| number = ML16243A477
| number = ML16243A477
| issue date = 08/25/2016
| issue date = 08/25/2016
| title = Brunswick Steam Electric Plant, Units 1 and 2 - U.S. Nuclear Regulatory Commission Emergency Preparedness Inspection Report 05000325/2016502 and 05000324/2016502
| title = U.S. Nuclear Regulatory Commission Emergency Preparedness Inspection Report 05000325/2016502 and 05000324/2016502
| author name = Bonser B R
| author name = Bonser B
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
| addressee name = Gideon W R
| addressee name = Gideon W
| addressee affiliation = Progress Energy Carolinas, Inc
| addressee affiliation = Progress Energy Carolinas, Inc
| docket = 05000324, 05000325
| docket = 05000324, 05000325
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 25, 2016 William Site Vice President Brunswick Steam Electric Plant
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ust 25, 2016


8470 River Road SE (M/C BNP001)
==SUBJECT:==
 
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000325/2016502 AND 05000324/2016502
Southport, NC 28461
 
SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000325/2016502 AND 05000324/2016502


==Dear Mr. Gideon:==
==Dear Mr. Gideon:==
On July 28, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Brunswick Steam Electric Plant, Units 1 and 2. The enclosed inspection report (IR)
On July 28, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Brunswick Steam Electric Plant, Units 1 and 2. The enclosed inspection report (IR)
documents the inspection results that were discussed on July 28, 2016, with you and members  
documents the inspection results that were discussed on July 28, 2016, with you and members of your staff.
 
of your staff.


The NRC inspectors did not identify any findings or violations of more than minor significance.
The NRC inspectors did not identify any findings or violations of more than minor significance.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public inspections, exemptions, requests for withholding," of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter, its Enclosure, and your response if any, will be available electronically for public inspection in the NRC's Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter, its Enclosure, and your response if any, will be available electronically for public inspection in the NRCs Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/
reading-rm/adams.html (the Public Electronic Reading Room).
reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA: Adam D. Nielsen for/  
Sincerely,
 
/RA: Adam D. Nielsen for/
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62  
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62


===Enclosure:===
===Enclosure:===
NRC IR 05000325 and 324/2016502  
NRC IR 05000325 and 324/2016502 w/Attachment: Supplementary Information


===w/Attachment:===
REGION II==
Supplementary Information
Docket Nos: 05000325 and 05000324 License Nos: DPR-71 and DPR-62 Report Nos: 05000325/2016502 and 05000324/2016502 Licensee: Duke Energy Progress, Inc.


cc: Distribution via Listserv
Facility: Brunswick Steam Electric Plant, Units 1 and 2 Location: Southport, NC Dates: July 25-28, 2016 Inspectors: Steven P. Sanchez, Senior Emergency Preparedness Inspector Christopher A. Fontana, Emergency Preparedness Inspector John D. Hickman, Emergency Preparedness Inspector (Trainee)
 
Wade T. Loo, Senior Health Physicist Mark Schwieg, Resident Inspector Approved by: Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure
__ ______________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE SPS VIA EMAIL JDH9 VIA EMAIL ADN FOR CAF2 WTL ADN FOR ADN FOR BRB1 NAME S. SANCHEZ J. HICKMAN C. FONTANA W. LOO M. SCHWIEG B. BONSER DATE 8/ 23 /2016 8/ 23 /2016 8/ 25/2016 8/25 /2016 8/25 /2016 8/25/206 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Mr. William from Mr. Brian R. Bonser dated August 25, 2016
 
SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000325/2016502 AND 05000324/2016502
 
DISTRIBUTION
: G. Hopper, RII, DRP J. Dodson, RII, SR PE D. Jackson, RII, PE
 
E. Powell, RII, RIDP M. Catts, RII, SRI
 
M. Schwieg, RII, RI S. Price, RII, ORA/RC L. Gibson, RII, EICS RIDSNRRDIRS
 
Public
 
Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket Nos: 05000325 and 05000324
 
License Nos: DPR-71 and DPR-62
 
Report Nos: 05000325/2016502 and 05000324/2016502
 
Licensee: Duke Energy Progress, Inc.
 
Facility: Brunswick Steam Electric Plant, Units 1 and 2  
 
Location: Southport, NC  
 
Dates: July 25-28, 2016  
 
Inspectors: Steven P. Sanchez, Senior Emergency Preparedness Inspector Christopher A. Fontana, Emergency Preparedness Inspector John D. Hickman, Emergency Preparedness Inspector (Trainee)
Wade T. Loo, Senior Health Physicist Mark Schwieg, Resident Inspector  
 
Approved by: Brian R. Bonser, Chief Plant Support Branch 1  
 
Division of Reactor Safety  


=SUMMARY=
=SUMMARY=
Inspection Report (IR) 05000325/2016502 and 05000324/2016502; 7/25/2016 - 7/28/2016;  
Inspection Report (IR) 05000325/2016502 and 05000324/2016502; 7/25/2016 - 7/28/2016;
 
Brunswick Steam Electric Plant, Units 1 and 2; Exercise and Baseline Inspection 


This report covers an inspection by three emergency preparedness inspectors, one senior health physicist, and one resident inspector. No findings of significance were identified. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 5.
Brunswick Steam Electric Plant, Units 1 and 2; Exercise and Baseline Inspection This report covers an inspection by three emergency preparedness inspectors, one senior health physicist, and one resident inspector. No findings of significance were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.


=REPORT DETAILS=
=REPORT DETAILS=
Line 94: Line 54:
==REACTOR SAFETY==
==REACTOR SAFETY==


===Cornerstone:===
===Cornerstone: Emergency Preparedness===
Emergency Preparedness


1EP1 Exercise Evaluation
1EP1 Exercise Evaluation
Line 101: Line 60:
====a. Inspection Scope====
====a. Inspection Scope====
The onsite inspection consisted of the following review and assessment:
The onsite inspection consisted of the following review and assessment:
* The adequacy of the licensee's performance in the biennial exercise, conducted on July 26, 2016, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards in 10 CFR 50.47(b)(4), (5), (9), and (10); which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
* The adequacy of the licensees performance in the biennial exercise, conducted on July 26, 2016, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards in 10 CFR 50.47(b)(4), (5), (9), and (10); which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
* The overall adequacy of the licensee's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities," and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center, Operations Support Center, and Emergency Operations Facility.
* The overall adequacy of the licensees emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities, and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center, Operations Support Center, and Emergency Operations Facility.
* Other performance areas, such as the emergency response organization's (ERO) recognition of abnormal plant conditions; command and control, intra- and inter- facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
* Other performance areas, such as the emergency response organizations (ERO)recognition of abnormal plant conditions; command and control, intra- and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
* Past performance issues from NRC inspection reports and Federal Emergency Management Agency (FEMA)/Department of Homeland Security (DHS) exercise reports to determine the effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14).
* Past performance issues from NRC inspection reports and Federal Emergency Management Agency (FEMA)/Department of Homeland Security (DHS) exercise reports to determine the effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14).
* The post-exercise critique process and the presentation to the licensee's senior management conducted on July 28, 2016, to evaluate the licensee's self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR Part 50, Appendix E, Subsection IV.F.2.g.
* The post-exercise critique process and the presentation to the licensee's senior management conducted on July 28, 2016, to evaluate the licensees self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR Part 50, Appendix E, Subsection IV.F.2.g.


The inspectors reviewed various documents, which are listed in the Attachment. The inspectors also attended the FEMA-sponsored public meeting on July 28, 2016. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
The inspectors reviewed various documents, which are listed in the Attachment. The inspectors also attended the FEMA-sponsored public meeting on July 28, 2016. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
Line 111: Line 70:
====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.
1EP4 Emergency Action Level and Emergency Plan Changes
1EP4 Emergency Action Level and Emergency Plan Changes


====a. Inspection Scope====
====a. Inspection Scope====
Since the last NRC inspection of this program area, one revision to the emergency plan, one revision to emergency action levels, and several revisions to emergency plan implementing procedures had been made. The licensee determined that, in accordance with 10 CFR 50.54(q), the Plan continued to meet the requirements of 10 CFR 50.47(b),
Since the last NRC inspection of this program area, one revision to the emergency plan, one revision to emergency action levels, and several revisions to emergency plan implementing procedures had been made. The licensee determined that, in accordance with 10 CFR 50.54(q), the Plan continued to meet the requirements of 10 CFR 50.47(b),and Appendix E to 10 CFR Part 50. The inspectors reviewed the revisions, and sampled implementing procedure changes to evaluate potential reductions in the effectiveness of the Plan. As this review was not documented in a Safety Evaluation Report, and does not constitute formal NRC approval of the changes, these changes remain subject to future NRC inspection in their entirety.
and Appendix E to 10 CFR Part 50. The inspectors reviewed the revisions, and sampled implementing procedure changes to evaluate potential reductions in the effectiveness of the Plan. As this review was not documented in a Safety Evaluation Report, and does not constitute formal NRC approval of the changes, these changes remain subject to future NRC inspection in their entirety.


The inspection was conducted in accordanc e with NRC Inspection Procedure (IP) 71114, Attachment 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standards of 10 CFR 50.47(b), and its related requirements in 10 CFR Part 50, Appendix E, were used as reference criteria.
The inspection was conducted in accordance with NRC Inspection Procedure (IP)71114, Attachment 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standards of 10 CFR 50.47(b), and its related requirements in 10 CFR Part 50, Appendix E, were used as reference criteria.


The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.
Line 124: Line 81:
====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review
1EP8 Exercise Evaluation - Scenario Review


====a. Inspection Scope====
====a. Inspection Scope====
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, "Exercise  
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).
 
Evaluation - Scenario Review," to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).


The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
Line 142: Line 96:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors sampled licensee submittals relative to the performance indicators (PIs)listed below for the period July 1, 2015, through March 31, 2016. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, was used to confirm the reporting basis for each data element.
The inspectors sampled licensee submittals relative to the performance indicators (PIs)listed below for the period July 1, 2015, through March 31, 2016. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, was used to confirm the reporting basis for each data element.


Emergency Preparedness Cornerstone
Emergency Preparedness Cornerstone
* Drill/Exercise Performance (DEP)
* Drill/Exercise Performance (DEP)
* Emergency Response Organization (ERO) Readiness
* Emergency Response Organization (ERO) Readiness
* Alert and Notification System (ANS) Reliability For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the PIs for ERO and DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the PI for ERO drill participation for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensee's records of periodic system tests. The inspectors also interviewed the licensee personnel who were responsible for collecting and evaluating the PI data. Licensee procedures, records, and other documents reviewed within this inspection area, are listed in the  
* Alert and Notification System (ANS) Reliability For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the PIs for ERO and DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the PI for ERO drill participation for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. The inspectors also interviewed the licensee personnel who were responsible for collecting and evaluating the PI data. Licensee procedures, records, and other documents reviewed within this inspection area, are listed in the
.
.
This inspection satisfied three inspection samples for PI verification on an annual basis.
This inspection satisfied three inspection samples for PI verification on an annual basis.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.
 
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings==
==4OA6 Meetings==


On July 28, 2016, the inspection team presented the inspection results to Mr. R. Gideon and other members of the plant staff. The inspectors confirmed that no proprietary information was provided during the inspection.
On July 28, 2016, the inspection team presented the inspection results to Mr. R. Gideon and other members of the plant staff. The inspectors confirmed that no proprietary information was provided during the inspection.


ATTACHMENT: Supplementary Information  
ATTACHMENT: Supplementary Information


=SUPPLEMENTARY INFORMATION=
=SUPPLEMENTARY INFORMATION=
Line 167: Line 119:


===Licensee personnel===
===Licensee personnel===
: [[contact::M. Austin]], Corporate Functional Area Manager  
: [[contact::M. Austin]], Corporate Functional Area Manager
: [[contact::R. Bassett]], Emergency Preparedness Specialist  
: [[contact::R. Bassett]], Emergency Preparedness Specialist
: [[contact::J. Bryant]], Regulatory Affairs  
: [[contact::J. Bryant]], Regulatory Affairs
: [[contact::K. Crocker]], Manager of Emergency Preparedness  
: [[contact::K. Crocker]], Manager of Emergency Preparedness
: [[contact::P. Dubrouillet]], Director of Engineering  
: [[contact::P. Dubrouillet]], Director of Engineering
: [[contact::J. Ferguson]], Manager of Nuclear Oversight  
: [[contact::J. Ferguson]], Manager of Nuclear Oversight
: [[contact::G. Galloway]], Radiation Protection  
: [[contact::G. Galloway]], Radiation Protection
: [[contact::R. Gideon]], Site Vice President  
: [[contact::R. Gideon]], Site Vice President
: [[contact::L. Grzeck]], Manager of Licensing/Regulatory Affairs  
: [[contact::L. Grzeck]], Manager of Licensing/Regulatory Affairs
: [[contact::B. Houston]], Manager of Maintenance  
: [[contact::B. Houston]], Manager of Maintenance
: [[contact::B. Kimray]], Corporate Emergency Preparedness  
: [[contact::B. Kimray]], Corporate Emergency Preparedness
: [[contact::K. Moser]], Plant General Manager  
: [[contact::K. Moser]], Plant General Manager
: [[contact::B. Nanney]], Corporate Emergency Preparedness  
: [[contact::B. Nanney]], Corporate Emergency Preparedness
: [[contact::J. Nolin]], General Manager of Engineering  
: [[contact::J. Nolin]], General Manager of Engineering
: [[contact::A. Pope]], Director Organizational Effectiveness  
: [[contact::A. Pope]], Director Organizational Effectiveness
: [[contact::K. Sawyer]], Emergency Preparedness Specialist  
: [[contact::K. Sawyer]], Emergency Preparedness Specialist
: [[contact::R. Wiemann]], Director of Engineering  
: [[contact::R. Wiemann]], Director of Engineering
: [[contact::B. Wooten]], Operations  
: [[contact::B. Wooten]], Operations


==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
==Section 1EP1: Exercise Evaluation==
===Procedures===
: 0ERP, Radiological Emergency Response Plan, Rev. 88 0PEP-02.1.1, Emergency Control - Notification of Unusual Event, Alert, Site Area Emergency, and General Emergency, Rev. 27 0PEP-02.2.1, Emergency Action Level Technical Bases, Rev. 8
: 0PEP-02.6.20, Dose Projection Coordinator, Rev. 27
: 0PEP-02.6.21, Emergency Communicator, Rev. 76
: 0PEP-02.6.26, Activation & Operation of the Technical Support Center, Rev. 37 0PEP-02.6.27, Activation and Operation of the Emergency Operations Facility (EOF), Rev. 38 0PEP-02.6.28, Off-Site Protective Action Recommendations, Rev. 14
: 0PEP-02.6.30, Alternate Emergency Facility Operation, Rev. 9
: 0PEP-03.4.8, Offsite Dose Projections for Monitored Releases, Rev. 3
: 0PEP-03.6.1, Release Estimates Based Upon Stack/Vent Readings, Rev. 16 0PEP-03.7.6, Emergency Exposure Controls, Rev. 4 0PEP-03.7.7, Onsite Radiological Controls, Rev. 5
: AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment, Rev. 1
: AD-EP-ALL-0301, Activation of the Emergency Response Organization Notification System, Rev. 0
: AD-EP-ALL-0802, Conducting Drills and Exercises, Rev. 2
: AD-EP-ALL-0803, Evaluation and Critique of Drills and Exercises, Rev. 0
: AD-PI-ALL-0100, Corrective Action Program, Rev. 6
: PD-EP-ALL-0800, Drills and Exercises Program, Rev. 2
: Records and Data Brunswick Steam Electric Plant 2016 Emergency Preparedness Biennial Exercise Scenario Brunswick Nuclear Plant Evaluated Exercise 2016 Management Debrief package Control Room Simulator, Operations Support Center, Technical Support Center, and
: Emergency Operations Facility/Joint Information Center - Documentation packages (logs, event notification forms, Protective Action Recommendations, Media releases, and 
: Radiological Dose Assessments)
: Corrective Action Documents (Nuclear Condition Reports)
: NCR 2048631, JIC facility procedure 0PEP-02.6.29 needs to be updated
: NCR 2048791, NOS ID: DPC trainee observed updating EOF status board
: NCR 2048827, Brunswick exercise 7/26/16 reactor water level discrepancy
: NCR 2048868, 7/26/16 EP exercise DEP failure - SAE classification
: NCR 2048965, ENS communicator 7/26/16 drill issues
: NCR 2048985, During EP drill, could not send or receive Coast Guard faxes
: NCR 2048995, Undesired partial activation of New Hanover #6 siren
: NCR 2049210, 7/26/16 EP exercise objective E.4 failure - NRC communication
: NCR 2049237, Review practice for keeping NOT resources in control room during an event
: NCR 2049327, 7/26/16 EP exercise - ORO PAG did not match the BNP PAR
: NCR 2049409, Errors on the EP ENFs
: NCR 2049447, WebEOC ENF not printing co rrectly for offsite organizations
: NCR 2049720, NRC identified player critique improvements
: NCR 2049711,
: EP 10CFR50.54(q) accuracy - 0PEP-02.2.1 (EAL Basis)
: NCR 2049712, Out of sequence notifications counted for DEP
==Section 1EP4: Emergency Action Level and Emergency Plan Changes==
===Procedures===
and Records 0ERP, Radiological Emergency Response Plan, Revs. 87 and 88
: 0PEP-02.6.28, Offsite Protective Action Recommendations, Rev. 13 & 14
: AD-PI-ALL-0100, Corrective Action Program, Rev. 6
: AD-EP-ALL-0501, Emergency Preparedness Staff Training & Qualifications, Rev. 0
: AD-EP-ALL-0602, Emergency Plan Change Screening and Effectiveness Evaluations 10 CFR
: 50.54(Q), Rev. 1
: KLD-TR-512, Development of Evacuation Time Estimates (ETE), dated November 2012
: KLD-TR-683, Development of Protective Action Strategies, dated 1/30/15 Summary of Key Findings of KLD ETE Analysis for Methodology of Rapidly Progressing Severe Accident (RPSA) at Brunswick, KLD Engineering, P.C., Rev. 1, dated January 2015 
: Change Packages
: 50.54(q) Screening Evaluation Form for 0ERP Radiological Emergency Response Plan Rev. 88,    dated 1/14/16 50.54(q) Effectiveness Evaluation Form for 0ERP Radiological Emergency Response Plan Rev. 88, dated 1/14/16
: 50.54(q) Screening Evaluation Form for 0PEP-02.6.28 Protective Action Recommendations Rev. 14, dated 1/14/16
: 50.54(q) Effectiveness Evaluation Form for 0PEP-02.6.28
: Protective Action Recommendations
: Rev. 14, dated 1/14/16 50.54(q) Screening Evaluation Form for 0PEP-02.1 Rev. 53 & 0PEP-02.2.1 Rev. 8, dated 
: 5/24/16
: 50.54(q) Effectiveness Evaluation Form for 0PEP-02.1 Rev. 53 & 0PEP-02.2.1 Rev. 8, dated 
: 6/1/16
: Corrective Action Documents
: NCR 0754945, Authorize use of Rev. 14 DRAFT 0PEP-2.6.28 for EP Training
: NCR 1964709, 0PEP-02.6.28, Rev. 14, License Submit 50.54(q) to NRC within 30 days of 
change
==Section 1EP8: Exercise Evaluation==
===Procedures===
: 0ERP, Radiological Emergency Response Plan, Rev. 88
: 0PEP-04.2, Emergency Facilities & Equipment, Rev. 42
: 0PEP-04.3, Performance of Training, Exercises, & Drills, Rev. 27
: AD-EP-ALL-0801, Design and Development of Drills and Exercises, Rev. 1
: AD-EP-ALL-0802, Conducting Drills and Exercises, Rev. 2
: AD-EP-ALL-0803, Evaluation and Critique of Drills and Exercises, Rev. 0
: PD-EP-ALL-0800, Drills and Exercises Program, Rev. 2
: Records and Data Brunswick Steam Electric Plant 2016 Emergency Preparedness Biennial Exercise Scenario Brunswick Nuclear Plant 8 Year Drill Objective Matrix
: BNP-EP-ID-14-02 May 13, 2014 Limited Participation ERO Training Drill Critique Report, dated   
: 7/06/14
: BNP-EP-ID-14-04 May 28, 2014 Limited Participation ERO Training Drill Critique Report, dated 
: 7/19/14
: BNP-EP-EX-14-01 July 22, 2014 Evaluated Exercise Critique Report, dated 9/15/14
: BNP-EP-ID-14-04 September 09, 2014 Limited Participation ERO Training Drill Critique Report, dated 11/05/14
: BNP-EP-10-15-01 January 19, 2015 Limited Participation ERO Training Drill Critique Report,    dated 2/24/15
: BNP-EP-10-15-02 April 16, 2015 Limited Scope Quarterly Drill Critique Report, dated 6/23/15
: BNP-EP-10-15-04 September 09, 2015 Limited Scope Quarterly Drill Critique Report, dated 
: 10/04/15
: BNP-EP-10-15-05 November 04, 2015 Limited Participation Quarterly Drill Critique Report, dated 10/04/15
==Section 4OA1: Performance Indicator Verification==


===Procedures===
: AD-EP-ALL-0001, Emergency Preparedness Key Performance Indicators, Rev. 1
: AD-EP-ALL-0002, NRC Regulatory Assessment Performance Indicator Guideline Emergency
: Preparedness Cornerstone, Rev. 1
: AD-EP-ALL-0803, Evaluation & Critique of Drills & Exercises, Rev. 0
: Records and Data Documentation of Performance Indicator data from July 1, 2015 through March 31, 2016 for
: DEP, ANS, and ERO Weekly Siren Tests and Independent Verification Checklists
: Corrective Action Documents
: NCR 0727460, EP DEP KPI changed from green to yellow
: NCR 0705775, Siren B18 failed to activa te during weekly silent test
: NCR 0751444, LOCT DLAS on EAL Classifications and Notifications
: NCR 0753244, EP DEP KPI changed from green to yellow
: NCR 1952101, BNP Siren B198 damaged by vehicle
==LIST OF ACRONYMS==
: [[USED]] [[]]
: [[ADAMS]] [[Agencywide Documents Access and Management System]]
: [[ANS]] [[Alert and Notification System]]
: [[CAP]] [[Corrective Action Program]]
: [[CFR]] [[Code of Federal Regulations]]
: [[DEP]] [[Drill and Exercise Performance]]
: [[DHS]] [[Department of Homeland Security]]
: [[EAL]] [[Emergency Action Level]]
: [[EOF]] [[Emergency Operations Facility]]
: [[EP]] [[Emergency Preparedness]]
: [[ERO]] [[Emergency Response Organization]]
: [[FEMA]] [[Federal Emergency Management Agency]]
: [[IMC]] [[Inspection Manual Chapter]]
: [[IP]] [[Inspection Procedure]]
: [[JIC]] [[Joint Information Center]]
: [[NCR]] [[Nuclear Condition Report]]
: [[NCV]] [[Non-Cited Violation]]
: [[NOS]] [[Nuclear Oversight]]
: [[NRC]] [[Nuclear Regulatory Commission]]
: [[ORO]] [[Offsite Response Organization]]
: [[OSC]] [[Operations Support Center]]
: [[PAR]] [[Protective Action Recommendation]]
: [[PIM]] [[Plant Issues Matrix]]
: [[PI]] [[Performance Indicator]]
: [[PI&R]] [[Problem Identification and Resolution]]
: [[ROP]] [[Reactor Oversight Process]]
: [[SDP]] [[Significance Determination Process]]
: [[SUNSI]] [[Sensitive Unclassified Non-Safeguards Information]]
: [[TBD]] [[To Be Determined]]
: [[TI]] [[Temporary Instruction]]
: [[TSC]] [[Technical Support Center]]
: [[VIO]] [[Violation]]
}}
}}

Latest revision as of 19:19, 19 December 2019

U.S. Nuclear Regulatory Commission Emergency Preparedness Inspection Report 05000325/2016502 and 05000324/2016502
ML16243A477
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/25/2016
From: Brian Bonser
NRC/RGN-II
To: William Gideon
Progress Energy Carolinas
References
IR 2016502
Download: ML16243A477 (12)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ust 25, 2016

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000325/2016502 AND 05000324/2016502

Dear Mr. Gideon:

On July 28, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Brunswick Steam Electric Plant, Units 1 and 2. The enclosed inspection report (IR)

documents the inspection results that were discussed on July 28, 2016, with you and members of your staff.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter, its Enclosure, and your response if any, will be available electronically for public inspection in the NRCs Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/

reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA: Adam D. Nielsen for/

Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62

Enclosure:

NRC IR 05000325 and 324/2016502 w/Attachment: Supplementary Information

REGION II==

Docket Nos: 05000325 and 05000324 License Nos: DPR-71 and DPR-62 Report Nos: 05000325/2016502 and 05000324/2016502 Licensee: Duke Energy Progress, Inc.

Facility: Brunswick Steam Electric Plant, Units 1 and 2 Location: Southport, NC Dates: July 25-28, 2016 Inspectors: Steven P. Sanchez, Senior Emergency Preparedness Inspector Christopher A. Fontana, Emergency Preparedness Inspector John D. Hickman, Emergency Preparedness Inspector (Trainee)

Wade T. Loo, Senior Health Physicist Mark Schwieg, Resident Inspector Approved by: Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure

SUMMARY

Inspection Report (IR) 05000325/2016502 and 05000324/2016502; 7/25/2016 - 7/28/2016;

Brunswick Steam Electric Plant, Units 1 and 2; Exercise and Baseline Inspection This report covers an inspection by three emergency preparedness inspectors, one senior health physicist, and one resident inspector. No findings of significance were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.

REPORT DETAILS

REACTOR SAFETY

Cornerstone: Emergency Preparedness

1EP1 Exercise Evaluation

a. Inspection Scope

The onsite inspection consisted of the following review and assessment:

  • The adequacy of the licensees performance in the biennial exercise, conducted on July 26, 2016, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards in 10 CFR 50.47(b)(4), (5), (9), and (10); which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
  • The overall adequacy of the licensees emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities, and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center, Operations Support Center, and Emergency Operations Facility.
  • Other performance areas, such as the emergency response organizations (ERO)recognition of abnormal plant conditions; command and control, intra- and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
  • The post-exercise critique process and the presentation to the licensee's senior management conducted on July 28, 2016, to evaluate the licensees self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR Part 50, Appendix E, Subsection IV.F.2.g.

The inspectors reviewed various documents, which are listed in the Attachment. The inspectors also attended the FEMA-sponsored public meeting on July 28, 2016. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.

b. Findings

No findings were identified.

1EP4 Emergency Action Level and Emergency Plan Changes

a. Inspection Scope

Since the last NRC inspection of this program area, one revision to the emergency plan, one revision to emergency action levels, and several revisions to emergency plan implementing procedures had been made. The licensee determined that, in accordance with 10 CFR 50.54(q), the Plan continued to meet the requirements of 10 CFR 50.47(b),and Appendix E to 10 CFR Part 50. The inspectors reviewed the revisions, and sampled implementing procedure changes to evaluate potential reductions in the effectiveness of the Plan. As this review was not documented in a Safety Evaluation Report, and does not constitute formal NRC approval of the changes, these changes remain subject to future NRC inspection in their entirety.

The inspection was conducted in accordance with NRC Inspection Procedure (IP)71114, Attachment 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standards of 10 CFR 50.47(b), and its related requirements in 10 CFR Part 50, Appendix E, were used as reference criteria.

The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.

b. Findings

No findings were identified.

1EP8 Exercise Evaluation - Scenario Review

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).

The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.

b. Findings

No findings were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

a. Inspection Scope

The inspectors sampled licensee submittals relative to the performance indicators (PIs)listed below for the period July 1, 2015, through March 31, 2016. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, was used to confirm the reporting basis for each data element.

Emergency Preparedness Cornerstone

  • Drill/Exercise Performance (DEP)
  • Emergency Response Organization (ERO) Readiness
  • Alert and Notification System (ANS) Reliability For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the PIs for ERO and DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the PI for ERO drill participation for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. The inspectors also interviewed the licensee personnel who were responsible for collecting and evaluating the PI data. Licensee procedures, records, and other documents reviewed within this inspection area, are listed in the

.

This inspection satisfied three inspection samples for PI verification on an annual basis.

b. Findings

No findings were identified.

4OA6 Meetings

On July 28, 2016, the inspection team presented the inspection results to Mr. R. Gideon and other members of the plant staff. The inspectors confirmed that no proprietary information was provided during the inspection.

ATTACHMENT: Supplementary Information

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

M. Austin, Corporate Functional Area Manager
R. Bassett, Emergency Preparedness Specialist
J. Bryant, Regulatory Affairs
K. Crocker, Manager of Emergency Preparedness
P. Dubrouillet, Director of Engineering
J. Ferguson, Manager of Nuclear Oversight
G. Galloway, Radiation Protection
R. Gideon, Site Vice President
L. Grzeck, Manager of Licensing/Regulatory Affairs
B. Houston, Manager of Maintenance
B. Kimray, Corporate Emergency Preparedness
K. Moser, Plant General Manager
B. Nanney, Corporate Emergency Preparedness
J. Nolin, General Manager of Engineering
A. Pope, Director Organizational Effectiveness
K. Sawyer, Emergency Preparedness Specialist
R. Wiemann, Director of Engineering
B. Wooten, Operations

LIST OF DOCUMENTS REVIEWED