ML18101B169: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:* ATTACHMENT 2
{{#Wiki_filter:*       ATTACHMENT 2 TECHNICAL SPECIFICATION PAGE WITH PEN AND INK CHANGES LICENSE AMENDMENT APPLICATION REVISION OF 28-VOLT DC SPECIFICATION SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75         LR-N95094 DOCKET NOS. 50-272 AND 50-311                         LCR 95-15 The following Technical Specification for Facility Operating License No. DPR-70 is affected by this License Amendment Request:
* TECHNICAL SPECIFICATION PAGE WITH PEN AND INK CHANGES LICENSE AMENDMENT APPLICATION REVISION OF 28-VOLT DC SPECIFICATION SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 LR-N95094 LCR 95-15 The following Technical Specification for Facility Operating License No. DPR-70 is affected by this License Amendment Request: Technical Specification Page 3.8.2.5 3/4 8-11 The following Technical Specification for Facility Operating License No. DPR-75 is affected by this License Amendment Request: Technical Specification 3.8.2.5 ,,---%01166178 960104 ------------.,,,, PDR ADOCK 05000272 P PDR Page 3/4 8-13 
Technical Specification             Page 3.8.2.5                             3/4 8-11 The following Technical Specification for Facility Operating License No. DPR-75 is affected by this License Amendment Request:
. .. *
Technical Specification             Page 3.8.2.5                           3/4 8-13
* ELECTRICAL POWER SYSTEMS . 28-VClT O.C. OISTRIBUT!OH
,,---%01166178 960104 ------------.,,,,
* OPERATING CONDITION FOR OPERATION 3.8.2.S Th* following D.C. bus trains shall be energized ind OPERABLE:
PDR ADOCK 05000272 P             PDR
TRAIN 1A cons i s t1 ng of ZS-vo. ;.1.;.t ..:D:.!:. . batt1ry No. lA an*d TRAIN 18 consisting of ZS-volt D.C. bus No. 18, 28-velt D.C.* batt1ry Ho. 18, 1nd (t least an1:full capacity APPLICABILITY:
 
HODES 1, 2, 3 1nd 4. L 6 .. iler-y chr,,.*,-;rer*
ELECTRICAL POWER SYSTEMS .
1 fH. ACTION: ** b. c.
28-VClT O.C. OISTRIBUT!OH
* i Oi-.,.o-+ tiV1d . . . With one 28-vol D.C. bus r9Stor9 the inoperable bus to OPERABLE stltus within 2 hours o.-be in 1t least HOT STANDBY within thl nut 6 houn and tn COLD SHUTDOWN w1th1n th* following 30 hours. SURVEILLANCE REQUIREMENTS 4.S.Z.5.1 Eich D.C. bus shall b1 determined OPERABLE and energized at l11st onc1 Pll" 7 days by vtrify1ng co1T1Ct br91k1r alignment and avatlabiltty.
* OPERATING LIMIT!~  CONDITION FOR OPERATION 3.8.2.S Th* following D.C. bus trains shall                       be   energized ind OPERABLE:
TRAIN 1A cons i st1 ng of ZS-vo.;.1.;.t. :D:.!:.C~*~bu!!.:!s~Ho'!-7~!.--IOl~.!!..!...!~!...!!..!...--
                . batt1ry No. lA an*d ...,:*~t-=-=H::.:S:.::t~on=*:_!.!fu!Ul-'--'~~..u..~~~
TRAIN 18 consisting of ZS-volt D.C. bus No. 18, 28-velt D.C.*
batt1ry Ho. 18, 1nd (t least an1:full capacity charge~
APPLICABILITY: HODES 1, 2, 3 1nd 4.                                 L 6..iler-y chr,,.*,-;rer* 1 fH.
Oi- .,.o-+ e~
ACTION:
* i tiV1d ene""ft'"l~Y.f                                ~ .             ..
          ** With   one 28-vol D.C. bus ~noperablt, r9Stor9 the inoperable bus to OPERABLE stltus within 2 hours o.- be in 1t least HOT STANDBY within thl nut 6 houn and tn COLD SHUTDOWN w1th1n th* following 30 hours.
b.
c.
SURVEILLANCE REQUIREMENTS 4.S.Z.5.1 Eich D.C. bus tl"a~n shall b1 determined OPERABLE and energized at l11st onc1 Pll" 7 days by vtrify1ng co1T1Ct br91k1r alignment and P,~r avatlabiltty.
* 4.8.Z. 5.2 Each 28-valt battery and 1bov1 r.qu1rtd charger shall* bt d1111anstr1ttd OPERABLE:
* 4.8.Z. 5.2 Each 28-valt battery and 1bov1 r.qu1rtd charger shall* bt d1111anstr1ttd OPERABLE:
: 1. At 111st once per 7 days by verifying that: 1. Th* electrolyte 11v1l of th* pilot cell is between the
: 1. At 111st once per 7 days by verifying that:
* mintDllll and rnAx1mwn 11v1l indication marks. SALEM-UNIT 1 3/4 8*11
: 1. Th* electrolyte 11v1l of th* pilot cell is between the
, .. ,* ... . *
* mintDllll and rnAx1mwn 11v1l indication marks.
* ELECTRICAL POWER SYSTEMS 28-VOLT D.C. DISTRIBUTION  
SALEM-UNIT 1                               3/4 8*11
-OPERATING LIMIT!NG CONDITION FOR OPERATION 3.8.2.5 The following D.C. bus trains shall be energized and OPERABLE:
 
TRAIN 2A consisting of 28-volt D.C. bus No. 2A, 28-volt D.C. battery No. 2A and battery charger 2Al. TRAIN 2B consisting of 28-volt D.C. bus No. 2B, D.C. battery No. 2B, and battery charger 2Bl. APPLICABILITY:
ELECTRICAL POWER SYSTEMS 28-VOLT D.C. DISTRIBUTION - OPERATING LIMIT!NG CONDITION FOR OPERATION 3.8.2.5 The following D.C. bus trains shall be energized and OPERABLE:
MODES l, 2, 3 and 4. ACTION: a. b. c. , i + eti.e..-£i'&e-J.
TRAIN 2A consisting of 28-volt D.C. bus No. 2A, 28-volt D.C. battery No.
t\.i1d
2A and battery charger 2Al.
/ c-r no With one 8-volt D.C. bus inoperable..f"restore the inoperable bus to OPERABLE.status within 2 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours. With one 28-volt O.C. battery inoperable, restore the inoperable battery to. OPERABLE status within 2 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 i v-efjh*h2-P.
TRAIN 2B consisting of 28-volt D.C. bus No. 2B,     28~volt    D.C. battery No.
With one 28-volt D.C. battery charger inoperable, restore the able charger to OPERABLE status within 2 hours or connect the backup charger for no more than 7 days or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours. SURVEILLANCE REQUIREMENTS 4.8.2.5. l Each D.C. bus train shall be deteT'lllined OPERABLE and energized at least once .per 7 days by verifying correct breaker alignment and power availability.
2B, and battery charger 2Bl.
APPLICABILITY:       MODES l, 2, 3 and 4.
ACTION:       t\.i1d ene"'i'~ec i
                                                                /  c-r no
                                                                          + eti.e..-£i'&e-J.
                                                                                  ~
: a. With one 8-volt D.C. bus inoperable..f"restore the inoperable bus to OPERABLE.status within 2 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
: b. With one 28-volt O.C. battery inoperable, restore the inoperable battery to. OPERABLE status within 2 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hour~. i
                                    ~      v-efjh*h2-P.
: c. With one 28-volt D.C. battery charger inoperable, restore the           inoper-able charger to OPERABLE status within 2 hours or connect the           backup charger for no more than 7 days or be in at least HOT STANDBY           within the next 6 hours and in COLD SHUTDOWN within the following 30           hours.
SURVEILLANCE REQUIREMENTS 4.8.2.5. l Each D.C. bus train shall be deteT'lllined OPERABLE and energized at least once .per 7 days by verifying correct breaker alignment and power availability.
4.8.2.5.2 Each 28-volt battery and above required charger shall be demonstrated OPERABLE:
4.8.2.5.2 Each 28-volt battery and above required charger shall be demonstrated OPERABLE:
: a. At least once per 7 days by verifying that: l. The electrolyte level of the pilot cell is between the minimum and maximum level indication marks. SALEM -UNIT 2 3/4 8-13
: a. At least once per 7 days by verifying that:
*
: l.     The electrolyte level of the pilot cell is between the minimum and maximum level indication marks.
* INSERT With one required 28-volt DC battery charger inoperable, restore the inoperable battery charger to OPERABLE status within 2 hours or connect the backup charger for no more than 7 days or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.}}
SALEM - UNIT 2                               3/4 8-13
 
INSERT With one required 28-volt DC battery charger inoperable, restore the inoperable battery charger to OPERABLE status within 2 hours or connect the backup charger for no more than 7 days or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.}}

Latest revision as of 05:37, 3 February 2020

Proposed Tech Specs Representing Changes to Spec 3/4.8.2.5, 28-Volt DC Distribution - Operating.
ML18101B169
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/04/1996
From:
Public Service Enterprise Group
To:
Shared Package
ML18101B168 List:
References
NUDOCS 9601160178
Download: ML18101B169 (4)


Text

  • ATTACHMENT 2 TECHNICAL SPECIFICATION PAGE WITH PEN AND INK CHANGES LICENSE AMENDMENT APPLICATION REVISION OF 28-VOLT DC SPECIFICATION SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 LR-N95094 DOCKET NOS. 50-272 AND 50-311 LCR 95-15 The following Technical Specification for Facility Operating License No. DPR-70 is affected by this License Amendment Request:

Technical Specification Page 3.8.2.5 3/4 8-11 The following Technical Specification for Facility Operating License No. DPR-75 is affected by this License Amendment Request:

Technical Specification Page 3.8.2.5 3/4 8-13

,,---%01166178 960104 ------------.,,,,

PDR ADOCK 05000272 P PDR

ELECTRICAL POWER SYSTEMS .

28-VClT O.C. OISTRIBUT!OH

  • OPERATING LIMIT!~ CONDITION FOR OPERATION 3.8.2.S Th* following D.C. bus trains shall be energized ind OPERABLE:

TRAIN 1A cons i st1 ng of ZS-vo.;.1.;.t. :D:.!:.C~*~bu!!.:!s~Ho'!-7~!.--IOl~.!!..!...!~!...!!..!...--

. batt1ry No. lA an*d ...,:*~t-=-=H::.:S:.::t~on=*:_!.!fu!Ul-'--'~~..u..~~~

TRAIN 18 consisting of ZS-volt D.C. bus No. 18, 28-velt D.C.*

batt1ry Ho. 18, 1nd (t least an1:full capacity charge~

APPLICABILITY: HODES 1, 2, 3 1nd 4. L 6..iler-y chr,,.*,-;rer* 1 fH.

Oi- .,.o-+ e~

ACTION:

  • i tiV1d ene""ft'"l~Y.f ~ . ..
    • With one 28-vol D.C. bus ~noperablt, r9Stor9 the inoperable bus to OPERABLE stltus within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> o.- be in 1t least HOT STANDBY within thl nut 6 houn and tn COLD SHUTDOWN w1th1n th* following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

c.

SURVEILLANCE REQUIREMENTS 4.S.Z.5.1 Eich D.C. bus tl"a~n shall b1 determined OPERABLE and energized at l11st onc1 Pll" 7 days by vtrify1ng co1T1Ct br91k1r alignment and P,~r avatlabiltty.

  • 4.8.Z. 5.2 Each 28-valt battery and 1bov1 r.qu1rtd charger shall* bt d1111anstr1ttd OPERABLE:
1. At 111st once per 7 days by verifying that:
1. Th* electrolyte 11v1l of th* pilot cell is between the
  • mintDllll and rnAx1mwn 11v1l indication marks.

SALEM-UNIT 1 3/4 8*11

ELECTRICAL POWER SYSTEMS 28-VOLT D.C. DISTRIBUTION - OPERATING LIMIT!NG CONDITION FOR OPERATION 3.8.2.5 The following D.C. bus trains shall be energized and OPERABLE:

TRAIN 2A consisting of 28-volt D.C. bus No. 2A, 28-volt D.C. battery No.

2A and battery charger 2Al.

TRAIN 2B consisting of 28-volt D.C. bus No. 2B, 28~volt D.C. battery No.

2B, and battery charger 2Bl.

APPLICABILITY: MODES l, 2, 3 and 4.

ACTION: t\.i1d ene"'i'~ec i

/ c-r no

+ eti.e..-£i'&e-J.

~

a. With one 8-volt D.C. bus inoperable..f"restore the inoperable bus to OPERABLE.status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With one 28-volt O.C. battery inoperable, restore the inoperable battery to. OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hour~. i

~ v-efjh*h2-P.

c. With one 28-volt D.C. battery charger inoperable, restore the inoper-able charger to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or connect the backup charger for no more than 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours.

SURVEILLANCE REQUIREMENTS 4.8.2.5. l Each D.C. bus train shall be deteT'lllined OPERABLE and energized at least once .per 7 days by verifying correct breaker alignment and power availability.

4.8.2.5.2 Each 28-volt battery and above required charger shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that:
l. The electrolyte level of the pilot cell is between the minimum and maximum level indication marks.

SALEM - UNIT 2 3/4 8-13

INSERT With one required 28-volt DC battery charger inoperable, restore the inoperable battery charger to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or connect the backup charger for no more than 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.