{{#Wiki_filter:CONDITION REPORT CR-PNP-2001-04238 | {{#Wiki_filter:- En-zzY | ||
09/27/ | ~ | ||
I CONDITION REPORT CR-PNP-2001-04238 Originator: CONVERTED DATA Originator Phone: 0 Originator Group: CONVERTED DATA Operability Required: N Reportability Required: N Supervisor Name: CONVERTED DATA Discovered Date: 09/27/2001 0O:OO Initiated Date: 09/27/2001 0O:OO Condition | |||
== Description:== | == Description:== | ||
TOUR OPR REPORTED THAT HCU 50- | |||
REPAIR HCU DIRECTIONAL CONTROL VALVE ASAP Immediate Action | TOUR OPR REPORTED THAT HCU 50-31 LEAK APPEARS WORSE. INVESTIGATED AND FOUND WATER LEAKING ACROSS JUNCTION BOX AND INTO CATCH CONTAINMENTBENEATH HCU. DETERMINED THAT WATER LEAKING PAST JUNCTION BOX UNACCEPTABLE POSSIBILITY OF FLOODING JUNCTION BOX. | ||
CONTACTED HP AND REROUTED LEAKAGE USING A RAG AND DUCT TAPE. IT DOES THE TRICK BUT LOOKS VERY UNPROFESSIONAL. REPAIR HCU DIRECTIONAL CONTROL VALVE ASAP Immediate Action | |||
== Description:== | == Description:== | ||
Line 32: | Line 32: | ||
EQUIPMENT: | EQUIPMENT: | ||
Tag Name Tag Suffi Name Component Code Process System Code 03 REFERENCE ITEMS: Type Code Description CONVERTED PR PR.01.4238 REACTIVITY - RELATED PNP-2001-4238 | Tag Name Tag Suffi Name Component Code Process System Code 03 REFERENCE ITEMS: | ||
:Plan Sched Outage Staff Current Contact: MILLER, R. Current Significance: | Type Code Description CONVERTED PR PR.01.4238 REACTIVITY - RELATED PNP-2001-4238 | ||
C - CORRECTION Closed by: MILLER, R. 10/4/2001 0:OO | |||
EnteiEY I ADMIN CR-PNP-2001-04238 Initiated Date: 9/27/2001 0:OO Owner Group :Plan Sched Outage Staff Current | |||
==Contact:== | |||
MILLER, R. | |||
Current Significance: C - CORRECTION Closed by: MILLER, R. 10/4/2001 0:OO Summary | |||
== Description:== | == Description:== | ||
TOUR OPR REPORTED THAT HCU 50- | |||
TOUR OPR REPORTED THAT HCU 50-31 LEAK APPEARS WORSE. INVESTIGATED AND FOUND WATER LEAKING ACROSS JUNCTION BOX AND INTO CATCH CONTAINMENT BENEATH HCU. DETERMINED THAT WATER LEAKING PAST JUNCTION BOX UNACCEPTABLE POSSIBILITY OF FLOODING JUNCTION BOX. | |||
CONTACTED HP AND REROUTED LEAKAGE USING A RAG AND DUCT TAPE. IT DOES THE TRICK BUT LOOKS VERY UNPROFESSIONAL. REPAIR HCU DIRECTIONAL CONTROL VALVE ASAP Remarks | |||
== Description:== | == Description:== | ||
Line 46: | Line 53: | ||
SEE EVALUATION RESPONSE. | SEE EVALUATION RESPONSE. | ||
E72teqg-y ASSIGNMENTS CR-PNP-2001-04238 Version: 1 SignificanceCode: C - CORRECTION ClassificationCode: NON-SIGNIFICANT Owner Group: Plan Sched Outage Staff Performed By: Edelhauser,James E 10/04/2001 0O:OO Assignment | |||
EVALUATE SCHEDULING THE REPAIRS FOR HCU 50- | == Description:== | ||
Maint Plant Production Staff | |||
EDELHAUSER, J. Performed By: | EVALUATE SCHEDULING THE REPAIRS FOR HCU 50-31. | ||
EDELHAUSER, J. Subperformed By: | |||
Approved By: Closed By: EDELHAUSER, J. | Entefgy CORRECTIVE ACTION CR-PNP-2001-04238 CA Number: 1 I - - - - __. - . __- -- - _ _ - ~ - - _ _ - | ||
12/03/2001 CA Type: GENERAL Plant Constraint: | I Group Name Assigned By: Plan Sched Outage Staff EDELHAUSER, J. | ||
NONE CA | Assigned To: Maint Plant Production Staff Edelhauser,JamesE Subassigned To : | ||
~~ ~~ | |||
Originated By: EDELHAUSER, J. 9/27/2001 0O:OO:OO Performed By: EDELHAUSER, J. 10/4/2001 0O:OO:OO Subperformed By: | |||
Approved By: | |||
Closed By: EDELHAUSER, J. 10/4/2001 0O:OO:OO Current Due Date: 12/03/2001 Initial Due Date: 12/03/2001 CA Type: GENERAL Plant Constraint: NONE CA | |||
== Description:== | == Description:== | ||
EVALUATE SCHEDULING THE REPAJRS FOR HCU 50- | |||
Subresponse | EVALUATE SCHEDULING THE REPAJRS FOR HCU 50-31. | ||
MEMO DETAILING THE RESULTS OF THE REVIEW AND THE CORRECTIVE ACTIONS TAKEN. [ 10/04/2001; J.Edelhauser] Problem Report relates to leaking HCU 50- | ===Response=== | ||
The work has now been completed and the maintenance request is in Post Work Test status. | CONVERTED DATA Subresponse : | ||
Closure Comments: | |||
MEMO DETAILING THE RESULTS OF THE REVIEW AND THE CORRECTIVE ACTIONS TAKEN. | |||
[ 10/04/2001; J.Edelhauser] Problem Report relates to leaking HCU 50-31 Direction Control Valve Block. The priority of related Maintenance Request 01 117275 was elevated and the work was schedule earlier. The work has now been completed and the maintenance request is in Post Work Test status. | |||
No further action is required to close the Problem Report. | No further action is required to close the Problem Report. | ||
Jim Edelhauser Scheduling Supervisor X8059}} | Jim Edelhauser Scheduling Supervisor X8059}} |
Latest revision as of 13:25, 7 December 2019
ML070780491 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 09/27/2001 |
From: | Entergy Corp |
To: | Office of Nuclear Reactor Regulation |
References | |
CR-PNP-2001-04238 | |
Download: ML070780491 (4) | |
Text
- En-zzY
~
I CONDITION REPORT CR-PNP-2001-04238 Originator: CONVERTED DATA Originator Phone: 0 Originator Group: CONVERTED DATA Operability Required: N Reportability Required: N Supervisor Name: CONVERTED DATA Discovered Date: 09/27/2001 0O:OO Initiated Date: 09/27/2001 0O:OO Condition
Description:
TOUR OPR REPORTED THAT HCU 50-31 LEAK APPEARS WORSE. INVESTIGATED AND FOUND WATER LEAKING ACROSS JUNCTION BOX AND INTO CATCH CONTAINMENTBENEATH HCU. DETERMINED THAT WATER LEAKING PAST JUNCTION BOX UNACCEPTABLE POSSIBILITY OF FLOODING JUNCTION BOX.
CONTACTED HP AND REROUTED LEAKAGE USING A RAG AND DUCT TAPE. IT DOES THE TRICK BUT LOOKS VERY UNPROFESSIONAL. REPAIR HCU DIRECTIONAL CONTROL VALVE ASAP Immediate Action
Description:
Suggested Action
Description:
EQUIPMENT:
Tag Name Tag Suffi Name Component Code Process System Code 03 REFERENCE ITEMS:
Type Code Description CONVERTED PR PR.01.4238 REACTIVITY - RELATED PNP-2001-4238
EnteiEY I ADMIN CR-PNP-2001-04238 Initiated Date: 9/27/2001 0:OO Owner Group :Plan Sched Outage Staff Current
Contact:
MILLER, R.
Current Significance: C - CORRECTION Closed by: MILLER, R. 10/4/2001 0:OO Summary
Description:
TOUR OPR REPORTED THAT HCU 50-31 LEAK APPEARS WORSE. INVESTIGATED AND FOUND WATER LEAKING ACROSS JUNCTION BOX AND INTO CATCH CONTAINMENT BENEATH HCU. DETERMINED THAT WATER LEAKING PAST JUNCTION BOX UNACCEPTABLE POSSIBILITY OF FLOODING JUNCTION BOX.
CONTACTED HP AND REROUTED LEAKAGE USING A RAG AND DUCT TAPE. IT DOES THE TRICK BUT LOOKS VERY UNPROFESSIONAL. REPAIR HCU DIRECTIONAL CONTROL VALVE ASAP Remarks
Description:
PR=EF HCU 50-31 LEAK WATER CATCH CONTAINMENT RADIATION PROTECTION M. MCDONNELL Closure
Description:
SEE EVALUATION RESPONSE.
E72teqg-y ASSIGNMENTS CR-PNP-2001-04238 Version: 1 SignificanceCode: C - CORRECTION ClassificationCode: NON-SIGNIFICANT Owner Group: Plan Sched Outage Staff Performed By: Edelhauser,James E 10/04/2001 0O:OO Assignment
Description:
EVALUATE SCHEDULING THE REPAIRS FOR HCU 50-31.
Entefgy CORRECTIVE ACTION CR-PNP-2001-04238 CA Number: 1 I - - - - __. - . __- -- - _ _ - ~ - - _ _ -
I Group Name Assigned By: Plan Sched Outage Staff EDELHAUSER, J.
Assigned To: Maint Plant Production Staff Edelhauser,JamesE Subassigned To :
~~ ~~
Originated By: EDELHAUSER, J. 9/27/2001 0O:OO:OO Performed By: EDELHAUSER, J. 10/4/2001 0O:OO:OO Subperformed By:
Approved By:
Closed By: EDELHAUSER, J. 10/4/2001 0O:OO:OO Current Due Date: 12/03/2001 Initial Due Date: 12/03/2001 CA Type: GENERAL Plant Constraint: NONE CA
Description:
EVALUATE SCHEDULING THE REPAJRS FOR HCU 50-31.
Response
CONVERTED DATA Subresponse :
Closure Comments:
MEMO DETAILING THE RESULTS OF THE REVIEW AND THE CORRECTIVE ACTIONS TAKEN.
[ 10/04/2001; J.Edelhauser] Problem Report relates to leaking HCU 50-31 Direction Control Valve Block. The priority of related Maintenance Request 01 117275 was elevated and the work was schedule earlier. The work has now been completed and the maintenance request is in Post Work Test status.
No further action is required to close the Problem Report.
Jim Edelhauser Scheduling Supervisor X8059