| number = ML18135A084
| number = ML18135A084
| issue date = 04/25/2018
| issue date = 04/25/2018
| title = Millstone, Units 2 and 3, North Anna, Units 1 and 2, Surry, Units 1 and 2, NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations
| title = NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations
| author name = Sartain M D
| author name = Sartain M
| author affiliation = Dominion Energy Nuclear Connecticut, Inc, Dominion Energy Services, Inc, Dominion Energy Virginia, Virginia Electric & Power Co (VEPCO)
| author affiliation = Dominion Energy Nuclear Connecticut, Inc, Dominion Energy Services, Inc, Dominion Energy Virginia, Virginia Electric & Power Co (VEPCO)
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Dominion Energy Services, Inc. 5000 Dominion Boulevard, Glen Allen, VA 23060 DominionEnergy.com April 25, 2018 U. S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:Dominion Energy Services, Inc.
Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Dominion Energy Serial No.: 18-179 NLOS/vlh Docket Nos.: 50-336/423 50-338/339 50-280/281 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC) VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)
5000 Dominion Boulevard, Glen Allen, VA 23060                   ~ Dominion DominionEnergy.com                           April 25, 2018   ~        Energy U. S. Nuclear Regulatory Commission                           Serial No.:   18-179 Attention: Document Control Desk                              NLOS/vlh One White Flint North                                        Docket Nos.: 50-336/423 11555 Rockville Pike                                                        50-338/339 Rockville, MD 20852-2738                                                    50-280/281 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC)
MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE SUMMARY 2018-02 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2018-02, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs). No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Frank Winks at (804) 273-4610.
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)
Sincerely, Mark D. Sartain Vice President  
MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE  
-Nuclear Engineering and Fleet Support Dominion Energy Services, Inc. for Dominion Energy Nuclear Connecticut, Inc. and Virginia Electric and Power Company  
 
==SUMMARY==
2018-02 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2018-02, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Frank Winks at (804) 273-4610.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Dominion Energy Services, Inc. for Dominion Energy Nuclear Connecticut, Inc. and Virginia Electric and Power Company


==Enclosures:==
==Enclosures:==
NRC Form 536 for Millstone, North Anna and Surry Power Stations cc:      U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-271.3 U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257
SN 18-179 Scheduling of Operator Licensing Examinations Page 2 of 2 Mr. Richard Guzman U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pik~
Rockville, MD 20852-2738 Mr. James R. Hall U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 81-A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 N,RC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station
I I
NRC FORM536                            U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY 0MB: NO. 3150-0131                                          EXPIRES: 11/30/2020 (11-2017)
                    ~c,.,,.RREG(t.C..>.
Estimated burden per response to comply with this voluntary information collection request 1 hour. This
                  ..                  '?o flo                      s. OPERATOR LICENSING                information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43). U.S. Nuclear EXAMINATION DATA              Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,
                ~
                  "+., ....... I  ""                                          and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                                    NRC REGION Millstone Power Station Unit 2                                                                                              I I                                                                                                                        11                                                        I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                              CY 20              CY 21                                      CY 22                                    CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED                              1                    0                                              1                                      0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                                0                    0                                              0                                      0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                              CY 20              CY 21                                CY 22                                    CY 23 NUMBER OF REACTOR OPERATORS                                8                                                                  8 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 4                                                                  4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4                                                                  4 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                              0                                                                  0 PROPOSED DATES PRIMARY DATE                            09/14/20                                                      09/12/22 ALTERNATE DATE                            09/21/20                                                      09/19/22 NRC FORM 536 (11-2017)


NRC Form 536 for Millstone, North Anna and Surry Power Stations cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-271.3 U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Richard Guzman U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pik~ Rockville, MD 20852-2738 Mr. James R. Hall U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 81-A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 N,RC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station SN 18-179 Scheduling of Operator Licensing Examinations Page 2 of 2 I I ! NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES:
NRC FORM536                           U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY 0MB: NO. 3150-0131                                         EXPIRES: 11/30/2020 (11-2017)
11/30/2020 (11-2017)  
                ~..:J~*""""'-<>o                                           Estimated burden per response to comply with this voluntary infonmation collection request 1 hour. This
~c,.,,.RREG(t.C..>.
            . 0                    ~
.. '?o OPERA TOR LICENSING Estimated burden per response to comply with this voluntary information collection request 1 hour. This f s information collection is used to plan budgets and resources for operator examinations.
OPERATOR LICENSING                infonmation collection is used to plan budgets and resources for operator examinations. Send
Send lo .. EXAMINATION DATA comments regarding burden estimate to the Information Services Branch (T-2 F43). U.S. Nuclear I Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,  
            /!!
"+., "" and to the Desk Officer, Office of Information and Regulatory  
            \;;                      .
: Affairs, NEOB-10202, (3150-0131),
n 0
Office ....... of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
EXAMINATION DATA comments regarding burden estimate to the lnfonmation Services Branch (T-2 F43), U.S. Nuclear
FACILITY NRC REGION I Millstone Power Station Unit 2 11 I I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ---------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ------------NUMBER OF REACTOR 8 8 OPERATORS NUMBER OF SENIOR REACTOR 4 4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 4 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 09/14/20 09/12/22 ALTERNATE DATE 09/21/20 09/19/22 NRC FORM 536 (11-2017)
              ~                    I:~                                    Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,
              ...,4'.,,        ~o"'                                      and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonmation collection.
FACILITY                                                                                                                 NRCREGION North Anna Power Station Units 1 & 2                                                                                     II I                                                                                                                      11                                                         I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                           CY 20               CY 21                                       CY 22                                   CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED                             1                   0                                             1                                       0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                             0                   0                                             0                                       0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                           CY 20             CY 21                                 CY 22                                     CY 23 NUMBER OF REACTOR OPERATORS 7                                                                  8 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT                             7                                                                  3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2                                                                  2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0                                                                  0 PROPOSED DATES PRIMARY DATE                         06/08/20                                                       06/06/22 ALTERNATE DATE                         06/15/20                                                       06/13/22 NRC FORM 536 (11-2017)


NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES:
NRC FORM536                                 U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY 0MB: NO. 3150-0131
11/30/2020 (11-2017)
* EXPIRES: 11/30/2020 (11-2017)
~*""""'-<
                ,;:,Y,$1'-f/.REG(tl..f>.
~..:J >o OPERA TOR LICENSING Estimated burden per response to comply with this voluntary infonmation collection request 1 hour. This 0 infonmation collection is used to plan budgets and resources for operator examinations.
Estimated burden per response to comply with this voluntary information collection request 1 hour. This
Send /!! n .. 0 comments regarding burden estimate to the lnfonmation Services Branch (T-2 F43), U.S. Nuclear \;; .. EXAMINATION DATA I:~ Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,
              ..                     <?,.
...,4'.,,
            ~
~o"' and to the Desk Officer, Office of Information and Regulatory
ti
: Affairs, NEOB-10202, (3150-0131),
                                        ~
Office ...... of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonmation collection.
                                          "0 OPERATOR LICENSING               information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear t;                           :
FACILITY NRCREGION I North Anna Power Station Units 1 & 2 11 II I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ----------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ------------NUMBER OF REACTOR 7 8 OPERATORS NUMBER OF SENIOR REACTOR 7 3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 06/08/20 06/06/22 ALTERNATE DATE 06/15/20 06/13/22 NRC FORM 536 (11-2017)
EXAMINATION DATA               Regulatoiy Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, *
NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131
            \ ,s..l)
* EXPIRES:
                      .......      +,O
11/30/2020 (11-2017)  
                                      #                                         and to the Desk Officer, Office of Information and Regulatoiy Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRG may not conduct or sponsor, and a person Is not required to respond to, the information collection.
,;:,Y,$1'-f/.REG(tl..f>.
FACILITY                                                                                                                       NRCREGION Surry Power Station Units 1 & 2                                                                                                 II I                                                                                                                            11                                                         I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                                 CY 20               CY 21                                     CY 22                                     CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED                                   1                   0                                             1                                       0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                                   0                   0                                             0                                     0 EXAMINATIONS
Estimated burden per response to comply with this voluntary information collection request 1 hour. This .. <?,. OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.
: 8. INITIAL OPERATORLICENSE EXAMINATIONS PROPOSED NUMBER                                 CY 20             CY 21                                 CY 22                                   CY 23 NUMBER OF REACTOR OPERATORS 11                                                                 11 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT                                   3                                                                  3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2                                                                  2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0                                                                  0 PROPOSED DATES PRIMARY DATE                               08/03/20                                                       08/01/22 ALTERNATE DATE                               08/10/20                                                       08/08/22 NRG FORM 536 (11-2017)}}
Send ti " .. 0 comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear t; : EXAMINATION DATA Regulatoiy Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,  
* \ # and to the Desk Officer, Office of Information and Regulatoiy  
: Affairs, NEOB-10202, (3150-0131),
Office ,s..l) +,O ....... of Management and Budge~ Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRG may not conduct or sponsor, and a person Is not required to respond to, the information collection.
FACILITY NRCREGION I Surry Power Station Units 1 & 2 11 II I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 -----------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS  
: 8. INITIAL OPERATORLICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ------------NUMBER OF REACTOR 11 11 OPERATORS NUMBER OF SENIOR REACTOR 3 3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 08/03/20 08/01/22 ALTERNATE DATE 08/10/20 08/08/22 NRG FORM 536 (11-2017)}}

Latest revision as of 00:51, 3 February 2020

NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations
ML18135A084
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 04/25/2018
From: Mark D. Sartain
Dominion Energy Nuclear Connecticut, Dominion Energy Services, Dominion Energy Virginia, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18135A084 (6)


Text

Dominion Energy Services, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 ~ Dominion DominionEnergy.com April 25, 2018 ~ Energy U. S. Nuclear Regulatory Commission Serial No.: 18-179 Attention: Document Control Desk NLOS/vlh One White Flint North Docket Nos.: 50-336/423 11555 Rockville Pike 50-338/339 Rockville, MD 20852-2738 50-280/281 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC)

VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)

MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE

SUMMARY

2018-02 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2018-02, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Frank Winks at (804) 273-4610.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Dominion Energy Services, Inc. for Dominion Energy Nuclear Connecticut, Inc. and Virginia Electric and Power Company

Enclosures:

NRC Form 536 for Millstone, North Anna and Surry Power Stations cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-271.3 U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257

SN 18-179 Scheduling of Operator Licensing Examinations Page 2 of 2 Mr. Richard Guzman U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pik~

Rockville, MD 20852-2738 Mr. James R. Hall U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 81-A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 N,RC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station

I I

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~c,.,,.RREG(t.C..>.

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

.. '?o flo s. OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43). U.S. Nuclear EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,

~

"+., ....... I "" and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Millstone Power Station Unit 2 I I 11 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 NUMBER OF REACTOR OPERATORS 8 8 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 4 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 4 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 PROPOSED DATES PRIMARY DATE 09/14/20 09/12/22 ALTERNATE DATE 09/21/20 09/19/22 NRC FORM 536 (11-2017)

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~..:J~*""""'-<>o Estimated burden per response to comply with this voluntary infonmation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

. 0 ~

OPERATOR LICENSING infonmation collection is used to plan budgets and resources for operator examinations. Send

/!!

\;; .

n 0

EXAMINATION DATA comments regarding burden estimate to the lnfonmation Services Branch (T-2 F43), U.S. Nuclear

~ I:~ Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,

...,4'.,, ~o"' and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonmation collection.

FACILITY NRCREGION North Anna Power Station Units 1 & 2 II I 11 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 NUMBER OF REACTOR OPERATORS 7 8 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 7 3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 PROPOSED DATES PRIMARY DATE 06/08/20 06/06/22 ALTERNATE DATE 06/15/20 06/13/22 NRC FORM 536 (11-2017)

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131

  • EXPIRES: 11/30/2020 (11-2017)

,;:,Y,$1'-f/.REG(tl..f>.

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

.. <?,.

~

ti

~

"0 OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear t;  :

EXAMINATION DATA Regulatoiy Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, *

\ ,s..l)

....... +,O

  1. and to the Desk Officer, Office of Information and Regulatoiy Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRG may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRCREGION Surry Power Station Units 1 & 2 II I 11 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS

8. INITIAL OPERATORLICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 NUMBER OF REACTOR OPERATORS 11 11 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 3 3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 PROPOSED DATES PRIMARY DATE 08/03/20 08/01/22 ALTERNATE DATE 08/10/20 08/08/22 NRG FORM 536 (11-2017)