Letter Sequence Other |
---|
|
|
MONTHYEARML0417002292004-06-30030 June 2004 May Monthly Report on the Status of Open TIAs Assigned to NRR Project stage: Other ML0608103392006-04-27027 April 2006 License Amendment, Revised Pressure Vessel Fluence and Pressure Temperature Curve Applicability to 30 Effective Full-Power Years of Operation Project stage: Other ML0611802442006-04-27027 April 2006 Technical Specifications, Revised Pressure Vessel Fluence and Pressure Temp Curve Applicability to 30 Effective Full-Power Years of Operation Project stage: Other 2004-06-30
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000298/20240032024-11-0505 November 2024 Integrated Inspection Report 05000298/2024003 ML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments 05000298/LER-2023-002-01, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 05000298/LER-2024-001, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications 05000298/LER-2024-002, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements 05000298/LER-2023-002, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2023-12-20020 December 2023 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A1122023-11-0909 November 2023 Project Manager Assignment IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 05000298/LER-2022-002-01, Manual Core Spray Injection to Restore Skimmer Surge Tank Level2023-06-29029 June 2023 Manual Core Spray Injection to Restore Skimmer Surge Tank Level ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 05000298/LER-2022-004-01, 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open2023-05-11011 May 2023 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open 05000298/LER-2023-001, Valve Test Failures Result in Condition Prohibited by Technical Specifications2023-05-0808 May 2023 Valve Test Failures Result in Condition Prohibited by Technical Specifications IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report 2024-09-03
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21040A3002021-03-29029 March 2021 Issuance of Amendment No. 269 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML20282A1762020-10-22022 October 2020 Issuance of Amendment No. 267 Regarding Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML20212J1762020-08-24024 August 2020 Temporary Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L 2020-LLE-0110 (Covid 19)) ML19352G1942020-01-28028 January 2020 Issuance of Amendment No. 264 Elimination of Technical Specification Requirements for Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML18348B1032019-02-21021 February 2019 Issuance of Amendment No. 262 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18186A5492018-08-0101 August 2018 Issuance of Amendment No.260 Revision to Technical Specifications to Adopt (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0138; EPID L-2017-LLA-0290) ML17144A0822017-06-20020 June 2017 Issuance of Amendment No. 259 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17061A0502017-03-31031 March 2017 Issuance of Amendment No. 258 Adoption of TSTF-425, Revision 3, ML16272A1372016-10-17017 October 2016 Issuance of Amendment No. 257 Revision of Technical Specifications - Safety Limit Minimum Critical Power Ratio ML16146A7492016-07-25025 July 2016 Issuance of Amendment No. 255 Replacement of Technical Specification Figure 4.1-1 with Text ML16119A4332016-07-25025 July 2016 Issuance of Amendment No. 254 Adoption of Technical Specification Task Force Change Traveler TSFT-535, Revision 0 ML16158A0222016-07-25025 July 2016 Issuance of Amendment No. 256 to Relocate the Pressure-Temperature Curves to a Pressure-Temperature Limits Report ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) ML14323A6442014-12-12012 December 2014 Issuance of Amendment No. 249, Request to Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13191A1052013-09-12012 September 2013 Issuance of Amendment No. 247, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13148A2252013-06-26026 June 2013 Issuance of Amendment No. 246, Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13032A5262013-02-22022 February 2013 Issuance of Amendment No. 245, Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML12341A1112012-12-31031 December 2012 Correction to Safety Evaluation Pages Issued with Amendment No. 243 Dated 11/9/2012, Revise TS 2.0, Safety Limits, to Revise Safety Limit Minimum Critical Power Ratio Values of a Cycle-Specific Calculation ML12318A1602012-12-13013 December 2012 Issuance of Amendment No. 244, Revise Physical Protection License Condition Related to Cyber Security Plan Implementation Schedule Milestone 6 ML12299A0922012-11-0909 November 2012 Issuance of Amendment No. 243, Revise Technical Specification 2.0, Safety Limits, to Revise Safety Limit Minimum Critical Power Ratio Values of a Cycle-Specific Calculation ML12251A0982012-09-28028 September 2012 Issuance of Amendment No. 242, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a ML1201302052012-02-16016 February 2012 Issuance of Amendment No. 241, Editorial Changes to Several Technical Specifications (Tss) and Revise TS 5.5.6 to Remove Expired One-Time Exception to 5-Year Test Frequency for a Safety Valve ML1136302582012-01-31031 January 2012 Issuance of Amendment No. 240, Revise Technical Specification 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection ML1128502652011-10-28028 October 2011 Issuance of Amendment No. 239, Correction of Non-Conservative Values in Battery Terminal Voltage and Specific Gravity Values in Technical Specification Surveillance Requirements ML1118010812011-07-27027 July 2011 License Amendment, Issuance of Amendment No. 238, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1103401602011-02-28028 February 2011 License Amendment, Issuance of Amendment 237, Revising Technical Specification Surveillance Requirement 3.8.1.9, Diesel Generator Load Test, in TS Section 3.8.1 to Correct Non-Conservative Power Factor Value ML0815402802008-06-30030 June 2008 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML0814200582008-06-10010 June 2008 Correction to Amendment No. 230 Control Room Envelope Habitability License Pages 4 & 5 and SE Pages 3, 4, 8, and 9 ML0812202812008-05-12012 May 2008 Issuance of Amendment No. 230 Control Room Habitability, TSTF-448 ML0730600362007-12-0404 December 2007 Issuance of Amendment No. 228, Revise TS 5.5.6, Inservice Testing Program, to Allow a One-Time Extension of the 5-yr Frequency Requirement for Setpoint Testing of Safety Valve MS-RV-70ARV ML0721300232007-09-0606 September 2007 License Amendment, Issuance of Amendment No. 227 Onsite Spent Fuel Storage Expansion ML0721800082007-08-0909 August 2007 Revised Pages of Facility Operating License No. DPR-46 ML0625400892006-10-31031 October 2006 Issuance of Amendment 226 MSIV Leakage Exemption from 10 CFR 50, Appendix J ML0625400242006-10-0303 October 2006 Issuance of Amendment Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0614400492006-09-0606 September 2006 License Amendment, Technical Specification (TS) Changes Associated with Inservice Testing Program, Section 5.5.6, Under TS Programs and Manuals, MD0335 ML0622602392006-09-0505 September 2006 License Amendment, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566 ML0612300512006-05-0303 May 2006 Correction to Amendment No. 218 2024-07-17
[Table view] Category:Safety Evaluation
MONTHYEARML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24117A2482024-05-0707 May 2024 Authorization and Safety Evaluation for Relief Request No. RC3-02 ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements ML21040A3002021-03-29029 March 2021 Issuance of Amendment No. 269 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML20282A1762020-10-22022 October 2020 Issuance of Amendment No. 267 Regarding Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML20255A2172020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20077L3392020-03-19019 March 2020 Proposed Inservice Inspection Alternatives RP5-02 and RI5-02 ML19352G1942020-01-28028 January 2020 Issuance of Amendment No. 264 Elimination of Technical Specification Requirements for Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML19079A0702019-05-0707 May 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4384; EPID No. L-2014-JLD-0046) ML19092A1402019-04-29029 April 2019 Proposed Inservice Inspection Alternative PR5-02 ML18348B1032019-02-21021 February 2019 Issuance of Amendment No. 262 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18186A5492018-08-0101 August 2018 Issuance of Amendment No.260 Revision to Technical Specifications to Adopt (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0138; EPID L-2017-LLA-0290) ML18183A3252018-07-31031 July 2018 Requests for Relief Associated with - the Fifth 10-year Inservice Inspection Interval Program (CAC Nos. MG0175 Through MG0179; Epids L-2017-LLR-0062 Through L-2017-LLR-0066) ML18064A1022018-03-22022 March 2018 Request No. RI-21, Revision 1 - Request for Relief Concerning Examinations for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9623; EPID L-2017-LLR-0026) ML17226A0322017-09-20020 September 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17144A0822017-06-20020 June 2017 Issuance of Amendment No. 259 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17061A0502017-03-31031 March 2017 Issuance of Amendment No. 258 Adoption of TSTF-425, Revision 3, ML16272A1372016-10-17017 October 2016 Issuance of Amendment No. 257 Revision of Technical Specifications - Safety Limit Minimum Critical Power Ratio ML16146A7492016-07-25025 July 2016 Issuance of Amendment No. 255 Replacement of Technical Specification Figure 4.1-1 with Text ML16119A4332016-07-25025 July 2016 Issuance of Amendment No. 254 Adoption of Technical Specification Task Force Change Traveler TSFT-535, Revision 0 ML16158A0222016-07-25025 July 2016 Issuance of Amendment No. 256 to Relocate the Pressure-Temperature Curves to a Pressure-Temperature Limits Report ML16048A3402016-02-24024 February 2016 Request for Inservice Inspection Program Alternative RP5-01 for Implementation of Code Case N-795 ML16042A3262016-02-24024 February 2016 Request for Relief RR5-01, Alternative Weld Overlay Repair for a Dissimilar Metal Weld Joining Nozzle to Control Rod Drive End Cap in Lieu of Specific ASME Boiler and Pressure Vessel Code Requirements ML16034A4792016-02-17017 February 2016 Request for Relief RI5-02, Alternative to Use Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code Requirements ML16034A3032016-02-12012 February 2016 Request for Relief RC3-01 for Alignment of Inservice Inspection and Containment Inservice Inspection (CAC No. MF6333 ML16014A1742016-02-12012 February 2016 Request for Relief RP-01 Through RP-09, RV-01 Through RV-05, and RG-01 Alternative to ASME OM Code Requirements for Inservice Testing for the Fifth Ten-Year Program Interval (CAC Nos. MF5911, MF5913, MF5914, MF5915, MF5916, Etc.) ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) ML15134A2422015-05-20020 May 2015 Relief Request RI-08, Revision 0, Relief from Reactor Vessel Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections, for the Fourth 10-Year Inservice Inspection Interval ML14365A0932015-01-13013 January 2015 Correction to Safety Evaluation Dated December 12, 2014, Regarding Amendment No. 249, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14323A6442014-12-12012 December 2014 Issuance of Amendment No. 249, Request to Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14190A0042014-07-25025 July 2014 Redacted, Review of License Renewal Commitment Review Related to Core Plate Hold Down Bolt Inspection Plan and Analysis (TAC Nos. ME9550 and MF3557) ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13263A1532013-10-0707 October 2013 Correction to Amendment No. 247 Issued 9/12/13, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report 2024-07-03
[Table view] |
Text
April 27, 2006 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P.O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - ISSUANCE OF AMENDMENT RE: REVISED PRESSURE VESSEL FLUENCE AND PRESSURE TEMPERATURE CURVE APPLICABILITY TO 30 EFFECTIVE FULL-POWER YEARS OF OPERATION (TAC NO. MC8728)
Dear Mr. Edington:
The Commission has issued the enclosed Amendment No. 219 to Facility Operating License No. DPR-46 for the Cooper Nuclear Station. The amendment consists of changes to the Technical Specifications in response to your application dated October 12, 2005.
The amendment would extend the range of applicability of the current pressure-temperature limit curves to the end of the current license or for 30 effective full-power years of operation.
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Brian Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosures:
- 1. Amendment No. 219 to DPR-46
- 2. Safety Evaluation cc w/encls: See next page
April 27, 2006 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P.O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - ISSUANCE OF AMENDMENT RE: REVISED PRESSURE VESSEL FLUENCE AND PRESSURE TEMPERATURE CURVE APPLICABILITY TO 30 EFFECTIVE FULL-POWER YEARS OF OPERATION (TAC NO. MC8728)
Dear Mr. Edington:
The Commission has issued the enclosed Amendment No. 219 to Facility Operating License No. DPR-46 for the Cooper Nuclear Station. The amendment consists of changes to the Technical Specifications in response to your application dated October 12, 2005.
The amendment would extend the range of applicability of the current pressure-temperature limit curves to the end of the current license or for 30 effective full-power years of operation.
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Brian Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosures:
- 1. Amendment No. 219 to DPR-46
- 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC RidsNrrLAFeizollahi LPLIV r/f RidsNrrDirsItsb (TBoyce)
GHill (2) RidsAcrsAcnwMailCenter RidsNrrDorl (CHaney/CHolden) RidsOgcRp RidsNrrDorlLpl4 (DTerao) RidsRgn4MailCenter (KKennedy)
RidsNrrPMBBenney RidsNrrDorlDpr LLois Accession No.: (Amd) (TS) (Pkg)
OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/OSS OGC NRR/LPL4/BC NAME BBenney LFeizollahi GCranston Shamrick (NLO) DTerao DATE 4/7/06 4/6/06 4/10/06 4/18/06 4/27/06 OFFICIAL RECORD COPY
NEBRASKA PUBLIC POWER DISTRICT DOCKET NO. 50-298 COOPER NUCLEAR STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 219 License No. DPR-46
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Nebraska Public Power District (the licensee) dated October 12, 2005, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. DPR-46 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 219, are hereby incorporated in the license. The Nebraska Public Power District shall operate the facility in accordance with the Technical Specifications.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 60 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 27, 2006
ATTACHMENT TO LICENSE AMENDMENT NO. 219 FACILITY OPERATING LICENSE NO. DPR-46 DOCKET NO. 50-298 Replace the following pages of the Appendix A Technical Specifications with the enclosed revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 3.4-23 3.4-23 3.4-24 3.4-24 3.4-25 3.4-25
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 219 TO FACILITY OPERATING LICENSE NO. DPR-46 NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION DOCKET NO. 50-298
1.0 INTRODUCTION
By letter dated October 12, 2005 (Agencywide Documents Access and Management System Accession No. ML052910034), the Nebraska Public Power District (NPPD), the licensee for the Cooper Nuclear Station (CNS), submitted information and requested to extend the range of applicability of the current pressure-temperature (PT) limit curves to the end of the current license or for 30 effective full-power years (EFPYs) of operation.
The current PT limit curves were developed in the early 90's using a vessel fluence calculation code and method not approved by the Nuclear Regulatory Commission (NRC) staff. In March 2001, the NRC staff issued Regulatory Guide (RG) 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence," which instructs the licensees to use an approved methodology for the calculation of the vessel fluence. For several plants, the fluence recalculation effort was delayed until the Radiation Analysis Modeling Application (RAMA) code was approved by the NRC. CNS is one of those plants, and in April 2004, they proposed (and the NRC staff approved) an interim applicability period for the PT limit curves to the End of Cycle 23. The basis of that approval was that the fluence estimate at that time was more than 30 percent lower than the estimated value, thereby, compensating for any uncertainties.
This request is based on a revised fluence calculation using the RAMA code that has been approved by the NRC staff, and also adheres to the guidance in RG 1.190. The recalculated peak vessel fluence value is slightly higher than the previously used value for the estimation of the PT limit curves. Therefore, the licensee is requesting to adjust the period of applicability of the current PT limit curves to 30 EFPYs (in place of the 32) and maintain the same PT limit curves.
2.0 REGULATORY EVALUATION
This review is based on the guidance in RG 1.190 and the fact that the RAMA code has been reviewed and approved by the NRC staff. The RG 1.190 guidance is based on the requirements of General Design Criteria (GDC) 14, 30 and 31. GDC 14, "Reactor coolant pressure boundary," requires that the reactor coolant pressure boundary be designed, fabricated, erected, and tested so as to have an extremely low probability of rapidly propagating rupture. GDC 30, "Quality of reactor coolant pressure boundary," requires, in part, that the
reactor coolant pressure boundary be designed, fabricated, erected, and tested to the highest quality standards practical. GDC 31, "Fracture prevention of the reactor coolant pressure boundary," requires, in part, that the reactor coolant pressure boundary be designed with sufficient margin to assure that when stressed under operating, maintenance, testing, and postulated accident conditions it behaves in a non-brittle manner.
3.0 TECHNICAL EVALUATION
3.1 RAMA Calculations The calculations performed using the RAMA code adhere to the guidance prescribed in RG 1.190. The nuclear data is based on the ENDF/B-VI data file and the BUGLE-96 nuclear data library. The inelastic scattering cross section approximation is P7 for all nuclides (except actinide and zirconium for which P5 is used) and the quadrature approximation is S8. Source values were derived from pin power distribution for Cycles 15 through 21 and estimated power levels for Cycles 1 through 14, for which detailed values were not available. This is acceptable because the total neutron source (neutron leakage) is a function of total energy generated while average power distribution is stable (assuming equilibrium core loadings). Source representation accounted for reactor down time and reduced power operation.
An eighth-core symmetry was analyzed. The core (in its planar view) is quarter-symmetric, but it becomes eighth-symmetric with the addition of a dummy assembly. The axial model depicted the jet pumps as well as the surveillance capsules. The RAMA code produces a three-dimensional flux distribution and the associated spectra in the locations of interest such as vessel welds and surveillance capsules. Details of the calculations are described in the TransWare Enterprises report EPR-VIP-003-R-002, "Cooper Nuclear Station Reactor Pressure Vessel Fluence Evaluation," by TransWare Enterprises Incorporated, April 2005.
3.2 RAMA Benchmarking The RAMA code was approved by the NRC staff on April 7, 2005. The approval, in part, is subject to the following limitation:
"To apply the RAMA methodology to plant groups of dissimilar geometry to BWR
[Boiling-Water Reactor]-IVs, EPRI [Electric Power Research Institute] must provide at least one plant specific capsule dosimetry analysis to quantify the potential presence of a bias and assure that the uncertainty is within the RG 1.190 limits . . . "
The CNS is a BWR-4 and need not provide a plant-specific surveillance capsule calculation to confirm RAMAs suitability for the task. Regardless, the licensee submitted the analysis of the first dosimetry surveillance capsule (removed at the End of Cycle 9 after 6.8 EFPYs) and the second capsule (removed at the End of Cycle 14 after 11.2 EFPYs). Comparison of the calculated-to-measured ratios (C/M) specific activity values indicate good agreement of all dosimeters except for Nickel in the second capsule that are outside the RG 1.190 limits.
However, the mean value is well within the limits and is acceptable.
In addition, the submittal lists the results of 27 other plant-specific BWR-4 surveillance capsule measurements for which the C/M values are well within the RG 1.190 limits. Finally, the
submittal reports that comparison to the BWR numerical benchmarks, the H.B. Robinson dosimetry standard, and numerous BWR-2 results are within the required limits.
3.3 RAMA Analytic Uncertainty RG 1.190 requires for the methodology to establish an analytic uncertainty, which when combined with the measured data uncertainty yields the total uncertainty and possible bias.
The reported combined uncertainty is well within the required limits and there is no measurable bias.
3.4 Calculated Vessel Neutron Fluence The RAMA code is qualified to calculate the CNS neutron field. The submittal lists the results of peak fluence for E > 1.0 million electron volts (MeV), for 32 EFPYs on the vessel shells and for the same conditions on the peak weld fluence. The values of relevance in this evaluation are the peak vessel shell # 2 value of 1.67x1018 n/cm2 at the inside radius and 1.22x1018 n/cm2 for the circumferential shell 1-2 weld (VCB-BA-2), both for 32 EFPYs. Both values are acceptable, because the methodology has been approved and the application conforms to the guidance in RG 1.190.
3.5 PT Limit Adjustment The peak vessel fluence used for the current PT limit curves is 1.57x1018 n/cm2 compared to 1.67x1018 n/cm2 for the recalculated value. The licensee chose to adjust the period of validity of the current limits rather than to recalculate the PT limits at this time. The adjusted period of validity is inversely proportional to the value of the fluence. Therefore, the proposed value is 30 EFPYs [(1.57/1.67)x32 = 30.08]. The 30 EFPYs value is acceptable because it is slightly conservative and, therefore, the fluence is acceptable.
3.6 Technical Specification Changes Because the PT limit curves remain the same, the only required changes are in the notation of technical specification Figures 3.4.9-1, 3.4.9-2, and 3.4.9-3 to indicate the new period of validity for 30 EFPYs in place of "End of Cycle 23." This is done correctly.
3.7 Conclusion The NRC staff reviewed the proposed reevaluation of the vessel fluence methodology and its application to the CNS for 30 EFPYs. The method adheres to the guidance in RG 1.190 and, thus, it is acceptable. In addition, the calculation was carried out in compliance with the same guidance regarding cross sections, geometrical representation, material distribution, etc.
Therefore, the proposed fluence values are acceptable. Finally, the licensee correctly represented the proposed changes to the plant technical specifications. The NRC staff finds the proposed changes acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment relates to changes in recordkeeping, reporting, or administrative procedures or requirements. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (71 FR 150; January 3, 2006). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: L. Lois Date: April 27, 2006
Cooper Nuclear Station cc:
Mr. William J. Fehrman Senior Resident Inspector President and Chief Executive Officer U.S. Nuclear Regulatory Commission Nebraska Public Power District P. O. Box 218 1414 15th Street Brownville, NE 68321 Columbus, NE 68601 Regional Administrator, Region IV Mr. Gene Mace U.S. Nuclear Regulatory Commission Nuclear Asset Manager 611 Ryan Plaza Drive, Suite 400 Nebraska Public Power District Arlington, TX 76011 P.O. Box 98 Brownville, NE 68321 Director, Missouri State Emergency Management Agency Mr. John C. McClure P. O. Box 116 Vice President and General Counsel Jefferson City, MO 65102-0116 Nebraska Public Power District P. O. Box 499 Chief, Radiation and Asbestos Columbus, NE 68602-0499 Control Section Kansas Department of Health Mr. Paul V. Fleming and Environment Licensing Manager Bureau of Air and Radiation Nebraska Public Power District 1000 SW Jackson P.O. Box 98 Suite 310 Brownville, NE 68321 Topeka, KS 66612-1366 Mr. Michael J. Linder, Director Mr. Daniel K. McGhee Nebraska Department of Environmental Bureau of Radiological Health Quality Iowa Department of Public Health P. O. Box 98922 Lucas State Office Building, 5th Floor Lincoln, NE 68509-8922 321 East 12th Street Des Moines, IA 50319 Chairman Nemaha County Board of Commissioners Mr. Keith G. Henke, Planner Nemaha County Courthouse Division of Community and Public Health 1824 N Street Office of Emergency Coordination Auburn, NE 68305 930 Wildwood P.O. Box 570 Jefferson City, MO 65102 Ms. Julia Schmitt, Manager Radiation Control Program Jerry C. Roberts, Director of Nuclear Nebraska Health & Human Services R & L Safety Assurance Public Health Assurance Nebraska Public Power District 301 Centennial Mall, South P.O. Box 98 P.O. Box 95007 Brownville, NE 68321 Lincoln, NE 68509-5007 Mr. John F. McCann, Director Mr. H. Floyd Gilzow Licensing, Entergy Nuclear Northeast Deputy Director for Policy Entergy Nuclear Operations, Inc.
Missouri Department of Natural Resources 440 Hamilton Avenue P. O. Box 176 White Plains, NY 10601-1813 Jefferson City, MO 65102-0176 February 2006