ML100680540: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML100680540
| number = ML100680540
| issue date = 03/09/2010
| issue date = 03/09/2010
| title = 03/30/2010 Notice of Meeting with Pilgrim Nuclear Power Station to Discuss Safety Performance for Calendar Year 2009 and Nrc'S Role in Ensuring Safe Plant Operations
| title = Notice of Meeting with Pilgrim Nuclear Power Station to Discuss Safety Performance for Calendar Year 2009 and Nrc'S Role in Ensuring Safe Plant Operations
| author name = Jackson D
| author name = Jackson D
| author affiliation = NRC/RGN-I/DRP/PB5
| author affiliation = NRC/RGN-I/DRP/PB5
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:March 9,2010 MN No. 10-009 U.S. NUCLEAR REGULATORY REGION NOTICE OF LICENSEE Licensee; Entergy Nuclear Operations, Inc. Facility:
{{#Wiki_filter:March 9,2010 MN No. 10-009 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee;               Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. Date and Time: March 30,2010, from 7:00 p.m. to 9:00 p.m. Location:
Facility:               Pilgrim Nuclear Power Station Docket No.
Hilton Garden Inn Four Home Depot Drive Plymouth, MA 02360 Purpose: To discuss the Nuclear Regulatory Commission's assessment of the safety performance of the Pilgrim Nuclear Power Station for calendar year 2009, and the role of the Nuclear Regulatory Commission in ensuring safe plant operations.
Date and Time:         March 30,2010, from 7:00 p.m. to 9:00 p.m.
Location:             Hilton Garden Inn Four Home Depot Drive Plymouth, MA 02360
 
==Purpose:==
To discuss the Nuclear Regulatory Commission's assessment of the safety performance of the Pilgrim Nuclear Power Station for calendar year 2009, and the role of the Nuclear Regulatory Commission in ensuring safe plant operations.
Attendees:
Attendees:
NRC: D. Jackson, Chief, Projects Branch 5, Region I J. White, Chief, Plant Support Branch 2, Region I M. Schneider.
NRC:         D. Jackson, Chief, Projects Branch 5, Region I J. White, Chief, Plant Support Branch 2, Region I M. Schneider. Senior Resident Inspector B. Smith, Resident Inspector L. Regner, Senior Project Manager. Division of License Renewal, NRR Entergy:     J. Alexander, Government Affairs Manager D. Tarantino, Communications Manager Public Participation*: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss Entergy's performance at Pilgrim during calendar year 2009 and the role of the agency in ensuring safe plant operations. During the session, the public will have the opportunity to talk with the NRC staff on an informal basis.
Senior Resident Inspector B. Smith, Resident Inspector L. Regner, Senior Project Manager. Division of License Renewal, NRR Entergy: J. Alexander, Government Affairs Manager D. Tarantino, Communications Manager Public This is a Category 3 Meeting.
The NRC's Annual Assessment Letter for Pilgrim Nuclear Power Station can be located in ADAMS with Accession Number ML100621417. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading~rm/adams.html.
The NRC staff will hold an open house to discuss Entergy's performance at Pilgrim during calendar year 2009 and the role of the agency in ensuring safe plant operations.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's web site at:
During the session, the public will have the opportunity to talk with the NRC staff on an informal basis. The NRC's Annual Assessment Letter for Pilgrim Nuclear Power Station can be located in ADAMS with Accession Number ML100621417.
www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html.
ADAMS is accessible from the NRC Web Site at: Additional information relative to the NRC's Annual Assessment Process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's web site at: www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html.
 
Meeting Contact: Donald Jackson, Chief, Projects Branch 5 (610) 337 w 5306 Ewmail: donald.jackson@nrc.gov Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 25, 2010, via telephone to the NRC meeting contact.
2 Meeting
Donald E. Projects Branch 5 Division of Reactor Projects Distribution via UstServ 2 Meeting Contact: Donald Jackson, Chief, Projects Branch 5 (610) 337-5306 E-mail: donald. jackson@nrc.gov Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 25, 2010, via telephone to the NRC meeting contact. Approved by: IRAJ Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Distribution:
 
fYla Email) B. Seine I, DRP Executive Director for Operations, M. Schneider, DRP, SRI OEOC (RIOSEDOMAILCENTER)
==Contact:==
B. Smith, ORP, RI Deputy Executive Director for Reactor Programs, A Ford, DRP OED (RIDSEDOMAILCENTER)
Donald Jackson, Chief, Projects Branch 5 (610) 337 5306 w
RidsNrrPMPlIgrlm Resource Director, Offlce of Nuclear Reactor Regulation, ROPreports, Resource@nrc.gov NRR(RIDSNRROD)
Ewmail: donald.jackson@nrc.gov
N. Sheehan, PAO Deputy Director, OfrICe of Nuclear,Reactor Regulation D. Serene!, PAO NRR (RIDSNRROD)
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 25, 2010, via telephone to the NRC meeting contact.
N. McNamara, SlO Director, Division of InspectIon  
m~a().
& Regional Support, D. Tifft, SlO NRRlDIRS(RIDSNRRDIRS)
Donald E. J~f Projects Branch 5 Division of Reactor Projects cc:    Distribution via UstServ
G. Matakas, ORA Director, Division of Operating Reactor lJcenslng C. O'Daniell, NRRlDORL (RlDSNRRDORL)
 
K. Heater, Asst. General Counsel Materials l.itigation  
2 Meeting
& Enforcement L. Pinkham, OGC (RIDSOGCMAllCENTER)
 
D. Bearde, S. Collins, RA (R10RAMAIL RESOURCE)
==Contact:==
T. Haverkamp, DNMS M. Dapas, DRA (R10RAMAIL RESOURCE)
Donald Jackson, Chief, Projects Branch 5 (610) 337-5306 E-mail: donald. jackson@nrc.gov
L. larche. DRM 0, l.ew, DRP (R1DRPMAIL RESOURCE) v, Lewis, RI Receptionist J. Clifford, DRP (R1DRPMAll RESOURCE)
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 25, 2010, via telephone to the NRC meeting contact.
PMNS D. Roberts, DRS (R1DRSMail Resource)
Approved by:
P. Wilson, DRS (R1DRSMail Resource)
IRAJ Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Distribution: fYla Email)                                           B. SeineI, DRP Executive Director for Operations,                                   M. Schneider, DRP, SRI OEOC (RIOSEDOMAILCENTER)                                           B. Smith, ORP, RI Deputy Executive Director for Reactor Programs,                     A Ford, DRP OED (RIDSEDOMAILCENTER)                                           RidsNrrPMPlIgrlm Resource Director, Offlce of Nuclear Reactor Regulation,                     ROPreports, Resource@nrc.gov NRR(RIDSNRROD)                                                     N. Sheehan, PAO Deputy Director, OfrICe of Nuclear,Reactor Regulation               D. Serene!, PAO NRR (RIDSNRROD)                                                   N. McNamara, SlO Director, Division of InspectIon & Regional Support,                 D. Tifft, SlO NRRlDIRS(RIDSNRRDIRS)                                             G. Matakas, ORA Director, Division of Operating Reactor lJcenslng                   C. O'Daniell, ORA NRRlDORL (RlDSNRRDORL)                                             K. Heater, DRP Asst. General Counsel Materials l.itigation & Enforcement           L. Pinkham, DRP OGC (RIDSOGCMAllCENTER)                                           D. Bearde, DRS S. Collins, RA                   (R10RAMAIL RESOURCE)               T. Haverkamp, DNMS M. Dapas, DRA                   (R10RAMAIL RESOURCE)               L. larche. DRM 0, l.ew, DRP                     (R1DRPMAIL RESOURCE)               v, Lewis, RI Receptionist J. Clifford, DRP                 (R1DRPMAll RESOURCE)               PMNS D. Roberts, DRS                 (R1DRSMail Resource)
L. Trocine, RI OEDO D, Jackson, DRP T. Setzer, DRP J. Heinly, ORP DOCUMENT NAME: S:\ROP-10 EOC Reviaw\Brallch 5\PG\Pilgrim ROP 10 Annual Assessment Meeting SUNSI Review Complete:
P. Wilson, DRS                   (R1DRSMail Resource)
OJ (Reviewer's After declaring this document "An Offlcial Agency Record" it released to the To receive a copy of this document.
L. Trocine, RI OEDO D, Jackson, DRP T. Setzer, DRP J. Heinly, ORP DOCUMENT NAME: S:\ROP-10 EOC Reviaw\Brallch 5\PG\Pilgrim ROP 10 Annual Assessment Meeting Notice.doc SUNSI Review Complete:               OJ (Reviewer's Initials)
Indicate in the box: "C" = Copy without "E" =Copy with attachment/enclosure "HOI:: No copy ML OFFICE RIIORP I RIIDRP I I !NAME JHeinly/JH DJackson/DJ DATE 3109/10 OFFICIAL RECORD COpy}}
After declaring this document "An Offlcial Agency Record" it ~ released to the Public.
To receive a copy of this document. Indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "HOI:: No copy                                               ML100680540 OFFICE       RIIORP                   I     RIIDRP                   I                   I
        !NAME           JHeinly/JH                     DJackson/DJ DATE           3/09110                        3109/10 OFFICIAL RECORD COpy}}

Latest revision as of 21:37, 6 December 2019

Notice of Meeting with Pilgrim Nuclear Power Station to Discuss Safety Performance for Calendar Year 2009 and Nrc'S Role in Ensuring Safe Plant Operations
ML100680540
Person / Time
Site: Pilgrim
Issue date: 03/09/2010
From: Diane Jackson
NRC/RGN-I/DRP/PB5
To:
Shared Package
ML100541700 List:
References
Download: ML100680540 (3)


Text

March 9,2010 MN No.10-009 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee; Entergy Nuclear Operations, Inc.

Facility: Pilgrim Nuclear Power Station Docket No.

Date and Time: March 30,2010, from 7:00 p.m. to 9:00 p.m.

Location: Hilton Garden Inn Four Home Depot Drive Plymouth, MA 02360

Purpose:

To discuss the Nuclear Regulatory Commission's assessment of the safety performance of the Pilgrim Nuclear Power Station for calendar year 2009, and the role of the Nuclear Regulatory Commission in ensuring safe plant operations.

Attendees:

NRC: D. Jackson, Chief, Projects Branch 5, Region I J. White, Chief, Plant Support Branch 2, Region I M. Schneider. Senior Resident Inspector B. Smith, Resident Inspector L. Regner, Senior Project Manager. Division of License Renewal, NRR Entergy: J. Alexander, Government Affairs Manager D. Tarantino, Communications Manager Public Participation*: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss Entergy's performance at Pilgrim during calendar year 2009 and the role of the agency in ensuring safe plant operations. During the session, the public will have the opportunity to talk with the NRC staff on an informal basis.

The NRC's Annual Assessment Letter for Pilgrim Nuclear Power Station can be located in ADAMS with Accession Number ML100621417. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading~rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's web site at:

www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html.

2 Meeting

Contact:

Donald Jackson, Chief, Projects Branch 5 (610) 337 5306 w

Ewmail: donald.jackson@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 25, 2010, via telephone to the NRC meeting contact.

m~a().

Donald E. J~f Projects Branch 5 Division of Reactor Projects cc: Distribution via UstServ

2 Meeting

Contact:

Donald Jackson, Chief, Projects Branch 5 (610) 337-5306 E-mail: donald. jackson@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 25, 2010, via telephone to the NRC meeting contact.

Approved by:

IRAJ Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Distribution: fYla Email) B. SeineI, DRP Executive Director for Operations, M. Schneider, DRP, SRI OEOC (RIOSEDOMAILCENTER) B. Smith, ORP, RI Deputy Executive Director for Reactor Programs, A Ford, DRP OED (RIDSEDOMAILCENTER) RidsNrrPMPlIgrlm Resource Director, Offlce of Nuclear Reactor Regulation, ROPreports, Resource@nrc.gov NRR(RIDSNRROD) N. Sheehan, PAO Deputy Director, OfrICe of Nuclear,Reactor Regulation D. Serene!, PAO NRR (RIDSNRROD) N. McNamara, SlO Director, Division of InspectIon & Regional Support, D. Tifft, SlO NRRlDIRS(RIDSNRRDIRS) G. Matakas, ORA Director, Division of Operating Reactor lJcenslng C. O'Daniell, ORA NRRlDORL (RlDSNRRDORL) K. Heater, DRP Asst. General Counsel Materials l.itigation & Enforcement L. Pinkham, DRP OGC (RIDSOGCMAllCENTER) D. Bearde, DRS S. Collins, RA (R10RAMAIL RESOURCE) T. Haverkamp, DNMS M. Dapas, DRA (R10RAMAIL RESOURCE) L. larche. DRM 0, l.ew, DRP (R1DRPMAIL RESOURCE) v, Lewis, RI Receptionist J. Clifford, DRP (R1DRPMAll RESOURCE) PMNS D. Roberts, DRS (R1DRSMail Resource)

P. Wilson, DRS (R1DRSMail Resource)

L. Trocine, RI OEDO D, Jackson, DRP T. Setzer, DRP J. Heinly, ORP DOCUMENT NAME: S:\ROP-10 EOC Reviaw\Brallch 5\PG\Pilgrim ROP 10 Annual Assessment Meeting Notice.doc SUNSI Review Complete: OJ (Reviewer's Initials)

After declaring this document "An Offlcial Agency Record" it ~ released to the Public.

To receive a copy of this document. Indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "HOI:: No copy ML100680540 OFFICE RIIORP I RIIDRP I I

!NAME JHeinly/JH DJackson/DJ DATE 3/09110 3109/10 OFFICIAL RECORD COpy