ML17109A291: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(10 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17109A291
| number = ML17109A291
| issue date = 04/19/2017
| issue date = 04/19/2017
| title = 2017/04/19 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Final Request for Additional Information Concerning LAR to Adopt TSTF-339, TSTF-5 and Other Administrative Changes (CAC MF8894)
| title = NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Final Request for Additional Information Concerning LAR to Adopt TSTF-339, TSTF-5 and Other Administrative Changes
| author name = Barillas M C
| author name = Barillas M
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
| addressee name = Robertson J N
| addressee name = Robertson J
| addressee affiliation = Duke Energy Corp
| addressee affiliation = Duke Energy Corp
| docket = 05000400
| docket = 05000400
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NRR-PMDAPEm Resource From:                            Barillas, Martha Sent:                            Wednesday, April 19, 2017 1:41 PM To:                              Robertson, Jeffrey N; Caves, John; McDaniel, Sarah A; Earp Jr, Dennis Cc:                              RidsNrrPMShearonHarris Resource; Barillas, Martha
 
==Subject:==
Shearon Harris Nuclear Power Plant, Unit 1 Final Request for Additional Information Concerning LAR to adopt TSTF-339, TSTF-5 and other administrative changes (CAC MF8894)
Mr. Robertson, Final Request for Additional Information On March 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) staff sent Duke Energy Progress, LLC the draft Request for Additional Information (RAI) provided below, requesting a response to the RAI by April 22, 2017. This RAI relates to a LAR that requests to relocate specific Technical Specification (TS) parameters to the Core Operating Limits Report (COLR) in accordance with TSTF-339, Revision 2, Relocate TS Parameters to COLR, to remove reference to PLP-106, Technical Specification Equipment List Program and Core Operating Limits Report, as it pertains to the COLR, and delete duplicate reporting requirements from Administrative Controls section in TS, consistent with TSTF-5, Delete Safety Limit Violation Notification Requirements, Revision 1, from Shearon Harris Nuclear Power Plant, Unit 1, Technical Specifications.
On April 3, 2017, Duke Energy Progress LLC and the NRC staff held a clarification call related to the draft RAI provided below. On April 19, 2017, during a call with the NRC project manager, Duke Energy agreed to provide a response to this final RAI by April 25, 2017. A publicly available version of this final RAI will be placed in the NRCs Agencywide Documents Access and Management System (ADAMS).
 
===RAI 1===
Generic Letter (GL) 88-16 provides guidance for the analytical methods used to determine the core operating limits to be listed in the Administrative Controls section of the TS to ensure that each of the TS parameters relocated to the COLR are being determined using an NRC approved methodology. The LAR requests an update to the list of TS parameters that are being relocated to the COLR but there was no request to update the list of analytical methods for these additional core operating limits. The LAR did not identify that any of the analytical methods, currently listed in the TS, are used to determine these additional core operating limits.
Please identify the analytical methods that will be used to determine the additional core operating limits found in TS 6.9.1.6, Insert 3, of the LAR.
Respectfully, Martha Barillas Project Manager Shearon Harris Nuclear Power Plant, Unit 1 NRR/DORL/Licensing Branch II-2 US Nuclear Regulatory Commission 301-415-2760 1
 
Hearing Identifier:      NRR_PMDA Email Number:            3449 Mail Envelope Properties      (Martha.Barillas@nrc.gov20170419134100)
 
==Subject:==
Shearon Harris Nuclear Power Plant, Unit 1 Final Request for Additional Information Concerning LAR to adopt TSTF-339, TSTF-5 and other administrative changes (CAC MF8894)
Sent Date:              4/19/2017 1:41:00 PM Received Date:          4/19/2017 1:41:00 PM From:                    Barillas, Martha Created By:              Martha.Barillas@nrc.gov Recipients:
"RidsNrrPMShearonHarris Resource" <RidsNrrPMShearonHarris.Resource@nrc.gov>
Tracking Status: None "Barillas, Martha" <Martha.Barillas@nrc.gov>
Tracking Status: None "Robertson, Jeffrey N" <Jeffrey.Robertson@duke-energy.com>
Tracking Status: None "Caves, John" <John.Caves@duke-energy.com>
Tracking Status: None "McDaniel, Sarah A" <Sarah.McDaniel@duke-energy.com>
Tracking Status: None "Earp Jr, Dennis" <Dennis.EarpJr@duke-energy.com>
Tracking Status: None Post Office:
Files                            Size                    Date & Time MESSAGE                          2365                    4/19/2017 1:41:00 PM Options Priority:                        Standard Return Notification:              No Reply Requested:                  No Sensitivity:                      Normal Expiration Date:
Recipients Received:}}

Latest revision as of 08:55, 4 December 2019

NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Final Request for Additional Information Concerning LAR to Adopt TSTF-339, TSTF-5 and Other Administrative Changes
ML17109A291
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/19/2017
From: Martha Barillas
Plant Licensing Branch II
To: Robertson J
Duke Energy Corp
References
MF8894
Download: ML17109A291 (2)


Text

NRR-PMDAPEm Resource From: Barillas, Martha Sent: Wednesday, April 19, 2017 1:41 PM To: Robertson, Jeffrey N; Caves, John; McDaniel, Sarah A; Earp Jr, Dennis Cc: RidsNrrPMShearonHarris Resource; Barillas, Martha

Subject:

Shearon Harris Nuclear Power Plant, Unit 1 Final Request for Additional Information Concerning LAR to adopt TSTF-339, TSTF-5 and other administrative changes (CAC MF8894)

Mr. Robertson, Final Request for Additional Information On March 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) staff sent Duke Energy Progress, LLC the draft Request for Additional Information (RAI) provided below, requesting a response to the RAI by April 22, 2017. This RAI relates to a LAR that requests to relocate specific Technical Specification (TS) parameters to the Core Operating Limits Report (COLR) in accordance with TSTF-339, Revision 2, Relocate TS Parameters to COLR, to remove reference to PLP-106, Technical Specification Equipment List Program and Core Operating Limits Report, as it pertains to the COLR, and delete duplicate reporting requirements from Administrative Controls section in TS, consistent with TSTF-5, Delete Safety Limit Violation Notification Requirements, Revision 1, from Shearon Harris Nuclear Power Plant, Unit 1, Technical Specifications.

On April 3, 2017, Duke Energy Progress LLC and the NRC staff held a clarification call related to the draft RAI provided below. On April 19, 2017, during a call with the NRC project manager, Duke Energy agreed to provide a response to this final RAI by April 25, 2017. A publicly available version of this final RAI will be placed in the NRCs Agencywide Documents Access and Management System (ADAMS).

RAI 1

Generic Letter (GL) 88-16 provides guidance for the analytical methods used to determine the core operating limits to be listed in the Administrative Controls section of the TS to ensure that each of the TS parameters relocated to the COLR are being determined using an NRC approved methodology. The LAR requests an update to the list of TS parameters that are being relocated to the COLR but there was no request to update the list of analytical methods for these additional core operating limits. The LAR did not identify that any of the analytical methods, currently listed in the TS, are used to determine these additional core operating limits.

Please identify the analytical methods that will be used to determine the additional core operating limits found in TS 6.9.1.6, Insert 3, of the LAR.

Respectfully, Martha Barillas Project Manager Shearon Harris Nuclear Power Plant, Unit 1 NRR/DORL/Licensing Branch II-2 US Nuclear Regulatory Commission 301-415-2760 1

Hearing Identifier: NRR_PMDA Email Number: 3449 Mail Envelope Properties (Martha.Barillas@nrc.gov20170419134100)

Subject:

Shearon Harris Nuclear Power Plant, Unit 1 Final Request for Additional Information Concerning LAR to adopt TSTF-339, TSTF-5 and other administrative changes (CAC MF8894)

Sent Date: 4/19/2017 1:41:00 PM Received Date: 4/19/2017 1:41:00 PM From: Barillas, Martha Created By: Martha.Barillas@nrc.gov Recipients:

"RidsNrrPMShearonHarris Resource" <RidsNrrPMShearonHarris.Resource@nrc.gov>

Tracking Status: None "Barillas, Martha" <Martha.Barillas@nrc.gov>

Tracking Status: None "Robertson, Jeffrey N" <Jeffrey.Robertson@duke-energy.com>

Tracking Status: None "Caves, John" <John.Caves@duke-energy.com>

Tracking Status: None "McDaniel, Sarah A" <Sarah.McDaniel@duke-energy.com>

Tracking Status: None "Earp Jr, Dennis" <Dennis.EarpJr@duke-energy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2365 4/19/2017 1:41:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: