ML19318C073: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 19: | Line 19: | ||
{{#Wiki_filter:__ _ . _ ._ _ _ __. . __ .__ | {{#Wiki_filter:__ _ . _ ._ _ _ __. . __ .__ | ||
. v. | . v. | ||
(]) | (]) | ||
2-ST-ll | 2-ST-ll | ||
: 1) Pase 2, Step 2.2, add the following: "and verify flIS has been calibrated for low temperature conditions (500' F)." | |||
: 1) Pase 2, Step 2.2, add the following: "and verify flIS has been calibrated | |||
for low temperature conditions (500' F)." | |||
: 2) Page 3, add to Step 2.11: " Set interval for a two minute trend." | : 2) Page 3, add to Step 2.11: " Set interval for a two minute trend." | ||
: 3) Page 3, Step.2.12, change "UO969" to U0965". | : 3) Page 3, Step.2.12, change "UO969" to U0965". | ||
Line 34: | Line 27: | ||
i | i | ||
: 5) Page 8, caution after Step 4.7, change "once" to "if". | : 5) Page 8, caution after Step 4.7, change "once" to "if". | ||
i | i | ||
: 6) Page 11, add to Step 4.23: "Using the reactivity computer, verify the | : 6) Page 11, add to Step 4.23: "Using the reactivity computer, verify the reactor is shutdown." l | ||
reactor is shutdown." l | |||
: 7) Attachment 6.7, page 1. change first sentence to read as follows: "During the performance of these tests, operation will be controlled by the follow- 1 ing criteria." | : 7) Attachment 6.7, page 1. change first sentence to read as follows: "During the performance of these tests, operation will be controlled by the follow- 1 ing criteria." | ||
l | l | ||
: 8) Attachment 6.7, page 1, item A., change "For all tests" to " Operational guidelines for all tests". | : 8) Attachment 6.7, page 1, item A., change "For all tests" to " Operational guidelines for all tests". | ||
: 9) Attachnent 6.7, page 1, Item A.c.(1), change "21" to "> 22". . | : 9) Attachnent 6.7, page 1, Item A.c.(1), change "21" to "> 22". . | ||
A 8008800 5/A ~}} | A 8008800 5/A ~}} |
Latest revision as of 07:10, 1 February 2020
ML19318C073 | |
Person / Time | |
---|---|
Site: | North Anna ![]() |
Issue date: | 06/24/1980 |
From: | VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | |
Shared Package | |
ML19318C068 | List: |
References | |
2-ST-11-01, 2-ST-11-1, NUDOCS 8006300512 | |
Download: ML19318C073 (1) | |
Text
__ _ . _ ._ _ _ __. . __ .__
. v.
(])
2-ST-ll
- 1) Pase 2, Step 2.2, add the following: "and verify flIS has been calibrated for low temperature conditions (500' F)."
- 2) Page 3, add to Step 2.11: " Set interval for a two minute trend."
- 3) Page 3, Step.2.12, change "UO969" to U0965".
- 4) Page 7, add 3.19: " 3.19 During the conduct of this test, the Test Engineer will make determinations relating to the amount of data being recorded (i.e. soeed records, collecting of data, etc.). This determina-tion will be ' oaded on the ability of the collected data to adequately reproduce th~e natural circulation conditions. The Test Engineer will meet the qualifications of a Startup Test Engineer as defined in the FSAR."
i
- 5) Page 8, caution after Step 4.7, change "once" to "if".
i
- 6) Page 11, add to Step 4.23: "Using the reactivity computer, verify the reactor is shutdown." l
- 7) Attachment 6.7, page 1. change first sentence to read as follows: "During the performance of these tests, operation will be controlled by the follow- 1 ing criteria."
l
- 8) Attachment 6.7, page 1, item A., change "For all tests" to " Operational guidelines for all tests".
- 9) Attachnent 6.7, page 1, Item A.c.(1), change "21" to "> 22". .
A 8008800 5/A ~