: 1)    Pase 2, Step 2.2, add the following: "and verify flIS has been calibrated for low temperature conditions (500' F)."
: 2) Page 3, add to Step 2.11:          " Set interval for a two minute trend."
: 3) Page 3, Step.2.12, change "UO969" to U0965".
: 4) Page 7, add 3.19: "              3.19 During the conduct of this test, the Test Engineer will make determinations relating to the amount of data being recorded (i.e. soeed records, collecting of data, etc.). This determina-tion will be ' oaded on the ability of the collected data to adequately reproduce th~e natural circulation conditions.        The Test Engineer will meet the qualifications of a Startup Test Engineer as defined in the FSAR."
i
: 5)    Page 8, caution after Step 4.7, change "once" to "if".
i
: 6)    Page 11, add to Step 4.23:      "Using the reactivity computer, verify the reactor is shutdown."                                                                l
: 7) Attachment 6.7, page 1. change first sentence to read as follows: "During the performance of these tests, operation will be controlled by the follow-          1 ing criteria."
l
: 8) Attachment 6.7, page 1, item A., change "For all tests" to " Operational guidelines for all tests".
: 9) Attachnent 6.7, page 1, Item A.c.(1), change "21" to "> 22".    .
A 8008800          5/A                                  ~}}

Latest revision as of 07:10, 1 February 2020

Changes to Procedure 2-ST-11, Effect of Steam Generator Secondary Side Isolation on Natural Circulation.
ML19318C073
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/24/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19318C068 List:
References
2-ST-11-01, 2-ST-11-1, NUDOCS 8006300512
Download: ML19318C073 (1)


Text

__ _ . _ ._ _ _ __. . __ .__

. v.

(])

2-ST-ll

1) Pase 2, Step 2.2, add the following: "and verify flIS has been calibrated for low temperature conditions (500' F)."
2) Page 3, add to Step 2.11: " Set interval for a two minute trend."
3) Page 3, Step.2.12, change "UO969" to U0965".
4) Page 7, add 3.19: " 3.19 During the conduct of this test, the Test Engineer will make determinations relating to the amount of data being recorded (i.e. soeed records, collecting of data, etc.). This determina-tion will be ' oaded on the ability of the collected data to adequately reproduce th~e natural circulation conditions. The Test Engineer will meet the qualifications of a Startup Test Engineer as defined in the FSAR."

i

5) Page 8, caution after Step 4.7, change "once" to "if".

i

6) Page 11, add to Step 4.23: "Using the reactivity computer, verify the reactor is shutdown." l
7) Attachment 6.7, page 1. change first sentence to read as follows: "During the performance of these tests, operation will be controlled by the follow- 1 ing criteria."

l

8) Attachment 6.7, page 1, item A., change "For all tests" to " Operational guidelines for all tests".
9) Attachnent 6.7, page 1, Item A.c.(1), change "21" to "> 22". .