Category:Letter
MONTHYEARIR 05000298/20240032024-11-0505 November 2024 Integrated Inspection Report 05000298/2024003 ML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments 05000298/LER-2023-002-01, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 05000298/LER-2024-001, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications 05000298/LER-2024-002, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements 05000298/LER-2023-002, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2023-12-20020 December 2023 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A1122023-11-0909 November 2023 Project Manager Assignment IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 05000298/LER-2022-002-01, Manual Core Spray Injection to Restore Skimmer Surge Tank Level2023-06-29029 June 2023 Manual Core Spray Injection to Restore Skimmer Surge Tank Level ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 05000298/LER-2022-004-01, 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open2023-05-11011 May 2023 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open 05000298/LER-2023-001, Valve Test Failures Result in Condition Prohibited by Technical Specifications2023-05-0808 May 2023 Valve Test Failures Result in Condition Prohibited by Technical Specifications IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report 2024-09-03
[Table view] Category:Meeting Summary
MONTHYEARML24204A0912024-07-30030 July 2024 Summary of May 9, 2024, Preapplication Teleconference with Nebraska Public Power District to Discuss Proposed Changes to the Cooper Nuclear Station Emergency Plan ML24122C6862024-05-0202 May 2024 Summary of the April 24, 2024 Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Cooper Nuclear Station ML24016A0772024-02-0202 February 2024 December 13, 2023, Summary of Pre-application Teleconference with Nebraska Public Power District to Discuss License Amendment to Adjust High Pressure Coolant Injection Flow Setpoints for Cooper Nuclear Station ML23165A0352023-06-26026 June 2023 Summary of June 1, 2023, Pre-Application Teleconference with Nebraska Public Power District to Discuss Planned License Amendment Request to Add Temporary Note to TS LCO 3.8.3 for Diesel Fuel Oil Tank Cleaning and Inspection ML23164A1152023-06-23023 June 2023 Summary of Pre-Application Teleconference with Nebraska Public Power District to Discuss Relief Request for Drywell Inspections Performed During Refueling Outage 32 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19350C3122019-12-19019 December 2019 Summary of December 3, 2019, Public Meeting with Nebraska Public Power District, on Proposed Changes to the Emergency Plan to Revise the Emergency Action Level Scheme at Cooper Nuclear Station ML19204A2452019-07-25025 July 2019 Summary of Presubmittal Teleconference with Nebraska Public Power District Regarding Proposed Exemption from Appendix J of 10 CFR Part 50 for Cooper Nuclear Station ML17324A2802017-11-16016 November 2017 Summary of Regulatory Conference to Discuss Safety Significance of Cooper Nuclear Station Emergency Station Service Transformer Bus Duct Deficiency ML16334A4732016-12-0606 December 2016 Summary of Closed Meeting to Discuss Dam Failure Analysis Developed for the Integrated Assessment for Cooper Nuclear Station ML14156A2832014-06-16016 June 2014 Summary of 5/22/2014 Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14147A3592014-06-0909 June 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML14139A3582014-06-0505 June 2014 5/9/2014 Summary of Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14139A3442014-05-29029 May 2014 Summary of Closed Meeting Between Representatives of the Nuclear Regulatory Commission, Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Analysis ML14031A1622014-02-10010 February 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML14034A0502014-02-0606 February 2014 Summary of Audit Conducted 1/28-29/2014, License Amendment Request to Adopt National Fire Protection Agency (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13178A1592013-06-26026 June 2013 Summary of Meeting for Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML1132200762011-12-0505 December 2011 Summary of Meeting with Nebraska Public Power District to Discuss Amendment Request to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4 for Cooper Nuclear Station ML1131903962011-11-0303 November 2011 Summary of Meeting with Nebraska Public Power District to Discuss Safety Performance at Cooper Nuclear Station ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML1121700812011-08-18018 August 2011 7/12/11 - Summary of Teleconference with Nebraska Public Power District to Discuss Cooper'S Request to Revise TS 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs) at Cooper Nuclear Station ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1112606772011-05-0606 May 2011 Summary of Meeting with Nebraska Public District, Cooper Discussed the Significance, Cause and Corrective Action Associated with an Apparent Violation with Low-to-Moderate Safety Significance ML1029204632010-10-29029 October 2010 Summary of Pre-Licensing Meeting with Nebraska Public Power District to Discuss Future License Amendment Request for Cooper Nuclear Station TSTF-493, Revision 4, Clarify Application of Setpoint Methodology for LSSS Functions ML1015303172010-07-13013 July 2010 Summary of Telephone Conference Call Held on May 26, 2010 Between the U.S. NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Responses to Requests for Additional Information, for Cooper Nuclear Station Lic ML1015204892010-06-16016 June 2010 Summary of Telephone Conference Call Held on May 18, 2010, Between the U.S. NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Responses to Requests for Additional Information for Cooper Nuclear Station Lic ML1016001102010-06-0909 June 2010 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1010406562010-05-11011 May 2010 04/07/10 Summary of Public Meeting to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of Cooper Nuclear Station License Renewal Application ML1011904802010-04-29029 April 2010 Summary of Meeting with Nebraska Public Power District to Discuss Issues Associated with the Independent Spent Fuel Storage Installation (ISFSI) ML1007106452010-04-20020 April 2010 Summary of Telephone Conference Call Held Between NRC & NPPD, Related to a Clarification for Certain Responses to RAI for Cooper Nuclear Station Lr ML1002901692010-02-26026 February 2010 Summary of Telephone Conference Call Held on January 14, 2010, Between the U.S. NRC and Nebraska Public Power District, Related to a Clarification for Certain Responses to Requests for Additional Information for Cooper Nuclear Station Licen ML1001900422010-02-0303 February 2010 Summary of Telephone Conference Call Held on 1/8/2010, Between the U.S. NRC and Nebraska Public Power District Related to a Clarification for Certain Responses to Requests for Additional Information for Cooper Nuclear Station ML1000900472010-01-21021 January 2010 November 9, 2009, Summary of Telephone Conference Call Held on Between NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Responses to Requests for Additional Information for Cooper License Renewal ML0929200262009-10-28028 October 2009 Summary of Telephone Conference Call Held on 09/14/09, Between the U.S. NRC Staff and NPPD, Related to a Request for Additional Information (RAI) and Clarification for Certain Responses to Rais, for Cooper Nuclear Station License Renewal ML0923007182009-10-15015 October 2009 Summary of Teleconference Call Held Between the NRC and Nebraska Public Power District Related to Clarifications on Request for Additional Information for Cooper ML0926805692009-10-0808 October 2009 09/02/09 Summary of Telephone Conference Call Between NRC Staff and NPPD, Related to a Clarification for Certain Responses to Requests for Additional Information, for Cooper Nuclear Station License Renewal ML0923804342009-09-17017 September 2009 07/07/2009 Meeting Summary, Telephone Conference Call Between the U.S. NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Requests for Additional Information, for Cooper Nuclear Station License Renewal ML0923101202009-09-17017 September 2009 Summary of Tele Conf Call with Nebraska Public Power Districts to Discuss Clarifications for the Severe Accident Mitigation Alternative Documented in the NRC Request for Additional Information Letter Dated May 1, 2009 ML0920103992009-08-25025 August 2009 Summary of Telephone Conference Call Held on June 16, 2009, Between the NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Requests for Additional Information, for Cooper Nuclear Station License Renewal ML0920303052009-07-29029 July 2009 Summary of Telephone Conference Call Held on 7/9/2009, Between the U.S. NRC Staff and Nebraska Public Power District, Related to a Clarification for Certain Requests for Additional Information, for Cooper Nuclear Station License Renewal ML0917503682009-07-0101 July 2009 Summary of Regulatory Audit Related to the Review of the License Renewal Application for Cooper Nuclear Station ML0915604962009-06-10010 June 2009 Summary of Telephone Conference Call Held on May 20, 2009, Between the USNRC Staff and NPPD, Related to a Clarification on Certain RAI (RAI B.1.15-3 and RAI B.1.15-4), for CNS Renewal ML0909704142009-04-30030 April 2009 Summary of Site Audit Related to the Review of the License Review Application for Cooper Nuclear Station, Unit 1 ML0909103082009-04-14014 April 2009 Summary of Public Environmental Scoping Meeting Related to the Review of the Cooper Nuclear Station, Licensed Renewal Application ML0909700972009-04-0707 April 2009 Summary of Annual Performance Assessment Meeting with Nebraska Public Power District to Discuss Safety Performance at Cooper Nuclear Station Between January 1 & December 31, 2008 ML0831101972008-11-0505 November 2008 Summary of Meeting with Nebraska Public Power District to Discuss Inspection Procedure 95002 Supplemental Inspection Preparations and Diesel Generator Performance Improvement Plan ML0810900022008-04-22022 April 2008 Summary of Telephone Conference Verbal Authorization for Cooper Relief Request RI-35 ML0720002802007-07-18018 July 2007 Meeting Summary for Regulatory and Predecisional Enforcement Conference; Cooper Nuclear Station 2024-07-30
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24124A0072024-05-0303 May 2024 Presubmittal Meeting EP Plan Change Meeting Slides ML24122C6862024-05-0202 May 2024 Summary of the April 24, 2024 Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Cooper Nuclear Station ML23150A1372023-06-0101 June 2023 Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection, June 1, 2023 ML23150A1382023-06-0101 June 2023 Pre Submittal Meeting: Containment Inservice Inspection (Cisi) Relief Request, June 1, 2023 ML21125A0372021-05-0606 May 2021 May 6, 2021 Public Meeting (Observation) Slides for RAP Back Program Presentation to Industry(003) ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML19196A3452019-07-18018 July 2019 July 18, 2019 Public Teleconference Slides Appendix J Exemption Request Presubmittal Teleconference ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML13178A1592013-06-26026 June 2013 Summary of Meeting for Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML1129715762011-10-24024 October 2011 Licensee Slides from 10/24/11 Meeting with Nebraska Public Power District to Discuss Cooper Nuclear Station ML1121401792011-07-11011 July 2011 Licensee Slides from Conference Call with Nebraska Public Power District ML1113805552011-05-16016 May 2011 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1112606772011-05-0606 May 2011 Summary of Meeting with Nebraska Public District, Cooper Discussed the Significance, Cause and Corrective Action Associated with an Apparent Violation with Low-to-Moderate Safety Significance ML1029202962010-10-19019 October 2010 Meeting Handouts for October 19, 2010 with Nebraska Public Power District Regarding Cooper Nuclear Station ML1016001102010-06-0909 June 2010 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1011904802010-04-29029 April 2010 Summary of Meeting with Nebraska Public Power District to Discuss Issues Associated with the Independent Spent Fuel Storage Installation (ISFSI) ML1011103782010-04-20020 April 2010 Public Meeting Summary from 4/7/2010 ML1010503762010-04-0707 April 2010 Preliminary Site-Specific Results of the License Renewal Environmental Review for Cooper Nuclear Station ML0909700972009-04-0707 April 2009 Summary of Annual Performance Assessment Meeting with Nebraska Public Power District to Discuss Safety Performance at Cooper Nuclear Station Between January 1 & December 31, 2008 ML0907506862009-02-25025 February 2009 Scoping and Process Public Meeting Sides of February 25, 2009 ML0831101972008-11-0505 November 2008 Summary of Meeting with Nebraska Public Power District to Discuss Inspection Procedure 95002 Supplemental Inspection Preparations and Diesel Generator Performance Improvement Plan ML0823503312008-08-22022 August 2008 Summary of Public Meeting with Nebraska Public Power District Presentation of Preparations for Inspection and Plans to Improve Performance of Emergency Diesel Generators at Cooper Nuclear Station ML0815501022008-05-28028 May 2008 Meeting Summary for Regulatory Conference with Nebraska Public Power District to Discuss the Significance of an Inspection Finding Associated with Two Procedures That Were Not Adequate ML0720002802007-07-18018 July 2007 Meeting Summary for Regulatory and Predecisional Enforcement Conference; Cooper Nuclear Station ML0623601232006-08-22022 August 2006 Danger Will Robinson: If You Change Cell Locations You May Break the VB Code! ML0615700432006-06-0202 June 2006 Summary of 05/30/2006 Annual Performance Assessment Meeting with Nebraska Public Power District Cooper Nuclear Station ML0612904602006-05-0505 May 2006 May 5, 2006 Meeting Slides ML0617905182006-03-0909 March 2006 RIC 2006 Presentation - Th5E - Jerry Roberts - ROP Inspection Program Update ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0532206852005-11-17017 November 2005 Nrc/Entergy Operations, Inc. Management Meeting 11/10/05 ML0531904622005-11-15015 November 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0524300942005-10-0303 October 2005 Slides from August 29, 2005 Meeting with NPPD ML0511000652005-04-19019 April 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station end-of-cycle ML0506802362005-03-0909 March 2005 Summary of Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station'S Simulator Fidelity Issues ML0503405322005-02-0303 February 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0413802292004-05-17017 May 2004 Summary of Confirmatory Action Letter 5th Quarterly Inspection Exit Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0409701292004-03-12012 March 2004 Summary of Meeting with Cooper Nuclear Station to Discuss Progress in Implementing Strategic Improvement Plan ML0409804682004-03-11011 March 2004 RIC 2004 Presentation - T4 - Jerry Roberts - Operating Experience ML0402800142004-01-27027 January 2004 Summary of CAL 4th Quarterly Inspection Exit Meeting with Nebraska Public Power District Cooper Nuclear Station ML0331402912003-11-0707 November 2003 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0323407332003-08-21021 August 2003 Cooper Nuclear Station, Presentation Slides Re. Main Steam Isolation Valve Leakage Pathway, License Condition 2.C.(6) ML0319101132003-07-0909 July 2003 Summary of Confirmatory Action Letter Quarterly Inspection Exit Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0311207402003-04-22022 April 2003 Meeting Summary for End-of-Cycle Performance Assessment for Cooper Nuclear Station ML0309201462003-04-0101 April 2003 Summary of Confirmatory Action Letter Quarterly Inspection Exit Meeting with Cooper Nuclear Station ML0302905232002-12-13013 December 2002 Briefing Slides for Presentation Status of the CNS BWRVIP Program from 12/13/2002 Meeting with Nebraska Public Power District ML0224904012002-09-0303 September 2002 Cooper Supplemental Inspections, Presentation to Nebraska Public Power District Board of Directors 2024-05-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 AUG 2 6 2002 David L. Wilson, Vice President of Nuclear Energy Nebraska Public Power District P.O. Box 98 Brownville, Nebraska 68321
SUBJECT:
SUMMARY
OF MEETING WITH COOPER NUCLEAR STATION
Dear Mr. Wilson:
Peru, Nebraska, on August 22, This refers to the meeting conducted at Peru State College, results of the Nuclear Regulatory 2002. The purpose of this meeting was to present the Nuclear Station to Nebraska Commission's supplemental inspection conducted at Cooper and Nebraska Public Power District's Public Power District. The attendance list and the NRC's presentation slides are enclosed.
of Practice," a copy of this letter In accordance with 10 CFR 2.790 of the NRC's "Rules inspection in the NRC Public and its enclosures will be available electronically for public (PARS) component of NRC's Document Room or from the Publicly Available Records the NRC Web site at document system (ADAMS). ADAMS is accessible from Electronic Reading Room).
http://www.nrc.qov/reading-rm/adams.html (the Public Sincerely, Kriss M. Kennedy Team Leader Division of Reactor Projects Docket: 50-298 License: DPR-46
Enclosures:
- 1. Attendance List
- 2. NRC Presentation Slides
- 3. NPPD Presentation Slides
Nebraska Public Power District Michael T. Coyle Site Vice President Nebraska Public Power District P.O. Box 98 Brownville, Nebraska 68321 John R. McPhail, General Counsel Nebraska Public Power District P.O. Box 499 Columbus, Nebraska 68602-0499 D. F. Kunsemiller, Risk and Regulatory Affairs Manager Nebraska Public Power District P.O. Box 98 Brownville, Nebraska 68321 Michael J. Linder, Director Nebraska Department of Environmental Quality P.O. Box 98922 Lincoln, Nebraska 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, Nebraska 68305 Sue Semerena, Section Administrator Nebraska Health and Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 Ronald A. Kucera, Deputy Director for Public Policy Department of Natural Resources 205 Jefferson Street Jefferson City, Missouri 65101 Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, Missouri 65101
Nebraska Public Power District Vick L. Cooper, Chief Radiation Control Program, RCP Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, Kansas 66612-1366 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street, Suite D Des Moines, Iowa 50309 William R. Mayben, President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, Nebraska 68601
ENCLOSURE 1 MEETING ATTENDANCE LIST
MEETING ATTENDANCE LICENSEEIFACILITY Nebraska Public Power District Cooper Nuclear Station DATE/TIME August 22, 2002; 7:00 p.m.
LOCATION Peru State College Theater 600 Hoyt Street Peru, Nebraska 68421 NAME (PLEASE PRINT) ORGANIZATION
&o/ Page /4 _.
______< kI_____ C% JS Page of
MEETING ATTENDANCE LICENSEEIFACILITY Nebraska Public Power District
, __Cooper Nuclear Station DATE/TIME August 22, 2002; 7:00 p.m.
LOCATION Peru State College Theater 600 Hoyt Street
___Peru, Nebraska 68421 NAME (PLEASE PRINT) I ORGANIZATION
\jcH462-./9 esS qL/
.PJoC, ,,4F .... iEAVP A
,,- C , C 5-v-Co*,z^ .).A* (Z.C-.u*t>.
so .....-- d a, C-Page.2 of_2
MEETING ATTENDANCE LICENSEE/FACILITY Nebraska Public Power District Cooper Nuclear Station DATE/TIME August 22, 2002; 7:00 p.m.
LOCATION Peru State College Theater 600 Hoyt Street Peru, Nebraska 68421 NAME (PLEASE PRINT) ORGANIZATION
$4t'm-, 1nt-kSrs C/VN ABUL 09*AOT
___ _F, _ C NSs4 Ar R aof Dagh~ '~ ~ '4 Pg Page -3 of
MEETING ATTENDANCE LICENSEEIFACILITY Nebraska Public Power District Cooper Nuclear Station DATE/TIME August 22, 2002; 7:00 p.m.
LOCATION Peru State College Theater 600 Hoyt Street Peru, Nebraska 68421 NAME (PLEASE PRINT) I ORGANIZATION t
F,4rZIA /cP PP
)~ki'i Sf/f~)~/CI~/~(C..61Z C-OALTIQW)
L-n
)t, *I*4, 0:51x
.. PagŽ_
Page 4.of '_7
MEETING ATTENDANCE LICENSEEIFACILITY Nebraska Public Power District Cooper Nuclear Station DATE/TIME August 22, 2002; 7:00 p.m.
LOCATION Peru State College Theater 600 Hoyt Street Peru, Nebraska 68421 NAME (PLEASE PRINT) I ORGANIZATION 1
___ _--__ __ . AJU/ -s4 ,
RA . djpp/0 Page ,..-of
MEETING ATTENDANCE LICENSEEIFACILITY Nebraska Public Power District Cooper Nuclear Station DATE/TIME August 22, 2002; 7:00 p.m.
LOCATION Peru State College Theater 600 Hoyt Street Peru, Nebraska 68421 NAME (PLEASE PRINT) ORGANIZATION
~~~~~ CS)
/*Vc~~C Page< of'
MEETING ATTENDANCE LICENSEE/FACILITY Nebraska Public Power District Cooper Nuclear Station DATE/TIME August 22, 2002; 7:00 p.m.
LOCATION Peru State College Theater 600 Hoyt Street Peru, Nebraska 68421 NAME (PLEASE PRINT) I ORGANIZATION
~ ax (a~e~w~Co, L L Oj & e- A 0 __________ ____
0*,,---6 *, NPPD Vwtic& 1~r6 !4o*-4t'e, (kipPD
/ g o Page -7 of .1
MEETING ATTENDANCE LICENSEEIFACILITY Nebraska Public Power District Cooper Nuclear Station DATE/TIME August 22, 2002; 7:00 p.m.
LOCATION Peru State College Theater 600 Hoyt Street Peru, Nebraska 68421 NAME (PLEASE PRINT) F ORGANIZATION 7 "7 C Aag/CMo5 f 1j4 i.C ell)>}~__________________
Page& ofj
MEETING ATTENDANCE LICENSEEIFACILITY Nebraska Public Power District Cooper Nuclear Station DATE/TIME August 22, 2002; 7:00 p.m.
LOCATION Peru State College Theater 600 Hoyt Street Peru, Nebraska 68421 NAME (PLEASE PRINT) I ORGANIZATION j/& Ž2 Page ,of j
ENCLOSURE 2 NRC PRESENTATION SLIDES
SUPPLEMENTAL NRC Personnel INSPECTION EXIT MEETING Elmo Collins Director Division of Reactor Safety Kriss Kennedy Chief, Branch F Division of Reactor Projects Scott Schwind Senior Resident Inspector Cooper Nuclear Station Nuclear Regulatory Commission Steve Cochrum Resident Inspector Cooper Nuclear Station Region IV Meeting Guidelines NPPD Introduction Meeting with Licensee Inform Public of Inspection Results
.v., Meeting Agenda
- 10) NRC Meeting Guidelines
"*Cooper Performance
"* Registration Table
"*Purpose of Inspection
"* Questions and Answers
"*Conduct of Inspection
"*Handouts "*Results of Inspection
"* NPPD Response
"*Feedback Forms
"* Questions and Answers 1
Cooper Performance Action Matrix WRRCRN CflRad P'**
- - ce.., CNRRR CRR*RCRR*
CRNM. RCRC*
"*Declining performance 2000 - 2002 -
'm' C,,CWNRCm
,CCrRCC=.
CNRCY RCC'.R' N0RCCN.N. a
,,- -- N.eR.g.,..
.. --CNRN*YRCNN in-- inN.r NNRC
"*Repetitive Degraded Cornerstone Column P N
,N.NCW C.,NCRC L8CN CORRRgNNR A.C(RC NC(CDC WtCS*RR of Action Matrix - April 2002 N
CRC
.mRC-NN- *-
.m.NWm
"*Required Actions Cm.-NP.4.C-N CP.N.CNN.RCRNocrnsos.(p r.p.. s.m
- NPPD develop performance improvement plan with NRC oversight N C
RC*C-N CRN8CR CCNRCNRCN
- NRC conduct supplemental o C -.
inspection PN- *RC.Cr.C.CCN- CCCNNRCC -=
,R.N--NmNP-NRCN .. NaNoN NP Inspection Purpose Conduct of Inspection
"*Determine:
- Breadth and depth of safety, "* 13-member team from 3 NRC Regions and organizational, programmatic, and Headquarters performance issues
- Acceptability of continued operation
- Need for additional regulatory action to "*Over 200 years nuclear experience arrest declining performance
"*Assess adequacy of corrective action "*Three weeks onsite inspection program
"*Five weeks in Region IV office
"*Assess performance in Reactor Safety Strategic Performance Area Conduct of Inspection *, Conduct of Inspection
- Determined extent of condition of performance issues
- Assessed adequacy of improvement plan in addressing plant performance issues
- Reviewed major internal and external performance assessments conducted - Process at Cooper since 1993 - Problem characterization
- Adequacy of improvement plan
- Conducted independent inspection of - Implementation process current plant performance in operations, maintenance, engineering, emergency preparedness, corrective action program, and human performance 2
0 Results 0, Results
"*Cooper Nuclear Station is being operated safely "*Process for developing improvement plan was not systematic
"*Long-standing performance issues have eroded the margin of safety "*Majority of performance issues were appropriately characterized
- Effectiveness of corrective action program
- Equipment reliability
- Human performance
"*Steps in over half of the action plans provided insufficient detail to assess
- Work planning and implementation
- Plant engineering effectiveness in improving performance
- Training
- Management effectiveness Results Results
- Development and use of departmental
- Some long-standing performance performance indicators deficiencies were not addressed by the
- Development and alignment of organizational improvement plan priorities
- Lack of organizational depth in implementing
- Equipment reliability engineering programs
- Adequacy of operability determinations - Entry of self-assessment results into the
- Adequacy of plant modification packages corrective action program
- Management of replacement parts - Formal written station expectations for accountability and ownership
- Utilization of lessons learned from industry operating experience - Lack of coordination and integration among site organizations (id'd by CNS as action plan to be
- Ineffective use of equipment trend data to submitted with Revision 2) improve reliability Results Results
- Many action plans had ineffective or
- Initial implementation of some action undeveloped performance indicators and items were ineffective measures
- Efforts to improve quality of root cause evaluations
- Actions identified by CNS as not being - Management observation program completed prior to submission of Rev I - Efforts to improve quality of operability
- Resources required to implement improvement determinations plan were not identified
- Implementation of integrated site activity
- Schedule for completion of steps not scheduling tool meaningful
- Actions in the improvement plan were not prioritized 3
-011 Summary V NRC Oversight
"*Cooper Nuclear Station is being operated
- Continue to implement the baseline safely inspection program
"*Lack of rigor in process
- Evaluate adequacy of Revision 2 of the improvement plan
"*Representative sample of performance issues identified "*Conduct quarterly inspections of progress in implementing the improvement plan
"*Substantial weaknesses in corrective action plans
"*Conduct quarterly public meetings to discuss progress
"*Little work done to effectively implement the improvement plan NPPD RESPONSE CLOSING REMARKS QUESTIONS AND ANSWERS 4
ENCLOSURE 3 NPPD PRESENTATION SLIDES
Agenda Nebraska Public Power District *Introduction - Dave Wilson, Vice President & Chief Nuclear Officer Cooper Nuclear Station
+Keeping Cooper Safe - Jim Hutton, Plant Manager NRC Public Exit Meeting
+Strategic Improvement - Mike Coyle, 95003 Inspection Site Vice President August 22, 2002 *Closing Remarks - Bill Mayben & Dave Wilson Introduction (cont'd)
- We Have an Improvement Strategy -
The Strategic Improvement Plan (TIP)
- We Are Committed to Improving Our Performance
- Actions Underway Will Keep Cooper Safe Keeping Cooper Safe Strategic Improvement
- Conduct of Operations mStability
. Consistency
+Equipment Performance & Reliability
. Follow-through
+Emergency Preparedness +Strategic Actions
- Corrective Action Program
- A good foundation for improvement in TIP Revision 1
- TIP Revision 2 is under development
- Performance Monitoring Will Ensure Long-Term Effectiveness 1
Summary TIP Revision 2 - Improvements
+Issues Understood
+Ongoing Improvement Actions +Comprehensive Actions
"*Prioritization and Ranking of Actions *Resource Estimates, Plans, and
"*Resource Estimates, Plans & Schedules Schedules
"*Management Team Ownership +Performance Monitoring
"*Integration of Improvement Actions +Industry Experience and Standards 2