ML19263D346: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 36: Line 36:
                                                                                                                                                       ~
                                                                                                                                                       ~
[_j
[_j
                                                                                                                                                                        ,,
[o_j u
[o_j u
T A st E    A T ON              ON PL Ard T      M TH                        Hour 5 22          S B af D        FO          H        sup*L R              MANt FACTL ER LTJ@L2J@
T A st E    A T ON              ON PL Ard T      M TH                        Hour 5 22          S B af D        FO          H        sup*L R              MANt FACTL ER LTJ@L2J@
Line 44: Line 43:
36              s'                      40    43              41                    a3            de              47 CAUSE DESCR.PTION AND CORRECflVE ^CTiONS h i  O        1 %e Fafety Va17es were carred due to excessive leakage, with the                                                                                                              l
36              s'                      40    43              41                    a3            de              47 CAUSE DESCR.PTION AND CORRECflVE ^CTiONS h i  O        1 %e Fafety Va17es were carred due to excessive leakage, with the                                                                                                              l
   )i ii j i excettion of the three gagged on 11/21/78.                                                                            No more tha.n three Safety                                      i
   )i ii j i excettion of the three gagged on 11/21/78.                                                                            No more tha.n three Safety                                      i
         ,  , i Valves were ever inoperable on either Steam Generator and the Linear
         ,  , i Valves were ever inoperable on either Steam Generator and the Linear 3        l Power High Trip Setpoint was always 5 405, meeting requirenents of m1 Action Statement T.S.3.7.1.la. Corrective action is included in attached, 8,lc,,,ppronological log.                                                      9        ,, ,,,00 0, en status                srOWER                          OT**EH ST ATUS L)            Dt SCOV E R Y                          DISCO'. E HY DE SCHIP flON i  5        [B_J@ l 012 l Ol@p0f max. duringl W@l NA                                                                                                                                      l
        ,
3        l Power High Trip Setpoint was always 5 405, meeting requirenents of m1 Action Statement T.S.3.7.1.la. Corrective action is included in attached,
  '
8,lc,,,ppronological log.                                                      9        ,, ,,,00 0, en status                srOWER                          OT**EH ST ATUS L)            Dt SCOV E R Y                          DISCO'. E HY DE SCHIP flON i  5        [B_J@ l 012 l Ol@p0f max. duringl W@l NA                                                                                                                                      l
                                                         ''      's            em                u        as        4c                                                                      so
                                                         ''      's            em                u        as        4c                                                                      so
               " STiviiv A            CO'4T E NT RE LE ASE D OF PELE ASE                          AVOUNT OF ACTivrTV                                                            LOct.f'ON OF HEL E A$(
               " STiviiv A            CO'4T E NT RE LE ASE D OF PELE ASE                          AVOUNT OF ACTivrTV                                                            LOct.f'ON OF HEL E A$(
       '    c                                                                                                            NA
       '    c                                                                                                            NA
                     'Lz.J @' LZ.J8L NA l            l                                                                                l
                     'Lz.J @' LZ.J8L NA l            l                                                                                l
  '
               '                                                                                "              ''                                                                            aa PEH50 NEi Ex,0s#Es NuM.E.                T ,E        OuLe,P1,0N@
               '                                                                                "              ''                                                                            aa PEH50 NEi Ex,0s#Es NuM.E.                T ,E        OuLe,P1,0N@
l i I e l I o l 01 Ol@LZ_J@l NA                                                                                                                                                                l
l i I e l I o l 01 Ol@LZ_J@l NA                                                                                                                                                                l
Line 62: Line 56:
       ' 9            L;;.J@l            NA                                                                                                                                                      l
       ' 9            L;;.J@l            NA                                                                                                                                                      l
   ,          - -                io                                                                                                                                                            ,,
   ,          - -                io                                                                                                                                                            ,,
PV 9 LICI TV I$syEO        DE SC A t P TION Ob                                                                                                                        bbC UbE UIdlY 2 o            lltjbl                NA                                                                                                                  1 ll llllll ll ltl
PV 9 LICI TV I$syEO        DE SC A t P TION Ob                                                                                                                        bbC UbE UIdlY 2 o            lltjbl                NA                                                                                                                  1 ll llllll ll ltl AME OF PREPAnER                                                                                      PHO'J E 7903270 % o
                                                                                          *      '
AME OF PREPAnER                                                                                      PHO'J E 7903270 % o


; ..
; ..

Revision as of 19:36, 1 February 2020

LER 79-019/03L-0 on 781031:w/both Reactor Coolant Loops & Associated Steam Generators in Operation,One or More Main Steam Line Safety Valves Were Inoperable.Caused by Safety Valve Gagging.W/Chronological Log Describing Incidents
ML19263D346
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/22/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19263D333 List:
References
LER-79-019-03L, LER-79-19-3L, NUDOCS 7903270480
Download: ML19263D346 (2)


Text

.

NRC FORM 366 U. S. NUCLE AR REGULATORY COMMISSION (7 77)

LICENSEE EVENT REPORT EXHIBIT A CONTROL BLOCK: (PLEASE PRINT OR TYPE ALL REOLIRED INFORMATIONI l l l \ \ lh 7

O i 8

l Aj R l A l Nl 01 2l@4l 0j0 l-l0 l0l 0l Oj0l- l0l0 [ g l1 l1j1 9 UCENSEE CODE nd UCENSE NUMBEH 25 2[a L K . N *.,E BYri Jo l1jg[ l b F C A T $8 g

CCN*1 7

O i 8

%Ta%60 LLJ@l0 61 I s 10 10 i 01316 i si@il DOCetET NUMBER tw1 69 i 0 EVENT i 3 lDATE 117 i 81@l 01_374 75 l 212 I 71980 l@

HFPOH1 OATE EVEN T DESCRIPTION ANC PROBASLE CONSEQUENCES h o 2 i With both Reactor Coolant loops and associated Steam Generators in l 0 3 1 operation, one or more t'.ain Steam line code Safety Valves were inoperablp O 4 I driny Mode 1. 2. or 7 contrary to T.S.3.7.1.1. Valve inoperability andj n s I unit operation status are detailed on attached chronological log. The j O is I relieving capacity of the remaining safety valves exceeded that recuired; e i I for safe overation, as dictated by T.S. Table 3.7.-l. l o s J Pecortable_per T.S.6.9.1.9 (b). no similar occurrences.  ;

7 8 9 80 Sv'; 3 E M CAJ$E C AUS E LOUP ,Agyg CCDE LCCE SUBCCDE COMPONE NT CODE %vv Lt e 5J4 LODE la191

' 8 I cI cl@ [d@ L3J@ IV I A I LIV I El XJ@ {@ { @

L to Ii 12 13 1A h 20

_ SE QUE N TI AL OCLURAT Vf NE Post i GE V'580N LE A k0 EVENTvtAR EEPORTNO CODi TYPt m,0

@ ?g.= _17, 191 2 n l-J a

1011191 u a L,_J 2

101 31 n .,

LLJ

~

[_j

[o_j u

T A st E A T ON ON PL Ard T M TH Hour 5 22 S B af D FO H sup*L R MANt FACTL ER LTJ@L2J@

JJ 34 LU@

3>

LZJ@ 1010101 u1 Lr.J@ LL_1@ L'LJ@ ILl21615l@

36 s' 40 43 41 a3 de 47 CAUSE DESCR.PTION AND CORRECflVE ^CTiONS h i O 1 %e Fafety Va17es were carred due to excessive leakage, with the l

)i ii j i excettion of the three gagged on 11/21/78. No more tha.n three Safety i

, , i Valves were ever inoperable on either Steam Generator and the Linear 3 l Power High Trip Setpoint was always 5 405, meeting requirenents of m1 Action Statement T.S.3.7.1.la. Corrective action is included in attached, 8,lc,,,ppronological log. 9 ,, ,,,00 0, en status srOWER OT**EH ST ATUS L) Dt SCOV E R Y DISCO'. E HY DE SCHIP flON i 5 [B_J@ l 012 l Ol@p0f max. duringl W@l NA l

's em u as 4c so

" STiviiv A CO'4T E NT RE LE ASE D OF PELE ASE AVOUNT OF ACTivrTV LOct.f'ON OF HEL E A$(

' c NA

'Lz.J @' LZ.J8L NA l l l

' " aa PEH50 NEi Ex,0s#Es NuM.E. T ,E OuLe,P1,0N@

l i I e l I o l 01 Ol@LZ_J@l NA l

' ' ' ,Easo~N A'. ;u'n'iEs

=

~uM.En OEsCai,TiO~@

i x 1010 0 l@l NA l 7 8 it 11 12 g LOS'. OF OR DAMAGE TO F ACILITY TVPE OESCRsP1 ION

' 9 L;;.J@l NA l

, - - io ,,

PV 9 LICI TV I$syEO DE SC A t P TION Ob bbC UbE UIdlY 2 o lltjbl NA 1 ll llllll ll ltl AME OF PREPAnER PHO'J E 7903270 % o

..

ATTACHMENT LER 50-368/79-019 MAIN STEAM SAFETY VALVE GAGGING CHRONOLOGICAL LOG DATE TIME DESCRIPTION 10/31/78 2205 2PSV1052, 2PSV1056 gagged due to leakage, Mode 3 operation.

11/ 1/78 2015 2PSV1052 ungagged; no leakage, valve seated properly follow-ing system heatup.

11/ 2/78 2050 2PSVIO02 gagged due to leakage.

11/ 3/78 2230 2PSV1052 gagged due to leakage.

11/ 8/78 1733 2PSV1052 ungagged for test, remained ungagged, 11/11/78 2135 To Mode 4 or 5 operation, Mode 3 operation with safety valves inoperable for 263.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

11/16/78 2PSV1002 replaced guide ring and worn rings. 2PSV1052 replaced worn rings. 2PSV1056 adjusted control and worn rings.

11/19/78 2010 To Mode 3 operation; 2PSV1056, 2PSV1002 inoperable.

11/21/78 0830 2PSV1052 gagged due to leakage.

11/21/78 2115 2PSV1055, 2PSV1052, 2PSV1056 remained gagged due to testing, no lockpins on worn ring.

11/28/78 New lockpins installed on all valves. 2PSV1002, 2PSV1055, 2PSV1056 ungagged. 2PSV1052 remained gagged due to gauled worn ring.

12/ 2/78 2353 To Mode 4 or 5 operation, Mode 3 operation with safety valves inoperable _ for 315.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.

12/ 5/78 1455 To Mode 3, 2,1 or Reactor Critical 0260 F (Initial Criti-cality) operation; 2PSV1052 inoperable.

12/17/78 1000 2PSV1002 gagged due to leakage.

12/20/78 2057 To Mode 4 operation, Mode 3, 2 or 1 operation with safety valves inoperable for 366.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />.

12/22/78 0320 To Mode 3, 2 or 1 operation; 2PSV1002, 2P'V1052 inoperable.

12/22/78 0900 2PSV1056 gagged due to leakage.

12/23/78 1410 To Mode 4 or 5 operation, Mode 3, 2 or 1 operation with safety valves inoperable for 34.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

12/25/78 2147 To Mode 3, 2 or 1 operation; 2PSV1002, 2PSV1052, 2PSV1056 inoperable.

12/27/78 0700 2PSV1053 gagged due to leakage.

12/30/78 1250 2PSV1056 ungagged, no leakage. 2PSV1054 gagged due to leakage.

2/ 1/79 0106 To Mode 4 or 5 operation. Mode 3, 2 or 1 operation with safety .ves inoperable for 890.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Total hours to date, 1870.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. 2PSV1002, 2PSV1052, 2PSV1053, 2PSV1054 repaired during present outage. All valves modified with new stem guide and realignment of seating surfaces to alleviate the problem of premature leakage.