{{#Wiki_filter:ATTACHMENT 2 TO AEP:NRC:1215B EXISTING TECHNICAL SPECIFICATION PAGES MARKED TO REFLECT PROPOSED CHANGES 95122b0234 951219 PDR ADOCK 05000315 P PDR CONTAXNMENT SYSTEMS CONTAXNMENT LEAKAGE LXMXTXNG CONDXTXON FOR OPERATXON 3.6.l..2 Containmene leakage rates shall be limited to: a.An overall integrated leakage rate of sL0.25 percene by weight of the coneainment air per 24 hours ae P12.0 psig, and b.A combined leakage rate of i0.60 L, for all peneeraeions and valves subject eo Types B and C.tests when pressurized to P,.1 APPLXCABXLXTY:
{{#Wiki_filter:ATTACHMENT 2 TO AEP:NRC:1215B EXISTING TECHNICAL SPECIFICATION PAGES MARKED TO REFLECT PROPOSED CHANGES 95122b0234 951219 PDR ADOCK 05000315 P             PDR
Modes 1, 2, 3 and 4.ACT XON: Pith either (a)the measured overall integrated containment leakage rate exceeding 0.75 L, or (b)with the measured combined leakage rate for all penetrations and valves subject eo es B and C tests exceedin 0.60 A5."rophMolWtHys4am eentesaPu AyPMOP&gh~~~~<w~~lee~g,&O<s7S~nad+4.~1~le+~~fuaaQPaue~+so<$
 
~Ot at~~g4~+0 7~+0 SAW Q HsQ+as>Oi(pO LC+lid'4 Q~CA4+51~le.~gag Joss(M7 SURVEXLLANCE RE UXREMENTS o~M~~~hu4z c b~20o C.4.6;1.2 n i en le r ed a ,b dern o o n ee'e e nd a b det x.te a pe f i A end 51 d.0 s X'.97: t ee at d nf C 5 es , B C er Le ge e t tin ha e em ts s ci ed.mo ve ex I egr ed d al mbi d be ond ed a or ce Ap d t 0 io Each.coneainment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.The provisions op Speoipioaeion'4.0.2 ase noe appileah1e.
CONTAXNMENT SYSTEMS CONTAXNMENT LEAKAGE LXMXTXNG CONDXTXON FOR OPERATXON 3.6.l..2     Containmene leakage rates                       shall be limited to:
f Aon-tim e ens n f e e t i erv is llo d fo th th d e A st e s on 10 ea se ce rio ori nail sc d d b p rfo ed t t e do Cy e.e e tw be er rm p or o nit es art o ow g e e re el g o age at 11 ol w e Cy e COOK NUCLEAR PLANT-UHXT L 3/4 6-2 AHENDHENT NO.48,460,4$7-A.4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.B.4.6.1.3 In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and C.4.6.1.6 The structural integrity of the containment steel liner shall be determined in accordance Appendix J Option B and Regulatory Guide September 1995.structure and with 10 CFR 50 1.163, dated CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS~a (t LIMITING CONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with: a.Both doors closed.except when=the air lock is being used, for normal'transit entry and exit through the containment, then at least one air lock door shall'be closed, and b.An overall air lock leakage rate of at P , 12 psig.a'PPLICABILITY:
: a. An   overall integrated leakage rate of sL0.25                                 percene by weight of   the coneainment               air   per 24 hours ae P 12.0 psig, and
MODES 1, 2, 3 and 4.to 0.05 L ACTXON: Wi.th an air lock i.noperable, restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY wi.thin, the next.6 hours and in COLD SWgDOMN within the following 30 hours.SURVEILLANCE RE UIRBfEVZS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE: a I te each en , ex pt en air ck i ein used or mu pie tz , w it all e do at t o e pe s~per'n r 1 ge est ou s aced res e for o e r b pres i@i the p.be een e s s t 2 ig d v xfy g a s le ge no ater an.5 Ex p on o p i"J" of C 5 COOK NUCLEAR PLANT-UNIT 1 3/4 6-4 AMENDMENT NO.~(~)
: b. A combined leakage                 rate of i0.60 L, for all peneeraeions and valves subject             eo Types B and           C.tests when pressurized to P,.
(').CONTAImENT Sysyms SURVEILLANCE RE UIREMENTS Continued v~hac 4o b.c~t le onc per mon , pe orm air akage st w out s ated ess e fo e on e do per.6.1.3., pe orm a air aka test th s ed p ssure'rce:th door,.y p ssur ing e ga etwe"the als t 12 p g a v fyi a se lea ge o o gr ter 0'.5 a't: east ce 6 m ths b cond ing ov all a-lock aka test t P 2 ps and y ve fyi that'over'ir loc ea e rat is w in i lim At least once per 6 months by verifying that only one door in each air lock can be opened at a time.~, C COOK NUCLEAR PIANT-UNIT 1 3/4 6-5 AMENDMENT NO.160 CONThINMENT SYSTEMS CONThINMENT STRUCZUEUQ.
1 APPLXCABXLXTY: Modes 1, 2,                         3   and 4.
INTEGRITY LXMXTINC CONDITION FOR'PERhTXON 3.6.1.6 The structural integrity of'the containment structure and steel liner shall be maintained at a level consistent vSth the acceptance criteria in Specification 4.6.1.6.APPLICABILITY:
ACTXON:
MODES 1, 2, 3 and 4.I JLCTXOH: Pith the structural integrity of the containment not conforming to the above requirements, restore their structural integrity to vithin the limits prior to increasing the Reactor.Coolant System temperature above 200 F.0 SURVEILLhNCE RE UIREMENTS 4.6.1.6 e ruc al te ty the ta nt s c and teel 1 al e te ed in the s tdo or e 4 c ta nt ea ge ate est ef ence pecif ati.6.'by vi 1 ecti a ac'si e s ace of th stru e st 1 r an verif g n app nt an s in ppear ce o the ac or er no eg at I hn it re rt o ny erma deg ti of e co inme s 1 er d ecte ur thes ins cti sh be e vI.1 y er d ecti COOK NUCLEhR PLANT-UNIT 1 3/4 6-9 F hMENDMENT NO:~
Pith either (a) the           measured overall integrated containment leakage rate exceeding 0.75 L, or (b) with the measured combined leakage rate for all penetrations and valves subject eo                             es B and C tests exceedin 0.60 A5."rophMolWtHys4am eentesaPu g4~ g, &O <s7S~nad             +4.     ~1~                 AyPMOP&gh le+~
0 I 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREi~q7$
          +0 7~+0 SAW Q HsQ +as > Oi(pO LC +lid'4 Q ~CA4+51~ le.
3/4.6 CONTAPS IEiVl SYSTEMS CONTAINMENT UENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.l.7 The coatainmcat purge supply aad exhaust system shall bc closed.except when operation of thc containmcat purge system is required for ptessute coatto1, AUG', and rcspirablc air quaHty coasidctatioas for personnel catty, and for sutveiHancc testing and maintenance activities.
SURVEXLLANCE RE             UXREMENTS
No more than onc purge supply path and oac purge exhaust path shaH bc open at a time.APPLICABILITY:
                                                                    ~
MODES I, 2, 3, aad 4.ACTION'.With onc eontaiameat purge supply and/or one exhaust isolation valve inoperable, isolate thc affected pcaetratioa by usc of at least oac automauc valve secuted in thc.closed positioa, and, withia 72 bouts, either: I)Restore the iaoperablc valve to OPERABLE status, or, 2)Deactivate thc automatic valve secured in the dosed position.b.Operatioa may thea coatiaue until performance of the next tequited valve test provided that thc automatic valve scouted in thc closed position is vcriTied to be deactivated ia the closed po'sitioa at least once per 3l days.c..Otherwise, bc in at least HOT STANDBY withh thc next 6 heirs and h COLD SHUTDOWN within the fallowing 30 hours.('.'I I d.Thc provisions of SpcciGeation 3.0.4 ate not applicable.
o~ M~~~ hu4z
SURUEILLANCE RE UIREMENTS 4.6.l.7.1 The survciHanee requirements of Tcchnical Speeilication 3/4.66.I apply." 5 r/v.(.,(,z.
                                                                                        ~~~~ <w~~
a~A COOK i IUCLEAR PLANT-UiT I Page 3/4 6 9a AiIEND~IZix 66 P
fuaaQPaue~+so<$
0 CON AINMENT SYSTEMS CONTAINM-"NT LEAKAGE LIMITI G CONDIT ON FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to: a.An overall integrated leakage rate of sL, 0.25 percent by weight of the containment air per 24 hours at P12.0 psig, and b.A combined leakage rate of s0.60 L, for'all penetrations and valves subject to Types'and C tests when pressurized to P,.ACTION;With either (a)the measured overall integrated containment leakage rate exceeding 0.75 Lor (b)with the measured combined leakage rate for all penetrations and valves sub]ect to Types B and C tests exceeding 0.60 Lrestore the overall integrated leakage rate to s0.75 L, and the combined leakage rate for all penetrations and valves sub]ect to TypeSB and C tests to s0.60 L, prior to f increasing the Reactor Coolant System temperature above 200'F.SURVEILLANCE RE UIREMENTS 4.6.1.2 Th co ai nt aka rate sha'be mo rat at e f ow st ch ule and all e term ed c o ce i cri ri spe fie n A end J o 10 50 usi the e ds p vi ons f N4.4.>i, 2: es, B an C (era I egra ed d ca Lea ge e)esti g sh 1 b co cte in cc t re ire nts pec ed n'end J o C odi ed app oved xe io Co ine e w h 5 Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.The provisions of Specification 4.0.2 are not applicable.
c b~ 20o ~gag
e ime exe tio to 0 C 50 Ap ndix, ect ns X..2(a an I.D., w ch low the ovi on of T n al ec ca on..8 o e pli le COOK NUCLEAR PZANT-UNXT 2 3/4 6-2 AMENDMENT NO.~, 173 A.4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.B.4.6.1.3 In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and C.4.6.1.6 The structural integrity of the containment steel liner shall be determined in accordance Appendix-J Option B and Regulatory Guide September 1995.structure and with 10 CFR 50 1.163, dated CONTAINMENT SYSTEHS ('.)CONTAINMENT AIR LOCKS LIHITINC CONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with: a.-Both doors closed except when the air lock is being used for normal transit entry and-exit:-through the contaireent, then at least one air 1ock door shall be closed, a.,d b.An overall air lock leakage rate of<0.05 La at Pa, 12.0 psig.APPLICADILITY:
                                                                                                            ~Ot at~~
NODES I, 2, 3 and a.ACTION: Mith an air lock inoperable, maintain at least one door closed;restore the air lock to OPERABLE status within 24 hours or be in at least HCT STANDBY within the next 6 hours and in.COLD SHUTDOWN within the followinq 30 hours.SLR".EILLANCE REQUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE: a.ter ch pen g, ex pt en e a i 1oc s b no sed r lti e en es he t 1 st o e p 72 urs.by erf rmi an a le age est itho a s ula pr re orc on t do.by ess izi the olum etw n th do seal to ps an veri ing sea eak e rat.n great t n 0.L.lea o e p 6m ths y pe ormi an r le ge tes it ut sim ated res re f ce o the r pe S ci cat 4.1.3;t by erfo ing a air akage it a s ula d pr sur for on e do~r y pr suri g e v ume etwe th oor eals 12 ig a veri ing a s 11 kag.rae fn area rtha 0.00 L.Rzq~')+t 8, x so oA end."J" fl FR 5.0.'.COOK'NI T-2 3/4 6-4 CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS (Continued) c.At east nce r 6 nths y cond ting.ov 11 ai oc ,aka tes at P.12', an',ve fyi that e ov a'll air ock akag.ate s wit'ts>mit At least once per 6 months by verifying that only one door in each air lock can be opened at a time.0.C.COOK-UNIT 2 3/4 6-5 CONTAINMENT SYSTEMS CONTAINMENT STRUCTURAL INTEGRITY LIMITINQ CONDITION FOR OPERATION 3.6.1.6 The structu=al integrity of the containment shall be maintained at a level consistent youth the acceptance criteria in Specification 4.6.1.6.APPLIChBILITY:
C.
MODES 1, 2, 3 and 4.JUNCTION: Vith the structural integrity of the containment not confoxming to the above recpxirements, restore the structural integxity to vithin the limits prior to 0 increasing the Reactor Coolant System temperature above 200 F.SURVEILLANCE RE UHKKENTS 4.6.1.6 e ruc 1 in grity dux'in he tdo for ach T e Spe fic ion.1.2 by a sua ter r and xter r s aces an erif g n appar t c ges norma deg ti f th con en sha be ezm d h nta ent aka rate est efere ce ins tion expo d.ac ssibl th cont en , inc ding e 1 z pl e, ap ran of e aces oth COOK NUCLEAR PLANT-UNIT 2 3/4 6-9 AMENDMENT NO.138 3/4 3/4.6 LIMITING CONDITIONS FOR.OPERATION AND SVRVEILLANCE REQUIREMENTS.;,',:..,'."".;." CONTAINMENT SYSTEMS 0 AfNME VENTI TION SYSTEM LIMITI G COND1TI N FOR PERA 0 3.6.1.7 Thc eoataiament purge supply and exhaust system shaH bc closed except when operation of thc coat;iiament purge,systctn is tcttuited for ptcssute control, ALPRA.and tespirablc air'quality." considerations for personnel catty,: aad for.sutvcBIancc testing aad maiatemuice aetiyiYies.','Po.
lee~
morc than oac purge supply path aad oac purge exhaust path shaH bc open at a time.ACTI NN: With onc containmeat purge supply aad/or oac exhaust isohtioa valve inopcrablc, isolate the'ffected penetration by use of at least oac automatic valve secured in the dosed posiYion,'ad, withia 72 hours, either: I)Restore thc iaoperablc valve to OPERABLE status, or, 2)Deactivate thc automatic.valve secured ia thc dosed posiYioa.~Operation may then continue uatil performance of the next requited valve test provitlcd that thc'utomatic valve secured ia thc dosed posiYioa is verified to be deactivated in the closed posiYion at least once per 31 days...Otherwise; bc in at last HOT STANDBY withh thc aext 6 hours aad in COLD SHUTDOWN within the following 30 hours.Thc provisions of Specification 3'.4 ate not appHcablc.
Joss(M7 4.6;1.2               n     i     en le             r   ed       a   ,b   dern     t    ee    at o   o     n   ee             e     e   nd     a     b det             d          nf 51                d.
SURVEILLANCE RE UIREMENTS 4.6.1.7.1 Thc surveiHaacc requitetnents of Teeluucal SpeciQcatio 3/4.6p.l apply.i~e COOK iiUCLEAR PLAif1-~e Page 3/4 6-9a Ai>IEG)CLIENT
x.te 0
~181 ATTACHMENT 3 TO AEP:NRC:1215B PROPOSED REVISED TECHNICAL SPECIFICATION PAGES 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS CONTAINMENT LEAKAGE LIMITING CONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to: APPLICABILITY:
a s
An overall integrated leakage rate of 6 La, 0.25 percent by weight of the containment air per 24 hours at Pa, 12.0 psig, and A combined leakage rate of 6 0.60 La for all penetrations and valves subject to Types B and C tests when pressurized to Pa.MODES 1, 2, 3 and 4.ACTION: With either (a)the measured overall integrated containment leakage rate exceeding 0.75 La, or (b)with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 La, restore the overall integrated leakage rate to S 0.75 La and the combined leakage rate for all penetrations and valves subject to Types B and C tests to 6 0.60 La prior to increasing the Reactor Coolant System temperature above 200'F.SURVEILLANCE RE UIREMENTS 4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.a.Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.b.The provisions of Specification 4.0.2 are not applicable.
pe     f       iX'. A end 97:
COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-2 AMENDMENT 4S, 4', 4', 406, 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with: Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and b.An overall air lock leakage rate of 6 0.05 La at Pa, 12 psig.APPLICABILITY:
C     5 es     , B           C       er       I    egr    ed    d        al    mbi d Le       ge       e       t tin         ha       be    ond      ed        a    or    ce e             em     ts   s     ci   ed.       Ap      d        t      0 mo                             ve     ex       io Each. coneainment               air lock shall           be verified to be in compliance with the requirements                         of Specification 3.6.1.3.
ACTION: MODES 1, 2, 3 and 4.With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.SURVEILLANCE RE UIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE: a.In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and At least once per 6 months by verifying that only one door in each air lock can be opened at a time.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6C AMENDMENT 440, 0 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS This Page Intentionally Left Blank'OOK NUCLEAR PLANT-UNIT I Page 3/4 6-5 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS CONTAINMENT STRUCTURAL INTEGRITY LIMITING CONDITION FOR OPERATION 3.6.1.6 The structural integrity of the containment structure and steel liner shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.APPLICABILITY:
The   provisions op Speoipioaeion'4.0.2                         ase noe appileah1e.
MODES 1, 2, 3 and 4.ACTION: With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits prior to increasing the Reactor Coolant System temperature above 200'F.SURVEILLANCE RE UIREMENTS 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-9 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.7 The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities.
f     Aon -tim         e     ens n         f     e e       ti      erv     is     llo   d fo       th th d         e A   st       e       s on 10             ea se         ce     rio ori nail sc d d                       b p rfo     ed   tt    e       do Cy e .                     e e tw             be er rm             p or   o nit   es art       o ow g e e re el g o age                               at 11 ol w e Cy   e COOK NUCLEAR PLANT - UHXT L                               3/4 6-2                     AHENDHENT NO.         48,460,4$ 7-
No more than one purge supply path and one purge exhaust path shall be open at a time.APPLICABILITY:
 
MODES 1, 2, 3, and 4.ACTION: ao With one containment purge supply and/or one exhaust'isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours, either: I)Restore the inoperable valve to OPERABLE status, or, 2)Deactivate the automatic valve secured in the closed position.Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.The provisions of Specification 3.0.4 are not applicable.
A. 4.6.1.2 Perform leakage rate testing in accordance with 10   CFR 50 Appendix J Option B and Regulatory Guide 1.163,       dated September 1995.
SURVEILLANCE RE UIREMENTS 4.6.1.7.1 The surveillance requirements of Technical Specifications 3/4.6.1.2 and 3/4.6.3.1 apply.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-9a AMENDMENT 66;40$,
B. 4.6.1.3 In accordance with 10 CFR 50 Appendix J Option       B and Regulatory Guide 1.163, dated September 1995, and C. 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option   B and Regulatory Guide 1.163, dated September 1995.
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINME<NT SYSTEMS CONTAINMENT LEAKAGE LIMITING CONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to: ao An overall integrated leakage rate of 6 La, 0.25 percent by weight of the containment air per 24 hours at Pa, 12 psig.APPLICABILITY:
 
ACTION: A combined leakage rate of 6 0.60 La for all penetrations and valves subject to Types B and C tests when pressurized to Pa.MODES 1, 2, 3 and 4.With either (a)the measured overall integrated containment leakage rate exceeding 0.75 La, or (b)with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 L>>, restore the overall integrated leakage rate to 6 0.75 La and the combined leakage rate for all penetrations and'alves subject to Types B and C tests to 6 0.60 L>>prior to increasing the Reactor Coolant System temperature above 200'F.SURVEILLANCE RE UIREMENTS 4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.a.Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.b.The provisions of Specification 4.0.2 are not applicable.
CONTAINMENT SYSTEMS CONTAINMENT   AIR LIMITING CONDITION LOCKS FOR OPERATION
COOK NUCLEAR PLANT-UNIT 2 Page 3/4 6-2 AMENDME<NT 445,~,
                                                              ~a (t
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with: APPLICABILITY:
3.6.1.3   Each containment                   air lock shall         be OPERABLE       with:
ACTION: Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and An overall air lock leakage rate of 6 0.05 La at Pa, 12.0 psig.MODES I, 2, 3 and 4.With an air lock inoperable, maintain at least one door closed;restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.SURVEILLANCE RE UIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE: a.In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and b.At least once per 6 months by verifying that only one door in each air lock can be opened at a time.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 64 AMENDMENT 0 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS This Page Intentionally Left Blank COOK NUCLEAR PLANT-UNIT 2 Page 3/4 6-5 AMENDMENT 0 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS CONTAINMENT STRUCTURAL INTEGRITY LIMITING CONDITION FOR OPERATION 3.6.1.6 The structural integrity of the containment shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.APPLICABILITY:
: a. Both doors closed. except when= the air lock is being used, for normal 'transit entry and exit through the containment, then at least one air lock door shall'be closed, and
MODES 1, 2, 3 and 4.ACTION: With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits prior to increasing the Reactor Coolant System temperature above 200'P.SURVEILLANCE RE UIREMENTS 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 6-9 AMENDMENT 438, 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.7 The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities.
: b. An overall air lock leakage rate of                                                       to 0.05 L at P , 12                 psig.
No more than one purge supply path and one purge exhaust path shall be open at a time.APPLICABILITY:
MODES a'PPLICABILITY:
MODES 1, 2, 3, and 4.ACTION: With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours, either: 1)Restore the inoperable valve to OPERABLE status, or, 2)Deactivate the automatic valve secured in the closed position.Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.The provisions of Specification 3.0.4 are not applicable.
1, 2,   3   and 4.
SURVEILLANCE RE UIREMENTS 4.6.1.7.1 The surveillance requirements of Technical Specifications 3/4.6.1.2 arid 3/4.6.3.1 apply.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 6-9a AMENDMENT 47)4R, 4 4}}
ACTXON:
Wi.th an air lock i.noperable, restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY wi.thin, the next.6 hours and in COLD SWgDOMN   within the following                         30 hours.
SURVEILLANCE RE UIRBfEVZS 4.6.1.3 Each containment air lock shall be demonstrated                                   OPERABLE:
te                                                             air        i itpt allen aI                          each     en       , ex                             ck       ein used       or mu                 pie       tz
                                          'n  , w                       e do     at       to    e pe           s ~
per                                 r   1     ge     est       ou       s     aced   res     e for                 o     e     r b     pres       i@i     the     p .be   een     e s     s t     2 ig                   d v xfy       g a s       le       ge     no     ater     an   .5 Ex p on   o                 p     i   "J" of         C     5 COOK NUCLEAR PLANT                   - UNIT   1                 3/4 6-4           AMENDMENT NO.     ~             (~ )
 
CONTAImENT Sysyms
(
  ').     SURVEILLANCE RE UIREMENTS         Continued
: b. t le     onc   per     mon     ,   pe   orm     air akage st w             out s     ated     ess     e fo   e on       e do   per   .6.1.3 .,           pe   orm a   air     aka     test     th     s         ed p   ssure'rce         :th   door,.
y p   ssur   ing       e ga     etwe     "the     als t   12 p g a v     fyi   a se       lea   ge o       o gr ter         0'. 5 all
                                                                                                        'ir a't:
c          east   ce         6 m   ths b cond         ing     ov       a     -lock t
                  ~
aka     test       P       2 ps       and   y ve   fyi that'           over loc     ea   e rat is     w     in   i   lim v~hac          At least   once per 6 months by verifying             that only   one door     in each 4o air lock   can be opened at a time.
                                                                                                              ~,
C COOK NUCLEAR PIANT   - UNIT 1                   3/4 6-5                   AMENDMENT NO.     160
 
CONThINMENT SYSTEMS CONThINMENT STRUCZUEUQ. INTEGRITY LXMXTINC CONDITION FOR'PERhTXON 3.6.1.6 The structural integrity of 'the containment structure and steel liner shall be maintained at a level consistent vSth the acceptance criteria in Specification 4.6.1.6.
APPLICABILITY:           MODES 1, 2,   3 and 4.
I JLCTXOH:
Pith the structural integrity of the containment not conforming to the above requirements, restore their structural integrity to vithin the limits           0 prior to increasing the Reactor. Coolant System temperature           above 200 F.
SURVEILLhNCE RE UIREMENTS 4.6.1. 6       e     ruc al te             ty the       ta       nt s     c         and   teel 1           al     e     te     ed       in the s tdo         or e             4 c     ta   nt n
ea a
ge ate ac  'si nt est an e s ef ence pecif ati ace in ppear of th stru       e
                                                            . 6.
st
                                                                      'by 1
vi r an 1
verif ecti g
app                   s                 ce o the       ac     or     er     no eg     at                                           I hn     it       re rt o ny             erma deg       tish  of     e co     inme       s 1   er   d   ecte     ur     thes ins cti                   be       e vI.       1     y er d   ecti F
COOK NUCLEhR PLANT           - UNIT   1           3/4 6-9                       hMENDMENT     NO:~
 
3/4 3/4.6 0
LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREi~q7$
CONTAPS IEiVl SYSTEMS I
CONTAINMENTUENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.l.7       The coatainmcat purge supply aad exhaust system shall bc closed.except when operation of thc containmcat purge system is required for ptessute coatto1, AUG', and rcspirablc air quaHty coasidctatioas for personnel catty, and for sutveiHancc testing and maintenance activities. No more than onc purge supply path and oac purge exhaust path shaH bc open at a time.
APPLICABILITY:         MODES       I, 2, 3, aad 4.
ACTION'.
With onc eontaiameat purge supply and/or one exhaust isolation valve inoperable, isolate thc affected pcaetratioa by usc of at least oac automauc valve secuted in thc. closed positioa, and, withia 72 bouts, either:
I)       Restore the iaoperablc valve to OPERABLE status, or,
: 2)         Deactivate thc automatic valve secured in the dosed position.
: b.       Operatioa may thea coatiaue until performance of the next tequited valve test provided that thc automatic valve scouted in thc closed position is vcriTied to be deactivated ia the closed po'sitioa at least once per 3l days.
c..       Otherwise, bc in at least HOT STANDBY withh thc next 6 heirs and                 h COLD SHUTDOWN within the fallowing 30 hours.                                                     ('. 'I I       d.       Thc provisions of SpcciGeation 3.0.4 ate not applicable.
SURUEILLANCE RE UIREMENTS 4.6.l.7.1     The survciHanee requirements of Tcchnical Speeilication 3/4.66.I apply.
5 r/v.(.,(,z. a~A COOK i IUCLEAR PLANT-UiT I                         Page 3/4 6 9a                                 AiIEND~IZix66
 
P 0
CON AINMENT SYSTEMS CONTAINM-"NT LEAKAGE LIMITI G     CONDIT ON FOR OPERATION 3.6.1.2         Containment leakage rates             shall   be   limited to:
: a.       An overall integrated leakage rate of sL, 0.25 percent by weight of the containment       air per 24 hours at P12.0 psig, and
: b.       A combined leakage         rate of s0.60 L, for 'all penetrations                 and   valves subject to     Types'     and C tests when pressurized to P,.
ACTION; With either (a) the measured overall integrated containment leakage rate exceeding 0.75 L or (b) with the measured combined leakage rate for all penetrations and valves sub]ect to Types B and C tests exceeding 0.60 L restore the overall integrated leakage rate to s0.75 L, and the combined leakage rate for all penetrations and valves sub]ect to TypeSB and C tests to s0.60 L, prior to                                           f increasing the Reactor Coolant System temperature above 200'F.
SURVEILLANCE RE UIREMENTS 4.6.1.2         Th   co   ai     nt   aka     rate sha         'be     mo   rat       at     e   f     ow st     ch cri ri spe fie ule and          all n A end e
J term ed o   10       50 c
usi o
the ce e
i ds p vi ons f                 N4 .4.>i, 2:
es,     B     an   C   (   era       I   egra ed       d     ca     Co    ine Lea   ge       e)     esti g sh     1 b     co     cte   in     cc           e w    h t     re   ire nts       pec     ed     n'     end     J     o       C       5 odi ed         app oved xe           io Each containment air lock shall be verified to be                                       in compliance with the requirements of Specification 3.6.1.3.
The   provisions of Specification 4.0.2 are not applicable.
I e   ime exe       tio to       0 C       50   Ap     ndix,         ect   ns       X..2(a         an
            .D.   , w   ch     low the         ovi on of       T     n   al     ec     ca   on     .   .8   o e     pli       le COOK NUCLEAR PZANT         - UNXT 2               3/4 6-2                             AMENDMENT NO.         ~,     173
 
A. 4.6.1.2 Perform leakage rate testing in accordance with 10   CFR 50 Appendix J Option B and Regulatory Guide 1.163,       dated September 1995.
B. 4.6.1.3 In accordance with 10 CFR 50 Appendix J Option       B and Regulatory Guide 1.163, dated September 1995, and C. 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix- J   Option B and Regulatory Guide 1.163, dated September  1995.
 
('. )
CONTAINMENT SYSTEHS CONTAINMENT AIR LOCKS LIHITINC CONDITION         FOR OPERATION 3.6.1.3     Each containment         air lock shall       be OPERABLE       with:
: a.   - Both doors closed except when the               air lock is being used for normal     transit entry and -exit:-through the contaireent, then at least one air 1ock door shall be closed, a.,d
: b.     An   overall air lock leakage rate of               < 0.05 La   at Pa, 12.0 psig.
APPLICADILITY:         NODES   I, 2, 3   and a.
ACTION:
Mith an air lock inoperable, maintain at least one door closed; restore the air lock to OPERABLE status within 24 hours or be in at least HCT STANDBY within the next 6 hours and in. COLD SHUTDOWN within the followinq 30 hours.
SLR".EILLANCE REQUIREMENTS 4.6.1.3     Each containment         air lock shall       be demonstrated         OPERABLE:
: a.           ter                                               i lti e g,en es pt he t st o e p 72 urs.
ch    pen        ex         en     e a       1oc     s b   no sed     r                                       1 by   erf rmi an a le age est itho a s ula                                   pr re orc on t do by ess izi the olum etw n
                                              .                                                    Rzq~'
th do seal to                   ps     an veri ing           sea     eak e rat.       )+t n great         t n 0. L .                                                       8, lea     o   e p     6m ths y pe ormi                 an     r le   ge tes       it   ut     sim     ated res re       f   ce o   the     r pe
                                        .1.3; t           by erfo ing a air itci    cat S                    4                                                      akage a s     ula   d pr   sur   for     on     e do~r y pr suri           g e v   ume     etwe     th     oor eals           12     ig a   veri   ing a s     11     kag   .rae       fn   area   rtha       0.00     L.
x     so       oA     end   ."J"     fl       FR   5.
: 0. '. COOK'NI T - 2                               3/4 6-4
 
CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS       (Continued)
: c. At east air
              ,aka ock tes nce at akag r
P 6
                                      .12 ate
                                          ', 'ts nths s wit y cond an  ',veting fyi .ov that
                                                              >mit 11  ai e ov oc a'll At least once per       6 months by     verifying that only     one door   in each air lock can       be opened     at a time.
: 0. C. COOK -   UNIT 2                       3/4 6-5
 
CONTAINMENT SYSTEMS CONTAINMENT STRUCTURAL INTEGRITY LIMITINQ CONDITION   FOR OPERATION 3.6.1.6 The structu=al integrity of the containment shall be maintained at     a level consistent youth the acceptance criteria in Specification 4.6.1.6.
APPLIChBILITY:   MODES 1, 2, 3 and 4.
JUNCTION:
Vith the structural integrity of the containment not confoxming to the above recpxirements, restore the structural integxity to vithin the limits prior to 0
increasing the Reactor Coolant System temperature above   200 F.
SURVEILLANCE RE UHKKENTS 4.6.1.6     e ruc     1 in grity f th con        en sha    be    ezm  d dux'in   he   tdo   for ach T e h nta ent aka rate est efere ce Spe fic ion       .1.2 by a sua ins tion              expo d. ac ssibl ter r and xter r s aces         th cont    en , inc ding    e 1  z pl e, an     erif g n appar t c ges         ap  ran  of  e    aces    oth norma   deg   ti COOK NUCLEAR PLANT  - UNIT 2          3/4 6-9                 AMENDMENT NO. 138
 
3/4     LIMITINGCONDITIONS FOR. OPERATION AND SVRVEILLANCEREQUIREMENTS.;,',:.., '." ".;."
3/4.6    CONTAINMENTSYSTEMS 0     AfNME     VENTI     TION SYSTEM LIMITI G COND1TI N FOR             PERA     0 3.6.1.7         Thc eoataiament purge supply and exhaust system shaH bc closed except when operation of thc coat;iiament purge,systctn is tcttuited for ptcssute control, ALPRA. and tespirablc air'quality."
considerations for personnel catty,: aad for.sutvcBIancc testing aad maiatemuice aetiyiYies.','Po.
morc than oac purge supply path aad oac purge exhaust path shaH bc open at a time.
ACTI   NN:
With onc containmeat purge supply aad/or oac exhaust isohtioa valve inopcrablc, isolate penetration by use of at least oac automatic valve secured in the dosed posiYion,'ad, the'ffected withia 72 hours, either:
I)       Restore thc iaoperablc valve to OPERABLE status, or,
: 2)       Deactivate thc automatic.valve secured ia thc dosed posiYioa.
              ~ Operation may then continue uatil performance of the next requited valve test provitlcd that thc
              'utomatic valve     secured ia thc dosed posiYioa is verified to be deactivated in the closed posiYion at least once per 31 days..
                .Otherwise; bc in at last HOT STANDBY withh thc aext 6 hours aad in COLD SHUTDOWN within the following 30 hours.
Thc provisions of Specification   3'.4 ate not appHcablc.
SURVEILLANCE RE UIREMENTS 4.6.1.7.1       Thc surveiHaacc requitetnents of Teeluucal SpeciQcatio       3/4.6p.l apply.
i ~
e COOK iiUCLEAR PLAif1-~e                             Page 3/4 6-9a                                 Ai>IEG)CLIENT               ~
181
 
ATTACHMENT 3 TO AEP:NRC:1215B PROPOSED REVISED TECHNICAL SPECIFICATION PAGES
 
3/4     LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMENTS 3/4.6     CONTAINMENTSYSTEMS CONTAINMENT LEAKAGE LIMITINGCONDITION FOR OPERATION 3.6.1.2           Containment leakage rates shall be limited to:
An overall integrated leakage rate of 6 La, 0.25 percent by weight of the containment air per 24 hours at Pa, 12.0 psig, and A combined leakage rate of 6 0.60 La for all penetrations and valves subject to Types B and C tests when pressurized to Pa.
APPLICABILITY:              MODES 1, 2, 3 and 4.
ACTION:
With either (a) the measured overall integrated containment leakage rate exceeding 0.75 La, or (b) with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 La, restore the overall integrated leakage rate to S 0.75 La and the combined leakage rate for all penetrations and valves subject to Types B and C tests to 6 0.60 La prior to increasing the Reactor Coolant System temperature above 200'F.
SURVEILLANCE RE UIREMENTS 4.6.1.2           Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.
: a.       Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.
: b.       The provisions of Specification 4.0.2 are not applicable.
COOK NUCLEAR PLANT-UNIT 1                           Page 3/4 6-2           AMENDMENT4S,         4', 4', 406,
 
3/4     LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6   CONTAINMENTSYSTEMS CONTAINMENT AIR LOCKS LIMITINGCONDITION FOR OPERATION 3.6.1.3         Each containment air lock shall be OPERABLE with:
Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and
: b.       An overall air lock leakage rate of 6 0.05 La at Pa, 12 psig.
APPLICABILITY:           MODES 1, 2, 3 and 4.
ACTION:
With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE RE UIREMENTS 4.6.1.3         Each containment air lock shall be demonstrated OPERABLE:
: a.       In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
COOK NUCLEAR PLANT-UNIT 1                       Page 3/4 6C                           AMENDMENT440,
 
0 3/4   LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS This Page Intentionally Left Blank
'OOK NUCLEAR PLANT-UNITI            Page 3/4 6-5
 
3/4     LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6     CONTAINMENTSYSTEMS CONTAINMENTSTRUCTURAL INTEGRITY LIMITINGCONDITION FOR OPERATION 3.6.1.6           The structural integrity of the containment structure and steel liner shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.
APPLICABILITY:             MODES 1, 2, 3 and 4.
ACTION:
With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits prior to increasing the Reactor Coolant System temperature above 200'F.
SURVEILLANCE RE UIREMENTS 4.6.1.6           The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.
COOK NUCLEAR PLANT-UNIT 1                           Page 3/4 6-9
 
3/4       LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6     CONTAINMENTSYSTEMS CONTAINMENT VENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.1.7         The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities. No more than one purge supply path and one purge exhaust path shall be open at a time.
APPLICABILITY:           MODES 1, 2, 3, and 4.
ACTION:
ao       With one containment purge supply and/or one exhaust'isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours, either:
I)       Restore the inoperable valve to OPERABLE status, or,
: 2)       Deactivate the automatic valve secured in the closed position.
Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.
Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
The provisions   of Specification 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.6.1.7.1       The surveillance requirements   of Technical Specifications 3/4.6.1.2   and 3/4.6.3.1 apply.
COOK NUCLEAR PLANT-UNIT 1                         Page 3/4 6-9a                     AMENDMENT66; 40$ ,
 
3/4     LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6   CONTAINME<NTSYSTEMS CONTAINMENTLEAKAGE LIMITINGCONDITION FOR OPERATION 3.6.1.2           Containment leakage rates shall be limited to:
ao       An overall integrated leakage rate of 6 La, 0.25 percent by weight of the containment air per 24 hours at Pa, 12 psig.
A combined leakage rate of 6 0.60 La for all penetrations   and valves subject to Types B and C tests when pressurized to Pa.
APPLICABILITY:              MODES 1, 2, 3 and 4.
ACTION:
With either (a) the measured overall integrated containment leakage rate exceeding 0.75 La, or (b) with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 L>>,
restore the overall integrated leakage rate to 6 0.75 La and the combined leakage rate for all penetrations and
'alves subject to Types B and C tests to 6 0.60 L>> prior to increasing the Reactor Coolant System temperature above 200'F.
SURVEILLANCE RE UIREMENTS 4.6.1.2           Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.
: a.       Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.
: b.       The provisions of Specification 4.0.2 are not applicable.
COOK NUCLEAR PLANT-UNIT2                            Page 3/4 6-2                       AMENDME<NT445,       ~,
 
3/4     LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6   CONTAINMENTSYSTEMS CONTAINMENTAIR LOCKS LIMITINGCONDITION FOR OPERATION 3.6.1.3           Each containment air lock shall be OPERABLE with:
Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and An overall air lock leakage rate of 6 0.05 La at Pa, 12.0 psig.
APPLICABILITY:            MODES     I, 2, 3 and 4.
ACTION:
With an air lock inoperable, maintain at least one door closed; restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE RE UIREMENTS 4.6.1.3           Each containment air lock shall be demonstrated OPERABLE:
: a.       In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and
: b.       At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
COOK NUCLEAR PLANT-UNIT2                            Page 3/4 64                               AMENDMENT
 
0 3/4   LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS This Page Intentionally Left Blank COOK NUCLEAR PLANT-UNIT2            Page 3/4 6-5               AMENDMENT
 
0 3/4       LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6     CONTAINMENTSYSTEMS CONTAINMENTSTRUCTURAL INTEGRITY LIMITINGCONDITION FOR OPERATION 3.6.1.6           The structural integrity of the containment shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.
APPLICABILITY:             MODES 1, 2, 3 and 4.
ACTION:
With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits prior to increasing the Reactor Coolant System temperature above 200'P.
SURVEILLANCE RE UIREMENTS 4.6.1.6           The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.
COOK NUCLEAR PLANT-UNIT2                            Page 3/4 6-9                       AMENDMENT438,
 
3/4       LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6     CONTAINMENTSYSTEMS CONTAINMENTVENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.1.7         The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities. No more than one purge supply path and one purge exhaust path shall be open at a time.
APPLICABILITY:           MODES 1, 2, 3, and 4.
ACTION:
With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours, either:
: 1)       Restore the inoperable valve to OPERABLE status, or,
: 2)       Deactivate the automatic valve secured in the closed position.
Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.
Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
The provisions of Specification 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.6.1.7.1     The surveillance requirements   of Technical Specifications 3/4.6.1.2   arid 3/4.6.3.1 apply.
COOK NUCLEAR PLANT-UNIT2                        Page 3/4 6-9a                       AMENDMENT47) 4R,
 
4 4}}

Latest revision as of 01:15, 4 February 2020

Proposed Tech Specs 3/4.6.1.2,3/4.6.1.3,3/4.6/1/6 & 3/4.6.1.7,replacing Option a Scheduling Requirements for Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) W/Requirement Per 10CFR50 App J Option B
ML17333A241
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/19/1995
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17333A240 List:
References
NUDOCS 9512260234
Download: ML17333A241 (26)


Text

ATTACHMENT 2 TO AEP:NRC:1215B EXISTING TECHNICAL SPECIFICATION PAGES MARKED TO REFLECT PROPOSED CHANGES 95122b0234 951219 PDR ADOCK 05000315 P PDR

CONTAXNMENT SYSTEMS CONTAXNMENT LEAKAGE LXMXTXNG CONDXTXON FOR OPERATXON 3.6.l..2 Containmene leakage rates shall be limited to:

a. An overall integrated leakage rate of sL0.25 percene by weight of the coneainment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ae P 12.0 psig, and
b. A combined leakage rate of i0.60 L, for all peneeraeions and valves subject eo Types B and C.tests when pressurized to P,.

1 APPLXCABXLXTY: Modes 1, 2, 3 and 4.

ACTXON:

Pith either (a) the measured overall integrated containment leakage rate exceeding 0.75 L, or (b) with the measured combined leakage rate for all penetrations and valves subject eo es B and C tests exceedin 0.60 A5."rophMolWtHys4am eentesaPu g4~ g, &O <s7S~nad +4. ~1~ AyPMOP&gh le+~

+0 7~+0 SAW Q HsQ +as > Oi(pO LC +lid'4 Q ~CA4+51~ le.

SURVEXLLANCE RE UXREMENTS

~

o~ M~~~ hu4z

~~~~ <w~~

fuaaQPaue~+so<$

c b~ 20o ~gag

~Ot at~~

C.

lee~

Joss(M7 4.6;1.2 n i en ' le r ed a ,b dern t ee at o o n ee e e nd a b det d nf 51 d.

x.te 0

a s

pe f iX'. A end 97:

C 5 es , B C er I egr ed d al mbi d Le ge e t tin ha be ond ed a or ce e em ts s ci ed. Ap d t 0 mo ve ex io Each. coneainment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.

The provisions op Speoipioaeion'4.0.2 ase noe appileah1e.

f Aon -tim e ens n f e e ti erv is llo d fo th th d e A st e s on 10 ea se ce rio ori nail sc d d b p rfo ed tt e do Cy e . e e tw be er rm p or o nit es art o ow g e e re el g o age at 11 ol w e Cy e COOK NUCLEAR PLANT - UHXT L 3/4 6-2 AHENDHENT NO. 48,460,4$ 7-

A. 4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

B. 4.6.1.3 In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and C. 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

CONTAINMENT SYSTEMS CONTAINMENT AIR LIMITING CONDITION LOCKS FOR OPERATION

~a (t

3.6.1.3 Each containment air lock shall be OPERABLE with:

a. Both doors closed. except when= the air lock is being used, for normal 'transit entry and exit through the containment, then at least one air lock door shall'be closed, and
b. An overall air lock leakage rate of to 0.05 L at P , 12 psig.

MODES a'PPLICABILITY:

1, 2, 3 and 4.

ACTXON:

Wi.th an air lock i.noperable, restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY wi.thin, the next.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SWgDOMN within the following 30 hours.

SURVEILLANCE RE UIRBfEVZS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:

te air i itpt allen aI each en , ex ck ein used or mu pie tz

'n , w e do at to e pe s ~

per r 1 ge est ou s aced res e for o e r b pres i@i the p .be een e s s t 2 ig d v xfy g a s le ge no ater an .5 Ex p on o p i "J" of C 5 COOK NUCLEAR PLANT - UNIT 1 3/4 6-4 AMENDMENT NO. ~ (~ )

CONTAImENT Sysyms

(

'). SURVEILLANCE RE UIREMENTS Continued

b. t le onc per mon , pe orm air akage st w out s ated ess e fo e on e do per .6.1.3 ., pe orm a air aka test th s ed p ssure'rce :th door,.

y p ssur ing e ga etwe "the als t 12 p g a v fyi a se lea ge o o gr ter 0'. 5 all

'ir a't:

c east ce 6 m ths b cond ing ov a -lock t

~

aka test P 2 ps and y ve fyi that' over loc ea e rat is w in i lim v~hac At least once per 6 months by verifying that only one door in each 4o air lock can be opened at a time.

~,

C COOK NUCLEAR PIANT - UNIT 1 3/4 6-5 AMENDMENT NO. 160

CONThINMENT SYSTEMS CONThINMENT STRUCZUEUQ. INTEGRITY LXMXTINC CONDITION FOR'PERhTXON 3.6.1.6 The structural integrity of 'the containment structure and steel liner shall be maintained at a level consistent vSth the acceptance criteria in Specification 4.6.1.6.

APPLICABILITY: MODES 1, 2, 3 and 4.

I JLCTXOH:

Pith the structural integrity of the containment not conforming to the above requirements, restore their structural integrity to vithin the limits 0 prior to increasing the Reactor. Coolant System temperature above 200 F.

SURVEILLhNCE RE UIREMENTS 4.6.1. 6 e ruc al te ty the ta nt s c and teel 1 al e te ed in the s tdo or e 4 c ta nt n

ea a

ge ate ac 'si nt est an e s ef ence pecif ati ace in ppear of th stru e

. 6.

st

'by 1

vi r an 1

verif ecti g

app s ce o the ac or er no eg at I hn it re rt o ny erma deg tish of e co inme s 1 er d ecte ur thes ins cti be e vI. 1 y er d ecti F

COOK NUCLEhR PLANT - UNIT 1 3/4 6-9 hMENDMENT NO:~

3/4 3/4.6 0

LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREi~q7$

CONTAPS IEiVl SYSTEMS I

CONTAINMENTUENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.l.7 The coatainmcat purge supply aad exhaust system shall bc closed.except when operation of thc containmcat purge system is required for ptessute coatto1, AUG', and rcspirablc air quaHty coasidctatioas for personnel catty, and for sutveiHancc testing and maintenance activities. No more than onc purge supply path and oac purge exhaust path shaH bc open at a time.

APPLICABILITY: MODES I, 2, 3, aad 4.

ACTION'.

With onc eontaiameat purge supply and/or one exhaust isolation valve inoperable, isolate thc affected pcaetratioa by usc of at least oac automauc valve secuted in thc. closed positioa, and, withia 72 bouts, either:

I) Restore the iaoperablc valve to OPERABLE status, or,

2) Deactivate thc automatic valve secured in the dosed position.
b. Operatioa may thea coatiaue until performance of the next tequited valve test provided that thc automatic valve scouted in thc closed position is vcriTied to be deactivated ia the closed po'sitioa at least once per 3l days.

c.. Otherwise, bc in at least HOT STANDBY withh thc next 6 heirs and h COLD SHUTDOWN within the fallowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. ('. 'I I d. Thc provisions of SpcciGeation 3.0.4 ate not applicable.

SURUEILLANCE RE UIREMENTS 4.6.l.7.1 The survciHanee requirements of Tcchnical Speeilication 3/4.66.I apply.

5 r/v.(.,(,z. a~A COOK i IUCLEAR PLANT-UiT I Page 3/4 6 9a AiIEND~IZix66

P 0

CON AINMENT SYSTEMS CONTAINM-"NT LEAKAGE LIMITI G CONDIT ON FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to:

a. An overall integrated leakage rate of sL, 0.25 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at P12.0 psig, and
b. A combined leakage rate of s0.60 L, for 'all penetrations and valves subject to Types' and C tests when pressurized to P,.

ACTION; With either (a) the measured overall integrated containment leakage rate exceeding 0.75 L or (b) with the measured combined leakage rate for all penetrations and valves sub]ect to Types B and C tests exceeding 0.60 L restore the overall integrated leakage rate to s0.75 L, and the combined leakage rate for all penetrations and valves sub]ect to TypeSB and C tests to s0.60 L, prior to f increasing the Reactor Coolant System temperature above 200'F.

SURVEILLANCE RE UIREMENTS 4.6.1.2 Th co ai nt aka rate sha 'be mo rat at e f ow st ch cri ri spe fie ule and all n A end e

J term ed o 10 50 c

usi o

the ce e

i ds p vi ons f N4 .4.>i, 2:

es, B an C ( era I egra ed d ca Co ine Lea ge e) esti g sh 1 b co cte in cc e w h t re ire nts pec ed n' end J o C 5 odi ed app oved xe io Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.

The provisions of Specification 4.0.2 are not applicable.

I e ime exe tio to 0 C 50 Ap ndix, ect ns X..2(a an

.D. , w ch low the ovi on of T n al ec ca on . .8 o e pli le COOK NUCLEAR PZANT - UNXT 2 3/4 6-2 AMENDMENT NO. ~, 173

A. 4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

B. 4.6.1.3 In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and C. 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix- J Option B and Regulatory Guide 1.163, dated September 1995.

('. )

CONTAINMENT SYSTEHS CONTAINMENT AIR LOCKS LIHITINC CONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with:

a. - Both doors closed except when the air lock is being used for normal transit entry and -exit:-through the contaireent, then at least one air 1ock door shall be closed, a.,d
b. An overall air lock leakage rate of < 0.05 La at Pa, 12.0 psig.

APPLICADILITY: NODES I, 2, 3 and a.

ACTION:

Mith an air lock inoperable, maintain at least one door closed; restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HCT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in. COLD SHUTDOWN within the followinq 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SLR".EILLANCE REQUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:

a. ter i lti e g,en es pt he t st o e p 72 urs.

ch pen ex en e a 1oc s b no sed r 1 by erf rmi an a le age est itho a s ula pr re orc on t do by ess izi the olum etw n

. Rzq~'

th do seal to ps an veri ing sea eak e rat. )+t n great t n 0. L . 8, lea o e p 6m ths y pe ormi an r le ge tes it ut sim ated res re f ce o the r pe

.1.3; t by erfo ing a air itci cat S 4 akage a s ula d pr sur for on e do~r y pr suri g e v ume etwe th oor eals 12 ig a veri ing a s 11 kag .rae fn area rtha 0.00 L.

x so oA end ."J" fl FR 5.

0. '. COOK'NI T - 2 3/4 6-4

CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS (Continued)

c. At east air

,aka ock tes nce at akag r

P 6

.12 ate

', 'ts nths s wit y cond an ',veting fyi .ov that

>mit 11 ai e ov oc a'll At least once per 6 months by verifying that only one door in each air lock can be opened at a time.

0. C. COOK - UNIT 2 3/4 6-5

CONTAINMENT SYSTEMS CONTAINMENT STRUCTURAL INTEGRITY LIMITINQ CONDITION FOR OPERATION 3.6.1.6 The structu=al integrity of the containment shall be maintained at a level consistent youth the acceptance criteria in Specification 4.6.1.6.

APPLIChBILITY: MODES 1, 2, 3 and 4.

JUNCTION:

Vith the structural integrity of the containment not confoxming to the above recpxirements, restore the structural integxity to vithin the limits prior to 0

increasing the Reactor Coolant System temperature above 200 F.

SURVEILLANCE RE UHKKENTS 4.6.1.6 e ruc 1 in grity f th con en sha be ezm d dux'in he tdo for ach T e h nta ent aka rate est efere ce Spe fic ion .1.2 by a sua ins tion expo d. ac ssibl ter r and xter r s aces th cont en , inc ding e 1 z pl e, an erif g n appar t c ges ap ran of e aces oth norma deg ti COOK NUCLEAR PLANT - UNIT 2 3/4 6-9 AMENDMENT NO. 138

3/4 LIMITINGCONDITIONS FOR. OPERATION AND SVRVEILLANCEREQUIREMENTS.;,',:.., '." ".;."

3/4.6 CONTAINMENTSYSTEMS 0 AfNME VENTI TION SYSTEM LIMITI G COND1TI N FOR PERA 0 3.6.1.7 Thc eoataiament purge supply and exhaust system shaH bc closed except when operation of thc coat;iiament purge,systctn is tcttuited for ptcssute control, ALPRA. and tespirablc air'quality."

considerations for personnel catty,: aad for.sutvcBIancc testing aad maiatemuice aetiyiYies.','Po.

morc than oac purge supply path aad oac purge exhaust path shaH bc open at a time.

ACTI NN:

With onc containmeat purge supply aad/or oac exhaust isohtioa valve inopcrablc, isolate penetration by use of at least oac automatic valve secured in the dosed posiYion,'ad, the'ffected withia 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, either:

I) Restore thc iaoperablc valve to OPERABLE status, or,

2) Deactivate thc automatic.valve secured ia thc dosed posiYioa.

~ Operation may then continue uatil performance of the next requited valve test provitlcd that thc

'utomatic valve secured ia thc dosed posiYioa is verified to be deactivated in the closed posiYion at least once per 31 days..

.Otherwise; bc in at last HOT STANDBY withh thc aext 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> aad in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Thc provisions of Specification 3'.4 ate not appHcablc.

SURVEILLANCE RE UIREMENTS 4.6.1.7.1 Thc surveiHaacc requitetnents of Teeluucal SpeciQcatio 3/4.6p.l apply.

i ~

e COOK iiUCLEAR PLAif1-~e Page 3/4 6-9a Ai>IEG)CLIENT ~

181

ATTACHMENT 3 TO AEP:NRC:1215B PROPOSED REVISED TECHNICAL SPECIFICATION PAGES

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENT LEAKAGE LIMITINGCONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to:

An overall integrated leakage rate of 6 La, 0.25 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at Pa, 12.0 psig, and A combined leakage rate of 6 0.60 La for all penetrations and valves subject to Types B and C tests when pressurized to Pa.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With either (a) the measured overall integrated containment leakage rate exceeding 0.75 La, or (b) with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 La, restore the overall integrated leakage rate to S 0.75 La and the combined leakage rate for all penetrations and valves subject to Types B and C tests to 6 0.60 La prior to increasing the Reactor Coolant System temperature above 200'F.

SURVEILLANCE RE UIREMENTS 4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

a. Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.
b. The provisions of Specification 4.0.2 are not applicable.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-2 AMENDMENT4S, 4', 4', 406,

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENT AIR LOCKS LIMITINGCONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with:

Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and

b. An overall air lock leakage rate of 6 0.05 La at Pa, 12 psig.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:

a. In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and At least once per 6 months by verifying that only one door in each air lock can be opened at a time.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6C AMENDMENT440,

0 3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS This Page Intentionally Left Blank

'OOK NUCLEAR PLANT-UNITI Page 3/4 6-5

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENTSTRUCTURAL INTEGRITY LIMITINGCONDITION FOR OPERATION 3.6.1.6 The structural integrity of the containment structure and steel liner shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits prior to increasing the Reactor Coolant System temperature above 200'F.

SURVEILLANCE RE UIREMENTS 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-9

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENT VENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.1.7 The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities. No more than one purge supply path and one purge exhaust path shall be open at a time.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

ao With one containment purge supply and/or one exhaust'isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, either:

I) Restore the inoperable valve to OPERABLE status, or,

2) Deactivate the automatic valve secured in the closed position.

Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.

Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCE RE UIREMENTS 4.6.1.7.1 The surveillance requirements of Technical Specifications 3/4.6.1.2 and 3/4.6.3.1 apply.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-9a AMENDMENT66; 40$ ,

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINME<NTSYSTEMS CONTAINMENTLEAKAGE LIMITINGCONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to:

ao An overall integrated leakage rate of 6 La, 0.25 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at Pa, 12 psig.

A combined leakage rate of 6 0.60 La for all penetrations and valves subject to Types B and C tests when pressurized to Pa.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With either (a) the measured overall integrated containment leakage rate exceeding 0.75 La, or (b) with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 L>>,

restore the overall integrated leakage rate to 6 0.75 La and the combined leakage rate for all penetrations and

'alves subject to Types B and C tests to 6 0.60 L>> prior to increasing the Reactor Coolant System temperature above 200'F.

SURVEILLANCE RE UIREMENTS 4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

a. Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.
b. The provisions of Specification 4.0.2 are not applicable.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 6-2 AMENDME<NT445, ~,

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENTAIR LOCKS LIMITINGCONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with:

Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and An overall air lock leakage rate of 6 0.05 La at Pa, 12.0 psig.

APPLICABILITY: MODES I, 2, 3 and 4.

ACTION:

With an air lock inoperable, maintain at least one door closed; restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:

a. In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and
b. At least once per 6 months by verifying that only one door in each air lock can be opened at a time.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 64 AMENDMENT

0 3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS This Page Intentionally Left Blank COOK NUCLEAR PLANT-UNIT2 Page 3/4 6-5 AMENDMENT

0 3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENTSTRUCTURAL INTEGRITY LIMITINGCONDITION FOR OPERATION 3.6.1.6 The structural integrity of the containment shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits prior to increasing the Reactor Coolant System temperature above 200'P.

SURVEILLANCE RE UIREMENTS 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 6-9 AMENDMENT438,

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENTVENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.1.7 The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities. No more than one purge supply path and one purge exhaust path shall be open at a time.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, either:

1) Restore the inoperable valve to OPERABLE status, or,
2) Deactivate the automatic valve secured in the closed position.

Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.

Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCE RE UIREMENTS 4.6.1.7.1 The surveillance requirements of Technical Specifications 3/4.6.1.2 arid 3/4.6.3.1 apply.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 6-9a AMENDMENT47) 4R,