ML18106A298: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:--
{{#Wiki_filter:--
* Public Service
* Public Service Electric and Gas Company Louis F. Storz                              Public Service Electric and Gas Company  P.O. Box 236, Hancocks Bridge, NJ 08038        609-339-5700 Senior Vice President - Muc!ear Operations JAN 3 0 1998 LR-N980049 United States Nuclear Regulatory Commission PSE&G Document Control Desk CONTROL Washington, DC 20555 Gentlemen:                                                                COPY #                        (Jj UPDATED FINAL SAFETY ANALYSIS REPORT, REVISION 16 SALEM GENERATING STATION UNITS 1 AND 2 DOCKET 'NOS. 50-272 and 50-311 Public Service Electric and Gas Company (PSE&G) hereby submits Revision No. 16 to the Salem Generating Station Updated Final Safety Analysis Report (UFSAR) in accordance with the requirements of 10CFR50.71(e).
* Electric and Gas Company Louis F. Storz                              Public Service Electric and Gas Company  P.O. Box 236, Hancocks Bridge, NJ 08038        609-339-5700 Senior Vice President - Muc!ear Operations JAN 3 0 1998 LR-N980049 United States Nuclear Regulatory Commission PSE&G Document Control Desk CONTROL Washington, DC 20555 Gentlemen:                                                                COPY #                        (Jj UPDATED FINAL SAFETY ANALYSIS REPORT, REVISION 16 SALEM GENERATING STATION UNITS 1 AND 2 DOCKET 'NOS. 50-272 and 50-311 Public Service Electric and Gas Company (PSE&G) hereby submits Revision No. 16 to the Salem Generating Station Updated Final Safety Analysis Report (UFSAR) in accordance with the requirements of 10CFR50.71(e).
Revision No. 16 to the Salem UFSAR contains identified text, table and figure changes required to reflect the plant configuration as of July 31, 1997, six months prior to this submittal. In addition, there are corrections of typographical errors and general editorial changes. A brief summary and explanation of each change is provided in an attachment to facilitate your review.
Revision No. 16 to the Salem UFSAR contains identified text, table and figure changes required to reflect the plant configuration as of July 31, 1997, six months prior to this submittal. In addition, there are corrections of typographical errors and general editorial changes. A brief summary and explanation of each change is provided in an attachment to facilitate your review.
Revision No. 16 is being issued 19 months after the prior full Revision No. 15, which was issued on June 12, 1996. The Salem UFSAR revisions are normally planned for
Revision No. 16 is being issued 19 months after the prior full Revision No. 15, which was issued on June 12, 1996. The Salem UFSAR revisions are normally planned for
Line 32: Line 31:
~ Recycled Paper
~ Recycled Paper


  -
Document Control Desk                    2
'.
* Document Control Desk                    2
* JAN 3O1998 LR-N980049 Attachments:
* JAN 3O1998 LR-N980049 Attachments:
           - Affidavit
           - Affidavit
Line 40: Line 37:
           - Salem UFSAR Revision No. 16 C    Document Control Desk - Original & ten copies Mr. Hubert J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Patrick Milano, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans - Salem (X24)
           - Salem UFSAR Revision No. 16 C    Document Control Desk - Original & ten copies Mr. Hubert J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Patrick Milano, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans - Salem (X24)
USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV Bureau of Nuclear Engineering PO Box415 Trenton, NJ 08625
USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV Bureau of Nuclear Engineering PO Box415 Trenton, NJ 08625
* Document Control Desk                  3
 
* LR-N980049
Document Control Desk                  3 LR-N980049
/rbk BC  (w/o attachments):
/rbk BC  (w/o attachments):
CNO & President - Nuclear Business Unit (N09)
CNO & President - Nuclear Business Unit (N09)
Line 55: Line 52:
Records Management Microfilm File Nos. 1.2.1, 2.1.3 95-4933
Records Management Microfilm File Nos. 1.2.1, 2.1.3 95-4933


      '
                                   *
                                   *
* REF: LR-N980049 STATE OF NEW JERSEY SS.
* REF: LR-N980049 STATE OF NEW JERSEY SS.
Line 61: Line 57:
                                                             ~
                                                             ~
Subjl:)ed and Sworn to before me this I      a    th day Of January, 1998 My Commission expires on April 21, 1998 KIMBERLY JO BROWN NOTARY PUBLIC OF NEW JERSEY My Commission Expires April 21, 1998
Subjl:)ed and Sworn to before me this I      a    th day Of January, 1998 My Commission expires on April 21, 1998 KIMBERLY JO BROWN NOTARY PUBLIC OF NEW JERSEY My Commission Expires April 21, 1998
*._.-*


r'*                      .PUBLIC SERVICE ELECTRIC &    S COMPANY
r'*                      .PUBLIC SERVICE ELECTRIC &    S COMPANY
Line 89: Line 84:
COPYHOLDER SIGNATURE:
COPYHOLDER SIGNATURE:


:.
Public Service Electric and Gas Company i  Louis F. Storz                                                Public Service Electric and Gas Company                                          609-339-5700        .*
!                                                    *                                                      *
* Public Service Electric and Gas Company i  Louis F. Storz                                                Public Service Electric and Gas Company                                          609-339-5700        .*
P.O. Box 236, Hancocks Bridge, NJ 08038 Senior Vice President
P.O. Box 236, Hancocks Bridge, NJ 08038 Senior Vice President
* Nuclear Operations JAN 30 1998 LR-N980049 United States Nuclear Regulatory Commission                                              PSE&G Document Control Desk Washington, DC 20555                                                                    CONTROL
* Nuclear Operations JAN 30 1998 LR-N980049 United States Nuclear Regulatory Commission                                              PSE&G Document Control Desk Washington, DC 20555                                                                    CONTROL
* Gentlemen:                                                                                COPY # 08 UPDATED FINAL SAFETY ANALYSIS REPORT, REVISION 16 SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 and 50-311
* Gentlemen:                                                                                COPY # 08 UPDATED FINAL SAFETY ANALYSIS REPORT, REVISION 16 SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 and 50-311
*i
*i I
'*
Public Service Electric and Gas Company (PSE&G) hereby submits Revision No. 16 to the Salem Generating Station Updated Final Safety Analysis Report (UFSAR) in accordance with the requirements of 10CFR50.71(e). *
I Public Service Electric and Gas Company (PSE&G) hereby submits Revision No. 16 to the Salem Generating Station Updated Final Safety Analysis Report (UFSAR) in accordance with the requirements of 10CFR50.71(e). *
* Revision No. 16 to the Salem UFSAR contains identified text, table and figure changes required to reflect the plant configuration as of July 31, 1997, six months prior to this submittal. In addition, there are corrections of typographical errors and general editorial changes. A brief summary and explanation of each change is provided in an attachment to facilitate your review.
* Revision No. 16 to the Salem UFSAR contains identified text, table and figure changes required to reflect the plant configuration as of July 31, 1997, six months prior to this submittal. In addition, there are corrections of typographical errors and general editorial changes. A brief summary and explanation of each change is provided in an attachment to facilitate your review.
Revision No. 16 is being issued 19 months after the prior full Revision No. 15, which was issued on June 12, 1996. The Salem UFSAR revisions are normally planned for six months after the S~lem Unit 1 refueling outages; however, this revision incorporates plant configuration d'lahg~s resulting from the Unit 2 extended outage which ended in July, 1997 -a_nd.                to
Revision No. 16 is being issued 19 months after the prior full Revision No. 15, which was issued on June 12, 1996. The Salem UFSAR revisions are normally planned for six months after the S~lem Unit 1 refueling outages; however, this revision incorporates plant configuration d'lahg~s resulting from the Unit 2 extended outage which ended in July, 1997 -a_nd.                to
                                              .. .: ** - - .
                                          *.. *-.
                                                               $atisfY*
                                                               $atisfY*
                                                               ~  -. -.
                                                               ~  -. -.
the
the 24 month maximum revision limit.
                                                                            , ..
24 month maximum revision limit.
Should the*r~ *b_f:t ani_qµe~tions with regard to this submittal, please do not hesitate to contact us~* - * "::-;;(*: ,-:f~.,~~'* ***
Should the*r~ *b_f:t ani_qµe~tions with regard to this submittal, please do not hesitate to contact us~* - * "::-;;(*: ,-:f~.,~~'* ***
                                                                 -  _;;, *'!f                                                                                  ---------~ -
                                                                 -  _;;, *'!f                                                                                  ---------~ -
* l1>t.. Printed on
* l1>t.. Printed on
     ~ Recycled Paper
     ~ Recycled Paper
* Document Control Desk
 
* JAN 301998
Document Control Desk
* 2 LR-N980049 I
* JAN 301998 2
LR-N980049 I
Attachments:
Attachments:
               -Affidavit
               -Affidavit
               - Summary of Salem UFSAR Revision 16 Changes
               - Summary of Salem UFSAR Revision 16 Changes
               - Salem UFSAR Revision No. 16 C    Document Control Desk - Original & ten copies Mr. Hubert J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Patrick Milano, Licensing Project Manager - Salem
               - Salem UFSAR Revision No. 16 C    Document Control Desk - Original & ten copies Mr. Hubert J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Patrick Milano, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission
    '
U. S. Nuclear Regulatory Commission
. i 1        One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans - Salem (X24)
. i 1        One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans - Salem (X24)
USNRC Senior Resident Inspector Mr. K Tosch, Manager, IV Bureau of Nuclear Engineering PO Box415 Trenton, NJ 08625
USNRC Senior Resident Inspector Mr. K Tosch, Manager, IV Bureau of Nuclear Engineering PO Box415 Trenton, NJ 08625
Line 126: Line 113:
  -1 I
  -1 I
I
I
  *


                          *                                *
REF: LR-N980049 STATE OF NEW JERSEY                          )
* REF: LR-N980049 STATE OF NEW JERSEY                          )
                                                 ) SS.
                                                 ) SS.
COUNTY OF SALEM                                )
COUNTY OF SALEM                                )
Line 138: Line 123:
KIMBERLY JO.BROWN~*
KIMBERLY JO.BROWN~*
NOTARY PUBLIC OF-NEW.*JERSEV My Commission* Expires April 21, 1998
NOTARY PUBLIC OF-NEW.*JERSEV My Commission* Expires April 21, 1998
* J i
 
'
J i
*1 j ~
*1 j ~
* Document Control Desk                  3
Document Control Desk                  3
                                                            *
~
~
LR-N980049
LR-N980049
Line 158: Line 142:
Records Management Microfilm File Nos. 1.2.1, 2.1.3
Records Management Microfilm File Nos. 1.2.1, 2.1.3
* 95-4933
* 95-4933
 
* INSERTION INSTRUCTIONS The following instructions are for the insertion of Revision 16 into the Salem Generating Station Updated Final Safety Analysis Report.
*.
* INSERTION INSTRUCTIONS
* The following instructions are for the insertion of Revision 16 into the Salem Generating Station Updated Final Safety Analysis Report.
Remove pages, tables, and/or figures listed in the REMOVE column and replace them with the pages, tables, and/or figures listed in the INSERT column. Dashes (---)
Remove pages, tables, and/or figures listed in the REMOVE column and replace them with the pages, tables, and/or figures listed in the INSERT column. Dashes (---)
in either column indicate no action required.
in either column indicate no action required.
Line 168: Line 149:


REMOVE
REMOVE
                  *  '
                         .INSERTION INSTRUCTIONS INSERT VOLUME 1 List of Current Pages                      List of Current Pages All Sheets                                  All Sheets 1.1-1/1.1-2                                1.1-1/1.1-2
                         .INSERTION INSTRUCTIONS
* INSERT VOLUME 1 List of Current Pages                      List of Current Pages All Sheets                                  All Sheets 1.1-1/1.1-2                                1.1-1/1.1-2
: 1. 6-lb/l. 6-2                              1. 6-lb/l. 6-2
: 1. 6-lb/l. 6-2                              1. 6-lb/l. 6-2
: 1. 6-3/1. 6-4                              i . 6-3 / i . 6-4
: 1. 6-3/1. 6-4                              i . 6-3 / i . 6-4
Line 176: Line 155:


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT-3.5-15/3.5-16                        3.5-15/3.5-16 3.5-17/3.5-18                        3. 5"."'17 /3. 5-18 3.5-19/3.5-20                        3.5-19/3.5-20 3.5-21/3.5-22                        3.5-21/3.5-21a 3.5-2lb/3.5-21c 3.5-2ld/3.5-22 T 3.5-1                              T 3.5-1 T3.5-2                                T 3.5-2 T 3.5-3                              T 3.5-3 F 3.5-6A F 3.5-7                              F 3.5-7 3.6-9/3.6-9a                          3.6-9/3.6-9a 3.6-11/3.6-12                        3.6-11/3.6-12 3.6-17/3.6-18                        3.6-17/3.6-18 3.6-19/3.6-20                        3.6-19/3.6-20 3.6-21/3.6-22                        3.6-21/3.6,-21a 3.6-21b/3.6-22 3.6-23/3.6-24                        3.6-23/3.6-24 3.6-25/3.6-26                        3.6-25/3.6-26 3.6-27/3.6-28                        3.6-27/3.6-28 3.6-29/3.6-30                        3.6-29/3.6,...30 3.6-35/3.6-36                        3.6-35/3.6-36 3.6-36a/3.6-36b 3.6-39/3.6-40                        3.6-39/3.6-40 3.6-41/3.6-42                        3.6-41/3.6-42 3.6-43/3.6-44                        3.6-43/3.6-44 3.6-55                              3.6-55 T 3.6-2                              T 3.6-2 F 3.6-10                              F 3.6-10 F 3.6-28                              F 3.6-28 VOLUME 2 3.7-5/3.7-6                          3.7-5/3.7-6 3.7-29/3.7-30                        3.7-29/3.7-30 3.8-1/3.8-2                          3.8-1/3.8-2 3.8-29/3.8-30                        3.8-29/3.8-30 3.8-65/3.8-66                        3.8-65/3.8-66 3.8-75/3.8-76                        3.8-75/3.8-76 3.8-77/3.8-77a                        3.8-77/3.8-78 3.8-77b/3.8-78 II-3 SGS-UFSAR                                                Revision 16 January 31, 1998
* INSERT-3.5-15/3.5-16                        3.5-15/3.5-16 3.5-17/3.5-18                        3. 5"."'17 /3. 5-18 3.5-19/3.5-20                        3.5-19/3.5-20 3.5-21/3.5-22                        3.5-21/3.5-21a 3.5-2lb/3.5-21c 3.5-2ld/3.5-22 T 3.5-1                              T 3.5-1 T3.5-2                                T 3.5-2 T 3.5-3                              T 3.5-3 F 3.5-6A F 3.5-7                              F 3.5-7 3.6-9/3.6-9a                          3.6-9/3.6-9a 3.6-11/3.6-12                        3.6-11/3.6-12 3.6-17/3.6-18                        3.6-17/3.6-18 3.6-19/3.6-20                        3.6-19/3.6-20 3.6-21/3.6-22                        3.6-21/3.6,-21a 3.6-21b/3.6-22 3.6-23/3.6-24                        3.6-23/3.6-24 3.6-25/3.6-26                        3.6-25/3.6-26 3.6-27/3.6-28                        3.6-27/3.6-28 3.6-29/3.6-30                        3.6-29/3.6,...30 3.6-35/3.6-36                        3.6-35/3.6-36 3.6-36a/3.6-36b 3.6-39/3.6-40                        3.6-39/3.6-40 3.6-41/3.6-42                        3.6-41/3.6-42 3.6-43/3.6-44                        3.6-43/3.6-44 3.6-55                              3.6-55 T 3.6-2                              T 3.6-2 F 3.6-10                              F 3.6-10 F 3.6-28                              F 3.6-28 VOLUME 2 3.7-5/3.7-6                          3.7-5/3.7-6 3.7-29/3.7-30                        3.7-29/3.7-30 3.8-1/3.8-2                          3.8-1/3.8-2 3.8-29/3.8-30                        3.8-29/3.8-30 3.8-65/3.8-66                        3.8-65/3.8-66 3.8-75/3.8-76                        3.8-75/3.8-76 3.8-77/3.8-77a                        3.8-77/3.8-78 3.8-77b/3.8-78 II-3 SGS-UFSAR                                                Revision 16 January 31, 1998


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT 3.8-79/3.8-80                        3.8-79/3.8-79a 3.8-79b/3.8-80 3.8-81/3.8-82                        3.8-81/3.8-82 F 3.8-36                              F 3.8-36 3A-5/3A-6                            3A-5/3A-6 3A-7b/3A-8                            3A-7b/3A-8 3A-9/3A-10                            3A-9/3A-10 3A-15/3A-16                          3A-15/3A-16 3A-23/3A-23a                          3A-23/3A-23a 3A-25/3A-26                          3A-25/3A-26 3A-37/3A-38                          3A-37/3A-38 3A-39/3A-40                          3A-39/3A-40 3A-45/3A-46                          3A-45/3A-46 3A-47/3A-48                          3A-47/3A-48 3A-49/3A-50                          3A-49/3A-50 3A-51/3A-5la                        3A-51/3A-5la 3A-5lb/3A-52                        3A-5lb/3A-52 3A-53/3A-54                          3A-53/3A-54 3A-55                                3A-55 F 3A-3                              F 3A-3 F  3A-4                              F 3A-4 T 4.1-1                              T 4.1-1 Sh 1                                  Sh 1 4.2-53/4.2-54                        4.2-53/4.2-54 4.2-55/4.2-56                        4.2-55/4.2-56 4.2-79/4.2-80                        4.2-79/4.2-80 4.3-23/4.3-24                        4.3-23/4.3-24 4.5-2K/4.5-2L                        4.5-2K/4.5-2L VOLUME 3 5.1-7/5.1-8                          5.1-7/5.1-8 F 5.l-6A                              F 5.1-6A Sh 1                                  Sh 1 Sh 2                                Sh 2 F 5.l-6B                            F 5.l-6B Sh 1                                Sh 1 Sh 3                                Sh 3 5.2-13/5.2-14                        5.2-13/5.2-14 5.2-15/5.2-16                        5.2-15/5.2-16 5.2-63/5.2-64                        5.2-63/5.2-64 II-4 SGS-UFSAR                                          Revision 16 January 31, 1998
* INSERT 3.8-79/3.8-80                        3.8-79/3.8-79a 3.8-79b/3.8-80 3.8-81/3.8-82                        3.8-81/3.8-82 F 3.8-36                              F 3.8-36 3A-5/3A-6                            3A-5/3A-6 3A-7b/3A-8                            3A-7b/3A-8 3A-9/3A-10                            3A-9/3A-10 3A-15/3A-16                          3A-15/3A-16 3A-23/3A-23a                          3A-23/3A-23a 3A-25/3A-26                          3A-25/3A-26 3A-37/3A-38                          3A-37/3A-38 3A-39/3A-40                          3A-39/3A-40 3A-45/3A-46                          3A-45/3A-46 3A-47/3A-48                          3A-47/3A-48 3A-49/3A-50                          3A-49/3A-50 3A-51/3A-5la                        3A-51/3A-5la 3A-5lb/3A-52                        3A-5lb/3A-52 3A-53/3A-54                          3A-53/3A-54 3A-55                                3A-55 F 3A-3                              F 3A-3 F  3A-4                              F 3A-4 T 4.1-1                              T 4.1-1 Sh 1                                  Sh 1 4.2-53/4.2-54                        4.2-53/4.2-54 4.2-55/4.2-56                        4.2-55/4.2-56 4.2-79/4.2-80                        4.2-79/4.2-80 4.3-23/4.3-24                        4.3-23/4.3-24 4.5-2K/4.5-2L                        4.5-2K/4.5-2L VOLUME 3 5.1-7/5.1-8                          5.1-7/5.1-8 F 5.l-6A                              F 5.1-6A Sh 1                                  Sh 1 Sh 2                                Sh 2 F 5.l-6B                            F 5.l-6B Sh 1                                Sh 1 Sh 3                                Sh 3 5.2-13/5.2-14                        5.2-13/5.2-14 5.2-15/5.2-16                        5.2-15/5.2-16 5.2-63/5.2-64                        5.2-63/5.2-64 II-4 SGS-UFSAR                                          Revision 16 January 31, 1998


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT 5.2-69/5.2-70                        5.2-69/5.2-70 5.2-71/5.2-72                        5.2-71/5.2-72 5.2-73/5.2-74                        5.2-73/5.2-74 T 5.2-3                            T 5.2-3 Sh 2                                Sh 2 T 5.2-4                            T 5.2-4 T 5.2-9B                            T 5.2-9B 5.3-1/5.3-2                        5.3-1/5.3-2 5.4-13/5.4-14                      5.4-13/5.4-14 5.5-5/5.5-6                        5.5-5/5.5-6 5.5-11/5.5-12                      5.5-11/5.5-12 5.5-43/5.5-44                      5.5-43/5.5-44 T 5.5-2                            T 5.5-2 Sh 1                                Sh 1 Sh 2                                Sh 2 F 5.5-2A                            F 5.5-2A Sh 1                                Sh 1 Sh 2                                Sh 2 F 5.5-2B                            F 5.5-2B Sh 1                                Sh 1 Sh 2                                Sh 2 5.6-1/5.6-la                        5.6-1/5.6-la 5.6-3/5.6-4                          5.6-3/5.6-4 5.6-5/5.6-6                          5.6-5/5.6-6 6-iii/6-iv                          6-iii/6-iv 6-v/6-vi                            6-v/6-vi 6-vii/6-viii                        6-vii/6-viii 6.2-9/6.2-10                        6.2-9/6.2-10 6.2-11/6.2-12                        6.2-11/6.2-12 6.2-15/6.2-16                        6.2-15/6.2-16 6.2-21/6.2-22                        6.2-21/6.2-22 6.2-23/6.2-24                        6.2-23/6.2-24 6.2-31/6.2-32                        6.2-31/6.2-32 6.2-33/6.2-34                        6.2-33/6.2-34 6.2-37/6.2-38                        6.2-37/6.2-38 6.2-43/6.2-44                        6.2-43/6.2-44 6.2-51/6.2-52                        6.2-51/6.2-52 6.2-53/6.2-54                        6.2-53/6.2-54 6.2-55/6.2-56                        6.2-55/6.2-56 6.2-57/6.2-58                        6.2-57/6.2-58 6.2-59/6.2-60                        6.2-59/6.2-59a II-5 SGS-UFSAR                                        Revision 16 January 31, 1998
* INSERT 5.2-69/5.2-70                        5.2-69/5.2-70 5.2-71/5.2-72                        5.2-71/5.2-72 5.2-73/5.2-74                        5.2-73/5.2-74 T 5.2-3                            T 5.2-3 Sh 2                                Sh 2 T 5.2-4                            T 5.2-4 T 5.2-9B                            T 5.2-9B 5.3-1/5.3-2                        5.3-1/5.3-2 5.4-13/5.4-14                      5.4-13/5.4-14 5.5-5/5.5-6                        5.5-5/5.5-6 5.5-11/5.5-12                      5.5-11/5.5-12 5.5-43/5.5-44                      5.5-43/5.5-44 T 5.5-2                            T 5.5-2 Sh 1                                Sh 1 Sh 2                                Sh 2 F 5.5-2A                            F 5.5-2A Sh 1                                Sh 1 Sh 2                                Sh 2 F 5.5-2B                            F 5.5-2B Sh 1                                Sh 1 Sh 2                                Sh 2 5.6-1/5.6-la                        5.6-1/5.6-la 5.6-3/5.6-4                          5.6-3/5.6-4 5.6-5/5.6-6                          5.6-5/5.6-6 6-iii/6-iv                          6-iii/6-iv 6-v/6-vi                            6-v/6-vi 6-vii/6-viii                        6-vii/6-viii 6.2-9/6.2-10                        6.2-9/6.2-10 6.2-11/6.2-12                        6.2-11/6.2-12 6.2-15/6.2-16                        6.2-15/6.2-16 6.2-21/6.2-22                        6.2-21/6.2-22 6.2-23/6.2-24                        6.2-23/6.2-24 6.2-31/6.2-32                        6.2-31/6.2-32 6.2-33/6.2-34                        6.2-33/6.2-34 6.2-37/6.2-38                        6.2-37/6.2-38 6.2-43/6.2-44                        6.2-43/6.2-44 6.2-51/6.2-52                        6.2-51/6.2-52 6.2-53/6.2-54                        6.2-53/6.2-54 6.2-55/6.2-56                        6.2-55/6.2-56 6.2-57/6.2-58                        6.2-57/6.2-58 6.2-59/6.2-60                        6.2-59/6.2-59a II-5 SGS-UFSAR                                        Revision 16 January 31, 1998


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT 6.2-59b/6.2-60 6.2-61/6.2-62                        6.2-61/6.2-62 6.2-65/6.2-66                        6.2-65/6.2-66 6.2-67/6.2-68                        6.2-67/6.2-68 6.2-85                              6.2-85 T 6.2-6                              T 6.2-6 T 6.2-9                              T 6.2-9 T 6.2-10                            T 6.2-10 Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 Sh 4                                Sh 4 Sh 5                                Sh 5 Sh 6                                Sh 6 Sh  7                                Sh 7 Sh  8                                Sh 8 Sh  9                                Sh 9 Sh  10                              Sh 10 Sh 11                                Sh 11 Sh 12                                Sh 12
* INSERT 6.2-59b/6.2-60 6.2-61/6.2-62                        6.2-61/6.2-62 6.2-65/6.2-66                        6.2-65/6.2-66 6.2-67/6.2-68                        6.2-67/6.2-68 6.2-85                              6.2-85 T 6.2-6                              T 6.2-6 T 6.2-9                              T 6.2-9 T 6.2-10                            T 6.2-10 Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 Sh 4                                Sh 4 Sh 5                                Sh 5 Sh 6                                Sh 6 Sh  7                                Sh 7 Sh  8                                Sh 8 Sh  9                                Sh 9 Sh  10                              Sh 10 Sh 11                                Sh 11 Sh 12                                Sh 12
*T 6.2-11                            T 6.2-11 T 6.2-12                            T 6.2-12 Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 T 6.2-13                            T 6.2-13 Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3 Sh 4 F 6.2.4B                            F 6.2.4B F 6.2-16                            F 6.2-16 F 6.2-18                            F 6.2-18 F 6.2-19                            F 6.2-19 F 6.2-21                            F 6.2-21 F 6.2-22                            F 6.2-22 F  6.2-23                            F 6.2-23 F  6.2-24                            F 6.2-24 F  6.2-29                            F 6.2-29.
*T 6.2-11                            T 6.2-11 T 6.2-12                            T 6.2-12 Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 T 6.2-13                            T 6.2-13 Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3 Sh 4 F 6.2.4B                            F 6.2.4B F 6.2-16                            F 6.2-16 F 6.2-18                            F 6.2-18 F 6.2-19                            F 6.2-19 F 6.2-21                            F 6.2-21 F 6.2-22                            F 6.2-22 F  6.2-23                            F 6.2-23 F  6.2-24                            F 6.2-24 F  6.2-29                            F 6.2-29.
F  6.2-30                            F 6.2-30.
F  6.2-30                            F 6.2-30.
Line 195: Line 170:


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT F 6.2-33                              F 6.2-33 F 6.2-34                              F 6.2-34 F 6.2-39                              F 6.2-39 F 6.2-40                              F 6.2-40 F 6.2-41                              F 6.2-41 F 6.2-42                            F  6.2-42 F 6.2-43                            F  6.2-43*
                                          **
INSERT F 6.2-33                              F 6.2-33 F 6.2-34                              F 6.2-34 F 6.2-39                              F 6.2-39 F 6.2-40                              F 6.2-40 F 6.2-41                              F 6.2-41 F 6.2-42                            F  6.2-42 F 6.2-43                            F  6.2-43*
F 6.2-45C                            F  6.2-45C F 6.2-450                            F  6.2-450 6.3-5/6.3-6                          6.3-5/6.3-6
F 6.2-45C                            F  6.2-45C F 6.2-450                            F  6.2-450 6.3-5/6.3-6                          6.3-5/6.3-6
.6.3-9/6.3-10                        6.3-9/6.3-10 6.3-13/6.3-14                        6.3-13/6.3-14 6.3-15/6.3-16                        6.3-15/6.3-16 6.3-21/6.3-22                        6.3-21/6.3-22 6.3-31/6.3-32                        6.3-31/6.3-32 6.3-33b/6.3-34                      6.3-33b/6.3-34 6.3-35/6.3-36                        6.3-35/6.3-36
.6.3-9/6.3-10                        6.3-9/6.3-10 6.3-13/6.3-14                        6.3-13/6.3-14 6.3-15/6.3-16                        6.3-15/6.3-16 6.3-21/6.3-22                        6.3-21/6.3-22 6.3-31/6.3-32                        6.3-31/6.3-32 6.3-33b/6.3-34                      6.3-33b/6.3-34 6.3-35/6.3-36                        6.3-35/6.3-36
Line 208: Line 181:
* Sh 2 Sh 3 Sh 4 F 6.3-lB Sh 1 Sh 2 Sh 3 Sh 4 F 6.3-lB Sh 1 Sh 2                                  Sh 2 Sh 3                                  Sh 3 Sh 4                                  Sh 4 VOLUME 4 6.4-1/6.4-2                            6.4-1/6.4-la 6.4-lb/6.4-lc 6.4-ld/6.4-2 6.4-3/6.4-4                            6.4-3/6.4-4 6.4-4a/6.4-4b 6.4-5                                  6.4-5 T 6.4-2                                T 6.4-2 Sh 1                                  Sh 1
* Sh 2 Sh 3 Sh 4 F 6.3-lB Sh 1 Sh 2 Sh 3 Sh 4 F 6.3-lB Sh 1 Sh 2                                  Sh 2 Sh 3                                  Sh 3 Sh 4                                  Sh 4 VOLUME 4 6.4-1/6.4-2                            6.4-1/6.4-la 6.4-lb/6.4-lc 6.4-ld/6.4-2 6.4-3/6.4-4                            6.4-3/6.4-4 6.4-4a/6.4-4b 6.4-5                                  6.4-5 T 6.4-2                                T 6.4-2 Sh 1                                  Sh 1
* Sh 2 T 6.4-3 7-iii/7-iv 7 .1-11/7 .1-lla 7.l-llb/7.1-12 T 6.4-3 7-iii/7-iv 7 .1-11/7 .1-12 7.1-13/7.1-14                          7.1-13/7.1-14
* Sh 2 T 6.4-3 7-iii/7-iv 7 .1-11/7 .1-lla 7.l-llb/7.1-12 T 6.4-3 7-iii/7-iv 7 .1-11/7 .1-12 7.1-13/7.1-14                          7.1-13/7.1-14
: 7. 2-11/7. 2-12                        7.2-11/7.2-12 7.2-23/7.2-24                          7.2-23/7.2-24 7.2-31/7.2-32                          7.2-31/7.2-32 7.2-37/7.2-38                          7.2-37/7.2-38 T 7.2-1                                T 7.2-1 Sh 2                                  Sh 2 Sh 5                                  Sh 5 F 7.2-5                                F 7.2-5 7~3-3/7.3-4                            7.3-3/7.3-4 7.3-5/7.3-6                            7.3-5/7.3-6 7.3-7/7.3-8                            7.3-7/7.3-8 7.3-19/7.3-20                          7.3-19/7.3-20
: 7. 2-11/7. 2-12                        7.2-11/7.2-12 7.2-23/7.2-24                          7.2-23/7.2-24 7.2-31/7.2-32                          7.2-31/7.2-32 7.2-37/7.2-38                          7.2-37/7.2-38 T 7.2-1                                T 7.2-1 Sh 2                                  Sh 2 Sh 5                                  Sh 5 F 7.2-5                                F 7.2-5 7~3-3/7.3-4                            7.3-3/7.3-4 7.3-5/7.3-6                            7.3-5/7.3-6 7.3-7/7.3-8                            7.3-7/7.3-8 7.3-19/7.3-20                          7.3-19/7.3-20 7.3-27/7.3-28                          7.3-27/7.3-28 T 7.3-2                                T 7.3-2 7.3-29/7.3-30                          7.3-29/7.3-30 II-8 SGS-UFSAR                                                  Revision 16 Januarv 31. 1998
* 7.3-27/7.3-28                          7.3-27/7.3-28 T 7.3-2                                T 7.3-2 7.3-29/7.3-30                          7.3-29/7.3-30 II-8 SGS-UFSAR                                                  Revision 16 Januarv 31. 1998


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT T 7.3-3                        T 7.3-3 Sh 1                            Sh 1 Sh 2                            Sh 2 T 7.3-4                        T 7.3-4 Sh 1                            Sh 1 Sh 2                            Sh 2 Sh 3                            Sh 3 Sh 4                            Sh 4 Sh 5                            Sh 5 Sh 6                            Sh 6 Sh 7                            Sh 7 Sh 8                            Sh 8 Sh 9                            Sh 9 Sh 10                          Sh 10 Sh 12                          Sh 12 Sh 13                          Sh 13 Sh 13a Sh 14                          Sh 14 Sh 15                          Sh 15 Sh 16                          Sh 16 Sh 17                          Sh 17 Sh 23                          Sh 23 Sh 24                          Sh 24 Sh 25                          Sh 25 Sh 26                          Sh 26 Sh 27                          Sh 27 Sh 28                          Sh 28 Sh 29                          Sh 29 Sh 30                          Sh 30 Sh 31                          Sh 31 Sh 32                          Sh 32 Sh 33                          Sh 33 Sh 34                          Sh 34 Sh 35                          Sh 35 Sh 36                          Sh 36 Sh 37                          Sh 37 Sh 38                          Sh 38 Sh 39                          Sh 39 Sh 40                          sh 40 Sh 41                          Sh 41 Sh 42                          Sh 42 Sh 43                          Sh 43 II-9 SGS-UFSAR                              Revision 16 January 31, 1998
* INSERT T 7.3-3                        T 7.3-3 Sh 1                            Sh 1 Sh 2                            Sh 2 T 7.3-4                        T 7.3-4 Sh 1                            Sh 1 Sh 2                            Sh 2 Sh 3                            Sh 3 Sh 4                            Sh 4 Sh 5                            Sh 5 Sh 6                            Sh 6 Sh 7                            Sh 7 Sh 8                            Sh 8 Sh 9                            Sh 9 Sh 10                          Sh 10 Sh 12                          Sh 12 Sh 13                          Sh 13 Sh 13a Sh 14                          Sh 14 Sh 15                          Sh 15 Sh 16                          Sh 16 Sh 17                          Sh 17 Sh 23                          Sh 23 Sh 24                          Sh 24 Sh 25                          Sh 25 Sh 26                          Sh 26 Sh 27                          Sh 27 Sh 28                          Sh 28 Sh 29                          Sh 29 Sh 30                          Sh 30 Sh 31                          Sh 31 Sh 32                          Sh 32 Sh 33                          Sh 33 Sh 34                          Sh 34 Sh 35                          Sh 35 Sh 36                          Sh 36 Sh 37                          Sh 37 Sh 38                          Sh 38 Sh 39                          Sh 39 Sh 40                          sh 40 Sh 41                          Sh 41 Sh 42                          Sh 42 Sh 43                          Sh 43 II-9 SGS-UFSAR                              Revision 16 January 31, 1998
* INSERTION INSTRUCTIONS REMOVE                            INSERT Sh 44                            Sh 44 Sh 45                            Sh 45 Sh 46                            Sh 46 Sh 47                            Sh 47 T 7.3-5                          T 7.3-5 Sh 1                              Sh 1 Sh 3                              Sh 3 Sh 5                              Sh 5 Sh 6                              Sh 6 Sh 7                              Sh 7 Sh 9                              Sh 9 Sh 13                            Sh 13 Sh 15                            Sh 15 T 7.3-6                          T 7.3-6 Sh 1                              Sh 1 Sh 2                              Sh 2 Sh 3                              Sh 3 Sh 4                              Sh 4 Sh 5                              Sh 5 Sh 6                              Sh 6 Sh 7                              Sh 7 Sh 8                              Sh 8 Sh 9                              Sh 9 Sh 10                            Sh 10 Sh 13                            Sh 13 Sh 14                            Sh 14 T 7.3-7                          T 7.3-7 Sh 1                              Sh 1 Sh 2                              Sh 2 F 7.3-4                          F 7.3-4 7.5-1/7.5-2                      7.5-1/7.5-2 7.5-3/7.5-4                      7.5-3/7.5-4 T 7.5-1                          T 7.5-1 Sh 4                              Sh 4 T 7.5-2                          T 7.5-2 Sh 8                              Sh 8 T 7.5-3                          T 7.5-3 T 7.5-4                          T 7.5-4 Sh 2                              Sh 2 Sh 4                              Sh 4 Sh 5                              Sh 5 II-10 SGS-UFSAR                                    Revision 16 January 31, 1998
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS REMOVE                              INSERT T 7.5-5                              T 7.5-5 Sh 2                                Sh 2 Sh 3                                Sh 3 7.6-5/7.6-6                          7.6-5/7.6-6 7.6-7/7.6-8                          7.6-7/7.6-8 7.7-3/7.7-4                          7.7-3/7.7-4 7.7-5/7.7-6                          7.7-5/7.7-6 7.7-7/7.7-8                          7.7-7/7.7-8 7.7-13/7.7-14                        7.7-13/7.7-14 7.7-17/7.7-17a                      7.7-17/7.7-17a 7.7-21/7.7-21a                      7.7-21/7.7-21a 7.7-27/7.7-28                        7.7-27/7.7-28 F 7.7-2                              F 7.7-2                      :'..
* REMOVE                            INSERT Sh 44                            Sh 44 Sh 45                            Sh 45 Sh 46                            Sh 46 Sh 47                            Sh 47 T 7.3-5                          T 7.3-5 Sh 1                              Sh 1 Sh 3                              Sh 3 Sh 5                              Sh 5 Sh 6                              Sh 6 Sh 7                              Sh 7 Sh 9                              Sh 9 Sh 13                            Sh 13 Sh 15                            Sh 15 T 7.3-6                          T 7.3-6 Sh 1                              Sh 1 Sh 2                              Sh 2 Sh 3                              Sh 3 Sh 4                              Sh 4 Sh 5                              Sh 5 Sh 6                              Sh 6 Sh 7                              Sh 7 Sh 8                              Sh 8 Sh 9                              Sh 9 Sh 10                            Sh 10 Sh 13                            Sh 13 Sh 14                            Sh 14 T 7.3-7                          T 7.3-7 Sh 1                              Sh 1 Sh 2                              Sh 2 F 7.3-4                          F 7.3-4 7.5-1/7.5-2                      7.5-1/7.5-2 7.5-3/7.5-4                      7.5-3/7.5-4 T 7.5-1                          T 7.5-1 Sh 4                              Sh 4 T 7.5-2                          T 7.5-2 Sh 8                              Sh 8 T 7.5-3                          T 7.5-3 T 7.5-4                          T 7.5-4 Sh 2                              Sh 2 Sh 4                              Sh 4 Sh 5                              Sh 5 II-10 SGS-UFSAR                                    Revision 16 January 31, 1998
* INSERTION INSTRUCTIONS
* REMOVE                              INSERT T 7.5-5                              T 7.5-5 Sh 2                                Sh 2 Sh 3                                Sh 3 7.6-5/7.6-6                          7.6-5/7.6-6 7.6-7/7.6-8                          7.6-7/7.6-8 7.7-3/7.7-4                          7.7-3/7.7-4 7.7-5/7.7-6                          7.7-5/7.7-6 7.7-7/7.7-8                          7.7-7/7.7-8 7.7-13/7.7-14                        7.7-13/7.7-14 7.7-17/7.7-17a                      7.7-17/7.7-17a 7.7-21/7.7-21a                      7.7-21/7.7-21a 7.7-27/7.7-28                        7.7-27/7.7-28 F 7.7-2                              F 7.7-2                      :'..
j' 7A-3/7A-4                            7A-3/7A-4 7A-5/7A-6                            7A-5/7A-6                      I*
j' 7A-3/7A-4                            7A-3/7A-4 7A-5/7A-6                            7A-5/7A-6                      I*
8-i/8-ii                            8-i/8-ii 8-iii 8-iv 8-iii 8-iv I
8-i/8-ii                            8-i/8-ii 8-iii 8-iv 8-iii 8-iv I
Line 223: Line 192:


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT F  8.3-5                            F 8.3-5 Sh 1                                Sh 1 Sh 2                                Sh 2 F 8.3-6                              F 8.3-6 Sh 2                                Sh 2 9-v/9-vi                            9-v/9-vi 9-xib/9-xii                          9-xib/9-xii 9.l-3b/9.1-4                        9.l-3b/9.l-4 9.1-13/9.1-14                        9.1-13/9.1-14 9.1-15/9.1-16                      9.1-15/9.1-16 9.1-29/9.1-30                      9.1-29/9.1-30 9.1-31/9.1-32                      9.1-31/9.1-32 9.1-33/9.1-34                      9.1-33/9.1-34 T 9.1-2                            T 9.1-2 Sh 1                                Sh 1 F 9.1-1                            F 9.1-1 F 9.1-4A                            F  9.l-4A F 9.1-48                            F 9.1-48 9.2-1/9.2-2                        9.2-1/9.2-2 9.2-3/9.2-4                        9.2-3/9.2-4 9.2-6a/9.2-6b                      9.2-6a/9.2-6b 9.2-9/9.2-9a                        9.2-9/9.2-9a 9.2-9b/9.2-10                      9.2-9b/9.2-10 9.2-13/9.2-14                      9.2-13/9.2-14 9.2-21/9.2-22                      9.2-21/9.2-22 T 9.2-1                              T 9.2-1 T 9.2-3                              T 9.2-3 T 9.2-4                              T 9.2-4 Sh 1                                Sh 1 F 9.2-lA                            F 9.2-lA Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 4                                Sh 4 Sh 5                                Sh 5 Sh 6                                Sh 6 F 9.2-18                            F 9.2-18 Sh 1                              . Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 II-12 SGS-UFSAR                                        Revision 16 January 31, 1998
* INSERT F  8.3-5                            F 8.3-5 Sh 1                                Sh 1 Sh 2                                Sh 2 F 8.3-6                              F 8.3-6 Sh 2                                Sh 2 9-v/9-vi                            9-v/9-vi 9-xib/9-xii                          9-xib/9-xii 9.l-3b/9.1-4                        9.l-3b/9.l-4 9.1-13/9.1-14                        9.1-13/9.1-14 9.1-15/9.1-16                      9.1-15/9.1-16 9.1-29/9.1-30                      9.1-29/9.1-30 9.1-31/9.1-32                      9.1-31/9.1-32 9.1-33/9.1-34                      9.1-33/9.1-34 T 9.1-2                            T 9.1-2 Sh 1                                Sh 1 F 9.1-1                            F 9.1-1 F 9.1-4A                            F  9.l-4A F 9.1-48                            F 9.1-48 9.2-1/9.2-2                        9.2-1/9.2-2 9.2-3/9.2-4                        9.2-3/9.2-4 9.2-6a/9.2-6b                      9.2-6a/9.2-6b 9.2-9/9.2-9a                        9.2-9/9.2-9a 9.2-9b/9.2-10                      9.2-9b/9.2-10 9.2-13/9.2-14                      9.2-13/9.2-14 9.2-21/9.2-22                      9.2-21/9.2-22 T 9.2-1                              T 9.2-1 T 9.2-3                              T 9.2-3 T 9.2-4                              T 9.2-4 Sh 1                                Sh 1 F 9.2-lA                            F 9.2-lA Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 4                                Sh 4 Sh 5                                Sh 5 Sh 6                                Sh 6 F 9.2-18                            F 9.2-18 Sh 1                              . Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 II-12 SGS-UFSAR                                        Revision 16 January 31, 1998
                                                                  '.:, .... *.*


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT Sh 4                                Sh 4 Sh 5                                Sh 5 Sh 6                                Sh 6 F 9.2-2B                            F 9.2-2B F 9.2-4A                            F 9.2-4A Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 F 9.2-4B                            F 9.2-4B Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 F 9.2-11                            F 9.2-11 Sh 5                                Sh 5 Sh 6                                Sh 6 Sh 7                                Sh 7 VOLUME 5 9.3-1/9.3-2                        9.3-1/9.3-2 9.3-31/9.3-32                      9.3-31/9.3-32 9.3-33/9.3-34                      9.3-33/9.3-34 9.3-47/9.3-48                      9.3-47/9.3-48 9.3-59/9.3-60                      9.3-59/9.3-60 9.3-61/9.3-62                        9.3-61/9.3-62 9.3-63                              9.3-63 T 9.3-4                              T 9.3-4 T 9.3-6                              T 9.3-6 Sh 12                                Sh 12 F 9.3-lA                            F 9.3-lA Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 Sh 4                                Sh 4 F 9.3-lB                            F 9.3-lB Sh 1                                Sh 1 Sh 2                                Sh 2 F 9.3-2A                            F 9.3-2A Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 II-13 SGS-UFSAR                                        Revision 16 January 31, 1998
* INSERT Sh 4                                Sh 4 Sh 5                                Sh 5 Sh 6                                Sh 6 F 9.2-2B                            F 9.2-2B F 9.2-4A                            F 9.2-4A Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 F 9.2-4B                            F 9.2-4B Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 F 9.2-11                            F 9.2-11 Sh 5                                Sh 5 Sh 6                                Sh 6 Sh 7                                Sh 7 VOLUME 5 9.3-1/9.3-2                        9.3-1/9.3-2 9.3-31/9.3-32                      9.3-31/9.3-32 9.3-33/9.3-34                      9.3-33/9.3-34 9.3-47/9.3-48                      9.3-47/9.3-48 9.3-59/9.3-60                      9.3-59/9.3-60 9.3-61/9.3-62                        9.3-61/9.3-62 9.3-63                              9.3-63 T 9.3-4                              T 9.3-4 T 9.3-6                              T 9.3-6 Sh 12                                Sh 12 F 9.3-lA                            F 9.3-lA Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 Sh 4                                Sh 4 F 9.3-lB                            F 9.3-lB Sh 1                                Sh 1 Sh 2                                Sh 2 F 9.3-2A                            F 9.3-2A Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 II-13 SGS-UFSAR                                        Revision 16 January 31, 1998


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT F 9.3-2B                          F 9.3-2B Sh 1                              Sh 1 Sh 2                              Sh 2 Sh 3                              Sh 3 F 9.3-2C                          F 9.3-2C F 9.3-3A                          F 9.3-3A Sh 2                              Sh 2 F 9.3-3B                          F 9.3-3B Sh 1                              Sh 1 Sh 3                              Sh 3 F 9.3-4A                          F 9.3-4A Sh 1                              Sh 1 F 9.3-4B                          F 9.3-4B Sh 1                              Sh 1 Sh 3                              Sh 3 F 9.3-5A                          F 9.3-5A Sh 1                              Sh 1 Sh 2                              Sh 2 F 9.3-5b                          F 9.3-5b Sh 1                              Sh 1 F 9.3-6A                          F 9.3-6A Sh 1                              Sh 1 Sh 2                              Sh 2 F 9.3-6B                          F 9.3-6B Sh 1                              Sh 1 Sh 2                              Sh 2 Sh 3                              Sh 3 F 9.3-7A                          F 9.3-7A Sh 1                              Sh 1 Sh 2                              Sh 2 F 9.3-7B                          F 9.3-7B Sh 1                              Sh 1 Sh 2                              Sh 2 Sh 3                              Sh 3 F 9.3-SB                          F 9.3-BB 9.4-1/9.4-la                      9.4-1/9.4-la 9.4-lb/9.4-2                      9.4-lb/9.4-2 9.4-3/9.4-4                        9.4-3/9.4-4 9.4-4a/9.4-4b 9.4-4c/9.4-4d 9.4-4e/9.4-4f 9.4-5/9.4-6                      9.4-5/9.4-6 II-14 SGS-UFSAR                                      Revision 16 January 31, 1998
* INSERT F 9.3-2B                          F 9.3-2B Sh 1                              Sh 1 Sh 2                              Sh 2 Sh 3                              Sh 3 F 9.3-2C                          F 9.3-2C F 9.3-3A                          F 9.3-3A Sh 2                              Sh 2 F 9.3-3B                          F 9.3-3B Sh 1                              Sh 1 Sh 3                              Sh 3 F 9.3-4A                          F 9.3-4A Sh 1                              Sh 1 F 9.3-4B                          F 9.3-4B Sh 1                              Sh 1 Sh 3                              Sh 3 F 9.3-5A                          F 9.3-5A Sh 1                              Sh 1 Sh 2                              Sh 2 F 9.3-5b                          F 9.3-5b Sh 1                              Sh 1 F 9.3-6A                          F 9.3-6A Sh 1                              Sh 1 Sh 2                              Sh 2 F 9.3-6B                          F 9.3-6B Sh 1                              Sh 1 Sh 2                              Sh 2 Sh 3                              Sh 3 F 9.3-7A                          F 9.3-7A Sh 1                              Sh 1 Sh 2                              Sh 2 F 9.3-7B                          F 9.3-7B Sh 1                              Sh 1 Sh 2                              Sh 2 Sh 3                              Sh 3 F 9.3-SB                          F 9.3-BB 9.4-1/9.4-la                      9.4-1/9.4-la 9.4-lb/9.4-2                      9.4-lb/9.4-2 9.4-3/9.4-4                        9.4-3/9.4-4 9.4-4a/9.4-4b 9.4-4c/9.4-4d 9.4-4e/9.4-4f 9.4-5/9.4-6                      9.4-5/9.4-6 II-14 SGS-UFSAR                                      Revision 16 January 31, 1998


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS
                                            *
                                       .INSERT 9.4-7/9.4-8                            9.4-7/9.4-8 9.4-8a/9.4-8b 9.4-9/9.4-10                          9.4-9/9.4-10 9.4-11/9.4-12                          9.4-11/9.4-12 9.4-13/9~4-14                          9.4-13/9.4-14 9.4-15/9.4-16                          9.4-15/9.4-16 9.4-17/9.4-18                          9.4-17/9.4-18 9.4-19/9.4-20                          9.4-19/9.4-20 9.4-25/9.4-26                          9.4-25/9.4-26 9.4-27/9.4-28                          9.4-27/9.4-28 9.4-29/9.4-30                          9.4-29/9.4-30 9.4-33/9.4-34                          9.4-33/9.4-34 9.4-35/9.4-36                          9.4-35/9.4-36 9.4-37/9~4-38                          9.4-37/9.4-38 9.4-39/9.4-39a                        9.4-39/9.4-39a 9.4-41/9.4-42                          9.4-41/9.4-42 9.4-43/9.4-44                          9.4-43/9.4-44 9.4-45/9.4-46                          9.4-45/9.4-46 F 9.4-lA                              F 9.4-lA F 9.4-lB                              F 9.4-lB F 9.4-2A                              F 9.4-2A Sh 1                                  Sh 1 F 9.4-2B                              F 9.4-2B Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 F 9.4-3B                                F 9.4-3B F 9.4-4A                                F 9.4-4A Sh 2                                  Sh 2 F 9.4-4B                              F 9.4-4B Sh 1                                  Sh 1 Sh 2                                  Sh 2 F 9.4-6A                              F 9.4-6A F 9.4-6B                              F 9.4-6B 9.5-3/9.5-4                            9.5-3/9.5-4 9.5-21/9.5-22                          9.5-21/9.5-22
                                       .INSERT 9.4-7/9.4-8                            9.4-7/9.4-8 9.4-8a/9.4-8b 9.4-9/9.4-10                          9.4-9/9.4-10 9.4-11/9.4-12                          9.4-11/9.4-12 9.4-13/9~4-14                          9.4-13/9.4-14 9.4-15/9.4-16                          9.4-15/9.4-16 9.4-17/9.4-18                          9.4-17/9.4-18 9.4-19/9.4-20                          9.4-19/9.4-20 9.4-25/9.4-26                          9.4-25/9.4-26 9.4-27/9.4-28                          9.4-27/9.4-28 9.4-29/9.4-30                          9.4-29/9.4-30 9.4-33/9.4-34                          9.4-33/9.4-34 9.4-35/9.4-36                          9.4-35/9.4-36 9.4-37/9~4-38                          9.4-37/9.4-38 9.4-39/9.4-39a                        9.4-39/9.4-39a 9.4-41/9.4-42                          9.4-41/9.4-42 9.4-43/9.4-44                          9.4-43/9.4-44 9.4-45/9.4-46                          9.4-45/9.4-46 F 9.4-lA                              F 9.4-lA F 9.4-lB                              F 9.4-lB F 9.4-2A                              F 9.4-2A Sh 1                                  Sh 1 F 9.4-2B                              F 9.4-2B Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 F 9.4-3B                                F 9.4-3B F 9.4-4A                                F 9.4-4A Sh 2                                  Sh 2 F 9.4-4B                              F 9.4-4B Sh 1                                  Sh 1 Sh 2                                  Sh 2 F 9.4-6A                              F 9.4-6A F 9.4-6B                              F 9.4-6B 9.5-3/9.5-4                            9.5-3/9.5-4 9.5-21/9.5-22                          9.5-21/9.5-22
: 9. 5-37 /9. 5-3.8                      9.5-37/9.5-38 9.5-39/9.5-40                          9.5-39/9.5-40 9.5-41/9.5-42                          9.5-41/9.5-42 9.5-43/9.5-44                          9.5-43/9.5-44 9.5-45/9.5-46                          9.5-45/9.5-46 II-15 SGS-UFSAR                                            Revision 16 January 31, 1998
: 9. 5-37 /9. 5-3.8                      9.5-37/9.5-38 9.5-39/9.5-40                          9.5-39/9.5-40 9.5-41/9.5-42                          9.5-41/9.5-42 9.5-43/9.5-44                          9.5-43/9.5-44 9.5-45/9.5-46                          9.5-45/9.5-46 II-15 SGS-UFSAR                                            Revision 16 January 31, 1998


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT F 9.5-2                                F 9.5-2 Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 10-i/10-ii                              10-i/10-ii 10-iii/10-iv                            10-iii/10-iv 10.2-1/10.2-2                          10.2-1/10.2-2 10.2-5/10.2-6                          10.2-5/10.2-6 10.2-11/10.2-12                        10.2-11/10.2-12 F 10.2-1                                F 10.2-1 Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 F 10.2-2A                              F 10.2-2A Sh 2                                    Sh 2 Sh 3                                    Sh 3 F 10.2-2B                              F 10.2-2B Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 F 10.2-3                                F  10.2-3 Sh 1                                    Sh 1 Sh 2                                    Sh 2 F 10.2-4                                F 10.2-4 Sh 2                                    Sh 2 10.3-1/10.3-2                          10.3-1/10.3-2 10.3-3/10.3-4                          10.3-3/10.3-4 10.3-5/10.3-6                          10.3-5/10.3-6 10.3-7/10.3-8                          10.3-7/10.3-8 10.3-9/10.3-10                          10.3-9/10.3-10
* INSERT F 9.5-2                                F 9.5-2 Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 10-i/10-ii                              10-i/10-ii 10-iii/10-iv                            10-iii/10-iv 10.2-1/10.2-2                          10.2-1/10.2-2 10.2-5/10.2-6                          10.2-5/10.2-6 10.2-11/10.2-12                        10.2-11/10.2-12 F 10.2-1                                F 10.2-1 Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 F 10.2-2A                              F 10.2-2A Sh 2                                    Sh 2 Sh 3                                    Sh 3 F 10.2-2B                              F 10.2-2B Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 F 10.2-3                                F  10.2-3 Sh 1                                    Sh 1 Sh 2                                    Sh 2 F 10.2-4                                F 10.2-4 Sh 2                                    Sh 2 10.3-1/10.3-2                          10.3-1/10.3-2 10.3-3/10.3-4                          10.3-3/10.3-4 10.3-5/10.3-6                          10.3-5/10.3-6 10.3-7/10.3-8                          10.3-7/10.3-8 10.3-9/10.3-10                          10.3-9/10.3-10
: 10. 3-11/10. 3-12                      10.3-11/10.3-12 10.3-15/10.3-16                        10.3-15/10.3-16 F 10.3-lA                              F 10.3-lA Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 Sh 4                                    Sh 4 Sh 5                                    Sh 5 Sh 6                                    Sh 6 II-16 SGS-UFSAR                                          Revision 16 January 31, 1998
: 10. 3-11/10. 3-12                      10.3-11/10.3-12 10.3-15/10.3-16                        10.3-15/10.3-16 F 10.3-lA                              F 10.3-lA Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 Sh 4                                    Sh 4 Sh 5                                    Sh 5 Sh 6                                    Sh 6 II-16 SGS-UFSAR                                          Revision 16 January 31, 1998


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT F 10.3-lB                              F 10.3-lB Sh 1                                  Sh 1 Sh 2                                  Sh 2 Sh 3                                  Sh 3 Sh 4                                  Sh 4 Sh 5                                    Sh 5 Sh 6                                  Sh 6 F 10.3-3                              F 10.3-3 Sh 1                                  Sh 1 Sh 2                                  Sh 2 VOLUME 6 10.4-1/10.4-2                          10.4-1/10.4-2 10.4-3/10.4-4                          10.4-3/10.4-4 10.4-5/10.4-6                          10.4-5/10.4-6 10.4-7/10.4-8                          10.4-7/10.4-8 10.4-8a/10.4-8b 10.4-9/10.4-10                        10.4-9/10.4-10 10.4-13/10.4-13a                      10.4-13/10.4-14 10.4-13b/10.4-14 10.4-17/10.4-18                        10.4-17/10.4-18 10.4-27                                10.4-27 T 10.4-2A                              T 10.4-2 T 10.4-2B F 10.4-3A                              F 10.4-3A Sh 1                                  Sh 1 Sh 2                                  Sh 2 Sh 3                                  Sh 3 Sh 4                                  Sh 4 F 10.4-3B                              F 10.4-3B Sh 1                                  Sh 1 Sh 2                                  Sh 2 Sh 3                                  Sh 3 F 10.4-5A                              F 10.4-5A Sh 2                                  Sh 2 Sh 3                                  Sh 3 F 10.4-5B                              F 10.4-5B Sh 1                                  Sh 1 Sh 2                                  Sh 2 Sh 3                                  Sh 3 II-17 SGS-UFSAR                                          Revision 16 January 31, 1998
* INSERT F 10.3-lB                              F 10.3-lB Sh 1                                  Sh 1 Sh 2                                  Sh 2 Sh 3                                  Sh 3 Sh 4                                  Sh 4 Sh 5                                    Sh 5 Sh 6                                  Sh 6 F 10.3-3                              F 10.3-3 Sh 1                                  Sh 1 Sh 2                                  Sh 2 VOLUME 6 10.4-1/10.4-2                          10.4-1/10.4-2 10.4-3/10.4-4                          10.4-3/10.4-4 10.4-5/10.4-6                          10.4-5/10.4-6 10.4-7/10.4-8                          10.4-7/10.4-8 10.4-8a/10.4-8b 10.4-9/10.4-10                        10.4-9/10.4-10 10.4-13/10.4-13a                      10.4-13/10.4-14 10.4-13b/10.4-14 10.4-17/10.4-18                        10.4-17/10.4-18 10.4-27                                10.4-27 T 10.4-2A                              T 10.4-2 T 10.4-2B F 10.4-3A                              F 10.4-3A Sh 1                                  Sh 1 Sh 2                                  Sh 2 Sh 3                                  Sh 3 Sh 4                                  Sh 4 F 10.4-3B                              F 10.4-3B Sh 1                                  Sh 1 Sh 2                                  Sh 2 Sh 3                                  Sh 3 F 10.4-5A                              F 10.4-5A Sh 2                                  Sh 2 Sh 3                                  Sh 3 F 10.4-5B                              F 10.4-5B Sh 1                                  Sh 1 Sh 2                                  Sh 2 Sh 3                                  Sh 3 II-17 SGS-UFSAR                                          Revision 16 January 31, 1998


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT F 10.4-6A                            F 10.4-6A Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 5                                Sh. 5 F 10.4-6B                            F 10.4-6B Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 Sh 4                                Sh 4 Sh 5                                Sh 5 Sh 6                                Sh 6 F 10.4-17A                          F l0.4-17A F 10.4-17B                          F 10.4-17B F 10.4-18A                          F 10.4-18A Sh 1                                Sh 1 Sh 2                                Sh 2 F 10.4-18B                          F 10.4-18B Sh 1                                Sh 1 Sh 2                                Sh 2 11-i/11-ii                          11-i/11-ii 11-iii/11-iv                        11-iii/11-iv 11.1-1/11.1-2                      11.1-1/11.1-2 11.1-3/11.1-4                      11.1-3/11.1-4 11.1-5/11.1-6                      11.1-5/11.1-6 1i.1-9/1i.1-10                      11.1-9/11.1-10 11.1-11                              11.1-11 T 11.1-1                            T 11.1-1 T 11.1-2                            T 11.1-2 T 11.1-3                            T 11.1-3 T 11.1-4                            T 11.1-4 T 11.1-5                            T 11.1-5 T 11.1-6                            T 11.1-6 T 11.1-7                            T  11.1-7 Sh 1                                Sh 1 Sh 2                                Sh 2 T 11.1-8                            T 11.1-8 T 11.1-11                          T 11.1-11 T 11.1-12                          T 11.1-12 T 11.1-13                          T 11.1-13 II-18 SGS-UFSAR                                        Revision 16 January 31, 1998
* INSERT F 10.4-6A                            F 10.4-6A Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 5                                Sh. 5 F 10.4-6B                            F 10.4-6B Sh 1                                Sh 1 Sh 2                                Sh 2 Sh 3                                Sh 3 Sh 4                                Sh 4 Sh 5                                Sh 5 Sh 6                                Sh 6 F 10.4-17A                          F l0.4-17A F 10.4-17B                          F 10.4-17B F 10.4-18A                          F 10.4-18A Sh 1                                Sh 1 Sh 2                                Sh 2 F 10.4-18B                          F 10.4-18B Sh 1                                Sh 1 Sh 2                                Sh 2 11-i/11-ii                          11-i/11-ii 11-iii/11-iv                        11-iii/11-iv 11.1-1/11.1-2                      11.1-1/11.1-2 11.1-3/11.1-4                      11.1-3/11.1-4 11.1-5/11.1-6                      11.1-5/11.1-6 1i.1-9/1i.1-10                      11.1-9/11.1-10 11.1-11                              11.1-11 T 11.1-1                            T 11.1-1 T 11.1-2                            T 11.1-2 T 11.1-3                            T 11.1-3 T 11.1-4                            T 11.1-4 T 11.1-5                            T 11.1-5 T 11.1-6                            T 11.1-6 T 11.1-7                            T  11.1-7 Sh 1                                Sh 1 Sh 2                                Sh 2 T 11.1-8                            T 11.1-8 T 11.1-11                          T 11.1-11 T 11.1-12                          T 11.1-12 T 11.1-13                          T 11.1-13 II-18 SGS-UFSAR                                        Revision 16 January 31, 1998


REMOVE
REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS INSERT F 11.2-lA                                F 11.2-lA Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 F 11.2-lB                                F 11.2-lB Sh 1                                      Sh 1 Sh 2                                      Sh 2 Sh 3                                      Sh 3 F 11.3-lA                                F 11.3-lA Sh 1                                      Sh 1 Sh 3                                      Sh 3 F 11.3-lB                                F 11.3-lB Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3
* INSERT F 11.2-lA                                F 11.2-lA Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3 F 11.2-lB                                F 11.2-lB Sh 1                                      Sh 1 Sh 2                                      Sh 2 Sh 3                                      Sh 3 F 11.3-lA                                F 11.3-lA Sh 1                                      Sh 1 Sh 3                                      Sh 3 F 11.3-lB                                F 11.3-lB Sh 1                                    Sh 1 Sh 2                                    Sh 2 Sh 3                                    Sh 3
: 11. 4-3/11. 4-4                          11. 4-3/11. 4-4
: 11. 4-3/11. 4-4                          11. 4-3/11. 4-4
: 11. 4-5/11. 4-5a                        11. 4-5/11. 4-5a 1i. 4-7/11. 4-8                          11. 4-7 /11. 4-8 11.4-9/11. 4-10                          11.4-9/11.4-10
: 11. 4-5/11. 4-5a                        11. 4-5/11. 4-5a 1i. 4-7/11. 4-8                          11. 4-7 /11. 4-8 11.4-9/11. 4-10                          11.4-9/11.4-10
Line 265: Line 225:
: 11. 6-3/11. 6-4 II-19 SGS-UFSAR                                              Revision 16 January 31, 1998
: 11. 6-3/11. 6-4 II-19 SGS-UFSAR                                              Revision 16 January 31, 1998


                   * .INSERTION INSTRUCTIONS
                   * .INSERTION INSTRUCTIONS REMOVE                                  INSERT 12-i/12-ii                              12-i/12-ii 12-iii/12-iv                            12-iii 12.1-9/12.1-10                          12.1-9/12.1-10 12.1-11/12.1-12                          12.1-11/12.1-12 12.1-13/12.1-14                          12.1-13/12.1-14 12.3-1/12.3-2                            12.3-1/12.3-2 12.3-3/12.3-3a                          12.3-3/12.3-3a 12.3-3d/12.3-4                          12.3-3d/12.3-4 12.4-1/12.4-2                            12~4-1/12.4-2 13-i/13-ii                              13-i/13-ii 13.1-1/13.1-la                          13.1-1/13.1-la 13.1-lb/13.1-2                          13.1-lb/13.1-2 13.1-2a/13.1-2b                          13.1-2a/13.1-2b 13.1-3/13.1-3a                          13.1-3/13.1-3a 13.1-3b/13.1-4                          13.1-3b/13.1-4 13.1-5/13.1-6                            13.1-5/13.1-6 13.1-6a/13.1-6b                          13.1-6a/13.l-6b 13.1-7/13.1-8                            13.1-7/13.1-8 13.1-8a/13.1-8b                          13.1-Ba/13.l-Bb 13.1-9/13.1-10                          13.1-9/13.1-10 13.1-11/13.1-12                          13.1-11/13.1-12 13.1-13/13.1-14                          13.1-13/13.1-14 13.1-15/13.1-16                          13.1-15/13.1-16 13.1-17/13.1-18                          13.1-17/13.1-18 13.1-18a/13.1-18b                        13.1-18a/13.1-18b T 13.1-1                                T 13.1-1 Sh 1                                    Sh 1 Sh 2 F 13.1-2                                F 13.1-2 F 13.1-3                                F 13.1-3 F 13.1-5                                F 13.1-5 F 13.1-5a                                F 1.3. l-5a F  13.1-6                                F 13.1-6 F  13.1-7                                F 13.1-7 F  13.1-8a                              F 13.1-8a F  13.1-8b                              F 13.1-Bb F 13.1-Se                                F 13.1-Be 13.2-1                                  13.2-1/13.2-2 13.4-1/13.4-2                            13.4-1 13.5-1/13.5-2                            13.5-1/13.5-2 13.5-2a/13.5-2b                          13.5-2a/13.5-2b II-20 SGS-UFSAR                                            Revision 16 January 31, 1998
* REMOVE                                  INSERT 12-i/12-ii                              12-i/12-ii 12-iii/12-iv                            12-iii 12.1-9/12.1-10                          12.1-9/12.1-10 12.1-11/12.1-12                          12.1-11/12.1-12 12.1-13/12.1-14                          12.1-13/12.1-14 12.3-1/12.3-2                            12.3-1/12.3-2 12.3-3/12.3-3a                          12.3-3/12.3-3a 12.3-3d/12.3-4                          12.3-3d/12.3-4 12.4-1/12.4-2                            12~4-1/12.4-2 13-i/13-ii                              13-i/13-ii 13.1-1/13.1-la                          13.1-1/13.1-la 13.1-lb/13.1-2                          13.1-lb/13.1-2 13.1-2a/13.1-2b                          13.1-2a/13.1-2b 13.1-3/13.1-3a                          13.1-3/13.1-3a 13.1-3b/13.1-4                          13.1-3b/13.1-4 13.1-5/13.1-6                            13.1-5/13.1-6 13.1-6a/13.1-6b                          13.1-6a/13.l-6b 13.1-7/13.1-8                            13.1-7/13.1-8 13.1-8a/13.1-8b                          13.1-Ba/13.l-Bb 13.1-9/13.1-10                          13.1-9/13.1-10 13.1-11/13.1-12                          13.1-11/13.1-12 13.1-13/13.1-14                          13.1-13/13.1-14 13.1-15/13.1-16                          13.1-15/13.1-16 13.1-17/13.1-18                          13.1-17/13.1-18 13.1-18a/13.1-18b                        13.1-18a/13.1-18b T 13.1-1                                T 13.1-1 Sh 1                                    Sh 1 Sh 2 F 13.1-2                                F 13.1-2 F 13.1-3                                F 13.1-3 F 13.1-5                                F 13.1-5 F 13.1-5a                                F 1.3. l-5a F  13.1-6                                F 13.1-6 F  13.1-7                                F 13.1-7 F  13.1-8a                              F 13.1-8a F  13.1-8b                              F 13.1-Bb F 13.1-Se                                F 13.1-Be 13.2-1                                  13.2-1/13.2-2 13.4-1/13.4-2                            13.4-1 13.5-1/13.5-2                            13.5-1/13.5-2 13.5-2a/13.5-2b                          13.5-2a/13.5-2b II-20 SGS-UFSAR                                            Revision 16 January 31, 1998


Remove 13.5-2c/13.5-2d
Remove 13.5-2c/13.5-2d
Line 275: Line 234:
: 15. 2-61/15. 2-62t':                            15.2-61/15.2-62
: 15. 2-61/15. 2-62t':                            15.2-61/15.2-62
                   .~~~7-:--
                   .~~~7-:--
T 15.2-1                                        T 15.2-1 Sh. 1                                          Sh 1 Sh 2                                          Sh 2 Sh 3                                          Sh 3 Sh 4                                          Sh 4 Sh 5                                            Sh 5 Sh 6
T 15.2-1                                        T 15.2-1 Sh. 1                                          Sh 1 Sh 2                                          Sh 2 Sh 3                                          Sh 3 Sh 4                                          Sh 4 Sh 5                                            Sh 5 Sh 6 Sh 6 Sh 7                                            Sh 7 Sh 8 II-21 SGS-UFSAR                                                          Revision 16 Januarv 31. 1998
* Sh 6 Sh 7                                            Sh 7 Sh 8 II-21 SGS-UFSAR                                                          Revision 16 Januarv 31. 1998
* REMOVE
* REMOVE
* INSERTION INSTRUCTIONS
* INSERTION INSTRUCTIONS
Line 295: Line 253:


i
i
* 1  *                              *
* 1  *
* LR-N980049 l
* LR-N980049 l
ATTACHMENT 1 Summary of Salem UFSAR Revision 16 Changes j
ATTACHMENT 1 Summary of Salem UFSAR Revision 16 Changes j
i
i
.l
.l
!
* 95-4933
* 95-4933


Line 312: Line 269:
:\'ew SAR Pages: 3.8-79a, 9.4- Ia SSAR 95-013          2.4                2.4-6            Correction of the maximum        PR 951221I13, Cales 6S0-3.4              3.4-5              load on the Auxiliary Building  0345, 6S0-0346, 6S0-0593 roof i
:\'ew SAR Pages: 3.8-79a, 9.4- Ia SSAR 95-013          2.4                2.4-6            Correction of the maximum        PR 951221I13, Cales 6S0-3.4              3.4-5              load on the Auxiliary Building  0345, 6S0-0346, 6S0-0593 roof i
I SSAR 95-027          10.3              10.3-1            Elimination of Main Steam
I SSAR 95-027          10.3              10.3-1            Elimination of Main Steam
     !                        3.6                3.6-12            Breaks in penetration areas DEF 94-00038, LER 272/95-
     !                        3.6                3.6-12            Breaks in penetration areas DEF 94-00038, LER 272/95-01 I Task I &2 3.6-17 3.6-21 3.6-22 3.6-23 3.6-24 3.6-27 3.6-55 3.6-9a F3.6-IO
* 01 I Task I &2 3.6-17 3.6-21 3.6-22 3.6-23 3.6-24 3.6-27 3.6-55 3.6-9a F3.6-IO
.-~~
.-~~
T3.6-2 New SAR Pages: 3.6-2 Ia SSAR 95-075        10                .10-iv              Auxiliary Feedwater Control      DCP 2EC-3 I 9 I Pkg. I 10.4              10.4-17            Valve AFI I and AF21 FI0.4-178          Modifications TI0.4-2 Tl0~4-2A T.10.4-28
T3.6-2 New SAR Pages: 3.6-2 Ia SSAR 95-075        10                .10-iv              Auxiliary Feedwater Control      DCP 2EC-3 I 9 I Pkg. I 10.4              10.4-17            Valve AFI I and AF21 FI0.4-178          Modifications TI0.4-2 Tl0~4-2A T.10.4-28
* Salem UFSAR Change!proved for Incorporation in Revisio'16                                          Page    2 12/16/97
 
Salem UFSAR Change!proved for Incorporation in Revisio'16                                          Page    2 12/16/97
  *i.
  *i.
CN Number SSAR 95-085 Affected Sections I.I 10.2 15.2 Affected Pages/Figuresrfables I.I-I 10.2-1 15.2-59 15.2-60 Description Replacement of low pressure turbine rotors Initiating or Ref. Document DCP 2EC-3353 l 5.2-60a l 5.2-60b 3.5              3.5-12 3.5-13 3.5-15 3.5-16 3.5-17 3.5-18 3.5-19 3.5-20 3.5-21 3.5-22 F3.5-6 F3.5-7 T3.5-l T3.5-2 T3.5-3
CN Number SSAR 95-085 Affected Sections I.I 10.2 15.2 Affected Pages/Figuresrfables I.I-I 10.2-1 15.2-59 15.2-60 Description Replacement of low pressure turbine rotors Initiating or Ref. Document DCP 2EC-3353 l 5.2-60a l 5.2-60b 3.5              3.5-12 3.5-13 3.5-15 3.5-16 3.5-17 3.5-18 3.5-19 3.5-20 3.5-21 3.5-22 F3.5-6 F3.5-7 T3.5-l T3.5-2 T3.5-3
:. SSAR 96-004 New SAR Pages: 3.5-21 a, 3.5-21 b, 3.5-6.3 21c T6.3-6 T6.3-6 T6.3-6 Sh 1 Sh 2 Sh 3 Revision of Refueling Water Storage Tank drawdown analysis PSE-96-533, DES-93-00209 T6.3-8  Sh 1 T6.3-8  Sh 2
:. SSAR 96-004 New SAR Pages: 3.5-21 a, 3.5-21 b, 3.5-6.3 21c T6.3-6 T6.3-6 T6.3-6 Sh 1 Sh 2 Sh 3 Revision of Refueling Water Storage Tank drawdown analysis PSE-96-533, DES-93-00209 T6.3-8  Sh 1 T6.3-8  Sh 2 I
'
SSAR 96-007  5.5              5.5-11              Delete Reference to Table 5.2-  n/a 1
I SSAR 96-007  5.5              5.5-11              Delete Reference to Table 5.2-  n/a 1
I                                                        29 - Correction of I                                                        typographical error J
I                                                        29 - Correction of I                                                        typographical error J
i    SSAR 96-008  9.5              9.5-43              Emergency diesel generator      DEC IEC-3401 starting air receiver compressor relief valve setting change SSAR 96-011  6.2              *F6.2-8              Containment spray header        DCP I EC-3450 F6.2-9              support steel revisions for higher accident temperature
i    SSAR 96-008  9.5              9.5-43              Emergency diesel generator      DEC IEC-3401 starting air receiver compressor relief valve setting change SSAR 96-011  6.2              *F6.2-8              Containment spray header        DCP I EC-3450 F6.2-9              support steel revisions for higher accident temperature
* Salem UFSAR Chang.pproved for Incorporation in Revisi!.6                              Page      3 12/16/97
 
*
Salem UFSAR Chang.pproved for Incorporation in Revisi!.6                              Page      3 12/16/97
~
~
Affected      Affected                                    Initiating or CN Number    Sections Pages/Figuresrrables Description                  Ref. Document
Affected      Affected                                    Initiating or CN Number    Sections Pages/Figuresrrables Description                  Ref. Document SSAR 96-012  9.1        9.1-30            New fuel elevator basket    DCP 2EE-0!43 replacement with a fuel reconstitution basket SSAR 96-013  9.3        9.3-59            Post-Accident Sampling      PR 950727195, PR 9.3-60            System (PASS) configuration  950817432 9.3-61            and description correction SSAR 96-016  10.4        10.4-2            Condenser vacuum pump        PR 960209175 10.4-3            description correction 10.4-4 SSAR 96-018  1.2        Fl.2-2            Control Room layout redesign DCP I EC-3360, Pkg. I, 4, T 5.1        F5.l-7                                        Mod 96-002 6.4        6.4-1 7.1        7.1-12 7.1-14 7.7        7.7-3 8.3        TS.3-6 9.4        9.4-2 F9.4- IA
  -----------
SSAR 96-012  9.1        9.1-30            New fuel elevator basket    DCP 2EE-0!43 replacement with a fuel reconstitution basket SSAR 96-013  9.3        9.3-59            Post-Accident Sampling      PR 950727195, PR 9.3-60            System (PASS) configuration  950817432 9.3-61            and description correction SSAR 96-016  10.4        10.4-2            Condenser vacuum pump        PR 960209175 10.4-3            description correction 10.4-4 SSAR 96-018  1.2        Fl.2-2            Control Room layout redesign DCP I EC-3360, Pkg. I, 4, T 5.1        F5.l-7                                        Mod 96-002 6.4        6.4-1 7.1        7.1-12 7.1-14 7.7        7.7-3 8.3        TS.3-6 9.4        9.4-2 F9.4- IA
* SSAR 96-026 A
* SSAR 96-026 A
15.4 A-80 T15.4-2l Sh 14 T15.4-2l Sh 6 Structural modification to annular steel columns and embedded channels DCP 2EC-3390 PKG I, DCP I EC-3476 PKG I SSAR 96-030  8.3        8.3-17            125 Volt DC battery charger  DCP 2EC-3332 PKG I 8.3-19            alann description change
15.4 A-80 T15.4-2l Sh 14 T15.4-2l Sh 6 Structural modification to annular steel columns and embedded channels DCP 2EC-3390 PKG I, DCP I EC-3476 PKG I SSAR 96-030  8.3        8.3-17            125 Volt DC battery charger  DCP 2EC-3332 PKG I 8.3-19            alann description change
* Salem UFSAR Change-proved for Incorporation in              Revisi~6                            Page ~
 
12/16/97
Salem UFSAR Change-proved for Incorporation in              Revisi~6                            Page ~
* J CN Number SSAR 96-031 Affected Sections 1.2 15.4 Affected Pages/Figu resff a hies F 1.2-1 15.4-27 15.4-28 15.4-29 Description Control area air conditioning upgrade Initiating or Ref. Document DCP I EC-3505 PKG I 15.4-30 15.4-31 Tl5.4-5D 2.2                2.2-10.
12/16/97 J
2.2-12a 2.2-9 T2.2-3 3.1                3.1-4 6                  6-v 6-vii 6.2                6.2-16
CN Number SSAR 96-031 Affected Sections 1.2 15.4 Affected Pages/Figu resff a hies F 1.2-1 15.4-27 15.4-28 15.4-29 Description Control area air conditioning upgrade Initiating or Ref. Document DCP I EC-3505 PKG I 15.4-30 15.4-31 Tl5.4-5D 2.2                2.2-10.
* 6.2-23 6.2-52 6.2-53 6.2-65 T6.2-l 1 T6.2-9 6.3                6.3-41 6.3-42 T6.3-12 6.4                6.4-1 6.4-2 6.4-4 6.4-5 T6.4-3 7.7                7.7-3 9.4                9.4-1 9.4-la 9.4-lb 9.4-2 9:4-3
2.2-12a 2.2-9 T2.2-3 3.1                3.1-4 6                  6-v 6-vii 6.2                6.2-16 6.2-23 6.2-52 6.2-53 6.2-65 T6.2-l 1 T6.2-9 6.3                6.3-41 6.3-42 T6.3-12 6.4                6.4-1 6.4-2 6.4-4 6.4-5 T6.4-3 7.7                7.7-3 9.4                9.4-1 9.4-la 9.4-lb 9.4-2 9:4-3
                                 '9.4 9.4-5 F9;4-IA F9.4-IB
                                 '9.4 9.4-5 F9;4-IA F9.4-IB
* New SAR Pages: 6.4-la, 6~4-lb, 6.4-lc, 6.4-1 d, 6.4-4a, 6.4-4b, 9.4-4a, 9.4-4b, 9.4-4c, 9.4-4d, 9.4-4e, 9.4-4f, Tl5.4-5E, Tl5.4-5F Sh I, Tl5.4-5F Sh 2, Tl5.4-5F Sh3
* New SAR Pages: 6.4-la, 6~4-lb, 6.4-lc, 6.4-1 d, 6.4-4a, 6.4-4b, 9.4-4a, 9.4-4b, 9.4-4c, 9.4-4d, 9.4-4e, 9.4-4f, Tl5.4-5E, Tl5.4-5F Sh I, Tl5.4-5F Sh 2, Tl5.4-5F Sh3
* Salem UFSAR Change.pproved for Incorporation in Revisi'16 Page    5 l2/l6i97 Affected        Affected                                      Initiating or CN Number    Sections Pages/Figuresffables  Description
 
Salem UFSAR Change.pproved for Incorporation in Revisi'16 Page    5 l2/l6i97 Affected        Affected                                      Initiating or CN Number    Sections Pages/Figuresffables  Description
* Ref. Document
* Ref. Document
                     ~  .
                     ~  .
SSAR 96-037  8 * .J      8.3-13            emergency diesel generator      DCP l EC-3529 PKG l. 2. 3.
SSAR 96-037  8 * .J      8.3-13            emergency diesel generator      DCP l EC-3529 PKG l. 2. 3.
vibration alann removal        DCP 2EC-3404 PKG l. 2. 3 SSAR 96-041  7.2          7.2-12            Hagan module isolation          DCP 2EC-3450 PKG I amplifier reference change SSAR 96-042  10.2        10.2-2            Main turbine lube oil          DCP 2EC-3402 PKG I purification system change SSAR 96-043  7.2        7.2-39            Appendix R alternate shutdown  DCP 2EC-3396 PKG I 7.3          F7.3-4            methodology - installation of 9.5        9.5-22            transfer switches, fuse size deletion SSAR 96-044  9.2        9.2-22            Reactor coolant pump loss of  PR 951006357, Proc SI.OP~
vibration alann removal        DCP 2EC-3404 PKG l. 2. 3 SSAR 96-041  7.2          7.2-12            Hagan module isolation          DCP 2EC-3450 PKG I amplifier reference change SSAR 96-042  10.2        10.2-2            Main turbine lube oil          DCP 2EC-3402 PKG I purification system change SSAR 96-043  7.2        7.2-39            Appendix R alternate shutdown  DCP 2EC-3396 PKG I 7.3          F7.3-4            methodology - installation of 9.5        9.5-22            transfer switches, fuse size deletion SSAR 96-044  9.2        9.2-22            Reactor coolant pump loss of  PR 951006357, Proc SI.OP~
component cooling flow trip    AB.RCP-0001 (Q) rev 3
component cooling flow trip    AB.RCP-0001 (Q) rev 3 correction to agree with SER SSAR 96-046  7.7          7.7-14            Replacement of Salem Unit 2    DCP 2EC-3337 PKG l, CR 8.3          8.3-20            P250 plant computer an.d      960726119 F8.3-5 SH 2      computer inverter F8.3-7 A            A-17 A-18 SSAR 96-047  8.3          F8.3-5 Sh 2      Emergency lighting inverter    DCP 2EC-3332 PKG 2 9.5          9.5-38            logic card modification SSAR 96-049  8.1          8.1-10            Replacement of28VDC relay      DCP 2EC-3363 PKG 1 cabinet circuit breakers SSAR 96-050  9.4        9.4-29            Containment ventilation        DCP l EC-3365 PKG l, DCP 9.4-35            penetration pressure vacuum    2EC-3325 F9.4-4A Sh2        relief valve replacement F9.4-4B Sh2 SSAR 96-051  3.6        3.6-36            Delete steam generator        DCP l EC-3301 PKG l, DCP F3.6-23            blowdown line piping material  2EC-3260 designation
,.
 
correction to agree with SER SSAR 96-046  7.7          7.7-14            Replacement of Salem Unit 2    DCP 2EC-3337 PKG l, CR 8.3          8.3-20            P250 plant computer an.d      960726119 F8.3-5 SH 2      computer inverter F8.3-7 A            A-17 A-18 SSAR 96-047  8.3          F8.3-5 Sh 2      Emergency lighting inverter    DCP 2EC-3332 PKG 2 9.5          9.5-38            logic card modification SSAR 96-049  8.1          8.1-10            Replacement of28VDC relay      DCP 2EC-3363 PKG 1 cabinet circuit breakers SSAR 96-050  9.4        9.4-29            Containment ventilation        DCP l EC-3365 PKG l, DCP 9.4-35            penetration pressure vacuum    2EC-3325 F9.4-4A Sh2        relief valve replacement F9.4-4B Sh2 SSAR 96-051  3.6        3.6-36            Delete steam generator        DCP l EC-3301 PKG l, DCP F3.6-23            blowdown line piping material  2EC-3260 designation
lj,.;
* lj,.;
Salem UFSAR Chang.pproved for Incorporation in Revisi'16                                    Page  6 12/16/97 l
Salem UFSAR Chang.pproved for Incorporation in Revisi'16                                    Page  6
Affected        Affected                                        Initiating or CN Number    Sections Pages/Figuresffables  Description                      Ref. Document j
!
12/16/97
* l Affected        Affected                                        Initiating or CN Number    Sections Pages/Figuresffables  Description                      Ref. Document j
SSAR 96-052  A            A-72              Revise Control Room access        DCP I EC-3619 PKG I description I
SSAR 96-052  A            A-72              Revise Control Room access        DCP I EC-3619 PKG I description I
SSAR_96-054  10.3        10.3-5            Replacement of Main Steam        DCP 2EC-3407 PKG I FI0.3-18 Sh I    steam traps with orifice/strainer FI0.3-18 Sh 2    assemblies SSAR 96-055  9.5          9.5-46          Emergency Diesel Generator        DCP 2EC-3266 PKG I low lube oil temperature setpoint change SSAR 96-056  9.5        9.5-40            Emergency Diesel Generator        DCP 2EC~3403 PKG I, 2, 3; fuel oil transfer pump level      DCP I EC-3453 PKG I, 2, 3 setpoint change SSAR96-057    10.4        10.4-2          Revision to Service Water and    95080~292,950803335, 9.2          9.2-1            Turbine Auxiliaries Cooling      960711079 ISM-0496, 9.2-2            Systems lists of components      lMD-0110 T9.2-I            cooled. Physical changes had been made by previous DCPs .
SSAR_96-054  10.3        10.3-5            Replacement of Main Steam        DCP 2EC-3407 PKG I FI0.3-18 Sh I    steam traps with orifice/strainer FI0.3-18 Sh 2    assemblies SSAR 96-055  9.5          9.5-46          Emergency Diesel Generator        DCP 2EC-3266 PKG I low lube oil temperature setpoint change SSAR 96-056  9.5        9.5-40            Emergency Diesel Generator        DCP 2EC~3403 PKG I, 2, 3; fuel oil transfer pump level      DCP I EC-3453 PKG I, 2, 3 setpoint change SSAR96-057    10.4        10.4-2          Revision to Service Water and    95080~292,950803335, 9.2          9.2-1            Turbine Auxiliaries Cooling      960711079 ISM-0496, 9.2-2            Systems lists of components      lMD-0110 T9.2-I            cooled. Physical changes had been made by previous DCPs .
* SSAR 96-059  3.6          3.6-35 3.6-41 Penetration Area high energy line break pressure relief path DCP 2EC-3388 PKG I 3.6-43            modification - installation of F3.6-28          new vent penthouse SSAR 96-060  10.3        10.3-12          Inner and outer penetration      DCP 2EC-3389 PKG I 3.6          3.6-44            area blowout panel
* SSAR 96-059  3.6          3.6-35 3.6-41 Penetration Area high energy line break pressure relief path DCP 2EC-3388 PKG I 3.6-43            modification - installation of F3.6-28          new vent penthouse SSAR 96-060  10.3        10.3-12          Inner and outer penetration      DCP 2EC-3389 PKG I 3.6          3.6-44            area blowout panel modifications SSAR 96-062  6.2          6~2-21            Revision to Containment          DEF# DES-90-1639, LCR 6.2-44            minimum sump pH                  94-48 + S95-258 Bases 6.2'-52                                            Change, CR 950801261, 6.2-53                                              950913211, NSAL PSE                                6.2-85                                              215 Task4 T6.2-9 6.3          6.3-10 6.3-64
                                  . _,
 
modifications SSAR 96-062  6.2          6~2-21            Revision to Containment          DEF# DES-90-1639, LCR 6.2-44            minimum sump pH                  94-48 + S95-258 Bases 6.2'-52                                            Change, CR 950801261, 6.2-53                                              950913211, NSAL PSE                                6.2-85                                              215 Task4 T6.2-9 6.3          6.3-10 6.3-64
12/16/97 Salem UFSAR Change~proved for Incorporation in Revision 16
* 12/16/97
* Page 7 Affected              Affected                                  Initiating or CN Number    Sections  Pages/Figuresffables    Description                    Ref. Document SSAR 96-064  9.4              9.4-18          Fuel Handling Building truck    DCP 2EC-352 I PKG 2 9.4-20        bay ventilation system addition of manual damper SSAR 96-066    12.1              12.1-10      In-core detector quantity and    PR 960308137. PR 12.1-11      storage location update          960325171 12.1-12 12.1-13 SSAR 96-070  8.3              T8.3-6          Revision to 125 Volt DC          DCP 2EE-O 119 PKG I battery load profile for Unit 2 as a result of replacement of steam generator feed pump vibration and shaft position instrumentation.
                    *
* Salem UFSAR Change~proved for Incorporation in Revision 16
* Page 7
    *
:!
Affected              Affected                                  Initiating or CN Number    Sections  Pages/Figuresffables    Description                    Ref. Document SSAR 96-064  9.4              9.4-18          Fuel Handling Building truck    DCP 2EC-352 I PKG 2 9.4-20        bay ventilation system addition of manual damper SSAR 96-066    12.1              12.1-10      In-core detector quantity and    PR 960308137. PR 12.1-11      storage location update          960325171 12.1-12 12.1-13 SSAR 96-070  8.3              T8.3-6          Revision to 125 Volt DC          DCP 2EE-O 119 PKG I battery load profile for Unit 2 as a result of replacement of steam generator feed pump vibration and shaft position instrumentation.
SSAR 96-071    9.4            9.4-12          Unit 2 Auxiliary Building        DCP 2EC-3423 PKG I 9.4-13          Ventilation System HEPA/charcoal filter damper fail-safe position modifications
SSAR 96-071    9.4            9.4-12          Unit 2 Auxiliary Building        DCP 2EC-3423 PKG I 9.4-13          Ventilation System HEPA/charcoal filter damper fail-safe position modifications
* SSAR 96-072    8.3          *rs.3-6          Revise Unit 2 125 Volt DC battery load profile as a result of alternate shutdown system inverter replacement DCP 2EC-3444 PKG I
* SSAR 96-072    8.3          *rs.3-6          Revise Unit 2 125 Volt DC battery load profile as a result of alternate shutdown system inverter replacement DCP 2EC-3444 PKG I
Line 371: Line 317:
J high range radiation monitors
J high range radiation monitors
* as non-safety related l
* as non-safety related l
'
SSAR 96-075    10.4            10.4-18        Steam Generator Slowdown          DCP 2EC-3470 PKG 1
SSAR 96-075    10.4            10.4-18        Steam Generator Slowdown          DCP 2EC-3470 PKG 1
                                   -~ ; -,  :
                                   -~ ; -,  :
Line 377: Line 322:
sampling system isolation valves - addition of a key lock switch bypass to open the
sampling system isolation valves - addition of a key lock switch bypass to open the
                             -.                        isolation valves when sampling is required for a faulted steam generator with a lo-lo level condition for Unit 2
                             -.                        isolation valves when sampling is required for a faulted steam generator with a lo-lo level condition for Unit 2
  *


    ,
Salem UFSAR Change,pproved for Incorporation in Revisi'16                                        Page    8
Salem UFSAR Change,pproved for Incorporation in Revisi'16                                        Page    8
      !"."
       '    12/16/97
       '    12/16/97
* l r
* l r
Line 395: Line 337:
                                         . 7.3~
                                         . 7.3~
7,:3:~~;~-
7,:3:~~;~-
SSAR 96-081 5.6              - *s:6-S          Installation of Letdown          DCP 2EC-354 I PKG I 7.2              - F1.i..s          Isolation Bypass in the RCS
SSAR 96-081 5.6              - *s:6-S          Installation of Letdown          DCP 2EC-354 I PKG I 7.2              - F1.i..s          Isolation Bypass in the RCS during low pressurizer level
                                . *-:
during low pressurizer level
*


     ' ~
     ' ~
Line 405: Line 344:
   *I CN Number SSAR 96-082 Affected Sections 11.4 Affected Pages/Figuresffables 11.4-10 11.4-16 11.4-5 I I .4-5a Description Radiation Monitor 2R4 I upgrade (plant vent)
   *I CN Number SSAR 96-082 Affected Sections 11.4 Affected Pages/Figuresffables 11.4-10 11.4-16 11.4-5 I I .4-5a Description Radiation Monitor 2R4 I upgrade (plant vent)
Initiating or Ref. Document DCP 2EC-3212, PR 950726207, TS Bases S95-258 11.4-8 11.4-9 F 11.4-1 F 11.4-3 Tl 1.4-2 Sh 2 3A              3A-8 A                A-52 SSAR 96-083  9.1              9.1-13          Revision to Spent Fuel Pool    DCP 2EC-3224 PKG I Rev 9.1-14          rerack for pool coolfug issues  2, CR 951207356 CRCA 2 SSAR 96-088  13.5            13.5-2a          Revise a procedure title for . NAP-22 NAP-22 to include the full title SSAR 96-089  12.3            12.3-3a          Revise Radiat.ion Protection    UFSAR Change Notice 95-Supervisor title to agree with  17 changes made in UFSAR
Initiating or Ref. Document DCP 2EC-3212, PR 950726207, TS Bases S95-258 11.4-8 11.4-9 F 11.4-1 F 11.4-3 Tl 1.4-2 Sh 2 3A              3A-8 A                A-52 SSAR 96-083  9.1              9.1-13          Revision to Spent Fuel Pool    DCP 2EC-3224 PKG I Rev 9.1-14          rerack for pool coolfug issues  2, CR 951207356 CRCA 2 SSAR 96-088  13.5            13.5-2a          Revise a procedure title for . NAP-22 NAP-22 to include the full title SSAR 96-089  12.3            12.3-3a          Revise Radiat.ion Protection    UFSAR Change Notice 95-Supervisor title to agree with  17 changes made in UFSAR
:e    SSAR 96-090  1.6              1.6-5 Revision 15 Revise the name "main steam      UFSAR Change Notice 93-10.2            I0.2-6          stop valve" to "main steam      60 10.3            10.3-15          isolation valve" I0.3-16 10.3-3 10.3-4
:e    SSAR 96-090  1.6              1.6-5 Revision 15 Revise the name "main steam      UFSAR Change Notice 93-10.2            I0.2-6          stop valve" to "main steam      60 10.3            10.3-15          isolation valve" I0.3-16 10.3-3 10.3-4 I                                  10.3-5 l
* I                                  10.3-5 l
I 10.4 I0.3-8 10.4-17
I 10.4 I0.3-8 10.4-17
.J 10.~s 3.6 '.          3.6-18 3.6-19 3.6-28
.J 10.~s 3.6 '.          3.6-18 3.6-19 3.6-28 3A:'        .. 3A-39
                              ..
3A:'        .. 3A-39
                                   *. 3A-9:
                                   *. 3A-9:
7.5              T1.S-5 SH 3 SSAR 96-093  9.4              9.4-20
7.5              T1.S-5 SH 3 SSAR 96-093  9.4              9.4-20
* Fuel Handling Building          DEF DES-90-01304, S-C-Ventilation heat loading on      FHV-MDC-1471 charcoal filter revision
* Fuel Handling Building          DEF DES-90-01304, S-C-Ventilation heat loading on      FHV-MDC-1471 charcoal filter revision
* I" i  12/16/97
 
                -                      .
I" i  12/16/97 Salem UFSAR Change~pproved for Incorporation in Revision 16
Salem UFSAR Change~pproved for Incorporation in Revision 16
                                                                                                               .
                                                                                                               .
* Page    10
* Page    10 i
* i
   ~~~u mJ>_er_
   ~~~u mJ>_er_
SSAR 96-094 Affected 7.7 Affected
SSAR 96-094 Affected 7.7 Affected
                 -=Sc::.e.::.:ct::.::cio=-=n=s_. --=P--=-a_..g"'-es"-/=-Fi°"'g~u_re-'-s_rrc__a.:..::b.c:cle=s-
                 -=Sc::.e.::.:ct::.::cio=-=n=s_. --=P--=-a_..g"'-es"-/=-Fi°"'g~u_re-'-s_rrc__a.:..::b.c:cle=s-
: 7. 7- l 7a Description Control Room Annunciator modificati'Ons Initiating or Ref. Document DCP 2EC-3508 PKG 1 SSAR 96-095  3A                                            3A-23                                            Update of the lnservice        PR 960321214 CRCA 5 3A-23a                                            Inspection programs, code 5.2                                          5.2-70                                          years, vendors and equipment 5.2-71 5.2-72 5.2-73 5.4                                          5.4-13 5.4-14 SSAR 96-096    15.2                                        15.2-6                                          Update description of          Update UFSAR to agree 15.2-7                                          subcritical rod withdrawal and with license FI5.2-l                                          steamline break core response Fl5.2-2 FI5.2-3 Tl5.2-l SH I 15.4                                          15.4-39 Fl5.4-48 fl5.4-50A
: 7. 7- l 7a Description Control Room Annunciator modificati'Ons Initiating or Ref. Document DCP 2EC-3508 PKG 1 SSAR 96-095  3A                                            3A-23                                            Update of the lnservice        PR 960321214 CRCA 5 3A-23a                                            Inspection programs, code 5.2                                          5.2-70                                          years, vendors and equipment 5.2-71 5.2-72 5.2-73 5.4                                          5.4-13 5.4-14 SSAR 96-096    15.2                                        15.2-6                                          Update description of          Update UFSAR to agree 15.2-7                                          subcritical rod withdrawal and with license FI5.2-l                                          steamline break core response Fl5.2-2 FI5.2-3 Tl5.2-l SH I 15.4                                          15.4-39 Fl5.4-48 fl5.4-50A Fl5.4-50B FI5.4-50C FI5.4-500 Fl5.4-50E Fl5.4-50F Fl5.4-51A Fl5.4-518 Fl5.4-51C Fl5.4-5 ID Fl5.4-51E Fl5.4-SIF FIS.4-52A FlS.4-528 PI-St4-52C Fl5.4-520 Fl5.4-52E Fl5.4-52F FIS.4-SJA FIS.4-SJB Fl5.4-53C Fl5.4-530 FlS.4-SJE FIS.4-53F TlS.4-1 SHJ
* Fl5.4-50B FI5.4-50C FI5.4-500 Fl5.4-50E Fl5.4-50F Fl5.4-51A Fl5.4-518 Fl5.4-51C Fl5.4-5 ID Fl5.4-51E Fl5.4-SIF FIS.4-52A FlS.4-528 PI-St4-52C Fl5.4-520 Fl5.4-52E Fl5.4-52F FIS.4-SJA FIS.4-SJB Fl5.4-53C Fl5.4-530 FlS.4-SJE FIS.4-53F TlS.4-1 SHJ
 
* 1 I
1 I
Salem UFSAR Chang.lpproved for Incorporation in Revisi!6                                          Page  11 12/16/97 Affected        Affected                                            Initiating or CN Number    Sections Pages/Figu resff l!_bles  Description                      Ref. Document SSAR 96-097  3.7          3.7-30                Seismic analyses and response    PR 951221156, PR 3.7-6                spectra for the Service Water    .951221170, DES-94-00092.
Salem UFSAR Chang.lpproved for Incorporation in Revisi!6                                          Page  11 12/16/97 Affected        Affected                                            Initiating or CN Number    Sections Pages/Figu resff l!_bles  Description                      Ref. Document SSAR 96-097  3.7          3.7-30                Seismic analyses and response    PR 951221156, PR 3.7-6                spectra for the Service Water    .951221170, DES-94-00092.
3.8          3.8-77a              Intake Structure and Outer        DES-94-0 3 .8-78              Penetration Areas 3.8-82 SSAR 96-099  5.1          F5.1-6Bshl            Mid-Loop wide range level        Generic Letter 88-17. DCP 5.6          5.6-4                upgrade to provide level        2EC-3453 PKG I 7.7          7.7-21                indication during reduced inventory conditions and during vacuum fill SSAR 96-100  9.4        9.4-6                  Auxiliary Building              Evaluation S-C-ABV-MEE-Ventilation - delete incorrect    1077, DEF DES-90-01161, reference to methyl iodine      CR 950921399 CRCA I 0, removal and clarify description  LCRs 95-24, 95-44, 96-21 of the ABV charcoal filter SSAR 96-103  3.6          3.6-9                  Eliminate the need to postulate  CR 951221180 CRCA 7
3.8          3.8-77a              Intake Structure and Outer        DES-94-0 3 .8-78              Penetration Areas 3.8-82 SSAR 96-099  5.1          F5.1-6Bshl            Mid-Loop wide range level        Generic Letter 88-17. DCP 5.6          5.6-4                upgrade to provide level        2EC-3453 PKG I 7.7          7.7-21                indication during reduced inventory conditions and during vacuum fill SSAR 96-100  9.4        9.4-6                  Auxiliary Building              Evaluation S-C-ABV-MEE-Ventilation - delete incorrect    1077, DEF DES-90-01161, reference to methyl iodine      CR 950921399 CRCA I 0, removal and clarify description  LCRs 95-24, 95-44, 96-21 of the ABV charcoal filter SSAR 96-103  3.6          3.6-9                  Eliminate the need to postulate  CR 951221180 CRCA 7 arbitrary intennediate pipe breaks in accordance with Generic Letter 87-11 SSAR 96-104  3.5          3.5-4                Clarify use of probabilistic risk DEF DES-94-00097 3.5-5                assessment for tornado missile 3.8          3.8-75                strikes to unprotected 3.8-76                components l
* arbitrary intennediate pipe breaks in accordance with Generic Letter 87-11 SSAR 96-104  3.5          3.5-4                Clarify use of probabilistic risk DEF DES-94-00097 3.5-5                assessment for tornado missile 3.8          3.8-75                strikes to unprotected 3.8-76                components l
3A          3A-50
3A          3A-50
.I  SSAR 96-105  4.2          4.2-54                Reduce minimum required 4.2-55                capability of the neutron sources from providing 2 counts per second to greater than 1 cps on the source range channels SSAR 96-106  5.5          5.5-43                Correction of CVCS valve          DCP 2EE-O I 4 7 1CV55 fail safe positi<m to*
.I  SSAR 96-105  4.2          4.2-54                Reduce minimum required 4.2-55                capability of the neutron sources from providing 2 counts per second to greater than 1 cps on the source range channels SSAR 96-106  5.5          5.5-43                Correction of CVCS valve          DCP 2EE-O I 4 7 1CV55 fail safe positi<m to*
                                                     "open"
                                                     "open"
  *
 
* 12/16/97
12/16/97 Salem UFSAR Change;'!'pproved for Incorporation in Revision 16
              *          *
* Salem UFSAR Change;'!'pproved for Incorporation in Revision 16
* Page  12 Affected          Affected                                          Initiating or CN Number    Sections    Pages/Figuresffables  Description                      Ref. Document SSAR 96-109  6.3 .          T6.3-13 Sh l        Update description of Service    DCP !EC-3292 pkg 1&2.
* Page  12 Affected          Affected                                          Initiating or CN Number    Sections    Pages/Figuresffables  Description                      Ref. Document SSAR 96-109  6.3 .          T6.3-13 Sh l        Update description of Service    DCP !EC-3292 pkg 1&2.
9.2            9.2-10              Water System pump                PR 960706223. 950803382.
9.2            9.2-10              Water System pump                PR 960706223. 950803382.
9.2-3              performance, maximum            960703098 9.2-6b              number of Service Water 9.2-9              pumps that can be removed from service for maintenance, and description of Component Cooling Heat exchanger service water flow control SSAR 96-110  8.3            8.3-6              115 Volt AC Instrumentation      PR 960530208, DCP 2SC-8.3-6a              Power system description        2032, CN 90-32 correction SSAR 96-111  15.4            Tl5.4-21SH16        Install anti-sweat pipe          DCP 2EE-0225 PKG 1 6.3            6.3-32              insulation on Service Water pipiitg at Containment Fan Coil
9.2-3              performance, maximum            960703098 9.2-6b              number of Service Water 9.2-9              pumps that can be removed from service for maintenance, and description of Component Cooling Heat exchanger service water flow control SSAR 96-110  8.3            8.3-6              115 Volt AC Instrumentation      PR 960530208, DCP 2SC-8.3-6a              Power system description        2032, CN 90-32 correction SSAR 96-111  15.4            Tl5.4-21SH16        Install anti-sweat pipe          DCP 2EE-0225 PKG 1 6.3            6.3-32              insulation on Service Water pipiitg at Containment Fan Coil j
* j Units j
Units j
I SSAR 96-113  5.2            5.2-63              Update of ISi program            CR 960321214 CRCA 10 description for stagnated borated water systems IA W IE Circular 76-06 and IE Bulletin 79-17 SSAR 96-114  10.4            10.4-8              Revise Circulating Water Pump    CR 960710211, CR 8.3            F8.3-2              electrical description to delete 960710181, DCP lSC-2269 reference to temporary power    PKG6, 7
I SSAR 96-113  5.2            5.2-63              Update of ISi program            CR 960321214 CRCA 10 description for stagnated borated water systems IA W IE Circular 76-06 and IE Bulletin 79-17 SSAR 96-114  10.4            10.4-8              Revise Circulating Water Pump    CR 960710211, CR 8.3            F8.3-2              electrical description to delete 960710181, DCP lSC-2269 reference to temporary power    PKG6, 7
                           .. ,                      supply from Hope Creek Switchyard, and "future" South Bus SSAR 96-115  15.4            15.4-23            Change to UFSAR description      New procedure SC.SA-6.3            6.3-41              of leakage outside containment  AP.ZZ-005l(Q) 6.3-42              from ECCS components T6.3-12            following an accident
                           .. ,                      supply from Hope Creek Switchyard, and "future" South Bus SSAR 96-115  15.4            15.4-23            Change to UFSAR description      New procedure SC.SA-6.3            6.3-41              of leakage outside containment  AP.ZZ-005l(Q) 6.3-42              from ECCS components T6.3-12            following an accident
* 12/16/97
 
* Salem UFSAR Changes Approved for Incorporation in Revision 16
12/16/97 Salem UFSAR Changes Approved for Incorporation in Revision 16
                                                             * *
                                                             * *
* Page  13
* Page  13
*
)
)
Affected                      Affected                                        Initiating or CN Number    Sections          Pages/Figuresffables        Description                      Ref. Document SSAR 96-116    10.3                      10.3-12          Steam Generator Tube Leak        DCP 2EC-3449 PKG 2 11.4                      11.4-17            Detection - installation of 11.4-18          nitrogen 16 detectors in the 11.4-5            main steam lines prior to the Tl 1.4-2 Sh I    relief valves to detect carryover Tl 1.4-2 Sh 2    from a primary to secondary Tll.4-2Sh3        leak.
Affected                      Affected                                        Initiating or CN Number    Sections          Pages/Figuresffables        Description                      Ref. Document SSAR 96-116    10.3                      10.3-12          Steam Generator Tube Leak        DCP 2EC-3449 PKG 2 11.4                      11.4-17            Detection - installation of 11.4-18          nitrogen 16 detectors in the 11.4-5            main steam lines prior to the Tl 1.4-2 Sh I    relief valves to detect carryover Tl 1.4-2 Sh 2    from a primary to secondary Tll.4-2Sh3        leak.
5.2                        5.2-69 New SAR Pages: I I .4- l 7a, T 11.4-2 Sh 4 SSAR 96-118  9.3                        9.3-48            Incorporate NRC ASME Code        PR 950804231 9.3-63            relief request for the Volume T9.3-4            Control Tank and the Regenerative Heat Exchanger Relief systems using administratively controlled manual isolation valves SSAR 96-120    6.2                      6.2-10            Incorporate Tech Spec            Amendments 184/ 166 6.2-11            Amendments 184/166 - change
5.2                        5.2-69 New SAR Pages: I I .4- l 7a, T 11.4-2 Sh 4 SSAR 96-118  9.3                        9.3-48            Incorporate NRC ASME Code        PR 950804231 9.3-63            relief request for the Volume T9.3-4            Control Tank and the Regenerative Heat Exchanger Relief systems using administratively controlled manual isolation valves SSAR 96-120    6.2                      6.2-10            Incorporate Tech Spec            Amendments 184/ 166 6.2-11            Amendments 184/166 - change test frequency for integrated leak rate testing to that allowed by I OCFR50 Appendix J Option B SSAR 96-121    9.1                      9.1-15            Fuel Handling Building sump      DCP lEC-3639 PKG 1 pump surveillance and high sump pump level alarm description revision SSAR 96-122    15.2                      15.2-32          Correction of typographical      CR 960719108 errors SSAR 96-123  2.2.          **-.:*_;*";_ ii';;15            Correction of typographical      CN 94-02 error in the date of a reference report
**
test frequency for integrated leak rate testing to that allowed by I OCFR50 Appendix J Option B SSAR 96-121    9.1                      9.1-15            Fuel Handling Building sump      DCP lEC-3639 PKG 1 pump surveillance and high sump pump level alarm description revision SSAR 96-122    15.2                      15.2-32          Correction of typographical      CR 960719108 errors SSAR 96-123  2.2.          **-.:*_;*";_ ii';;15            Correction of typographical      CN 94-02 error in the date of a reference report
   . SSAR 96~124  8.3                        T8.3-5            Revise Unit 2 28 VDC Battery      DCP 2EC-358 I Load Profile due to containlnentventcontrolboard pushbutton modifications
   . SSAR 96~124  8.3                        T8.3-5            Revise Unit 2 28 VDC Battery      DCP 2EC-358 I Load Profile due to containlnentventcontrolboard pushbutton modifications
* Salem UFSAR Change.proved for Incorporation in Revisio"6                                            Page  14 12/16/97
 
   *'                Affected            Affected                                        Initiating or CN Number      Sections    Pages/Figuresffables  Description                      Ref. Document
Salem UFSAR Change.proved for Incorporation in Revisio"6                                            Page  14 12/16/97
      -------
   *'                Affected            Affected                                        Initiating or CN Number      Sections    Pages/Figuresffables  Description                      Ref. Document SSAR 96-125    15.2              15.2-60          Correction to turbine control      DCP 2EC-3353, CR 7.2              7.2-24          references for section 10          960716247,960716226 SSAR 96-126    3.6              3.6-36a          Provide protection for Turbine    DCP 2EC-3522 PKG I 3.6-42          Driven Aux Feed pump F3.6-28          enclosure by adding blowout 9.4              F9.4-2B SH 3    panels, removing and installing dampers, and adding temperature switches SSAR 96-127    9.3                9.3-1            Station air compresstrs -          CR 960723136, Cale S-C-change description to one is      CA-MDC-1639 typically running from two SSAR 96-129    11.4              11.4-8          Correction of miscellaneous        CR 960719097, 960716279, 15.I              15.1-2          typographical errors              960716271
SSAR 96-125    15.2              15.2-60          Correction to turbine control      DCP 2EC-3353, CR 7.2              7.2-24          references for section 10          960716247,960716226 SSAR 96-126    3.6              3.6-36a          Provide protection for Turbine    DCP 2EC-3522 PKG I 3.6-42          Driven Aux Feed pump F3.6-28          enclosure by adding blowout 9.4              F9.4-2B SH 3    panels, removing and installing dampers, and adding temperature switches SSAR 96-127    9.3                9.3-1            Station air compresstrs -          CR 960723136, Cale S-C-change description to one is      CA-MDC-1639 typically running from two SSAR 96-129    11.4              11.4-8          Correction of miscellaneous        CR 960719097, 960716279, 15.I              15.1-2          typographical errors              960716271
  ;.
  ;.
15.2              15.2-41 SSAR 96-130    A                A-35              Post accident access to vital      Cale S-C-VAR-MDC-1518 A-36              areas - increase in the areas as a A-37              result of addressing EOPs A-38 A-39 A-40 A-41 A-42 l                                    A-43 New SAR Pages: A-36a, A-4la, TA-4 sh
15.2              15.2-41 SSAR 96-130    A                A-35              Post accident access to vital      Cale S-C-VAR-MDC-1518 A-36              areas - increase in the areas as a A-37              result of addressing EOPs A-38 A-39 A-40 A-41 A-42 l                                    A-43 New SAR Pages: A-36a, A-4la, TA-4 sh
'I                              l, TA-4 sh 2, TA-4 sh
'I                              l, TA-4 sh 2, TA-4 sh
-i                              3, TA-4 sh 4, TA-5 sh l, TA-5 sh 2, TA-5 sh 3, TA-5 sh4 SSAR 96-132    15.4              15 ..i:.121      Correction of total thermal flow    CR 960801353 4.1              T4~*1".'l SH I  rate in the listed tables for 5.2              T5.2-3 SH2      consistency with a prior change, and a typographical text correction for the subject ofFigures 15 .4-99 and 15 .4-100
-i                              3, TA-4 sh 4, TA-5 sh l, TA-5 sh 2, TA-5 sh 3, TA-5 sh4 SSAR 96-132    15.4              15 ..i:.121      Correction of total thermal flow    CR 960801353 4.1              T4~*1".'l SH I  rate in the listed tables for 5.2              T5.2-3 SH2      consistency with a prior change, and a typographical text correction for the subject ofFigures 15 .4-99 and 15 .4-100
* l
 
l
*;
*;
Salem UFSAR Change.pproved for Incorporation in Revisi!6 Page 15 12/16/97
Salem UFSAR Change.pproved for Incorporation in Revisi!6 Page 15 12/16/97
* CN Number
* CN Number SSAR 96-133 Affected Sections 3A Affected Pages/Figuresffables 3A-5 Description Incorporation of Amendments I I 0/89 pertaining to Operations Manager qualifications and Amendments 1361115 Initiating or Ref. Document CR 960801268 960801285.
    ------
SSAR 96-133 Affected Sections 3A Affected Pages/Figuresffables 3A-5 Description Incorporation of Amendments I I 0/89 pertaining to Operations Manager qualifications and Amendments 1361115 Initiating or Ref. Document CR 960801268 960801285.
Amendments 110/89, 136/115 pertaining to licensed operator qualifications SSAR 96-135  3A          3A-16            Correction of miscellaneous        CR 960724058. 960715125, 3A-51            typographical errors              960711261 9.1        9.1-14 9.1-16 9.1-32 9.1-34 9.5        9.5-41 SSAR 96-137  15.3        15.3-2            Miscellaneous editorial            CR 960801123, 960725210,
Amendments 110/89, 136/115 pertaining to licensed operator qualifications SSAR 96-135  3A          3A-16            Correction of miscellaneous        CR 960724058. 960715125, 3A-51            typographical errors              960711261 9.1        9.1-14 9.1-16 9.1-32 9.1-34 9.5        9.5-41 SSAR 96-137  15.3        15.3-2            Miscellaneous editorial            CR 960801123, 960725210,
               . 4.5        4.5-2k            clarifications - rewording of a    960719113 9.4        9.4-33            sentence and correction of section references SSAR 96-138  13.l        13.l-2b          Change responsibility for site    proposed organization 17.2        17.2-15a          access training from Manager -    change Nuclear Security to Director -
               . 4.5        4.5-2k            clarifications - rewording of a    960719113 9.4        9.4-33            sentence and correction of section references SSAR 96-138  13.l        13.l-2b          Change responsibility for site    proposed organization 17.2        17.2-15a          access training from Manager -    change Nuclear Security to Director -
Nuclear Training Center
Nuclear Training Center
*


    !*
Salem UFSAR Change"pproved for Incorporation in Revisi'16                                      Page 16
Salem UFSAR Change"pproved for Incorporation in Revisi'16                                      Page 16
     '  12/16/97
     '  12/16/97
* i CN Number SSAR 96-139 Affected Sections 3A 6.2 Affected Pages/Figuresffables 3A-51a 6.2-55 6.2-58 6.2-59 Description Containment isolation valve list revision to comply with Tech Spec's, GDC 54 through 57.
* i CN Number SSAR 96-139 Affected Sections 3A 6.2 Affected Pages/Figuresffables 3A-51a 6.2-55 6.2-58 6.2-59 Description Containment isolation valve list revision to comply with Tech Spec's, GDC 54 through 57.
and ANSI/ANS 56.2 Initiating or Ref. Document LCR S95-02 6.2-60 6.2-61 6.2-66 6.2-67 F6.2-16 F6.2-18 F6.2-l 9 F6.2-21 F6.2-22 F6.2-23 F6.2-24 F6.2-29 F6.2-30 F6.2-3 I F6.2-32 F6.2-33 F6.2-34 F6.2-39
and ANSI/ANS 56.2 Initiating or Ref. Document LCR S95-02 6.2-60 6.2-61 6.2-66 6.2-67 F6.2-16 F6.2-18 F6.2-l 9 F6.2-21 F6.2-22 F6.2-23 F6.2-24 F6.2-29 F6.2-30 F6.2-3 I F6.2-32 F6.2-33 F6.2-34 F6.2-39 F6.2-40 F6.2-41 F6.2-42 F6.2-43 F6.2-45C F6.2-45D T6.2-IO SH l T6.2- l 0 Sh IO T6.2- l0 Sh 11 T6.2- l0 Sh 12 I
* F6.2-40 F6.2-41 F6.2-42 F6.2-43 F6.2-45C F6.2-45D T6.2-IO SH l T6.2- l 0 Sh IO
  '
T6.2- l0 Sh 11 T6.2- l0 Sh 12 I
-'
i T6.2-l0 Sh 2 T6.2-10 Sh 3 T6.2-l0 Sh4 T6,2-IO Sh 5 T6.2-l0 Sh 6 T6,2-l0 Sh 7 T6.2-l0 Sh 8 T6.2-10 Sh 9 T6.2-12 SH l T6.2-12 SH 2 T6.2-12 SH 3 T6.2-13 SH l T6.2-13 Sh 2 6.3              6.3-10 New SAR Pages: 6.2-59a
i T6.2-l0 Sh 2 T6.2-10 Sh 3 T6.2-l0 Sh4 T6,2-IO Sh 5 T6.2-l0 Sh 6 T6,2-l0 Sh 7 T6.2-l0 Sh 8 T6.2-10 Sh 9 T6.2-12 SH l T6.2-12 SH 2 T6.2-12 SH 3 T6.2-13 SH l T6.2-13 Sh 2 6.3              6.3-10 New SAR Pages: 6.2-59a
* Salem UFSAR Chang.pproved for Incorporation in Revisi'16                                        Page  17 12/16/97
 
* 1 Affected                Affected                                    lnitiatin~ or CN Number    Sections Pages/Figuresffables      Description                      Ref. Document i  SSAR 96-140  6.3          6.3-44                Containment fan coil unit -      CR 950803341 9.4            9.4-30              delete statements that service water automatically isolates on a high radiation signal in the service water outlets from containment SSAR 96-141  15.2          15.2-37            Correction* of typographical    CR 960805086, 960805089 15.3          15.3-5              errors and clarifications SSAR 96-142  15.4          15.4-130            Deletion of a Chapter 15 reference mistakenly added by CN 96-38 and is not referred to
Salem UFSAR Chang.pproved for Incorporation in Revisi'16                                        Page  17 12/16/97 1
* in the text SSAR 96-144  3.8          3.8-65                Containment airlock pressure    Amendments 56/24 testing - incorporation of license amendments 56/24
Affected                Affected                                    lnitiatin~ or CN Number    Sections Pages/Figuresffables      Description                      Ref. Document i  SSAR 96-140  6.3          6.3-44                Containment fan coil unit -      CR 950803341 9.4            9.4-30              delete statements that service water automatically isolates on a high radiation signal in the service water outlets from containment SSAR 96-141  15.2          15.2-37            Correction* of typographical    CR 960805086, 960805089 15.3          15.3-5              errors and clarifications SSAR 96-142  15.4          15.4-130            Deletion of a Chapter 15 reference mistakenly added by CN 96-38 and is not referred to
. !
* in the text SSAR 96-144  3.8          3.8-65                Containment airlock pressure    Amendments 56/24 testing - incorporation of license amendments 56/24 I
I SSAR 96-145  2.2          2.2-10                Revision to control room *
SSAR 96-145  2.2          2.2-10                Revision to control room
* j                                                                                      CR 951020268, Engr Eva! A-2.2-12a              habitability discussions to      O-ZZ-NEE-0735/l T2.2-2 SH l          reflect recent revision to T2.2-2 SH 2          calculations and an engineering T2.2-4 SH l          evaluation 6.4          6.4-3 T6.4-2 SH l iI T6.4-2 SH 2 j
* j                                                                                      CR 951020268, Engr Eva! A-2.2-12a              habitability discussions to      O-ZZ-NEE-0735/l T2.2-2 SH l          reflect recent revision to T2.2-2 SH 2          calculations and an engineering T2.2-4 SH l          evaluation 6.4          6.4-3 T6.4-2 SH l iI T6.4-2 SH 2 j
SSAR 96-146  13.5        l3.5-2c              Deletion of procedure NAP-61    NAP-61 cancelled
SSAR 96-146  13.5        l3.5-2c              Deletion of procedure NAP-61    NAP-61 cancelled
:I for Significant Event Response J                                                        Team - this function is part of Corrective Action Program
:I for Significant Event Response J                                                        Team - this function is part of Corrective Action Program
                                     .*;*_ ~..          NAP-6 SSAR 96-147  10.2          10.2-l              Correction of typographical      CR 960425182, 960509135, 8.1        . a.t-3.              errors, clarifications and        960515195,960719066, 8.3          8;3;.2*              addition of information missed    960724156,960731081, 8.3-4*              byDCPs                            960607124 8.3-5b 9.5          9.5-37 A            A-2 A-3
                                     .*;*_ ~..          NAP-6 SSAR 96-147  10.2          10.2-l              Correction of typographical      CR 960425182, 960509135, 8.1        . a.t-3.              errors, clarifications and        960515195,960719066, 8.3          8;3;.2*              addition of information missed    960724156,960731081, 8.3-4*              byDCPs                            960607124 8.3-5b 9.5          9.5-37 A            A-2 A-3
* 1
 
!
1 Salem UFSAR Change.pproved for Incorporation in              Revisi~6                              Page 18 12/16/97
Salem UFSAR Change.pproved for Incorporation in              Revisi~6                              Page 18 12/16/97
* CN Number SSAR 96-149 Affected Sections 13.1 Affected Pages/Figuresffables
* CN Number SSAR 96-149 Affected Sections 13.1 Affected Pages/Figuresffables
: 13. l-2a
: 13. l-2a
Line 502: Line 421:
                       "    *-  **-*-.- * * &#xa3;
                       "    *-  **-*-.- * * &#xa3;
                                 ..
                                 ..
* 7.6-8
* 7.6-8 pressure and RCS peak pressure revision SSAR 96-156 6.3                    6.3-21          Delete spiral wound gasket      CR 960719167 material description for MOVs
                                              .....
 
pressure and RCS peak
S~lem UFSAR Chang.pproved for lncorporatio*n in Revisi~6                                  Page  19 12/16/97 Affected      Affected                                        Initiating or CN Number  Sections Pages/Figuresffables Description                      Ref. Document SSAR 96-157 13. l        13.l-6b          QA organization change -        HC UFSAR CN 96-93 Fl3. l-7          reduction of quality assessment 17.2        17.2-33          manager positions from two to Fl7.2-I          one SSAR 96-159 4.2        4.2-79            Correction of rod drop time      License Amendments 96172._
                      <*_,          ,*  *:*"'
pressure revision
                .. _-
                                            ..
SSAR 96-156 6.3                    6.3-21          Delete spiral wound gasket      CR 960719167 material description for MOVs
* S~lem UFSAR Chang.pproved for lncorporatio*n in Revisi~6                                  Page  19 12/16/97 Affected      Affected                                        Initiating or CN Number  Sections Pages/Figuresffables Description                      Ref. Document SSAR 96-157 13. l        13.l-6b          QA organization change -        HC UFSAR CN 96-93 Fl3. l-7          reduction of quality assessment 17.2        17.2-33          manager positions from two to Fl7.2-I          one SSAR 96-159 4.2        4.2-79            Correction of rod drop time      License Amendments 96172._
4.2-80            from 2.2 to 2. 7 seconds per    CR 960829242 License Amendments 96/72 SSAR 96-161 10.4        10.4-13          Increase feedwater heater        DCP 2EC-3285_ PKG 2 10.4-27          design pressure from 700 to 725 psig for first through fifth stages              "'
4.2-80            from 2.2 to 2. 7 seconds per    CR 960829242 License Amendments 96/72 SSAR 96-161 10.4        10.4-13          Increase feedwater heater        DCP 2EC-3285_ PKG 2 10.4-27          design pressure from 700 to 725 psig for first through fifth stages              "'
*


       ~
       ~
Salem  UFS~R Change~proved for Incorporation in Revisic'16.                                    Page  20 12/16/97
Salem  UFS~R Change~proved for Incorporation in Revisic'16.                                    Page  20 12/16/97
* CN Number
* CN Number SSAR 96-165 Affected Sections 3A Affected P;tges/Figuresrr~~~
          ---*-*--
SSAR 96-165 Affected Sections 3A Affected P;tges/Figuresrr~~~
3A-26 Description Update PSE&G's position regarding Regulatory Guide I .52 for acceptance criteria for in-place testing of charcoal Initiating or Ref. Document Unit 2 license amendment 88, CR 960829255 adsorbers and HEPA units, per Unit 2 License Amendment 88 SSAR 96-167    9.5          9.5-45          Emergency Diesel Generator        CR 950823075 I
3A-26 Description Update PSE&G's position regarding Regulatory Guide I .52 for acceptance criteria for in-place testing of charcoal Initiating or Ref. Document Unit 2 license amendment 88, CR 960829255 adsorbers and HEPA units, per Unit 2 License Amendment 88 SSAR 96-167    9.5          9.5-45          Emergency Diesel Generator        CR 950823075 I
prelube pump description revision SSAR 96-168    6.3        6.3-16            Safety Injection pump test        CR 960815172. 9605I0136 method - delete reference to .
prelube pump description revision SSAR 96-168    6.3        6.3-16            Safety Injection pump test        CR 960815172. 9605I0136 method - delete reference to .
I 00 gpm test line in parallel to minitlow line
I 00 gpm test line in parallel to minitlow line SSAR 96-170  . 15.4        15.4-50        Steam generator tube rupture        CR 960121088 15.4-51        event - revision increases the 15.4-52        amount of operator time to i.
  .,'
SSAR 96-170  . 15.4        15.4-50        Steam generator tube rupture        CR 960121088 15.4-51        event - revision increases the 15.4-52        amount of operator time to i.
15.4-55          complete the isolation procedure from 30 to 50 minutes, and reduces the subcooling margin during cooldown stage from 50 to 20 degrees F.
15.4-55          complete the isolation procedure from 30 to 50 minutes, and reduces the subcooling margin during cooldown stage from 50 to 20 degrees F.
  ,
I SSAR 96-171    5.5          T5.5-2 SH I      RHR system failure analysis        CR 960716245 I
I SSAR 96-171    5.5          T5.5-2 SH I      RHR system failure analysis        CR 960716245 I
:I T5.5-2 SH 2      revision addressing recovery for failure of a RHR suction valve RH 1 or RH2 to open
:I T5.5-2 SH 2      revision addressing recovery for failure of a RHR suction valve RH 1 or RH2 to open SSAR 96-172    17.2        17.2-1          NAP-I procedure revision i1.2-13 SSAR 96-173    17.2        17.2.,.22        NAP-3 procedure revision 17.2-24
                                      '
 
SSAR 96-172    17.2        17.2-1          NAP-I procedure revision i1.2-13 SSAR 96-173    17.2        17.2.,.22        NAP-3 procedure revision 17.2-24
l I Salem UFSAR Chang.pproved for Incorporation in Revis!.6                                          Page  21 12/16/97 Affected        Affected                                            Initiating or CN Number  Sections  Pages/Figu resrr ~hies  Description                      Ref. Document SSAR 96-174  7.7          7.7-6                Control rod bank insertion        DCP 2EC-3575 PKG I. CR 7.7-7                monitor - delete reference to Hi  _951213180.
* l I Salem UFSAR Chang.pproved for Incorporation in Revis!.6                                          Page  21 12/16/97 Affected        Affected                                            Initiating or CN Number  Sections  Pages/Figu resrr ~hies  Description                      Ref. Document SSAR 96-174  7.7          7.7-6                Control rod bank insertion        DCP 2EC-3575 PKG I. CR 7.7-7                monitor - delete reference to Hi  _951213180.
F7.7-2              Tavg signal as input to the monitor
F7.7-2              Tavg signal as input to the monitor
       ;*
       ;*
Line 543: Line 449:
II i                                  -~-
II i                                  -~-
SSAR 96-181  11.4          Tl 1.4-2 SH l      Radiation Monitoring -            DEF DES-91-00365 contairurient ventilation isolation - delete reference to second unused radiation monitor detectors in 2R12A and 2Rl2B channels
SSAR 96-181  11.4          Tl 1.4-2 SH l      Radiation Monitoring -            DEF DES-91-00365 contairurient ventilation isolation - delete reference to second unused radiation monitor detectors in 2R12A and 2Rl2B channels
* Salem UFSAR Change!proved for Incorporation in Revisi.!6                                    Page  22 12/16/97
 
Salem UFSAR Change!proved for Incorporation in Revisi.!6                                    Page  22 12/16/97
* CN Number SSAR 96-182 Affected Sections 3.8 Affected Pages/Figu resrf ables 3.8-2 Description Containment Building lightning protection - editorial change of description Initiating or Ref. Document DCP 2EE-0247 PKG 1 SSAR 96-183 15.3            15.3-6          Revision to chapter 15, Small Break LOCA.
* CN Number SSAR 96-182 Affected Sections 3.8 Affected Pages/Figu resrf ables 3.8-2 Description Containment Building lightning protection - editorial change of description Initiating or Ref. Document DCP 2EE-0247 PKG 1 SSAR 96-183 15.3            15.3-6          Revision to chapter 15, Small Break LOCA.
SSAR 96-184 3.8              3.8-2          Containment Building lightning  DCP IEE-0314 PKG 1 protection - editorial change to description SSAR 96-185 11.4            11.4-23        Radiation Monitoring - change    DEF DES-91-00640 description of method of calibration for radiation detectors SSAR 96-186 13.1            13.1-11        In Manager Salem Operations duties, change review of
SSAR 96-184 3.8              3.8-2          Containment Building lightning  DCP IEE-0314 PKG 1 protection - editorial change to description SSAR 96-185 11.4            11.4-23        Radiation Monitoring - change    DEF DES-91-00640 description of method of calibration for radiation detectors SSAR 96-186 13.1            13.1-11        In Manager Salem Operations duties, change review of
Line 551: Line 458:
I                                                and 53A (status of control air)
I                                                and 53A (status of control air)
I
I
  .j                                                to 5 from I
  .j                                                to 5 from I le
                            . :,.,
le


I
I
Line 561: Line 466:
Replace Varable 73 steam generator blowdown radiation moniti:>rs with varable 35a steam generator narrow range level for use as primary indication of steam generator tube rupture SSAR 96-190  15.4            15.4-4                    Emergency "Diesel Generators -  CR 960502113 6.3            6.3-53                    clarification of delay times j                  8.3            8.3-9
Replace Varable 73 steam generator blowdown radiation moniti:>rs with varable 35a steam generator narrow range level for use as primary indication of steam generator tube rupture SSAR 96-190  15.4            15.4-4                    Emergency "Diesel Generators -  CR 960502113 6.3            6.3-53                    clarification of delay times j                  8.3            8.3-9
   ~      SSAR 96-191  6.3          T6.3-5                      Chemical and Volume Control System -_change material for 12 centrifugal charging pump DCP lEC-3018 to all stainless steel J
   ~      SSAR 96-191  6.3          T6.3-5                      Chemical and Volume Control System -_change material for 12 centrifugal charging pump DCP lEC-3018 to all stainless steel J
  '
I SSAR 96-192  8.3          TS.3-6                      Station Air Compressor          DCP 1EC-3651 PKG 2 j
I SSAR 96-192  8.3          TS.3-6                      Station Air Compressor          DCP 1EC-3651 PKG 2 j
I                    9.3          F9.3-1A SH 1                Control modification - change .
I                    9.3          F9.3-1A SH 1                Control modification - change .
Line 569: Line 473:
                                     .;  .__,_:***
                                     .;  .__,_:***
i                                *,,*..
i                                *,,*..
'
 
* Salem UFSAR Change.pproved for Incorporation in              Revisi~6                                Page 2-l l 2/l 6/97
Salem UFSAR Change.pproved for Incorporation in              Revisi~6                                Page 2-l l 2/l 6/97
* CN Number SSAR 96-194 Affected Sections 11.4 Affected Pages/Figuresffables 11.4-19 11.4-4 l l .4-5 l l .4-5a Description Radiation Monitoring System 1/2RIA/8 replacement by l/2RIB for Control Area Air Conditioning System and Initiating or Ref. Document DCP l EC-3505 PKG 3 l l .4-8        Emergency Air Conditioning F 1 l.4-6        System Tl l.4-l SH  I
* CN Number SSAR 96-194 Affected Sections 11.4 Affected Pages/Figuresffables 11.4-19 11.4-4 l l .4-5 l l .4-5a Description Radiation Monitoring System 1/2RIA/8 replacement by l/2RIB for Control Area Air Conditioning System and Initiating or Ref. Document DCP l EC-3505 PKG 3 l l .4-8        Emergency Air Conditioning F 1 l.4-6        System Tl l.4-l SH  I
                                           . Tl 1.4-2 SH  l Tl 1.4-3 SH  I Tl 1.4-4 SH  I 3.1                3.1-4 6.4                6.4-2 8.3                T8.3-6 9.4                9.4-4
                                           . Tl 1.4-2 SH  l Tl 1.4-3 SH  I Tl 1.4-4 SH  I 3.1                3.1-4 6.4                6.4-2 8.3                T8.3-6 9.4                9.4-4
                     '.'Jew SAR Pages: F 11.4-9                                  '&deg; SSAR 96-195      9.5                9.5-46          Emergency Diesei Generator
                     '.'Jew SAR Pages: F 11.4-9                                  '&deg; SSAR 96-195      9.5                9.5-46          Emergency Diesei Generator
* ocp IEC-3310 PKG I
* ocp IEC-3310 PKG I low lube oil temperature setpoint change SSAR 96-196      13.2              13.2-1          Revision to training description  CR 960514114 New SAR Pages:    13.2-2
                                                                                    .
low lube oil temperature setpoint change SSAR 96-196      13.2              13.2-1          Revision to training description  CR 960514114 New SAR Pages:    13.2-2
* SSAR 96-198      15. l 15.2 T15.l-2SH2 T15.2-l SH I Tl5.2-l Sh 2 Tl5.2-l Sh 3 Tl5.2-l Sh 4 Tl5.2-l Sh 5 Correction of accident analysis tables for feedwater system malfunctions related to the computer code used and description of excessive feedwater at full load for single CN 96-38 omission Tl5.2-l Sh 6    and multiple loops
* SSAR 96-198      15. l 15.2 T15.l-2SH2 T15.2-l SH I Tl5.2-l Sh 2 Tl5.2-l Sh 3 Tl5.2-l Sh 4 Tl5.2-l Sh 5 Correction of accident analysis tables for feedwater system malfunctions related to the computer code used and description of excessive feedwater at full load for single CN 96-38 omission Tl5.2-l Sh 6    and multiple loops
   '                                      Tl5.2-l Sh 7 j                New SAR Pages: Tl 5 .2-1 Sh 8 SSAR 96-200      9.5                9.5-43          Emergency Diesel Generator -      DCP IEC-3533 PKG 1, 2, 3
   '                                      Tl5.2-l Sh 7 j                New SAR Pages: Tl 5 .2-1 Sh 8 SSAR 96-200      9.5                9.5-43          Emergency Diesel Generator -      DCP IEC-3533 PKG 1, 2, 3
Line 582: Line 484:
*1
*1
   '                                                        compressor start/stop pressure switch setpoint change to stop at 245 psig rising from 250 SSAR 96-201      10                10-iv            Correction of miscellaneous        CR 960703098 5.S                5.S-6            minor errors from UFSAR 7.3                7.3-20          Revision 12 change notice incorporation
   '                                                        compressor start/stop pressure switch setpoint change to stop at 245 psig rising from 250 SSAR 96-201      10                10-iv            Correction of miscellaneous        CR 960703098 5.S                5.S-6            minor errors from UFSAR 7.3                7.3-20          Revision 12 change notice incorporation
    *


  '
Salem UFSAR Change"pproved for Incorporation in    Revis~'16                          Page 25 12/16/97 CN Number SSAR 96-205 Affected Sections 8.3 Affected Pages/Figuresffables 8.3-17 8.3-19 Description Replacement of 125 voe battery chargers Initiating or Ref. Document DeP I Ee-3385 PKG I SSAR 96-206 5.6        5.6-3            Removal of Hagan instrument  DeP 2Ee-3574 PKG l 5.6-4            loop 2PT458A for Pressurizer pressure narrow range differential pressure SSAR 96-207 9.3        T9.3-6 SH 12      eves System - change relief  CR 960325 I 22 valve capacities 1
Salem UFSAR Change"pproved for Incorporation in    Revis~'16                          Page 25 12/16/97
 
*!
Salem UFSAR Change.pproved for Incorporation in  Revis~'16                            Page 26 12/16/97
CN Number
* 1 CN Number SSAR 96-209 Affected Sections 7.3 Affected Pages/Figuresffables 7.3-27 T7.3-3 sh I T7.3-3 sh 2 T7.3-4 sh I Description Containment flood level following a LOCA is being changed from elevation 83'- l" to 84'-0" to include additional Initiating or Ref. Document CR 960418084 T7.3-4 sh 10      water volume from the T7.3-4sh 12      accumulators and reactor T7.3-4 sh 13      coolant blowdown - update T7.3-4sh 13a      Tables 7.3-4, 7.3-5, 7.3-6 and T7.3-4sh 14      7.3-7 T7.3-4sh 15 T7.3-4 sh 16 T7.3-4 sh 17 T7.3-4 sh 2 T7.3-4 sh 23 T7.3-4 sh 24 T7.3-4 sh 25 T7.3-4 sh 26 T7.3-4 sh 27 T7.3-4 sh 28 T7.3-4 sh 29 T7.3-4 sh 3 T7.3-4 sh 30 T7.3-4 sh 31 T7.3-4 sh 32 T7.3-4 sh 33 T7.3-4 sh 34 T7.3-4 sh 35 T7.3-4 sh 36 T7.3-4 sh 37 T7.3-4 sh 38 T7.3-4 sh 39 1                          T7.3-4 sh 4 l                          T7.3-4 sh 40 T7.3-4 sh 41
    ---------
SSAR 96-205 Affected Sections 8.3 Affected Pages/Figuresffables 8.3-17 8.3-19 Description Replacement of 125 voe battery chargers Initiating or Ref. Document DeP I Ee-3385 PKG I SSAR 96-206 5.6        5.6-3            Removal of Hagan instrument  DeP 2Ee-3574 PKG l 5.6-4            loop 2PT458A for Pressurizer pressure narrow range differential pressure SSAR 96-207 9.3        T9.3-6 SH 12      eves System - change relief  CR 960325 I 22 valve capacities
* 1
!
* Salem UFSAR Change.pproved for Incorporation in  Revis~'16                            Page 26 12/16/97
* 1 CN Number SSAR 96-209 Affected Sections 7.3 Affected Pages/Figuresffables 7.3-27 T7.3-3 sh I T7.3-3 sh 2 T7.3-4 sh I Description Containment flood level following a LOCA is being changed from elevation 83'- l" to 84'-0" to include additional Initiating or Ref. Document CR 960418084 T7.3-4 sh 10      water volume from the T7.3-4sh 12      accumulators and reactor T7.3-4 sh 13      coolant blowdown - update T7.3-4sh 13a      Tables 7.3-4, 7.3-5, 7.3-6 and T7.3-4sh 14      7.3-7 T7.3-4sh 15 T7.3-4 sh 16 T7.3-4 sh 17 T7.3-4 sh 2 T7.3-4 sh 23 T7.3-4 sh 24 T7.3-4 sh 25 T7.3-4 sh 26 T7.3-4 sh 27 T7.3-4 sh 28 T7.3-4 sh 29 T7.3-4 sh 3 T7.3-4 sh 30
* T7.3-4 sh 31 T7.3-4 sh 32 T7.3-4 sh 33 T7.3-4 sh 34 T7.3-4 sh 35 T7.3-4 sh 36 T7.3-4 sh 37 T7.3-4 sh 38 T7.3-4 sh 39 1                          T7.3-4 sh 4 l                          T7.3-4 sh 40 T7.3-4 sh 41
-1                          T7.3-4 sh 42
-1                          T7.3-4 sh 42
  '
  '                          T7.3-4 sh 43 T7.3-4 sh 44 T7.3-4 sh 45 T7.3-4 sh 46 T7.3-4 sh 47 T7.3-4 sh 5 T7.3-4 sh 6 T7.3-4 sh 7 T7.3-4 sh 8 T7.3-4 sh 9 T7.3-5 sh 1 T7.3-5 sh 13 T7.3-5 sh 3
  '                          T7.3-4 sh 43 T7.3-4 sh 44 T7.3-4 sh 45 T7.3-4 sh 46 T7.3-4 sh 47 T7.3-4 sh 5 T7.3-4 sh 6 T7.3-4 sh 7 T7.3-4 sh 8 T7.3-4 sh 9 T7.3-5 sh 1 T7.3-5 sh 13
* T7.3-5 sh 3


12116191
12116191 Salem UFSAR Changes Approved for Incorporation in Revision 16          **                          Page  21 1
* Salem UFSAR Changes Approved for Incorporation in Revision 16          **                          Page  21
Affected            Affected                                      Initiating or CN Number          Sections      Pages/Figu resff ables  Description                  Ref. Document T7.3-5 sh 5 T7.3-5 sh 6 T7.3-5 sh 7 T7.3-5 sh 9 T7.3-6 sh I T7.3-6 sh 10 T7.3-6sh 13 T7.3-6 sh 14 T7.3-6 sh 2 T7.3-6 sh 3 T7.3-6 sh 4 T7.3-6 sh 5 T7.3-6 sh 6 T7.3-6 sh 7 T7.3-6 sh 8 T7.3-6 sh 9 T7.3-7sh 1 T7.3-7 sh 2 SSAR 96-210        9.4              9.4-10            Auxiliary Building ventilation CR 950921399 CRCA 12 i.
* 1 Affected            Affected                                      Initiating or CN Number          Sections      Pages/Figu resff ables  Description                  Ref. Document
    *-- - - - - - -
T7.3-5 sh 5 T7.3-5 sh 6 T7.3-5 sh 7 T7.3-5 sh 9 T7.3-6 sh I T7.3-6 sh 10 T7.3-6sh 13 T7.3-6 sh 14 T7.3-6 sh 2 T7.3-6 sh 3 T7.3-6 sh 4 T7.3-6 sh 5 T7.3-6 sh 6 T7.3-6 sh 7 T7.3-6 sh 8 T7.3-6 sh 9 T7.3-7sh 1 T7.3-7 sh 2 SSAR 96-210        9.4              9.4-10            Auxiliary Building ventilation CR 950921399 CRCA 12 i.
9.4-11            system description update in 9.4-12            section 9.4.2 9.4-13 9.4-14 9.4-15 9.4-5 9.4-6 9.4-7 9.4-8 9.4-9 New SAR Pages: 9.4-Sa SSAR 96-212        6.3              T6.3-7            Clarification of centrifugal  CR 960719214 charging pump horsepower rating during accident conditions
9.4-11            system description update in 9.4-12            section 9.4.2 9.4-13 9.4-14 9.4-15 9.4-5 9.4-6 9.4-7 9.4-8 9.4-9 New SAR Pages: 9.4-Sa SSAR 96-212        6.3              T6.3-7            Clarification of centrifugal  CR 960719214 charging pump horsepower rating during accident conditions
* Revisi~6 1
 
Revisi~6 1
Salem UFSAR Change-proved for Incorporation in                                                      Page  28
Salem UFSAR Change-proved for Incorporation in                                                      Page  28
"    12/16/97
"    12/16/97
Line 614: Line 504:
Addition of closure contacts to containment sample isolation PIRS 961125199 DCP IEC-3430 valves to indicate low flow alarm on !RI l/Rl2 sample skid if valves are closed.
Addition of closure contacts to containment sample isolation PIRS 961125199 DCP IEC-3430 valves to indicate low flow alarm on !RI l/Rl2 sample skid if valves are closed.
SSAR 97-008    10.3              10.3-10          Adds description of variable    DCP I EC-3328/::!EC-3293, damping of steam flow            PR 960502113 transmitters
SSAR 97-008    10.3              10.3-10          Adds description of variable    DCP I EC-3328/::!EC-3293, damping of steam flow            PR 960502113 transmitters
                                -.- ,,. '
 
* Salem UFSAR Change!proved for Incorporation in 12/16/97 Revisi~6                          Page 29
Salem UFSAR Change!proved for Incorporation in 12/16/97 Revisi~6                          Page 29
   *I CN Number SSAR 97-009 Affected Sections 11 I I. I Affected Pages/Figuresffables I I-iv I I.I-I 11.1-10 I 1.1-1 I Description Revision to incorporate updated offsite dose analysis results.
   *I CN Number SSAR 97-009 Affected Sections 11 I I. I Affected Pages/Figuresffables I I-iv I I.I-I 11.1-10 I 1.1-1 I Description Revision to incorporate updated offsite dose analysis results.
Initiating or Ref. Document S-C-FHV-MDC-1616 11.1-2 11.1-3 11.1-4 11.1-5 11.1-6 Tl I. I-I Tl I.I-I I t11.1-12 Tl 1.1-13 Tl 1.1-2 Tl.1.1-3
Initiating or Ref. Document S-C-FHV-MDC-1616 11.1-2 11.1-3 11.1-4 11.1-5 11.1-6 Tl I. I-I Tl I.I-I I t11.1-12 Tl 1.1-13 Tl 1.1-2 Tl.1.1-3 Tl 1.1-4 Tl 1.1-5 Tl 1.1-6 Tl 1.1-7 Sh I Tl 1.1-7 Sh 2 Tl 1.1-8 15          15-ix 15-vii 15-x 15-xxiiia 15-xxv 15.1        15.1-12 15.l-12a 15.1-13 15.1-14 j                          15.1-24 I
* Tl 1.1-4 Tl 1.1-5 Tl 1.1-6 Tl 1.1-7 Sh I Tl 1.1-7 Sh 2 Tl 1.1-8 15          15-ix 15-vii 15-x 15-xxiiia 15-xxv 15.1        15.1-12 15.l-12a 15.1-13 15.1-14 j                          15.1-24 I
T15.l-5 I
T15.l-5 I
Tl5.l-6 J                15.3        15.3-17 15*.3-18 15.4 ,*    1_5.4-130 15.4;.16 15.4-17 15.4~18 .
Tl5.l-6 J                15.3        15.3-17 15*.3-18 15.4 ,*    1_5.4-130 15.4;.16 15.4-17 15.4~18 .
Line 624: Line 513:
* 15.4-27
* 15.4-27


12/16/97
12/16/97 Salem UFSAR Chang.pproved for Incorporation in Revision 16
* Salem UFSAR Chang.pproved for Incorporation in Revision 16
* Page 30
* Page 30
  *    )
  *    )
CN Number
CN Number Affected Sections Affected Pages/Figuresffables 15.4-40 I 5.4-40a 15.4-41 15.4-42 Description .
        -*-----
Affected Sections Affected Pages/Figuresffables 15.4-40 I 5.4-40a 15.4-41 15.4-42 Description .
Initiating or Ref. Document 15.4-49 15.4-50 15.4-52 15.4-53 15.4-54 15.4-55 15.4-56.
Initiating or Ref. Document 15.4-49 15.4-50 15.4-52 15.4-53 15.4-54 15.4-55 15.4-56.
15.4-61 15.4-62 15.4-63 F15.4-47A Fl5.4-47B F15.4-47C F15.4-62
15.4-61 15.4-62 15.4-63 F15.4-47A Fl5.4-47B F15.4-47C F15.4-62
  < *~
  < *~
Fl 5.4-63 F15.4~64 F\5.4-65 F\5.4-66
Fl 5.4-63 F15.4~64 F\5.4-65 F\5.4-66 F15.4-67 T\5.4-11 T15.4-5A T15.4-5B T\5.4-5C T15.4-7 T15.4-8 Tl5.4-9 2                  2-iii 2-viii
* F15.4-67 T\5.4-11 T15.4-5A T15.4-5B T\5.4-5C T15.4-7 T15.4-8 Tl5.4-9 2                  2-iii 2-viii
"                  2.3                2.3-11 2.3-12
"                  2.3                2.3-11 2.3-12
                                       . 2.3-13 2.3-14 2.3-15 3A                  3a-5la 3A-5lb 3A-52 3A-53 9.4                9.4-37 New SAR Pages: 2.3- l 4a, 2.3- l 4b, T2.3-21, T2.3-22, 15.4-18a, l 5.4-18b, 15.4-22a, 15.4-55a, T15.4-58 Sh 2, T15.4-7A, T15.4-78,
                                       . 2.3-13 2.3-14 2.3-15 3A                  3a-5la 3A-5lb 3A-52 3A-53 9.4                9.4-37 New SAR Pages: 2.3- l 4a, 2.3- l 4b, T2.3-21, T2.3-22, 15.4-18a, l 5.4-18b, 15.4-22a, 15.4-55a, T15.4-58 Sh 2, T15.4-7A, T15.4-78, T15.4-7C,
* T15.4-7C,
 
* 12/16/97
12/16/97 Salem UFSAR Changes Approved for Incorporation in Revision 16
* Salem UFSAR Changes Approved for Incorporation in Revision 16
* Page 31 j
* Page 31
CN Number SSAR97-012 Affected Sections 8.1
* j CN Number SSAR97-012 Affected Sections 8.1
:"Jew SAR Pages:      8.1-11 a Affected Pages/Figuresffables 8.1-11 8.1-8 Description Correction of separation criteria for emergency feeds Initiating or Ref. Document PIRS No. 960912139 SSAR 97-013    3A                          3A-5          Revise Reg Guide 1.11          PIRS 961120111 description in Section 3A to include the RVLIS instrument lines.
:"Jew SAR Pages:      8.1-11 a Affected Pages/Figuresffables 8.1-11 8.1-8 Description Correction of separation criteria for emergency feeds Initiating or Ref. Document PIRS No. 960912139 SSAR 97-013    3A                          3A-5          Revise Reg Guide 1.11          PIRS 961120111 description in Section 3A to include the RVLIS instrument lines.
SSAR 97-015    9.2                        T9.2-3        Edited Table 9.2-3 to clarify T9.2-4 Sh I  varying charging pump flow as a result of CCW temperature and heat load. Edited Table 9.2-4 to indicate that Component Cooling* Pump rated capacity and rated head were design points.
SSAR 97-015    9.2                        T9.2-3        Edited Table 9.2-3 to clarify T9.2-4 Sh I  varying charging pump flow as a result of CCW temperature and heat load. Edited Table 9.2-4 to indicate that Component Cooling* Pump rated capacity and rated head were design points.
SSAR 97-016    6.3                          6.3-49      Typographical/editorial change
SSAR 97-016    6.3                          6.3-49      Typographical/editorial change SSAR 97-017    9.4                          9.4-10      Auxiliary Building ventilation  DCP 2EC-3269 pkg I 9.4-11      upgrade.
* SSAR 97-017    9.4                          9.4-10      Auxiliary Building ventilation  DCP 2EC-3269 pkg I 9.4-11      upgrade.
9.4-12 9.4-14 9.4-15 9.4-6 9.4-7 F9.4-2B Sh I
9.4-12 9.4-14 9.4-15 9.4-6 9.4-7 F9.4-2B Sh I
* F9.4-2B Sh 2 F9.4-28 Sh 3 SSAR 97-019    14.2                        Tl4.2-l Sh 6  Add SUP 20.3 to table that was inadvertently or incorrectly
* F9.4-2B Sh 2 F9.4-28 Sh 3 SSAR 97-019    14.2                        Tl4.2-l Sh 6  Add SUP 20.3 to table that was inadvertently or incorrectly
                             .. **-:.-                      removed or omitted.
                             .. **-:.-                      removed or omitted.
                                        *-
                                          ..    ...
SSAR 97-020    5.6                        5':6;5:*      Unit l bypass circuitry for low DCP lEC-3620 7.2.                    . F7.~-5          pressurizer level isolation signal.
SSAR 97-020    5.6                        5':6;5:*      Unit l bypass circuitry for low DCP lEC-3620 7.2.                    . F7.~-5          pressurizer level isolation signal.
SSAR 97-021    9.3                        9.3-32        Clarify description of CVCS 9.3-33        mixed bed demineralizers.
SSAR 97-021    9.3                        9.3-32        Clarify description of CVCS 9.3-33        mixed bed demineralizers.
* i I
 
12/16/97
i I
* Salem UFSAR Changes Approved for Incorporation in Revision 16
12/16/97 Salem UFSAR Changes Approved for Incorporation in Revision 16
* Page  32
* Page  32
  ~
  ~
Affected              Affected                                    Initiating or CN Number  Sections  Pages/Figu resff a hies Description                      Ref. Document SSAR 97-023 6.2              6.2-31          Containment Fan Coil Unit        DCP 2EC-3590 pkg 15 6.2-33          (CFCU) return piping temperature increase to 221 degrees F.
Affected              Affected                                    Initiating or CN Number  Sections  Pages/Figu resff a hies Description                      Ref. Document SSAR 97-023 6.2              6.2-31          Containment Fan Coil Unit        DCP 2EC-3590 pkg 15 6.2-33          (CFCU) return piping temperature increase to 221 degrees F.
SSAR 97-024 9.2              9.2-14          Revise Section 9.2.2 to address requirement for 3 Component Cooling Water pumps to be available to meet single failure requirements.
SSAR 97-024 9.2              9.2-14          Revise Section 9.2.2 to address requirement for 3 Component Cooling Water pumps to be available to meet single failure requirements.
SSAR 97-025 5.1              5.1-7          Revise affected page to reflect  PIRS 960725259 that the Reactor Vessel Head Vent valve will have power during normal operations SSAR 97-032 6.2              T6.2-13 Sh2      Revise note for SW58 and        PIRS 960731232 SW72 in Table 6.2-13 to clarify
SSAR 97-025 5.1              5.1-7          Revise affected page to reflect  PIRS 960725259 that the Reactor Vessel Head Vent valve will have power during normal operations SSAR 97-032 6.2              T6.2-13 Sh2      Revise note for SW58 and        PIRS 960731232 SW72 in Table 6.2-13 to clarify I
  !*
that the valves are not Type C I
I that the valves are not Type C I
i                                                tested.
i                                                tested.
* SSAR 97-033 7.3 9.5 7.3-29 F7.3-4 9.5-22 Revise UFSAR contents regarding fuses and specific instructions for the 230V DC system in order to meet plant operations and design.
* SSAR 97-033 7.3 9.5 7.3-29 F7.3-4 9.5-22 Revise UFSAR contents regarding fuses and specific instructions for the 230V DC system in order to meet plant operations and design.
Line 675: Line 555:
Equipment) to reflect current organization and practices.
Equipment) to reflect current organization and practices.
SSAR 97-038 13.5              13.5-2b        Remove topics no longer 13.5-2c        applicable to the list of topics for Nuclear Adminstrative Procedures (NAPs) .
SSAR 97-038 13.5              13.5-2b        Remove topics no longer 13.5-2c        applicable to the list of topics for Nuclear Adminstrative Procedures (NAPs) .
* Salem UFSAR Change.pproved for Incorporation in Revisi'16                                                                                                                    Page 33 l 2/l 6i97
 
Salem UFSAR Change.pproved for Incorporation in Revisi'16                                                                                                                    Page 33 l 2/l 6i97
* _C_N !' u!_TI_b_er_
* _C_N !' u!_TI_b_er_
SSAR 97-039 Affected 12.3 13 13.1 12.3-1 13-i Affected
SSAR 97-039 Affected 12.3 13 13.1 12.3-1 13-i Affected
Line 685: Line 566:
: 13. l-3a 13.1-4 13.l-6a 13.1-8 13.1-9 F13.1-3 F13.l-8a Fl3.l-8b F13. l-8e T13.l-1 SH2 13.4                                          13.4-1 13.4-2 13.5                                          13.5-1 13.5-2 17.2                                          17.2-15a 17.2-16 17.2-17 17.2-19 17.2-22 17.2-23 17.2-24 17.2-28
: 13. l-3a 13.1-4 13.l-6a 13.1-8 13.1-9 F13.1-3 F13.l-8a Fl3.l-8b F13. l-8e T13.l-1 SH2 13.4                                          13.4-1 13.4-2 13.5                                          13.5-1 13.5-2 17.2                                          17.2-15a 17.2-16 17.2-17 17.2-19 17.2-22 17.2-23 17.2-24 17.2-28
                                                         ...          17.2-29
                                                         ...          17.2-29
                                                            ..
                                     .    ~-.  '***.                  17.2,.33 17.2;.36 17.2-37
                                     .    ~-.  '***.                  17.2,.33 17.2;.36 17.2-37
                                                                   ~)7:'.2~38
                                                                   ~)7:'.2~38
                                                               ... -*. ,.t ,.,.,.,
                                                               ... -*. ,.t ,.,.,.,
                                                             *:'f72-39 i7.2-4 17.2-5 17.2-6 Fl7.2-l 9.5                                          9.5-3 9.5-4 NewSARPages: 17.2-7a, 17.2-7c, 17.2-
                                                             *:'f72-39 i7.2-4 17.2-5 17.2-6 Fl7.2-l 9.5                                          9.5-3 9.5-4 NewSARPages: 17.2-7a, 17.2-7c, 17.2-7k
* 7k


Salem UFSAR Change!proved for Incorporation in Revisio'16                                          Page  34 12/16/97
Salem UFSAR Change!proved for Incorporation in Revisio'16                                          Page  34 12/16/97 l
* l I
I CN Number SSAR 97-044 Affected Sections 13.1 Affected Pages/Figuresffables 13.l-3a
CN Number SSAR 97-044 Affected Sections 13.1 Affected Pages/Figuresffables 13.l-3a
: 13. l-3b 13.1-4 13.1~5 Description Reorganization within the Nuclear Engineering Department.
: 13. l-3b 13.1-4 13.1~5 Description Reorganization within the Nuclear Engineering Department.
Initiating or Ref. Document 13.1-6
Initiating or Ref. Document 13.1-6
: 13. l-6a Fl3. l-5 Fl3. l-5a SSAR 97-046  8.1                8.1-7            Free air cable separation in    S-C-ZZ-ESE-0841. rev 2 8.1-9            limited hazard areas SSAR 97-047  6.3                6.3-13            Editorial correction,tPf        Technical Specification T6.3-4            minimum required RWST          Amendments 55 and 83 9,1                9.1-15            volume to bring UFSAR in compliance with Technical Specification 3.1.2.6 and 3.5.5 changes made in accordance with Amendments 55 and 83 SSAR 97-051  13. l            .13.l-6a          Incorporates Technical          Tech Spec amendments 192 13.l-6b          Specification Amendments 192    and I 75 Fl3.l-7          and 175 to relocate Tech Spec Tl3.l-1SH1        section 6.5 to UFSAR section T13.l-1SH2        I 7.2 and change Safety Review 13.4              13.4-1            Group to Nuclear Review 13.4-2            Board.
: 13. l-6a Fl3. l-5 Fl3. l-5a SSAR 97-046  8.1                8.1-7            Free air cable separation in    S-C-ZZ-ESE-0841. rev 2 8.1-9            limited hazard areas SSAR 97-047  6.3                6.3-13            Editorial correction,tPf        Technical Specification T6.3-4            minimum required RWST          Amendments 55 and 83 9,1                9.1-15            volume to bring UFSAR in compliance with Technical Specification 3.1.2.6 and 3.5.5 changes made in accordance with Amendments 55 and 83 SSAR 97-051  13. l            .13.l-6a          Incorporates Technical          Tech Spec amendments 192 13.l-6b          Specification Amendments 192    and I 75 Fl3.l-7          and 175 to relocate Tech Spec Tl3.l-1SH1        section 6.5 to UFSAR section T13.l-1SH2        I 7.2 and change Safety Review 13.4              13.4-1            Group to Nuclear Review 13.4-2            Board.
17.2              17.2-19 17.2-40 17.2-6
17.2              17.2-19 17.2-40 17.2-6
-1 I                                    17.2-7 Fl7.2-l T17.2-l Sh l T17.2-l Sh 2 3A                3A-5 3A-5la 3A-5lb 7.2                7.2-38 7A                7A-4 New SAR Pages: l7.2-7a, l7.2-7b, l7.2-7c, l7.2-7d, l7.2-7e, l7.2-7f, l7.2-7g, l7.2-7h, 17 .2-7i, 17 .2-7j,
-1 I                                    17.2-7 Fl7.2-l T17.2-l Sh l T17.2-l Sh 2 3A                3A-5 3A-5la 3A-5lb 7.2                7.2-38 7A                7A-4 New SAR Pages: l7.2-7a, l7.2-7b, l7.2-7c, l7.2-7d, l7.2-7e, l7.2-7f, l7.2-7g, l7.2-7h, 17 .2-7i, 17 .2-7j, l7.2-7k
* l7.2-7k


1 lI ~
1 lI ~
Line 706: Line 583:
Salem UFSAR Change.pproved for Incorporation in Revisi16
Salem UFSAR Change.pproved for Incorporation in Revisi16
. !*                                                                                                  Page    35 12/16/97
. !*                                                                                                  Page    35 12/16/97
  *1
  *1 Affected      Affected                                          Initiating or CN Number    Sections  Pages/Figu resffables  Description                    Ref. Document SSAR 97-052  7A        . 7A-6                Reconcile UFSAR Section 7 A    License amendments I 14/96 with NRC approved license        and 176/157 amendments 114/96 and 176/157 SSAR 97-054  6.2          F6.2-l 7          Revise to incorporate DCP        DCP 2EC-36 I 2 F6.2-26            2EC-3612 F6.2-38 F6.2-44 T6.2-IO Sh 3 T6.2-IO Sh 8 T6.2-12 Sh 3 SSAR 97-056  6.2          T6.2-6            Revise RHR pump NPSH            Cale# S-C-RHR-MDC-1711 6.3          6.3-9              parameters for recirculation T6.3-13 Sh 2        mode of operation SSAR 97-057  7.2          7.2-32              Revise UF:SAR based on          DCP 2EC-36 I 7 pkg I F7.2-4              changes to Pressurizer pressure 7.5          7.5-4              circuits in accordance with DCP 2EC-36 l 7 pkg l
-
Affected      Affected                                          Initiating or CN Number    Sections  Pages/Figu resffables  Description                    Ref. Document
        ---------
SSAR 97-052  7A        . 7A-6                Reconcile UFSAR Section 7 A    License amendments I 14/96 with NRC approved license        and 176/157 amendments 114/96 and 176/157 SSAR 97-054  6.2          F6.2-l 7          Revise to incorporate DCP        DCP 2EC-36 I 2 F6.2-26            2EC-3612 F6.2-38 F6.2-44 T6.2-IO Sh 3 T6.2-IO Sh 8 T6.2-12 Sh 3 SSAR 97-056  6.2          T6.2-6            Revise RHR pump NPSH            Cale# S-C-RHR-MDC-1711 6.3          6.3-9              parameters for recirculation T6.3-13 Sh 2        mode of operation SSAR 97-057  7.2          7.2-32              Revise UF:SAR based on          DCP 2EC-36 I 7 pkg I F7.2-4              changes to Pressurizer pressure 7.5          7.5-4              circuits in accordance with DCP 2EC-36 l 7 pkg l
'*    SSAR 97-058  11.4        11.4-11            Adds description of a loss of flow alann modification for containment atmosphere DCP I EC-3430 pkg I radiation monitors lR11/lR12.
'*    SSAR 97-058  11.4        11.4-11            Adds description of a loss of flow alann modification for containment atmosphere DCP I EC-3430 pkg I radiation monitors lR11/lR12.
SSAR 97-059  13. I        13.l-6b            Transferred the responsibility 17.2        17.2-5            ofthe Quality Verification.
SSAR 97-059  13. I        13.l-6b            Transferred the responsibility 17.2        17.2-5            ofthe Quality Verification.
Line 717: Line 590:
                                       ;--
                                       ;--
                                           *'        to the Manager - Quality Assessment, Salem/Hope Creek SSAR 97-061  5.2          T5.2-9b            Update to Table 5.2-9b to        PR 970410102 include a note that 23 S/G was designed to ASME Section III, 1965 and all addenda thfough Winter 1995 .
                                           *'        to the Manager - Quality Assessment, Salem/Hope Creek SSAR 97-061  5.2          T5.2-9b            Update to Table 5.2-9b to        PR 970410102 include a note that 23 S/G was designed to ASME Section III, 1965 and all addenda thfough Winter 1995 .
*


'f  >
'f  >
I    Salem UFSAR Chang.lpproved for Incorporation in Revisi!6                                            Page  36
I    Salem UFSAR Chang.lpproved for Incorporation in Revisi!6                                            Page  36
:I    12/16/97
:I    12/16/97 i
* i Affected            Affected                                      Initiating or CN Number      Sections      Pages/Figuresrfables  Description                    Ref. Document I    SSAR 97-063    6.4              6.4-2              Revision to the Control Area  DCP I EC-3505 pkg 11.
Affected            Affected                                      Initiating or CN Number      Sections      Pages/Figuresrfables  Description                    Ref. Document I    SSAR 97-063    6.4              6.4-2              Revision to the Control Area  DCP I EC-3505 pkg 11.
T6.4-3            Ventilation System parameters  SSAR CN 96-031 9.4              9.4-3              based on implementation of DCP I EC-3505 pkg I I
T6.4-3            Ventilation System parameters  SSAR CN 96-031 9.4              9.4-3              based on implementation of DCP I EC-3505 pkg I I
:-;ew SAR Pages: 9.4-4b, 9.4-4d, 9.4-4f SSAR 97-064      13.1              13.1-6          Transfer of Project Managers 13.1-8          and their associated functions 17.2              17.2-19          from Nuclear Engineering to Nuclear Business Support.
:-;ew SAR Pages: 9.4-4b, 9.4-4d, 9.4-4f SSAR 97-064      13.1              13.1-6          Transfer of Project Managers 13.1-8          and their associated functions 17.2              17.2-19          from Nuclear Engineering to Nuclear Business Support.
SSAR 97-065    9.4              9.4-42            Add additional details of SPA V DCP lEC-3701pkg1 9.4-43            system operation at reduced 9.4-44            temperatures.
SSAR 97-065    9.4              9.4-42            Add additional details of SPA V DCP lEC-3701pkg1 9.4-43            system operation at reduced 9.4-44            temperatures.
F9.4-6a SSAR 97-066    8.1              8.1-7            Revise Section 8.1.2.4.2 to    Safety Evaluation S-C-ZZ-address containment free air    ESE-0875, SSAR CN 97-046
F9.4-6a SSAR 97-066    8.1              8.1-7            Revise Section 8.1.2.4.2 to    Safety Evaluation S-C-ZZ-address containment free air    ESE-0875, SSAR CN 97-046 separation SSAR 97-069    6.3              6.3-9            Revises RHR Mode 4 Hot Leg      LCR S97-77 T6.3-6 Sh 3      recirculation alignment.
* separation SSAR 97-069    6.3              6.3-9            Revises RHR Mode 4 Hot Leg      LCR S97-77 T6.3-6 Sh 3      recirculation alignment.
SSAR 97-071    6.3                6.3-34            Revision to RWST draindown      2-EOP-LOCA-3, SSAR CN 6.3-35            analysis                        96-004 6.3-36 6.3-37 T6.3-6 Sh l T6.3-6 Sh 2 T6.3-6 Sh 3 New SAR Pages: 6.3-36a, 63-36b, 6.3-36c SSAR 97-073    6.3              T6.3**13 Sh 2      Revises NPSH for RHR pumps      S-C-RHR-MDC-171 l, Rev.
SSAR 97-071    6.3                6.3-34            Revision to RWST draindown      2-EOP-LOCA-3, SSAR CN 6.3-35            analysis                        96-004 6.3-36 6.3-37 T6.3-6 Sh l T6.3-6 Sh 2 T6.3-6 Sh 3 New SAR Pages: 6.3-36a, 63-36b, 6.3-36c SSAR 97-073    6.3              T6.3**13 Sh 2      Revises NPSH for RHR pumps      S-C-RHR-MDC-171 l, Rev.
on Table 6.3-13 previously      l, SSAR CN 97-056 revised by SSAR CN 97-056 .
on Table 6.3-13 previously      l, SSAR CN 97-056 revised by SSAR CN 97-056 .
*


  ,,.
..      Salem UFSAR Changetproved for Incorporation in Revisi'16 12/16/97 Page    37 i
..      Salem UFSAR Changetproved for Incorporation in Revisi'16 12/16/97 Page    37
Affected        Affected                                      Initiating or CN Number  Sections  Pages/Figuresffables  Description                    Ref. Document SSAR 97-076  9.3          9.3-59          Revise UFSAR Section 9.3.6.1    PR 960723057 to identify that PASS ventilation exhaust is filtered with HEPA filters and not aligned to the charcoal adsorbers.
* i Affected        Affected                                      Initiating or CN Number  Sections  Pages/Figuresffables  Description                    Ref. Document
        --------
SSAR 97-076  9.3          9.3-59          Revise UFSAR Section 9.3.6.1    PR 960723057 to identify that PASS ventilation exhaust is filtered with HEPA filters and not aligned to the charcoal adsorbers.
SSAR 97-079  8.3          8.3-9            Revise description of when      DCP I EC-3438 diesel generator breaker closes after a startup.
SSAR 97-079  8.3          8.3-9            Revise description of when      DCP I EC-3438 diesel generator breaker closes after a startup.
SSAR 97-080 9.4          9.4-42            Revises design basis for CA V  S-l-CAV-MDC-1722, Rev. 0 area maximum temperatures in Normal and Emergency Summer operations.
SSAR 97-080 9.4          9.4-42            Revises design basis for CA V  S-l-CAV-MDC-1722, Rev. 0 area maximum temperatures in Normal and Emergency Summer operations.
Line 746: Line 613:
                                 *3A47              detailed description of Post-    NUMARC/NESP-007 TMI Emergency Preparedness actions and refer to Section 13.3, Emergency Plan.
                                 *3A47              detailed description of Post-    NUMARC/NESP-007 TMI Emergency Preparedness actions and refer to Section 13.3, Emergency Plan.
SSAR 97-087  9.5          9.5-43          Adds description of turbo-boost  DCP I EC-3695 to EOG Starting Air Systeni
SSAR 97-087  9.5          9.5-43          Adds description of turbo-boost  DCP I EC-3695 to EOG Starting Air Systeni
* f
 
!
f Salem UFSAR Change.proved for Incorporation in Revisi.6                                              Page 38
Salem UFSAR Change.proved for Incorporation in Revisi.6                                              Page 38
* 12/16/97
* 12/16/97
* CN Number SSAR 97-091 Affected Sections 12.3 12.4 3.11 Affected
* CN Number SSAR 97-091 Affected Sections 12.3 12.4 3.11 Affected
Line 755: Line 621:
Initiating or Ref. Document 3A                3A-54 3A-55 A                  A-56 A-57 SSAR 97-094  9.4                9.4-2              Revises the Chilled Water        DCP 2EE-03 17 Control Valve 2CH1_68 description in accordance with modifications perfonned under DCP 2EE-03 l 7.
Initiating or Ref. Document 3A                3A-54 3A-55 A                  A-56 A-57 SSAR 97-094  9.4                9.4-2              Revises the Chilled Water        DCP 2EE-03 17 Control Valve 2CH1_68 description in accordance with modifications perfonned under DCP 2EE-03 l 7.
New SAR Pages:  9.4-4a, 9.4-4b SSAR 97-095  9.4                9.4            Implements controls              DCP lEE-0371 F9.4-1A            modifications to the Control Area Air Conditioning System (CAACS).
New SAR Pages:  9.4-4a, 9.4-4b SSAR 97-095  9.4                9.4            Implements controls              DCP lEE-0371 F9.4-1A            modifications to the Control Area Air Conditioning System (CAACS).
New SAR Pages:  9.4-4a: 9.4-4b
New SAR Pages:  9.4-4a: 9.4-4b SSAR 97-096  9.4                9.4-12              Provide new loss-of-power        DCP lEC-3510 9.4-13              damper fail-safe positions for five ABV dampers and new bypass valves for charcoal filter unit 14 outlet damper controls .
* SSAR 97-096  9.4                9.4-12              Provide new loss-of-power        DCP lEC-3510 9.4-13              damper fail-safe positions for five ABV dampers and new bypass valves for charcoal filter unit 14 outlet damper controls .
*


    .,,
Salem UFSAR Change-proved for Incorporation in Revisi.16                                                Page  39
Salem UFSAR Change-proved for Incorporation in Revisi.16                                                Page  39
   "      12/16/97
   "      12/16/97
* CN Number
* CN Number SSAR 97-102
        -------
* Affected Sections 10.3 Affected Pages/Figuresffa~I-~--
SSAR 97-102
* Affected Sections
                        *-----
10.3 Affected Pages/Figuresffa~I-~--
10.3-7 Description Revises the Main Steam Line surveillance test pressure from I000 psig to 800 to I 015 psig.
10.3-7 Description Revises the Main Steam Line surveillance test pressure from I000 psig to 800 to I 015 psig.
Initiating or Ref. Document
Initiating or Ref. Document Engineering Evaluation S-C-MS-MEE-1239 SSAR _97-103      13.1              13.1-1              Reflects NBU organizational
                                                                                                -------
Engineering Evaluation S-C-MS-MEE-1239 SSAR _97-103      13.1              13.1-1              Reflects NBU organizational
: 13. l-2b          change which consolidates
: 13. l-2b          change which consolidates
: 13. l-6a          QA/NSR, Nuclear Training
: 13. l-6a          QA/NSR, Nuclear Training
Line 780: Line 637:
J SSAR 97-108      15.2              15.2-14            Allowable control rod position  LCR 97-19, WCAP-14962-P 15.2-62            deviation for Unit 2 is being 4.3              4.3-23              changed from+/- 12 steps to 7.5              T7.5-2 Sh 8          +/- 18 steps <=85% power and
J SSAR 97-108      15.2              15.2-14            Allowable control rod position  LCR 97-19, WCAP-14962-P 15.2-62            deviation for Unit 2 is being 4.3              4.3-23              changed from+/- 12 steps to 7.5              T7.5-2 Sh 8          +/- 18 steps <=85% power and
                                                                 +/- 12 steps >85% power.
                                                                 +/- 12 steps >85% power.
* Salem UFSAR Chang.!proved for Incorporation in 12/16/97 Revisi~6                                Page  -lO
 
Salem UFSAR Chang.!proved for Incorporation in 12/16/97 Revisi~6                                Page  -lO
* CN Number SSAR 97-111 Affected 1.6 13.1 Affected 1.6-2 1.6-6 13.1-10 13.1-11 Description Change to Operations Department responsibilities and titles Initiating or Ref. Document 13.1-12 13.1-13 13.1-14 13.1-15 13.1-9 Fl3.l-6 F13. l-8a Fl3. l-8b Tl3. I-I Sh I 17.2              17.2-37 9.5                9.5-3
* CN Number SSAR 97-111 Affected 1.6 13.1 Affected 1.6-2 1.6-6 13.1-10 13.1-11 Description Change to Operations Department responsibilities and titles Initiating or Ref. Document 13.1-12 13.1-13 13.1-14 13.1-15 13.1-9 Fl3.l-6 F13. l-8a Fl3. l-8b Tl3. I-I Sh I 17.2              17.2-37 9.5                9.5-3
                 ~e:N SAR Pages: 6.4-la, 9.4-la SSAR 97-113    15.4              Tl5.4-21sh16  Description of fiberglass
                 ~e:N SAR Pages: 6.4-la, 9.4-la SSAR 97-113    15.4              Tl5.4-21sh16  Description of fiberglass
Line 787: Line 645:
* Prevention and the General Manager - Salem Operations will assume responsibility for Nuclear Security.
* Prevention and the General Manager - Salem Operations will assume responsibility for Nuclear Security.
J SSAR 97-118    17.2              17.2-16      Removes the statement              Regulatory Guide 1.64 specifying a Nuclear Engineering Manual and clarifies that Nuclear Engineering Procedures provide implementation guidance .
J SSAR 97-118    17.2              17.2-16      Removes the statement              Regulatory Guide 1.64 specifying a Nuclear Engineering Manual and clarifies that Nuclear Engineering Procedures provide implementation guidance .
*


   )l I .,,,
   )l I .,,,
Line 795: Line 652:
SSAR97-121    17.2                17.2-19        Nomenclature and                NC.DE-AP.ZZ-0004 (Q) responsibility changes for the process of updating and approving design drawings.
SSAR97-121    17.2                17.2-19        Nomenclature and                NC.DE-AP.ZZ-0004 (Q) responsibility changes for the process of updating and approving design drawings.
SSAR 97-122  13.l                13.l-6b        Consolidation of Manager -
SSAR 97-122  13.l                13.l-6b        Consolidation of Manager -
: 13. 1-7        Corrective Action with 13.1-8        Managers Emergency 17.2                17.2-4        Preparedness and Instructional 17.2-5        Technology. New Manager
: 13. 1-7        Corrective Action with 13.1-8        Managers Emergency 17.2                17.2-4        Preparedness and Instructional 17.2-5        Technology. New Manager Fl7.2-I        title: Manager - Corrective Action, Emergency Preparedness and lnstri.ictional Technology. Also moves Quality Service functions from Manager - Corrective Action to Director - Quality, Nuclear Training and Emergency
* Fl7.2-I        title: Manager - Corrective Action, Emergency Preparedness and lnstri.ictional Technology. Also moves Quality Service functions from Manager - Corrective Action to Director - Quality, Nuclear Training and Emergency
!                                                          Preparedness.
!                                                          Preparedness.
i                    New SAR Pages: I 7 .2-4a 1
i                    New SAR Pages: I 7 .2-4a 1
j SSAR 97-125  3.6                                Correction of IEEE Standard 279-1968 incorrectly listed as "179- I 968."
j SSAR 97-125  3.6                                Correction of IEEE Standard 279-1968 incorrectly listed as "179- I 968."
SSAR 97-128  17.2                17.2-15        Revise NDE and VT                SER TAC examination personnel training  69082/69043/69044 assessment period to be consistent with ASME Section XI requirements .
SSAR 97-128  17.2                17.2-15        Revise NDE and VT                SER TAC examination personnel training  69082/69043/69044 assessment period to be consistent with ASME Section XI requirements .
* Salem UFSAR Change!proved for Incorporation in                    Revisio~                            Page  42 12/I 6197
 
Salem UFSAR Change!proved for Incorporation in                    Revisio~                            Page  42 12/I 6197
* CN Number SSAR 97-132 Affected Sections 3.8 Affected Pages/Figures/Tables F3.8-36 Description Revise Personnel Airlock general arrangement figure to remove unecessary detail.
* CN Number SSAR 97-132 Affected Sections 3.8 Affected Pages/Figures/Tables F3.8-36 Description Revise Personnel Airlock general arrangement figure to remove unecessary detail.
Initiating or Ref. Document SSAR 97-134                                              Clarifies qualification requirements for Onsite Independent Reviewers (OIR) and makes an editorial correction to QA review of selected station procedures.
Initiating or Ref. Document SSAR 97-134                                              Clarifies qualification requirements for Onsite Independent Reviewers (OIR) and makes an editorial correction to QA review of selected station procedures.

Revision as of 04:58, 3 February 2020

Forwards Rev 16 to Salem Generating Station UFSAR IAW Requirements of 10CFR50.71(e).Rev Contains Identified Text, Table & Figure Changes Required to Reflect Plant Configuration as of 970731
ML18106A298
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/30/1998
From: Storz L
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18106A299 List:
References
LR-N980049, NUDOCS 9802100046
Download: ML18106A298 (77)


Text

--

  • Public Service Electric and Gas Company Louis F. Storz Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700 Senior Vice President - Muc!ear Operations JAN 3 0 1998 LR-N980049 United States Nuclear Regulatory Commission PSE&G Document Control Desk CONTROL Washington, DC 20555 Gentlemen: COPY # (Jj UPDATED FINAL SAFETY ANALYSIS REPORT, REVISION 16 SALEM GENERATING STATION UNITS 1 AND 2 DOCKET 'NOS. 50-272 and 50-311 Public Service Electric and Gas Company (PSE&G) hereby submits Revision No. 16 to the Salem Generating Station Updated Final Safety Analysis Report (UFSAR) in accordance with the requirements of 10CFR50.71(e).

Revision No. 16 to the Salem UFSAR contains identified text, table and figure changes required to reflect the plant configuration as of July 31, 1997, six months prior to this submittal. In addition, there are corrections of typographical errors and general editorial changes. A brief summary and explanation of each change is provided in an attachment to facilitate your review.

Revision No. 16 is being issued 19 months after the prior full Revision No. 15, which was issued on June 12, 1996. The Salem UFSAR revisions are normally planned for

~ix months after the Salem Unit 1 refueling outages; however, this revision incorporates plant configuration changes resulting from the Unit 2 extended outage which ended in July, 1997 and to satisfy the 24 month maximum revision limit.

Should there be any questions with regard to this submittal, please do not hesitate to contact us.

Sincerely,

?~";, -f~

_,, [<;

9802100046 980130 PDR ADOCK 05000272 Ans~ ****,,**

111111111111111111111111111111111111\lll K PDR

~ Printedon 1\\1

~ Recycled Paper

Document Control Desk 2

  • JAN 3O1998 LR-N980049 Attachments:

- Affidavit

- Summary of Salem UFSAR Revision 16 Changes

- Salem UFSAR Revision No. 16 C Document Control Desk - Original & ten copies Mr. Hubert J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Patrick Milano, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans - Salem (X24)

USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV Bureau of Nuclear Engineering PO Box415 Trenton, NJ 08625

Document Control Desk 3 LR-N980049

/rbk BC (w/o attachments):

CNO & President - Nuclear Business Unit (N09)

Senior Vice President - Nuclear Engineering (N19)

Director - QA/NT/EP (120)

Director - Licensing I Regulation and Fuels (N21)

General Manager - Salem Operations (S05)

Manager - Nuclear Review Board (N38)

Manager - Joint Owners/Ext Aff Interface (N28)

Licensing Operational Manager - Salem (N21)

J. Keenan, Esq. (N21)

(w/ attachments except Salem UFSAR Revision No. 16):

Records Management Microfilm File Nos. 1.2.1, 2.1.3 95-4933

COUNTY OF SALEM L. F. Storz, being duly sworn, states that he is Senior Vice President - Nuclear Operations of Public Service Electric and Gas CGmpany, that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this certificatio11; and that in accordance with 10CFR50.71(e)(2), the information contained in the attached letter and Updated Final Safety Analysis Report accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement, and contains an identification of changes made under the provisions of 10CFRS0.59 but not previously submitted to the Commission.

~

Subjl:)ed and Sworn to before me this I a th day Of January, 1998 My Commission expires on April 21, 1998 KIMBERLY JO BROWN NOTARY PUBLIC OF NEW JERSEY My Commission Expires April 21, 1998

r'* .PUBLIC SERVICE ELECTRIC & S COMPANY

. 01/31/98 DOCUMENT DISTRIBUTION NOTICE PAGE ],. ;OF 1

~';1r.f

... *...-.. i*

TRANSMITT~L: ~pG QQ26292 TO: NUCLEAR REGULATORY COMMISSION 'ir0(f26292't1: ;

DOCUMENT CONTROL DESK COPYHOLDER: SFSR0008 *.}~h ';' '

WASHINGTON, DC 20555 DESCRIPTION: LEC/985 REV 16 ~~~ FS~'

  • r . *.tr:~s-H,::. ~ ~:t .

~ *:-Ji(~*~~. . :.

PLEASE INSERT THE FOLLOWING DOCUMENTS INTO YOUR CONTROLLED FI~~/~NUAL. **

SUPERCEDED DOCUMENTS MUST BE SO MARKED AND PHYSICALLY REMOVEO. ~OR~'PESTRQYED.

~- :-:~.~~ ~

  • -A; .

SHT/

CLASS DOCUMENT ID VOL INST REV STAT TYPE

-.,-,!'l.\" ... --

PROC SFSR-LOEP 000 016 A SFSR ri?r *QQl

.J : .

1 '  !

..: .. ~*

*J THIS ACKNOWLEDGEMENT RECEIPT MUST BE RETURNED WITHIN 5 WQRKI.NG DAXS TO:

PSE&G DMG/MC N04 PO BOX 236 HANCOCKS BRIDGE, NJ 08038 YOUR SIGNATURE BELOW VERIFIES THAT (1) THE ABOVE DOCUMENTS HAVE.B~EN FIL.ED AND SUPERSEDED DOCUMENTS HAVE BEEN REMOVED AND DESTROYED OR CLEARL_*~rKED AS OBSOLETE (2) THE MAILING ADDRESS AND COPYHOLDER INFORMATION AR~ OR~CT OR CORRECTIONS HAVE BEEN IDENTIFIED ON THIS TRANSMITTAL. _; -,

SEE MY INSTRUCTIONS ABOVE CHANGE COPYHOLDER INFORMATION  : *.

REMOVE FROM DISTRIBUTION (DOCUMENTS MUST BE RETURNED)

COPYHOLDER SIGNATURE:

Public Service Electric and Gas Company i Louis F. Storz Public Service Electric and Gas Company 609-339-5700 .*

P.O. Box 236, Hancocks Bridge, NJ 08038 Senior Vice President

  • Nuclear Operations JAN 30 1998 LR-N980049 United States Nuclear Regulatory Commission PSE&G Document Control Desk Washington, DC 20555 CONTROL
  • i I

Public Service Electric and Gas Company (PSE&G) hereby submits Revision No. 16 to the Salem Generating Station Updated Final Safety Analysis Report (UFSAR) in accordance with the requirements of 10CFR50.71(e). *

  • Revision No. 16 to the Salem UFSAR contains identified text, table and figure changes required to reflect the plant configuration as of July 31, 1997, six months prior to this submittal. In addition, there are corrections of typographical errors and general editorial changes. A brief summary and explanation of each change is provided in an attachment to facilitate your review.

Revision No. 16 is being issued 19 months after the prior full Revision No. 15, which was issued on June 12, 1996. The Salem UFSAR revisions are normally planned for six months after the S~lem Unit 1 refueling outages; however, this revision incorporates plant configuration d'lahg~s resulting from the Unit 2 extended outage which ended in July, 1997 -a_nd. to

$atisfY*

~ -. -.

the 24 month maximum revision limit.

Should the*r~ *b_f:t ani_qµe~tions with regard to this submittal, please do not hesitate to contact us~* - * "::-;;(*: ,-:f~.,~~'* ***

- _;;, *'!f ---------~ -

  • l1>t.. Printed on

~ Recycled Paper

Document Control Desk

  • JAN 301998 2

LR-N980049 I

Attachments:

-Affidavit

- Summary of Salem UFSAR Revision 16 Changes

- Salem UFSAR Revision No. 16 C Document Control Desk - Original & ten copies Mr. Hubert J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Patrick Milano, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission

. i 1 One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans - Salem (X24)

USNRC Senior Resident Inspector Mr. K Tosch, Manager, IV Bureau of Nuclear Engineering PO Box415 Trenton, NJ 08625

  • 1

-1 I

-1 I

I

REF: LR-N980049 STATE OF NEW JERSEY )

) SS.

COUNTY OF SALEM )

L. F. Storz, being duly sworn, states that he is Senior Vice President - Nuclear Operations of Public Service Electric and Gas CGmpany, that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this certification; and that in accordance with 10CFRS0.71 (e)(2), the information contained in the attached letter and Updated Final Safety Analysis Report accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement, and contains an identification of changes made under the provisions of 10CFRS0.59 but not ,previously submitted to the Commission.

~~

Sub.:JZ)ed and Sworn to before me this f:).._ th day of January, 1998 My Commission _expires on* April 21, 1998

' *? . *. . '.

KIMBERLY JO.BROWN~*

NOTARY PUBLIC OF-NEW.*JERSEV My Commission* Expires April 21, 1998

J i

  • 1 j ~

Document Control Desk 3

~

LR-N980049

/rbk BC (w/o attachments):

CNO & President - Nuclear Business Unit (N09)

Senior Vice President - Nuclear Engineering (N19)

Director - QA/NT/EP (120)

Director - Licensing I Regulation and Fuels (N21)

General Manager - Salem Operations (SOS)

Manager - Nuclear Review Board (N38)

Manager - Joint Owners/Ext Aff Interface (N28)

Licensing Operational Manager - Salem (N21)

J. Keenan, Esq. (N21)

(w/ attachments except Salem UFSAR Revision No. 16):

Records Management Microfilm File Nos. 1.2.1, 2.1.3

  • 95-4933

Remove pages, tables, and/or figures listed in the REMOVE column and replace them with the pages, tables, and/or figures listed in the INSERT column. Dashes (---)

in either column indicate no action required.

Vertical bars have been placed in the margins of inserted pages and tables to indicate revision locations.

II-1 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

.INSERTION INSTRUCTIONS INSERT VOLUME 1 List of Current Pages List of Current Pages All Sheets All Sheets 1.1-1/1.1-2 1.1-1/1.1-2

1. 6-lb/l. 6-2 1. 6-lb/l. 6-2
1. 6-3/1. 6-4 i . 6-3 / i . 6-4
1. 6-5/1. 6-6 1. 6-5/1. 6-6 2-iii/2-iv 2-iii/2-iv 2-vii/2-viii 2-vii/2-viii 2.2-9/2.2-10 2.2-9/2.2-10 2.2-12a/2.2-12b 2.2-12a/2.2-12b 2.2-15 2.2-15 T 2.2-2 T 2.2-2 Sh 1 Sh 1 Sh 2 Sh 2 T 2.2-3 T 2.2-3 T 2.2-4 T 2.2-4 Sh 1 Sh 1 Sh 2 Sh 2 2.3-11/2.3-12 2.3-11/2.3-12 2.3-13/2.3-14 2.3-13/2.3-14 2.3-14a/2.3.:..14b 2.3-15 2.3-15 T 2.3-21 T 2.3-22 2.4-5/2.4-6 2.4-5/2.4-6 3-i/3-ii 3-i/3-ii 3-vii/3-viii 3-vii/3-viii 3-xi/3-xii 3-xi/3-xii 3-xxi 3-xxi 3.1-3/3.1-4 3.1-3/3.1-4 3.1-9/3.1-10 3.1-9/3.1-10 3.4-5/3.4-6 3.4-5/3.4-6 3.5-3/3.5-4 3.5-3/3.5-4 3.5-5/3.5-6 3.5-5/3.5-6 3.5-11/3.5-12 3.5-11/3.5-12 3.5-13/3.5-14 3.5-13/3.5-14 II-2 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT-3.5-15/3.5-16 3.5-15/3.5-16 3.5-17/3.5-18 3. 5"."'17 /3. 5-18 3.5-19/3.5-20 3.5-19/3.5-20 3.5-21/3.5-22 3.5-21/3.5-21a 3.5-2lb/3.5-21c 3.5-2ld/3.5-22 T 3.5-1 T 3.5-1 T3.5-2 T 3.5-2 T 3.5-3 T 3.5-3 F 3.5-6A F 3.5-7 F 3.5-7 3.6-9/3.6-9a 3.6-9/3.6-9a 3.6-11/3.6-12 3.6-11/3.6-12 3.6-17/3.6-18 3.6-17/3.6-18 3.6-19/3.6-20 3.6-19/3.6-20 3.6-21/3.6-22 3.6-21/3.6,-21a 3.6-21b/3.6-22 3.6-23/3.6-24 3.6-23/3.6-24 3.6-25/3.6-26 3.6-25/3.6-26 3.6-27/3.6-28 3.6-27/3.6-28 3.6-29/3.6-30 3.6-29/3.6,...30 3.6-35/3.6-36 3.6-35/3.6-36 3.6-36a/3.6-36b 3.6-39/3.6-40 3.6-39/3.6-40 3.6-41/3.6-42 3.6-41/3.6-42 3.6-43/3.6-44 3.6-43/3.6-44 3.6-55 3.6-55 T 3.6-2 T 3.6-2 F 3.6-10 F 3.6-10 F 3.6-28 F 3.6-28 VOLUME 2 3.7-5/3.7-6 3.7-5/3.7-6 3.7-29/3.7-30 3.7-29/3.7-30 3.8-1/3.8-2 3.8-1/3.8-2 3.8-29/3.8-30 3.8-29/3.8-30 3.8-65/3.8-66 3.8-65/3.8-66 3.8-75/3.8-76 3.8-75/3.8-76 3.8-77/3.8-77a 3.8-77/3.8-78 3.8-77b/3.8-78 II-3 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT 3.8-79/3.8-80 3.8-79/3.8-79a 3.8-79b/3.8-80 3.8-81/3.8-82 3.8-81/3.8-82 F 3.8-36 F 3.8-36 3A-5/3A-6 3A-5/3A-6 3A-7b/3A-8 3A-7b/3A-8 3A-9/3A-10 3A-9/3A-10 3A-15/3A-16 3A-15/3A-16 3A-23/3A-23a 3A-23/3A-23a 3A-25/3A-26 3A-25/3A-26 3A-37/3A-38 3A-37/3A-38 3A-39/3A-40 3A-39/3A-40 3A-45/3A-46 3A-45/3A-46 3A-47/3A-48 3A-47/3A-48 3A-49/3A-50 3A-49/3A-50 3A-51/3A-5la 3A-51/3A-5la 3A-5lb/3A-52 3A-5lb/3A-52 3A-53/3A-54 3A-53/3A-54 3A-55 3A-55 F 3A-3 F 3A-3 F 3A-4 F 3A-4 T 4.1-1 T 4.1-1 Sh 1 Sh 1 4.2-53/4.2-54 4.2-53/4.2-54 4.2-55/4.2-56 4.2-55/4.2-56 4.2-79/4.2-80 4.2-79/4.2-80 4.3-23/4.3-24 4.3-23/4.3-24 4.5-2K/4.5-2L 4.5-2K/4.5-2L VOLUME 3 5.1-7/5.1-8 5.1-7/5.1-8 F 5.l-6A F 5.1-6A Sh 1 Sh 1 Sh 2 Sh 2 F 5.l-6B F 5.l-6B Sh 1 Sh 1 Sh 3 Sh 3 5.2-13/5.2-14 5.2-13/5.2-14 5.2-15/5.2-16 5.2-15/5.2-16 5.2-63/5.2-64 5.2-63/5.2-64 II-4 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT 5.2-69/5.2-70 5.2-69/5.2-70 5.2-71/5.2-72 5.2-71/5.2-72 5.2-73/5.2-74 5.2-73/5.2-74 T 5.2-3 T 5.2-3 Sh 2 Sh 2 T 5.2-4 T 5.2-4 T 5.2-9B T 5.2-9B 5.3-1/5.3-2 5.3-1/5.3-2 5.4-13/5.4-14 5.4-13/5.4-14 5.5-5/5.5-6 5.5-5/5.5-6 5.5-11/5.5-12 5.5-11/5.5-12 5.5-43/5.5-44 5.5-43/5.5-44 T 5.5-2 T 5.5-2 Sh 1 Sh 1 Sh 2 Sh 2 F 5.5-2A F 5.5-2A Sh 1 Sh 1 Sh 2 Sh 2 F 5.5-2B F 5.5-2B Sh 1 Sh 1 Sh 2 Sh 2 5.6-1/5.6-la 5.6-1/5.6-la 5.6-3/5.6-4 5.6-3/5.6-4 5.6-5/5.6-6 5.6-5/5.6-6 6-iii/6-iv 6-iii/6-iv 6-v/6-vi 6-v/6-vi 6-vii/6-viii 6-vii/6-viii 6.2-9/6.2-10 6.2-9/6.2-10 6.2-11/6.2-12 6.2-11/6.2-12 6.2-15/6.2-16 6.2-15/6.2-16 6.2-21/6.2-22 6.2-21/6.2-22 6.2-23/6.2-24 6.2-23/6.2-24 6.2-31/6.2-32 6.2-31/6.2-32 6.2-33/6.2-34 6.2-33/6.2-34 6.2-37/6.2-38 6.2-37/6.2-38 6.2-43/6.2-44 6.2-43/6.2-44 6.2-51/6.2-52 6.2-51/6.2-52 6.2-53/6.2-54 6.2-53/6.2-54 6.2-55/6.2-56 6.2-55/6.2-56 6.2-57/6.2-58 6.2-57/6.2-58 6.2-59/6.2-60 6.2-59/6.2-59a II-5 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT 6.2-59b/6.2-60 6.2-61/6.2-62 6.2-61/6.2-62 6.2-65/6.2-66 6.2-65/6.2-66 6.2-67/6.2-68 6.2-67/6.2-68 6.2-85 6.2-85 T 6.2-6 T 6.2-6 T 6.2-9 T 6.2-9 T 6.2-10 T 6.2-10 Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 Sh 4 Sh 5 Sh 5 Sh 6 Sh 6 Sh 7 Sh 7 Sh 8 Sh 8 Sh 9 Sh 9 Sh 10 Sh 10 Sh 11 Sh 11 Sh 12 Sh 12
  • T 6.2-11 T 6.2-11 T 6.2-12 T 6.2-12 Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 T 6.2-13 T 6.2-13 Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 4 F 6.2.4B F 6.2.4B F 6.2-16 F 6.2-16 F 6.2-18 F 6.2-18 F 6.2-19 F 6.2-19 F 6.2-21 F 6.2-21 F 6.2-22 F 6.2-22 F 6.2-23 F 6.2-23 F 6.2-24 F 6.2-24 F 6.2-29 F 6.2-29.

F 6.2-30 F 6.2-30.

F 6.2-31 F 6.2-31 F 6.2-32 F 6.2-32 II-6 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT F 6.2-33 F 6.2-33 F 6.2-34 F 6.2-34 F 6.2-39 F 6.2-39 F 6.2-40 F 6.2-40 F 6.2-41 F 6.2-41 F 6.2-42 F 6.2-42 F 6.2-43 F 6.2-43*

F 6.2-45C F 6.2-45C F 6.2-450 F 6.2-450 6.3-5/6.3-6 6.3-5/6.3-6

.6.3-9/6.3-10 6.3-9/6.3-10 6.3-13/6.3-14 6.3-13/6.3-14 6.3-15/6.3-16 6.3-15/6.3-16 6.3-21/6.3-22 6.3-21/6.3-22 6.3-31/6.3-32 6.3-31/6.3-32 6.3-33b/6.3-34 6.3-33b/6.3-34 6.3-35/6.3-36 6.3-35/6.3-36

) 6.3-36a/6.3-36b 6.3-36c/6.3-36d 6.3-37/6.3-38 6.3-37/6.3-38 6.3-41/6.3-42 6.3-41/6.3-42 6.3-43/6.3-44 6.3-43/6.3-44 6.3-49/6.3-50 6.3-49/6.3-50 6.3-53/6.3-54 6.3-53/6.3-54 6.3-61/6.3-62 6.3-61/6.3-62 6.3-63/6.3-64 6.3-63/6~3-64 T 6.3-4 T 6.3-4 T 6.3-5 T 6.3-5 T 6.3-6 T 6.3-6 Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 T 6.3-7 T 6.3-7 T 6.3-8 T 6.3-8 Sh 1 Sh 1 Sh 2 T 6.3-12 T 6.3-12 T 6.3-13 T 6.3-13 Sh 1 Sh 1 Sh 2 Sh 2 II-7 SGS-UFSAR Revision 16 January 31, 1998

Remove F 6.3-lA Sh 1

  • INSERTION INSTRUCTIONS
  • In _

F 6.3-lA Sh 1

  • Sh 2 Sh 3 Sh 4 F 6.3-lB Sh 1 Sh 2 Sh 3 Sh 4 F 6.3-lB Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 Sh 4 VOLUME 4 6.4-1/6.4-2 6.4-1/6.4-la 6.4-lb/6.4-lc 6.4-ld/6.4-2 6.4-3/6.4-4 6.4-3/6.4-4 6.4-4a/6.4-4b 6.4-5 6.4-5 T 6.4-2 T 6.4-2 Sh 1 Sh 1
  • Sh 2 T 6.4-3 7-iii/7-iv 7 .1-11/7 .1-lla 7.l-llb/7.1-12 T 6.4-3 7-iii/7-iv 7 .1-11/7 .1-12 7.1-13/7.1-14 7.1-13/7.1-14
7. 2-11/7. 2-12 7.2-11/7.2-12 7.2-23/7.2-24 7.2-23/7.2-24 7.2-31/7.2-32 7.2-31/7.2-32 7.2-37/7.2-38 7.2-37/7.2-38 T 7.2-1 T 7.2-1 Sh 2 Sh 2 Sh 5 Sh 5 F 7.2-5 F 7.2-5 7~3-3/7.3-4 7.3-3/7.3-4 7.3-5/7.3-6 7.3-5/7.3-6 7.3-7/7.3-8 7.3-7/7.3-8 7.3-19/7.3-20 7.3-19/7.3-20 7.3-27/7.3-28 7.3-27/7.3-28 T 7.3-2 T 7.3-2 7.3-29/7.3-30 7.3-29/7.3-30 II-8 SGS-UFSAR Revision 16 Januarv 31. 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT T 7.3-3 T 7.3-3 Sh 1 Sh 1 Sh 2 Sh 2 T 7.3-4 T 7.3-4 Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 Sh 4 Sh 5 Sh 5 Sh 6 Sh 6 Sh 7 Sh 7 Sh 8 Sh 8 Sh 9 Sh 9 Sh 10 Sh 10 Sh 12 Sh 12 Sh 13 Sh 13 Sh 13a Sh 14 Sh 14 Sh 15 Sh 15 Sh 16 Sh 16 Sh 17 Sh 17 Sh 23 Sh 23 Sh 24 Sh 24 Sh 25 Sh 25 Sh 26 Sh 26 Sh 27 Sh 27 Sh 28 Sh 28 Sh 29 Sh 29 Sh 30 Sh 30 Sh 31 Sh 31 Sh 32 Sh 32 Sh 33 Sh 33 Sh 34 Sh 34 Sh 35 Sh 35 Sh 36 Sh 36 Sh 37 Sh 37 Sh 38 Sh 38 Sh 39 Sh 39 Sh 40 sh 40 Sh 41 Sh 41 Sh 42 Sh 42 Sh 43 Sh 43 II-9 SGS-UFSAR Revision 16 January 31, 1998
  • INSERTION INSTRUCTIONS REMOVE INSERT Sh 44 Sh 44 Sh 45 Sh 45 Sh 46 Sh 46 Sh 47 Sh 47 T 7.3-5 T 7.3-5 Sh 1 Sh 1 Sh 3 Sh 3 Sh 5 Sh 5 Sh 6 Sh 6 Sh 7 Sh 7 Sh 9 Sh 9 Sh 13 Sh 13 Sh 15 Sh 15 T 7.3-6 T 7.3-6 Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 Sh 4 Sh 5 Sh 5 Sh 6 Sh 6 Sh 7 Sh 7 Sh 8 Sh 8 Sh 9 Sh 9 Sh 10 Sh 10 Sh 13 Sh 13 Sh 14 Sh 14 T 7.3-7 T 7.3-7 Sh 1 Sh 1 Sh 2 Sh 2 F 7.3-4 F 7.3-4 7.5-1/7.5-2 7.5-1/7.5-2 7.5-3/7.5-4 7.5-3/7.5-4 T 7.5-1 T 7.5-1 Sh 4 Sh 4 T 7.5-2 T 7.5-2 Sh 8 Sh 8 T 7.5-3 T 7.5-3 T 7.5-4 T 7.5-4 Sh 2 Sh 2 Sh 4 Sh 4 Sh 5 Sh 5 II-10 SGS-UFSAR Revision 16 January 31, 1998
  • INSERTION INSTRUCTIONS REMOVE INSERT T 7.5-5 T 7.5-5 Sh 2 Sh 2 Sh 3 Sh 3 7.6-5/7.6-6 7.6-5/7.6-6 7.6-7/7.6-8 7.6-7/7.6-8 7.7-3/7.7-4 7.7-3/7.7-4 7.7-5/7.7-6 7.7-5/7.7-6 7.7-7/7.7-8 7.7-7/7.7-8 7.7-13/7.7-14 7.7-13/7.7-14 7.7-17/7.7-17a 7.7-17/7.7-17a 7.7-21/7.7-21a 7.7-21/7.7-21a 7.7-27/7.7-28 7.7-27/7.7-28 F 7.7-2 F 7.7-2  :'..

j' 7A-3/7A-4 7A-3/7A-4 7A-5/7A-6 7A-5/7A-6 I*

8-i/8-ii 8-i/8-ii 8-iii 8-iv 8-iii 8-iv I

8.1-3/8.1-4 8.1-3/8.1-4 8.1-7/8.1-8 8.1-7/8.1-8 8.1-9/8.1-10 8.1-9/8.1-10 8.1-11/8.1-12 8.1-11/8.1-lla 8.1-llb/8.1-12 8.3-1/8.3-2 8.3-1/8.3-2 8.3-3/8.3-4 8.3-3/8.3-4 8.3-5b/8.3-6 8.3-5b/8.3-6 8.3-6a/8.3-6b 8.3-9/8.3-10 8.3-9/8.3-10 8.3-13/8.3-14 8.3-13/8.3-14 8.3-17/8.3-18 8.3-17/8.3-18 8.3-19/8.3-20 8.3-19/8.3-20 T 8.3-5 T 8.3-5 T 8.3-6 T 8.3-6 F 8.3-2 F 8.3-2 F 8.3-3A F 8.3-3A F 8.3-38 F 8.3-38 F 8.3-4 F 8.3-4 F 8.3-4A F 8.3-4A F 8.3-48 F 8.3-48 II-11 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT F 8.3-5 F 8.3-5 Sh 1 Sh 1 Sh 2 Sh 2 F 8.3-6 F 8.3-6 Sh 2 Sh 2 9-v/9-vi 9-v/9-vi 9-xib/9-xii 9-xib/9-xii 9.l-3b/9.1-4 9.l-3b/9.l-4 9.1-13/9.1-14 9.1-13/9.1-14 9.1-15/9.1-16 9.1-15/9.1-16 9.1-29/9.1-30 9.1-29/9.1-30 9.1-31/9.1-32 9.1-31/9.1-32 9.1-33/9.1-34 9.1-33/9.1-34 T 9.1-2 T 9.1-2 Sh 1 Sh 1 F 9.1-1 F 9.1-1 F 9.1-4A F 9.l-4A F 9.1-48 F 9.1-48 9.2-1/9.2-2 9.2-1/9.2-2 9.2-3/9.2-4 9.2-3/9.2-4 9.2-6a/9.2-6b 9.2-6a/9.2-6b 9.2-9/9.2-9a 9.2-9/9.2-9a 9.2-9b/9.2-10 9.2-9b/9.2-10 9.2-13/9.2-14 9.2-13/9.2-14 9.2-21/9.2-22 9.2-21/9.2-22 T 9.2-1 T 9.2-1 T 9.2-3 T 9.2-3 T 9.2-4 T 9.2-4 Sh 1 Sh 1 F 9.2-lA F 9.2-lA Sh 1 Sh 1 Sh 2 Sh 2 Sh 4 Sh 4 Sh 5 Sh 5 Sh 6 Sh 6 F 9.2-18 F 9.2-18 Sh 1 . Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 II-12 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT Sh 4 Sh 4 Sh 5 Sh 5 Sh 6 Sh 6 F 9.2-2B F 9.2-2B F 9.2-4A F 9.2-4A Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 F 9.2-4B F 9.2-4B Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 F 9.2-11 F 9.2-11 Sh 5 Sh 5 Sh 6 Sh 6 Sh 7 Sh 7 VOLUME 5 9.3-1/9.3-2 9.3-1/9.3-2 9.3-31/9.3-32 9.3-31/9.3-32 9.3-33/9.3-34 9.3-33/9.3-34 9.3-47/9.3-48 9.3-47/9.3-48 9.3-59/9.3-60 9.3-59/9.3-60 9.3-61/9.3-62 9.3-61/9.3-62 9.3-63 9.3-63 T 9.3-4 T 9.3-4 T 9.3-6 T 9.3-6 Sh 12 Sh 12 F 9.3-lA F 9.3-lA Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 Sh 4 F 9.3-lB F 9.3-lB Sh 1 Sh 1 Sh 2 Sh 2 F 9.3-2A F 9.3-2A Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 II-13 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT F 9.3-2B F 9.3-2B Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 F 9.3-2C F 9.3-2C F 9.3-3A F 9.3-3A Sh 2 Sh 2 F 9.3-3B F 9.3-3B Sh 1 Sh 1 Sh 3 Sh 3 F 9.3-4A F 9.3-4A Sh 1 Sh 1 F 9.3-4B F 9.3-4B Sh 1 Sh 1 Sh 3 Sh 3 F 9.3-5A F 9.3-5A Sh 1 Sh 1 Sh 2 Sh 2 F 9.3-5b F 9.3-5b Sh 1 Sh 1 F 9.3-6A F 9.3-6A Sh 1 Sh 1 Sh 2 Sh 2 F 9.3-6B F 9.3-6B Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 F 9.3-7A F 9.3-7A Sh 1 Sh 1 Sh 2 Sh 2 F 9.3-7B F 9.3-7B Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 F 9.3-SB F 9.3-BB 9.4-1/9.4-la 9.4-1/9.4-la 9.4-lb/9.4-2 9.4-lb/9.4-2 9.4-3/9.4-4 9.4-3/9.4-4 9.4-4a/9.4-4b 9.4-4c/9.4-4d 9.4-4e/9.4-4f 9.4-5/9.4-6 9.4-5/9.4-6 II-14 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS

.INSERT 9.4-7/9.4-8 9.4-7/9.4-8 9.4-8a/9.4-8b 9.4-9/9.4-10 9.4-9/9.4-10 9.4-11/9.4-12 9.4-11/9.4-12 9.4-13/9~4-14 9.4-13/9.4-14 9.4-15/9.4-16 9.4-15/9.4-16 9.4-17/9.4-18 9.4-17/9.4-18 9.4-19/9.4-20 9.4-19/9.4-20 9.4-25/9.4-26 9.4-25/9.4-26 9.4-27/9.4-28 9.4-27/9.4-28 9.4-29/9.4-30 9.4-29/9.4-30 9.4-33/9.4-34 9.4-33/9.4-34 9.4-35/9.4-36 9.4-35/9.4-36 9.4-37/9~4-38 9.4-37/9.4-38 9.4-39/9.4-39a 9.4-39/9.4-39a 9.4-41/9.4-42 9.4-41/9.4-42 9.4-43/9.4-44 9.4-43/9.4-44 9.4-45/9.4-46 9.4-45/9.4-46 F 9.4-lA F 9.4-lA F 9.4-lB F 9.4-lB F 9.4-2A F 9.4-2A Sh 1 Sh 1 F 9.4-2B F 9.4-2B Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 F 9.4-3B F 9.4-3B F 9.4-4A F 9.4-4A Sh 2 Sh 2 F 9.4-4B F 9.4-4B Sh 1 Sh 1 Sh 2 Sh 2 F 9.4-6A F 9.4-6A F 9.4-6B F 9.4-6B 9.5-3/9.5-4 9.5-3/9.5-4 9.5-21/9.5-22 9.5-21/9.5-22

9. 5-37 /9. 5-3.8 9.5-37/9.5-38 9.5-39/9.5-40 9.5-39/9.5-40 9.5-41/9.5-42 9.5-41/9.5-42 9.5-43/9.5-44 9.5-43/9.5-44 9.5-45/9.5-46 9.5-45/9.5-46 II-15 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT F 9.5-2 F 9.5-2 Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 10-i/10-ii 10-i/10-ii 10-iii/10-iv 10-iii/10-iv 10.2-1/10.2-2 10.2-1/10.2-2 10.2-5/10.2-6 10.2-5/10.2-6 10.2-11/10.2-12 10.2-11/10.2-12 F 10.2-1 F 10.2-1 Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 F 10.2-2A F 10.2-2A Sh 2 Sh 2 Sh 3 Sh 3 F 10.2-2B F 10.2-2B Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 F 10.2-3 F 10.2-3 Sh 1 Sh 1 Sh 2 Sh 2 F 10.2-4 F 10.2-4 Sh 2 Sh 2 10.3-1/10.3-2 10.3-1/10.3-2 10.3-3/10.3-4 10.3-3/10.3-4 10.3-5/10.3-6 10.3-5/10.3-6 10.3-7/10.3-8 10.3-7/10.3-8 10.3-9/10.3-10 10.3-9/10.3-10
10. 3-11/10. 3-12 10.3-11/10.3-12 10.3-15/10.3-16 10.3-15/10.3-16 F 10.3-lA F 10.3-lA Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 Sh 4 Sh 5 Sh 5 Sh 6 Sh 6 II-16 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT F 10.3-lB F 10.3-lB Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 Sh 4 Sh 5 Sh 5 Sh 6 Sh 6 F 10.3-3 F 10.3-3 Sh 1 Sh 1 Sh 2 Sh 2 VOLUME 6 10.4-1/10.4-2 10.4-1/10.4-2 10.4-3/10.4-4 10.4-3/10.4-4 10.4-5/10.4-6 10.4-5/10.4-6 10.4-7/10.4-8 10.4-7/10.4-8 10.4-8a/10.4-8b 10.4-9/10.4-10 10.4-9/10.4-10 10.4-13/10.4-13a 10.4-13/10.4-14 10.4-13b/10.4-14 10.4-17/10.4-18 10.4-17/10.4-18 10.4-27 10.4-27 T 10.4-2A T 10.4-2 T 10.4-2B F 10.4-3A F 10.4-3A Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 Sh 4 F 10.4-3B F 10.4-3B Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 F 10.4-5A F 10.4-5A Sh 2 Sh 2 Sh 3 Sh 3 F 10.4-5B F 10.4-5B Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 II-17 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT F 10.4-6A F 10.4-6A Sh 1 Sh 1 Sh 2 Sh 2 Sh 5 Sh. 5 F 10.4-6B F 10.4-6B Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 Sh 4 Sh 5 Sh 5 Sh 6 Sh 6 F 10.4-17A F l0.4-17A F 10.4-17B F 10.4-17B F 10.4-18A F 10.4-18A Sh 1 Sh 1 Sh 2 Sh 2 F 10.4-18B F 10.4-18B Sh 1 Sh 1 Sh 2 Sh 2 11-i/11-ii 11-i/11-ii 11-iii/11-iv 11-iii/11-iv 11.1-1/11.1-2 11.1-1/11.1-2 11.1-3/11.1-4 11.1-3/11.1-4 11.1-5/11.1-6 11.1-5/11.1-6 1i.1-9/1i.1-10 11.1-9/11.1-10 11.1-11 11.1-11 T 11.1-1 T 11.1-1 T 11.1-2 T 11.1-2 T 11.1-3 T 11.1-3 T 11.1-4 T 11.1-4 T 11.1-5 T 11.1-5 T 11.1-6 T 11.1-6 T 11.1-7 T 11.1-7 Sh 1 Sh 1 Sh 2 Sh 2 T 11.1-8 T 11.1-8 T 11.1-11 T 11.1-11 T 11.1-12 T 11.1-12 T 11.1-13 T 11.1-13 II-18 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS INSERT F 11.2-lA F 11.2-lA Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 F 11.2-lB F 11.2-lB Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 F 11.3-lA F 11.3-lA Sh 1 Sh 1 Sh 3 Sh 3 F 11.3-lB F 11.3-lB Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3
11. 4-3/11. 4-4 11. 4-3/11. 4-4
11. 4-5/11. 4-5a 11. 4-5/11. 4-5a 1i. 4-7/11. 4-8 11. 4-7 /11. 4-8 11.4-9/11. 4-10 11.4-9/11.4-10
11. 4-11/11. 4-12 11. 4-11/11. 4-12 11.4-15/11.4-16 11. 4-15/11. 4-16
11. 4-17 /11. 4-18 11. 4-17 /11. 4-18
11. 4-19 /11. 4-20 11. 4-19 /11. 4-20 11.4-23 11.4-23 T 11. 4-1 T 11.4-1 Sh 1 Sh 1 T 11.4-2 T 11.4-2 Sh 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 T 11.4-3 T 11.4-3 Sh 1 Sh 1 T 11. 4-4 T 11.4-4 Sh 1 Sh 1 F 11.4-1 F 11.4-1 F 11.4-3 F 11.4-3 F 11.4-6 F 11.4-6 F 11.4-9
11. 6-1/11. 6-2 11. 6-1/11. 6-2
11. 6-3/11. 6-4 II-19 SGS-UFSAR Revision 16 January 31, 1998
  • .INSERTION INSTRUCTIONS REMOVE INSERT 12-i/12-ii 12-i/12-ii 12-iii/12-iv 12-iii 12.1-9/12.1-10 12.1-9/12.1-10 12.1-11/12.1-12 12.1-11/12.1-12 12.1-13/12.1-14 12.1-13/12.1-14 12.3-1/12.3-2 12.3-1/12.3-2 12.3-3/12.3-3a 12.3-3/12.3-3a 12.3-3d/12.3-4 12.3-3d/12.3-4 12.4-1/12.4-2 12~4-1/12.4-2 13-i/13-ii 13-i/13-ii 13.1-1/13.1-la 13.1-1/13.1-la 13.1-lb/13.1-2 13.1-lb/13.1-2 13.1-2a/13.1-2b 13.1-2a/13.1-2b 13.1-3/13.1-3a 13.1-3/13.1-3a 13.1-3b/13.1-4 13.1-3b/13.1-4 13.1-5/13.1-6 13.1-5/13.1-6 13.1-6a/13.1-6b 13.1-6a/13.l-6b 13.1-7/13.1-8 13.1-7/13.1-8 13.1-8a/13.1-8b 13.1-Ba/13.l-Bb 13.1-9/13.1-10 13.1-9/13.1-10 13.1-11/13.1-12 13.1-11/13.1-12 13.1-13/13.1-14 13.1-13/13.1-14 13.1-15/13.1-16 13.1-15/13.1-16 13.1-17/13.1-18 13.1-17/13.1-18 13.1-18a/13.1-18b 13.1-18a/13.1-18b T 13.1-1 T 13.1-1 Sh 1 Sh 1 Sh 2 F 13.1-2 F 13.1-2 F 13.1-3 F 13.1-3 F 13.1-5 F 13.1-5 F 13.1-5a F 1.3. l-5a F 13.1-6 F 13.1-6 F 13.1-7 F 13.1-7 F 13.1-8a F 13.1-8a F 13.1-8b F 13.1-Bb F 13.1-Se F 13.1-Be 13.2-1 13.2-1/13.2-2 13.4-1/13.4-2 13.4-1 13.5-1/13.5-2 13.5-1/13.5-2 13.5-2a/13.5-2b 13.5-2a/13.5-2b II-20 SGS-UFSAR Revision 16 January 31, 1998

Remove 13.5-2c/13.5-2d

  • INSERTION INSTRUCTIONS
  • In t 13.5-2c/13.5-2d
  • T 14.2-1 Sh 6 15-v/15-vi 15-vii/15-viia 15-ix/15-x T 14.2-1 Sh 6 15-v/15-vi 15-vii/15-viia 15-ix/15-x 15-xi/15-xii 15-xi/15-xii 15-xiii/15-xiiia 15-xiii/15-xiiia 15-xxiii/15-xxiiia 15-xxiii/15-xxiiia 15-xxv/15-xxvi 15-xxv/15-xxvi 15.1-1/15.1-2 15.1-1/15.1-2 15.1-11/15.1-12 15 .1-11/15 .1-12 15.l-12a/15.l-12b 15.1-13/15.1-14 15.1-13/15.1-14 15.1-23/15.1-24 15.1-23/15.1-24 T 15.1-2 T 15.1-2 Sh 2 Sh 2 T 15.1-5 T 15.1-5 T 15.1-6 T 15.1-6
  • 15.2-1/15.2-2 15.2-5b/15.2-6 15.2-7/15.2-8 VOLUME 7 15.2-1/15.2-2 15.2-5b/15.2-6 15.2-7/15.2-8 15.2:-13/15.2-14 15.2-13/15.2-14 15.2-31/15.2-32 15.2-31/15.2-32 15.2-37/15.2-38 15.2-37/15.2-38 15.2-41/15.2-42 15.2-41/15.2-42 15.2-59/15.2-60 15.2-59/15.2-60 15.2-60a/15.2-60b 15.2-60a/15.2-60b
15. 2-61/15. 2-62t': 15.2-61/15.2-62

.~~~7-:--

T 15.2-1 T 15.2-1 Sh. 1 Sh 1 Sh 2 Sh 2 Sh 3 Sh 3 Sh 4 Sh 4 Sh 5 Sh 5 Sh 6 Sh 6 Sh 7 Sh 7 Sh 8 II-21 SGS-UFSAR Revision 16 Januarv 31. 1998

  • REMOVE
  • INSERTION INSTRUCTIONS
  • INSERT F 15.2-:"1 F 15.2-1 F 15.2-2 F 15.2-2 F 15.2-3 F 15.2-3 15.3-1/15.3-2 15.3-1/15.3-2 15.3-5/15.3-6 15.3-5/15.3-6 15.3-13/15.3-14 15.3-13/15.3-14 15.3-15/15.3-16 15.3-15/15.3-16 15.3-17/15.3-18 15.3-17/15.3-18 15.4-3b/15.4-4 15.4-3b/15.4-4 15.4-15/15.4-16 15.4-15/15.4-16 15.4-17/15.4-18 15.4.;.17/15.4-18 15.4-18a/15.4-18b 15.4-19/15.4-20 15.4-19/15.4-20 15.4-21/15.4-22 15.4-21/15.4-22 15.4-22a/15.4-22b 15.4-23/15.4-24 15.4-23/15.4-24 15.4-25/15.4-26 15.4-25/15.4-26 15.4-27/15.4-28 15.4-27/15.4-28 15.4-29/15.4-30 15.4-29/15.4-30 15.4-31/15.4-32 15.4-31/15.4-32 15.4-37/15.4-38 15.4-37/15.4-38 15.4-39/15.4-40 15.4-39/15.4-40 15.4-40a/15.4-40b 15.4-41/15.4-42 15.4-41/15.4-42 15.4-49/15.4-50 15.4-49/15.4-50 15.4-51/15.4-52 15.4-51/15.4-52 15.4-53/15.4-54 15.4-53/15.4-54 15.4-55/15.4-56 15.4-55/15.4-56 15.4-61/15.4-62 15.4-61/15.4-62 15.4-63/15.4-64 15.4-63/15.4-64 15.4-121/15.4-122 15.4-121/15.4-122 15.4-129/15.4-130 15.4-129/15.4-130 T 15.4-1 T 15.4-1 Sh 3 Sh 3 T 15.4-5A T 15.4-5A T 15.4-5B T 15.4-5B Sh 1 Sh 1 Sh 2 T 15.4-5C T 15.4-5C T 15.4-50 T 15.4-50 T 15.4-5E T 15.4-7 T 15.4-7 II-22 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS
  • INSERT T 15.4-7A T 15.4-78 T 15.4-7C

. T 15. 4-8 T 15.4-8 T 15.4-9 T 15.4-9 T 15.4-11 T 15.4-11 T 15.4-21 T 15.4-21 Sh 6 Sh 6 Sh 14 Sh 14 Sh 16 Sh 16 F 15.4-47A F 15.4-47A F 15.4-47B F 15.4-478 F 15.4-47C F 15.4-47C F 15.4-48 F 15.4-48 F 15.4-50A F 15.4-50A F 15.4-50B F 15.4-508 F 15.4-50C F 15.4-50C F 15.4-500 F 15.4-500 F 15.4-50E F 15.4-50E F 15.4-50F F 15.4-50F F 15.4-51A F 15.4-51A F 15.4-518 F 15.4-518 F 15.4-51C F 15.4-51C F 15.4-510 F 15.4-510 F 15.4-51E F 15.4-51E F 15.4-51F F 15.4-51F F 15.4-52A F 15.4-52A F 15.4-528 F 15.4-528 F 15~4-52C F 15.4-52C F 15.4-520 F 15.4-520 F 15.4-52E F 15.4-52E F 15.4-52F F 15.4-52F F 15.4-53A F 15.4-53A F 15.4-538 F 15.4-538 F 15.4-53C F 15.4-53C F 15.4-530 F 15.4-530 F 15.4-53E F 15.4-53E F 15.4-53F F 15.4-53F F 15.4-62 F 15.4-62 F 15.4-63 F 15.4-63 F 15.4-64 F 15.4-64 F 15.4-65 F 15.4-65 II-23 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS
  • INSERT F 15.4-66 F 15.4-66 F 15.4-67 F 15.4-67 17-i/17-ii 17-i/17-ii 17-iii/17-iv 17-iii/17-iv 17.2-1/17.2-2 17.2-1/17.2-2 17.2-3/17.2-4 17.2-3/17.2-4 17.2-4a/17.2-4b 17.2-5/17.2-6 17.2-5/17.2-6 17.2-6a/17.2-6b 17.2-7/17.2-8 17.2-7/17.2-7a 17.2-7b/17.2-7c 17.2-7d/17.2-7e 17.2-7f/17.2-7g 17.2-7h/17.2-7i 17.2-7j/17.2-8 17.2-13/17.2-14 17.2-13/17.2-14 17.2-15/17.2-15a 17.2-15/17.2-15a 17.2-15b/17.2-16 17.2-15b/17.2-16 17.2-19/17.2-20 17.2-19/17.2-20 17.2-21/17.2-22 17.2-21/17.2-22 17.2-23/17.2-24 17.2-23/17.2-24 17.2-27/17.2-28 17.2-27/17.2-28 17.2-29/17.2-30 17.2-29/17.2-30 17.2-33/17.2-34 17.2-33/17.2-34 17.2-35/17.2-36 17.2-35/17.2-36 17.2-37/17.2-38 17.2-37/17.2-38 17.2-39/17.2-40 17.2-39/17.2-40 T 17.2-1 T 17.2-1 Sh 1 Sh 1 Sh 2 Sh 2 F 17.2-1 F 17.2-1 A-i/A-ii A-i/A-ii A-1/A-2 A-1/A-2 A-3/A-4 A-3/A-4 A-15/A-16 A-15/A-16 A-17/A-18 A-17/A-18 A-35/A-36 A-35/A-36 A-36a/A-36b A-37/A-38 A-37/A-38 A-39/A-40 A-39/A-40 II-24 SGS-UFSAR Revision 16 January 31, 1998

REMOVE

  • INSERTION INSTRUCTIONS
  • INSERT A-41/A-42 A-41/A-4la A-4lb/A_:.42 A-43/A-44 A-43/A-44 A-51/A-52 A-51/A-52 A-55/A-56 A-55/A-56 A-57/A-58 A-57/A-58 A-71/A-72 A-71/A-72 A-79/A-80 A-79/A-80 T A-4 Sh 1 Sh 2 Sh 3 Sh 4 T A-5 Sh 1 Sh 2 Sh 3 Sh 4 II-25 SGS-UFSAR Revision 16 January 31, 1998

i

  • 1 *
  • LR-N980049 l

ATTACHMENT 1 Summary of Salem UFSAR Revision 16 Changes j

i

.l

  • 95-4933

ij* The following is a list of .oved changes to the Salem UFSAR which " . included in future revisions.

Salem UFSAR Changes Approved for Incorporation in Revision 16

' 12/16/97 Page

  • 1

.I CN Number SSAR 93-002 Affected Sections 3.8 6.2 9.4 Affected Pages/Figuresffables 3.8-79 6.2-37 9.4-16 Description D.ocument methodology for the analysis for seismic HV AC and Initiating or Ref. Document Tech Standard SC.DE-TS.ZZ-4 707(Q)

HV AC supports. This analysis 9.4-20 is a SQUG-type analysis.

9.4-26 9.4-27 9.4-28 9.4-29 9.4-39 9.4-42 9.4-45 9.4-8

\'ew SAR Pages: 3.8-79a, 9.4- Ia SSAR 95-013 2.4 2.4-6 Correction of the maximum PR 951221I13, Cales 6S0-3.4 3.4-5 load on the Auxiliary Building 0345, 6S0-0346, 6S0-0593 roof i

I SSAR 95-027 10.3 10.3-1 Elimination of Main Steam

! 3.6 3.6-12 Breaks in penetration areas DEF 94-00038, LER 272/95-01 I Task I &2 3.6-17 3.6-21 3.6-22 3.6-23 3.6-24 3.6-27 3.6-55 3.6-9a F3.6-IO

.-~~

T3.6-2 New SAR Pages: 3.6-2 Ia SSAR 95-075 10 .10-iv Auxiliary Feedwater Control DCP 2EC-3 I 9 I Pkg. I 10.4 10.4-17 Valve AFI I and AF21 FI0.4-178 Modifications TI0.4-2 Tl0~4-2A T.10.4-28

Salem UFSAR Change!proved for Incorporation in Revisio'16 Page 2 12/16/97

  • i.

CN Number SSAR 95-085 Affected Sections I.I 10.2 15.2 Affected Pages/Figuresrfables I.I-I 10.2-1 15.2-59 15.2-60 Description Replacement of low pressure turbine rotors Initiating or Ref. Document DCP 2EC-3353 l 5.2-60a l 5.2-60b 3.5 3.5-12 3.5-13 3.5-15 3.5-16 3.5-17 3.5-18 3.5-19 3.5-20 3.5-21 3.5-22 F3.5-6 F3.5-7 T3.5-l T3.5-2 T3.5-3

. SSAR 96-004 New SAR Pages: 3.5-21 a, 3.5-21 b, 3.5-6.3 21c T6.3-6 T6.3-6 T6.3-6 Sh 1 Sh 2 Sh 3 Revision of Refueling Water Storage Tank drawdown analysis PSE-96-533, DES-93-00209 T6.3-8 Sh 1 T6.3-8 Sh 2 I

SSAR 96-007 5.5 5.5-11 Delete Reference to Table 5.2- n/a 1

I 29 - Correction of I typographical error J

i SSAR 96-008 9.5 9.5-43 Emergency diesel generator DEC IEC-3401 starting air receiver compressor relief valve setting change SSAR 96-011 6.2 *F6.2-8 Containment spray header DCP I EC-3450 F6.2-9 support steel revisions for higher accident temperature

Salem UFSAR Chang.pproved for Incorporation in Revisi!.6 Page 3 12/16/97

~

Affected Affected Initiating or CN Number Sections Pages/Figuresrrables Description Ref. Document SSAR 96-012 9.1 9.1-30 New fuel elevator basket DCP 2EE-0!43 replacement with a fuel reconstitution basket SSAR 96-013 9.3 9.3-59 Post-Accident Sampling PR 950727195, PR 9.3-60 System (PASS) configuration 950817432 9.3-61 and description correction SSAR 96-016 10.4 10.4-2 Condenser vacuum pump PR 960209175 10.4-3 description correction 10.4-4 SSAR 96-018 1.2 Fl.2-2 Control Room layout redesign DCP I EC-3360, Pkg. I, 4, T 5.1 F5.l-7 Mod 96-002 6.4 6.4-1 7.1 7.1-12 7.1-14 7.7 7.7-3 8.3 TS.3-6 9.4 9.4-2 F9.4- IA

15.4 A-80 T15.4-2l Sh 14 T15.4-2l Sh 6 Structural modification to annular steel columns and embedded channels DCP 2EC-3390 PKG I, DCP I EC-3476 PKG I SSAR 96-030 8.3 8.3-17 125 Volt DC battery charger DCP 2EC-3332 PKG I 8.3-19 alann description change

Salem UFSAR Change-proved for Incorporation in Revisi~6 Page ~

12/16/97 J

CN Number SSAR 96-031 Affected Sections 1.2 15.4 Affected Pages/Figu resff a hies F 1.2-1 15.4-27 15.4-28 15.4-29 Description Control area air conditioning upgrade Initiating or Ref. Document DCP I EC-3505 PKG I 15.4-30 15.4-31 Tl5.4-5D 2.2 2.2-10.

2.2-12a 2.2-9 T2.2-3 3.1 3.1-4 6 6-v 6-vii 6.2 6.2-16 6.2-23 6.2-52 6.2-53 6.2-65 T6.2-l 1 T6.2-9 6.3 6.3-41 6.3-42 T6.3-12 6.4 6.4-1 6.4-2 6.4-4 6.4-5 T6.4-3 7.7 7.7-3 9.4 9.4-1 9.4-la 9.4-lb 9.4-2 9:4-3

'9.4 9.4-5 F9;4-IA F9.4-IB

  • New SAR Pages: 6.4-la, 6~4-lb, 6.4-lc, 6.4-1 d, 6.4-4a, 6.4-4b, 9.4-4a, 9.4-4b, 9.4-4c, 9.4-4d, 9.4-4e, 9.4-4f, Tl5.4-5E, Tl5.4-5F Sh I, Tl5.4-5F Sh 2, Tl5.4-5F Sh3

Salem UFSAR Change.pproved for Incorporation in Revisi'16 Page 5 l2/l6i97 Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description

  • Ref. Document

~ .

SSAR 96-037 8 * .J 8.3-13 emergency diesel generator DCP l EC-3529 PKG l. 2. 3.

vibration alann removal DCP 2EC-3404 PKG l. 2. 3 SSAR 96-041 7.2 7.2-12 Hagan module isolation DCP 2EC-3450 PKG I amplifier reference change SSAR 96-042 10.2 10.2-2 Main turbine lube oil DCP 2EC-3402 PKG I purification system change SSAR 96-043 7.2 7.2-39 Appendix R alternate shutdown DCP 2EC-3396 PKG I 7.3 F7.3-4 methodology - installation of 9.5 9.5-22 transfer switches, fuse size deletion SSAR 96-044 9.2 9.2-22 Reactor coolant pump loss of PR 951006357, Proc SI.OP~

component cooling flow trip AB.RCP-0001 (Q) rev 3 correction to agree with SER SSAR 96-046 7.7 7.7-14 Replacement of Salem Unit 2 DCP 2EC-3337 PKG l, CR 8.3 8.3-20 P250 plant computer an.d 960726119 F8.3-5 SH 2 computer inverter F8.3-7 A A-17 A-18 SSAR 96-047 8.3 F8.3-5 Sh 2 Emergency lighting inverter DCP 2EC-3332 PKG 2 9.5 9.5-38 logic card modification SSAR 96-049 8.1 8.1-10 Replacement of28VDC relay DCP 2EC-3363 PKG 1 cabinet circuit breakers SSAR 96-050 9.4 9.4-29 Containment ventilation DCP l EC-3365 PKG l, DCP 9.4-35 penetration pressure vacuum 2EC-3325 F9.4-4A Sh2 relief valve replacement F9.4-4B Sh2 SSAR 96-051 3.6 3.6-36 Delete steam generator DCP l EC-3301 PKG l, DCP F3.6-23 blowdown line piping material 2EC-3260 designation

lj,.;

Salem UFSAR Chang.pproved for Incorporation in Revisi'16 Page 6 12/16/97 l

Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document j

SSAR 96-052 A A-72 Revise Control Room access DCP I EC-3619 PKG I description I

SSAR_96-054 10.3 10.3-5 Replacement of Main Steam DCP 2EC-3407 PKG I FI0.3-18 Sh I steam traps with orifice/strainer FI0.3-18 Sh 2 assemblies SSAR 96-055 9.5 9.5-46 Emergency Diesel Generator DCP 2EC-3266 PKG I low lube oil temperature setpoint change SSAR 96-056 9.5 9.5-40 Emergency Diesel Generator DCP 2EC~3403 PKG I, 2, 3; fuel oil transfer pump level DCP I EC-3453 PKG I, 2, 3 setpoint change SSAR96-057 10.4 10.4-2 Revision to Service Water and 95080~292,950803335, 9.2 9.2-1 Turbine Auxiliaries Cooling 960711079 ISM-0496, 9.2-2 Systems lists of components lMD-0110 T9.2-I cooled. Physical changes had been made by previous DCPs .

  • SSAR 96-059 3.6 3.6-35 3.6-41 Penetration Area high energy line break pressure relief path DCP 2EC-3388 PKG I 3.6-43 modification - installation of F3.6-28 new vent penthouse SSAR 96-060 10.3 10.3-12 Inner and outer penetration DCP 2EC-3389 PKG I 3.6 3.6-44 area blowout panel modifications SSAR 96-062 6.2 6~2-21 Revision to Containment DEF# DES-90-1639, LCR 6.2-44 minimum sump pH 94-48 + S95-258 Bases 6.2'-52 Change, CR 950801261, 6.2-53 950913211, NSAL PSE 6.2-85 215 Task4 T6.2-9 6.3 6.3-10 6.3-64

12/16/97 Salem UFSAR Change~proved for Incorporation in Revision 16

  • Page 7 Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document SSAR 96-064 9.4 9.4-18 Fuel Handling Building truck DCP 2EC-352 I PKG 2 9.4-20 bay ventilation system addition of manual damper SSAR 96-066 12.1 12.1-10 In-core detector quantity and PR 960308137. PR 12.1-11 storage location update 960325171 12.1-12 12.1-13 SSAR 96-070 8.3 T8.3-6 Revision to 125 Volt DC DCP 2EE-O 119 PKG I battery load profile for Unit 2 as a result of replacement of steam generator feed pump vibration and shaft position instrumentation.

SSAR 96-071 9.4 9.4-12 Unit 2 Auxiliary Building DCP 2EC-3423 PKG I 9.4-13 Ventilation System HEPA/charcoal filter damper fail-safe position modifications

  • SSAR 96-072 8.3 *rs.3-6 Revise Unit 2 125 Volt DC battery load profile as a result of alternate shutdown system inverter replacement DCP 2EC-3444 PKG I

~ .

i l

I SSAR 96-074 11.4 ll.4-16 Reclassify the Unit 2 plant vent DCP 2EC-3340 PKG 1 I

J high range radiation monitors

  • as non-safety related l

SSAR 96-075 10.4 10.4-18 Steam Generator Slowdown DCP 2EC-3470 PKG 1

-~ ; -,  :

*~*

sampling system isolation valves - addition of a key lock switch bypass to open the

-. isolation valves when sampling is required for a faulted steam generator with a lo-lo level condition for Unit 2

Salem UFSAR Change,pproved for Incorporation in Revisi'16 Page 8

' 12/16/97

  • l r

CN Number SSAR 96-076 Affected Sections 11.4 8.3

9. l Affected Pages/Figuresffables 11.4-19 Tl l.4-4 SH l T8.3-6
9. l-3b Description Unit 2 Fuel Handling Area Ventilation System - addition of an automatic initiation of exhaust fans on a high radiation Initiating or Ref. Document DCP 2EC-3559 PKG l. LCR S96-088 9.4 9.4-18 signal from RMS SSAR 96-077 10.4 I 0.4-8a Unit 2 Circulating Water DCP 2EC-3465 PKG I

- I 0.4-9 System controls modification FI0.4-38 SH I to delete condenser water box FI0.4-38 SH 2 vacuum during a circulating FI0.4-38 SH 3 water pump start FI0.4~38 SH 4 SSAR 96-078 8.3 8.3-9 Unit 2 Emergency Diesel DCP 2EC3387 PKG I, 2, 3 Generators A, 8 and C:

installation of new EOG breaker voltage pennissive relays with setpoints corresponding to acceptable 4KV bus voltage

  • I SSAR 96-079 SSAR 96-080 5.6 15.4 3.6 3A 5.6-la

- I5A-38 3.6-28 3A-37 Reactor Coolant System cold leg streaming analysis Reactor Protection System Signal Low-Low Tavg nomenclature change Letters NFSI-95-577, NFSI- -

95-567 DCP 2EC-3264 PKG 2, PR 951108095, DEF DES 01646 j 6.3 6.3-6 7.2 7.2-24 j 7.2-37 T7.2-l Sh 2

'-1l 7.3 T7.2-l Sh S

. 7.3~

7,:3:~~;~-

SSAR 96-081 5.6 - *s:6-S Installation of Letdown DCP 2EC-354 I PKG I 7.2 - F1.i..s Isolation Bypass in the RCS during low pressurizer level

' ~

Salem UFSAR Change!proved for Incorporation in Revisic'16 Page 9

' 12/16/97

  • I CN Number SSAR 96-082 Affected Sections 11.4 Affected Pages/Figuresffables 11.4-10 11.4-16 11.4-5 I I .4-5a Description Radiation Monitor 2R4 I upgrade (plant vent)

Initiating or Ref. Document DCP 2EC-3212, PR 950726207, TS Bases S95-258 11.4-8 11.4-9 F 11.4-1 F 11.4-3 Tl 1.4-2 Sh 2 3A 3A-8 A A-52 SSAR 96-083 9.1 9.1-13 Revision to Spent Fuel Pool DCP 2EC-3224 PKG I Rev 9.1-14 rerack for pool coolfug issues 2, CR 951207356 CRCA 2 SSAR 96-088 13.5 13.5-2a Revise a procedure title for . NAP-22 NAP-22 to include the full title SSAR 96-089 12.3 12.3-3a Revise Radiat.ion Protection UFSAR Change Notice 95-Supervisor title to agree with 17 changes made in UFSAR

e SSAR 96-090 1.6 1.6-5 Revision 15 Revise the name "main steam UFSAR Change Notice 93-10.2 I0.2-6 stop valve" to "main steam 60 10.3 10.3-15 isolation valve" I0.3-16 10.3-3 10.3-4 I 10.3-5 l

I 10.4 I0.3-8 10.4-17

.J 10.~s 3.6 '. 3.6-18 3.6-19 3.6-28 3A:' .. 3A-39

7.5 T1.S-5 SH 3 SSAR 96-093 9.4 9.4-20

  • Fuel Handling Building DEF DES-90-01304, S-C-Ventilation heat loading on FHV-MDC-1471 charcoal filter revision

I" i 12/16/97 Salem UFSAR Change~pproved for Incorporation in Revision 16

.

  • Page 10 i

~~~u mJ>_er_

SSAR 96-094 Affected 7.7 Affected

-=Sc::.e.::.:ct::.::cio=-=n=s_. --=P--=-a_..g"'-es"-/=-Fi°"'g~u_re-'-s_rrc__a.:..::b.c:cle=s-

7. 7- l 7a Description Control Room Annunciator modificati'Ons Initiating or Ref. Document DCP 2EC-3508 PKG 1 SSAR 96-095 3A 3A-23 Update of the lnservice PR 960321214 CRCA 5 3A-23a Inspection programs, code 5.2 5.2-70 years, vendors and equipment 5.2-71 5.2-72 5.2-73 5.4 5.4-13 5.4-14 SSAR 96-096 15.2 15.2-6 Update description of Update UFSAR to agree 15.2-7 subcritical rod withdrawal and with license FI5.2-l steamline break core response Fl5.2-2 FI5.2-3 Tl5.2-l SH I 15.4 15.4-39 Fl5.4-48 fl5.4-50A Fl5.4-50B FI5.4-50C FI5.4-500 Fl5.4-50E Fl5.4-50F Fl5.4-51A Fl5.4-518 Fl5.4-51C Fl5.4-5 ID Fl5.4-51E Fl5.4-SIF FIS.4-52A FlS.4-528 PI-St4-52C Fl5.4-520 Fl5.4-52E Fl5.4-52F FIS.4-SJA FIS.4-SJB Fl5.4-53C Fl5.4-530 FlS.4-SJE FIS.4-53F TlS.4-1 SHJ

1 I

Salem UFSAR Chang.lpproved for Incorporation in Revisi!6 Page 11 12/16/97 Affected Affected Initiating or CN Number Sections Pages/Figu resff l!_bles Description Ref. Document SSAR 96-097 3.7 3.7-30 Seismic analyses and response PR 951221156, PR 3.7-6 spectra for the Service Water .951221170, DES-94-00092.

3.8 3.8-77a Intake Structure and Outer DES-94-0 3 .8-78 Penetration Areas 3.8-82 SSAR 96-099 5.1 F5.1-6Bshl Mid-Loop wide range level Generic Letter 88-17. DCP 5.6 5.6-4 upgrade to provide level 2EC-3453 PKG I 7.7 7.7-21 indication during reduced inventory conditions and during vacuum fill SSAR 96-100 9.4 9.4-6 Auxiliary Building Evaluation S-C-ABV-MEE-Ventilation - delete incorrect 1077, DEF DES-90-01161, reference to methyl iodine CR 950921399 CRCA I 0, removal and clarify description LCRs 95-24, 95-44, 96-21 of the ABV charcoal filter SSAR 96-103 3.6 3.6-9 Eliminate the need to postulate CR 951221180 CRCA 7 arbitrary intennediate pipe breaks in accordance with Generic Letter 87-11 SSAR 96-104 3.5 3.5-4 Clarify use of probabilistic risk DEF DES-94-00097 3.5-5 assessment for tornado missile 3.8 3.8-75 strikes to unprotected 3.8-76 components l

3A 3A-50

.I SSAR 96-105 4.2 4.2-54 Reduce minimum required 4.2-55 capability of the neutron sources from providing 2 counts per second to greater than 1 cps on the source range channels SSAR 96-106 5.5 5.5-43 Correction of CVCS valve DCP 2EE-O I 4 7 1CV55 fail safe positi<m to*

"open"

12/16/97 Salem UFSAR Change;'!'pproved for Incorporation in Revision 16

  • Page 12 Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document SSAR 96-109 6.3 . T6.3-13 Sh l Update description of Service DCP !EC-3292 pkg 1&2.

9.2 9.2-10 Water System pump PR 960706223. 950803382.

9.2-3 performance, maximum 960703098 9.2-6b number of Service Water 9.2-9 pumps that can be removed from service for maintenance, and description of Component Cooling Heat exchanger service water flow control SSAR 96-110 8.3 8.3-6 115 Volt AC Instrumentation PR 960530208, DCP 2SC-8.3-6a Power system description 2032, CN 90-32 correction SSAR 96-111 15.4 Tl5.4-21SH16 Install anti-sweat pipe DCP 2EE-0225 PKG 1 6.3 6.3-32 insulation on Service Water pipiitg at Containment Fan Coil j

Units j

I SSAR 96-113 5.2 5.2-63 Update of ISi program CR 960321214 CRCA 10 description for stagnated borated water systems IA W IE Circular 76-06 and IE Bulletin 79-17 SSAR 96-114 10.4 10.4-8 Revise Circulating Water Pump CR 960710211, CR 8.3 F8.3-2 electrical description to delete 960710181, DCP lSC-2269 reference to temporary power PKG6, 7

.. , supply from Hope Creek Switchyard, and "future" South Bus SSAR 96-115 15.4 15.4-23 Change to UFSAR description New procedure SC.SA-6.3 6.3-41 of leakage outside containment AP.ZZ-005l(Q) 6.3-42 from ECCS components T6.3-12 following an accident

12/16/97 Salem UFSAR Changes Approved for Incorporation in Revision 16

  • *
  • Page 13

)

Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document SSAR 96-116 10.3 10.3-12 Steam Generator Tube Leak DCP 2EC-3449 PKG 2 11.4 11.4-17 Detection - installation of 11.4-18 nitrogen 16 detectors in the 11.4-5 main steam lines prior to the Tl 1.4-2 Sh I relief valves to detect carryover Tl 1.4-2 Sh 2 from a primary to secondary Tll.4-2Sh3 leak.

5.2 5.2-69 New SAR Pages: I I .4- l 7a, T 11.4-2 Sh 4 SSAR 96-118 9.3 9.3-48 Incorporate NRC ASME Code PR 950804231 9.3-63 relief request for the Volume T9.3-4 Control Tank and the Regenerative Heat Exchanger Relief systems using administratively controlled manual isolation valves SSAR 96-120 6.2 6.2-10 Incorporate Tech Spec Amendments 184/ 166 6.2-11 Amendments 184/166 - change test frequency for integrated leak rate testing to that allowed by I OCFR50 Appendix J Option B SSAR 96-121 9.1 9.1-15 Fuel Handling Building sump DCP lEC-3639 PKG 1 pump surveillance and high sump pump level alarm description revision SSAR 96-122 15.2 15.2-32 Correction of typographical CR 960719108 errors SSAR 96-123 2.2. **-.:*_;*";_ ii';;15 Correction of typographical CN 94-02 error in the date of a reference report

. SSAR 96~124 8.3 T8.3-5 Revise Unit 2 28 VDC Battery DCP 2EC-358 I Load Profile due to containlnentventcontrolboard pushbutton modifications

Salem UFSAR Change.proved for Incorporation in Revisio"6 Page 14 12/16/97

  • ' Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document SSAR 96-125 15.2 15.2-60 Correction to turbine control DCP 2EC-3353, CR 7.2 7.2-24 references for section 10 960716247,960716226 SSAR 96-126 3.6 3.6-36a Provide protection for Turbine DCP 2EC-3522 PKG I 3.6-42 Driven Aux Feed pump F3.6-28 enclosure by adding blowout 9.4 F9.4-2B SH 3 panels, removing and installing dampers, and adding temperature switches SSAR 96-127 9.3 9.3-1 Station air compresstrs - CR 960723136, Cale S-C-change description to one is CA-MDC-1639 typically running from two SSAR 96-129 11.4 11.4-8 Correction of miscellaneous CR 960719097, 960716279, 15.I 15.1-2 typographical errors 960716271
.

15.2 15.2-41 SSAR 96-130 A A-35 Post accident access to vital Cale S-C-VAR-MDC-1518 A-36 areas - increase in the areas as a A-37 result of addressing EOPs A-38 A-39 A-40 A-41 A-42 l A-43 New SAR Pages: A-36a, A-4la, TA-4 sh

'I l, TA-4 sh 2, TA-4 sh

-i 3, TA-4 sh 4, TA-5 sh l, TA-5 sh 2, TA-5 sh 3, TA-5 sh4 SSAR 96-132 15.4 15 ..i:.121 Correction of total thermal flow CR 960801353 4.1 T4~*1".'l SH I rate in the listed tables for 5.2 T5.2-3 SH2 consistency with a prior change, and a typographical text correction for the subject ofFigures 15 .4-99 and 15 .4-100

l

Salem UFSAR Change.pproved for Incorporation in Revisi!6 Page 15 12/16/97

  • CN Number SSAR 96-133 Affected Sections 3A Affected Pages/Figuresffables 3A-5 Description Incorporation of Amendments I I 0/89 pertaining to Operations Manager qualifications and Amendments 1361115 Initiating or Ref. Document CR 960801268 960801285.

Amendments 110/89, 136/115 pertaining to licensed operator qualifications SSAR 96-135 3A 3A-16 Correction of miscellaneous CR 960724058. 960715125, 3A-51 typographical errors 960711261 9.1 9.1-14 9.1-16 9.1-32 9.1-34 9.5 9.5-41 SSAR 96-137 15.3 15.3-2 Miscellaneous editorial CR 960801123, 960725210,

. 4.5 4.5-2k clarifications - rewording of a 960719113 9.4 9.4-33 sentence and correction of section references SSAR 96-138 13.l 13.l-2b Change responsibility for site proposed organization 17.2 17.2-15a access training from Manager - change Nuclear Security to Director -

Nuclear Training Center

Salem UFSAR Change"pproved for Incorporation in Revisi'16 Page 16

' 12/16/97

  • i CN Number SSAR 96-139 Affected Sections 3A 6.2 Affected Pages/Figuresffables 3A-51a 6.2-55 6.2-58 6.2-59 Description Containment isolation valve list revision to comply with Tech Spec's, GDC 54 through 57.

and ANSI/ANS 56.2 Initiating or Ref. Document LCR S95-02 6.2-60 6.2-61 6.2-66 6.2-67 F6.2-16 F6.2-18 F6.2-l 9 F6.2-21 F6.2-22 F6.2-23 F6.2-24 F6.2-29 F6.2-30 F6.2-3 I F6.2-32 F6.2-33 F6.2-34 F6.2-39 F6.2-40 F6.2-41 F6.2-42 F6.2-43 F6.2-45C F6.2-45D T6.2-IO SH l T6.2- l 0 Sh IO T6.2- l0 Sh 11 T6.2- l0 Sh 12 I

i T6.2-l0 Sh 2 T6.2-10 Sh 3 T6.2-l0 Sh4 T6,2-IO Sh 5 T6.2-l0 Sh 6 T6,2-l0 Sh 7 T6.2-l0 Sh 8 T6.2-10 Sh 9 T6.2-12 SH l T6.2-12 SH 2 T6.2-12 SH 3 T6.2-13 SH l T6.2-13 Sh 2 6.3 6.3-10 New SAR Pages: 6.2-59a

Salem UFSAR Chang.pproved for Incorporation in Revisi'16 Page 17 12/16/97 1

Affected Affected lnitiatin~ or CN Number Sections Pages/Figuresffables Description Ref. Document i SSAR 96-140 6.3 6.3-44 Containment fan coil unit - CR 950803341 9.4 9.4-30 delete statements that service water automatically isolates on a high radiation signal in the service water outlets from containment SSAR 96-141 15.2 15.2-37 Correction* of typographical CR 960805086, 960805089 15.3 15.3-5 errors and clarifications SSAR 96-142 15.4 15.4-130 Deletion of a Chapter 15 reference mistakenly added by CN 96-38 and is not referred to

  • in the text SSAR 96-144 3.8 3.8-65 Containment airlock pressure Amendments 56/24 testing - incorporation of license amendments 56/24 I

SSAR 96-145 2.2 2.2-10 Revision to control room

  • j CR 951020268, Engr Eva! A-2.2-12a habitability discussions to O-ZZ-NEE-0735/l T2.2-2 SH l reflect recent revision to T2.2-2 SH 2 calculations and an engineering T2.2-4 SH l evaluation 6.4 6.4-3 T6.4-2 SH l iI T6.4-2 SH 2 j

SSAR 96-146 13.5 l3.5-2c Deletion of procedure NAP-61 NAP-61 cancelled

I for Significant Event Response J Team - this function is part of Corrective Action Program

.*;*_ ~.. NAP-6 SSAR 96-147 10.2 10.2-l Correction of typographical CR 960425182, 960509135, 8.1 . a.t-3. errors, clarifications and 960515195,960719066, 8.3 8;3;.2* addition of information missed 960724156,960731081, 8.3-4* byDCPs 960607124 8.3-5b 9.5 9.5-37 A A-2 A-3

1 Salem UFSAR Change.pproved for Incorporation in Revisi~6 Page 18 12/16/97

  • CN Number SSAR 96-149 Affected Sections 13.1 Affected Pages/Figuresffables
13. l-2a
13. l-2b Fl3. l-6 Description Radiological Safety organization change Initiating or Ref. Document SSAR 96-150 5.3 5.3-2 Reactor Cooling System 7.5 T7.5-l SH 4 subcooling margin monitor A A-15 clarification of accuracies SSAR 96-151 10.3 10.3-4 Add allowance for use of DCP 2EC_-3426 PKG 1 3.6 3.6-18 stainless steel piping for main 3.6-30 steam system, feedwater 3.6-36 system, steam generator 3.6-39 blowdown piping, auxiliary 3.6-40 feedwater pump steam lines, heating steam system , heating water system for erosion/corrosion purposes
    • SSAR 96-152 9.4 9.4-38 Pressure-Vacuum Relief System for containment building - delete statement that the system operates for at least CR 15 minutes when energized SSAR 96-154 6.3 6.3-62 RHR minimum flow line - CR 960912290 delete description of the existence of flow. indication

_..i_

SSAR 96-155 1.6* .. . ,- 7.6~6. POPS/LTOPS overshoot CR 960828068

" *- **-*-.- * * £

..

  • 7.6-8 pressure and RCS peak pressure revision SSAR 96-156 6.3 6.3-21 Delete spiral wound gasket CR 960719167 material description for MOVs

S~lem UFSAR Chang.pproved for lncorporatio*n in Revisi~6 Page 19 12/16/97 Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document SSAR 96-157 13. l 13.l-6b QA organization change - HC UFSAR CN 96-93 Fl3. l-7 reduction of quality assessment 17.2 17.2-33 manager positions from two to Fl7.2-I one SSAR 96-159 4.2 4.2-79 Correction of rod drop time License Amendments 96172._

4.2-80 from 2.2 to 2. 7 seconds per CR 960829242 License Amendments 96/72 SSAR 96-161 10.4 10.4-13 Increase feedwater heater DCP 2EC-3285_ PKG 2 10.4-27 design pressure from 700 to 725 psig for first through fifth stages "'

~

Salem UFS~R Change~proved for Incorporation in Revisic'16. Page 20 12/16/97

  • CN Number SSAR 96-165 Affected Sections 3A Affected P;tges/Figuresrr~~~

3A-26 Description Update PSE&G's position regarding Regulatory Guide I .52 for acceptance criteria for in-place testing of charcoal Initiating or Ref. Document Unit 2 license amendment 88, CR 960829255 adsorbers and HEPA units, per Unit 2 License Amendment 88 SSAR 96-167 9.5 9.5-45 Emergency Diesel Generator CR 950823075 I

prelube pump description revision SSAR 96-168 6.3 6.3-16 Safety Injection pump test CR 960815172. 9605I0136 method - delete reference to .

I 00 gpm test line in parallel to minitlow line SSAR 96-170 . 15.4 15.4-50 Steam generator tube rupture CR 960121088 15.4-51 event - revision increases the 15.4-52 amount of operator time to i.

15.4-55 complete the isolation procedure from 30 to 50 minutes, and reduces the subcooling margin during cooldown stage from 50 to 20 degrees F.

I SSAR 96-171 5.5 T5.5-2 SH I RHR system failure analysis CR 960716245 I

I T5.5-2 SH 2 revision addressing recovery for failure of a RHR suction valve RH 1 or RH2 to open SSAR 96-172 17.2 17.2-1 NAP-I procedure revision i1.2-13 SSAR 96-173 17.2 17.2.,.22 NAP-3 procedure revision 17.2-24

l I Salem UFSAR Chang.pproved for Incorporation in Revis!.6 Page 21 12/16/97 Affected Affected Initiating or CN Number Sections Pages/Figu resrr ~hies Description Ref. Document SSAR 96-174 7.7 7.7-6 Control rod bank insertion DCP 2EC-3575 PKG I. CR 7.7-7 monitor - delete reference to Hi _951213180.

F7.7-2 Tavg signal as input to the monitor

SSAR 96-175 6.3 6.3-63

  • Refueling Water Storage Tank CR 960812 I 09. 960808244 6.3-64 level instrumentation and 7.3 7.3-7 Accumulator MOV position 7.5 7.5-1 indication light power source -

revise description to distinguish differences between Units l and2 SSAR 96-176 5.2 5.2-14 Steam Generator Tube Rupture 5.2-15 event - editorial change to description of the event

. 9.4-41 9.5-43 Emergency Diesel Generator -

clarify function of jacket water system after cooler heater CR 951017158 SSAR 96-178 9. l F9.l-l Spent Fuel Pool - update CR 960807270, DCP l EC-T9.l-2 SH l reracked quantity of fuel 3252, 2EC-3224, UFSAR

_;*, assemblies for Unit 2 in the CN 95-25 figure, and update pool water l

  • I fluid temperatures for components in the table.

II i -~-

SSAR 96-181 11.4 Tl 1.4-2 SH l Radiation Monitoring - DEF DES-91-00365 contairurient ventilation isolation - delete reference to second unused radiation monitor detectors in 2R12A and 2Rl2B channels

Salem UFSAR Change!proved for Incorporation in Revisi.!6 Page 22 12/16/97

  • CN Number SSAR 96-182 Affected Sections 3.8 Affected Pages/Figu resrf ables 3.8-2 Description Containment Building lightning protection - editorial change of description Initiating or Ref. Document DCP 2EE-0247 PKG 1 SSAR 96-183 15.3 15.3-6 Revision to chapter 15, Small Break LOCA.

SSAR 96-184 3.8 3.8-2 Containment Building lightning DCP IEE-0314 PKG 1 protection - editorial change to description SSAR 96-185 11.4 11.4-23 Radiation Monitoring - change DEF DES-91-00640 description of method of calibration for radiation detectors SSAR 96-186 13.1 13.1-11 In Manager Salem Operations duties, change review of

.

incident reports to conditions adverse to quality SSAR 96-187 7.5 T7.5-4 SH 2 Reg Guide 1.97 - delete Letter NLR-N94175, RG Variable I 9A - radiation* 1.97 rev 3 exposure rate for Fuel Handling Building and Penetration Area monitors SSAR 96-188 7.5 T7.5-4 SH4 Reg Guide l.97 - revise CR 960426096, 960614093 i T7.5-5 SH2 compliance levels of Variables l

I T7.5-5 Sh 3 53 (status of standby power)

I and 53A (status of control air)

I

.j to 5 from I le

I

-.~.

.Salem UFSAR Change.proved for Inc~rporation in Revisi.6 Page 23 12/16/97

  • l CN Number SSAR 96-189 Affected Sections 15.4 7.5 Affected Pages/Figuresffables 15.4-51 15.4-52 T7.5-3 T7.5-4 SH 2 Description Reg Guide I. 97 changes: I) relaxed environmental qualification requirements for Varable 22 Reactor Coolant Initiating or Ref. Document etter NLR-N92 I 45. N RC 3123192 letter. PSBP 322234-01 T7.5-4 SH 5 System accumulator tank level T7.5-5 SH 3 and pressure to Ieve I I, 2)

Replace Varable 73 steam generator blowdown radiation moniti:>rs with varable 35a steam generator narrow range level for use as primary indication of steam generator tube rupture SSAR 96-190 15.4 15.4-4 Emergency "Diesel Generators - CR 960502113 6.3 6.3-53 clarification of delay times j 8.3 8.3-9

~ SSAR 96-191 6.3 T6.3-5 Chemical and Volume Control System -_change material for 12 centrifugal charging pump DCP lEC-3018 to all stainless steel J

I SSAR 96-192 8.3 TS.3-6 Station Air Compressor DCP 1EC-3651 PKG 2 j

I 9.3 F9.3-1A SH 1 Control modification - change .

j to 125VDC2C battery loading 1

i I

I

.; .__,_:***

i *,,*..

Salem UFSAR Change.pproved for Incorporation in Revisi~6 Page 2-l l 2/l 6/97

  • CN Number SSAR 96-194 Affected Sections 11.4 Affected Pages/Figuresffables 11.4-19 11.4-4 l l .4-5 l l .4-5a Description Radiation Monitoring System 1/2RIA/8 replacement by l/2RIB for Control Area Air Conditioning System and Initiating or Ref. Document DCP l EC-3505 PKG 3 l l .4-8 Emergency Air Conditioning F 1 l.4-6 System Tl l.4-l SH I

. Tl 1.4-2 SH l Tl 1.4-3 SH I Tl 1.4-4 SH I 3.1 3.1-4 6.4 6.4-2 8.3 T8.3-6 9.4 9.4-4

'.'Jew SAR Pages: F 11.4-9 '° SSAR 96-195 9.5 9.5-46 Emergency Diesei Generator

  • ocp IEC-3310 PKG I low lube oil temperature setpoint change SSAR 96-196 13.2 13.2-1 Revision to training description CR 960514114 New SAR Pages: 13.2-2
  • SSAR 96-198 15. l 15.2 T15.l-2SH2 T15.2-l SH I Tl5.2-l Sh 2 Tl5.2-l Sh 3 Tl5.2-l Sh 4 Tl5.2-l Sh 5 Correction of accident analysis tables for feedwater system malfunctions related to the computer code used and description of excessive feedwater at full load for single CN 96-38 omission Tl5.2-l Sh 6 and multiple loops

' Tl5.2-l Sh 7 j New SAR Pages: Tl 5 .2-1 Sh 8 SSAR 96-200 9.5 9.5-43 Emergency Diesel Generator - DCP IEC-3533 PKG 1, 2, 3

  • 1 starting and turbo-boost air
  • 1

' compressor start/stop pressure switch setpoint change to stop at 245 psig rising from 250 SSAR 96-201 10 10-iv Correction of miscellaneous CR 960703098 5.S 5.S-6 minor errors from UFSAR 7.3 7.3-20 Revision 12 change notice incorporation

Salem UFSAR Change"pproved for Incorporation in Revis~'16 Page 25 12/16/97 CN Number SSAR 96-205 Affected Sections 8.3 Affected Pages/Figuresffables 8.3-17 8.3-19 Description Replacement of 125 voe battery chargers Initiating or Ref. Document DeP I Ee-3385 PKG I SSAR 96-206 5.6 5.6-3 Removal of Hagan instrument DeP 2Ee-3574 PKG l 5.6-4 loop 2PT458A for Pressurizer pressure narrow range differential pressure SSAR 96-207 9.3 T9.3-6 SH 12 eves System - change relief CR 960325 I 22 valve capacities 1

Salem UFSAR Change.pproved for Incorporation in Revis~'16 Page 26 12/16/97

  • 1 CN Number SSAR 96-209 Affected Sections 7.3 Affected Pages/Figuresffables 7.3-27 T7.3-3 sh I T7.3-3 sh 2 T7.3-4 sh I Description Containment flood level following a LOCA is being changed from elevation 83'- l" to 84'-0" to include additional Initiating or Ref. Document CR 960418084 T7.3-4 sh 10 water volume from the T7.3-4sh 12 accumulators and reactor T7.3-4 sh 13 coolant blowdown - update T7.3-4sh 13a Tables 7.3-4, 7.3-5, 7.3-6 and T7.3-4sh 14 7.3-7 T7.3-4sh 15 T7.3-4 sh 16 T7.3-4 sh 17 T7.3-4 sh 2 T7.3-4 sh 23 T7.3-4 sh 24 T7.3-4 sh 25 T7.3-4 sh 26 T7.3-4 sh 27 T7.3-4 sh 28 T7.3-4 sh 29 T7.3-4 sh 3 T7.3-4 sh 30 T7.3-4 sh 31 T7.3-4 sh 32 T7.3-4 sh 33 T7.3-4 sh 34 T7.3-4 sh 35 T7.3-4 sh 36 T7.3-4 sh 37 T7.3-4 sh 38 T7.3-4 sh 39 1 T7.3-4 sh 4 l T7.3-4 sh 40 T7.3-4 sh 41

-1 T7.3-4 sh 42

' T7.3-4 sh 43 T7.3-4 sh 44 T7.3-4 sh 45 T7.3-4 sh 46 T7.3-4 sh 47 T7.3-4 sh 5 T7.3-4 sh 6 T7.3-4 sh 7 T7.3-4 sh 8 T7.3-4 sh 9 T7.3-5 sh 1 T7.3-5 sh 13 T7.3-5 sh 3

12116191 Salem UFSAR Changes Approved for Incorporation in Revision 16 ** Page 21 1

Affected Affected Initiating or CN Number Sections Pages/Figu resff ables Description Ref. Document T7.3-5 sh 5 T7.3-5 sh 6 T7.3-5 sh 7 T7.3-5 sh 9 T7.3-6 sh I T7.3-6 sh 10 T7.3-6sh 13 T7.3-6 sh 14 T7.3-6 sh 2 T7.3-6 sh 3 T7.3-6 sh 4 T7.3-6 sh 5 T7.3-6 sh 6 T7.3-6 sh 7 T7.3-6 sh 8 T7.3-6 sh 9 T7.3-7sh 1 T7.3-7 sh 2 SSAR 96-210 9.4 9.4-10 Auxiliary Building ventilation CR 950921399 CRCA 12 i.

9.4-11 system description update in 9.4-12 section 9.4.2 9.4-13 9.4-14 9.4-15 9.4-5 9.4-6 9.4-7 9.4-8 9.4-9 New SAR Pages: 9.4-Sa SSAR 96-212 6.3 T6.3-7 Clarification of centrifugal CR 960719214 charging pump horsepower rating during accident conditions

Revisi~6 1

Salem UFSAR Change-proved for Incorporation in Page 28

" 12/16/97

  • CN Number SSAR 97-001 Affected Sections 15 15.2 15-v 15-vi 15.2-2 Affected Pages/Figuresffables l 5.2-60a Description Deletion of Section 15 .2.16, Rod Withdrawal at Full Power and replaces it with Section 15.3.5, Rod Withdrawal at Full Initiating or Ref. Document l 5.2-60b *Power 15.2-61 15.3 15.3-1 15.3-14 15.3-15 15.3-16 SSAR 97-003 9.4 9.4-42 Revise Section 9.4.6 to reflect higher acceptable temperatures within areas served by SPA Vs HV AC system.

SSAR 97-004 8.1 8.1-11 Revise separation criteria for S-C-RC-ESE-0870, PR 8.1-8 emergency feeds. 960912139 New SAR Pages: 8.1-11 a

. SSAR 97-005 SSAR 97-007 9.4 11.4 9.4-7 11.4-11 Change maximum temperature in the 22 CCW heat exchanger and pump room.

Addition of closure contacts to containment sample isolation PIRS 961125199 DCP IEC-3430 valves to indicate low flow alarm on !RI l/Rl2 sample skid if valves are closed.

SSAR 97-008 10.3 10.3-10 Adds description of variable DCP I EC-3328/::!EC-3293, damping of steam flow PR 960502113 transmitters

Salem UFSAR Change!proved for Incorporation in 12/16/97 Revisi~6 Page 29

  • I CN Number SSAR 97-009 Affected Sections 11 I I. I Affected Pages/Figuresffables I I-iv I I.I-I 11.1-10 I 1.1-1 I Description Revision to incorporate updated offsite dose analysis results.

Initiating or Ref. Document S-C-FHV-MDC-1616 11.1-2 11.1-3 11.1-4 11.1-5 11.1-6 Tl I. I-I Tl I.I-I I t11.1-12 Tl 1.1-13 Tl 1.1-2 Tl.1.1-3 Tl 1.1-4 Tl 1.1-5 Tl 1.1-6 Tl 1.1-7 Sh I Tl 1.1-7 Sh 2 Tl 1.1-8 15 15-ix 15-vii 15-x 15-xxiiia 15-xxv 15.1 15.1-12 15.l-12a 15.1-13 15.1-14 j 15.1-24 I

T15.l-5 I

Tl5.l-6 J 15.3 15.3-17 15*.3-18 15.4 ,* 1_5.4-130 15.4;.16 15.4-17 15.4~18 .

15:4-19 15.4-20 15.4-21 15.4-22 15.4-23 15.4-24 15.4-25 15.4-26

  • 15.4-27

12/16/97 Salem UFSAR Chang.pproved for Incorporation in Revision 16

  • Page 30
  • )

CN Number Affected Sections Affected Pages/Figuresffables 15.4-40 I 5.4-40a 15.4-41 15.4-42 Description .

Initiating or Ref. Document 15.4-49 15.4-50 15.4-52 15.4-53 15.4-54 15.4-55 15.4-56.

15.4-61 15.4-62 15.4-63 F15.4-47A Fl5.4-47B F15.4-47C F15.4-62

< *~

Fl 5.4-63 F15.4~64 F\5.4-65 F\5.4-66 F15.4-67 T\5.4-11 T15.4-5A T15.4-5B T\5.4-5C T15.4-7 T15.4-8 Tl5.4-9 2 2-iii 2-viii

" 2.3 2.3-11 2.3-12

. 2.3-13 2.3-14 2.3-15 3A 3a-5la 3A-5lb 3A-52 3A-53 9.4 9.4-37 New SAR Pages: 2.3- l 4a, 2.3- l 4b, T2.3-21, T2.3-22, 15.4-18a, l 5.4-18b, 15.4-22a, 15.4-55a, T15.4-58 Sh 2, T15.4-7A, T15.4-78, T15.4-7C,

12/16/97 Salem UFSAR Changes Approved for Incorporation in Revision 16

  • Page 31 j

CN Number SSAR97-012 Affected Sections 8.1

"Jew SAR Pages: 8.1-11 a Affected Pages/Figuresffables 8.1-11 8.1-8 Description Correction of separation criteria for emergency feeds Initiating or Ref. Document PIRS No. 960912139 SSAR 97-013 3A 3A-5 Revise Reg Guide 1.11 PIRS 961120111 description in Section 3A to include the RVLIS instrument lines.

SSAR 97-015 9.2 T9.2-3 Edited Table 9.2-3 to clarify T9.2-4 Sh I varying charging pump flow as a result of CCW temperature and heat load. Edited Table 9.2-4 to indicate that Component Cooling* Pump rated capacity and rated head were design points.

SSAR 97-016 6.3 6.3-49 Typographical/editorial change SSAR 97-017 9.4 9.4-10 Auxiliary Building ventilation DCP 2EC-3269 pkg I 9.4-11 upgrade.

9.4-12 9.4-14 9.4-15 9.4-6 9.4-7 F9.4-2B Sh I

  • F9.4-2B Sh 2 F9.4-28 Sh 3 SSAR 97-019 14.2 Tl4.2-l Sh 6 Add SUP 20.3 to table that was inadvertently or incorrectly

.. **-:.- removed or omitted.

SSAR 97-020 5.6 5':6;5:* Unit l bypass circuitry for low DCP lEC-3620 7.2. . F7.~-5 pressurizer level isolation signal.

SSAR 97-021 9.3 9.3-32 Clarify description of CVCS 9.3-33 mixed bed demineralizers.

i I

12/16/97 Salem UFSAR Changes Approved for Incorporation in Revision 16

  • Page 32

~

Affected Affected Initiating or CN Number Sections Pages/Figu resff a hies Description Ref. Document SSAR 97-023 6.2 6.2-31 Containment Fan Coil Unit DCP 2EC-3590 pkg 15 6.2-33 (CFCU) return piping temperature increase to 221 degrees F.

SSAR 97-024 9.2 9.2-14 Revise Section 9.2.2 to address requirement for 3 Component Cooling Water pumps to be available to meet single failure requirements.

SSAR 97-025 5.1 5.1-7 Revise affected page to reflect PIRS 960725259 that the Reactor Vessel Head Vent valve will have power during normal operations SSAR 97-032 6.2 T6.2-13 Sh2 Revise note for SW58 and PIRS 960731232 SW72 in Table 6.2-13 to clarify I

that the valves are not Type C I

i tested.

  • SSAR 97-033 7.3 9.5 7.3-29 F7.3-4 9.5-22 Revise UFSAR contents regarding fuses and specific instructions for the 230V DC system in order to meet plant operations and design.

DCP 2EC-3546 i

i J

SSAR 97-034 9.4 9.4-42 Add additional details of SPA V DCP 2EC-3625 pkg 1

'j 9.4-43 9.4-44 system operations at reduced temperatures.

I I *.,.1

.. *~

SSAR 97-037 17.2 17.2-35 Change wording of 17.2.12 PIR 970220259, 970606220 (Maintenance and Test .

Equipment) to reflect current organization and practices.

SSAR 97-038 13.5 13.5-2b Remove topics no longer 13.5-2c applicable to the list of topics for Nuclear Adminstrative Procedures (NAPs) .

Salem UFSAR Change.pproved for Incorporation in Revisi'16 Page 33 l 2/l 6i97

  • _C_N !' u!_TI_b_er_

SSAR 97-039 Affected 12.3 13 13.1 12.3-1 13-i Affected

-=S:. : e-=-ct:. :.io=-=n=s__ ---=P=-=a::..cg'-'-e=-s/-=-F.:.igo..:u:..:.r.c.::es:.:_rr-=-a=-=b:.. :le=s'--

13.1-10 13.1-11 Description Reorganization of Maintenance Organization (site-wide),

Reorganization of Salem station (create new title, Initiating or Ref. Document 13.1-12 Director - Salem Operations.

13.1-13 Chemistry to report to 13.1-15 Operations and Change Senior 13.1-16 Nuclear Shift Supervisor 13.1-18 (SNSS) to Shift 13.1-2 Superintendent.)

13. l-2a 13.l-2b
13. l-3a 13.1-4 13.l-6a 13.1-8 13.1-9 F13.1-3 F13.l-8a Fl3.l-8b F13. l-8e T13.l-1 SH2 13.4 13.4-1 13.4-2 13.5 13.5-1 13.5-2 17.2 17.2-15a 17.2-16 17.2-17 17.2-19 17.2-22 17.2-23 17.2-24 17.2-28

... 17.2-29

. ~-. '***. 17.2,.33 17.2;.36 17.2-37

~)7:'.2~38

... -*. ,.t ,.,.,.,

  • 'f72-39 i7.2-4 17.2-5 17.2-6 Fl7.2-l 9.5 9.5-3 9.5-4 NewSARPages: 17.2-7a, 17.2-7c, 17.2-7k

Salem UFSAR Change!proved for Incorporation in Revisio'16 Page 34 12/16/97 l

I CN Number SSAR 97-044 Affected Sections 13.1 Affected Pages/Figuresffables 13.l-3a

13. l-3b 13.1-4 13.1~5 Description Reorganization within the Nuclear Engineering Department.

Initiating or Ref. Document 13.1-6

13. l-6a Fl3. l-5 Fl3. l-5a SSAR 97-046 8.1 8.1-7 Free air cable separation in S-C-ZZ-ESE-0841. rev 2 8.1-9 limited hazard areas SSAR 97-047 6.3 6.3-13 Editorial correction,tPf Technical Specification T6.3-4 minimum required RWST Amendments 55 and 83 9,1 9.1-15 volume to bring UFSAR in compliance with Technical Specification 3.1.2.6 and 3.5.5 changes made in accordance with Amendments 55 and 83 SSAR 97-051 13. l .13.l-6a Incorporates Technical Tech Spec amendments 192 13.l-6b Specification Amendments 192 and I 75 Fl3.l-7 and 175 to relocate Tech Spec Tl3.l-1SH1 section 6.5 to UFSAR section T13.l-1SH2 I 7.2 and change Safety Review 13.4 13.4-1 Group to Nuclear Review 13.4-2 Board.

17.2 17.2-19 17.2-40 17.2-6

-1 I 17.2-7 Fl7.2-l T17.2-l Sh l T17.2-l Sh 2 3A 3A-5 3A-5la 3A-5lb 7.2 7.2-38 7A 7A-4 New SAR Pages: l7.2-7a, l7.2-7b, l7.2-7c, l7.2-7d, l7.2-7e, l7.2-7f, l7.2-7g, l7.2-7h, 17 .2-7i, 17 .2-7j, l7.2-7k

1 lI ~

Salem UFSAR Change.pproved for Incorporation in Revisi16

. !* Page 35 12/16/97

  • 1 Affected Affected Initiating or CN Number Sections Pages/Figu resffables Description Ref. Document SSAR 97-052 7A . 7A-6 Reconcile UFSAR Section 7 A License amendments I 14/96 with NRC approved license and 176/157 amendments 114/96 and 176/157 SSAR 97-054 6.2 F6.2-l 7 Revise to incorporate DCP DCP 2EC-36 I 2 F6.2-26 2EC-3612 F6.2-38 F6.2-44 T6.2-IO Sh 3 T6.2-IO Sh 8 T6.2-12 Sh 3 SSAR 97-056 6.2 T6.2-6 Revise RHR pump NPSH Cale# S-C-RHR-MDC-1711 6.3 6.3-9 parameters for recirculation T6.3-13 Sh 2 mode of operation SSAR 97-057 7.2 7.2-32 Revise UF:SAR based on DCP 2EC-36 I 7 pkg I F7.2-4 changes to Pressurizer pressure 7.5 7.5-4 circuits in accordance with DCP 2EC-36 l 7 pkg l

'* SSAR 97-058 11.4 11.4-11 Adds description of a loss of flow alann modification for containment atmosphere DCP I EC-3430 pkg I radiation monitors lR11/lR12.

SSAR 97-059 13. I 13.l-6b Transferred the responsibility 17.2 17.2-5 ofthe Quality Verification.

17.2-6 function from the Manager -

Corrective & Quality Services

--
  • ' to the Manager - Quality Assessment, Salem/Hope Creek SSAR 97-061 5.2 T5.2-9b Update to Table 5.2-9b to PR 970410102 include a note that 23 S/G was designed to ASME Section III, 1965 and all addenda thfough Winter 1995 .

'f >

I Salem UFSAR Chang.lpproved for Incorporation in Revisi!6 Page 36

I 12/16/97 i

Affected Affected Initiating or CN Number Sections Pages/Figuresrfables Description Ref. Document I SSAR 97-063 6.4 6.4-2 Revision to the Control Area DCP I EC-3505 pkg 11.

T6.4-3 Ventilation System parameters SSAR CN 96-031 9.4 9.4-3 based on implementation of DCP I EC-3505 pkg I I

-;ew SAR Pages: 9.4-4b, 9.4-4d, 9.4-4f SSAR 97-064 13.1 13.1-6 Transfer of Project Managers 13.1-8 and their associated functions 17.2 17.2-19 from Nuclear Engineering to Nuclear Business Support.

SSAR 97-065 9.4 9.4-42 Add additional details of SPA V DCP lEC-3701pkg1 9.4-43 system operation at reduced 9.4-44 temperatures.

F9.4-6a SSAR 97-066 8.1 8.1-7 Revise Section 8.1.2.4.2 to Safety Evaluation S-C-ZZ-address containment free air ESE-0875, SSAR CN 97-046 separation SSAR 97-069 6.3 6.3-9 Revises RHR Mode 4 Hot Leg LCR S97-77 T6.3-6 Sh 3 recirculation alignment.

SSAR 97-071 6.3 6.3-34 Revision to RWST draindown 2-EOP-LOCA-3, SSAR CN 6.3-35 analysis96-004 6.3-36 6.3-37 T6.3-6 Sh l T6.3-6 Sh 2 T6.3-6 Sh 3 New SAR Pages: 6.3-36a,63-36b, 6.3-36c SSAR 97-073 6.3 T6.3**13 Sh 2 Revises NPSH for RHR pumps S-C-RHR-MDC-171 l, Rev.

on Table 6.3-13 previously l, SSAR CN 97-056 revised by SSAR CN 97-056 .

.. Salem UFSAR Changetproved for Incorporation in Revisi'16 12/16/97 Page 37 i

Affected Affected Initiating or CN Number Sections Pages/Figuresffables Description Ref. Document SSAR 97-076 9.3 9.3-59 Revise UFSAR Section 9.3.6.1 PR 960723057 to identify that PASS ventilation exhaust is filtered with HEPA filters and not aligned to the charcoal adsorbers.

SSAR 97-079 8.3 8.3-9 Revise description of when DCP I EC-3438 diesel generator breaker closes after a startup.

SSAR 97-080 9.4 9.4-42 Revises design basis for CA V S-l-CAV-MDC-1722, Rev. 0 area maximum temperatures in Normal and Emergency Summer operations.

SSAR 97-081 4.2 4.2-79 Corrects rod drop time and TS amendment 96/72, PIRS 4.2-80 surveillance requirements in 970415279 Section 4 to concur with Technical Specifications.

i. SSAR 97-083 6.3 6.3-21 Revise UFSAR Section 6.3.2.2 regarding bolting materials for motor operated valves.

PR 970418269 SSAR 97-085 7.7 7.7-28 Updates information on Flux Technical Specifications, Peaking Factor to become Westinghouse WCAP-7308-consistent with Technical L-P-A Specifications.

SSAR 97-086 3A 3A-45 Update reference to Regulatory Reg. Guide I.IOI, NuReg

. 3A-46 Guide I.IOI, remove old 0654/FEMARep-I and

SSAR 97-087 9.5 9.5-43 Adds description of turbo-boost DCP I EC-3695 to EOG Starting Air Systeni

f Salem UFSAR Change.proved for Incorporation in Revisi.6 Page 38

  • 12/16/97
  • CN Number SSAR 97-091 Affected Sections 12.3 12.4 3.11 Affected

~_ges/Figuresffables __ _

12.3-4 12.4-1 F3A-3 F3A-4 Descrip_tion Revise post accident iodine analysis methods and make miscellaneous editorial corrections -

Initiating or Ref. Document 3A 3A-54 3A-55 A A-56 A-57 SSAR 97-094 9.4 9.4-2 Revises the Chilled Water DCP 2EE-03 17 Control Valve 2CH1_68 description in accordance with modifications perfonned under DCP 2EE-03 l 7.

New SAR Pages: 9.4-4a, 9.4-4b SSAR 97-095 9.4 9.4 Implements controls DCP lEE-0371 F9.4-1A modifications to the Control Area Air Conditioning System (CAACS).

New SAR Pages: 9.4-4a: 9.4-4b SSAR 97-096 9.4 9.4-12 Provide new loss-of-power DCP lEC-3510 9.4-13 damper fail-safe positions for five ABV dampers and new bypass valves for charcoal filter unit 14 outlet damper controls .

Salem UFSAR Change-proved for Incorporation in Revisi.16 Page 39

" 12/16/97

  • Affected Sections 10.3 Affected Pages/Figuresffa~I-~--

10.3-7 Description Revises the Main Steam Line surveillance test pressure from I000 psig to 800 to I 015 psig.

Initiating or Ref. Document Engineering Evaluation S-C-MS-MEE-1239 SSAR _97-103 13.1 13.1-1 Reflects NBU organizational

13. l-2b change which consolidates
13. l-6a QA/NSR, Nuclear Training
13. l-6b Center and Radiological Safety 13.1-8 under the one Director -
13. l-8a Quality, Nuclear Training and Fl3.l-2 Emergency Preparedness Fl3. l-3 Tl3.l-I Sh I 13.2 13.2-1
  • 17.2 17.2-13 17.2-15a 17.2-3 17.2-4 17.2-5 17.2-6 I.

17.2-7 Fl7.2-l Tl7.2-l Sh I 8.1 8.1-12 9.5 9.5-3 9.5-4 New SAR Pages: I 7.2-4a, l 7.2-5a, 17.2-6a, 17.2-7e, I 7.2-7f, 17.2-7g, l 7.2-7i, 17.2-7j, 17.2-7k 1 SSAR 97-106 5.2 T5.2-4 Revise Pressurizer Relief Tank DES-92-00400 l (PRT) rupture disc pressure from 85 to 100 psig.

J SSAR 97-108 15.2 15.2-14 Allowable control rod position LCR 97-19, WCAP-14962-P 15.2-62 deviation for Unit 2 is being 4.3 4.3-23 changed from+/- 12 steps to 7.5 T7.5-2 Sh 8 +/- 18 steps <=85% power and

+/- 12 steps >85% power.

Salem UFSAR Chang.!proved for Incorporation in 12/16/97 Revisi~6 Page -lO

  • CN Number SSAR 97-111 Affected 1.6 13.1 Affected 1.6-2 1.6-6 13.1-10 13.1-11 Description Change to Operations Department responsibilities and titles Initiating or Ref. Document 13.1-12 13.1-13 13.1-14 13.1-15 13.1-9 Fl3.l-6 F13. l-8a Fl3. l-8b Tl3. I-I Sh I 17.2 17.2-37 9.5 9.5-3

~e:N SAR Pages: 6.4-la, 9.4-la SSAR 97-113 15.4 Tl5.4-21sh16 Description of fiberglass

  • DCP 2EE-0225 6.3 *6.3-32 blanket anti-sweat insulation installed on 3" and 2" service water piping on CFCUs in the Salem Unit 2 Containment.
  • SSAR 97-117 13.1 13.l-18a 13.1-2 13.l-2a Fl3. l-6 Fl3. l-8a Shift of responsibility for Loss Prevention and Nuclear Security organizations. The General Manager - Hope Creek Operations will assume 9.5 9.5-3 responsibility for Loss
  • Prevention and the General Manager - Salem Operations will assume responsibility for Nuclear Security.

J SSAR 97-118 17.2 17.2-16 Removes the statement Regulatory Guide 1.64 specifying a Nuclear Engineering Manual and clarifies that Nuclear Engineering Procedures provide implementation guidance .

)l I .,,,

.. Salem UFSAR Change.pproved for Incorporation in Revisi-6 12/16/97 Page 41

  • CN Number SSAR 97-119 Affected Sections I. I Affected Pages/Figuresffables I. 1-1 Description Completion of correction to shared components and systems overlooked in Section 1.1 when corrections were Initiating or Ref. Document DCP 1EC-3505. SSAR CN

?6-03 I and 50.59 Safety Eva! S96-147 made to Section 3.1 as part of CN 96-031 SSAR 97-120 7.3 7.3-7 Edit page 7 .3-7to correct the PR 960812109. SSAR CN description of the Unit 2 RWST 96-175 level instrumentation.

SSAR97-121 17.2 17.2-19 Nomenclature and NC.DE-AP.ZZ-0004 (Q) responsibility changes for the process of updating and approving design drawings.

SSAR 97-122 13.l 13.l-6b Consolidation of Manager -

13. 1-7 Corrective Action with 13.1-8 Managers Emergency 17.2 17.2-4 Preparedness and Instructional 17.2-5 Technology. New Manager Fl7.2-I title: Manager - Corrective Action, Emergency Preparedness and lnstri.ictional Technology. Also moves Quality Service functions from Manager - Corrective Action to Director - Quality, Nuclear Training and Emergency

! Preparedness.

i New SAR Pages: I 7 .2-4a 1

j SSAR 97-125 3.6 Correction of IEEE Standard 279-1968 incorrectly listed as "179- I 968."

SSAR 97-128 17.2 17.2-15 Revise NDE and VT SER TAC examination personnel training 69082/69043/69044 assessment period to be consistent with ASME Section XI requirements .

Salem UFSAR Change!proved for Incorporation in Revisio~ Page 42 12/I 6197

  • CN Number SSAR 97-132 Affected Sections 3.8 Affected Pages/Figures/Tables F3.8-36 Description Revise Personnel Airlock general arrangement figure to remove unecessary detail.

Initiating or Ref. Document SSAR 97-134 Clarifies qualification requirements for Onsite Independent Reviewers (OIR) and makes an editorial correction to QA review of selected station procedures.

'.'iew SAR Pages: I 7.2-5a, I 7.2-7k SSAR 97-137 13.1 13.l-2a Captures the changes in

13. l-3a responsibility due to the 13.l-3b December 1997 reorganization of the Nuclear Engineering Department.

13.l-2a Transfer of the Code Assurance 10CFR50.54a of May 16, 17.2-29 Specialist functions from QA to 1997 Maintenance.

15.4-30 Deletes reference redundant data in Table 15.4-5F added by Change N:otice 96-031 and reference to Table 15.4-5F on page 15.4-30.

J New SAR Pages: Table 15.4-5F sheets 1, l 2 and 3 (added by l

  • I SSAR CN 96-031 and deleted.by this CN)

.  :~ . .;.i!.*!1~' ~;:

. *:: *.1 ~*:* ~-

l . : 1~~:: _ ~