ML062360123: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML062360123
| number = ML062360123
| issue date = 08/22/2006
| issue date = 08/22/2006
| title = Cooper - Danger Will Robinson: If You Change Cell Locations You May Break the VB Code!
| title = Danger Will Robinson: If You Change Cell Locations You May Break the VB Code!
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Cooper Danger Will Robinson:
{{#Wiki_filter:Cooper                 Danger Will Robinson: if you change cell locations you may break the VB code!
if you change cell locations you may break the VB code!SealType tBatt tCoreUncovery tDGR50 tEPFail tLong tShort LOOPClass(1)
SealType             0         Reactor coolant pump seal type tBatt              4.00          Battery depletion time (not used in the current formulation - tLong is what is actually used) tCoreUncovery      0.50          Core uncovery time tDGR50            4.00          Median diesel generator repair time tEPFail            0.00          Emergency power failure time (generally assumed to be 0.)
LOOPClass(2)
tLong              4.00          Long-term recovery time (this will generally be the battery depletion time!)
LOOPClass(3)
tShort            0.00          Short-term recovery time LOOPClass(1)    TRUE            Plant centered LOOP LOOPClass(2)    TRUE            Grid-related LOOP LOOPClass(3)    TRUE            Severe weather related LOOP LOOPClass(4)    TRUE            Extreme weather LOOP (1032 only, 5496 does not model this class)
LOOPClass(4) 0 4.00 0.50 4.00 0.00 4.00 0.00 TRUE TRUE TRUE TRUE Reactor coolant pump seal type Battery depletion time (not used in the current formulation  
NUREG/CR-5496 LOOPFreq     5.32E-06           LOOP Frequency (per hour)
-tLong is what is actually used)Core uncovery time Median diesel generator repair time Emergency power failure time (generally assumed to be 0.)Long-term recovery time (this will generally be the battery depletion time!)Short-term recovery time Plant centered LOOP Grid-related LOOP Severe weather related LOOP Extreme weather LOOP (1032 only, 5496 does not model this class)NUREG/CR-5496 LOOPFreq 5.32E-06 PNRLOOPST 1.OOE+00 PNREPBD 6.81 E-02 PSLOCA N/A PNREPSL N/A PNREPNSL N/A DGRunTime 14.00 LOOP Frequency (per hour)P(EP Not Recovered in Short Term)P(EP Not Recovered in Long Term) -BWR Only P(Seal LOCA)P(EP No Rec Long I Seal LOCA)P(EP No Rec Long I No Seal LOCA)Diesel Generator Mission Time LOOP Frequency (per hour)P(EP Not Recovered in Short Term)P(EP Not Recovered in Long Term) -BWR Only P(Seal LOCA)P(EP No Rec Long I Seal LOCA)P(EP No Rec Long I No Seal LOCA)Diesel Generator Mission Time Instructions:
PNRLOOPST     1.OOE+00           P(EP Not Recovered in Short Term)
Alt+F1 1 will show you the VBA code Alt+F8 will show you the VBA routines you must run to update probabilities on this page NUREG-1032 LOOPFreq PNRLOOPST PNREPBD PSLOCA PNREPSL PNREPNSL DGRunTime 1.10E-05 1.OOE+00 2.25E-02 N/A N/A N/A 2.27 N_.}}
PNREPBD      6.81 E-02          P(EP Not Recovered in Long Term) - BWR Only PSLOCA              N/A          P(Seal LOCA)                                                         Instructions:
PNREPSL            N/A          P(EP No Rec Long I Seal LOCA)                                         Alt+F1 1 will show you the VBA code PNREPNSL            N/A          P(EP No Rec Long I No Seal LOCA)                                     Alt+F8 will show you the VBA routines DGRunTime        14.00          Diesel Generator Mission Time                                         you must run to update probabilities on this page NUREG-1032 LOOPFreq      1.10E-05          LOOP Frequency (per hour)
PNRLOOPST    1.OOE+00            P(EP Not Recovered in Short Term)
PNREPBD      2.25E-02            P(EP Not Recovered in Long Term) - BWR Only PSLOCA              N/A          P(Seal LOCA)
PNREPSL            N/A          P(EP No Rec Long I Seal LOCA)
PNREPNSL            N/A          P(EP No Rec Long I No Seal LOCA)
DGRunTime         2.27           Diesel Generator Mission Time N_.}}

Latest revision as of 15:48, 23 November 2019

Danger Will Robinson: If You Change Cell Locations You May Break the VB Code!
ML062360123
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/22/2006
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2006-0007, NUREG-1032, NUREG/CR-5496
Download: ML062360123 (1)


Text

Cooper Danger Will Robinson: if you change cell locations you may break the VB code!

SealType 0 Reactor coolant pump seal type tBatt 4.00 Battery depletion time (not used in the current formulation - tLong is what is actually used) tCoreUncovery 0.50 Core uncovery time tDGR50 4.00 Median diesel generator repair time tEPFail 0.00 Emergency power failure time (generally assumed to be 0.)

tLong 4.00 Long-term recovery time (this will generally be the battery depletion time!)

tShort 0.00 Short-term recovery time LOOPClass(1) TRUE Plant centered LOOP LOOPClass(2) TRUE Grid-related LOOP LOOPClass(3) TRUE Severe weather related LOOP LOOPClass(4) TRUE Extreme weather LOOP (1032 only, 5496 does not model this class)

NUREG/CR-5496 LOOPFreq 5.32E-06 LOOP Frequency (per hour)

PNRLOOPST 1.OOE+00 P(EP Not Recovered in Short Term)

PNREPBD 6.81 E-02 P(EP Not Recovered in Long Term) - BWR Only PSLOCA N/A P(Seal LOCA) Instructions:

PNREPSL N/A P(EP No Rec Long I Seal LOCA) Alt+F1 1 will show you the VBA code PNREPNSL N/A P(EP No Rec Long I No Seal LOCA) Alt+F8 will show you the VBA routines DGRunTime 14.00 Diesel Generator Mission Time you must run to update probabilities on this page NUREG-1032 LOOPFreq 1.10E-05 LOOP Frequency (per hour)

PNRLOOPST 1.OOE+00 P(EP Not Recovered in Short Term)

PNREPBD 2.25E-02 P(EP Not Recovered in Long Term) - BWR Only PSLOCA N/A P(Seal LOCA)

PNREPSL N/A P(EP No Rec Long I Seal LOCA)

PNREPNSL N/A P(EP No Rec Long I No Seal LOCA)

DGRunTime 2.27 Diesel Generator Mission Time N_.