L-18-141, Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 40: Line 40:
:                i    OPERATOR LICENSING                information collection is used to plan budgets and resources for operator examinations. Send Ii                                                      comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA
:                i    OPERATOR LICENSING                information collection is used to plan budgets and resources for operator examinations. Send Ii                                                      comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA
             ,..,        .I s
             ,..,        .I s
                .......
Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150--0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150--0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                            NRC REGION PERRY NUCLEAR POWER PLANT Docket No. 50-440, License No. NPF-58                                                                            1111 I
FACILITY                                                                                                            NRC REGION PERRY NUCLEAR POWER PLANT Docket No. 50-440, License No. NPF-58                                                                            1111 I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE
A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2020              CY 2021                                    CY 2022                                  cy2023 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                                            1                                                                                      1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY2020              CY2021                                CY2022                                  CY2023 NUMBER OF REACTOR OPERATORS 4                                                                                    4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4                                                                                    4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2                                                                                    2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0                                                                                    0 PROPOSED DATES PRIMARY DATE                                        2/15/2021                                                                          2/13/2023 ALTERNATE DATE                                        2/8/2021                                                                          2/6/2023 NRC FORM 536 (11-2017)
                                                                  -                                            -                                        -
CY2020              CY 2021                                    CY 2022                                  cy2023
                                            --
PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                                            1                                                                                      1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS
                                            -                    -                                      -                                        -
PROPOSED NUMBER                    CY2020              CY2021                                CY2022                                  CY2023 NUMBER OF REACTOR OPERATORS 4                                                                                    4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4                                                                                    4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2                                                                                    2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0                                                                                    0 PROPOSED DATES PRIMARY DATE                                        2/15/2021                                                                          2/13/2023 ALTERNATE DATE                                        2/8/2021                                                                          2/6/2023 NRC FORM 536 (11-2017)


FENOC'              ~
FENOC'              ~
Line 75: Line 68:
:                i    OPERATOR LICENSING                information collection is used to plan budgets and resources for operator examinations. Send Ii                                                      comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA
:                i    OPERATOR LICENSING                information collection is used to plan budgets and resources for operator examinations. Send Ii                                                      comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA
             ,..,        .I s
             ,..,        .I s
                .......
Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150--0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150--0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                            NRC REGION PERRY NUCLEAR POWER PLANT Docket No. 50-440, License No. NPF-58                                                                            1111 I
FACILITY                                                                                                            NRC REGION PERRY NUCLEAR POWER PLANT Docket No. 50-440, License No. NPF-58                                                                            1111 I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE
A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2020              CY 2021                                    CY 2022                                  cy2023 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                                            1                                                                                      1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY2020              CY2021                                CY2022                                  CY2023 NUMBER OF REACTOR OPERATORS 4                                                                                    4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4                                                                                    4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2                                                                                    2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0                                                                                    0 PROPOSED DATES PRIMARY DATE                                        2/15/2021                                                                          2/13/2023 ALTERNATE DATE                                        2/8/2021                                                                          2/6/2023 NRC FORM 536 (11-2017)}}
                                                                  -                                            -                                        -
CY2020              CY 2021                                    CY 2022                                  cy2023
                                            --
PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                                            1                                                                                      1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS
                                            -                    -                                      -                                        -
PROPOSED NUMBER                    CY2020              CY2021                                CY2022                                  CY2023 NUMBER OF REACTOR OPERATORS 4                                                                                    4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4                                                                                    4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2                                                                                    2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0                                                                                    0 PROPOSED DATES PRIMARY DATE                                        2/15/2021                                                                          2/13/2023 ALTERNATE DATE                                        2/8/2021                                                                          2/6/2023 NRC FORM 536 (11-2017)}}

Latest revision as of 03:13, 3 February 2020

Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations
ML18127A059
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/07/2018
From: Hamilton D
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, NRC/RGN-III
References
L-18-141
Download: ML18127A059 (3)


Text

FENOC' ~

Perry Nuclear Power Plant PO. Box 97 10 Center Road Perry. Ohio 44081 FirstEnergy Nuclear Operating Company David B. Hamilton 440-280-5382 Vice President May 7, 2018 L-18-141 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations This letter provides the Perry Nuclear Power Plant response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations. The RIS requested licensees to voluntarily submit a response using NRC Form 536 to provide information for scheduling and preparation of operator licensing examinations.

The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for calendar years 2020 through 2023. The proposed numbers for 2021 and beyond are contingent on continued operations.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mrs. Polly Boissoneault, Manager, Perry Training Section at (440) 280-5253.

Sincerely,

~

David B. Hamilton

Enclosure:

OPERATOR LICENSING EXAMINATION DATA, NRC Form 536 cc: Ms. Colleen Schmidt, Operator Licensing Section, NRC Region Ill Mr. Robert Orlikowski, Branch Chief, Operator Licensing Section, NRC Region Ill NRC Project Manager NRC Resident Inspector

Enclosure L-18-141 Operator Licensing Examination Data, NRC Form 536 (1 of 2 Pages)

NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020

¥'

(11-2017)

~P.IIEO<,<.t, Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

i OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send Ii comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA

,.., .I s

Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150--0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION PERRY NUCLEAR POWER PLANT Docket No. 50-440, License No. NPF-58 1111 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2020 CY 2021 CY 2022 cy2023 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2020 CY2021 CY2022 CY2023 NUMBER OF REACTOR OPERATORS 4 4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 PROPOSED DATES PRIMARY DATE 2/15/2021 2/13/2023 ALTERNATE DATE 2/8/2021 2/6/2023 NRC FORM 536 (11-2017)

FENOC' ~

Perry Nuclear Power Plant PO. Box 97 10 Center Road Perry. Ohio 44081 FirstEnergy Nuclear Operating Company David B. Hamilton 440-280-5382 Vice President May 7, 2018 L-18-141 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations This letter provides the Perry Nuclear Power Plant response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations. The RIS requested licensees to voluntarily submit a response using NRC Form 536 to provide information for scheduling and preparation of operator licensing examinations.

The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for calendar years 2020 through 2023. The proposed numbers for 2021 and beyond are contingent on continued operations.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mrs. Polly Boissoneault, Manager, Perry Training Section at (440) 280-5253.

Sincerely,

~

David B. Hamilton

Enclosure:

OPERATOR LICENSING EXAMINATION DATA, NRC Form 536 cc: Ms. Colleen Schmidt, Operator Licensing Section, NRC Region Ill Mr. Robert Orlikowski, Branch Chief, Operator Licensing Section, NRC Region Ill NRC Project Manager NRC Resident Inspector

Enclosure L-18-141 Operator Licensing Examination Data, NRC Form 536 (1 of 2 Pages)

NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020

¥'

(11-2017)

~P.IIEO<,<.t, Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

i OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send Ii comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA

,.., .I s

Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150--0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION PERRY NUCLEAR POWER PLANT Docket No. 50-440, License No. NPF-58 1111 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2020 CY 2021 CY 2022 cy2023 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2020 CY2021 CY2022 CY2023 NUMBER OF REACTOR OPERATORS 4 4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 PROPOSED DATES PRIMARY DATE 2/15/2021 2/13/2023 ALTERNATE DATE 2/8/2021 2/6/2023 NRC FORM 536 (11-2017)