Changes to Procedure 2-ST-11, Effect of Steam Generator Secondary Side Isolation on Natural Circulation
ML19318C073
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/24/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19318C068 List:
References
2-ST-11-01, 2-ST-11-1, NUDOCS 8006300512
Download: ML19318C073 (1)


Text

__

v.

(])

2-ST-ll 1)

Pase 2, Step 2.2, add the following:

"and verify flIS has been calibrated for low temperature conditions (500' F)."

2) Page 3, add to Step 2.11:

" Set interval for a two minute trend."

3) Page 3, Step.2.12, change "UO969" to U0965".
4) Page 7, add 3.19:

3.19 During the conduct of this test, the Test Engineer will make determinations relating to the amount of data being recorded (i.e. soeed records, collecting of data, etc.).

This determina-tion will be ' aded on the ability of the collected data to adequately o

reproduce th~e natural circulation conditions.

The Test Engineer will meet the qualifications of a Startup Test Engineer as defined in the FSAR."

i 5)

Page 8, caution after Step 4.7, change "once" to "if".

i 6)

Page 11, add to Step 4.23:

"Using the reactivity computer, verify the reactor is shutdown."

l

7) Attachment 6.7, page 1. change first sentence to read as follows:

"During the performance of these tests, operation will be controlled by the follow-1 ing criteria."

l

8) Attachment 6.7, page 1, item A., change "For all tests" to " Operational guidelines for all tests".
9) Attachnent 6.7, page 1, Item A.c.(1), change "21" to "> 22".