Forwards Revisions to Procedures 2-ST-8,2-ST-9 & 2-ST-11 Re Natural Circulation Verification Training Plan for Conduct of Tests Submitted
Date released: 11/28/2019 Download: ML19318C068


Changes to Procedure 2-ST-11, Effect of Steam Generator Secondary Side Isolation on Natural Circulation.
ML19318C073
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/24/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML19318C073 (1)
Changes to Procedure 2-ST-9, Natural Circulation W/Simulated Loss of Circulation Verification.
ML19318C071
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/24/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML19318C071 (1)
Changes to Procedure 2-ST-8, Natural Circulation Verification.
ML19318C070
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/24/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML19318C070 (1)
Forwards Revisions to Procedures 2-ST-8,2-ST-9 & 2-ST-11 Re Natural Circulation Verification Training Plan for Conduct of Tests Submitted
ML19318C067
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/24/1980
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: DENTON H R, YOUNGBLOOD B J
Office of Nuclear Reactor Regulation
References
Download: ML19318C067 (2)