2-ST-ll 1)
Pase 2, Step 2.2, add the following:
"and verify flIS has been calibrated for low temperature conditions (500' F)."
- 2) Page 3, add to Step 2.11:
" Set interval for a two minute trend."
- 3) Page 3, Step.2.12, change "UO969" to U0965".
- 4) Page 7, add 3.19:
3.19 During the conduct of this test, the Test Engineer will make determinations relating to the amount of data being recorded (i.e. soeed records, collecting of data, etc.).
This determina-tion will be ' aded on the ability of the collected data to adequately o
reproduce th~e natural circulation conditions.
The Test Engineer will meet the qualifications of a Startup Test Engineer as defined in the FSAR."
i 5)
Page 8, caution after Step 4.7, change "once" to "if".
i 6)
Page 11, add to Step 4.23:
"Using the reactivity computer, verify the reactor is shutdown."
l
- 7) Attachment 6.7, page 1. change first sentence to read as follows:
"During the performance of these tests, operation will be controlled by the follow-1 ing criteria."
l
- 8) Attachment 6.7, page 1, item A., change "For all tests" to " Operational guidelines for all tests".
- 9) Attachnent 6.7, page 1, Item A.c.(1), change "21" to "> 22".