| title = 12/13/12 Summary of Meeting with TVA Regarding Hydrology Updates
| title = Summary of Meeting with TVA Regarding Hydrology Updates
| author name = Hon A
| author name = Hon A
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 January 11, 2013 Tennessee Valley Authority Watts Bar Nuclear Plant, Unit 1 and Sequoyah Nuclear Plant, Units 1 and 2  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 11, 2013 LICENSEE:        Tennessee Valley Authority FACILITY:        Watts Bar Nuclear Plant, Unit 1 and Sequoyah Nuclear Plant, Units 1 and 2
 
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF DECEMBER 13, 2012, MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON THE STATUS OF HYDROLOGY On December 13,2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11545 Rockville Pike, Rockville, Maryland.
OF DECEMBER 13, 2012, MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON THE STATUS OF HYDROLOGY On December 13,2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11545 Rockville Pike, Rockville, Maryland.
The purpose of the meeting was to discuss: status of TVA efforts to build a new hydrology model based on current hydrology software and the resulted probable maximum flood levels, results of recent analysis of the HESCO temporary flood barrier's vulnerability to postulated barge impact and the simulations to close the traffic access gaps upon notification, update on learning from Fukushima flooding walkdowns, and status of commitments made to the June 25, 2012 Confirmatory Action Letter. An agenda was provided with the meeting notice (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12319A172).
The purpose of the meeting was to discuss:
A list of attendees is enclosed.
* status of TVA efforts to build a new hydrology model based on current hydrology software and the resulted probable maximum flood levels,
Mr. Joseph Shea discussed TVA's slide presentation (ADAMS Accession No. ML12348A208) with support from TVA staff, and answered questions from the NRC staff. TVA plans to submit a supplement to the July 19, 2012, license amendment request (LAR) for Watts Bar Unit 1 to include the main control room emergency ventilation chiller circulating water pump and clarify h,Ow it is credited in the design bases of the plant. However, TVA does not expect, in the near future, to update the July 19, 2013 LAR to include the methodology and the new probable maximum flood level based on the recent analysis discussed and requests the current staff review be continued.
* results of recent analysis of the HESCO temporary flood barrier's vulnerability to postulated barge impact and the simulations to close the traffic access gaps upon notification,
TVA plans to submit a report in January 2013 documenting the results of the recent analyses and exercises, including the following: The results of the HESCO temporary flood barrier gap closing simulation exercises recently performed. River traffic management plan. Results of the recently performed computational fluid dynamics (CFD) computer model simulation of a runaway barge, including the description of the model, velocity profile along the depth of the water, and the choice of projectile shape to represent a barge.
* update on learning from Fukushima flooding walkdowns, and
-2 For future additional CFD modeling considerations, include wind effects and the feasibility of modeling an assumed barge impact on the HESCO barrier and work backward for a credible starting point. No regulatory decisions were made at the meeting. Members of the public were in attendance by telephone.
* status of commitments made to the June 25, 2012 Confirmatory Action Letter.
No public meeting feedback forms were received.
An agenda was provided with the meeting notice (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12319A172). A list of attendees is enclosed.
Please direct any inquiries to me by phone at 301-415-8480, or e-mail at Andrew.Hon@nrc.gov. Andrew Hon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390,50-327, and List of cc w/encl: Distribution via LIST OF A MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON THE LICENSING BASIS FOR FLOODING/HYDROLOGY WAITS BAR NUCLEAR PLANT, UNIT 1 SEQUOYAH NUCLEAR PLANT. UNITS 1 AND 2 THURSDAY, DECEMBER 13, 2012 Tennessee Valley Authority J. Shea J. Williams P. Selman B. Wetzel T. Spink R. Golden Nuclear Regulatory Commission (from NRR unless otherwise noted)
Mr. Joseph Shea discussed TVA's slide presentation (ADAMS Accession No. ML12348A208) with support from TVA staff, and answered questions from the NRC staff. TVA plans to submit a supplement to the July 19, 2012, license amendment request (LAR) for Watts Bar Unit 1 to include the main control room emergency ventilation chiller circulating water pump and clarify h,Ow it is credited in the design bases of the plant. However, TVA does not expect, in the near future, to update the July 19, 2013 LAR to include the methodology and the new probable maximum flood level based on the recent analysis discussed and requests the current staff review be continued. TVA plans to submit a report in January 2013 documenting the results of the recent analyses and exercises, including the following:
M. Evans P. Hiland J. Monninger M. Cheok R. Taylor E. Miller* A. Hon J. Poole F. Ferrante J. Uribe N. DiFrancesco J. Mitman S. Flanders, NRO C. Cook, NRO S. Shaeffer, RII* R. Monk, RII* T. Nicholson, RES PUBLIC J. Riley* J. Gasper* J. Bellini* *by teleconference Enclosure 
: 1. The results of the HESCO temporary flood barrier gap closing simulation exercises recently performed.
-For future additional CFD modeling considerations, include wind effects and the feasibility of modeling an assumed barge impact on the HESCO barrier and work backward for a credible starting point. No regulatory decisions were made at the meeting. Members of the public were in attendance by telephone.
: 2.      River traffic management plan.
No public meeting feedback forms were received.
: 3.      Results of the recently performed computational fluid dynamics (CFD) computer model simulation of a runaway barge, including the description of the model, velocity profile along the depth of the water, and the choice of projectile shape to represent a barge.
 
                                              -2
: 4. For future additional CFD modeling considerations, include wind effects and the feasibility of modeling an assumed barge impact on the HESCO barrier and work backward for a credible starting point.
No regulatory decisions were made at the meeting. Members of the public were in attendance by telephone. No public meeting feedback forms were received.
Please direct any inquiries to me by phone at 301-415-8480, or e-mail at Andrew.Hon@nrc.gov.
Please direct any inquiries to me by phone at 301-415-8480, or e-mail at Andrew.Hon@nrc.gov.
IRA! Andrew Hon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390, 50-327, and List of cc w/encl: Distribution via DISTRIBUTION:
Andrew Hon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390,50-327, and 50-328
PUBLIC RidsNrrDorlLpl2-2 F. Ferrante LPL2-2 rlf M. Evans J. Uribe RidsAcrsAcnw_MailCTR Resource P. Hiland N. DiFrancesco RidsNrrPMSequoyah J. Monninger J. Mitman RidsNrrPMWattsBar1 Resource M. Cheok S. Flanders, NRO RidsNrrLABClayton Resource R. Taylor C. Cook, NRO RidsRgn2MailCenter Resource E. Miller S. Shaeffer, RII RidsOgcRp Resource A. Hon R. Monk, RII RidsNrrOd Resource J. Poole T. Nicholson, RES ADAMS Accession Nos.: Package ML13010A117 Notice ML12319A172 SlidesML12348A208 Summary ML13010A137 i,OFFICE NRRlLPL2-2/PM NRRlLPL2-2/LA(ln NRRlLPL2*2/LA NRRlLPL2*2IBC NRRlLPL2*21PM II NAME AHon FKeith BClayton JQuichocho AHon II DATE 1110/13 1/10/13 1/10/13 1/11/13 1/11113 OFFICIAL RECORD COPY}}
 
==Enclosure:==
 
List of Attendees cc w/encl: Distribution via Listserv
 
LIST OF AITENDEES MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON THE LICENSING BASIS FOR FLOODING/HYDROLOGY WAITS BAR NUCLEAR PLANT, UNIT 1 SEQUOYAH NUCLEAR PLANT. UNITS 1 AND 2 THURSDAY, DECEMBER 13, 2012 Tennessee Valley Authority J. Shea            J. Williams P. Selman          B. Wetzel T. Spink            R. Golden Nuclear Regulatory Commission (from NRR unless otherwise noted)
M. Evans           P. Hiland J. Monninger        M. Cheok R. Taylor          E. Miller*
A. Hon              J. Poole F. Ferrante        J. Uribe N. DiFrancesco     J. Mitman S. Flanders, NRO   C. Cook, NRO S. Shaeffer, RIIR. Monk, RII*
T. Nicholson, RES PUBLIC J. Riley*          J. Gasper*
J. Bellini*
*by teleconference Enclosure
 
Package ML13010A117 Notice ML12319A172 SlidesML12348A208 Summary ML13010A137 i,OFFICE       NRRlLPL2-2/PM       NRRlLPL2-2/LA(ln       NRRlLPL2*2/LA     NRRlLPL2*2IBC         NRRlLPL2*21PM II NAME         AHon                 FKeith                 BClayton         JQuichocho           AHon II DATE         1110/13             1/10/13               1/10/13           1/11/13               1/11113}}

Latest revision as of 15:21, 5 December 2019

Summary of Meeting with TVA Regarding Hydrology Updates
ML13010A137
Person / Time
Site: Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/11/2013
From: Andrew Hon
Plant Licensing Branch II
To:
Hon, Andy
Shared Package
ML13010A117 List:
References
Download: ML13010A137 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 11, 2013 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Plant, Unit 1 and Sequoyah Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF DECEMBER 13, 2012, MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON THE STATUS OF HYDROLOGY On December 13,2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11545 Rockville Pike, Rockville, Maryland.

The purpose of the meeting was to discuss:

  • status of TVA efforts to build a new hydrology model based on current hydrology software and the resulted probable maximum flood levels,
  • results of recent analysis of the HESCO temporary flood barrier's vulnerability to postulated barge impact and the simulations to close the traffic access gaps upon notification,
  • update on learning from Fukushima flooding walkdowns, and
  • status of commitments made to the June 25, 2012 Confirmatory Action Letter.

An agenda was provided with the meeting notice (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12319A172). A list of attendees is enclosed.

Mr. Joseph Shea discussed TVA's slide presentation (ADAMS Accession No. ML12348A208) with support from TVA staff, and answered questions from the NRC staff. TVA plans to submit a supplement to the July 19, 2012, license amendment request (LAR) for Watts Bar Unit 1 to include the main control room emergency ventilation chiller circulating water pump and clarify h,Ow it is credited in the design bases of the plant. However, TVA does not expect, in the near future, to update the July 19, 2013 LAR to include the methodology and the new probable maximum flood level based on the recent analysis discussed and requests the current staff review be continued. TVA plans to submit a report in January 2013 documenting the results of the recent analyses and exercises, including the following:

1. The results of the HESCO temporary flood barrier gap closing simulation exercises recently performed.
2. River traffic management plan.
3. Results of the recently performed computational fluid dynamics (CFD) computer model simulation of a runaway barge, including the description of the model, velocity profile along the depth of the water, and the choice of projectile shape to represent a barge.

-2

4. For future additional CFD modeling considerations, include wind effects and the feasibility of modeling an assumed barge impact on the HESCO barrier and work backward for a credible starting point.

No regulatory decisions were made at the meeting. Members of the public were in attendance by telephone. No public meeting feedback forms were received.

Please direct any inquiries to me by phone at 301-415-8480, or e-mail at Andrew.Hon@nrc.gov.

Andrew Hon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390,50-327, and 50-328

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF AITENDEES MANAGEMENT MEETING WITH TENNESSEE VALLEY AUTHORITY ON THE LICENSING BASIS FOR FLOODING/HYDROLOGY WAITS BAR NUCLEAR PLANT, UNIT 1 SEQUOYAH NUCLEAR PLANT. UNITS 1 AND 2 THURSDAY, DECEMBER 13, 2012 Tennessee Valley Authority J. Shea J. Williams P. Selman B. Wetzel T. Spink R. Golden Nuclear Regulatory Commission (from NRR unless otherwise noted)

M. Evans P. Hiland J. Monninger M. Cheok R. Taylor E. Miller*

A. Hon J. Poole F. Ferrante J. Uribe N. DiFrancesco J. Mitman S. Flanders, NRO C. Cook, NRO S. Shaeffer, RII* R. Monk, RII*

T. Nicholson, RES PUBLIC J. Riley* J. Gasper*

J. Bellini*

  • by teleconference Enclosure

Package ML13010A117 Notice ML12319A172 SlidesML12348A208 Summary ML13010A137 i,OFFICE NRRlLPL2-2/PM NRRlLPL2-2/LA(ln NRRlLPL2*2/LA NRRlLPL2*2IBC NRRlLPL2*21PM II NAME AHon FKeith BClayton JQuichocho AHon II DATE 1110/13 1/10/13 1/10/13 1/11/13 1/11113