Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211D920 | 20 August 1999 | Revised Pages to Third Ten Year ISI Program & Relief Requests | |
ML20195B588 | 14 May 1999 | Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 | Boric Acid Stroke time Cold shutdown justification Scaffolding |
ML20195B569 | 14 May 1999 | Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 | Boric Acid Stroke time Cold shutdown justification Power Operated Valves Scaffolding |
ML20205P234 | 1 May 1999 | Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 | Boric Acid Time of Discovery High Radiation Area Hydrostatic Nondestructive Examination VT-2 Through-Wall Leak Dissimilar Metal Weld Scaffolding |
ML20205P251 | 1 May 1999 | Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component Supports | VT-2 Dissimilar Metal Weld |
ML20205P265 | 4 February 1999 | Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure Tests | B.5.b Mitigating Strategies |
ML20206N885 | 14 December 1998 | Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval | Boric Acid Hydrostatic VT-2 |
ML20206N871 | 30 November 1998 | Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component Supports | Boric Acid VT-2 Scaffolding |
ML20236H531 | 1 July 1998 | Draft Nuclear Control Room Operator Development Program NAPS Module NCRODP-78 Spent Fuel Dry Storage Cask System. Draft Lesson Plans & Job Performance Measures Included | Safe Shutdown Earthquake Job Performance Measure Design basis earthquake Earthquake |
ML20236H554 | 4 June 1998 | Rev 5 to Procedure VPAP-0810, Crane & Hoist Program | Safe Shutdown Job Performance Measure Control of Heavy Loads |
ML20236H539 | 4 June 1998 | Rev 1 to Procedure VPAP-0809, NUREG-0612 Heavy Load Program | Safe Shutdown Control of Heavy Loads Scaffolding |
ML20206N858 | 30 April 1998 | Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430 | Hydrostatic Nondestructive Examination VT-2 Dissimilar Metal Weld Scaffolding Grace period |
ML20236H570 | 2 April 1998 | Rev 8 to Procedure VPAP-1901, Industrial Safety & Health | Fitness for Duty Fire Protection Program Fatality |
ML20236H563 | 10 February 1998 | Rev 11 to Procedure VPAP-0105, Fitness for Duty Program | Fitness for Duty Fatality |
ML20210Q205 | 31 December 1997 | 1997 Severe Accident Management Tabletop (Scenario 1) Drill Manual | Severe Accident Management Guideline |
ML20199G568 | 30 June 1997 | Rev 5 to VPAP-2001, Station Planning & Scheduling. Even Numbered Pages of Incoming Submittal Not Included | Shutdown Margin Maintenance Rule Program Scaffolding Grace period |
ML20210Q199 | 10 June 1997 | Rev 0 to VPAP-2604, Severe Accident Mgt Guideline (SAMG) Program Administration | Reactor Vessel Water Level Severe Accident Management Guideline |
ML20199G446 | 29 August 1996 | Rev 28 to 1-MOP-6.90, Emergency Diesel Generator 1-EE-EG-1H. Page 35 of 72 in Attachment 4 of Incoming Submittal Was Not Included | Boric Acid Maintenance Rule Program Offsite Circuit |
ML20236H556 | 2 August 1996 | Rev 3 to Procedure TRCP-0009, Instructional Staff Training & Qualifications | |
ML20134J960 | 31 May 1996 | /Unit 2 Fuel Assembly Insp Program | |
ML20138B542 | 16 May 1996 | Rev 7 to VPAP-2103, Odcm | |
ML20217K448 | 31 October 1995 | Seismic Design & Evaluation Guidelines for DOE HLW Storage Tanks & Appurtenances | Hydrostatic Design basis earthquake Earthquake |
ML20084U181 | 30 April 1995 | Rev 5 to Second 10-yr Interval ISI Program Plan | |
ML20069A797 | 29 March 1994 | Second Interval ISI Plan, Rev 5 ISI Program,Rev 3 | |
ML20065H922 | 30 November 1993 | ISI Program General Second Insp Interval | |
ML20058N491 | 5 November 1993 | Rev 7 to North Anna Units 1 & 2 IST Program Plan Second Insp Interval 901214-001214 | |
ML20092M906 | 1 September 1991 | Rev 2 to VPAP-2103, Odcm | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20081F350 | 28 May 1991 | Rev 1 to North Anna Unit 1 Inservice Insp Plan for Components & Component Supports,Second Insp Interval | |
ML20082K821 | 3 May 1991 | Rev 1 to Station Administrative Procedure VPAP-2104, Radwaste Process Control Program | Process Control Program |
ML18151A655 | 14 November 1990 | Revised Corporate Emergency Plan Implementing Procedures, Including Rev 0 to CPIP-1.0,CPIP-2.0,CPIP-2.1,CPIP-2.2, CPIP-2.3,CPIP-2.4,CPIP-2.5,CPIP-2.6,CPIP-3.0,CPIP-3.1 & CPIP-3.2 | Minimum staff |
ML20058C115 | 17 October 1990 | Inservice Testing Program Plan for North Anna Unit 1 | |
ML20065P274 | 30 September 1990 | Rev 1 to Vol 1 of VEPCO North Anna Power Station Unit 2 Inservice Insp Plan for Second Insp Interval:For Components & Component Supports 901214-001214 | |
ML20065P271 | 30 September 1990 | Vol 1,Rev 0 to VEPCO North Anna Power Station Unit 1 Inservice Insp Plan for Second Insp Interval:For Components & Component Supports Dec 1988 - Dec 1998 | |
ML20058G055 | 31 August 1990 | Inservice Insp Program for Second Insp Interval,Vol 1,Inservice Insp Program for Components & Component Supports | |
ML20055D493 | 14 June 1990 | Rev 6 to VEPCO North Anna Power Station Unit 1 Inservice Testing Program Plan for Pumps & Valves Second Insp Interval 901214-001214 | |
ML20055D494 | 14 June 1990 | Rev 6 to VEPCO North Anna Power Station Unit 2 Inservice Testing Program Plan for Pumps & Valves Second Insp Interval 901214-001214 | |
ML20043B109 | 27 April 1990 | Rev 0 to Station Administrative Procedure VPAP-2103, Odcm. | |
ML20043B111 | 27 April 1990 | Rev 0 to Station Administrative Procedure VPAP-2104, Radwaste Process Control Program. | Boric Acid Offsite Dose Calculation Manual Process Control Program |
ML20248E920 | 3 October 1989 | Inservice Testing Program Plan for Pumps & Valves First Insp Interval 780606 - 901214, Rev 5 | |
ML20248E923 | 3 October 1989 | Inservice Testing Program Plan for Pumps & Valves First Insp Interval 801214 - 901214, Rev 5 | |
ML20197F126 | 31 March 1988 | Rev 0 to Inservice Insp Program Plan for Second Insp Interval,Vol 1,Inservice Insp Program Plan for Components & Component Supports,880606-980606. W/92 Oversize Drawings | High Radiation Area Hydrostatic VT-2 Incorporated by reference Dissimilar Metal Weld Scaffolding |
ML20235U339 | 12 June 1987 | Revised Emergency Plan Implementing Procedures,Including Rev 1.00 to 1-ES-3.1, Post-STGR Cooldown Using Backfill (W/No Attachments) & Rev 1.00 to 1-EP-0, Reactor Trip or Safety Injection (W/No Attachments). Related Info Encl | |
ML20215K268 | 19 December 1985 | Offsite Dose Calculation Manual,North Anna Power Station Units 1 & 2 | Offsite Dose Calculation Manual Process Control Program |
ML20215K273 | 27 November 1985 | Process Control Program,North Anna Power Station Units 1 & 2 | Boric Acid Incorporated by reference Process Control Program |
ML20108A104 | 4 March 1985 | Proposed Methodology for Implementing Mechanical Cleaning of Svc Water Piping & Repair of Svc Water Isolation Valves | Through Wall Leak |
ML20108B580 | 28 February 1985 | VEPCO Proposed Program,Mechanical Cleaning & Valve Repair Svc Water Sys,North Anna Power Station,Feb 1985. W/One Oversize Drawing.Aperture Card Available in PDR | |
ML20112G377 | 15 November 1984 | Emergency Exercise 841115,Exercise Manual | |
ML18141A530 | 1 March 1984 | Control Room Design Review Program Plan for North Anna & Surry Power Stations, in Response to Suppl 1 to NUREG-0737 | Backfit |
ML20079L536 | 21 December 1983 | Public Version of Rev 5 to Emergency Plan Implementing Procedure EPIP-3.04, Activation of Emergency Operation Facility | |
ML18142A137 | 15 September 1983 | Procedure 1-OP-4.19, Receipt & Storage of Spent Fuel TN-8L Shipping Cask,Unloading & Handling Procedures. |