Cooper SealType 0
tBatt 4.00 tCoreUncovery 0.50 tDGR50 4.00 tEPFail 0.00 tLong 4.00 tShort 0.00 LOOPClass(1)
TRUE LOOPClass(2)
TRUE LOOPClass(3)
TRUE LOOPCIass(4)
TRUE NUREG/CR-5496 LOOPFreq 5.32E-06 PNRLOOPST 1.00E+00 PNREPBD 6.81 E-02 PSLOCA N/A PNREPSL N/A PNREPNSL N/A
.-JPDGRunTime 14.00 NUREG-1032 LOOPFreq 1.10E-05 PNRLOOPST 1.00E+00 PNREPBD 2.25E-02 PSLOCA N/A PNREPSL N/A PNREPNSL N/A DGRunTime 2.27 4e41-gBI
-~
C~
~'
Danger Will Roblnson: If you change cell locations you may break the V Reactor coolant pump seal type Battery depletion time (not used in the current formulation - tLong i:
Core uncovery time Median diesel generator repair time Emergency power failure time (generally assumed to be 0.)
Long-term recovery time (this will generally be the battery depletior Short-term recovery time Plant centered LOOP Grid-related LOOP Severe weather related LOOP Extreme weather LOOP (1032 only, 5496 does not model this clas LOOP Frequency (per hour)
P(EP Not Recovered in Short Term)
P(EP Not Recovered in Long Term) - BWR Only P(Seal LOCA)
P(EP No Rec Long I No Seal LOCA)
Diesel Generator Mission Time LOOP Frequency (per hour)
P(EP Not Recovered in Short Term)
P(EP Not Recovered in Long Term) - BWR Only P(Seal LOCA)
P(EP No Rec Long I No Seal LOCA)
Diesel Generator Mission Time z,-e4&Q (Qcl!g P,