Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
Results
Other: ML083030246, ML083330066, ML083640401, ML090220584, ML090650061, ML090720066, ML090720068, ML090830248, ML090860762, ML090930256, ML091070269, ML091170031, ML091830055, ML091880258, ML101040676, ML101050376, ML101270268, ML102010302, ML102020397, NLS2009099, SAMA Meteorological Anomaly Related to the Cooper Nuclear Station License Renewal Application
|
MONTHYEARML0830302462008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Appendix E, Environmental Report Project stage: Other ML0833300662008-12-19019 December 2008 Determination of Acceptability and Sufficiency for Docketing and Opportunity for a Hearing Regarding the Application from Nebraska Public Power District, for Renewal of the Operating License for the Cooper Nuclear Station Project stage: Other ML0901203602009-01-0909 January 2009 Safety Evaluation Report Project stage: Request ML0836404012009-01-21021 January 2009 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Cooper Nuclear Station Unit 1 (TAC No. MD9763 and MD 9737) LTR Project stage: Other ML0906500612009-02-0202 February 2009 Letter from Nebraska State Historical Society Regarding Cooper Nuclear Station License Renewal Project stage: Other ML0907506862009-02-25025 February 2009 Scoping and Process Public Meeting Sides of February 25, 2009 Project stage: Request ML0908400622009-02-25025 February 2009 Transcript of Cooper Nuclear Station License Renewal Pubic Meeting - Evening Session, February 25, 2009, Pages 1-41 Project stage: Meeting ML0908400632009-02-25025 February 2009 Transcript of Cooper Nuclear Station License Renewal Public Meeting - Afternoon Session, Wednesday, February 25, 2009, Pages 1-33 Project stage: Meeting ML0907200662009-02-25025 February 2009 Comment (1) of James Gerweck, on Behalf of the Richardson County, Nebraska, Emergency Management Agency, Supporting CNS License Renewal Project stage: Other ML0907200682009-02-27027 February 2009 Comment (3) of Ashtin Paris, on Behalf of the City of Rock Port, Supporting Nebraska Public Power District'S Cooper Nuclear Station License Renewal Project stage: Other ML0908607622009-03-0909 March 2009 Letter from the Nebraska Department of Natural Resources the Cooper Nuclear Station License Renewal Project stage: Other ML0907200672009-03-10010 March 2009 Comment (2) of Alan Richard, on Behalf of Pawnee City Development Corporation, Supporting Renewal of License for Cooper Nuclear Station Project stage: Request ML0908302482009-04-0303 April 2009 Environmental Site Audit Regarding Cooper Nuclear Station Unit 1 License Renewal Application (TAC MD9763 and MD9737) Project stage: Other ML0902205842009-04-0303 April 2009 Proposed Review Schedule Regarding the Application from Nebraska Public Power District for Renewal of the Operating License for the Cooper Nuclear Station Project stage: Other ML0909302562009-04-0909 April 2009 Audit Plan for Aging Management Program Site Audit Regarding Cooper Nuclear Station Unit 1, License Renewal Application (Tac No. MD9737) Project stage: Other ML0909103082009-04-14014 April 2009 Summary of Public Environmental Scoping Meeting Related to the Review of the Cooper Nuclear Station, Licensed Renewal Application Project stage: Meeting ML0910702692009-04-16016 April 2009 EPA Comment on the Cooper Nuclear Station License Renewal Application Project stage: Other ML0911700312009-04-28028 April 2009 Environmental Site Audit Regarding Cooper Nuclear Station Unit 1 License Renewal Application Project stage: Other ML0909704142009-04-30030 April 2009 Summary of Site Audit Related to the Review of the License Review Application for Cooper Nuclear Station, Unit 1 Project stage: Approval ML0911905972009-05-0101 May 2009 Request for Additional Information for the Review of the Cooper Nuclear Station License Renewal Application (TAC No. MD9763 and MD9737) Project stage: RAI NLS2009039, Response to Request for Additional Information for License Renewal Application - Balance-of-Plant Scoping and Screening2009-05-28028 May 2009 Response to Request for Additional Information for License Renewal Application - Balance-of-Plant Scoping and Screening Project stage: Response to RAI ML0912000172009-05-29029 May 2009 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Application by the Nebraska Public Power District, for Renewal of the Operating License for Cooper Nuclear Station Unit 1 Project stage: Approval ML0917500882009-06-0101 June 2009 CNS Lr - NDEQ 2009 Ambient Network Plan Project stage: Request ML0918300552009-06-0808 June 2009 Reply from Fish and Wildlife Service on Transmission Line for Cooper Nuclear Station License Renewal Project stage: Other ML0915303162009-06-0808 June 2009 Request for Additional Information for the Review of the Cooper Nuclear Station License Renewal Application Project stage: RAI ML0917501182009-06-11011 June 2009 CNS Lr - Tornado Occurrences in Nemaha County, Ne 1950-2009 Project stage: Request ML0913803652009-06-15015 June 2009 Audit Report Regarding the Cooper Nuclear Station, Unit 1, License Renewal Application Project stage: Acceptance Review NLS2009040, Response to Request for Additional Information for License Renewal Application - Aging Management Programs2009-06-15015 June 2009 Response to Request for Additional Information for License Renewal Application - Aging Management Programs Project stage: Response to RAI NLS2009049, Response to Request for Additional Information for License Renewal Application - Section B and C2009-06-22022 June 2009 Response to Request for Additional Information for License Renewal Application - Section B and C Project stage: Response to RAI ML0916002892009-06-29029 June 2009 Request for Additional Information for Cooper Nuclear Station License Renewal Project stage: RAI ML0916002782009-06-29029 June 2009 Request for Additional Information for the Review of the Cooper Nuclear Station License Renewal Application Project stage: RAI NLS2009048, Response to Request for Additional Information for License Renewal Application Severe Accident Mitigation Alternatives2009-07-0101 July 2009 Response to Request for Additional Information for License Renewal Application Severe Accident Mitigation Alternatives Project stage: Response to RAI ML0917503682009-07-0101 July 2009 Summary of Regulatory Audit Related to the Review of the License Renewal Application for Cooper Nuclear Station Project stage: Approval ML0918802582009-07-0808 July 2009 Environment Project Manager Change for the License Renewal of Cooper Nuclear Station Project stage: Other ML0918804782009-07-14014 July 2009 Request for Additional Information Project stage: RAI ML0919005022009-07-14014 July 2009 Request for Additional Information for the Review of the Cooper Nuclear Station License Renewal Application Project stage: RAI ML0918804822009-07-14014 July 2009 Request for Additional Information for the Review of Cooper Nuclear Station License Renewal Application Project stage: RAI ML0918702982009-07-16016 July 2009 Request for Additional Information for the Review of the Cooper Nuclear Station License Renewal Application Project stage: RAI ML0918703042009-07-16016 July 2009 License Renewal Request for Additional Information Project stage: RAI ML0921600842009-07-20020 July 2009 Notice of Diane Curran'S Withdrawal of Appearance Project stage: Request ML0920902762009-07-29029 July 2009 Request for Additional Information for the Review of the Cooper Nuclear Station License Renewal Application (TACs MD9763 and MD9737) Project stage: RAI NLS2009055, Response to Request for Additional Information for License Renewal Application2009-07-29029 July 2009 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI NLS2009063, Response to Request for Additional Information for License Renewal Application2009-08-17017 August 2009 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI ML0919600402009-08-19019 August 2009 Summary of Regulatory Audit Related to the Review of the License Renewal Application for Cooper Nuclear Station Project stage: Approval ML0923106542009-08-28028 August 2009 Request for Additional Information for the Review of the Cooper Nuclear Station License Renewal Application Project stage: RAI ML0926500572009-09-28028 September 2009 Request for Additional Information for the Review of the Cooper Nuclear Station License Renewal Application Project stage: RAI ML0926809352009-10-0707 October 2009 Request for Additional Information for the Review of the Cooper Nuclear Station License Renewal Application Project stage: RAI ML0927300142009-10-15015 October 2009 Request for Additional Information for the Review of the Cooper Nuclear Station License Renewal Application Project stage: RAI NLS2009085, Response to Request for Additional Information on License Renewal Application2009-10-22022 October 2009 Response to Request for Additional Information on License Renewal Application Project stage: Response to RAI ML0929200192009-10-29029 October 2009 Request for Additional Information for the Review of the Cooper Nuclear Station License Renewal Application Project stage: RAI 2009-04-09
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML23317A2032023-12-13013 December 2023 Pre-Submittal Meeting: Tech Spec Amendment Request for HPCI Flow Switch Setpoint Change ML23150A1382023-06-0101 June 2023 Pre Submittal Meeting: Containment Inservice Inspection (Cisi) Relief Request, June 1, 2023 ML23150A1372023-06-0101 June 2023 Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection, June 1, 2023 ML21125A0372021-05-0606 May 2021 May 6, 2021 Public Meeting (Observation) Slides for RAP Back Program Presentation to Industry(003) ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14149A0902014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule June 2012 Through February 2015 Gantt Chart ML14149A0882014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule May 2014 Through February 2015 Gantt Chart ML14149A0852014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Hi-Level Overview Schedule for Flooding Hazard Reevaluation Report ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML13178A1592013-06-26026 June 2013 Summary of Meeting for Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML1129715762011-10-24024 October 2011 Licensee Slides from 10/24/11 Meeting with Nebraska Public Power District to Discuss Cooper Nuclear Station ML1121401792011-07-11011 July 2011 Licensee Slides from Conference Call with Nebraska Public Power District IR 05000298/20110092011-06-10010 June 2011 EA-11-204, Cooper Nuclear Station, Final Significance Determination of White Finding and Notice of Violation, NRC Inspection Report 05000298/2011009 ML1112606772011-05-0606 May 2011 Summary of Meeting with Nebraska Public District, Cooper Discussed the Significance, Cause and Corrective Action Associated with an Apparent Violation with Low-to-Moderate Safety Significance ML1029202962010-10-19019 October 2010 Meeting Handouts for October 19, 2010 with Nebraska Public Power District Regarding Cooper Nuclear Station ML1016001102010-06-0909 June 2010 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1011904802010-04-29029 April 2010 Summary of Meeting with Nebraska Public Power District to Discuss Issues Associated with the Independent Spent Fuel Storage Installation (ISFSI) ML1011103782010-04-20020 April 2010 Public Meeting Summary from 4/7/2010 ML1010503762010-04-0707 April 2010 Preliminary Site-Specific Results of the License Renewal Environmental Review for Cooper Nuclear Station ML0909700972009-04-0707 April 2009 Summary of Annual Performance Assessment Meeting with Nebraska Public Power District to Discuss Safety Performance at Cooper Nuclear Station Between January 1 & December 31, 2008 ML0907506862009-02-25025 February 2009 Scoping and Process Public Meeting Sides of February 25, 2009 ML0816201532008-06-10010 June 2008 End-of-Cycle Meeting Summary 6/2/08 ML0815501022008-05-28028 May 2008 Meeting Summary for Regulatory Conference with Nebraska Public Power District to Discuss the Significance of an Inspection Finding Associated with Two Procedures That Were Not Adequate ML0712005272007-04-30030 April 2007 Nrc/Entergy Operations, Inc. Management Meeting to Discuss the Performance of Arkansas Nuclear One, Cooper, Grand Gulf, River Bend and Waterford, Unit 3 ML0721104822006-10-31031 October 2006 Significance Determination Process Refresher Training ML0612904602006-05-0505 May 2006 May 5, 2006 Meeting Slides ML0524300942005-10-0303 October 2005 Slides from August 29, 2005 Meeting with NPPD ML0503405322005-02-0303 February 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0413802292004-05-17017 May 2004 Summary of Confirmatory Action Letter 5th Quarterly Inspection Exit Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0410503302004-04-14014 April 2004 Meeting Summary for End-of-Cycle Performance Assessment for Cooper Nuclear Station ML0402800142004-01-27027 January 2004 Summary of CAL 4th Quarterly Inspection Exit Meeting with Nebraska Public Power District Cooper Nuclear Station ML0331402912003-11-0707 November 2003 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0302905232002-12-13013 December 2002 Briefing Slides for Presentation Status of the CNS BWRVIP Program from 12/13/2002 Meeting with Nebraska Public Power District ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary ML0205703522002-02-26026 February 2002 02-07-02 Cooper/Nebraska Public Power District Meeting Summary ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2023-06-01
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23150A1372023-06-0101 June 2023 Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection, June 1, 2023 ML23150A1382023-06-0101 June 2023 Pre Submittal Meeting: Containment Inservice Inspection (Cisi) Relief Request, June 1, 2023 ML21125A0372021-05-0606 May 2021 May 6, 2021 Public Meeting (Observation) Slides for RAP Back Program Presentation to Industry(003) ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML19196A3452019-07-18018 July 2019 July 18, 2019 Public Teleconference Slides Appendix J Exemption Request Presubmittal Teleconference ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML13178A1592013-06-26026 June 2013 Summary of Meeting for Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML1129715762011-10-24024 October 2011 Licensee Slides from 10/24/11 Meeting with Nebraska Public Power District to Discuss Cooper Nuclear Station ML1121401792011-07-11011 July 2011 Licensee Slides from Conference Call with Nebraska Public Power District ML1113805552011-05-16016 May 2011 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1112606772011-05-0606 May 2011 Summary of Meeting with Nebraska Public District, Cooper Discussed the Significance, Cause and Corrective Action Associated with an Apparent Violation with Low-to-Moderate Safety Significance ML1029202962010-10-19019 October 2010 Meeting Handouts for October 19, 2010 with Nebraska Public Power District Regarding Cooper Nuclear Station ML1016001102010-06-0909 June 2010 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1011904802010-04-29029 April 2010 Summary of Meeting with Nebraska Public Power District to Discuss Issues Associated with the Independent Spent Fuel Storage Installation (ISFSI) ML1011103782010-04-20020 April 2010 Public Meeting Summary from 4/7/2010 ML1010503762010-04-0707 April 2010 Preliminary Site-Specific Results of the License Renewal Environmental Review for Cooper Nuclear Station ML0909700972009-04-0707 April 2009 Summary of Annual Performance Assessment Meeting with Nebraska Public Power District to Discuss Safety Performance at Cooper Nuclear Station Between January 1 & December 31, 2008 ML0907506862009-02-25025 February 2009 Scoping and Process Public Meeting Sides of February 25, 2009 ML0831101972008-11-0505 November 2008 Summary of Meeting with Nebraska Public Power District to Discuss Inspection Procedure 95002 Supplemental Inspection Preparations and Diesel Generator Performance Improvement Plan ML0823503312008-08-22022 August 2008 Summary of Public Meeting with Nebraska Public Power District Presentation of Preparations for Inspection and Plans to Improve Performance of Emergency Diesel Generators at Cooper Nuclear Station ML0815501022008-05-28028 May 2008 Meeting Summary for Regulatory Conference with Nebraska Public Power District to Discuss the Significance of an Inspection Finding Associated with Two Procedures That Were Not Adequate ML0720002802007-07-18018 July 2007 Meeting Summary for Regulatory and Predecisional Enforcement Conference; Cooper Nuclear Station ML0623601232006-08-22022 August 2006 Danger Will Robinson: If You Change Cell Locations You May Break the VB Code! ML0615700432006-06-0202 June 2006 Summary of 05/30/2006 Annual Performance Assessment Meeting with Nebraska Public Power District Cooper Nuclear Station ML0612904602006-05-0505 May 2006 May 5, 2006 Meeting Slides ML0617905182006-03-0909 March 2006 RIC 2006 Presentation - Th5E - Jerry Roberts - ROP Inspection Program Update ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0532206852005-11-17017 November 2005 Nrc/Entergy Operations, Inc. Management Meeting 11/10/05 ML0531904622005-11-15015 November 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0524300942005-10-0303 October 2005 Slides from August 29, 2005 Meeting with NPPD ML0511000652005-04-19019 April 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station end-of-cycle ML0506802362005-03-0909 March 2005 Summary of Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station'S Simulator Fidelity Issues ML0503405322005-02-0303 February 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0413802292004-05-17017 May 2004 Summary of Confirmatory Action Letter 5th Quarterly Inspection Exit Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0409701292004-03-12012 March 2004 Summary of Meeting with Cooper Nuclear Station to Discuss Progress in Implementing Strategic Improvement Plan ML0409804682004-03-11011 March 2004 RIC 2004 Presentation - T4 - Jerry Roberts - Operating Experience ML0402800142004-01-27027 January 2004 Summary of CAL 4th Quarterly Inspection Exit Meeting with Nebraska Public Power District Cooper Nuclear Station ML0331402912003-11-0707 November 2003 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0323407332003-08-21021 August 2003 Cooper Nuclear Station, Presentation Slides Re. Main Steam Isolation Valve Leakage Pathway, License Condition 2.C.(6) ML0319101132003-07-0909 July 2003 Summary of Confirmatory Action Letter Quarterly Inspection Exit Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0311207402003-04-22022 April 2003 Meeting Summary for End-of-Cycle Performance Assessment for Cooper Nuclear Station ML0309201462003-04-0101 April 2003 Summary of Confirmatory Action Letter Quarterly Inspection Exit Meeting with Cooper Nuclear Station ML0302905232002-12-13013 December 2002 Briefing Slides for Presentation Status of the CNS BWRVIP Program from 12/13/2002 Meeting with Nebraska Public Power District ML0224904012002-09-0303 September 2002 Cooper Supplemental Inspections, Presentation to Nebraska Public Power District Board of Directors ML0224001612002-08-26026 August 2002 8/22/02 - Summary of Meeting with Cooper Nuclear Station 2023-06-01
[Table view] |
Text
Cooper Nuclear Station License Renewal Process and Environmental Scoping Meeting S. , Purpose of Today's Meeting Provide overview of license renewal review process Describe the environmental review process Provide license renewal review schedule Receive public input on environmental review
- Describe how to submit comments
- Accept comments today 1
NRC Regulatory Oversight
>NRC's Governing Statutes
- Atomic Energy Act
- National Environmental Policy Act (NEPA)
NRC Regulatory Oversight
>NRC's Mission
- Protect Public Health and Safety
- Promote Common Defense and Security
- Protect Environment 2
~2~y Cooper Nuclear Station License Renewal SCooper Nuclear Station
- License expiration date 1/18/2014
>Application was filed on 9/24/2008 Contents of Application General information about the plant owner or operator
> Technical information about plant structures and components and how the applicant proposes to manage aging
> Changes to plant Technical Specifications
> Environmental Report 3
License Renewal Review Safety Review Focuses on the aging effects of components and structures important to plant safety
- Staff review is to determine whether aging effects will be effectively managed
- Considers generic and site specific operating experience related to the effects of aging.
>" Environmental Review
- Considers, analyzes, and discloses environmental impacts of continued plant operation and alternatives to license renewal
- Staff review is to determine if the environmental impacts of license renewal are so great that license renewal would be unreasonable Ongoing Regulatory Oversight
> Emergency Planning
- 10 CFR 50.47
> Security
- 10 CFR Part 73
> Current Safety Performance operating reactor performance web site http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/CNS/cnschart.html 4
License Renewal Process
> The ongoing regulatory process is adequate to ensure the safety of all currently operating plants
> The same plant operating rules apply during the renewal term
- NRC applies additional conditions for aging management 5
Safety Review (10 CFR Part 54)
)Safety Review by NRC technical staff
- Review application and supporting documentation
- On-site audits
- Issue Safety Evaluation Report
);National Environmental Policy Act (NEPA)
- Informs Federal decision making
- Public disclosure of environmental impacts and other considerations
)NRC's Environmental Regulations 10 CFR Part 51
>Staff prepares an Environmental Impact Statement 6
Environmental Impact
.. .Statement
)Staff Evaluates Impacts to Resources
- Wildlife and Fish
- Water and Air Resources
-Historical or Cultural Resources
- Taxes, Community Development, Environmental Justice
- Human Health P
- Land Use Environmental Review (10 CFR.Part 51)
Scope
- Generic (Programmatic) Environmental
- Impact Statement (GEIS)
- Site-specific Supplemental Environmental Impact Statement (SEIS)
- Look at new and significant information on generic conclusions reached in the GElS 7
Scoping and Public Involvement
>What about your community should the NRC focus on in the EIS?
>What local environmental issues should the NRC examine?
>What reasonable alternatives are appropriate for the area?
8
Submitting Comments on the Scope of the Environmental Review
> Provide written comments:
> By mail: Chief; Rules, Directives, and Editing Branch Division of Administrative Services Mailstop T-6D59 U.S. Nuclear Regulatory Commission Washington, DC 20555
> E-mail: CooperEIS@nrc.gov
> In person: 11545 Rockville Pike Rockville, Maryland Comments should be submitted by March 27, 2009 Environmental Review Milestones Application Received Sep. 24, 2008 Notice of Opportunity for Hearing Dec. 30, 2008 Notice of Intent for Scoping Jan. 26, 2009 Environmental Scoping Meeting Feb. 25, 2009 Hearing Opportunity Closes Mar. 2, 2009 Scoping Comments Due Mar. 27, 2009 Draft SEIS Issued Dec. 15, 2009 Draft SEIS Public Meeting Jan. 21, 2010 Draft SEIS Comments Due Apr. 6, 2010 Final SEIS Issued Jun. 29, 2010 9
A -
Additional Information Environmental Contacts: (800) 368-5642
> Tam Tran, ext. 3617
> Emmanuel Sayoc, ext. 1924 Documents located at:
- Auburn Memorial Library, 1810 Courthouse Ave., Auburn, NE 68305
> Documents can be viewed at the NRC's Web site http://www.nrc.gov/reactors/operating/licensi ng/renewal/applications/cooper.html A
Share Your Views
>What about your community should the NRC focus on in the EIS?
>What local environmental issues should the NRC examine?
>What reasonable alternatives are appropriate for the area?
10