{{#Wiki_filter:Dominion _Energy Nuclear Connecticut, Inc. Rt 156, J36pe Ferry Road, Waterford, CT 06385 Dominion Energy.com U. S. Nuclear Regulatory Commission Attention: | {{#Wiki_filter:Dominion _Energy Nuclear Connecticut, Inc. | ||
Document Control Desk Washington, DC 20555 | Rt 156, J36pe Ferry Road, Waterford, CT 06385 Dominion Energy.com JUL 2 3 2019 ft Dominion iji#"' Energy U. S. Nuclear Regulatory Commission Serial No. 19-291 Attention: Document Control Desk NSSL/MLC RO Washington, DC 20555 Docket No. 50-423 License No. NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. | ||
Sincerely, L. J. Armstrong Director, Nuclear Safety and Licensing | MILLSTONE POWER STATION UNIT 3 INSERVICE INSPECTION PROGRAM ~ OWNER'S ACTIVITY REPORT, REFUELING .OUTAGE 19 Dominion Energy Nuclear Connecticut, Inc. (DENG) hereby submits the American Society of Mechanical En_gineers (ASME), Section XI, Form OAR-1, Owne'r's Activity Report, for the period from November 15, 2017 through Refueling Outage 19, completed on May 14, *2019 for Millstone Power Station Unit 3. The enclosure is in accordance with the requirements of ASME Code Case N-532-4. | ||
-Millstone | If you have any questions or require additional information, please contact Jeffry A. | ||
Langan at (860) 444-5544. | |||
Sincerely, L. J. Armstrong Director, Nuclear Safety and Licensing - Millstone | |||
==Enclosure:== | ==Enclosure:== | ||
: 1. Owner's Activity Report, Refueling Outage 19, Revision 0. | |||
Commitments made in this letter: None | |||
' Serial No. | |||
: . ENCLOSURE 1 * . *. OWNER'S ACTIVITY REPORT * : REFUELING OUTAGE 19 *. REVISION 0 -_*.--... * -~--.,, -=~-. --.. --:_ . | Serial No. 19-291 MPS3 Owner's Activity Report Docket No. 50-423 Page 2 of 2 cc: U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman Senior Project Manager - Millstone Power Station U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station | ||
' Serial No. 197291 Docket Nci:*56-423 : . | |||
ENCLOSURE 1 | |||
* .*. OWNER'S ACTIVITY REPORT *: | |||
REFUELING OUTAGE 19 | |||
*. REVISION 0 | |||
- _*.--... * -~- -.,, - =~- . - - .. - - :_ . | |||
---~-= ~- | |||
*. *. DOMINION ENERGY NUCl,.EAR CONNECTICUT, INC. | |||
*MILLSTONE POWER STATION UNIT 3 | |||
MILLSTONE POWER STATION UNIT NO. 3 OWNER'S ACTIVITY REPORT REFUELING OUTAGE 19 Revision 0 Contents: | MILLSTONE POWER STATION UNIT NO. 3 OWNER'S ACTIVITY REPORT REFUELING OUTAGE 19 Revision 0 Contents: | ||
OAR-1 Report Number: MP3-3R19 Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service. Table 2: Abstract of Repairs/Replacement Activities Required for Continued Service Prepared By: | OAR-1 Report Number: MP3-3R19 Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service. | ||
Table 2: Abstract of Repairs/Replacement Activities Required for Continued Service 1 I Prepared By: Date: fofs'/ ffe.o Ir I I Reviewed By: Date: | |||
Independent Review Reviewed By: Date: t?d* f': Z,;/ | |||
Form OAR-1 Owner's Activity Report Attachment 1, ER-AA-ISl-100 | Form OAR-1 Owner's Activity Report Attachment 1, ER-AA-ISl-100 | ||
* Page 1 of 3 Report Number: | * Page 1 of 3 Report Number:_ _,.,_M"""P=3_.-3_,_R,,.,1. ,.9_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Plant _ _ _ _ _.,.,M"'"il,,,ls"""toe<!n...,e<-'P'-'o""w""ee<!r...,S""t"'"at,,.,io""n.u.,....R,.,,o""p"'"e.._F-"'e,...rry-'-'-'R"'o""'a""d.'-'W,.,_,,,at,,,e""'rf""o,.,rd..,..-"'C<-'=o"-'n"-'ne""c,,.,t'""'ic,._ut"-"-06:.:.:3"'8""5'-------- | |||
_ | Unit No._-=3==------- Commercial service date April 26. 1986 Refueling outage no. ___,1..,.9_ __ | ||
Unit | (if applicable} | ||
Commercial service date April 26. 1986 Refueling outage no. ___,1..,. | 1 Current inspection interval _C=o=m'-'-""-pl=e~tio=n~of'""3,,,,rd,..l~n""te=rv.,_,a=I.._/=B=eg"'"'i"""'n.,_,_ni=n..,g_.,o.... f . .,_4_h..,..ln=te=rv'-'=al,___ _ _ _ _ _ _ _ _ __ | ||
(1 5\ 2n°, 3rd, 41\ other) 1 Current inspection period _ _.3~rd~i'"'nt=e.c.,rv="a~l-:c3:rrd~p-,:;e=r=io~d..../~4_ 11.._5_1 p""'ea.. ... | |||
=B=eg"'"'i"""'n.,_,_ni=n..,g_.,o | h~ln=t=erv.....;.;a.... n*o~d,___ _ _ _ _ _ _ _ _ _ _ __ | ||
.... f | (1st, 2na, 3ra) | ||
Edition and Addenda of Section XI applicable to the inspection plans 2004 Edition. No Addenda for the 3rd Interval I | |||
. 2013 Edition. No Addenda for the 4th Inspection Interval. _ __ | |||
-:c3:rrd~p-,:;e=r=io~d | Date and revision of inspection plans Interval 3 - 07/31/2017 Revision 2, Change OS/ Interval 4 - 2/23/2019 Revision 0 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans NIA Code Cases used: N-460 N-532-4 N-722-1 N-729-4 N-770-2 (if applicable) | ||
.... /~ | CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the | ||
-completion of | |||
* 3R19-* conform to the requirements of Section-XI. -* | |||
* o~d,__ | (refueling outage number) | ||
Date 06/05/2019 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Connecticut and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford. Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI. | |||
_ __ Date and revision of inspection plans Interval 3 -07/31/2017 Revision 2, Change OS/ Interval 4 -2/23/2019 Revision 0 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans NIA Code Cases used: N-460 N-532-4 N-722-1 N-729-4 N-770-2 (if applicable) | By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a Joss of any kind arising from or connected with this inspection. | ||
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the -completion of | Insr's | ||
* 3R19-* conform to the requirements of Section-XI. | -~-~...* ...~"'l-"""'""=~r;,,~'---¥b.-'""~'-----'""""'"- Commissions'.-.L.~==-~..u:i..-+--"--~~:.-:.--4~,c,&.~~""""-.,.LZ S1gnaturv | ||
-* (refueling outage number) Date 06/05/2019 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Connecticut and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford. | * Date t!lt *I/.;:: | ||
Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a Joss of any kind arising from or connected with this inspection. | * ZoL.P | ||
-~-~ ... * ... ~"'l-"""'""=~r;,,~'---¥b.-'""~'-----'""""'"- | |||
Commissions'.-.L.~==-~..u:i..-+--"--~~:.-:.--4~,c,&.~~""""-.,.LZ | .Form OAR-1 Owner's Activity Report Attachment 1, ER-AA-ISl-100 Page 2 of 3 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number Corrosion on support shim plate evaluated by Engineering and found to Pipe Support F-A/ F1.30F be acceptable for continued service as 3-CCP-3-PSS467 documented in UIR MP3-19-0D1/ | ||
* Date t!lt * /.;:: | |||
* ZoL.P | |||
. Form OAR-1 Owner's Activity Report Attachment 1, ER-AA-ISl-100 Page 2 of 3 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number Corrosion on support shim plate | |||
CR1119813. | CR1119813. | ||
Pipe support alignment evaluated by Engineering and found to be acceptable | Pipe support alignment evaluated by Engineering and found to be acceptable Pipe Support for continued service as documented in F-A/ F1.20A 3-FWS-4-PSR011 UIR MP3-19-002 / CR1120902. | ||
/ CR1120902. | |||
Adjustment performed to align support to restore back to oriqinal desiQn condition. | Adjustment performed to align support to restore back to oriqinal desiQn condition. | ||
Support spring load setting evaluated by | Support spring load setting evaluated by Pipe Support Engineering and found to be acceptable F-A/ F1.10C 3-RCS-1-PSSH127 for continued service as documented in UIR MP3-19-0D3 / CR1120925. | ||
/ CR1120925. | |||
Form OAR-1 Owner's Activity Report Attachment 1, ER-AA-ISl-100 Page 3 of 3 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code Class Item Description Description of Work Date Repair/Replacemen.t Completed Plan Number Replace Flange on 3 Pipe Flange | Form OAR-1 Owner's Activity Report Attachment 1, ER-AA-ISl-100 Page 3 of 3 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code Class Item Description Description of Work Date Repair/Replacemen.t Completed Plan Number Replace Flange on Service Water Line 3 Pipe Flange 01/31/2019 53203239241 3-SWP-006-33-3 Replace 3HVR*ACU1 B 3 Cooling coil upper and lower chilled 05/10/2019 53102849005 | ||
-*---water cooling coils * *--Repair flange on Service | - *- - -water cooling coils * *- - | ||
Repair flange on Service Water Spool piece 3-3 Pipe Flange 04/26/2019 53203244488 SWP-21-3 Repair corrosion damage on inlet flange and elbow 3 Pipe Flange / Elbow 04/26/2019 53103131366 of Service Water line 3-SWP-018-311-3}} |
Latest revision as of 03:52, 2 February 2020
ML19211B167 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 07/23/2019 |
From: | Armstrong L Dominion Energy Nuclear Connecticut |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
19-291 | |
Download: ML19211B167 (7) | |
Text
Dominion _Energy Nuclear Connecticut, Inc.
Rt 156, J36pe Ferry Road, Waterford, CT 06385 Dominion Energy.com JUL 2 3 2019 ft Dominion iji#"' Energy U. S. Nuclear Regulatory Commission Serial No.19-291 Attention: Document Control Desk NSSL/MLC RO Washington, DC 20555 Docket No. 50-423 License No. NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 3 INSERVICE INSPECTION PROGRAM ~ OWNER'S ACTIVITY REPORT, REFUELING .OUTAGE 19 Dominion Energy Nuclear Connecticut, Inc. (DENG) hereby submits the American Society of Mechanical En_gineers (ASME),Section XI, Form OAR-1, Owne'r's Activity Report, for the period from November 15, 2017 through Refueling Outage 19, completed on May 14, *2019 for Millstone Power Station Unit 3. The enclosure is in accordance with the requirements of ASME Code Case N-532-4.
If you have any questions or require additional information, please contact Jeffry A.
Langan at (860) 444-5544.
Sincerely, L. J. Armstrong Director, Nuclear Safety and Licensing - Millstone
Enclosure:
- 1. Owner's Activity Report, Refueling Outage 19, Revision 0.
Commitments made in this letter: None
Serial No.19-291 MPS3 Owner's Activity Report Docket No. 50-423 Page 2 of 2 cc: U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman Senior Project Manager - Millstone Power Station U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station
' Serial No. 197291 Docket Nci:*56-423 : .
ENCLOSURE 1
- .*. OWNER'S ACTIVITY REPORT *:
REFUELING OUTAGE 19
- . REVISION 0
- _*.--... * -~- -.,, - =~- . - - .. - - :_ .
---~-= ~-
- . *. DOMINION ENERGY NUCl,.EAR CONNECTICUT, INC.
- MILLSTONE POWER STATION UNIT 3
MILLSTONE POWER STATION UNIT NO. 3 OWNER'S ACTIVITY REPORT REFUELING OUTAGE 19 Revision 0 Contents:
OAR-1 Report Number: MP3-3R19 Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service.
Table 2: Abstract of Repairs/Replacement Activities Required for Continued Service 1 I Prepared By: Date: fofs'/ ffe.o Ir I I Reviewed By: Date:
Independent Review Reviewed By: Date: t?d* f': Z,;/
Form OAR-1 Owner's Activity Report Attachment 1, ER-AA-ISl-100
- Page 1 of 3 Report Number:_ _,.,_M"""P=3_.-3_,_R,,.,1. ,.9_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Plant _ _ _ _ _.,.,M"'"il,,,ls"""toe<!n...,e<-'P'-'o""w""ee<!r...,S""t"'"at,,.,io""n.u.,....R,.,,o""p"'"e.._F-"'e,...rry-'-'-'R"'o""'a""d.'-'W,.,_,,,at,,,e""'rf""o,.,rd..,..-"'C<-'=o"-'n"-'ne""c,,.,t'""'ic,._ut"-"-06:.:.:3"'8""5'--------
Unit No._-=3==------- Commercial service date April 26. 1986 Refueling outage no. ___,1..,.9_ __
(if applicable}
1 Current inspection interval _C=o=m'-'-""-pl=e~tio=n~of'""3,,,,rd,..l~n""te=rv.,_,a=I.._/=B=eg"'"'i"""'n.,_,_ni=n..,g_.,o.... f . .,_4_h..,..ln=te=rv'-'=al,___ _ _ _ _ _ _ _ _ __
(1 5\ 2n°, 3rd, 41\ other) 1 Current inspection period _ _.3~rd~i'"'nt=e.c.,rv="a~l-:c3:rrd~p-,:;e=r=io~d..../~4_ 11.._5_1 p""'ea.. ...
h~ln=t=erv.....;.;a.... n*o~d,___ _ _ _ _ _ _ _ _ _ _ __
(1st, 2na, 3ra)
Edition and Addenda of Section XI applicable to the inspection plans 2004 Edition. No Addenda for the 3rd Interval I
. 2013 Edition. No Addenda for the 4th Inspection Interval. _ __
Date and revision of inspection plans Interval 3 - 07/31/2017 Revision 2, Change OS/ Interval 4 - 2/23/2019 Revision 0 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans NIA Code Cases used: N-460 N-532-4 N-722-1 N-729-4 N-770-2 (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the
-completion of
- 3R19-* conform to the requirements of Section-XI. -*
(refueling outage number)
Date 06/05/2019 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Connecticut and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford. Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a Joss of any kind arising from or connected with this inspection.
Insr's
-~-~...* ...~"'l-"""'""=~r;,,~'---¥b.-'""~'-----'""""'"- Commissions'.-.L.~==-~..u:i..-+--"--~~:.-:.--4~,c,&.~~""""-.,.LZ S1gnaturv
- Date t!lt *I/.;::
- ZoL.P
.Form OAR-1 Owner's Activity Report Attachment 1, ER-AA-ISl-100 Page 2 of 3 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number Corrosion on support shim plate evaluated by Engineering and found to Pipe Support F-A/ F1.30F be acceptable for continued service as 3-CCP-3-PSS467 documented in UIR MP3-19-0D1/
CR1119813.
Pipe support alignment evaluated by Engineering and found to be acceptable Pipe Support for continued service as documented in F-A/ F1.20A 3-FWS-4-PSR011 UIR MP3-19-002 / CR1120902.
Adjustment performed to align support to restore back to oriqinal desiQn condition.
Support spring load setting evaluated by Pipe Support Engineering and found to be acceptable F-A/ F1.10C 3-RCS-1-PSSH127 for continued service as documented in UIR MP3-19-0D3 / CR1120925.
Form OAR-1 Owner's Activity Report Attachment 1, ER-AA-ISl-100 Page 3 of 3 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code Class Item Description Description of Work Date Repair/Replacemen.t Completed Plan Number Replace Flange on Service Water Line 3 Pipe Flange 01/31/2019 53203239241 3-SWP-006-33-3 Replace 3HVR*ACU1 B 3 Cooling coil upper and lower chilled 05/10/2019 53102849005
- *- - -water cooling coils * *- -
Repair flange on Service Water Spool piece 3-3 Pipe Flange 04/26/2019 53203244488 SWP-21-3 Repair corrosion damage on inlet flange and elbow 3 Pipe Flange / Elbow 04/26/2019 53103131366 of Service Water line 3-SWP-018-311-3