Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22207A049 | 25 July 2022 | Information Request, Security IR 2022402 | |
NLS2021035, Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 3 | 10 May 2021 | Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 3 | Safe Shutdown Reactor Vessel Water Level High Radiation Area Fire impairment Severe Accident Management Guideline Minimum staff Fire Protection Program |
NLS2016063, Enclosure 2: Response to Areas of Requested Information in Appendix a of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Non-Proprietary Version) | 27 October 2016 | Enclosure 2: Response to Areas of Requested Information in Appendix a of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Non-Proprietary Version) | |
ML16125A522 | 4 May 2016 | FOIA/PA-2016-0455 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed | |
ML15014A160 | 14 January 2015 | Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process | |
ML15014A153 | 14 January 2015 | Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process | |
ML13143A331 | 6 June 2013 | Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 | |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML100330601 | 8 February 2010 | Compression Test of Concrete, 4000 Psi | |
ML093350751 | 14 January 2010 | Temporary Instruction 2515/180, Managing Fatigue | |
ML100341313 | 8 January 2010 | Compression Test of Concrete, 3000 Psi | |
ML091180247 | 9 March 2009 | Enclosure 5 - FAQ Log | Time of Discovery High winds Mission time Water Inventory Control Significance Determination Process |
ML092110589 | 6 March 2009 | Nebraska Game and Parks Commission Species by County List | |
ML091760654 | 4 April 2008 | CNS Lr - Air Pollutants and Control Techniques - Particulate Matter, Control Techniques, EPA | |
ML091750183 | 15 February 2008 | Lr - NPPD Statement on Addressing Climate Change | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML072110433 | 25 July 2007 | Questions from 1 Through 8 | Ultimate heat sink Fuel cladding |
ML062860234 | 11 October 2006 | SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency | High winds Mission time Probabilistic Risk Assessment Large early release frequency |
ML062860241 | 11 October 2006 | Analysis: Brief Description of Issue | High winds Mission time Probabilistic Risk Assessment Large early release frequency |
ML062860240 | 11 October 2006 | Analysis: Briefing Description of Issue | High winds Mission time Probabilistic Risk Assessment Large early release frequency |
ML062860229 | 11 October 2006 | Analysis: Brief Description of Issue | High winds Mission time Probabilistic Risk Assessment Large early release frequency |
ML062830079 | 6 October 2006 | Release Severity and Timing Classification Scheme (Severity, Timing) | Mission time Probabilistic Risk Assessment |
ML062710144 | 25 September 2006 | Violations (Violations Are Severity Level IV Unless Otherwise Stated) | |
ML062360117 | 22 August 2006 | Identification and Resolution of Problems - SW System Alignment | |
ML062360126 | 22 August 2006 | Loop Category | |
ML062360123 | 22 August 2006 | Danger Will Robinson: If You Change Cell Locations You May Break the VB Code! | Mission time |
ML062360119 | 22 August 2006 | Potential Risk Contribution from Large Early Release Frequency (LERF) | Significance Determination Process Large early release frequency |
ML062220561 | 9 August 2006 | SDP Phase 1 Screening Worksheet for IE, Ms, and B Cornerstones | Fire Barrier Fuel cladding |
ML062220484 | 9 August 2006 | Undated Paper, Page 8, Table 2 | Mission time |
ML062220496 | 9 August 2006 | Preliminary Risk Screening for Cooper Service Water Issues | |
ML062220500 | 9 August 2006 | Danger Will Robinson: If You Change Cell Locations You May Break the V | Mission time |
ML062220544 | 9 August 2006 | State the Performance Deficiency Exactly as Stated | High winds Mission time Probabilistic Risk Assessment Large early release frequency |
ML061860700 | 3 July 2006 | Enclosure - Final Significance Determination Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency | Mission time Significance Determination Process Large early release frequency |
ML060180537 | 27 June 2005 | CNS - 06-2005 - Initial Examination Written Reference Handout | |
ML062860215 | 2 December 2004 | SERP Worksheet for DP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency | Reactor Vessel Water Level Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML062860197 | 30 November 2004 | E-Mail from Sanborn to Allen Et Al., Agenda for Region IV Serp'S on Thurs., Dec. 2, Outside Scope | High winds Reactor Vessel Water Level Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML062860186 | 20 October 2004 | SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency | High winds Reactor Vessel Water Level Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML061980242 | 18 October 2004 | NRC Question B and CNS Answer | |
ML061980235 | 18 October 2004 | NRC Question a and CNS Answer | |
ML061980228 | 22 September 2004 | Condition Report CR-CNS-2004-06422, Alarm Procedure Errors | |
ML061940420 | 21 September 2004 | CNS Answers to NRC Questions | |
ML062360287 | 25 August 2004 | Memo from R. A. Gramm (NRR) to T. A. Bergman (Oedo), Subj: G20040484, Re-Issued Briefing Package for Drop-In Visit on September 2, 2004 by Nebraska Public Power District (NPPD) Officials... | Fitness for Duty |
ML062860104 | 15 July 2004 | SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML062860105 | 15 July 2004 | SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency | High winds Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML062860106 | 15 July 2004 | SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency | High winds Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML062860109 | 15 July 2004 | SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency | High winds Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML061940438 | 26 December 2001 | CNS Notification 10132527 | Safe Shutdown Unanalyzed Condition Fitness for Duty Past operability Fire impairment Weak link |
ML061940308 | 12 June 2001 | CNS Surveillance Data Sheets - Procedure 7.3.1.11, Revision 3 |