ML17205A036: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 12: Line 12:
| document type = Slides and Viewgraphs
| document type = Slides and Viewgraphs
| page count = 6
| page count = 6
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:Perry Nuclear Power Plant Annual Assessment Summary 2016 Reactor Oversight Process Nuclear Regulatory Commission - Region III
What We/NRC Regulate            What It Includes Reactors Materials Safety                      Security Waste Environment What We Dont Regulate            Assurance of Plant Safety Elements Continuous Training                  Long-Term Maintenance Military                Radon Regulation Compliance Defense In-X-Rays                              Depth 1
How We Regulate                        Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution Performance Indicators                Significance Threshold Performance Indicators 17 Performance Indicators PIs for each cornerstone              Green          White          Yellow          Red Licensee submits data to NRC Increasing Safety Significance quarterly Inspection program verifies accuracy  Inspection Findings Data available on NRC website Green          White          Yellow          Red Increasing Safety Significance 2
Action Matrix Columns                                                              Industry-Wide Performance 90      86 80                                  As of 02/27/2017 Multiple/Repetitive                  70 Licensee            Regulatory  Degraded                      Unacceptable Degraded Response            Response  Performance                      Performance      60 Cornerstone 50 40 30 20 10 Increasing:                                                                            10 0    3 0
* Safety Significance                                                                                    0  0
* Inspection
* Management Involvement
* Regulatory Action Industry-Wide Inspection Findings                                                Industry-Wide Performance Indicators Finding data current as of 2/22/2017 693 700                                                                                      6713 7000 600                                                    Calendar Year 6000                            Calendar Year 500                                                      2016 data 2016 data 5000 400 300                                                                              4000 200                                                                              3000 100                                                                              2000 2  4 0
0                                                                            1000 0                                                        7 0    0 0
Green White Yellow  Red 3
NRC Annual Assessment Summary                                NRC Inspection Activities Perry Nuclear Power Plant                                        Perry 2016 6728 total hours expended by NRC on Reactor The Licensee, FirstEnergy Nuclear Operating                Oversight Process activities Company, operated the plant safely and in a manner that preserved the public health and safety and              2846 inspector hours of direct inspection activity protected the environment                                    663 inspector hours reviewing and observing plant Perry met all cornerstone objectives and was in the          operating status Licensee Response Column of the NRCs ROP                    1767 inspector hours of preparation for and Action Matrix for all quarters of 2016                        documentation of inspection activities NRC plans baseline inspections at Perry in 2017 and          1452 hours for other Reactor Oversight Process one follow-up inspection for 4 traditional enforcement findings with the potential to impede the regulatory elements (e.g., assessments and communications) process for errors in reporting issues NRC Inspection Activities                                      Perry Nuclear Power Plant Perry Nuclear Power Plant for 2016                                    PIs and Findings January 1 through December 31, 2016 2 resident inspectors on site - residents produced four quarterly inspection reports and walked through the        19 Green/Severity Level IV findings which included:
plant daily                                                    Emergency Core Cooling heat exchanger flow indication 27 other inspectors participated in various inspections        instrument valves not properly aligned Failure to implement a periodic replacement of hoses used Major team inspections in 2016:                                with FLEX equipment Special inspection to review spurious opening of          Use of a method for analyzing flooding which was not some reactor coolant system safety valves                  consistent with method in licensees design basis Failure to insure welding process on a RCS vent valve was Implementation of FLEX/Mitigating Strategies              conducted properly ForceonForce exercise 4
Actions in Response to the                          NRC Social Media Japan Nuclear Accident Channels
* Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.html
* Blog:        http://public-blog.nrc-gateway.gov/
* Mailbox for comments on staff actions:
* Flickr:    http://www.flickr.com/photos/nrcgov/
JLD_Public.Resource@nrc.gov
* Twitter: https://twitter.com/#!/nrcgov
* YouTube: http://www.youtube.com/user/NRCgov
* Office of Public Affairs Point of
==Contact:==
OPA.resource@nrc.gov or 301-415-8200
* RSS:      http://www.nrc.gov/public-involve/listserver.html#rss Contacting the NRC Report an emergency
    * (301) 816-5100 (call collect)
Report a safety concern
    * (800) 695-7403
* Allegation@nrc.gov General information or questions
* www.nrc.gov Perry NRC Resident Inspectors
* 440-259-3610 5}}

Latest revision as of 08:06, 4 December 2019

Presentation for 2016 Perry EOC Open House
ML17205A036
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/19/2017
From:
NRC/RGN-III
To:
References
Download: ML17205A036 (6)


Text

Perry Nuclear Power Plant Annual Assessment Summary 2016 Reactor Oversight Process Nuclear Regulatory Commission - Region III

What We/NRC Regulate What It Includes Reactors Materials Safety Security Waste Environment What We Dont Regulate Assurance of Plant Safety Elements Continuous Training Long-Term Maintenance Military Radon Regulation Compliance Defense In-X-Rays Depth 1

How We Regulate Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution Performance Indicators Significance Threshold Performance Indicators 17 Performance Indicators PIs for each cornerstone Green White Yellow Red Licensee submits data to NRC Increasing Safety Significance quarterly Inspection program verifies accuracy Inspection Findings Data available on NRC website Green White Yellow Red Increasing Safety Significance 2

Action Matrix Columns Industry-Wide Performance 90 86 80 As of 02/27/2017 Multiple/Repetitive 70 Licensee Regulatory Degraded Unacceptable Degraded Response Response Performance Performance 60 Cornerstone 50 40 30 20 10 Increasing: 10 0 3 0

  • Safety Significance 0 0
  • Inspection
  • Management Involvement
  • Regulatory Action Industry-Wide Inspection Findings Industry-Wide Performance Indicators Finding data current as of 2/22/2017 693 700 6713 7000 600 Calendar Year 6000 Calendar Year 500 2016 data 2016 data 5000 400 300 4000 200 3000 100 2000 2 4 0

0 1000 0 7 0 0 0

Green White Yellow Red 3

NRC Annual Assessment Summary NRC Inspection Activities Perry Nuclear Power Plant Perry 2016 6728 total hours expended by NRC on Reactor The Licensee, FirstEnergy Nuclear Operating Oversight Process activities Company, operated the plant safely and in a manner that preserved the public health and safety and 2846 inspector hours of direct inspection activity protected the environment 663 inspector hours reviewing and observing plant Perry met all cornerstone objectives and was in the operating status Licensee Response Column of the NRCs ROP 1767 inspector hours of preparation for and Action Matrix for all quarters of 2016 documentation of inspection activities NRC plans baseline inspections at Perry in 2017 and 1452 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.52486e-4 months <br /> for other Reactor Oversight Process one follow-up inspection for 4 traditional enforcement findings with the potential to impede the regulatory elements (e.g., assessments and communications) process for errors in reporting issues NRC Inspection Activities Perry Nuclear Power Plant Perry Nuclear Power Plant for 2016 PIs and Findings January 1 through December 31, 2016 2 resident inspectors on site - residents produced four quarterly inspection reports and walked through the 19 Green/Severity Level IV findings which included:

plant daily Emergency Core Cooling heat exchanger flow indication 27 other inspectors participated in various inspections instrument valves not properly aligned Failure to implement a periodic replacement of hoses used Major team inspections in 2016: with FLEX equipment Special inspection to review spurious opening of Use of a method for analyzing flooding which was not some reactor coolant system safety valves consistent with method in licensees design basis Failure to insure welding process on a RCS vent valve was Implementation of FLEX/Mitigating Strategies conducted properly ForceonForce exercise 4

Actions in Response to the NRC Social Media Japan Nuclear Accident Channels

  • Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov

  • Office of Public Affairs Point of

Contact:

OPA.resource@nrc.gov or 301-415-8200

  • (301) 816-5100 (call collect)

Report a safety concern

  • (800) 695-7403
  • Allegation@nrc.gov General information or questions
  • www.nrc.gov Perry NRC Resident Inspectors
  • 440-259-3610 5