| number = ML062260239
| number = ML062260239
| issue date = 09/05/2006
| issue date = 09/05/2006
| title = Cooper, License Amendment, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566
| title = License Amendment, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566
| author name = Benney B J
| author name = Benney B
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Nebraska Public Power District (NPPD)
| addressee affiliation = Nebraska Public Power District (NPPD)
| docket = 05000298
| docket = 05000298
| license number = DPR-046
| license number = DPR-046
| contact person = Benney B J, NRR/DORL, 415-3764
| contact person = Benney B, NRR/DORL, 415-3764
| case reference number = TAC MC8566
| case reference number = TAC MC8566
| package number = ML062260229
| package number = ML062260229
Line 15: Line 15:
| page count = 20
| page count = 20
| project = TAC:MC8566
| project = TAC:MC8566
| stage = Approval
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:September 5, 2006Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District
{{#Wiki_filter:September 5, 2006 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321
 
P. O. Box 98 Brownville, NE 68321


==SUBJECT:==
==SUBJECT:==
COOPER NUCLEAR STATION - ISSUANCE OF AMENDMENT RE:APPLICATION OF THE ALTERNATIVE SOURCE TERM FOR REEVALUATIONOF THE FUEL HANDLING ACCIDENT DOSE CONSEQUENCES AND RELATED TECHNICAL SPECIFICATION CHANGES (TAC NO. MC8566)
COOPER NUCLEAR STATION - ISSUANCE OF AMENDMENT RE:
APPLICATION OF THE ALTERNATIVE SOURCE TERM FOR REEVALUATION OF THE FUEL HANDLING ACCIDENT DOSE CONSEQUENCES AND RELATED TECHNICAL SPECIFICATION CHANGES (TAC NO. MC8566)


==Dear Mr. Edington:==
==Dear Mr. Edington:==


The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosedAmendment No. 222 to Facility Operating License No. DPR-46 for the Cooper Nuclear Station. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 29, 2005, as supplemented by letters dated January 16, and April 7, 2006.The amendment replaces the current accident source term used in the fuel handling accident(FHA) design-basis radiological analysis with an alternative source term (AST) pursuant to Title 10 of the Code of Federal Regulations, Part 50.67, "Accident Source Term." The licenseeperformed the revised FHA analysis in support of TS changes related to refueling operations.A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will beincluded in the Commission's next biweekly Federal Register notice.Sincerely,/RA/Brian Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-298
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 222 to Facility Operating License No. DPR-46 for the Cooper Nuclear Station.
The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 29, 2005, as supplemented by letters dated January 16, and April 7, 2006.
The amendment replaces the current accident source term used in the fuel handling accident (FHA) design-basis radiological analysis with an alternative source term (AST) pursuant to Title 10 of the Code of Federal Regulations, Part 50.67, "Accident Source Term." The licensee performed the revised FHA analysis in support of TS changes related to refueling operations.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
                                            /RA/
Brian Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 222 to DPR-462. Safety Evaluationcc w/encls: See next page September 5, 2006Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District
: 1. Amendment No. 222 to DPR-46
: 2. Safety Evaluation cc w/encls: See next page


P. O. Box 98 Brownville, NE 68321
September 5, 2006 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321


==SUBJECT:==
==SUBJECT:==
COOPER NUCLEAR STATION - ISSUANCE OF AMENDMENT RE:APPLICATION OF THE ALTERNATIVE SOURCE TERM FOR REEVALUATIONOF THE FUEL HANDLING ACCIDENT DOSE CONSEQUENCES AND RELATED TECHNICAL SPECIFICATION CHANGES (TAC NO. MC8566)
COOPER NUCLEAR STATION - ISSUANCE OF AMENDMENT RE:
APPLICATION OF THE ALTERNATIVE SOURCE TERM FOR REEVALUATION OF THE FUEL HANDLING ACCIDENT DOSE CONSEQUENCES AND RELATED TECHNICAL SPECIFICATION CHANGES (TAC NO. MC8566)


==Dear Mr. Edington:==
==Dear Mr. Edington:==


The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosedAmendment No. 222 to Facility Operating License No. DPR-46 for the Cooper Nuclear Station. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 29, 2005, as supplemented by letters dated January 16, and April 7, 2006.The amendment replaces the current accident source term used in the fuel handling accident(FHA) design-basis radiological analysis with an alternative source term (AST) pursuant to Title 10 of the Code of Federal Regulations, Part 50.67, "Accident Source Term." The licenseeperformed the revised FHA analysis in support of TS changes related to refueling operations.A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will beincluded in the Commission's next biweekly Federal Register notice.Sincerely,/RA/Brian Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-298
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 222 to Facility Operating License No. DPR-46 for the Cooper Nuclear Station.
The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 29, 2005, as supplemented by letters dated January 16, and April 7, 2006.
The amendment replaces the current accident source term used in the fuel handling accident (FHA) design-basis radiological analysis with an alternative source term (AST) pursuant to Title 10 of the Code of Federal Regulations, Part 50.67, "Accident Source Term." The licensee performed the revised FHA analysis in support of TS changes related to refueling operations.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
                                                /RA/
Brian Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 222 to DPR-462. Safety Evaluationcc w/encls: See next pageDISTRIBUTION
: 1. Amendment No. 222 to DPR-46
:PUBLICRidsNrrPMBBenneyRidsAcrsAcnwMailCenterLPLIV ReadingRidsNrrLALFeizollahiRidsRgn4MailCenter (KKennedy)RidsNrrDorl (CHaney/CHolden)RidsNrrDorlDpr RidNrrDirsItsb RidsNrrDorlLpl4 (DTerao)RidsOgcRpGHill (2)RBHarvey, AADBPACKAGE NO.: ML062260229ACCESSION NO.: ML062260239TS Page: ML062490037OFFICENRR/LPL4/PMNRR/LPL4/LAAADB/BCITSB/BCOGCNRR/LPL4/BCNAMEBBenney;mxr4LFeizollahiMKotzalesTTjaderAHodgdonDTeraoDATE8/22/068/22/068/22/068/24/068/25/069/1/06OFFICIAL RECORD COPY NEBRASKA PUBLIC POWER DISTRICTDOCKET NO. 50-298COOPER NUCLEAR STATIONAMENDMENT TO FACILITY OPERATING LICENSEAmendment No. 222License No. DPR-461.The Nuclear Regulatory Commission (the Commission) has found that:A.The application for amendment by the Nebraska Public Power District (thelicensee) dated September 29, 2005, as supplemented by letters dated January 16, and April 7, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I;B.The facility will operate in conformity with the application, the provisions of theAct, and the rules and regulations of the Commission;C.There is reasonable assurance (i) that the activities authorized by thisamendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with theCommission's regulations;D.The issuance of this license amendment will not be inimical to the commondefense and security or to the health and safety of the public; and E.The issuance of this amendment is in accordance with 10 CFR Part 51 of theCommission's regulations and all applicable requirements have been satisfied. 2.Accordingly, the license is amended by changes to the Technical Specifications asindicated in the attachment to this license amendment and Paragraph 2.C.(2) of FacilityOperating License No. DPR-46 is hereby amended to read as follows:(2)Technical SpecificationsThe Technical Specifications contained in Appendix A, as revised throughAmendment No. 222, are hereby incorporated in the license. The Nebraska Public Power District shall operate the facility in accordance with the TechnicalSpecifications.3.The license amendment is effective as of its date of issuance and shall be implementedwithin 30 days of issuance.FOR THE NUCLEAR REGULATORY COMMISSION/RA/David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
: 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC                                RidsNrrPMBBenney            RidsAcrsAcnwMailCenter LPLIV Reading                          RidsNrrLALFeizollahi        RidsRgn4MailCenter (KKennedy)
RidsNrrDorl (CHaney/CHolden)           RidsNrrDorlDpr               RidNrrDirsItsb RidsNrrDorlLpl4 (DTerao)               RidsOgcRp                    GHill (2)
RBHarvey, AADB PACKAGE NO.: ML062260229 ACCESSION NO.: ML062260239 TS Page: ML062490037 OFFICE    NRR/LPL4/PM        NRR/LPL4/LA    AADB/BC      ITSB/BC      OGC            NRR/LPL4/BC NAME      BBenney;mxr4        LFeizollahi    MKotzales    TTjader      AHodgdon        DTerao DATE      8/22/06            8/22/06        8/22/06      8/24/06      8/25/06        9/1/06 OFFICIAL RECORD COPY
 
NEBRASKA PUBLIC POWER DISTRICT DOCKET NO. 50-298 COOPER NUCLEAR STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 222 License No. DPR-46
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Nebraska Public Power District (the licensee) dated September 29, 2005, as supplemented by letters dated January 16, and April 7, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. DPR-46 is hereby amended to read as follows:
(2)     Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 222, are hereby incorporated in the license. The Nebraska Public Power District shall operate the facility in accordance with the Technical Specifications.
: 3. The license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
                                      /RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==
Changes to the Technical   SpecificationsDate of Issuance: September 5, 2006 ATTACHMENT TO LICENSE AMENDMENT NO. 222FACILITY OPERATING LICENSE NO. DPR-46DOCKET NO. 50-298Replace the following pages of the Appendix A Technical Specifications with the attachedrevised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.REMOVEINSERT3.3-573.3-573.3-633.3-63 3.6-323.6-32 3.6-333.6-33 3.6-343.6-34 3.6-363.6-36 3.6-383.6-38 3.6-393.6-39 3.6-403.6-40 3.7-83.7-8 3.7-93.7-9 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONRELATED TO AMENDMENT NO. 222 TOFACILITY OPERATING LICENSE NO. DPR-46NEBRASKA PUBLIC POWER DISTRICTCOOPER NUCLEAR STATIONDOCKET NO. 50-29
Changes to the Technical Specifications Date of Issuance: September 5, 2006
 
ATTACHMENT TO LICENSE AMENDMENT NO. 222 FACILITY OPERATING LICENSE NO. DPR-46 DOCKET NO. 50-298 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE                          INSERT 3.3-57                          3.3-57 3.3-63                          3.3-63 3.6-32                          3.6-32 3.6-33                          3.6-33 3.6-34                          3.6-34 3.6-36                          3.6-36 3.6-38                          3.6-38 3.6-39                          3.6-39 3.6-40                          3.6-40 3.7-8                          3.7-8 3.7-9                          3.7-9
 
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 222 TO FACILITY OPERATING LICENSE NO. DPR-46 NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION DOCKET NO. 50-298
 
==1.0    INTRODUCTION==
 
By application dated September 29, 2005 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML052770499), as supplemented by letters dated January 16, and April 7, 2006 (ADAMS Accession Nos. ML060200292 and ML061020078, respectively),
Nebraska Public Power District (the licensee) requested a license amendment for the Cooper Nuclear Station (CNS). The supplements dated January 16 and April 7, 2006, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination as published on January 3, 2006 (71 FR 149), in the Federal Register.
This amendment will replace the current accident source term used in calculating the fuel handling accident (FHA) dose consequences with the alternative source term (AST) in accordance with Title 10 of the Code of Federal Regulations, Part 50.67 (10 CFR 50.67),
"Accident Source Term." The FHA re-analysis also involved several changes in selected analysis assumptions. The licensee performed the FHA re-analysis in support of technical specification (TS) changes related to refueling operations.
The following TSs are proposed to be revised:
!      TS 3.3.6.2, Secondary Containment Isolation Instrumentation
!      TS 3.3.7.1, Control Room Emergency Filter (CREF) System Instrumentation
!      TS 3.6.4.1, Secondary Containment
!      TS 3.6.4.2, Secondary Containment Isolation Valves (SCIVs)
!      TS 3.6.4.3, Standby Gas Treatment (SGT) System
!      TS 3.7.4, CREF System The proposed TS changes would eliminate operability requirements for (1) the secondary containment, the SCIVs, the SGT system, and the secondary containment isolation instrumentation when handling irradiated fuel that has decayed for at least [[estimated NRC review hours::24 hours]] since
 
critical reactor operations and (2) the CREF system and its initiation instrumentation when handling irradiated fuel that has decayed for at least 7 days. The proposed changes are based on Technical Specifications Task Force Traveler 51 (TSTF-51), "Revised Containment Requirements During Handling Irradiated Fuel and Core Alterations."
The licensee stated that this license amendment is being requested to reduce the duration and cost of planned plant outages.


==81.0INTRODUCTION==
==2.0      REGULATORY EVALUATION==
By application dated September 29, 2005 (Agencywide Documents Access and ManagementSystem (ADAMS) Accession No. ML052770499), as supplemented by letters dated January 16, and April 7, 2006 (ADAMS Accession Nos. ML060200292 and ML061020078, respectively),
Nebraska Public Power District (the licensee) requested a license amendment for the Cooper Nuclear Station (CNS). The supplements dated January 16 and April 7, 2006, providedadditional information that clarified the application, did not expand the scope of the applicationas originally noticed, and did not change the staff's original proposed no significant hazards consideration determination as published on January 3, 2006 (71 FR 149), in the FederalRegister. This amendment will replace the current accident source term used in calculating the fuelhandling accident (FHA) dose consequences with the alternative source term (AST) in accordance with Title 10 of the Code of Federal Regulations, Part 50.67 (10 CFR 50.67),"Accident Source Term."  The FHA re-analysis also involved several changes in selected analysis assumptions. The licensee performed the FHA re-analysis in support of technical specification (TS) changes related to refueling operations.The following TSs are proposed to be revised:


!TS 3.3.6.2, Secondary Containment Isolation Instrumentation
This safety evaluation (SE) addresses the impact of the proposed changes on previously analyzed design-basis accident (DBA) radiological consequences and the acceptability of the revised analyses results. The regulatory requirements are the accident dose criteria in 10 CFR 50.67, "Accident Source Term," as supplemented in Regulatory Position 4.4 of Regulatory Guide (RG) 1.183, "Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors," and 10 CFR Part 50, Appendix A, General Design Criterion 19, "Control Room," as supplemented by Section 6.4 of NUREG-0800, "Standard Review Plan [SRP] for the Review of Safety Analysis Reports for Nuclear Power Plants."
!TS 3.3.7.1, Control Room Emergency Filter (CREF) System Instrumentation
Except where the licensee proposed a suitable alternative, the U.S. Nuclear Regulatory Commission (NRC) staff utilized the regulatory guidance provided in SRP Section 15.0.1, "Radiological Consequence Analysis Using Alternative Source Terms," in performing this review. The NRC staff also considered relevant information in the CNS updated safety analysis report, TSs, and TSTF-51.
!TS 3.6.4.1, Secondary Containment
!TS 3.6.4.2, Secondary Containment Isolation Valves (SCIVs)
!TS 3.6.4.3, Standby Gas Treatment (SGT) System
!TS 3.7.4, CREF SystemThe proposed TS changes would eliminate operability requirements for (1) the secondarycontainment, the SCIVs, the SGT system, and the secondary containment isolationinstrumentation when handling irradiated fuel that has decayed for at least 24 hours since  critical reactor operations and (2) the CREF system and its initiation instrumentation whenhandling irradiated fuel that has decayed for at least 7 days. The proposed changes are based on Technical Specifications Task Force Traveler 51 (TSTF-51), "Revised Containment Requirements During Handling Irradiated Fuel and Core Alterations."The licensee stated that this license amendment is being requested to reduce the duration andcost of planned plant outages.


==2.0REGULATORY EVALUATION==
==3.0      TECHNICAL EVALUATION==
This safety evaluation (SE) addresses the impact of the proposed changes on previouslyanalyzed design-basis accident (DBA) radiological consequences and the acceptability of therevised analyses results. The regulatory requirements are the accident dose criteria in 10 CFR 50.67, "Accident Source Term," as supplemented in Regulatory Position 4.4 ofRegulatory Guide (RG) 1.183, "Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors," and 10 CFR Part 50, Appendix A, General Design Criterion 19, "Control Room," as supplemented by Section 6.4 of NUREG-0800, "StandardReview Plan [SRP] for the Review of Safety Analysis Reports for Nuclear Power Plants."
Except where the licensee proposed a suitable alternative, the U.S. Nuclear RegulatoryCommission (NRC) staff utilized the regulatory guidance provided in SRP Section 15.0.1,"Radiological Consequence Analysis Using Alternative Source Terms," in performing this review. The NRC staff also considered relevant information in the CNS updated safety analysisreport, TSs, and TSTF-51.


==3.0TECHNICAL EVALUATION==
The NRC staff reviewed the regulatory and technical analyses, as related to the radiological consequences of DBAs, performed by the licensee in support of its proposed license amendment. Information regarding these analyses was provided in Attachment 1 and  of the submittal dated September 29, 2005, and in supplementary letters dated January 16, and April 7, 2006. The NRC staff reviewed the assumptions, inputs, and methods used by the licensee to evaluate the impacts of the revised design-basis FHA analyses. The findings of this SE are based on the descriptions of the licensees analyses and other supporting information docketed by the licensee. However, the NRC staff also performed independent calculations to confirm the conservatism of the licensees analyses.
The NRC staff reviewed the regulatory and technical analyses, as related to the radiologicalconsequences of DBAs, performed by the licensee in support of its proposed license amendment. Information regarding these analyses was provided in Attachment 1 and  of the submittal dated September 29, 2005, and in supplementary letters datedJanuary 16, and April 7, 2006. The NRC staff reviewed the assumptions, inputs, and methodsused by the licensee to evaluate the impacts of the revised design-basis FHA analyses. The findings of this SE are based on the descriptions of the licensee's analyses and other supporting information docketed by the licensee. However, the NRC staff also performedindependent calculations to confirm the conservatism of the licensee's analyses. TSTF-51, Revision 2, allows for removal of the TS requirements for engineered safeguardsfeatures, such as secondary containment and SGT, to be operable during movement of fuel, once sufficient radioactive decay has taken place to ensure that offsite doses remain well within (i.e., 25 percent of) 10 CFR Part 100 limits. TSTF-51 placed the following reviewer's note in the basis for the standard TS 3.6.4.1, "Secondary Containment":The addition of the term "recently" associated with handling irradiated fuel in allof the containment function Technical Specification requirements is only applicable to those licensees who have demonstrated by analysis that after sufficient radioactive decay has occurred, off-site doses resulting from a fuel handling accident remain below the Standard Review Plan limits (well within 10 CFR [Part] 100). Additionally, licensees adding the term "recently" must make the followingcommitment which is consistent with draft NUMARC 93-01, Revision 3, Section 11.2.6, "Safety Assessment for Removal of Equipment from Service During Shutdown Conditions," subheading "Containment - Primary (PWR [pressurized-water reactor])/Secondary (BWR [boiling-water reactor])."The following guidelines are included in the assessment of systems removedfrom service during movement of irradiated fuel:-During fuel handling/core alterations, ventilation system and radiationmonitor availability (as defined in NUMARC 91-06) should be assessed,with respect to filtration and monitoring of releases from the fuel.
TSTF-51, Revision 2, allows for removal of the TS requirements for engineered safeguards features, such as secondary containment and SGT, to be operable during movement of fuel, once sufficient radioactive decay has taken place to ensure that offsite doses remain well within (i.e., 25 percent of) 10 CFR Part 100 limits. TSTF-51 placed the following reviewers note in the basis for the standard TS 3.6.4.1, "Secondary Containment":
The addition of the term "recently" associated with handling irradiated fuel in all of the containment function Technical Specification requirements is only applicable to those licensees who have demonstrated by analysis that after sufficient radioactive decay has occurred, off-site doses resulting from a fuel handling accident remain below the Standard Review Plan limits (well within 10 CFR [Part] 100).
 
Additionally, licensees adding the term "recently" must make the following commitment which is consistent with draft NUMARC 93-01, Revision 3, Section 11.2.6, "Safety Assessment for Removal of Equipment from Service During Shutdown Conditions," subheading "Containment - Primary (PWR [pressurized-water reactor])/Secondary (BWR [boiling-water reactor])."
The following guidelines are included in the assessment of systems removed from service during movement of irradiated fuel:
      -     During fuel handling/core alterations, ventilation system and radiation monitor availability (as defined in NUMARC 91-06) should be assessed, with respect to filtration and monitoring of releases from the fuel.
Following shutdown, radioactivity in the fuel decays away fairly rapidly.
Following shutdown, radioactivity in the fuel decays away fairly rapidly.
The basis of the technical specification operability amendment is thereduction in doses due to such decay. The goal of maintaining ventilation system and radiation monitor availability is to reduce doses even furtherbelow that provided by the natural decay.-A single normal or contingency method to promptly close primary orsecondary containment penetrations should be developed. Such prompt methods need not completely block the penetration or be capable of resisting pressure.The purpose of the 'prompt methods' mentioned above are to enable ventilationsystems to draw the release from a postulated fuel handling accident in theproper direction such that it can be treated and monitored.When draft NUMARC 93-01, Revision 3, was issued in the final version, Section 11.2.6 wasrenumbered to Section 11.3.6 and the guidelines quoted above were numbered 11.3.6.5 andmodified slightly as follows:. . . the following guidelines should be included in the assessment of systemsremoved from service:-During fuel handling/core alterations, ventilation system and radiationmonitor availability (as defined in NUMARC 91-06) should be assessed,with respect to filtration and monitoring of releases from the fuel.
The basis of the technical specification operability amendment is the reduction in doses due to such decay. The goal of maintaining ventilation system and radiation monitor availability is to reduce doses even further below that provided by the natural decay.
      -     A single normal or contingency method to promptly close primary or secondary containment penetrations should be developed. Such prompt methods need not completely block the penetration or be capable of resisting pressure.
The purpose of the prompt methods mentioned above are to enable ventilation systems to draw the release from a postulated fuel handling accident in the proper direction such that it can be treated and monitored.
When draft NUMARC 93-01, Revision 3, was issued in the final version, Section 11.2.6 was renumbered to Section 11.3.6 and the guidelines quoted above were numbered 11.3.6.5 and modified slightly as follows:
      . . . the following guidelines should be included in the assessment of systems removed from service:
      -     During fuel handling/core alterations, ventilation system and radiation monitor availability (as defined in NUMARC 91-06) should be assessed, with respect to filtration and monitoring of releases from the fuel.
Following shutdown, radioactivity in the RCS [reactor coolant system]
Following shutdown, radioactivity in the RCS [reactor coolant system]
decays fairly rapidly. The basis of the Technical Specification operabilityamendment is the reduction in doses due to such decay. The goal of maintaining ventilati on system and radiation monitor availability is toreduce doses even further below that provided by the natural decay, and to avoid unmonitored releases.-A single normal or contingency method to promptly close primary orsecondary containment penetrations should be developed. Such prompt methods need not completely block the penetration or be capable of resisting pressure. The purpose is to enable ventilation systems to draw the release from a postulated fuel handling accident in the properdirection such that it can be treated and monitored.The NRC staff considers the final version and the draft version of this section ofNUMARC 93-01, Revision 3, to be functionally equivalent. The licensee committed to implement the guidelines of Section 11.3.6.5 of NUMARC 93-01, Revision 3, within 30 days ofthe implementation of this license amendment. The NRC staff finds this meets the commitmentrequired by TSTF-51, Revision 2.Because the licensee has applied to implement an AST selectively for the FHA, the regulatorydose criteria of 10 CFR 50.67 are used in lieu of the 10 CFR Part 100 dose limits in determining acceptability of the changes. 3.1Radiological Consequences of the Fuel Handling Accident The licensee evaluated the dose consequences of an FHA following both a 24-hour decay timesince reactor shutdown and a 7-day decay time since reactor shutdown. This evaluation was based on the AST guidelines outlined in NUREG-1465, "Accident Source Terms forLight-Water Nuclear Power Plants," and RG 1.183, as well as the NRC computer codeRADTRAD Version 3.03 (NUREG/CR-6604, "RADTRAD: A Simplified Model for RadionuclideTransport and Removal and Dose Estimation," including Supplements 1 and 2). To support its TS changes, the licensee's evaluation demonstrated that the radiological doses at the exclusionarea boundary (EAB), low population zone (LPZ), and in the control room (CR) are within regulatory limits without crediting the operability of secondary containment, secondarycontainment isolation valves, the SGT system, or secondary containment isolationinstrumentation after a 24-hour decay period following reactor shutdown. Likewise, the licensee's evaluation demonstrated that control room radiological doses are within regulatorylimits without crediting the operability of the CREF system and CREF system instrumentationafter a 7-day decay period following reactor shutdown.The licensee's limiting postulated FHA event assumed a fuel assembly is dropped into thereactor core during refueling operations from a height of 32.95 feet, which is the maximum height allowed by the fuel handling equipment. The resulting impact of the fuel assembly onto the top of the core is assumed to damage 151, GE14, 10x10 fuel rods (representingapproximately 0.3133 percent of the core) causing a gap release of radionuclides to the water pool above the core. This event could also occur over the spent fuel pool. However, the licensee states that significantly fewer (i.e., 48) fuel rods would be damaged in the latter case, due to reduced drop height. Since both the reactor cavity and spent fuel pool are located in the reactor building, an FHA in either the reactor cavity or the spent fuel pool is assumed to have the same potential release pathways from the reactor building to the environment.Given that the primary containment remains open during refueling, the licensee assumed theradionuclides released as a result of the FHA pass through the water in the reactor cavity and enter the reactor building refueling floor atmosphere instantaneously. The water pool above the core serves as a barrier to the release of a significant amount of radionuclides. The remaining radionuclides that become airborne in the reactor building are assumed to be released to the outside environment over a 2-hour period. 1Footnote 11 to RG 1.183 states that the release fractions listed in RG 1.183 Table 3 are acceptable for usewith fuels having a peak burnup up to 62 gigawatt-days per metric ton uranium (GWD/MTU), provided thatthe maximum linear heat generation rate does not exceed the 6.3 kilowatt per foot peak rod average powerfor burnup exceeding 54 GWD/MTU. The licensee's response to Question 1 in Attachment 1 to its letterdated April 7, 2006, states that the current core will remain within the constraints of this footnote and corereload design control measures will ensure that future cores remain within the burnup limitation.
decays fairly rapidly. The basis of the Technical Specification operability amendment is the reduction in doses due to such decay. The goal of maintaining ventilation system and radiation monitor availability is to reduce doses even further below that provided by the natural decay, and to avoid unmonitored releases.
2In Question #2 of its request for additional information (RAI) letter dated February 9, 2006, the NRC staffasked the licensee to (1) identify all the possible release points for the FHA when the reactor building dooris open to the environment and the standby gas treatment system and secondary containment areinoperable, and (2) justify why the reactor building vent release pathway is assumed to bound all of theseThe licensee determined the inventory of fission products in the fuel rods based on themaximum full power operation of the core with an assumed core power equal to the current licensed rated thermal power of 2381 megawatts thermal (MWt). The licensee multiplied this value by a factor of 1.02 to account for maximum possible measurement uncertainty as required by Appendix K to 10 CFR Part 50 for nuclear reactor power operation. The licensee assumed the core had operated at this power level for an extended period of time such that fission product equilibrium was reached. For radionuclides that have not reached equilibrium,the core inventory at time of shutdown was used. To account for differences in power distribution across the core, the licensee applied a peaking factor of 2.0 to the average inventory. The majority of the fission products produced during plant operation remain within the fuelpellet; however, some migrate to void spaces, known as "gap," within the fuel rods. The licensee calculated the activity in the gap using the non-loss-of-coolant-accident gap inventoryfractions presented in Table 3 of RG 1.183.
      -     A single normal or contingency method to promptly close primary or secondary containment penetrations should be developed. Such prompt methods need not completely block the penetration or be capable of resisting pressure. The purpose is to enable ventilation systems to draw
1  The licensee assumed that as the resulting gapactivity release rises through the overlaying water, the elemental halogen species (i.e., Bromine and Iodine) are scrubbed by the water column, resulting in an effective halogen decontamination factor of 200 (i.e., 99.5 percent of the total halogen release from the damagedfuel rods is retained by the water). No decontamination of noble gases (i.e., Krypton and Xenon) was assumed.The guidance in RG 1.183 allows an effective halogen decontamination factor of 200 when theoverlaying water column is at least 23 feet. This pre-condition is met for the reactor cavity but not for the spent fuel pool where the water depth is only 21 feet 6 inches. The licensee statedthat the implied reduction in scrubbing efficiency is offset by the reduced number of fuel rods (i.e., 48 versus 151) that are projected to be damaged by a fuel assembly drop over the spent fuel pool. The effective decontamination factor in RG 1.183 is based on an exponential function where more scrubbing occurs at the bottom of the water column than at the top. As such, apool level of 21 feet 6 inches (a reduction of about 6.5 percent in pool depth) would result in a reduction in scrubbing efficiency of less than 6.5 percent. This is less than the 68 percent reduction in the amount of damaged rods, and hence the radionuclides released from the spent fuel pool are less than from the reactor cavity pool. The NRC staff finds the licensee'sconclusion, that the consequences of an FHA over the reactor cavity bounds those for an FHA over the spent fuel pool, to be acceptable.The licensee initially identified two possible release points for the FHA when the reactor buildingis open to the environment and the SGT system and containment are inoperable:  the reactorbuilding vent and the reactor building railroad airlock doors. Since physical interlocks andsecurity considerations prevent both reactor building railroad airlock doors from being open concurrently, the licensee modeled FHA releases as occurring through the reactor building vent.2  other possible release pathways for the control room dose assessment. In its letter response dated April 7,2006, the licensee identified a number of additional potential release pathways to the environmentassuming an FHA on the refuel floor but stated that the reactor building vent remained bounding because ofits direct path to the outside environment and relatively short distance to the control room intake. Foradditional conservatism, the licensee made a commitment to keep the reactor building roof hatch closedduring movement of irradiated fuel in the secondary containment.
 
3The licensee evaluated the ability of the reactor building exhaust plenum radiation monitor to provide the necessary CREF system initiation signal for the FHA. This setpoint assessment is predicated on havingventilation flow in the exhaust plenum at the start of the FHA. Therefore, if the CREF system is not inoperation, the licensee has committed to having either a reactor building exhaust fan or an SGT system fanin operation prior to conducting fuel handling operations when less than a 7-day decay time has elapsed.
the release from a postulated fuel handling accident in the proper direction such that it can be treated and monitored.
4Although the CREF system is currently specified as having a 95 percent efficiency for all iodine species, the licensee modeled a filtered efficiency of 89 percent for all iodine species in its analyses in order to providefor future analytical operational margin.
The NRC staff considers the final version and the draft version of this section of NUMARC 93-01, Revision 3, to be functionally equivalent. The licensee committed to implement the guidelines of Section 11.3.6.5 of NUMARC 93-01, Revision 3, within 30 days of the implementation of this license amendment. The NRC staff finds this meets the commitment required by TSTF-51, Revision 2.
5The unfiltered inleakage assumption of 400 cfm is conservative when compared to the inleakage value of 64 cfm measured by the licensee during tracer gas testing for the radiological emergency mode ofoperation as reported in its in September 30, 2004, response to NRC Generic Letter 2003-01, "ControlRoom Habitability."The licensee's FHA evaluation of control room doses for the 24-hour decay time case creditedthe operability of the CREF system and CREF system instrumentation. During both normal andradiological emergency modes of operation, the control room envelope is positively pressurized and the return air from the control room envelope is recirculated without filtration. During the first 1 minute of the event, the licensee assumed a normal unfiltered inflow of 3235 cubic feet per minute (cfm). The CREF system was then assumed to actuate due to high radiationdetected in the reactor building exhaust plenum.
Because the licensee has applied to implement an AST selectively for the FHA, the regulatory dose criteria of 10 CFR 50.67 are used in lieu of the 10 CFR Part 100 dose limits in determining acceptability of the changes.
3  For the remaining duration of the event, thelicensee assumed an emergency filtered inflow of 810 cfm.
3.1    Radiological Consequences of the Fuel Handling Accident The licensee evaluated the dose consequences of an FHA following both a 24-hour decay time since reactor shutdown and a 7-day decay time since reactor shutdown. This evaluation was based on the AST guidelines outlined in NUREG-1465, "Accident Source Terms for Light-Water Nuclear Power Plants," and RG 1.183, as well as the NRC computer code RADTRAD Version 3.03 (NUREG/CR-6604, "RADTRAD: A Simplified Model for Radionuclide Transport and Removal and Dose Estimation," including Supplements 1 and 2). To support its TS changes, the licensees evaluation demonstrated that the radiological doses at the exclusion area boundary (EAB), low population zone (LPZ), and in the control room (CR) are within regulatory limits without crediting the operability of secondary containment, secondary containment isolation valves, the SGT system, or secondary containment isolation instrumentation after a 24-hour decay period following reactor shutdown. Likewise, the licensees evaluation demonstrated that control room radiological doses are within regulatory limits without crediting the operability of the CREF system and CREF system instrumentation after a 7-day decay period following reactor shutdown.
The licensee also assumed anunfiltered inleakage of 400 cfm throughout the entire duration of the event.
The licensees limiting postulated FHA event assumed a fuel assembly is dropped into the reactor core during refueling operations from a height of 32.95 feet, which is the maximum height allowed by the fuel handling equipment. The resulting impact of the fuel assembly onto the top of the core is assumed to damage 151, GE14, 10x10 fuel rods (representing approximately 0.3133 percent of the core) causing a gap release of radionuclides to the water pool above the core. This event could also occur over the spent fuel pool. However, the licensee states that significantly fewer (i.e., 48) fuel rods would be damaged in the latter case, due to reduced drop height. Since both the reactor cavity and spent fuel pool are located in the reactor building, an FHA in either the reactor cavity or the spent fuel pool is assumed to have the same potential release pathways from the reactor building to the environment.
5The licensee's FHA evaluation of control room doses for the 7-day decay time case did notcredit the availability of the CREF system. For this scenario, a normal unfiltered inflow of3635 cfm (which includes 400 cfm inleakage) was used for the duration of the accident.The licensee also qualitatively assessed the potential gamma shine dose from external sourcesto the control room during the FHA. The radiation sources external to the control room includethe airborne external cloud and CREF system filters located within the control room envelope. The licensee concluded that the cloud shine and CREF system shine control room doses wouldbe a fraction of the inhalation doses and the resulting total dose would still be below regulatorycriteria. The NRC staff reviewed the information provided in the licensee's submittal, as supplemented,and also performed an independent calculation that confirmed the licensee's dose results. The assumptions used by the licensee (which are listed in Table 1 of this SE) were found acceptable by the NRC staff. The licensee's calculated dose results are given in Table 2. The NRC staff has found the licensee's calculated doses acceptable because they are within theSRP 15.0.1 radiological dose acceptance criteria for an FHA. These criteria are 6.3 roentgenequivalent man (rem) total effective dose equivalent (TEDE) at the EAB for the worst 2 hours, 6.3 rem TEDE at the LPZ for the duration of the accident, and 5 rem TEDE in the CR for theduration of the accident.3.2Atmospheric Dispersion Estimates  6Each SGT system fan has a flow rate of 1780 cfm and the reactor building exhaust fan flow rates arehigher. If the CREF system is not in operation, the licensee has committed to having either a reactorbuilding fan or SGT system fan in operation prior to conducting fuel handling operations when less than a 7-day decay time has elapsed.3.2.1Control Room /Q ValuesThe licensee's control room dose analyses modeled FHA releases as occurring through thereactor building vent and assumed a single receptor point at the CR air intake for both unfilteredand filtered inflow and unfiltered inleakage. The licensee used existing CR atmospheric dispersion factors (/Q values) that had been submitted for NRC staff review as part of thesubmittal for the current FHA of record (License Amendment No.187). These /Q values, whichare presented in Table 1, were listed in the calculation provided in Enclosure 1 to the licensee'sletter dated September 14, 2001. They were generated using the NRC computer codeARCON96 (NUREG/CR-6331, Revision 1, "Atmospheric Relative Concentrations in BuildingWakes") and onsite meteorological data collected during calendar years 1994-1998. The release assumptions used for the currently licensed FHA and the one proposed in thislicense amendment request are somewhat different. The previous FHA assumed a 90-second unfiltered ground level reactor building vent release followed by an elevated filtered stack release for the balance of the 30-day duration, while the new analyses assumes a 30-day unfiltered reactor building vent ground level release. In its letter dated September 14, 2001, thelicensee presented /Q values calculated for the reactor building vent release assuming threedifferent values for the reactor building vent flow rate (i.e., 51,333 cfm, 9500 cfm, and 1780 cfm). The three flow rates modeled a reactor building exhaust fan coast down after a primary containment isolation system trip on high radiation in the reactor building exhaustplenum. For the new analyses, the licensee elected to use the highest (i.e., most conservative) of the three sets of /Q values, which are the /Q values associated with the lowest (i.e.,1780 cfm) reactor building vent flow rate.
Given that the primary containment remains open during refueling, the licensee assumed the radionuclides released as a result of the FHA pass through the water in the reactor cavity and enter the reactor building refueling floor atmosphere instantaneously. The water pool above the core serves as a barrier to the release of a significant amount of radionuclides. The remaining radionuclides that become airborne in the reactor building are assumed to be released to the outside environment over a 2-hour period.
6  Although the 1780 cfm /Q values are notspecifically cited in the License Amendment No. 187 Safety Evaluation (as they were not applicable until after the 90-second Reactor Building ground level release had terminated), they are based on the same previously approved 1994-1998 meteorological data and ARCON96 methodology. For these reasons, the NRC staff has concluded that the CR /Q valuespresented in Table 1 are acceptable for use in the CR dose assessment submitted in support of this amendment.3.2.2Offsite /Q ValuesThe /Q values used by the licensee for the EAB and LPZ dose consequence assessments arebased on ground level releases from the reactor building vent calculated using site specific inputs and methodology described in RG 1.3, "Assumptions Used for Evaluating the PotentialRadiological Consequences of a Loss of Coolant Accident for Boiling Water Reactors."  These/Q values are presented in Table 1. The calculation documenting these /Q values waspreviously submitted to the NRC staff in Enclosure 6 to a letter dated February 28, 2001. Asubset of these /Q values (i.e., the /Q values listed as the 0-2 hour EAB and LPZ values)was approved by the NRC staff for use in License Amendment No. 187. The remaining EABand LPZ /Q values approved in License Amendment No. 187 are not applicable to the newanalyses because they represent elevated stack releases. Since the remaining offsite /Qvalues listed in Table 1 represent ground level reactor building vent releases derived using the same previously approved RG 1.3 methodology, the NRC staff has concl uded that the EAB andLPZ /Q values presented in Table 1 are acceptable for use in the offsite dose assessmentsubmitted in support of this amendment. 7In its original submittal, dated September 29, 2005, the licensee proposed introducing the term "recentlyirradiated fuel assemblies" in the applicability and action statements for the TSs related to fuelingoperations. In some cases (i.e., TSs 3.3.6.2, 3.6.4.1, 3.6.4.2, and 3.6.4.3), the licensee was defining thisterm in the corresponding TS bases as fuel that has occupied part of a critical reactor core within theprevious 24 hours; in other cases (i.e., TSs 3.3.7.1 and 3.7.4), the licensee was defining this term in thecorresponding TS bases as fuel that has occupied part of a critical reactor core within the previous 7 days. In Question #4 of its RAI letter dated February 9, 2006, the NRC staff asked the licensee how using thesame term (i.e., recently irradiated fuel assemblies) with different definitions within the TS would not causeconfusion. In its letter response dated April 7, 2006, the licensee agreed that having different definitions for"recently irradiated fuel assemblies" could be a source of confusion and decided to use the term "latelyirradiated fuel assemblies" for the 7-day irradiation period.3.3Technical Specification ChangesThe licensee proposed revising the TS for selected systems to relax operability requirementsduring the movement of irradiated fuel that has decayed for at least 24 hours or for at least7 days.7 a. 24-hour Decayed FuelThe licensee proposed changes to the applicability and action statements for thefollowing TSs:
 
!TS 3.6.4.1, Secondary Containment
The licensee determined the inventory of fission products in the fuel rods based on the maximum full power operation of the core with an assumed core power equal to the current licensed rated thermal power of 2381 megawatts thermal (MWt). The licensee multiplied this value by a factor of 1.02 to account for maximum possible measurement uncertainty as required by Appendix K to 10 CFR Part 50 for nuclear reactor power operation. The licensee assumed the core had operated at this power level for an extended period of time such that fission product equilibrium was reached. For radionuclides that have not reached equilibrium, the core inventory at time of shutdown was used. To account for differences in power distribution across the core, the licensee applied a peaking factor of 2.0 to the average inventory.
!TS 3.6.4.2, Secondary Containment Isolation Valves
The majority of the fission products produced during plant operation remain within the fuel pellet; however, some migrate to void spaces, known as "gap," within the fuel rods. The licensee calculated the activity in the gap using the non-loss-of-coolant-accident gap inventory fractions presented in Table 3 of RG 1.183.1 The licensee assumed that as the resulting gap activity release rises through the overlaying water, the elemental halogen species (i.e., Bromine and Iodine) are scrubbed by the water column, resulting in an effective halogen decontamination factor of 200 (i.e., 99.5 percent of the total halogen release from the damaged fuel rods is retained by the water). No decontamination of noble gases (i.e., Krypton and Xenon) was assumed.
!TS 3.6.4.3, Standby Gas Treatment SystemFor these TSs, the licensee proposes deleting "During CORE ALTERATIONS" from theapplicability and action statements. In addition, the licensee is proposing adding theterm "recently" in front of "irradiated" in the phrase "During movement of irradiated fuel assemblies in the secondary containment" in the applicability and action statements.The licensee is also proposing modifying the applicability statement as described abovefor the following TS:
The guidance in RG 1.183 allows an effective halogen decontamination factor of 200 when the overlaying water column is at least 23 feet. This pre-condition is met for the reactor cavity but not for the spent fuel pool where the water depth is only 21 feet 6 inches. The licensee stated that the implied reduction in scrubbing efficiency is offset by the reduced number of fuel rods (i.e., 48 versus 151) that are projected to be damaged by a fuel assembly drop over the spent fuel pool. The effective decontamination factor in RG 1.183 is based on an exponential function where more scrubbing occurs at the bottom of the water column than at the top. As such, a pool level of 21 feet 6 inches (a reduction of about 6.5 percent in pool depth) would result in a reduction in scrubbing efficiency of less than 6.5 percent. This is less than the 68 percent reduction in the amount of damaged rods, and hence the radionuclides released from the spent fuel pool are less than from the reactor cavity pool. The NRC staff finds the licensees conclusion, that the consequences of an FHA over the reactor cavity bounds those for an FHA over the spent fuel pool, to be acceptable.
!TS 3.3.6.2, Secondary Containment Isolation Instrumentationb. 7-day Decayed FuelThe licensee proposed changes to the applicability and action statements for thefollowing TS:
The licensee initially identified two possible release points for the FHA when the reactor building is open to the environment and the SGT system and containment are inoperable: the reactor building vent and the reactor building railroad airlock doors. Since physical interlocks and security considerations prevent both reactor building railroad airlock doors from being open concurrently, the licensee modeled FHA releases as occurring through the reactor building vent.2 1
!TS 3.7.4, CR Emergency Filter SystemFor this TS, the licensee proposes deleting "During CORE ALTERATIONS" from theapplicability and action statements. In addition, the licensee is proposing adding theterm "lately" in front of "irradiated" in the phrase "During movement of irradiated fuel assemblies in the secondary containment" in the applicability and action statements.
Footnote 11 to RG 1.183 states that the release fractions listed in RG 1.183 Table 3 are acceptable for use with fuels having a peak burnup up to 62 gigawatt-days per metric ton uranium (GWD/MTU), provided that the maximum linear heat generation rate does not exceed the 6.3 kilowatt per foot peak rod average power for burnup exceeding 54 GWD/MTU. The licensees response to Question 1 in Attachment 1 to its letter dated April 7, 2006, states that the current core will remain within the constraints of this footnote and core reload design control measures will ensure that future cores remain within the burnup limitation.
8The licensee made a second commitment in its September 29, 2005, license amendment request that wassubsequently withdrawn in its letter dated April 7, 2006.- 9 -The licensee is also proposing modifying the applicability statement as described abovefor the following TS:
2 In Question #2 of its request for additional information (RAI) letter dated February 9, 2006, the NRC staff asked the licensee to (1) identify all the possible release points for the FHA when the reactor building door is open to the environment and the standby gas treatment system and secondary containment are inoperable, and (2) justify why the reactor building vent release pathway is assumed to bound all of these
!TS 3.3.7.1, CR Emergency Filter System InstrumentationThe FHA is the only event during CORE ALTERATIONS that is postulated to result in fueldamage and radiological release. The limiting condition for operation and required actions willremain applicable during activities that could result in an FHA with fuel damage and radiological release. Therefore, the deletion of CORE ALTERATIONS is acceptable. These changes are consistent with the current FHA analysis and TSTF-51. Also, in accordance with the reviewer's note in TSTF-51 mentioned above, the licensee committed to the containment closureguidelines located in NUMARC 93-01. Therefore, these proposed changes to the above listed TSs are acceptable, subject to the acceptance of the radiological consequences as notedbelow.The re-analyses of the FHA following both a 24-hour decay time and a 7-day decay time did notcredit action by any system addressed by the above listed TSs. The FHA re-analysis wasconsistent with the definitions of "recently irradiated fuel" and "lately irradiated fuel" andacceptable dose results were obtained with the subject systems inoperable. As such, theproposed revisions are acceptable from an accident radiological consequence perspective.3.4Licensee Commitments The licensee has made the following commitment in the license amendment request datedSeptember 29, 2005:
 
8 a.Within 30 days of issuance of the license amendment, the licensee commits toimplement the guidelines of Section 11.3.6.5 of NUMARC 93-01, Revision 3, using astrategy outlined in the Response to Appendix B, Question 2. (Commitment NumberNLS2005075-01). The licensee stated that the approach that will be taken to conform to the NUMARCguidance will be to develop secondary containment breach control guidance that will bea prerequisite to moving irradiated fuel when secondary containment, the SCIVs, the SGT system, or secondary containment isolation instrumentation are not operable. Thisbreach control guidance will incl ude: SEnsuring that secondary containment access doors and hatches are closed (exceptfor opening and closing for normal personnel travel). Fouling of an access door/hatch is not allowed unless an individual is on station to restore the closed configuration if an FHA occurs.
The licensees FHA evaluation of control room doses for the 24-hour decay time case credited the operability of the CREF system and CREF system instrumentation. During both normal and radiological emergency modes of operation, the control room envelope is positively pressurized and the return air from the control room envelope is recirculated without filtration. During the first 1 minute of the event, the licensee assumed a normal unfiltered inflow of 3235 cubic feet per minute (cfm). The CREF system was then assumed to actuate due to high radiation detected in the reactor building exhaust plenum.3 For the remaining duration of the event, the licensee assumed an emergency filtered inflow of 810 cfm.4 The licensee also assumed an unfiltered inleakage of 400 cfm throughout the entire duration of the event.5 The licensees FHA evaluation of control room doses for the 7-day decay time case did not credit the availability of the CREF system. For this scenario, a normal unfiltered inflow of 3635 cfm (which includes 400 cfm inleakage) was used for the duration of the accident.
SEnsuring that there is normally one available train of SGT, such that if an FHAoccurs, the SGT train can be started manually. If both SGT trains would be out of service (such as for work on a component in the common suction line),  pre-positioned means would be on hand with personnel stati oned to ensure systemintegrity could be restored and one train placed in operation.
The licensee also qualitatively assessed the potential gamma shine dose from external sources to the control room during the FHA. The radiation sources external to the control room include the airborne external cloud and CREF system filters located within the control room envelope.
SEnsuring there is at least the capability of closing one SCIV manually for eachsecondary containment penetration.
The licensee concluded that the cloud shine and CREF system shine control room doses would be a fraction of the inhalation doses and the resulting total dose would still be below regulatory criteria.
SEnsuring there are no breaches of piping systems that penetrate both sides ofsecondary containment unless there are pre-positioned means to close the breach if an FHA occurs.
The NRC staff reviewed the information provided in the licensees submittal, as supplemented, and also performed an independent calculation that confirmed the licensees dose results. The assumptions used by the licensee (which are listed in Table 1 of this SE) were found acceptable by the NRC staff. The licensees calculated dose results are given in Table 2. The NRC staff has found the licensees calculated doses acceptable because they are within the SRP 15.0.1 radiological dose acceptance criteria for an FHA. These criteria are 6.3 roentgen equivalent man (rem) total effective dose equivalent (TEDE) at the EAB for the worst [[estimated NRC review hours::2 hours]], 6.3 rem TEDE at the LPZ for the duration of the accident, and 5 rem TEDE in the CR for the duration of the accident.
SEnsuring there is no maintenance in progress that compromises the structuralintegrity of secondary containment (e.g., removal of blowout panels, or core dr ills).The licensee stated that the strategy outlined above is designed to ensure that thesecondary containment function can be restored without the allowance of partial breaches. Therefore, no SGT system tests above the applicable TS surveillance testingrequirements are needed.The licensee has made the following commitments in its letter dated April 7, 2006:
3.2      Atmospheric Dispersion Estimates other possible release pathways for the control room dose assessment. In its letter response dated April 7, 2006, the licensee identified a number of additional potential release pathways to the environment assuming an FHA on the refuel floor but stated that the reactor building vent remained bounding because of its direct path to the outside environment and relatively short distance to the control room intake. For additional conservatism, the licensee made a commitment to keep the reactor building roof hatch closed during movement of irradiated fuel in the secondary containment.
a.Concurrent with 30-day implementation of issued license amendment, the reactorbuilding roof hatch will be maintained closed during the movement of irradiated fuel insecondary containment.  (Commitment Number NLS2006017-01).In order to ensure the reactor building vent remains the bounding release point as modeled inthe CR dose assessment analysis, the reactor building roof hatch will be maintained closedduring the movement of irradiated fuel in secondary containment. b.Concurrent with 30-day implementation of issued license amendment, the TS 3.3.7.1bases will be revised as provided in Enclosure 2 to formalize this support feature [airflowin the reactor building exhaust plenum].  (Commitment Number NLS2006017-02).The licensee has assessed the TS setpoint for the radiation monitor and has determined thatwith a reactor building exhaust fan or SGT system fan initially running, the design-basis ASTFHA will cause reactor building exhaust plenum high radiation activation. The TS 3.3.7.1 basisis being revised to formalize that adequate ventilation exhaust airflow is a support function to the reactor building ventilation exhaust plenum high radiation monitor during the movement of lately irradiated fuel. In this manner, ventilation exhaust airflow will be a TS operabilityrequirement for the radiation monitor. In the case of the election to operate with the CREFsystem manually initiated (in lieu of a running reactor building exhaust fan or SGT fan), TS 3.3.7.1 would prevent the start of fuel movement until Required Action C.1 had beencompleted ("Initiate CREF System"). Station procedures will ensure these TS-drivenprerequisites are met prior to moving lately irradiated fuel. The NRC staff has reviewed these licensee commitments and has concluded that thesecommitments meet the Section 11.3.6.5 of NUMARC 93-01, Revision 3, guidelines that(1) ventilation system and radiation monitor availability be maintained and (2) a single normal orcontingency method to promptly close primary or secondary containment penetrations be developed.  
3 The licensee evaluated the ability of the reactor building exhaust plenum radiation monitor to provide the necessary CREF system initiation signal for the FHA. This setpoint assessment is predicated on having ventilation flow in the exhaust plenum at the start of the FHA. Therefore, if the CREF system is not in operation, the licensee has committed to having either a reactor building exhaust fan or an SGT system fan in operation prior to conducting fuel handling operations when less than a 7-day decay time has elapsed.
4 Although the CREF system is currently specified as having a 95 percent efficiency for all iodine species, the licensee modeled a filtered efficiency of 89 percent for all iodine species in its analyses in order to provide for future analytical operational margin.
5 The unfiltered inleakage assumption of 400 cfm is conservative when compared to the inleakage value of 64 cfm measured by the licensee during tracer gas testing for the radiological emergency mode of operation as reported in its in September 30, 2004, response to NRC Generic Letter 2003-01, "Control Room Habitability."
 
3.2.1  Control Room /Q Values The licensees control room dose analyses modeled FHA releases as occurring through the reactor building vent and assumed a single receptor point at the CR air intake for both unfiltered and filtered inflow and unfiltered inleakage. The licensee used existing CR atmospheric dispersion factors (/Q values) that had been submitted for NRC staff review as part of the submittal for the current FHA of record (License Amendment No.187). These /Q values, which are presented in Table 1, were listed in the calculation provided in Enclosure 1 to the licensees letter dated September 14, 2001. They were generated using the NRC computer code ARCON96 (NUREG/CR-6331, Revision 1, "Atmospheric Relative Concentrations in Building Wakes") and onsite meteorological data collected during calendar years 1994-1998.
The release assumptions used for the currently licensed FHA and the one proposed in this license amendment request are somewhat different. The previous FHA assumed a 90-second unfiltered ground level reactor building vent release followed by an elevated filtered stack release for the balance of the 30-day duration, while the new analyses assumes a 30-day unfiltered reactor building vent ground level release. In its letter dated September 14, 2001, the licensee presented /Q values calculated for the reactor building vent release assuming three different values for the reactor building vent flow rate (i.e., 51,333 cfm, 9500 cfm, and 1780 cfm). The three flow rates modeled a reactor building exhaust fan coast down after a primary containment isolation system trip on high radiation in the reactor building exhaust plenum. For the new analyses, the licensee elected to use the highest (i.e., most conservative) of the three sets of /Q values, which are the /Q values associated with the lowest (i.e.,1780 cfm) reactor building vent flow rate.6 Although the 1780 cfm /Q values are not specifically cited in the License Amendment No. 187 Safety Evaluation (as they were not applicable until after the 90-second Reactor Building ground level release had terminated), they are based on the same previously approved 1994-1998 meteorological data and ARCON96 methodology. For these reasons, the NRC staff has concluded that the CR /Q values presented in Table 1 are acceptable for use in the CR dose assessment submitted in support of this amendment.
3.2.2  Offsite /Q Values The /Q values used by the licensee for the EAB and LPZ dose consequence assessments are based on ground level releases from the reactor building vent calculated using site specific inputs and methodology described in RG 1.3, "Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Boiling Water Reactors." These
/Q values are presented in Table 1. The calculation documenting these /Q values was previously submitted to the NRC staff in Enclosure 6 to a letter dated February 28, 2001. A subset of these /Q values (i.e., the /Q values listed as the 0-2 hour EAB and LPZ values) was approved by the NRC staff for use in License Amendment No. 187. The remaining EAB and LPZ /Q values approved in License Amendment No. 187 are not applicable to the new analyses because they represent elevated stack releases. Since the remaining offsite /Q values listed in Table 1 represent ground level reactor building vent releases derived using the same previously approved RG 1.3 methodology, the NRC staff has concluded that the EAB and LPZ /Q values presented in Table 1 are acceptable for use in the offsite dose assessment submitted in support of this amendment.
6 Each SGT system fan has a flow rate of 1780 cfm and the reactor building exhaust fan flow rates are higher. If the CREF system is not in operation, the licensee has committed to having either a reactor building fan or SGT system fan in operation prior to conducting fuel handling operations when less than a 7-day decay time has elapsed.
 
3.3    Technical Specification Changes The licensee proposed revising the TS for selected systems to relax operability requirements during the movement of irradiated fuel that has decayed for at least [[estimated NRC review hours::24 hours]] or for at least 7 days.7
: a. 24-hour Decayed Fuel The licensee proposed changes to the applicability and action statements for the following TSs:
        ! TS 3.6.4.1, Secondary Containment
        ! TS 3.6.4.2, Secondary Containment Isolation Valves
        ! TS 3.6.4.3, Standby Gas Treatment System For these TSs, the licensee proposes deleting "During CORE ALTERATIONS" from the applicability and action statements. In addition, the licensee is proposing adding the term "recently" in front of "irradiated" in the phrase "During movement of irradiated fuel assemblies in the secondary containment" in the applicability and action statements.
The licensee is also proposing modifying the applicability statement as described above for the following TS:
        ! TS 3.3.6.2, Secondary Containment Isolation Instrumentation
: b. 7-day Decayed Fuel The licensee proposed changes to the applicability and action statements for the following TS:
        ! TS 3.7.4, CR Emergency Filter System For this TS, the licensee proposes deleting "During CORE ALTERATIONS" from the applicability and action statements. In addition, the licensee is proposing adding the term "lately" in front of "irradiated" in the phrase "During movement of irradiated fuel assemblies in the secondary containment" in the applicability and action statements.
7 In its original submittal, dated September 29, 2005, the licensee proposed introducing the term "recently irradiated fuel assemblies" in the applicability and action statements for the TSs related to fueling operations. In some cases (i.e., TSs 3.3.6.2, 3.6.4.1, 3.6.4.2, and 3.6.4.3), the licensee was defining this term in the corresponding TS bases as fuel that has occupied part of a critical reactor core within the previous [[estimated NRC review hours::24 hours]]; in other cases (i.e., TSs 3.3.7.1 and 3.7.4), the licensee was defining this term in the corresponding TS bases as fuel that has occupied part of a critical reactor core within the previous 7 days.
In Question #4 of its RAI letter dated February 9, 2006, the NRC staff asked the licensee how using the same term (i.e., recently irradiated fuel assemblies) with different definitions within the TS would not cause confusion. In its letter response dated April 7, 2006, the licensee agreed that having different definitions for "recently irradiated fuel assemblies" could be a source of confusion and decided to use the term "lately irradiated fuel assemblies" for the 7-day irradiation period.
 
The licensee is also proposing modifying the applicability statement as described above for the following TS:
        ! TS 3.3.7.1, CR Emergency Filter System Instrumentation The FHA is the only event during CORE ALTERATIONS that is postulated to result in fuel damage and radiological release. The limiting condition for operation and required actions will remain applicable during activities that could result in an FHA with fuel damage and radiological release. Therefore, the deletion of CORE ALTERATIONS is acceptable. These changes are consistent with the current FHA analysis and TSTF-51. Also, in accordance with the reviewers note in TSTF-51 mentioned above, the licensee committed to the containment closure guidelines located in NUMARC 93-01. Therefore, these proposed changes to the above listed TSs are acceptable, subject to the acceptance of the radiological consequences as noted below.
The re-analyses of the FHA following both a 24-hour decay time and a 7-day decay time did not credit action by any system addressed by the above listed TSs. The FHA re-analysis was consistent with the definitions of "recently irradiated fuel" and "lately irradiated fuel" and acceptable dose results were obtained with the subject systems inoperable. As such, the proposed revisions are acceptable from an accident radiological consequence perspective.
3.4    Licensee Commitments The licensee has made the following commitment in the license amendment request dated September 29, 2005:8
: a.      Within 30 days of issuance of the license amendment, the licensee commits to implement the guidelines of Section 11.3.6.5 of NUMARC 93-01, Revision 3, using a strategy outlined in the Response to Appendix B, Question 2. (Commitment Number NLS2005075-01).
The licensee stated that the approach that will be taken to conform to the NUMARC guidance will be to develop secondary containment breach control guidance that will be a prerequisite to moving irradiated fuel when secondary containment, the SCIVs, the SGT system, or secondary containment isolation instrumentation are not operable. This breach control guidance will include:
S    Ensuring that secondary containment access doors and hatches are closed (except for opening and closing for normal personnel travel). Fouling of an access door/hatch is not allowed unless an individual is on station to restore the closed configuration if an FHA occurs.
S    Ensuring that there is normally one available train of SGT, such that if an FHA occurs, the SGT train can be started manually. If both SGT trains would be out of service (such as for work on a component in the common suction line),
8 The licensee made a second commitment in its September 29, 2005, license amendment request that was subsequently withdrawn in its letter dated April 7, 2006.
 
pre-positioned means would be on hand with personnel stationed to ensure system integrity could be restored and one train placed in operation.
S  Ensuring there is at least the capability of closing one SCIV manually for each secondary containment penetration.
S  Ensuring there are no breaches of piping systems that penetrate both sides of secondary containment unless there are pre-positioned means to close the breach if an FHA occurs.
S  Ensuring there is no maintenance in progress that compromises the structural integrity of secondary containment (e.g., removal of blowout panels, or core drills).
The licensee stated that the strategy outlined above is designed to ensure that the secondary containment function can be restored without the allowance of partial breaches. Therefore, no SGT system tests above the applicable TS surveillance testing requirements are needed.
The licensee has made the following commitments in its letter dated April 7, 2006:
: a.       Concurrent with 30-day implementation of issued license amendment, the reactor building roof hatch will be maintained closed during the movement of irradiated fuel in secondary containment. (Commitment Number NLS2006017-01).
In order to ensure the reactor building vent remains the bounding release point as modeled in the CR dose assessment analysis, the reactor building roof hatch will be maintained closed during the movement of irradiated fuel in secondary containment.
: b.      Concurrent with 30-day implementation of issued license amendment, the TS 3.3.7.1 bases will be revised as provided in Enclosure 2 to formalize this support feature [airflow in the reactor building exhaust plenum]. (Commitment Number NLS2006017-02).
The licensee has assessed the TS setpoint for the radiation monitor and has determined that with a reactor building exhaust fan or SGT system fan initially running, the design-basis AST FHA will cause reactor building exhaust plenum high radiation activation. The TS 3.3.7.1 basis is being revised to formalize that adequate ventilation exhaust airflow is a support function to the reactor building ventilation exhaust plenum high radiation monitor during the movement of lately irradiated fuel. In this manner, ventilation exhaust airflow will be a TS operability requirement for the radiation monitor. In the case of the election to operate with the CREF system manually initiated (in lieu of a running reactor building exhaust fan or SGT fan),
TS 3.3.7.1 would prevent the start of fuel movement until Required Action C.1 had been completed ("Initiate CREF System"). Station procedures will ensure these TS-driven prerequisites are met prior to moving lately irradiated fuel.
The NRC staff has reviewed these licensee commitments and has concluded that these commitments meet the Section 11.3.6.5 of NUMARC 93-01, Revision 3, guidelines that (1) ventilation system and radiation monitor availability be maintained and (2) a single normal or contingency method to promptly close primary or secondary containment penetrations be developed.


==4.0STATE CONSULTATION==
==4.0    STATE CONSULTATION==
In accordance with the Commission's regulations, the Nebraska State official was notified of theproposed issuance of the amendment. The State official had no comments.


==5.0ENVIRONMENTAL CONSIDERATION==
In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment. The State official had no comments.
The amendment changes a requirement with respect to the installation or use of a facilitycomponent located within the restricted area as defined in 10 CFR Part 20. The NRC staff hasdetermined that the amendment involves no significant increase in the amounts, and nosignificant change in the types, of any effluents that may be released offsite, and that there isno significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (71 FR 149, January 3, 2006). Accordingly, the amendment meets the eligibility criteria forcategorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.


==6.0CONCLUSION==
==5.0    ENVIRONMENTAL CONSIDERATION==
The NRC staff has reviewed the AST implementation proposed by the licensee for CNS. TheNRC staff also reviewed the proposed changes to the TSs associated with this licenseamendment request. In performing this review, the NRC staff relied upon information placed onthe docket by the licensee, staff experience in doing similar reviews, and, where deemed necessary, staff confirmatory calculations.This licensing action is considered a selective implementation of the AST. With the approval ofthis amendment, the AST, the TEDE criteria, and the analysis methods, assumptions, and inputs become the licensing basis for the assessment of radiological consequences of the FHA DBA. This approval is limited to this specific implementation. Subsequent modifications based on the selected characteristics incorporated into the licensing basis by this action may be possible under the provisions of 10 CFR 50.59. However, use of other characteristics of an AST or use of TEDE criteria that are not part of the approved licensing basis, and changes to previously approved AST characteristics, requires prior staff approval under 10 CFR 50.67.
The selected characteristics of the AST and the TEDE criteria may not be extended to other aspects of the plant design or operation without prior NRC review under 10 CFR 50.67. Allfuture radiological analyses performed to demonstrate compliance with regulatory requirements shall address the selected characteristics of the AST and the TEDE criteria as described in the CNS licensing basis.The NRC staff reviewed the assumptions, inputs, and methods used by the licensee to assessthe radiological impacts of the proposed changes. The NRC staff finds that the licensee usedanalysis, methods, and assumptions consistent with the guidance of RG 1.183, with the exceptions discussed and accepted earlier in this SE. The NRC staff compared the dosesestimated by the licensee to the applicable acceptance criteria and to the results estimated by the staff in its confirmatory calculations. The NRC staff finds, with reasonable assurance, thatthe licensee's estimates of TEDE due to a design-basis FHA will comply with the requirementsof 10 CFR 50.67 and are in accordance with the guidance of RG 1.183. The NRC staff finds reasonable assurance that CNS will continue to provide sufficient safetymargins with adequate defense in depth to address unanticipated events and to compensatefor uncertainties in accident progression and analysis assumptions and parameters. The NRC staff concludes that the proposed AST implementation and the associated TS changes areacceptable from the standpoint of radiological consequences.The Commission has concluded, based on the considerations discussed above, that:  (1) thereis reasonable assurance that the health and safety of the public will not be endangered byoperation in the proposed manner, (2) such activities will be conducted in compliance with theCommission's regulations, and (3) the issuance of the amendment will not be inimical to thecommon defense and security or to the health and safety of the public.Principal Contributor:R. Brad Harvey Date:  September 6, 2006 9The licensee's input to the RADTRAD computer model specified the iodine fractions as 0.95 aerosol, 0.0485elemental, and 0.0015 organic. This discrepancy in iodine species fractions had no impact on the RADTRADresults since the filter efficiencies for all three iodine species were set to the same value (89 percent).TABLE 1FHA Analysis AssumptionsReactor power2429 MWtRadial peaking factor2.0 Fission product decay period24 hours and 7 days Number of fuel rods damaged151 Number of rods in core (equivalent full length)47,857 Fuel Gap fission product inventoryI-131 Kr-85 Other iodines and noble gases Alkali metals 8%10%5%0.12%Iodine species fractionsElemental Organic Particulates 0.9985 0.0015 noneReactor cavity water depth23 feet Pool iodine effective decontamination factor200 Chemical form of iodine above pool 9ElementalOrganic 57%43%Release modelingImmediate release from fuel through reactor cavity pool to building 100% release from building in 2 hours No credit for building holdup or filtration prior to releaseCR envelope volume141,860 ft 3Normal ventilation unfiltered fresh intake3,235 cfm CREF system filtered intake810 cfmCREF system start delay time, minutes1 minute Unfiltered outside inleakage400 cfm CREF system filter efficiency89%
TABLE 1 (continued)CR occupancy factors 0-24 hr 24-96 hr 96-720 hr 1.0 0.6 0.4CR breathing rate3.5x104 m 3/secOffsite breathing rate 0-8 hr 8-24 hr 24-720 hr3.5x104 m 3/sec1.8x104 m 3/sec2.3x104 m 3/secAtmospheric dispersion factors, sec/m 3Ground level release from reactor building ventPeriod 0-2 hr 2-8 hr 8-24 hr 24-96 hr 96-720 hr EAB5.2x104 LPZ2.9x1042.9x1047.3x1052.5x1055.2x106 CR4.15x1033.24x1031.32x1039.01x1047.22x104TABLE 2Calculated FHA Radiological Consequences EAB LPZ CRCalculated results, TEDE24-hr decay period 7 day decay period 1.459 0.627 0.815 0.350 4.507 4.446Dose acceptance criteria, TEDE6.36.35 February 2006Cooper Nuclear Station cc:
Mr. William J. Fehrman President and Chief Executive Officer Nebraska Public Power District


1414 15 th StreetColumbus, NE 68601Mr. Gene MaceNuclear Asset Manager Nebraska Public Power District
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (71 FR 149, January 3, 2006). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.


P.O. Box 98 Brownville, NE 68321Mr. John C. McClureVice President and General Counsel Nebraska Public Power District
==6.0    CONCLUSION==


P. O. Box 499 Columbus, NE  68602-0499Mr. Paul V. FlemingLicensing Manager Nebraska Public Power District
The NRC staff has reviewed the AST implementation proposed by the licensee for CNS. The NRC staff also reviewed the proposed changes to the TSs associated with this license amendment request. In performing this review, the NRC staff relied upon information placed on the docket by the licensee, staff experience in doing similar reviews, and, where deemed necessary, staff confirmatory calculations.
This licensing action is considered a selective implementation of the AST. With the approval of this amendment, the AST, the TEDE criteria, and the analysis methods, assumptions, and inputs become the licensing basis for the assessment of radiological consequences of the FHA DBA. This approval is limited to this specific implementation. Subsequent modifications based on the selected characteristics incorporated into the licensing basis by this action may be possible under the provisions of 10 CFR 50.59. However, use of other characteristics of an AST or use of TEDE criteria that are not part of the approved licensing basis, and changes to previously approved AST characteristics, requires prior staff approval under 10 CFR 50.67.
The selected characteristics of the AST and the TEDE criteria may not be extended to other aspects of the plant design or operation without prior NRC review under 10 CFR 50.67. All future radiological analyses performed to demonstrate compliance with regulatory requirements shall address the selected characteristics of the AST and the TEDE criteria as described in the CNS licensing basis.
The NRC staff reviewed the assumptions, inputs, and methods used by the licensee to assess the radiological impacts of the proposed changes. The NRC staff finds that the licensee used analysis, methods, and assumptions consistent with the guidance of RG 1.183, with the exceptions discussed and accepted earlier in this SE. The NRC staff compared the doses estimated by the licensee to the applicable acceptance criteria and to the results estimated by the staff in its confirmatory calculations. The NRC staff finds, with reasonable assurance, that the licensees estimates of TEDE due to a design-basis FHA will comply with the requirements of 10 CFR 50.67 and are in accordance with the guidance of RG 1.183.


P.O. Box 98 Brownville, NE 68321Mr. Michael J. Linder, Director Nebraska Department of Environmental Quality P. O. Box 98922 Lincoln, NE  68509-8922Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE  68305Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE  68509-5007Mr. H. Floyd GilzowDeputy Director for Policy Missouri Department of Natural Resources
The NRC staff finds reasonable assurance that CNS will continue to provide sufficient safety margins with adequate defense in depth to address unanticipated events and to compensate for uncertainties in accident progression and analysis assumptions and parameters. The NRC staff concludes that the proposed AST implementation and the associated TS changes are acceptable from the standpoint of radiological consequences.
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: R. Brad Harvey Date: September 6, 2006


P. O. Box 176 Jefferson City, MO  65102-0176Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 218 Brownville, NE 68321Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX  76011Director, Missouri State Emergency    Management Agency
TABLE 1 FHA Analysis Assumptions Reactor power                                                                                  2429 MWt Radial peaking factor                                                                                2.0 Fission product decay period                                                              [[estimated NRC review hours::24 hours]] and 7 days Number of fuel rods damaged                                                                        151 Number of rods in core (equivalent full length)                                                  47,857 Fuel Gap fission product inventory I-131                                                                                        8%
Kr-85                                                                                      10%
Other iodines and noble gases                                                                5%
Alkali metals                                                                            0.12%
Iodine species fractions Elemental                                                                                0.9985 Organic                                                                                  0.0015 Particulates                                                                              none Reactor cavity water depth                                                                        23 feet Pool iodine effective decontamination factor                                                        200 Chemical form of iodine above pool9 Elemental                                                                                  57%
Organic                                                                                    43%
Release modeling Immediate release from fuel through reactor cavity pool to building 100% release from building in [[estimated NRC review hours::2 hours]] No credit for building holdup or filtration prior to release CR envelope volume                                                                            141,860 ft3 Normal ventilation unfiltered fresh intake                                                      3,235 cfm CREF system filtered intake                                                                      810 cfm CREF system start delay time, minutes                                                            1 minute Unfiltered outside inleakage                                                                    400 cfm CREF system filter efficiency                                                                      89%
9 The licensees input to the RADTRAD computer model specified the iodine fractions as 0.95 aerosol, 0.0485 elemental, and 0.0015 organic. This discrepancy in iodine species fractions had no impact on the RADTRAD results since the filter efficiencies for all three iodine species were set to the same value (89 percent).


P. O. Box 116 Jefferson City, MO  65102-0116Chief, Radiation and Asbestos  Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW JacksonSuite 310 Topeka, KS 66612-1366Mr. Daniel K. McGheeBureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA  50319Mr. Keith G. Henke, PlannerDivision of Community and Public Health Office of Emergency Coordination 930 Wildwood P.O. Box 570 Jefferson City, MO 65102Jerry C. Roberts, Director of Nuclear  Safety Assurance Nebraska Public Power District
TABLE 1 (continued)
CR occupancy factors 0-24 hr                                                      1.0 24-96 hr                                                      0.6 96-720 hr                                                    0.4 CR breathing rate                                              3.5x10!4 m3/sec Offsite breathing rate 0-8 hr                                                  3.5x10!4 m3/sec 8-24 hr                                                1.8x10!4 m3/sec 24-720 hr                                              2.3x10!4 m3/sec Atmospheric dispersion factors, sec/m3 Ground level release from reactor building vent Period                                EAB          LPZ                CR 0-2 hr                              5.2x10!4    2.9x10!4          4.15x10!3 2-8 hr                                            2.9x10!4          3.24x10!3 8-24 hr                                          7.3x10!5          1.32x10!3 24-96 hr                                          2.5x10!5          9.01x10!4 96-720 hr                                        5.2x10!6          7.22x10!4 TABLE 2 Calculated FHA Radiological Consequences EAB          LPZ                CR Calculated results, TEDE 24-hr decay period                    1.459        0.815              4.507 7 day decay period                    0.627        0.350              4.446 Dose acceptance criteria, TEDE                6.3          6.3                5


P.O. Box 98 Brownville, NE 68321Mr. John F. McCann, DirectorLicensing, Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Cooper Nuclear Station cc:
440 Hamilton Avenue White Plains, NY 10601-1813}}
Mr. William J. Fehrman                  Senior Resident Inspector President and Chief Executive Officer    U.S. Nuclear Regulatory Commission Nebraska Public Power District          P. O. Box 218 1414 15th Street                        Brownville, NE 68321 Columbus, NE 68601 Regional Administrator, Region IV Mr. Gene Mace                            U.S. Nuclear Regulatory Commission Nuclear Asset Manager                    611 Ryan Plaza Drive, Suite 400 Nebraska Public Power District          Arlington, TX 76011 P.O. Box 98 Brownville, NE 68321                    Director, Missouri State Emergency Management Agency Mr. John C. McClure                      P. O. Box 116 Vice President and General Counsel      Jefferson City, MO 65102-0116 Nebraska Public Power District P. O. Box 499                            Chief, Radiation and Asbestos Columbus, NE 68602-0499                    Control Section Kansas Department of Health Mr. Paul V. Fleming                        and Environment Licensing Manager                        Bureau of Air and Radiation Nebraska Public Power District          1000 SW Jackson P.O. Box 98                              Suite 310 Brownville, NE 68321                    Topeka, KS 66612-1366 Mr. Michael J. Linder, Director          Mr. Daniel K. McGhee Nebraska Department of Environmental    Bureau of Radiological Health Quality                                Iowa Department of Public Health P. O. Box 98922                          Lucas State Office Building, 5th Floor Lincoln, NE 68509-8922                  321 East 12th Street Des Moines, IA 50319 Chairman Nemaha County Board of Commissioners    Mr. Keith G. Henke, Planner Nemaha County Courthouse                Division of Community and Public Health 1824 N Street                            Office of Emergency Coordination Auburn, NE 68305                        930 Wildwood P.O. Box 570 Jefferson City, MO 65102 Ms. Julia Schmitt, Manager Radiation Control Program                Jerry C. Roberts, Director of Nuclear Nebraska Health & Human Services R & L    Safety Assurance Public Health Assurance                  Nebraska Public Power District 301 Centennial Mall, South              P.O. Box 98 P.O. Box 95007                          Brownville, NE 68321 Lincoln, NE 68509-5007 Mr. John F. McCann, Director Mr. H. Floyd Gilzow                      Licensing, Entergy Nuclear Northeast Deputy Director for Policy              Entergy Nuclear Operations, Inc.
Missouri Department of Natural Resources 440 Hamilton Avenue P. O. Box 176                            White Plains, NY 10601-1813 Jefferson City, MO 65102-0176 February 2006}}

Latest revision as of 16:02, 23 November 2019

License Amendment, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566
ML062260239
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/05/2006
From: Brian Benney
NRC/NRR/ADRO/DORL/LPLIV
To: Edington R
Nebraska Public Power District (NPPD)
Benney B, NRR/DORL, 415-3764
Shared Package
ML062260229 List:
References
TAC MC8566
Download: ML062260239 (20)


Text

September 5, 2006 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - ISSUANCE OF AMENDMENT RE:

APPLICATION OF THE ALTERNATIVE SOURCE TERM FOR REEVALUATION OF THE FUEL HANDLING ACCIDENT DOSE CONSEQUENCES AND RELATED TECHNICAL SPECIFICATION CHANGES (TAC NO. MC8566)

Dear Mr. Edington:

The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 222 to Facility Operating License No. DPR-46 for the Cooper Nuclear Station.

The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 29, 2005, as supplemented by letters dated January 16, and April 7, 2006.

The amendment replaces the current accident source term used in the fuel handling accident (FHA) design-basis radiological analysis with an alternative source term (AST) pursuant to Title 10 of the Code of Federal Regulations, Part 50.67, "Accident Source Term." The licensee performed the revised FHA analysis in support of TS changes related to refueling operations.

A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.

Sincerely,

/RA/

Brian Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosures:

1. Amendment No. 222 to DPR-46
2. Safety Evaluation cc w/encls: See next page

September 5, 2006 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - ISSUANCE OF AMENDMENT RE:

APPLICATION OF THE ALTERNATIVE SOURCE TERM FOR REEVALUATION OF THE FUEL HANDLING ACCIDENT DOSE CONSEQUENCES AND RELATED TECHNICAL SPECIFICATION CHANGES (TAC NO. MC8566)

Dear Mr. Edington:

The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 222 to Facility Operating License No. DPR-46 for the Cooper Nuclear Station.

The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 29, 2005, as supplemented by letters dated January 16, and April 7, 2006.

The amendment replaces the current accident source term used in the fuel handling accident (FHA) design-basis radiological analysis with an alternative source term (AST) pursuant to Title 10 of the Code of Federal Regulations, Part 50.67, "Accident Source Term." The licensee performed the revised FHA analysis in support of TS changes related to refueling operations.

A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.

Sincerely,

/RA/

Brian Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosures:

1. Amendment No. 222 to DPR-46
2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:

PUBLIC RidsNrrPMBBenney RidsAcrsAcnwMailCenter LPLIV Reading RidsNrrLALFeizollahi RidsRgn4MailCenter (KKennedy)

RidsNrrDorl (CHaney/CHolden) RidsNrrDorlDpr RidNrrDirsItsb RidsNrrDorlLpl4 (DTerao) RidsOgcRp GHill (2)

RBHarvey, AADB PACKAGE NO.: ML062260229 ACCESSION NO.: ML062260239 TS Page: ML062490037 OFFICE NRR/LPL4/PM NRR/LPL4/LA AADB/BC ITSB/BC OGC NRR/LPL4/BC NAME BBenney;mxr4 LFeizollahi MKotzales TTjader AHodgdon DTerao DATE 8/22/06 8/22/06 8/22/06 8/24/06 8/25/06 9/1/06 OFFICIAL RECORD COPY

NEBRASKA PUBLIC POWER DISTRICT DOCKET NO. 50-298 COOPER NUCLEAR STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 222 License No. DPR-46

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by the Nebraska Public Power District (the licensee) dated September 29, 2005, as supplemented by letters dated January 16, and April 7, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. DPR-46 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 222, are hereby incorporated in the license. The Nebraska Public Power District shall operate the facility in accordance with the Technical Specifications.

3. The license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: September 5, 2006

ATTACHMENT TO LICENSE AMENDMENT NO. 222 FACILITY OPERATING LICENSE NO. DPR-46 DOCKET NO. 50-298 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

REMOVE INSERT 3.3-57 3.3-57 3.3-63 3.3-63 3.6-32 3.6-32 3.6-33 3.6-33 3.6-34 3.6-34 3.6-36 3.6-36 3.6-38 3.6-38 3.6-39 3.6-39 3.6-40 3.6-40 3.7-8 3.7-8 3.7-9 3.7-9

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 222 TO FACILITY OPERATING LICENSE NO. DPR-46 NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION DOCKET NO. 50-298

1.0 INTRODUCTION

By application dated September 29, 2005 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML052770499), as supplemented by letters dated January 16, and April 7, 2006 (ADAMS Accession Nos. ML060200292 and ML061020078, respectively),

Nebraska Public Power District (the licensee) requested a license amendment for the Cooper Nuclear Station (CNS). The supplements dated January 16 and April 7, 2006, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination as published on January 3, 2006 (71 FR 149), in the Federal Register.

This amendment will replace the current accident source term used in calculating the fuel handling accident (FHA) dose consequences with the alternative source term (AST) in accordance with Title 10 of the Code of Federal Regulations, Part 50.67 (10 CFR 50.67),

"Accident Source Term." The FHA re-analysis also involved several changes in selected analysis assumptions. The licensee performed the FHA re-analysis in support of technical specification (TS) changes related to refueling operations.

The following TSs are proposed to be revised:

! TS 3.3.6.2, Secondary Containment Isolation Instrumentation

! TS 3.3.7.1, Control Room Emergency Filter (CREF) System Instrumentation

! TS 3.6.4.1, Secondary Containment

! TS 3.6.4.2, Secondary Containment Isolation Valves (SCIVs)

! TS 3.6.4.3, Standby Gas Treatment (SGT) System

! TS 3.7.4, CREF System The proposed TS changes would eliminate operability requirements for (1) the secondary containment, the SCIVs, the SGT system, and the secondary containment isolation instrumentation when handling irradiated fuel that has decayed for at least 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> since

critical reactor operations and (2) the CREF system and its initiation instrumentation when handling irradiated fuel that has decayed for at least 7 days. The proposed changes are based on Technical Specifications Task Force Traveler 51 (TSTF-51), "Revised Containment Requirements During Handling Irradiated Fuel and Core Alterations."

The licensee stated that this license amendment is being requested to reduce the duration and cost of planned plant outages.

2.0 REGULATORY EVALUATION

This safety evaluation (SE) addresses the impact of the proposed changes on previously analyzed design-basis accident (DBA) radiological consequences and the acceptability of the revised analyses results. The regulatory requirements are the accident dose criteria in 10 CFR 50.67, "Accident Source Term," as supplemented in Regulatory Position 4.4 of Regulatory Guide (RG) 1.183, "Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors," and 10 CFR Part 50, Appendix A, General Design Criterion 19, "Control Room," as supplemented by Section 6.4 of NUREG-0800, "Standard Review Plan [SRP] for the Review of Safety Analysis Reports for Nuclear Power Plants."

Except where the licensee proposed a suitable alternative, the U.S. Nuclear Regulatory Commission (NRC) staff utilized the regulatory guidance provided in SRP Section 15.0.1, "Radiological Consequence Analysis Using Alternative Source Terms," in performing this review. The NRC staff also considered relevant information in the CNS updated safety analysis report, TSs, and TSTF-51.

3.0 TECHNICAL EVALUATION

The NRC staff reviewed the regulatory and technical analyses, as related to the radiological consequences of DBAs, performed by the licensee in support of its proposed license amendment. Information regarding these analyses was provided in Attachment 1 and of the submittal dated September 29, 2005, and in supplementary letters dated January 16, and April 7, 2006. The NRC staff reviewed the assumptions, inputs, and methods used by the licensee to evaluate the impacts of the revised design-basis FHA analyses. The findings of this SE are based on the descriptions of the licensees analyses and other supporting information docketed by the licensee. However, the NRC staff also performed independent calculations to confirm the conservatism of the licensees analyses.

TSTF-51, Revision 2, allows for removal of the TS requirements for engineered safeguards features, such as secondary containment and SGT, to be operable during movement of fuel, once sufficient radioactive decay has taken place to ensure that offsite doses remain well within (i.e., 25 percent of) 10 CFR Part 100 limits. TSTF-51 placed the following reviewers note in the basis for the standard TS 3.6.4.1, "Secondary Containment":

The addition of the term "recently" associated with handling irradiated fuel in all of the containment function Technical Specification requirements is only applicable to those licensees who have demonstrated by analysis that after sufficient radioactive decay has occurred, off-site doses resulting from a fuel handling accident remain below the Standard Review Plan limits (well within 10 CFR [Part] 100).

Additionally, licensees adding the term "recently" must make the following commitment which is consistent with draft NUMARC 93-01, Revision 3, Section 11.2.6, "Safety Assessment for Removal of Equipment from Service During Shutdown Conditions," subheading "Containment - Primary (PWR [pressurized-water reactor])/Secondary (BWR [boiling-water reactor])."

The following guidelines are included in the assessment of systems removed from service during movement of irradiated fuel:

- During fuel handling/core alterations, ventilation system and radiation monitor availability (as defined in NUMARC 91-06) should be assessed, with respect to filtration and monitoring of releases from the fuel.

Following shutdown, radioactivity in the fuel decays away fairly rapidly.

The basis of the technical specification operability amendment is the reduction in doses due to such decay. The goal of maintaining ventilation system and radiation monitor availability is to reduce doses even further below that provided by the natural decay.

- A single normal or contingency method to promptly close primary or secondary containment penetrations should be developed. Such prompt methods need not completely block the penetration or be capable of resisting pressure.

The purpose of the prompt methods mentioned above are to enable ventilation systems to draw the release from a postulated fuel handling accident in the proper direction such that it can be treated and monitored.

When draft NUMARC 93-01, Revision 3, was issued in the final version, Section 11.2.6 was renumbered to Section 11.3.6 and the guidelines quoted above were numbered 11.3.6.5 and modified slightly as follows:

. . . the following guidelines should be included in the assessment of systems removed from service:

- During fuel handling/core alterations, ventilation system and radiation monitor availability (as defined in NUMARC 91-06) should be assessed, with respect to filtration and monitoring of releases from the fuel.

Following shutdown, radioactivity in the RCS [reactor coolant system]

decays fairly rapidly. The basis of the Technical Specification operability amendment is the reduction in doses due to such decay. The goal of maintaining ventilation system and radiation monitor availability is to reduce doses even further below that provided by the natural decay, and to avoid unmonitored releases.

- A single normal or contingency method to promptly close primary or secondary containment penetrations should be developed. Such prompt methods need not completely block the penetration or be capable of resisting pressure. The purpose is to enable ventilation systems to draw

the release from a postulated fuel handling accident in the proper direction such that it can be treated and monitored.

The NRC staff considers the final version and the draft version of this section of NUMARC 93-01, Revision 3, to be functionally equivalent. The licensee committed to implement the guidelines of Section 11.3.6.5 of NUMARC 93-01, Revision 3, within 30 days of the implementation of this license amendment. The NRC staff finds this meets the commitment required by TSTF-51, Revision 2.

Because the licensee has applied to implement an AST selectively for the FHA, the regulatory dose criteria of 10 CFR 50.67 are used in lieu of the 10 CFR Part 100 dose limits in determining acceptability of the changes.

3.1 Radiological Consequences of the Fuel Handling Accident The licensee evaluated the dose consequences of an FHA following both a 24-hour decay time since reactor shutdown and a 7-day decay time since reactor shutdown. This evaluation was based on the AST guidelines outlined in NUREG-1465, "Accident Source Terms for Light-Water Nuclear Power Plants," and RG 1.183, as well as the NRC computer code RADTRAD Version 3.03 (NUREG/CR-6604, "RADTRAD: A Simplified Model for Radionuclide Transport and Removal and Dose Estimation," including Supplements 1 and 2). To support its TS changes, the licensees evaluation demonstrated that the radiological doses at the exclusion area boundary (EAB), low population zone (LPZ), and in the control room (CR) are within regulatory limits without crediting the operability of secondary containment, secondary containment isolation valves, the SGT system, or secondary containment isolation instrumentation after a 24-hour decay period following reactor shutdown. Likewise, the licensees evaluation demonstrated that control room radiological doses are within regulatory limits without crediting the operability of the CREF system and CREF system instrumentation after a 7-day decay period following reactor shutdown.

The licensees limiting postulated FHA event assumed a fuel assembly is dropped into the reactor core during refueling operations from a height of 32.95 feet, which is the maximum height allowed by the fuel handling equipment. The resulting impact of the fuel assembly onto the top of the core is assumed to damage 151, GE14, 10x10 fuel rods (representing approximately 0.3133 percent of the core) causing a gap release of radionuclides to the water pool above the core. This event could also occur over the spent fuel pool. However, the licensee states that significantly fewer (i.e., 48) fuel rods would be damaged in the latter case, due to reduced drop height. Since both the reactor cavity and spent fuel pool are located in the reactor building, an FHA in either the reactor cavity or the spent fuel pool is assumed to have the same potential release pathways from the reactor building to the environment.

Given that the primary containment remains open during refueling, the licensee assumed the radionuclides released as a result of the FHA pass through the water in the reactor cavity and enter the reactor building refueling floor atmosphere instantaneously. The water pool above the core serves as a barrier to the release of a significant amount of radionuclides. The remaining radionuclides that become airborne in the reactor building are assumed to be released to the outside environment over a 2-hour period.

The licensee determined the inventory of fission products in the fuel rods based on the maximum full power operation of the core with an assumed core power equal to the current licensed rated thermal power of 2381 megawatts thermal (MWt). The licensee multiplied this value by a factor of 1.02 to account for maximum possible measurement uncertainty as required by Appendix K to 10 CFR Part 50 for nuclear reactor power operation. The licensee assumed the core had operated at this power level for an extended period of time such that fission product equilibrium was reached. For radionuclides that have not reached equilibrium, the core inventory at time of shutdown was used. To account for differences in power distribution across the core, the licensee applied a peaking factor of 2.0 to the average inventory.

The majority of the fission products produced during plant operation remain within the fuel pellet; however, some migrate to void spaces, known as "gap," within the fuel rods. The licensee calculated the activity in the gap using the non-loss-of-coolant-accident gap inventory fractions presented in Table 3 of RG 1.183.1 The licensee assumed that as the resulting gap activity release rises through the overlaying water, the elemental halogen species (i.e., Bromine and Iodine) are scrubbed by the water column, resulting in an effective halogen decontamination factor of 200 (i.e., 99.5 percent of the total halogen release from the damaged fuel rods is retained by the water). No decontamination of noble gases (i.e., Krypton and Xenon) was assumed.

The guidance in RG 1.183 allows an effective halogen decontamination factor of 200 when the overlaying water column is at least 23 feet. This pre-condition is met for the reactor cavity but not for the spent fuel pool where the water depth is only 21 feet 6 inches. The licensee stated that the implied reduction in scrubbing efficiency is offset by the reduced number of fuel rods (i.e., 48 versus 151) that are projected to be damaged by a fuel assembly drop over the spent fuel pool. The effective decontamination factor in RG 1.183 is based on an exponential function where more scrubbing occurs at the bottom of the water column than at the top. As such, a pool level of 21 feet 6 inches (a reduction of about 6.5 percent in pool depth) would result in a reduction in scrubbing efficiency of less than 6.5 percent. This is less than the 68 percent reduction in the amount of damaged rods, and hence the radionuclides released from the spent fuel pool are less than from the reactor cavity pool. The NRC staff finds the licensees conclusion, that the consequences of an FHA over the reactor cavity bounds those for an FHA over the spent fuel pool, to be acceptable.

The licensee initially identified two possible release points for the FHA when the reactor building is open to the environment and the SGT system and containment are inoperable: the reactor building vent and the reactor building railroad airlock doors. Since physical interlocks and security considerations prevent both reactor building railroad airlock doors from being open concurrently, the licensee modeled FHA releases as occurring through the reactor building vent.2 1

Footnote 11 to RG 1.183 states that the release fractions listed in RG 1.183 Table 3 are acceptable for use with fuels having a peak burnup up to 62 gigawatt-days per metric ton uranium (GWD/MTU), provided that the maximum linear heat generation rate does not exceed the 6.3 kilowatt per foot peak rod average power for burnup exceeding 54 GWD/MTU. The licensees response to Question 1 in Attachment 1 to its letter dated April 7, 2006, states that the current core will remain within the constraints of this footnote and core reload design control measures will ensure that future cores remain within the burnup limitation.

2 In Question #2 of its request for additional information (RAI) letter dated February 9, 2006, the NRC staff asked the licensee to (1) identify all the possible release points for the FHA when the reactor building door is open to the environment and the standby gas treatment system and secondary containment are inoperable, and (2) justify why the reactor building vent release pathway is assumed to bound all of these

The licensees FHA evaluation of control room doses for the 24-hour decay time case credited the operability of the CREF system and CREF system instrumentation. During both normal and radiological emergency modes of operation, the control room envelope is positively pressurized and the return air from the control room envelope is recirculated without filtration. During the first 1 minute of the event, the licensee assumed a normal unfiltered inflow of 3235 cubic feet per minute (cfm). The CREF system was then assumed to actuate due to high radiation detected in the reactor building exhaust plenum.3 For the remaining duration of the event, the licensee assumed an emergency filtered inflow of 810 cfm.4 The licensee also assumed an unfiltered inleakage of 400 cfm throughout the entire duration of the event.5 The licensees FHA evaluation of control room doses for the 7-day decay time case did not credit the availability of the CREF system. For this scenario, a normal unfiltered inflow of 3635 cfm (which includes 400 cfm inleakage) was used for the duration of the accident.

The licensee also qualitatively assessed the potential gamma shine dose from external sources to the control room during the FHA. The radiation sources external to the control room include the airborne external cloud and CREF system filters located within the control room envelope.

The licensee concluded that the cloud shine and CREF system shine control room doses would be a fraction of the inhalation doses and the resulting total dose would still be below regulatory criteria.

The NRC staff reviewed the information provided in the licensees submittal, as supplemented, and also performed an independent calculation that confirmed the licensees dose results. The assumptions used by the licensee (which are listed in Table 1 of this SE) were found acceptable by the NRC staff. The licensees calculated dose results are given in Table 2. The NRC staff has found the licensees calculated doses acceptable because they are within the SRP 15.0.1 radiological dose acceptance criteria for an FHA. These criteria are 6.3 roentgen equivalent man (rem) total effective dose equivalent (TEDE) at the EAB for the worst 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br />, 6.3 rem TEDE at the LPZ for the duration of the accident, and 5 rem TEDE in the CR for the duration of the accident.

3.2 Atmospheric Dispersion Estimates other possible release pathways for the control room dose assessment. In its letter response dated April 7, 2006, the licensee identified a number of additional potential release pathways to the environment assuming an FHA on the refuel floor but stated that the reactor building vent remained bounding because of its direct path to the outside environment and relatively short distance to the control room intake. For additional conservatism, the licensee made a commitment to keep the reactor building roof hatch closed during movement of irradiated fuel in the secondary containment.

3 The licensee evaluated the ability of the reactor building exhaust plenum radiation monitor to provide the necessary CREF system initiation signal for the FHA. This setpoint assessment is predicated on having ventilation flow in the exhaust plenum at the start of the FHA. Therefore, if the CREF system is not in operation, the licensee has committed to having either a reactor building exhaust fan or an SGT system fan in operation prior to conducting fuel handling operations when less than a 7-day decay time has elapsed.

4 Although the CREF system is currently specified as having a 95 percent efficiency for all iodine species, the licensee modeled a filtered efficiency of 89 percent for all iodine species in its analyses in order to provide for future analytical operational margin.

5 The unfiltered inleakage assumption of 400 cfm is conservative when compared to the inleakage value of 64 cfm measured by the licensee during tracer gas testing for the radiological emergency mode of operation as reported in its in September 30, 2004, response to NRC Generic Letter 2003-01, "Control Room Habitability."

3.2.1 Control Room /Q Values The licensees control room dose analyses modeled FHA releases as occurring through the reactor building vent and assumed a single receptor point at the CR air intake for both unfiltered and filtered inflow and unfiltered inleakage. The licensee used existing CR atmospheric dispersion factors (/Q values) that had been submitted for NRC staff review as part of the submittal for the current FHA of record (License Amendment No.187). These /Q values, which are presented in Table 1, were listed in the calculation provided in Enclosure 1 to the licensees letter dated September 14, 2001. They were generated using the NRC computer code ARCON96 (NUREG/CR-6331, Revision 1, "Atmospheric Relative Concentrations in Building Wakes") and onsite meteorological data collected during calendar years 1994-1998.

The release assumptions used for the currently licensed FHA and the one proposed in this license amendment request are somewhat different. The previous FHA assumed a 90-second unfiltered ground level reactor building vent release followed by an elevated filtered stack release for the balance of the 30-day duration, while the new analyses assumes a 30-day unfiltered reactor building vent ground level release. In its letter dated September 14, 2001, the licensee presented /Q values calculated for the reactor building vent release assuming three different values for the reactor building vent flow rate (i.e., 51,333 cfm, 9500 cfm, and 1780 cfm). The three flow rates modeled a reactor building exhaust fan coast down after a primary containment isolation system trip on high radiation in the reactor building exhaust plenum. For the new analyses, the licensee elected to use the highest (i.e., most conservative) of the three sets of /Q values, which are the /Q values associated with the lowest (i.e.,1780 cfm) reactor building vent flow rate.6 Although the 1780 cfm /Q values are not specifically cited in the License Amendment No. 187 Safety Evaluation (as they were not applicable until after the 90-second Reactor Building ground level release had terminated), they are based on the same previously approved 1994-1998 meteorological data and ARCON96 methodology. For these reasons, the NRC staff has concluded that the CR /Q values presented in Table 1 are acceptable for use in the CR dose assessment submitted in support of this amendment.

3.2.2 Offsite /Q Values The /Q values used by the licensee for the EAB and LPZ dose consequence assessments are based on ground level releases from the reactor building vent calculated using site specific inputs and methodology described in RG 1.3, "Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Boiling Water Reactors." These

/Q values are presented in Table 1. The calculation documenting these /Q values was previously submitted to the NRC staff in Enclosure 6 to a letter dated February 28, 2001. A subset of these /Q values (i.e., the /Q values listed as the 0-2 hour EAB and LPZ values) was approved by the NRC staff for use in License Amendment No. 187. The remaining EAB and LPZ /Q values approved in License Amendment No. 187 are not applicable to the new analyses because they represent elevated stack releases. Since the remaining offsite /Q values listed in Table 1 represent ground level reactor building vent releases derived using the same previously approved RG 1.3 methodology, the NRC staff has concluded that the EAB and LPZ /Q values presented in Table 1 are acceptable for use in the offsite dose assessment submitted in support of this amendment.

6 Each SGT system fan has a flow rate of 1780 cfm and the reactor building exhaust fan flow rates are higher. If the CREF system is not in operation, the licensee has committed to having either a reactor building fan or SGT system fan in operation prior to conducting fuel handling operations when less than a 7-day decay time has elapsed.

3.3 Technical Specification Changes The licensee proposed revising the TS for selected systems to relax operability requirements during the movement of irradiated fuel that has decayed for at least 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> or for at least 7 days.7

a. 24-hour Decayed Fuel The licensee proposed changes to the applicability and action statements for the following TSs:

! TS 3.6.4.1, Secondary Containment

! TS 3.6.4.2, Secondary Containment Isolation Valves

! TS 3.6.4.3, Standby Gas Treatment System For these TSs, the licensee proposes deleting "During CORE ALTERATIONS" from the applicability and action statements. In addition, the licensee is proposing adding the term "recently" in front of "irradiated" in the phrase "During movement of irradiated fuel assemblies in the secondary containment" in the applicability and action statements.

The licensee is also proposing modifying the applicability statement as described above for the following TS:

! TS 3.3.6.2, Secondary Containment Isolation Instrumentation

b. 7-day Decayed Fuel The licensee proposed changes to the applicability and action statements for the following TS:

! TS 3.7.4, CR Emergency Filter System For this TS, the licensee proposes deleting "During CORE ALTERATIONS" from the applicability and action statements. In addition, the licensee is proposing adding the term "lately" in front of "irradiated" in the phrase "During movement of irradiated fuel assemblies in the secondary containment" in the applicability and action statements.

7 In its original submittal, dated September 29, 2005, the licensee proposed introducing the term "recently irradiated fuel assemblies" in the applicability and action statements for the TSs related to fueling operations. In some cases (i.e., TSs 3.3.6.2, 3.6.4.1, 3.6.4.2, and 3.6.4.3), the licensee was defining this term in the corresponding TS bases as fuel that has occupied part of a critical reactor core within the previous 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />; in other cases (i.e., TSs 3.3.7.1 and 3.7.4), the licensee was defining this term in the corresponding TS bases as fuel that has occupied part of a critical reactor core within the previous 7 days.

In Question #4 of its RAI letter dated February 9, 2006, the NRC staff asked the licensee how using the same term (i.e., recently irradiated fuel assemblies) with different definitions within the TS would not cause confusion. In its letter response dated April 7, 2006, the licensee agreed that having different definitions for "recently irradiated fuel assemblies" could be a source of confusion and decided to use the term "lately irradiated fuel assemblies" for the 7-day irradiation period.

The licensee is also proposing modifying the applicability statement as described above for the following TS:

! TS 3.3.7.1, CR Emergency Filter System Instrumentation The FHA is the only event during CORE ALTERATIONS that is postulated to result in fuel damage and radiological release. The limiting condition for operation and required actions will remain applicable during activities that could result in an FHA with fuel damage and radiological release. Therefore, the deletion of CORE ALTERATIONS is acceptable. These changes are consistent with the current FHA analysis and TSTF-51. Also, in accordance with the reviewers note in TSTF-51 mentioned above, the licensee committed to the containment closure guidelines located in NUMARC 93-01. Therefore, these proposed changes to the above listed TSs are acceptable, subject to the acceptance of the radiological consequences as noted below.

The re-analyses of the FHA following both a 24-hour decay time and a 7-day decay time did not credit action by any system addressed by the above listed TSs. The FHA re-analysis was consistent with the definitions of "recently irradiated fuel" and "lately irradiated fuel" and acceptable dose results were obtained with the subject systems inoperable. As such, the proposed revisions are acceptable from an accident radiological consequence perspective.

3.4 Licensee Commitments The licensee has made the following commitment in the license amendment request dated September 29, 2005:8

a. Within 30 days of issuance of the license amendment, the licensee commits to implement the guidelines of Section 11.3.6.5 of NUMARC 93-01, Revision 3, using a strategy outlined in the Response to Appendix B, Question 2. (Commitment Number NLS2005075-01).

The licensee stated that the approach that will be taken to conform to the NUMARC guidance will be to develop secondary containment breach control guidance that will be a prerequisite to moving irradiated fuel when secondary containment, the SCIVs, the SGT system, or secondary containment isolation instrumentation are not operable. This breach control guidance will include:

S Ensuring that secondary containment access doors and hatches are closed (except for opening and closing for normal personnel travel). Fouling of an access door/hatch is not allowed unless an individual is on station to restore the closed configuration if an FHA occurs.

S Ensuring that there is normally one available train of SGT, such that if an FHA occurs, the SGT train can be started manually. If both SGT trains would be out of service (such as for work on a component in the common suction line),

8 The licensee made a second commitment in its September 29, 2005, license amendment request that was subsequently withdrawn in its letter dated April 7, 2006.

pre-positioned means would be on hand with personnel stationed to ensure system integrity could be restored and one train placed in operation.

S Ensuring there is at least the capability of closing one SCIV manually for each secondary containment penetration.

S Ensuring there are no breaches of piping systems that penetrate both sides of secondary containment unless there are pre-positioned means to close the breach if an FHA occurs.

S Ensuring there is no maintenance in progress that compromises the structural integrity of secondary containment (e.g., removal of blowout panels, or core drills).

The licensee stated that the strategy outlined above is designed to ensure that the secondary containment function can be restored without the allowance of partial breaches. Therefore, no SGT system tests above the applicable TS surveillance testing requirements are needed.

The licensee has made the following commitments in its letter dated April 7, 2006:

a. Concurrent with 30-day implementation of issued license amendment, the reactor building roof hatch will be maintained closed during the movement of irradiated fuel in secondary containment. (Commitment Number NLS2006017-01).

In order to ensure the reactor building vent remains the bounding release point as modeled in the CR dose assessment analysis, the reactor building roof hatch will be maintained closed during the movement of irradiated fuel in secondary containment.

b. Concurrent with 30-day implementation of issued license amendment, the TS 3.3.7.1 bases will be revised as provided in Enclosure 2 to formalize this support feature [airflow in the reactor building exhaust plenum]. (Commitment Number NLS2006017-02).

The licensee has assessed the TS setpoint for the radiation monitor and has determined that with a reactor building exhaust fan or SGT system fan initially running, the design-basis AST FHA will cause reactor building exhaust plenum high radiation activation. The TS 3.3.7.1 basis is being revised to formalize that adequate ventilation exhaust airflow is a support function to the reactor building ventilation exhaust plenum high radiation monitor during the movement of lately irradiated fuel. In this manner, ventilation exhaust airflow will be a TS operability requirement for the radiation monitor. In the case of the election to operate with the CREF system manually initiated (in lieu of a running reactor building exhaust fan or SGT fan),

TS 3.3.7.1 would prevent the start of fuel movement until Required Action C.1 had been completed ("Initiate CREF System"). Station procedures will ensure these TS-driven prerequisites are met prior to moving lately irradiated fuel.

The NRC staff has reviewed these licensee commitments and has concluded that these commitments meet the Section 11.3.6.5 of NUMARC 93-01, Revision 3, guidelines that (1) ventilation system and radiation monitor availability be maintained and (2) a single normal or contingency method to promptly close primary or secondary containment penetrations be developed.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (71 FR 149, January 3, 2006). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0 CONCLUSION

The NRC staff has reviewed the AST implementation proposed by the licensee for CNS. The NRC staff also reviewed the proposed changes to the TSs associated with this license amendment request. In performing this review, the NRC staff relied upon information placed on the docket by the licensee, staff experience in doing similar reviews, and, where deemed necessary, staff confirmatory calculations.

This licensing action is considered a selective implementation of the AST. With the approval of this amendment, the AST, the TEDE criteria, and the analysis methods, assumptions, and inputs become the licensing basis for the assessment of radiological consequences of the FHA DBA. This approval is limited to this specific implementation. Subsequent modifications based on the selected characteristics incorporated into the licensing basis by this action may be possible under the provisions of 10 CFR 50.59. However, use of other characteristics of an AST or use of TEDE criteria that are not part of the approved licensing basis, and changes to previously approved AST characteristics, requires prior staff approval under 10 CFR 50.67.

The selected characteristics of the AST and the TEDE criteria may not be extended to other aspects of the plant design or operation without prior NRC review under 10 CFR 50.67. All future radiological analyses performed to demonstrate compliance with regulatory requirements shall address the selected characteristics of the AST and the TEDE criteria as described in the CNS licensing basis.

The NRC staff reviewed the assumptions, inputs, and methods used by the licensee to assess the radiological impacts of the proposed changes. The NRC staff finds that the licensee used analysis, methods, and assumptions consistent with the guidance of RG 1.183, with the exceptions discussed and accepted earlier in this SE. The NRC staff compared the doses estimated by the licensee to the applicable acceptance criteria and to the results estimated by the staff in its confirmatory calculations. The NRC staff finds, with reasonable assurance, that the licensees estimates of TEDE due to a design-basis FHA will comply with the requirements of 10 CFR 50.67 and are in accordance with the guidance of RG 1.183.

The NRC staff finds reasonable assurance that CNS will continue to provide sufficient safety margins with adequate defense in depth to address unanticipated events and to compensate for uncertainties in accident progression and analysis assumptions and parameters. The NRC staff concludes that the proposed AST implementation and the associated TS changes are acceptable from the standpoint of radiological consequences.

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: R. Brad Harvey Date: September 6, 2006

TABLE 1 FHA Analysis Assumptions Reactor power 2429 MWt Radial peaking factor 2.0 Fission product decay period 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> and 7 days Number of fuel rods damaged 151 Number of rods in core (equivalent full length) 47,857 Fuel Gap fission product inventory I-131 8%

Kr-85 10%

Other iodines and noble gases 5%

Alkali metals 0.12%

Iodine species fractions Elemental 0.9985 Organic 0.0015 Particulates none Reactor cavity water depth 23 feet Pool iodine effective decontamination factor 200 Chemical form of iodine above pool9 Elemental 57%

Organic 43%

Release modeling Immediate release from fuel through reactor cavity pool to building 100% release from building in 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> No credit for building holdup or filtration prior to release CR envelope volume 141,860 ft3 Normal ventilation unfiltered fresh intake 3,235 cfm CREF system filtered intake 810 cfm CREF system start delay time, minutes 1 minute Unfiltered outside inleakage 400 cfm CREF system filter efficiency 89%

9 The licensees input to the RADTRAD computer model specified the iodine fractions as 0.95 aerosol, 0.0485 elemental, and 0.0015 organic. This discrepancy in iodine species fractions had no impact on the RADTRAD results since the filter efficiencies for all three iodine species were set to the same value (89 percent).

TABLE 1 (continued)

CR occupancy factors 0-24 hr 1.0 24-96 hr 0.6 96-720 hr 0.4 CR breathing rate 3.5x10!4 m3/sec Offsite breathing rate 0-8 hr 3.5x10!4 m3/sec 8-24 hr 1.8x10!4 m3/sec 24-720 hr 2.3x10!4 m3/sec Atmospheric dispersion factors, sec/m3 Ground level release from reactor building vent Period EAB LPZ CR 0-2 hr 5.2x10!4 2.9x10!4 4.15x10!3 2-8 hr 2.9x10!4 3.24x10!3 8-24 hr 7.3x10!5 1.32x10!3 24-96 hr 2.5x10!5 9.01x10!4 96-720 hr 5.2x10!6 7.22x10!4 TABLE 2 Calculated FHA Radiological Consequences EAB LPZ CR Calculated results, TEDE 24-hr decay period 1.459 0.815 4.507 7 day decay period 0.627 0.350 4.446 Dose acceptance criteria, TEDE 6.3 6.3 5

Cooper Nuclear Station cc:

Mr. William J. Fehrman Senior Resident Inspector President and Chief Executive Officer U.S. Nuclear Regulatory Commission Nebraska Public Power District P. O. Box 218 1414 15th Street Brownville, NE 68321 Columbus, NE 68601 Regional Administrator, Region IV Mr. Gene Mace U.S. Nuclear Regulatory Commission Nuclear Asset Manager 611 Ryan Plaza Drive, Suite 400 Nebraska Public Power District Arlington, TX 76011 P.O. Box 98 Brownville, NE 68321 Director, Missouri State Emergency Management Agency Mr. John C. McClure P. O. Box 116 Vice President and General Counsel Jefferson City, MO 65102-0116 Nebraska Public Power District P. O. Box 499 Chief, Radiation and Asbestos Columbus, NE 68602-0499 Control Section Kansas Department of Health Mr. Paul V. Fleming and Environment Licensing Manager Bureau of Air and Radiation Nebraska Public Power District 1000 SW Jackson P.O. Box 98 Suite 310 Brownville, NE 68321 Topeka, KS 66612-1366 Mr. Michael J. Linder, Director Mr. Daniel K. McGhee Nebraska Department of Environmental Bureau of Radiological Health Quality Iowa Department of Public Health P. O. Box 98922 Lucas State Office Building, 5th Floor Lincoln, NE 68509-8922 321 East 12th Street Des Moines, IA 50319 Chairman Nemaha County Board of Commissioners Mr. Keith G. Henke, Planner Nemaha County Courthouse Division of Community and Public Health 1824 N Street Office of Emergency Coordination Auburn, NE 68305 930 Wildwood P.O. Box 570 Jefferson City, MO 65102 Ms. Julia Schmitt, Manager Radiation Control Program Jerry C. Roberts, Director of Nuclear Nebraska Health & Human Services R & L Safety Assurance Public Health Assurance Nebraska Public Power District 301 Centennial Mall, South P.O. Box 98 P.O. Box 95007 Brownville, NE 68321 Lincoln, NE 68509-5007 Mr. John F. McCann, Director Mr. H. Floyd Gilzow Licensing, Entergy Nuclear Northeast Deputy Director for Policy Entergy Nuclear Operations, Inc.

Missouri Department of Natural Resources 440 Hamilton Avenue P. O. Box 176 White Plains, NY 10601-1813 Jefferson City, MO 65102-0176 February 2006