsaremet.Whileperforming thesurveillances specified in4.7.9.1.1 thefiresuppression watersystemisstillcapableofperforming itsintendedfunction.
    ~ l            N
Consequently, itisnotnecessary toentertheACTIONSTATEMENT specified in3.7.9.1whiletheSURVEILLANCES specified in4.7.9.1.1 arebeingperformed, unlessthetestedequipment failstheSURVEILLANCE.
                        ~ I N
Inaddition, anallowance ismadeforensuringasufficient volumeofHalonandC02intheHalonandC02storagetanksbyverifying eithertheweight,level,orpressureofthetanks.Thefiresuppression watersystemhasthreefirepumpscommontobothunitswhichdischarge intounderground ringheaders.Thereisonemotor-driven horizontal centrifugal firepumpratedat2500gpmthattakessuctionfromthefirewaterstoragetanks;andtwodiesel-engine-driven horizontal centrifugal firepumpsratedat2500gpmthattakesuctionfromthefirewaterstoragetanks.Havingacombination ofdiesel-driven andelectric-motor-driven pumpsinthesystemdesignisconsistent withNRCBranchTechnical PositionAPSCB9'-1.TheflowpathscapableoftakingsuctionfromLakeMichiganarenormallyisolatedtoprecludezebramusselinfestation ofthesystem.COOKNUCLEARPLANT-UNIT2B3/47-7AMENDMENT NO.
P k 'I 1 II f ~
43PC-II BASES34.7.9Continued Thepurposeofthecharcoalfilterfiresuppression T/Sistoaccountfordetection andsuppression offiresinthecharcoalfilters.Manualoperation ofthesesystemsisallowedbecausetwo-point heatdetection withcontrolroomandlocalannunciation oftroubleconditions isprovidedforthecharcoalfilters.TheOPERABILITY ofthefiresuppression systemprotecting thecharcoalfiltersisonlyrequiredwhenthereischarcoalinthefilters.Actuation ofspraywaterontothecharcoalfiltersrequiresboththemanualopeningofthesystemisolation valveandreachingthehightemperature alarmsetpointfortheautomatic openingofthesystemdelugevalve.Becauseoftheinaccessibility ofthelowercontainment topersonnel duringoperation duetoALARAradiation exposureconcerns, theuseofoneormoreCCTVsinthelowercontainment, tomonitorforfireandsmoke,isanacceptable substitute toacontinuous firewatch,ifthefiresuppression systembecomesinoperable.
 
Allhourlyfirewatchpatrolsareperformed atintervals ofsixtyminuteswithamarginoffifteenminutes.Acontinuous firewatchrequiresthatatrainedindividual beinthespecified areaatalltimesandthateachfirezonewithinthespecified areabepatrolled atleastonceeveryfifteenminuteswithamarginoffiveminutes.Acontrolvalveisdefinedasavalvethatwhencloseddoesnotleaveanalternate openflowpathtoasystem,Asectionalizing valveisdefinedasavalvethatwhencloseddoesnotpreventanalternate openflowpathtoasystemandhencedoesnotmakethefiresuppression watersysteminoperable.
BASES 3  4.7.9  FIRE SUPPRESSION SYSTEMS The OPERABILITY  of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression systems consist of the water system, spray and/or sprinklers, CO , Halon and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.
Undercertainsituations, theclosureofasectionalizing valvefollowedbytheclosureofasecondvalvewillnotleaveanopenflowpathtooneofthespecified systems.Inthisinstance, ActionStatement cofSpecification 3.7.9.1isapplicable.
In the event that one or more C02 suppression systems requiring automatic actuation must be isolated for personal protection to permit entry for routine tours, maintenance, construction, or surveillance testing in the protected area, the fire detection system(s) required to be OPERABLE by Specification 3.3.3.7 shall be verified to be OPERABLE. Isolation of an automatic C02 suppression system temporarily puts this system in a manual actuation mode.
Manualactuation ofCOfiresuppression systemsprovidesadequatefireprotection fortheprotected areasbasedonoperablefiredetection inthearea,lowcombustible
Reliance on the fire detection system, in conjunction with the ability to manually discharge the CO suppression system will provide adequate fire protection for periods when personnel are required to work in these areas.
: loadings, andpromptfirebrigaderesponsetoalarms.COOKNUCLEARPLANT-UNIT2B3/47-8AMENDMENT NO.4k, I1h4'P,P'14I&rl' BASES34.7.9Continued ManyoftheActionStatements takecreditforOPERABLEfiredetection inlieuofafirewatchwhenafireprotection systemisinoperable.
In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service. When the inoperable fire fighting equipment is intended for use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than if the inoperable equipment is the primary means of fire suppression. Backup fire protection equipment will normally tak'e the form of permanently mounted fire extinguishers and/or fire hose stations in or near the area, or fire hoses routed to the affected area.
OPERABLEfiredetection providessufficient earlywarningcapability ofafiretotheappropriate ControlRoom.DuringSurveillance TestingofaLowPressureCOSystemwiththesysteminoperable, therequirement foracontinuous firewatchmaybesuspended duringportionsofthetestwhichresultormayresultinadischarge intotheCOprotected area.Similarly, ifaC02actuation occurswhichresultsintheneedtohavetheLowPressureCOSystemmadeinoperable, therequirement foracontinuous firewatchmaybesuspended.
In the event that the fire water tanks become inoperable, Lake Michigan may serve as their backup. Two manual, diesel-engine driven, vertical-turbine fire pumps rated at 2000 gpm, which take suction off of Lake Michigan and provide water to the fire suppression header, are administratively controlled, One of these pumps may serve as a backup to one of the fire suppression pumps that take suction off of the tanks. However, it is not our intent to rely on backup systems or other compensatory measures for an extended period of time and action will be taken to restore the inoperable portions of the fire suppression system to OPERABLE status within a reasonable period.
Ineithercase,theareaaffectedshallberestoredtohabitability assoonaspracticable, afterwhichthecontinuous firewatchistobere-established ifthesystemisstillinoperable.
The  surveillance requirements provide assurance that the minimum OPERABILITY requirements of the fire suppression systems are met. While performing the surveillances specified in 4.7.9.1 the fire suppression water system is  still capable of performing its intended function. Consequently,   it  is not necessary to enter the ACTION STATEMENT specified in 3.7.9.1 while the SURVEILLANCES specified in 4.7.9.1.1 are being performed, unless the tested equipment fails the SURVEILLANCE. In addition, an allowance is made for ensuring a sufficient volume of Halon and COi in the Halon and COi storage tanks by verifying either the weight, level, or pressure of the tanks.
34.7.10FIRERATEDASSEMBLIES TheOPERABILITY ofthefirebarriersandbarrierpenetrations e'nsuresthatfiredamagewillbelimited.Thesedesignfeaturesminimizethepossibility ofasinglefireinvolving morethanonefireareapriortodetection andextinguishment.
COOK NUCLEAR PLANT  - UNIT 1        B 3/4 7-7                  AMENDMENT NO 68" ')gg8 I
Thefirebarriersandfirebarrierpenetration sealingdevicesareperiodically inspected toverifytheirOPERABILITY.
 
Thefunctional testingofthefiredampersisprovidedtoensurethatthedampersremainfunctional.
1 t  r
Theventilation sealsaresealsaroundventilation ductworkpenetrating firebarriers.
* V a
Itisnotourintenttorelyonbackupsystemsorothercompensatory measuresforanextendedperiodoftimeandACTIONwillbetakentorestoretheinoperable portionsofthefireratedassemblytoOPERABLEstatuswithinareasonable period.Forthepurposeofdetermining OPERABILITY, anOPERABLEfireratedassembly/sealing deviceisonethatiscapableofperforming itsintendedsafetyfunction.
V S    at Pl I f  I!
COOKNUCLEARPLANT-UNIT2B3/47-9AMENDMENT NO.July15,1986BasesClarification}}
 
BASES 3  4.4.7.9  Continued The fire suppression water system has three fire pumps common to both units which discharge into underground ring headers,    There is one motor-driven horizontal centrifugal fire pump rated at 2500 gpm that takes suction from the fire water storage tanks; and two diesel-engine-driven horizontal centrifugal fire pumps rated at 2500 gpm that take suction from the fire water storage tanks. Having a combination of diesel-driven and electric motor-driven pumps in the system design is consistent with NRC Branch Technical Position APSCB 9.5-1.
The  flow paths capable of taking suction from Lake Michigan are normally isolated to preclude zebra mussel infestation of the system.
The purpose  of the charcoal filter fire suppression T/S is to account for detection and suppression of fires in the charcoal filters. Manual operation of these systems is allowed because two-point heat detection with control room and local annunciation of trouble conditions is provided for the charcoal filters. The OPERABILITY of the fire suppression system protecting the charcoal filters is only required when there is charcoal in the filters.
Actuation of spray water onto the charcoal filters requires both the manual opening of the system isolation valve and reaching the high temperature alarm setpoint for the automatic opening of the system deluge valve.
Because  of the inaccessibility of the lower containment to personnel during operation due to ALARA radiation exposure concerns, the use of one or more CCTVs in the lower containment, to monitor for fire and smoke, is an acceptable substitute to an hourly fire watch, becomes inoperable.
if the fire suppression system All hourly fire watch patrols  are performed at intervals of  sixty minutes with a margin of fifteen minutes.
A  continuous fire watch requires that a trained individual be in the specified area at all times and that each fire zone within the specified area be patrolled at least once every fifteen minutes with a margin of five minutes.
COOK NUCLEAR PLANT  - UNIT 1        B 3/4 7-8            AMENDMENT NO, 480, 484
 
4
    ."t    t r
          ~ ~
I I
J v
 
BASES 3  4.7.9  Continued A  control valve is defined as a valve that when closed does not leave an alternate open flow path to a system. A sectionalizing valve is defined          as a valve that when closed does not prevent an alternate open flow path to a system and hence does not make the fire suppression water system inoperable.
Under certain situations, the closure of a sectionalizing valve followed by the closure of a second valve will not leave an open flow path to one of the specified systems. In this instance, Action Statement        c of Specification 3.7.9.1 is applicable.
Manual  actuation of CO fire suppression systems provides adequate fire protection for the prospected areas based on OPERABLE fire detection in the area, low combustible loadings, and prompt fire brigade response to alarms.
Many  of the Action Statements take credit for OPERABLE fire detection in lieu of a  fire watch when a fire protection system is inoperable. OPERABLE fire detection provides sufficient early warning capability of a fire to the appropriate Control  Room.
During Surveillance Testing of a Low Pressure CO System with the system inoperable, the requirement for a continuous fire watch may be suspended during portions of the test which result or may result in a discharge into the CO  protected area. Similarly,     if a CO actuation occurs which results in the need to have the Low Pressure C02 System made inoperable, the requirement for a continuous fire watch may be suspended.       In either case, the area affected shall be restored to habitability as soon as practicable, after which the continuous fire watch is to be re-established      if the system is  still inoperable.
4.7.10  FIRE RATED ASSEMBLIES The OPERABILITY of the    fire barriers and barrier penetrations ensure that      fire damage  will be limited. These design features minimize the possibility of a single  fire involving more than one  fire  area prior to detection and extinguishment. The    fire barriers and   fire  barrier penetration sealing devices are periodically inspected to verify their OPERABILITY. The functional testing of the    fire  dampers is provided to ensure that the dampers remain functional. The ventilation seals area seals around ventilation duct work penetrating  fire  barriers. It is not our intent to rely on backup systems or other compensatory measures for an extended period of time and action will be taken to restore the inoperable portions of the fire rated assembly to OPERABLE status within a reasonable period.
For the purpose of determining OPERABILITY, an OPERABLE fire rated assembly and/or sealing device is one that is capable of performing its intended safety function.
COOK NUCLEAR PLANT  - UNIT 1        B  3/4 7-9             AMENDMENT NO,  480,
 
f ~,
0      1 4 - I k k II ~  $  II II, I  4 h,
A
 
PLANT SYSTEMS 3 4.7.9   PIRE SUPPRESSION SYSTEMS PIRE SUPPRESSION WATER SYSTEM LIMITING CONDITION    FOR OPERATION 3,7.9.1   The  fire  suppression water system shall be considered to be    OPERABLE with:
: a. Three  fire  suppression system pumps, 'ach with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header,
: b. Two  fire water tanks, each with a minimum usable volume of 565,000 gallons. (34.0 feet level indication) c ~  An OPERABLE  flow path capable of taking suction from either one of the  fire water tanks and transferring the water through distribution piping (with OPERABLE sectionalizing valves) up to the yard hydrant curb control valves, to the hose station valve(s) and water suppression system controlling valve(s). The hose station valve(s) and the water suppression system controlling valve(s) that are required to be in the flow path are given in Specifications 3.7.9.5 and  3.7.9.2, respectively.
APPLICABILITY: At  all  times.
ACTION:
: a. With one  pump  inoperable, restore the inoperable pump to OPERABLE status within  7  days or provide an alternate backup pump.
: b. With one  fire  water tank inoperable, restore the inoperable tank to OPERABLE  status within 30 days or establish a backup water system supply.
c>>  With the  fire  suppression water system otherwise inoperable:
: 1. Restore the    fire suppression water distribution system to OPERABLE  status within  24 hours, or
: 2. Establish  a backup  fire  suppression water system within 24 hours.
: d. The  provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
+ These pumps and tanks are shared between Units 1 and 2.
COOK NUCLEAR PLANT  - UNIT  2        3/4 7-36              AMENDMENT NO.
 
C.
P I ~
    ~V ya l
 
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.9.1.1  The  fire  suppression water system shall be demonstrated      OPERABLE:
: a. At least once per 7 days by verifying the water supply contained in the fire water tanks.
: b. At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating    it  for at least 15 minutes on recirculation flow.
c ~  At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
: d. At least once per    6  months by performance  of a system  flush of  above ground  internal distribution headers    and fire hydrants.
: e. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
At least once per 18 months by performing a system functional test which includes simulated automatic actuation of the system throughout its operating sequence, and:
: 1. Verifying that each automatic valve in the flow path actuates to its correct position,
: 2. Verifying that each pump develops a flow of at least 2500 gpm at a system head of at least 300 feet of water by observing three points (minimum, rated, and peak) on the pump's performance curve,
: 3. Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel,  and
: 4. Verifying that    each pump  starts in its preplanned  sequence  to maintain the fire suppression water system pressure greater than or equal to 100 psig.
go  At least once per    3 years by performing a series of flow tests so that every fire    main segment (excluding individual system supplies) has been verified to be clear of obstruction by a      full flow test.
COOK NUCLEAR PLANT  - UNIT  2          3/4 7-37              AMENDMENT NO. 44, 445
 
~ ~ I I ~
 
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS        Continued 4.7.9.1.2    The  fire  pump  diesel engines shall  be demonstrated  OPERABLE:
: a. At least once per      31 days by verifying:
1,    The fuel storage tanks contain at least      160 gallons of fuel, and
: 2. The diesels start from ambient conditions and operate for at least  30  minutes.
: b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tanks obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.
c>>  At least once per 18 months by subjecting the diesels to an inspection in accordance with procedures prepared in conjunction with the manufacturer's recommendations for this class of standby service.
4.7.9.1.3  The  fire pump  diesel starting battery banks  and chargers  shall  be demonstrated  OPERABLE:
: a. At least once per      7 days by verifying that:
: 1. The electrolyte level of    each battery is  above the plates,  and
: 2. The output battery voltage of each bank is greater than 24 volts.
: b. At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.
c  ~  At least once per      18 months by  verifying that:
: 1. The batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and
: 2. The battery-to-battery    and  terminal connections are clean, tight, free of corrosion,    and coated with anti-corrosion material.
COOK NUCLEAR PLANT    - UNIT  2        3/4 7-38                AMENDMENT NO. 44,
                                                                                        ,'I
 
e k 1 ll I
t L ~
J
                          'y)
  'I ~    l
\ ~
 
PLANT SYSTEMS BASES The  service life of a snubber is evaluated via manufacturer's input and information through consideration of the snubber service conditions and associated installation and maintenance records (newly installed snubber, seal replaced, spring replaced, in high radiation area, in high temperature area, etc...). The requirement to monitor the snubber service life is included to ensure that the snubbers periodically undergo a performance evaluation in view of their age and operating conditions. These records will provide statistical bases for future consideration of snubber service life. The requirements for the maintenance of records and the snubber service life review are not intended to affect plant operation.
The number of snubbers to be functionally tested during each surveillance is based on calculations performed to allow extension of the surveillance interval from 18 months to 24 months, and therefore, the number of snubbers functionally tested deviates from the number required by the Westinghouse Standard Technical Specifications (NUREG-0452, Revision 4).
3 4.7.8  SEALED SOURCE CONTAMINATION The  limitations on removable contamination for sources requiring leak testing, including alpha emitters, is based on 10 CPR 70.39(c) limits for plutonium.
This limitation will ensure that leakage from byproduct, source, and special nuclear material sources will not exceed allowable intake values.
3 4.7.9    PIRE SUPPRESSION SYSTEMS The OPERABILITY  of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers, CO2, halon and fire hose stations.      The collective capability of the fire suppression systems  is  adequate to  minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.
In the event that one or more C02 suppression systems requiring automatic actuation must be isolated for personal protection to permit entry for routine tours, maintenance, construction, or surveillance testing in the protected area, the fire detection system(s) required to be OPERABLE by Specification 3.3.3.7 shall be verified to be OPERABLE. Isolation of an automatic C02 suppression syst: em temporarily puts this system in a manual actuation mode.
Reliance on the fire detection system, in conjunction with the ability to manually discharge the CO suppression system, will provide adequate fire protection for periods when personnel are required to work in these areas, COOK NUCLEAR PLANT  - UNIT  2        B 3/4 7-6              AMENDMENT NO. 6k,
 
I~
4
 
PLANT    SYSTEMS BASES 3  4.7.9  Continued In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service. When the inoperable  fire-fighting equipment is  intended for  use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than    if the inoperable equipment is the primary means of fire suppression. Backup fire protection equipment will normally take the form of permanently mounted fire extinguishers and/or fire hose stations in or near the area, or fire hoses routed to the affected area.
In the event that the fire water tanks become inoperable, Lake Michigan may serve as their backup. Two manual, diesel-engine driven, vertical-turbine fire pumps rated at 2000 gpm, which take suction off of Lake Michigan and provide water to the fire suppression header, are administratively controlled.
One of these pumps may serve as a backup to one of the fire suppression pumps that take suction off of the tanks. However, it is not our intent to rely on backup systems or other compensatory measures for an extended period of time and action will be taken to restore the inoperable portions of the fire suppression system to OPERABLE status within a reasonable period.
The  surveillance requirements provide assurance that the minimum OPERABILITY requirements of the fire suppression systems are met. While performing the surveillances specified in 4.7.9.1.1 the fire suppression water system is still  capable of performing its intended function. Consequently,    it  is not necessary to enter the ACTION STATEMENT specified in 3.7.9.1 while the SURVEILLANCES specified in 4.7.9.1.1 are being performed, unless the tested equipment fails the SURVEILLANCE. In addition, an allowance is made for ensuring a sufficient volume of Halon and C02 in the Halon and C02 storage tanks by verifying either the weight, level, or pressure of the tanks.
The fire suppression water system has three fire pumps common to both units which discharge into underground ring headers. There is one motor-driven horizontal centrifugal fire pump rated at 2500 gpm that takes suction from the fire water storage tanks; and two  diesel-engine-driven horizontal centrifugal fire pumps rated at 2500 gpm that  take suction from the  fire water storage tanks. Having a combination of diesel-driven and electric-motor-driven pumps in the system design is consistent with NRC Branch Technical Position APSCB 9 '-1.
The  flow paths capable of taking suction from Lake Michigan are normally isolated to preclude zebra mussel infestation of the system.
COOK NUCLEAR PLANT  - UNIT 2        B 3/4 7-7        AMENDMENT NO.
 
4 3 P C
    -II
 
BASES 3 4.7.9  Continued The purpose  of the charcoal filter fire suppression T/S is to account for detection and suppression of fires in the charcoal filters. Manual operation of these systems is allowed because two-point heat detection with control room and local annunciation of trouble conditions is provided for the charcoal filters. The OPERABILITY of the fire suppression system protecting the charcoal filters is only required when there is charcoal in the filters.
Actuation of spray water onto the charcoal filters requires both the manual opening of the system isolation valve and reaching the high temperature alarm setpoint for the automatic opening of the system deluge valve.
Because of the inaccessibility of the lower containment to personnel during operation due to ALARA radiation exposure concerns, the use of one or more CCTVs in the lower containment, to monitor for fire and smoke, is an acceptable substitute to a continuous fire watch,  if the fire suppression system becomes inoperable.
All hourly fire  watch patrols are performed at intervals of sixty minutes with a margin of  fifteen minutes.
A continuous fire watch requires that a trained individual be in the specified area at all times and that each fire zone within the specified area be patrolled at least once every fifteen minutes with a margin of five minutes.
A  control valve is defined as a valve that when closed does not leave an alternate open flow path to a system, A sectionalizing valve is defined as a valve that when closed does not prevent an alternate open flow path to a system and hence does not make the fire suppression water system inoperable.
Under certain situations, the closure of a sectionalizing valve followed by the closure of a second valve will not leave an open flow path to one of the specified systems. In this instance, Action Statement c of Specification 3.7.9.1 is applicable.
Manual  actuation of CO fire suppression systems provides adequate fire protection for the protected areas based on operable fire detection in the area, low combustible loadings, and prompt fire brigade response to alarms.
COOK NUCLEAR PLANT  - UNIT 2      B  3/4 7-8        AMENDMENT NO. 4k,
 
I 1    h 4 '
P, P
                  '14I&
l'r
 
BASES 3  4.7.9  Continued Many  of the Action Statements take credit for OPERABLE fire detection in lieu of a  fire watch when a fire protection system is inoperable. OPERABLE fire detection provides sufficient early warning capability of a fire to the appropriate Control  Room.
During Surveillance Testing of a Low Pressure CO System with the system inoperable, the requirement for a continuous fire watch may be suspended during portions of the test which result or may result in a discharge into the CO  protected area. Similarly,    if a C02 actuation occurs which results in the need to have the Low Pressure CO System made inoperable, the requirement for a continuous fire watch may be suspended.      In either case, the area affected shall be restored to habitability as soon as practicable, after which the continuous fire watch is to be re-established      if  the system is  still inoperable.
3  4.7.10 FIRE  RATED ASSEMBLIES The OPERABILITY of the  fire barriers and barrier penetrations e'nsures that fire  damage  will be limited. These design features minimize the possibility of a single  fire involving more than one  fire  area prior to detection and extinguishment. The    fire barriers and  fire  barrier penetration sealing devices are periodically inspected to verify their OPERABILITY. The functional testing of the  fire dampers is provided to ensure that the dampers remain functional. The ventilation seals are seals around ventilation duct work penetrating fire barriers. It is not our intent to rely on backup systems or other compensatory measures for an extended period of time and ACTION will be taken to restore the inoperable portions of the fire rated assembly to OPERABLE status within a reasonable period.
For the purpose of determining OPERABILITY, an OPERABLE fire rated assembly/sealing device is one that is capable of performing its intended safety function.
COOK NUCLEAR PLANT  - UNIT 2        B  3/4 7-9          AMENDMENT NO.
July 15, 1986 Bases  Clarification}}

Latest revision as of 01:38, 4 February 2020

Proposed TS 3/4.7.9 Re Fire Suppression Water Sys & TS 4.7.9.1.1 Re SR for Fire Suppression Water Sys
ML17331A026
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/27/1993
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331A025 List:
References
NUDOCS 9302020075
Download: ML17331A026 (26)


Text

Attachment to AEP:NRC:0692CL Donald C. Cook Nuclear Plant Units 1 and 2 Technical Specifications 9302020075 930127

'PDR ADOCK 050003i5 P PDR j

I

'h c ~

PLANT SYSTEMS 3 4.7.9 FIRE SUPPRESSION SYSTEMS FIRE SUPPRESSION WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.9.1 The fire suppression water system shall be considered to be OPERABLE with:

a. Three fire suppression system pumps, 'ach with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header,
b. Two fire water tanks, 'ach with a minimum usable volume of 565,000 gallons (34.0 feet level indication).

Ce An OPERABLE flow path capable of taking suction from either one of the fire water tanks and transferring the water through distribution piping (with OPERABLE sectionalizing valves) up to the yard hydrant curb control valves, to the hose station valve(s) and water suppression system controlling valve(s). The hose station valve(s) and the water suppression system controlling valve(s) that are required to be in .the flow path are given in Specifications 3.7.9.5 and 3.7.9.2, respectively.

APPLICABILITY: At all times.

ACTION:

a. With one pump inoperable, restore the inoperable pump to OPERABLE status within 7 days or provide an alternate backup pump.
b. With one fire water tank inoperable, restore the inoperable tank to OPERABLE status within 30 days or establish a backup water system supply.

ce With the fire suppression water system otherwise inoperable:

1. Restore the fire suppression water distribution system to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or
2. Establish a backup fire suppression water system within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d, The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

+ These pumps and tanks are shared between Units 1 and 2.

COOK NUCLEAR PLANT - UNIT 1 3/4 7-41 AMENDMENT NO.

PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4 '.9.1.1 The fire suppression ~ater system shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying the water supply contained in the fire water tanks.

At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating it for at least 15 minutes on recirculation flow.

c ~ At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.

d. At least once per 6 months by performance of a system flush of above ground internal distribution headers and fire hydrants.
e. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.

At least once per 18 months by performing a system functional test.

which includes simulated automatic actuation of the system throughout its operating sequence, and:

1. Verifying that each automatic valve in the flow path actuates to its correct position,
2. Verifying that each pump develops a flow of at least 2500 gpm at a system head of at least 300 feet of water by observing three points (minimum, rated, and peak) on the pump's performance curve,
3. Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel, and
4. Verifying that each pump starts in its preplanned sequence to maintain the fire suppression water system pressure greater than or equal to 100 psig.

go At least once per 3 years by performing a series of flow tests so that every fire main segment (excluding individual system supplies) has been verified to be clear of obstruction by a full flow test.

COOK NUCLEAR PLANT - UNIT 1 3/4 7-42 AMENDMENT NO.

PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4,7.9.1.2 The fire pump diesel engines shall be demonstrated OPERABLE:

a. At least once per 31 days by verifying:
1. The fuel storage tanks contain at least 160 gallons of fuel, and
2. The diesels start from ambient conditions and operate for at least 30 minutes.
b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tanks obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.

co At least once per 18 months by subjecting the diesels to an inspection in accordance with procedures prepared in conjunction with the manufacturer's recommendations for this class of standby service.

4.7,9.1.3 The fire pump diesel starting battery banks and chargers shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that;
1. The electrolyte level of each battery is above the plates, and
2. The output battery voltage of each bank is greater than 24 volts.
b. At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.

co At least once per 18 months by verifying that:

1. The batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and
2. The battery-to-battery and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material.

COOK NUCLEAR PLANT - UNIT 1 3/4 7-43 AMENDMENT NO.

k H f

~ ~ t II

~ l N

~ I N

P k 'I 1 II f ~

BASES 3 4.7.9 FIRE SUPPRESSION SYSTEMS The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression systems consist of the water system, spray and/or sprinklers, CO , Halon and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.

In the event that one or more C02 suppression systems requiring automatic actuation must be isolated for personal protection to permit entry for routine tours, maintenance, construction, or surveillance testing in the protected area, the fire detection system(s) required to be OPERABLE by Specification 3.3.3.7 shall be verified to be OPERABLE. Isolation of an automatic C02 suppression system temporarily puts this system in a manual actuation mode.

Reliance on the fire detection system, in conjunction with the ability to manually discharge the CO suppression system will provide adequate fire protection for periods when personnel are required to work in these areas.

In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service. When the inoperable fire fighting equipment is intended for use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than if the inoperable equipment is the primary means of fire suppression. Backup fire protection equipment will normally tak'e the form of permanently mounted fire extinguishers and/or fire hose stations in or near the area, or fire hoses routed to the affected area.

In the event that the fire water tanks become inoperable, Lake Michigan may serve as their backup. Two manual, diesel-engine driven, vertical-turbine fire pumps rated at 2000 gpm, which take suction off of Lake Michigan and provide water to the fire suppression header, are administratively controlled, One of these pumps may serve as a backup to one of the fire suppression pumps that take suction off of the tanks. However, it is not our intent to rely on backup systems or other compensatory measures for an extended period of time and action will be taken to restore the inoperable portions of the fire suppression system to OPERABLE status within a reasonable period.

The surveillance requirements provide assurance that the minimum OPERABILITY requirements of the fire suppression systems are met. While performing the surveillances specified in 4.7.9.1 the fire suppression water system is still capable of performing its intended function. Consequently, it is not necessary to enter the ACTION STATEMENT specified in 3.7.9.1 while the SURVEILLANCES specified in 4.7.9.1.1 are being performed, unless the tested equipment fails the SURVEILLANCE. In addition, an allowance is made for ensuring a sufficient volume of Halon and COi in the Halon and COi storage tanks by verifying either the weight, level, or pressure of the tanks.

COOK NUCLEAR PLANT - UNIT 1 B 3/4 7-7 AMENDMENT NO 68" ')gg8 I

1 t r

  • V a

V S at Pl I f I!

BASES 3 4.4.7.9 Continued The fire suppression water system has three fire pumps common to both units which discharge into underground ring headers, There is one motor-driven horizontal centrifugal fire pump rated at 2500 gpm that takes suction from the fire water storage tanks; and two diesel-engine-driven horizontal centrifugal fire pumps rated at 2500 gpm that take suction from the fire water storage tanks. Having a combination of diesel-driven and electric motor-driven pumps in the system design is consistent with NRC Branch Technical Position APSCB 9.5-1.

The flow paths capable of taking suction from Lake Michigan are normally isolated to preclude zebra mussel infestation of the system.

The purpose of the charcoal filter fire suppression T/S is to account for detection and suppression of fires in the charcoal filters. Manual operation of these systems is allowed because two-point heat detection with control room and local annunciation of trouble conditions is provided for the charcoal filters. The OPERABILITY of the fire suppression system protecting the charcoal filters is only required when there is charcoal in the filters.

Actuation of spray water onto the charcoal filters requires both the manual opening of the system isolation valve and reaching the high temperature alarm setpoint for the automatic opening of the system deluge valve.

Because of the inaccessibility of the lower containment to personnel during operation due to ALARA radiation exposure concerns, the use of one or more CCTVs in the lower containment, to monitor for fire and smoke, is an acceptable substitute to an hourly fire watch, becomes inoperable.

if the fire suppression system All hourly fire watch patrols are performed at intervals of sixty minutes with a margin of fifteen minutes.

A continuous fire watch requires that a trained individual be in the specified area at all times and that each fire zone within the specified area be patrolled at least once every fifteen minutes with a margin of five minutes.

COOK NUCLEAR PLANT - UNIT 1 B 3/4 7-8 AMENDMENT NO, 480, 484

4

."t t r

~ ~

I I

J v

BASES 3 4.7.9 Continued A control valve is defined as a valve that when closed does not leave an alternate open flow path to a system. A sectionalizing valve is defined as a valve that when closed does not prevent an alternate open flow path to a system and hence does not make the fire suppression water system inoperable.

Under certain situations, the closure of a sectionalizing valve followed by the closure of a second valve will not leave an open flow path to one of the specified systems. In this instance, Action Statement c of Specification 3.7.9.1 is applicable.

Manual actuation of CO fire suppression systems provides adequate fire protection for the prospected areas based on OPERABLE fire detection in the area, low combustible loadings, and prompt fire brigade response to alarms.

Many of the Action Statements take credit for OPERABLE fire detection in lieu of a fire watch when a fire protection system is inoperable. OPERABLE fire detection provides sufficient early warning capability of a fire to the appropriate Control Room.

During Surveillance Testing of a Low Pressure CO System with the system inoperable, the requirement for a continuous fire watch may be suspended during portions of the test which result or may result in a discharge into the CO protected area. Similarly, if a CO actuation occurs which results in the need to have the Low Pressure C02 System made inoperable, the requirement for a continuous fire watch may be suspended. In either case, the area affected shall be restored to habitability as soon as practicable, after which the continuous fire watch is to be re-established if the system is still inoperable.

3 4.7.10 FIRE RATED ASSEMBLIES The OPERABILITY of the fire barriers and barrier penetrations ensure that fire damage will be limited. These design features minimize the possibility of a single fire involving more than one fire area prior to detection and extinguishment. The fire barriers and fire barrier penetration sealing devices are periodically inspected to verify their OPERABILITY. The functional testing of the fire dampers is provided to ensure that the dampers remain functional. The ventilation seals area seals around ventilation duct work penetrating fire barriers. It is not our intent to rely on backup systems or other compensatory measures for an extended period of time and action will be taken to restore the inoperable portions of the fire rated assembly to OPERABLE status within a reasonable period.

For the purpose of determining OPERABILITY, an OPERABLE fire rated assembly and/or sealing device is one that is capable of performing its intended safety function.

COOK NUCLEAR PLANT - UNIT 1 B 3/4 7-9 AMENDMENT NO, 480,

f ~,

0 1 4 - I k k II ~ $ II II, I 4 h,

A

PLANT SYSTEMS 3 4.7.9 PIRE SUPPRESSION SYSTEMS PIRE SUPPRESSION WATER SYSTEM LIMITING CONDITION FOR OPERATION 3,7.9.1 The fire suppression water system shall be considered to be OPERABLE with:

a. Three fire suppression system pumps, 'ach with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header,
b. Two fire water tanks, each with a minimum usable volume of 565,000 gallons. (34.0 feet level indication) c ~ An OPERABLE flow path capable of taking suction from either one of the fire water tanks and transferring the water through distribution piping (with OPERABLE sectionalizing valves) up to the yard hydrant curb control valves, to the hose station valve(s) and water suppression system controlling valve(s). The hose station valve(s) and the water suppression system controlling valve(s) that are required to be in the flow path are given in Specifications 3.7.9.5 and 3.7.9.2, respectively.

APPLICABILITY: At all times.

ACTION:

a. With one pump inoperable, restore the inoperable pump to OPERABLE status within 7 days or provide an alternate backup pump.
b. With one fire water tank inoperable, restore the inoperable tank to OPERABLE status within 30 days or establish a backup water system supply.

c>> With the fire suppression water system otherwise inoperable:

1. Restore the fire suppression water distribution system to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or
2. Establish a backup fire suppression water system within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

+ These pumps and tanks are shared between Units 1 and 2.

COOK NUCLEAR PLANT - UNIT 2 3/4 7-36 AMENDMENT NO.

C.

P I ~

~V ya l

PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.9.1.1 The fire suppression water system shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying the water supply contained in the fire water tanks.
b. At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating it for at least 15 minutes on recirculation flow.

c ~ At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.

d. At least once per 6 months by performance of a system flush of above ground internal distribution headers and fire hydrants.
e. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.

At least once per 18 months by performing a system functional test which includes simulated automatic actuation of the system throughout its operating sequence, and:

1. Verifying that each automatic valve in the flow path actuates to its correct position,
2. Verifying that each pump develops a flow of at least 2500 gpm at a system head of at least 300 feet of water by observing three points (minimum, rated, and peak) on the pump's performance curve,
3. Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel, and
4. Verifying that each pump starts in its preplanned sequence to maintain the fire suppression water system pressure greater than or equal to 100 psig.

go At least once per 3 years by performing a series of flow tests so that every fire main segment (excluding individual system supplies) has been verified to be clear of obstruction by a full flow test.

COOK NUCLEAR PLANT - UNIT 2 3/4 7-37 AMENDMENT NO. 44, 445

~ ~ I I ~

PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.9.1.2 The fire pump diesel engines shall be demonstrated OPERABLE:

a. At least once per 31 days by verifying:

1, The fuel storage tanks contain at least 160 gallons of fuel, and

2. The diesels start from ambient conditions and operate for at least 30 minutes.
b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tanks obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.

c>> At least once per 18 months by subjecting the diesels to an inspection in accordance with procedures prepared in conjunction with the manufacturer's recommendations for this class of standby service.

4.7.9.1.3 The fire pump diesel starting battery banks and chargers shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that:
1. The electrolyte level of each battery is above the plates, and
2. The output battery voltage of each bank is greater than 24 volts.
b. At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.

c ~ At least once per 18 months by verifying that:

1. The batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and
2. The battery-to-battery and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material.

COOK NUCLEAR PLANT - UNIT 2 3/4 7-38 AMENDMENT NO. 44,

,'I

e k 1 ll I

t L ~

J

'y)

'I ~ l

\ ~

PLANT SYSTEMS BASES The service life of a snubber is evaluated via manufacturer's input and information through consideration of the snubber service conditions and associated installation and maintenance records (newly installed snubber, seal replaced, spring replaced, in high radiation area, in high temperature area, etc...). The requirement to monitor the snubber service life is included to ensure that the snubbers periodically undergo a performance evaluation in view of their age and operating conditions. These records will provide statistical bases for future consideration of snubber service life. The requirements for the maintenance of records and the snubber service life review are not intended to affect plant operation.

The number of snubbers to be functionally tested during each surveillance is based on calculations performed to allow extension of the surveillance interval from 18 months to 24 months, and therefore, the number of snubbers functionally tested deviates from the number required by the Westinghouse Standard Technical Specifications (NUREG-0452, Revision 4).

3 4.7.8 SEALED SOURCE CONTAMINATION The limitations on removable contamination for sources requiring leak testing, including alpha emitters, is based on 10 CPR 70.39(c) limits for plutonium.

This limitation will ensure that leakage from byproduct, source, and special nuclear material sources will not exceed allowable intake values.

3 4.7.9 PIRE SUPPRESSION SYSTEMS The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers, CO2, halon and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.

In the event that one or more C02 suppression systems requiring automatic actuation must be isolated for personal protection to permit entry for routine tours, maintenance, construction, or surveillance testing in the protected area, the fire detection system(s) required to be OPERABLE by Specification 3.3.3.7 shall be verified to be OPERABLE. Isolation of an automatic C02 suppression syst: em temporarily puts this system in a manual actuation mode.

Reliance on the fire detection system, in conjunction with the ability to manually discharge the CO suppression system, will provide adequate fire protection for periods when personnel are required to work in these areas, COOK NUCLEAR PLANT - UNIT 2 B 3/4 7-6 AMENDMENT NO. 6k,

I~

4

PLANT SYSTEMS BASES 3 4.7.9 Continued In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service. When the inoperable fire-fighting equipment is intended for use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than if the inoperable equipment is the primary means of fire suppression. Backup fire protection equipment will normally take the form of permanently mounted fire extinguishers and/or fire hose stations in or near the area, or fire hoses routed to the affected area.

In the event that the fire water tanks become inoperable, Lake Michigan may serve as their backup. Two manual, diesel-engine driven, vertical-turbine fire pumps rated at 2000 gpm, which take suction off of Lake Michigan and provide water to the fire suppression header, are administratively controlled.

One of these pumps may serve as a backup to one of the fire suppression pumps that take suction off of the tanks. However, it is not our intent to rely on backup systems or other compensatory measures for an extended period of time and action will be taken to restore the inoperable portions of the fire suppression system to OPERABLE status within a reasonable period.

The surveillance requirements provide assurance that the minimum OPERABILITY requirements of the fire suppression systems are met. While performing the surveillances specified in 4.7.9.1.1 the fire suppression water system is still capable of performing its intended function. Consequently, it is not necessary to enter the ACTION STATEMENT specified in 3.7.9.1 while the SURVEILLANCES specified in 4.7.9.1.1 are being performed, unless the tested equipment fails the SURVEILLANCE. In addition, an allowance is made for ensuring a sufficient volume of Halon and C02 in the Halon and C02 storage tanks by verifying either the weight, level, or pressure of the tanks.

The fire suppression water system has three fire pumps common to both units which discharge into underground ring headers. There is one motor-driven horizontal centrifugal fire pump rated at 2500 gpm that takes suction from the fire water storage tanks; and two diesel-engine-driven horizontal centrifugal fire pumps rated at 2500 gpm that take suction from the fire water storage tanks. Having a combination of diesel-driven and electric-motor-driven pumps in the system design is consistent with NRC Branch Technical Position APSCB 9 '-1.

The flow paths capable of taking suction from Lake Michigan are normally isolated to preclude zebra mussel infestation of the system.

COOK NUCLEAR PLANT - UNIT 2 B 3/4 7-7 AMENDMENT NO.

4 3 P C

-II

BASES 3 4.7.9 Continued The purpose of the charcoal filter fire suppression T/S is to account for detection and suppression of fires in the charcoal filters. Manual operation of these systems is allowed because two-point heat detection with control room and local annunciation of trouble conditions is provided for the charcoal filters. The OPERABILITY of the fire suppression system protecting the charcoal filters is only required when there is charcoal in the filters.

Actuation of spray water onto the charcoal filters requires both the manual opening of the system isolation valve and reaching the high temperature alarm setpoint for the automatic opening of the system deluge valve.

Because of the inaccessibility of the lower containment to personnel during operation due to ALARA radiation exposure concerns, the use of one or more CCTVs in the lower containment, to monitor for fire and smoke, is an acceptable substitute to a continuous fire watch, if the fire suppression system becomes inoperable.

All hourly fire watch patrols are performed at intervals of sixty minutes with a margin of fifteen minutes.

A continuous fire watch requires that a trained individual be in the specified area at all times and that each fire zone within the specified area be patrolled at least once every fifteen minutes with a margin of five minutes.

A control valve is defined as a valve that when closed does not leave an alternate open flow path to a system, A sectionalizing valve is defined as a valve that when closed does not prevent an alternate open flow path to a system and hence does not make the fire suppression water system inoperable.

Under certain situations, the closure of a sectionalizing valve followed by the closure of a second valve will not leave an open flow path to one of the specified systems. In this instance, Action Statement c of Specification 3.7.9.1 is applicable.

Manual actuation of CO fire suppression systems provides adequate fire protection for the protected areas based on operable fire detection in the area, low combustible loadings, and prompt fire brigade response to alarms.

COOK NUCLEAR PLANT - UNIT 2 B 3/4 7-8 AMENDMENT NO. 4k,

I 1 h 4 '

P, P

'14I&

l'r

BASES 3 4.7.9 Continued Many of the Action Statements take credit for OPERABLE fire detection in lieu of a fire watch when a fire protection system is inoperable. OPERABLE fire detection provides sufficient early warning capability of a fire to the appropriate Control Room.

During Surveillance Testing of a Low Pressure CO System with the system inoperable, the requirement for a continuous fire watch may be suspended during portions of the test which result or may result in a discharge into the CO protected area. Similarly, if a C02 actuation occurs which results in the need to have the Low Pressure CO System made inoperable, the requirement for a continuous fire watch may be suspended. In either case, the area affected shall be restored to habitability as soon as practicable, after which the continuous fire watch is to be re-established if the system is still inoperable.

3 4.7.10 FIRE RATED ASSEMBLIES The OPERABILITY of the fire barriers and barrier penetrations e'nsures that fire damage will be limited. These design features minimize the possibility of a single fire involving more than one fire area prior to detection and extinguishment. The fire barriers and fire barrier penetration sealing devices are periodically inspected to verify their OPERABILITY. The functional testing of the fire dampers is provided to ensure that the dampers remain functional. The ventilation seals are seals around ventilation duct work penetrating fire barriers. It is not our intent to rely on backup systems or other compensatory measures for an extended period of time and ACTION will be taken to restore the inoperable portions of the fire rated assembly to OPERABLE status within a reasonable period.

For the purpose of determining OPERABILITY, an OPERABLE fire rated assembly/sealing device is one that is capable of performing its intended safety function.

COOK NUCLEAR PLANT - UNIT 2 B 3/4 7-9 AMENDMENT NO.

July 15, 1986 Bases Clarification