Category:Letter
MONTHYEARIR 05000298/20240032024-11-0505 November 2024 Integrated Inspection Report 05000298/2024003 ML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments 05000298/LER-2023-002-01, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 05000298/LER-2024-001, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications 05000298/LER-2024-002, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements 05000298/LER-2023-002, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2023-12-20020 December 2023 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A1122023-11-0909 November 2023 Project Manager Assignment IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 05000298/LER-2022-002-01, Manual Core Spray Injection to Restore Skimmer Surge Tank Level2023-06-29029 June 2023 Manual Core Spray Injection to Restore Skimmer Surge Tank Level ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 05000298/LER-2022-004-01, 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open2023-05-11011 May 2023 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open 05000298/LER-2023-001, Valve Test Failures Result in Condition Prohibited by Technical Specifications2023-05-0808 May 2023 Valve Test Failures Result in Condition Prohibited by Technical Specifications IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report 2024-09-03
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24124A0072024-05-0303 May 2024 Presubmittal Meeting EP Plan Change Meeting Slides ML23317A2032023-12-13013 December 2023 Pre-Submittal Meeting: Tech Spec Amendment Request for HPCI Flow Switch Setpoint Change ML23150A1382023-06-0101 June 2023 Pre Submittal Meeting: Containment Inservice Inspection (Cisi) Relief Request, June 1, 2023 ML23150A1372023-06-0101 June 2023 Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection, June 1, 2023 ML21125A0372021-05-0606 May 2021 May 6, 2021 Public Meeting (Observation) Slides for RAP Back Program Presentation to Industry(003) ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14149A0902014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule June 2012 Through February 2015 Gantt Chart ML14149A0882014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule May 2014 Through February 2015 Gantt Chart ML14149A0852014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Hi-Level Overview Schedule for Flooding Hazard Reevaluation Report ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML13178A1592013-06-26026 June 2013 Summary of Meeting for Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML1129715762011-10-24024 October 2011 Licensee Slides from 10/24/11 Meeting with Nebraska Public Power District to Discuss Cooper Nuclear Station ML1121401792011-07-11011 July 2011 Licensee Slides from Conference Call with Nebraska Public Power District IR 05000298/20110092011-06-10010 June 2011 EA-11-204, Cooper Nuclear Station, Final Significance Determination of White Finding and Notice of Violation, NRC Inspection Report 05000298/2011009 ML1112606772011-05-0606 May 2011 Summary of Meeting with Nebraska Public District, Cooper Discussed the Significance, Cause and Corrective Action Associated with an Apparent Violation with Low-to-Moderate Safety Significance ML1029202962010-10-19019 October 2010 Meeting Handouts for October 19, 2010 with Nebraska Public Power District Regarding Cooper Nuclear Station ML1016001102010-06-0909 June 2010 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1011904802010-04-29029 April 2010 Summary of Meeting with Nebraska Public Power District to Discuss Issues Associated with the Independent Spent Fuel Storage Installation (ISFSI) ML1011103782010-04-20020 April 2010 Public Meeting Summary from 4/7/2010 ML1010503762010-04-0707 April 2010 Preliminary Site-Specific Results of the License Renewal Environmental Review for Cooper Nuclear Station ML0909700972009-04-0707 April 2009 Summary of Annual Performance Assessment Meeting with Nebraska Public Power District to Discuss Safety Performance at Cooper Nuclear Station Between January 1 & December 31, 2008 ML0907506862009-02-25025 February 2009 Scoping and Process Public Meeting Sides of February 25, 2009 ML0816201532008-06-10010 June 2008 End-of-Cycle Meeting Summary 6/2/08 ML0815501022008-05-28028 May 2008 Meeting Summary for Regulatory Conference with Nebraska Public Power District to Discuss the Significance of an Inspection Finding Associated with Two Procedures That Were Not Adequate ML0712005272007-04-30030 April 2007 Nrc/Entergy Operations, Inc. Management Meeting to Discuss the Performance of Arkansas Nuclear One, Cooper, Grand Gulf, River Bend and Waterford, Unit 3 ML0721104822006-10-31031 October 2006 Significance Determination Process Refresher Training ML0612904602006-05-0505 May 2006 May 5, 2006 Meeting Slides ML0524300942005-10-0303 October 2005 Slides from August 29, 2005 Meeting with NPPD ML0503405322005-02-0303 February 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0413802292004-05-17017 May 2004 Summary of Confirmatory Action Letter 5th Quarterly Inspection Exit Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0410503302004-04-14014 April 2004 Meeting Summary for End-of-Cycle Performance Assessment for Cooper Nuclear Station ML0402800142004-01-27027 January 2004 Summary of CAL 4th Quarterly Inspection Exit Meeting with Nebraska Public Power District Cooper Nuclear Station ML0331402912003-11-0707 November 2003 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0302905232002-12-13013 December 2002 Briefing Slides for Presentation Status of the CNS BWRVIP Program from 12/13/2002 Meeting with Nebraska Public Power District ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary ML0205703522002-02-26026 February 2002 02-07-02 Cooper/Nebraska Public Power District Meeting Summary ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2024-05-03
[Table view] Category:Meeting Summary
MONTHYEARML24204A0912024-07-30030 July 2024 Summary of May 9, 2024, Preapplication Teleconference with Nebraska Public Power District to Discuss Proposed Changes to the Cooper Nuclear Station Emergency Plan ML24122C6862024-05-0202 May 2024 Summary of the April 24, 2024 Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Cooper Nuclear Station ML24016A0772024-02-0202 February 2024 December 13, 2023, Summary of Pre-application Teleconference with Nebraska Public Power District to Discuss License Amendment to Adjust High Pressure Coolant Injection Flow Setpoints for Cooper Nuclear Station ML23165A0352023-06-26026 June 2023 Summary of June 1, 2023, Pre-Application Teleconference with Nebraska Public Power District to Discuss Planned License Amendment Request to Add Temporary Note to TS LCO 3.8.3 for Diesel Fuel Oil Tank Cleaning and Inspection ML23164A1152023-06-23023 June 2023 Summary of Pre-Application Teleconference with Nebraska Public Power District to Discuss Relief Request for Drywell Inspections Performed During Refueling Outage 32 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19350C3122019-12-19019 December 2019 Summary of December 3, 2019, Public Meeting with Nebraska Public Power District, on Proposed Changes to the Emergency Plan to Revise the Emergency Action Level Scheme at Cooper Nuclear Station ML19204A2452019-07-25025 July 2019 Summary of Presubmittal Teleconference with Nebraska Public Power District Regarding Proposed Exemption from Appendix J of 10 CFR Part 50 for Cooper Nuclear Station ML17324A2802017-11-16016 November 2017 Summary of Regulatory Conference to Discuss Safety Significance of Cooper Nuclear Station Emergency Station Service Transformer Bus Duct Deficiency ML16334A4732016-12-0606 December 2016 Summary of Closed Meeting to Discuss Dam Failure Analysis Developed for the Integrated Assessment for Cooper Nuclear Station ML14156A2832014-06-16016 June 2014 Summary of 5/22/2014 Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14147A3592014-06-0909 June 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML14139A3582014-06-0505 June 2014 5/9/2014 Summary of Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14139A3442014-05-29029 May 2014 Summary of Closed Meeting Between Representatives of the Nuclear Regulatory Commission, Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Analysis ML14031A1622014-02-10010 February 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML14034A0502014-02-0606 February 2014 Summary of Audit Conducted 1/28-29/2014, License Amendment Request to Adopt National Fire Protection Agency (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13178A1592013-06-26026 June 2013 Summary of Meeting for Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML1132200762011-12-0505 December 2011 Summary of Meeting with Nebraska Public Power District to Discuss Amendment Request to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4 for Cooper Nuclear Station ML1131903962011-11-0303 November 2011 Summary of Meeting with Nebraska Public Power District to Discuss Safety Performance at Cooper Nuclear Station ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML1121700812011-08-18018 August 2011 7/12/11 - Summary of Teleconference with Nebraska Public Power District to Discuss Cooper'S Request to Revise TS 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs) at Cooper Nuclear Station ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1112606772011-05-0606 May 2011 Summary of Meeting with Nebraska Public District, Cooper Discussed the Significance, Cause and Corrective Action Associated with an Apparent Violation with Low-to-Moderate Safety Significance ML1029204632010-10-29029 October 2010 Summary of Pre-Licensing Meeting with Nebraska Public Power District to Discuss Future License Amendment Request for Cooper Nuclear Station TSTF-493, Revision 4, Clarify Application of Setpoint Methodology for LSSS Functions ML1015303172010-07-13013 July 2010 Summary of Telephone Conference Call Held on May 26, 2010 Between the U.S. NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Responses to Requests for Additional Information, for Cooper Nuclear Station Lic ML1015204892010-06-16016 June 2010 Summary of Telephone Conference Call Held on May 18, 2010, Between the U.S. NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Responses to Requests for Additional Information for Cooper Nuclear Station Lic ML1016001102010-06-0909 June 2010 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1010406562010-05-11011 May 2010 04/07/10 Summary of Public Meeting to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of Cooper Nuclear Station License Renewal Application ML1011904802010-04-29029 April 2010 Summary of Meeting with Nebraska Public Power District to Discuss Issues Associated with the Independent Spent Fuel Storage Installation (ISFSI) ML1007106452010-04-20020 April 2010 Summary of Telephone Conference Call Held Between NRC & NPPD, Related to a Clarification for Certain Responses to RAI for Cooper Nuclear Station Lr ML1002901692010-02-26026 February 2010 Summary of Telephone Conference Call Held on January 14, 2010, Between the U.S. NRC and Nebraska Public Power District, Related to a Clarification for Certain Responses to Requests for Additional Information for Cooper Nuclear Station Licen ML1001900422010-02-0303 February 2010 Summary of Telephone Conference Call Held on 1/8/2010, Between the U.S. NRC and Nebraska Public Power District Related to a Clarification for Certain Responses to Requests for Additional Information for Cooper Nuclear Station ML1000900472010-01-21021 January 2010 November 9, 2009, Summary of Telephone Conference Call Held on Between NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Responses to Requests for Additional Information for Cooper License Renewal ML0929200262009-10-28028 October 2009 Summary of Telephone Conference Call Held on 09/14/09, Between the U.S. NRC Staff and NPPD, Related to a Request for Additional Information (RAI) and Clarification for Certain Responses to Rais, for Cooper Nuclear Station License Renewal ML0923007182009-10-15015 October 2009 Summary of Teleconference Call Held Between the NRC and Nebraska Public Power District Related to Clarifications on Request for Additional Information for Cooper ML0926805692009-10-0808 October 2009 09/02/09 Summary of Telephone Conference Call Between NRC Staff and NPPD, Related to a Clarification for Certain Responses to Requests for Additional Information, for Cooper Nuclear Station License Renewal ML0923804342009-09-17017 September 2009 07/07/2009 Meeting Summary, Telephone Conference Call Between the U.S. NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Requests for Additional Information, for Cooper Nuclear Station License Renewal ML0923101202009-09-17017 September 2009 Summary of Tele Conf Call with Nebraska Public Power Districts to Discuss Clarifications for the Severe Accident Mitigation Alternative Documented in the NRC Request for Additional Information Letter Dated May 1, 2009 ML0920103992009-08-25025 August 2009 Summary of Telephone Conference Call Held on June 16, 2009, Between the NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Requests for Additional Information, for Cooper Nuclear Station License Renewal ML0920303052009-07-29029 July 2009 Summary of Telephone Conference Call Held on 7/9/2009, Between the U.S. NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Requests for Additional Information, for Cooper Nuclear Station License Renewal ML0917503682009-07-0101 July 2009 Summary of Regulatory Audit Related to the Review of the License Renewal Application for Cooper Nuclear Station ML0915604962009-06-10010 June 2009 Summary of Telephone Conference Call Held on May 20, 2009, Between the USNRC Staff and NPPD, Related to a Clarification on Certain RAI (RAI B.1.15-3 and RAI B.1.15-4), for CNS Renewal ML0909704142009-04-30030 April 2009 Summary of Site Audit Related to the Review of the License Review Application for Cooper Nuclear Station, Unit 1 ML0909103082009-04-14014 April 2009 Summary of Public Environmental Scoping Meeting Related to the Review of the Cooper Nuclear Station, Licensed Renewal Application ML0909700972009-04-0707 April 2009 Summary of Annual Performance Assessment Meeting with Nebraska Public Power District to Discuss Safety Performance at Cooper Nuclear Station Between January 1 & December 31, 2008 ML0831101972008-11-0505 November 2008 Summary of Meeting with Nebraska Public Power District to Discuss Inspection Procedure 95002 Supplemental Inspection Preparations and Diesel Generator Performance Improvement Plan ML0810900022008-04-22022 April 2008 Summary of Telephone Conference Verbal Authorization for Cooper Relief Request RI-35 ML0720002802007-07-18018 July 2007 Meeting Summary for Regulatory and Predecisional Enforcement Conference; Cooper Nuclear Station 2024-07-30
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24124A0072024-05-0303 May 2024 Presubmittal Meeting EP Plan Change Meeting Slides ML24122C6862024-05-0202 May 2024 Summary of the April 24, 2024 Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Cooper Nuclear Station ML23150A1372023-06-0101 June 2023 Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection, June 1, 2023 ML23150A1382023-06-0101 June 2023 Pre Submittal Meeting: Containment Inservice Inspection (Cisi) Relief Request, June 1, 2023 ML21125A0372021-05-0606 May 2021 May 6, 2021 Public Meeting (Observation) Slides for RAP Back Program Presentation to Industry(003) ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML19196A3452019-07-18018 July 2019 July 18, 2019 Public Teleconference Slides Appendix J Exemption Request Presubmittal Teleconference ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML13178A1592013-06-26026 June 2013 Summary of Meeting for Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML1129715762011-10-24024 October 2011 Licensee Slides from 10/24/11 Meeting with Nebraska Public Power District to Discuss Cooper Nuclear Station ML1121401792011-07-11011 July 2011 Licensee Slides from Conference Call with Nebraska Public Power District ML1113805552011-05-16016 May 2011 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1112606772011-05-0606 May 2011 Summary of Meeting with Nebraska Public District, Cooper Discussed the Significance, Cause and Corrective Action Associated with an Apparent Violation with Low-to-Moderate Safety Significance ML1029202962010-10-19019 October 2010 Meeting Handouts for October 19, 2010 with Nebraska Public Power District Regarding Cooper Nuclear Station ML1016001102010-06-0909 June 2010 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1011904802010-04-29029 April 2010 Summary of Meeting with Nebraska Public Power District to Discuss Issues Associated with the Independent Spent Fuel Storage Installation (ISFSI) ML1011103782010-04-20020 April 2010 Public Meeting Summary from 4/7/2010 ML1010503762010-04-0707 April 2010 Preliminary Site-Specific Results of the License Renewal Environmental Review for Cooper Nuclear Station ML0909700972009-04-0707 April 2009 Summary of Annual Performance Assessment Meeting with Nebraska Public Power District to Discuss Safety Performance at Cooper Nuclear Station Between January 1 & December 31, 2008 ML0907506862009-02-25025 February 2009 Scoping and Process Public Meeting Sides of February 25, 2009 ML0831101972008-11-0505 November 2008 Summary of Meeting with Nebraska Public Power District to Discuss Inspection Procedure 95002 Supplemental Inspection Preparations and Diesel Generator Performance Improvement Plan ML0823503312008-08-22022 August 2008 Summary of Public Meeting with Nebraska Public Power District Presentation of Preparations for Inspection and Plans to Improve Performance of Emergency Diesel Generators at Cooper Nuclear Station ML0815501022008-05-28028 May 2008 Meeting Summary for Regulatory Conference with Nebraska Public Power District to Discuss the Significance of an Inspection Finding Associated with Two Procedures That Were Not Adequate ML0720002802007-07-18018 July 2007 Meeting Summary for Regulatory and Predecisional Enforcement Conference; Cooper Nuclear Station ML0623601232006-08-22022 August 2006 Danger Will Robinson: If You Change Cell Locations You May Break the VB Code! ML0615700432006-06-0202 June 2006 Summary of 05/30/2006 Annual Performance Assessment Meeting with Nebraska Public Power District Cooper Nuclear Station ML0612904602006-05-0505 May 2006 May 5, 2006 Meeting Slides ML0617905182006-03-0909 March 2006 RIC 2006 Presentation - Th5E - Jerry Roberts - ROP Inspection Program Update ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0532206852005-11-17017 November 2005 Nrc/Entergy Operations, Inc. Management Meeting 11/10/05 ML0531904622005-11-15015 November 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0524300942005-10-0303 October 2005 Slides from August 29, 2005 Meeting with NPPD ML0511000652005-04-19019 April 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station end-of-cycle ML0506802362005-03-0909 March 2005 Summary of Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station'S Simulator Fidelity Issues ML0503405322005-02-0303 February 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0413802292004-05-17017 May 2004 Summary of Confirmatory Action Letter 5th Quarterly Inspection Exit Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0409701292004-03-12012 March 2004 Summary of Meeting with Cooper Nuclear Station to Discuss Progress in Implementing Strategic Improvement Plan ML0409804682004-03-11011 March 2004 RIC 2004 Presentation - T4 - Jerry Roberts - Operating Experience ML0402800142004-01-27027 January 2004 Summary of CAL 4th Quarterly Inspection Exit Meeting with Nebraska Public Power District Cooper Nuclear Station ML0331402912003-11-0707 November 2003 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0323407332003-08-21021 August 2003 Cooper Nuclear Station, Presentation Slides Re. Main Steam Isolation Valve Leakage Pathway, License Condition 2.C.(6) ML0319101132003-07-0909 July 2003 Summary of Confirmatory Action Letter Quarterly Inspection Exit Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0311207402003-04-22022 April 2003 Meeting Summary for End-of-Cycle Performance Assessment for Cooper Nuclear Station ML0309201462003-04-0101 April 2003 Summary of Confirmatory Action Letter Quarterly Inspection Exit Meeting with Cooper Nuclear Station ML0302905232002-12-13013 December 2002 Briefing Slides for Presentation Status of the CNS BWRVIP Program from 12/13/2002 Meeting with Nebraska Public Power District ML0224904012002-09-0303 September 2002 Cooper Supplemental Inspections, Presentation to Nebraska Public Power District Board of Directors 2024-05-03
[Table view] |
Text
UNITED STATES
- iNUCLEAR REGULATORY COMMISSION
& REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 44t SoARLINGTON, X TEXAS 76011-4005 November 7, 2003 Clay C. Warren, Chief Nuclear Officer Nebraska Public Power District P.O. Box 98 Brownville, NE 68321
SUBJECT:
SUMMARY
OF MEETING WITH NEBRASKA PUBLIC POWER DISTRICT REGARDING COOPER NUCLEAR STATION
Dear Mr. Warren:
This refers to the meeting conducted at the Brownville Concert Hall, Brownville, Nebraska, on November 4, 2003. The purpose of this meeting was to present the results of the NRC's third quarterly inspection of Cooper Nuclear Station's actions associated with the Confirmatory Action Letter issued on January 30, 2003, and the Biennial Problem Identification and Resolution inspection conducted at the Cooper Nuclear Station. The attendance list and the NRC's and Nebraska Public Power District's presentation slides are enclosed.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Kriss M. Kennedy, Chief Project Branch C Division of Reactor Projects Docket: 50-298 License: DPR-46
Enclosures:
- 1. Attendance List
- 2. NRC Presentation Slides
- 3. NPPD Presentation Slides
Nebraska Public Power District Chief, Radiation and Asbestos Control- Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street, Suite D Des Moines, IA 50309 William J. Fehrman, President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601
Nebraska Public Power District Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
Acting DRS Director (DDC)
Senior Resident Inspector (SCS)
Branch Chief, DRP/C (KMK)
Senior Project Engineer, DRP/C (WCW)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
Jim Isom, Pilot Plant Program (JAI)
RidsNrrDipmLipb Anne Boland, OEDO RIV Coordinator (ATB)
CNS Site Secretary (SLN)
AqIAMS: "Yes El No Initials: W tVJ 0' Publicly Available El Non-Publicly Available Cl Sensitive ONon-Sensitive DMA f'KQIXtK144 A A'rAC% _D .M...-A I I--UO1V1O-LJ.-urc.wpu WCWalker;df KMKennedy _ ________
11/O6/03 11/ 1/03 _ _ I II OFFICIAL REC-(ORD COPY T=Telephone E=E-mail F=Fax
ENCLOSURE 1 ATTENDANCE LIST
NRC PUBLIC MEETING ATTENDANCE LICENSEE/FACILITY Nebraska Public Power District l_ Cooper Nuclear Station DATE/TIME November 4,2003; 7:00 p.m.
LOCATION Brownville Concert Hall, Brownville, Nebraska
[ NAME (PLEASE PRINT) ORGANIZATION Q 7C 1 n _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ l l _
)e nI V 41 /eq'l /J/ ///p a~i-Im4~2 AU)Aa? /6/f etYCY/4 C'e OlF 0AfTV LlsA 60 (J2S A) PP LO Page I of *4
NRC PUBLIC MEETING ATTENDANCE LICENSEE/FACILITY Nebraska Public Power District Cooper Nuclear Station DATE/TIME November 4,2003; 7:00 p.m.
LOCATION Brownville Concert Hall, Brownville, Nebraska NAME (PLEASE PRINT) I ORGANIZATION 1R, >APe 0
- 2) '
21Oorat J<rl f-lfySlyly I /PXQ' kVAl 6 1,4'n&,s- /,9 Page 2 of 4
NRC PUBLIC MEETING ATTENDANCE LICENSEE/FACILITY Nebraska Public Power District
__ Cooper Nuclear Station DATE/TIME November 4, 2003; 7:00 p.m.
LOCATION Brownville Concert Hall, Brownville, Nebraska NAME (PLEASE PRINT) I ORGANIZATION
__________ . VA/t2 T171 Vllklf~e4ja 1-o~ ng~36 ~ 11 JAjo ~LA A iW {)RWo 84e q 1f?7b pa i CI 6L'A N> FB) e st1- Nu Q)\U R-ScA- / h t p/*
C~~)kcL w Pagefit Page 3 of 4
NRC PUBLIC MEETING ATTENDANCE LICENSEE/FACILITY Nebraska Public Power District Cooper Nuclear Station DATE/TIME November 4, 2003; 7:00 p.m.
LOCATION Brownville Concert Hall, Brownville, Nebraska NAME (PLEASE PRINT) ORGANIZATION b iFf(\ t bl~ {kl- )4i~r lth 4 k~~j iy/fL'Se/tVzI
_ _ _ _ _ _ _ w _ _ _ _ Po JIZC - jZA WL )i 1-j clean F3 ehrrovr dpJb)
Page 4 Of 4
ENCLOSURE 2 NRC PRESENTATION SLIDES
U.S. Nuclear Regulatory Commission
- Hi _ NRC Personnel Art Howell Director, Division of Reactor Projects
=2 Region IV Kriss Kennedy Chief, Branch C, Division of Reactor Projects I'm Anthony Gody Chief, Operations Branch, Division of Reactor Safety Greg Werner Senior Operations Engineer, Operations Branch, Division of Cooper Nuclear Station Reactor Safety Wayne Walker Senior Project Engineer, Branch C, Division of Reactor Exit Meeting Projects Scott Schwind Senior Resident Inspector, Cooper Nuclear Station Victor Dricks Public Affairs Officer, Region IV sW. I d 37 Srd*.2 d 37 Nebraska Public Power District Meeting Guidelines
- 41. . .a Cooper Nuclear Station Purpose of Meeting - Inform Public of Inspection Findings Introduction Meeting with Licensee sWd.3.I37 M~. 4d 37
a~ Meeting Guidelines 4 Meeting Agenda Inspection Summary Registration Table Confirmatory Action Letter Inspection Questions and Answers Identification and Resolution of Problems Inspection Handouts Nebraska Public Power District Response Feedback Forms Questions and Answers Sfld.5d 37 S6Jd.6d37 x a, Inspection Summary Inspection Summary (Cont)
- The confirmatory action letter inspection allows
- Progress is being made in each CAL area, but the NRC to assess the effectiveness of the Cooper either additional efforts or time Is needed Strategic Improvement Plan to address degraded especially in the area of human performance and performance. equipment reliability.
u The identification and resolution inspection allows
- Issues adequately identified, but problems persist the NRC to evaluate the effectiveness of the with the evaluation of issues and effectiveness of Cooper corrective action program to detect and corrective actions.
correct problems in a manner that limits risk to members of the public.
- 6 Potential Violations of low safety significance Sfid. 7 d37 M.*8 d Sid. 7 6137 Sfld.9 6137 37
' Confirmatory Action Letter iConfirmatory Action Letter nspection Scope
- NRC and Cooper Performance Indicators
- Material Condition and Equipment Reliability
- Plant Modifications and Configuration Control
- Issues Identified in the 2nd Quarterly CAL
- Corrective Action Program, Utilization of Industry Inspection, June 2003 Operating Experience, and Self-Assessments
- Cooper Audits and Self Assessments
- Implementation of Engineering Programs Sd. Sd 37 SMd.10 .M37 Confirmatory Action Letter 'l Quality of Improvement Plan Inspection Results Closure Packa!ge
- Team reviewed 52 improvement plan actions.
- Closure packages were complete with two
- 50 of 52 actions reviewed were completed as exceptions noted.
described in the Strategic Improvement Plan.
- Some minor discrepancies noted
- A number of the important actions in the Action Plans covered by the CAL have been implemented.
- Overall, 157 of 263 Strategic Improvement Plan actions reviewed.
SlMd.1 I c37 Sfid. 12 d 37
Oa Emergency Preparedness Evaluation of Human Performance 1114aw-, -I,-
- Improvement Plan Actions addressed in CAL completed and previously inspected (June
- Five CAL related improvement plan actions 2003) reviewed and completed.
- Efforts to improve performance have been less than fully effective. However, some
- Baseline inspections Improvements noted.
- Baseline Inspections Sid. 13d 37 Slid.14 d 37 Evaluation of Human Performance (cont) 4valuation E~
of Human Performance (cont) 4 of 6 performance indicators reviewed by the team did not meet goals or were unsatisfactory.
- Human Performance Event
- Human Performance Error Rate
- Qualification Matrix Adherence
- Additional actions are needed to
- Overtime (%hours) Year to Date improve and maintain performance.
- 2 of 6 performance indicators meeting goals
- Improvements are in the process of
- Configuration Control Events being implemented.
- OSHA Recordable Injury Rate SM. ISd 37 SlidM.
1S 37
~Maeril ondtin and Equipment ~aterial Condition and Equipment 4 Ribility
- 35 of 37 improvement plan actions were completed as scheduled.
- Actions completed to date have provided the necessary processes or actions for Improvement.
- Actions Implemented have not resulted In satisfactory performance. - Numerous equipment improvements have recently been completed.
- Several examples of challenges to plant and equipment reliability - Additional time is needed to bring about improvement.
Sld. 170139 SM9d. 19 137 Plant Modifications and Configuration Corrective Action Program, Utilization Control oy lndustry Operating Experience and Self-Assessment
- 3 actions were completed as scheduled.
- 7 actions completed as scheduled.
- Issues adequately identified, but problems persist with the evaluation of Issues and effectiveness of corrective actions.
- Engineering Inspection May 2003 did not
- Self Assessments were thorough and self-critical.
identify any significant issues.
- Industry operating experience
- Additional time is needed to bring about improvement.
- Performance indicators Sd.190d37 Slid. 20d 37
I Confirmatory Action Letter 14 1 Engineering Programs 4 Inspection Conclusions
- One action completed as scheduled.
Most improvement plan actions were completed
- Performance Indicators not meeting goals. on schedule.
- Baseline inspections Progress Is being made in each CAL area.
- Additional time is needed to bring about - Additional actions appear to be necessary In improvement. the human performance area.
- More time is necessary to demonstrate improved equipment reliability.
Slid.21 d 37 Soid.22 237 Identification and Resolution of 4 E Identification and Resolution of Problems_nspecton (Cont)
Evaluated Areas Introduction - Anthony Gody 1) Effectiveness of problem Identification
- 2) Effectiveness of prioritization and evaluation of issues
- 3) Effectiveness of corrective actions
- 4) Assessment of safety-conscious work Sid. 230137 environment Sid. 24d 37
f I
Effectiveness of Problem Effectiveness of Prioritization and
,valuation of Issues - Assessment ii4 Identification -Assessment
- Problems were adequately identified and entered
- Problems with prioritization and evaluation of into the corrective action program -some Issues.
exceptions noted.
- Operator work arounds
- Two -evaluations failed to Identify the apparent
- Aging Agastat relays -Potential Criterion XVI cause of the events.
Violation
- RCR 2003-0979
- Previous inspections also determined problems were adequately Identified. - RCR 2003-0428
- Plant personnel had low thresholds for entering problems into the corrective action program.
SMil.2Sd 37 Slid. 26 d 37 Effectiveness of Prioritization and Effectiveness of Prioritization and Evaluation of Issues - Assessment Evaluation of Issues - Assessment (Cont)
- Two examples of not performing operability
- The quality of root cause determinations were determinations when required - Potential T.S. 5.4.1 good.
Violation
- Significant improvement in the ownership and
- 17 examples of failure to follow preventive knowledge of the condition review group and maintenance procedures - Potential T.S. 5.4.1 the corrective action review board.
Violation Sid. 27 d 37 SMd.M8d 37
Effectiveness of Corrective Effectiveness of Corrective Actions -Assessment w~ctons Asessment_(Cqnt)
- Fire protection modifications not actively pursued
- Service air compressor preventive maintenance not performed
- Aging Agastat relay replaced with a relay of the same age -Potential Criterion XVI violation Sd. 29 .137 Slid. 30 d 37 Safety-Conscious Work Identification and Resolution of I Environment - Assessment Problems Conclusions S1. .- _.
- Employees were willing to identify safety
- All potential violations have either been issues through either the corrective action corrected or placed into the corrective action program or the employee concerns program. program.
- All potential violations are of low safety significance.
- Issues adequately identified, but problems persist with the evaluation of issues and effectiveness of corrective actions.
Slod.31d137 Slid.*32 d 37
Public Power District i0 Other Finding
- Potential Appendix B, Criterion III, design control violation for an unauthorized modification to the Zurn strainer controllers.
Response
Slid. 33dl 37 Slid.34 d D U.S. Nuclear Regulatory Commission Region IV Coi Com -.me .tns.
Closing Comments Slid. 35d 37
U.S. Nuclear Regulatory Commission Region IV Conclusion of the Cooper Nuclear Station Exit Meeting Skib 37d 37
ENCLOSURE 3 NPPD PRESENTATION SLIDES
Agenda PI & R / 3rd Quarter TIP Inspection NRC Public Meeting
- Opening Remarks Stu Minahan
- Inspection Results & Stu Minahan Cooper Nuclear Station Overall Performance November 4, 2003
- Human Performance Stu Minahan
- Corrective Action John Christensen Program
- Equipment Reliability & Gary Kline Program Improvements
. Closing Remarks Stu Minahan Inspection Results Inspection Results &
Overall Performance
- CNS generally agrees with the results
- CNS concurs with the potential NCVs Stu Minahan
- CNS recognizes importance of cross-Acting Site Vice President cutting focus areas
- Actions have been taken, or in progress, to address these issues I'I 3
I
Overall Performance Pillar PI Trend
- Recent forced outage 60%
- Planned power reductions to correct 50%.- -006 equipment issues CO.g.40..00"
- Working toward changing attitudes concerning plant and personnel 20% . -
performance 0%-
5 ERO Performance i _ C
~
S j000 ~
0 f ~ ~ ~
ff 0 0 00 ,fff0000
.5? .5 2
Human Performance
- Accelerating improvement efforts
- Implementing changes and tools
- Realizing changing trends in the positive direction
- 0 Human Performance Event Free Days 100 80.
70 -
60 50 30 20 10
OSHA Recordable Injury Rate Operator Distractions 1.4 ~ ~ 250 200 1 1.0 A
106 150 I100 0.4 02 00 -.-.
50 04O ow >+s~~//e4 Control Room Deficiencies On-line Maintenance Backlog 300 540 40 [50 .2 c1 25 10 II log 5
so 50 0-1016 i ". ' 5 '
4
Engineering Inventory Human Performance Going Forward 3750 3125 Q1
- Increased focus on management observations and coaching 2500
- Increase in dedicated resources I t87s L
- Implementation of integrated Human 1250 Performance Trainer
- Multi-faceted - Safety, chemistry, radiation 0 - I - - __ -
protection, human performance traps, 11.1 Ile .111.1 1P1 .111.11 "P/ 1.1O11.1 41 .1 .1 11 procedure usage, ..
- Long term evolution of Trainer
- Will continue to be one of the critical Corrective Action Program management focus areas
- Maturing Human Performance Trainer John Christensen
- Focus on upcoming refuel outage Plant Manager
__ I
~ "' 1 la~="70 19 5
CAP Open Items CAP Backlog 2800 2600 350 2400- - - -- - - 300- ,
2200
{C 2000 S.50 . /
i1800 ' .200
1 /
1400 ..
1&DO 50 a _ -_ . _ .- . .. _ _ . _ _
.' _'0 '0 0 0 0 ~ '0 0 0 CAP Performance Index Equipment Reliability &
35s Program Improvements 3sA 25 Gary Kline 2D General Manager, 1.5 Engineering 001 6
Building the Foundation
- Equipment Reliability Process
- System Engineering Roles and Responsibilities
- Trending / Monitoring Focus
~2 6 Equipment Reliability Process Building the Foundation ao.,
'I I - Management Alignment
- Interfacing with System Engineers
- Key Focus Areas 27 7
Building the Foundation Building the Foundation (cont)
- System Engineering Roles and
- Trending / Monitoring Focus Responsibilities - Proactive Engineering
- Realignment of Priorities - Improvements
- INPO Assist Visit 29 30 New SW System Equipment Related CM Orders El 3:
8
- -I-------- I------
Unplanned RB HVAC System LCO's AV1 13 1
Building the Foundation ( .., Successes
- Upgrade to improve Engineering
- Mitigation of Missouri River Level Performance Changes
- Emphasis on Plant reliability
- Scram Solenoid Pilot Valves
- Diesel Generator Connecting Rod 351 9
System Health Successes (cont.)
10
- Mitigation of Missouri River Level Changes
- Scram Solenoid Pilot Valves
- Diesel Generator Connecting Rod S ~m :" ;~- ;
J7 38 Challenges Program Improvements
- Material Condition Balance of Plant
- EQ Program Closure Assessment
- Workload Management 39 1-10
Program Health Closing Remarks woCo Stu Minahan Acting Site Vice President 7S5' 11