EPID:L-2023-LRM-0036, Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection, June 1, 2023 (Open) |
|
MONTHYEARML23137A1572023-05-17017 May 2023 Pre-Application Teleconference Meeting with Nebraska Public Power District to Discuss Planned License Amendment Request for Cooper Nuclear Station Project stage: Meeting ML23150A1372023-06-0101 June 2023 Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection, June 1, 2023 Project stage: Request ML23165A0352023-06-26026 June 2023 Summary of June 1, 2023, Pre-Application Teleconference with Nebraska Public Power District to Discuss Planned License Amendment Request to Add Temporary Note to TS LCO 3.8.3 for Diesel Fuel Oil Tank Cleaning and Inspection Project stage: Meeting 2023-06-01
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24124A0072024-05-0303 May 2024 Presubmittal Meeting EP Plan Change Meeting Slides ML23317A2032023-12-13013 December 2023 Pre-Submittal Meeting: Tech Spec Amendment Request for HPCI Flow Switch Setpoint Change ML23150A1382023-06-0101 June 2023 Pre Submittal Meeting: Containment Inservice Inspection (Cisi) Relief Request, June 1, 2023 ML23150A1372023-06-0101 June 2023 Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection, June 1, 2023 ML21125A0372021-05-0606 May 2021 May 6, 2021 Public Meeting (Observation) Slides for RAP Back Program Presentation to Industry(003) ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14149A0902014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule June 2012 Through February 2015 Gantt Chart ML14149A0882014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule May 2014 Through February 2015 Gantt Chart ML14149A0852014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Hi-Level Overview Schedule for Flooding Hazard Reevaluation Report ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML13178A1592013-06-26026 June 2013 Summary of Meeting for Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML1129715762011-10-24024 October 2011 Licensee Slides from 10/24/11 Meeting with Nebraska Public Power District to Discuss Cooper Nuclear Station ML1121401792011-07-11011 July 2011 Licensee Slides from Conference Call with Nebraska Public Power District IR 05000298/20110092011-06-10010 June 2011 EA-11-204, Cooper Nuclear Station, Final Significance Determination of White Finding and Notice of Violation, NRC Inspection Report 05000298/2011009 ML1112606772011-05-0606 May 2011 Summary of Meeting with Nebraska Public District, Cooper Discussed the Significance, Cause and Corrective Action Associated with an Apparent Violation with Low-to-Moderate Safety Significance ML1029202962010-10-19019 October 2010 Meeting Handouts for October 19, 2010 with Nebraska Public Power District Regarding Cooper Nuclear Station ML1016001102010-06-0909 June 2010 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1011904802010-04-29029 April 2010 Summary of Meeting with Nebraska Public Power District to Discuss Issues Associated with the Independent Spent Fuel Storage Installation (ISFSI) ML1011103782010-04-20020 April 2010 Public Meeting Summary from 4/7/2010 ML1010503762010-04-0707 April 2010 Preliminary Site-Specific Results of the License Renewal Environmental Review for Cooper Nuclear Station ML0909700972009-04-0707 April 2009 Summary of Annual Performance Assessment Meeting with Nebraska Public Power District to Discuss Safety Performance at Cooper Nuclear Station Between January 1 & December 31, 2008 ML0907506862009-02-25025 February 2009 Scoping and Process Public Meeting Sides of February 25, 2009 ML0816201532008-06-10010 June 2008 End-of-Cycle Meeting Summary 6/2/08 ML0815501022008-05-28028 May 2008 Meeting Summary for Regulatory Conference with Nebraska Public Power District to Discuss the Significance of an Inspection Finding Associated with Two Procedures That Were Not Adequate ML0712005272007-04-30030 April 2007 Nrc/Entergy Operations, Inc. Management Meeting to Discuss the Performance of Arkansas Nuclear One, Cooper, Grand Gulf, River Bend and Waterford, Unit 3 ML0721104822006-10-31031 October 2006 Significance Determination Process Refresher Training ML0612904602006-05-0505 May 2006 May 5, 2006 Meeting Slides ML0524300942005-10-0303 October 2005 Slides from August 29, 2005 Meeting with NPPD ML0503405322005-02-0303 February 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0413802292004-05-17017 May 2004 Summary of Confirmatory Action Letter 5th Quarterly Inspection Exit Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0410503302004-04-14014 April 2004 Meeting Summary for End-of-Cycle Performance Assessment for Cooper Nuclear Station ML0402800142004-01-27027 January 2004 Summary of CAL 4th Quarterly Inspection Exit Meeting with Nebraska Public Power District Cooper Nuclear Station ML0331402912003-11-0707 November 2003 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0302905232002-12-13013 December 2002 Briefing Slides for Presentation Status of the CNS BWRVIP Program from 12/13/2002 Meeting with Nebraska Public Power District ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary ML0205703522002-02-26026 February 2002 02-07-02 Cooper/Nebraska Public Power District Meeting Summary ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2024-05-03
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24124A0072024-05-0303 May 2024 Presubmittal Meeting EP Plan Change Meeting Slides ML24122C6862024-05-0202 May 2024 Summary of the April 24, 2024 Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Cooper Nuclear Station ML23150A1372023-06-0101 June 2023 Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection, June 1, 2023 ML23150A1382023-06-0101 June 2023 Pre Submittal Meeting: Containment Inservice Inspection (Cisi) Relief Request, June 1, 2023 ML21125A0372021-05-0606 May 2021 May 6, 2021 Public Meeting (Observation) Slides for RAP Back Program Presentation to Industry(003) ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML19196A3452019-07-18018 July 2019 July 18, 2019 Public Teleconference Slides Appendix J Exemption Request Presubmittal Teleconference ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML13178A1592013-06-26026 June 2013 Summary of Meeting for Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML1129715762011-10-24024 October 2011 Licensee Slides from 10/24/11 Meeting with Nebraska Public Power District to Discuss Cooper Nuclear Station ML1121401792011-07-11011 July 2011 Licensee Slides from Conference Call with Nebraska Public Power District ML1113805552011-05-16016 May 2011 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1112606772011-05-0606 May 2011 Summary of Meeting with Nebraska Public District, Cooper Discussed the Significance, Cause and Corrective Action Associated with an Apparent Violation with Low-to-Moderate Safety Significance ML1029202962010-10-19019 October 2010 Meeting Handouts for October 19, 2010 with Nebraska Public Power District Regarding Cooper Nuclear Station ML1016001102010-06-0909 June 2010 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1011904802010-04-29029 April 2010 Summary of Meeting with Nebraska Public Power District to Discuss Issues Associated with the Independent Spent Fuel Storage Installation (ISFSI) ML1011103782010-04-20020 April 2010 Public Meeting Summary from 4/7/2010 ML1010503762010-04-0707 April 2010 Preliminary Site-Specific Results of the License Renewal Environmental Review for Cooper Nuclear Station ML0909700972009-04-0707 April 2009 Summary of Annual Performance Assessment Meeting with Nebraska Public Power District to Discuss Safety Performance at Cooper Nuclear Station Between January 1 & December 31, 2008 ML0907506862009-02-25025 February 2009 Scoping and Process Public Meeting Sides of February 25, 2009 ML0831101972008-11-0505 November 2008 Summary of Meeting with Nebraska Public Power District to Discuss Inspection Procedure 95002 Supplemental Inspection Preparations and Diesel Generator Performance Improvement Plan ML0823503312008-08-22022 August 2008 Summary of Public Meeting with Nebraska Public Power District Presentation of Preparations for Inspection and Plans to Improve Performance of Emergency Diesel Generators at Cooper Nuclear Station ML0815501022008-05-28028 May 2008 Meeting Summary for Regulatory Conference with Nebraska Public Power District to Discuss the Significance of an Inspection Finding Associated with Two Procedures That Were Not Adequate ML0720002802007-07-18018 July 2007 Meeting Summary for Regulatory and Predecisional Enforcement Conference; Cooper Nuclear Station ML0623601232006-08-22022 August 2006 Danger Will Robinson: If You Change Cell Locations You May Break the VB Code! ML0615700432006-06-0202 June 2006 Summary of 05/30/2006 Annual Performance Assessment Meeting with Nebraska Public Power District Cooper Nuclear Station ML0612904602006-05-0505 May 2006 May 5, 2006 Meeting Slides ML0617905182006-03-0909 March 2006 RIC 2006 Presentation - Th5E - Jerry Roberts - ROP Inspection Program Update ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0532206852005-11-17017 November 2005 Nrc/Entergy Operations, Inc. Management Meeting 11/10/05 ML0531904622005-11-15015 November 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0524300942005-10-0303 October 2005 Slides from August 29, 2005 Meeting with NPPD ML0511000652005-04-19019 April 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station end-of-cycle ML0506802362005-03-0909 March 2005 Summary of Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station'S Simulator Fidelity Issues ML0503405322005-02-0303 February 2005 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0413802292004-05-17017 May 2004 Summary of Confirmatory Action Letter 5th Quarterly Inspection Exit Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0409701292004-03-12012 March 2004 Summary of Meeting with Cooper Nuclear Station to Discuss Progress in Implementing Strategic Improvement Plan ML0409804682004-03-11011 March 2004 RIC 2004 Presentation - T4 - Jerry Roberts - Operating Experience ML0402800142004-01-27027 January 2004 Summary of CAL 4th Quarterly Inspection Exit Meeting with Nebraska Public Power District Cooper Nuclear Station ML0331402912003-11-0707 November 2003 Summary of Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0323407332003-08-21021 August 2003 Cooper Nuclear Station, Presentation Slides Re. Main Steam Isolation Valve Leakage Pathway, License Condition 2.C.(6) ML0319101132003-07-0909 July 2003 Summary of Confirmatory Action Letter Quarterly Inspection Exit Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML0311207402003-04-22022 April 2003 Meeting Summary for End-of-Cycle Performance Assessment for Cooper Nuclear Station ML0309201462003-04-0101 April 2003 Summary of Confirmatory Action Letter Quarterly Inspection Exit Meeting with Cooper Nuclear Station ML0302905232002-12-13013 December 2002 Briefing Slides for Presentation Status of the CNS BWRVIP Program from 12/13/2002 Meeting with Nebraska Public Power District ML0224904012002-09-0303 September 2002 Cooper Supplemental Inspections, Presentation to Nebraska Public Power District Board of Directors 2024-05-03
[Table view] |
Text
Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection
June 1, 2023 Agenda
- Technical Specification (TS) Requirements
- Permanent Equipment Lineup
- Use of Temporary Equipment
- TS Revision to Limiting Condition of Operation (LCO) 3.8.3
- Submittal Timeline Maintenance Requirements
- CNS License Renewal Buried Pipe and Tanks Inspection Program (NLS2010050-04, ADAMS Accession Number ML101310605) and Diesel Fuel Monitoring Program (NLS2008071-06, ADAMS Accession Number ML083030225) require periodic emptying, cleaning and examination of the buried Diesel Fuel Oil Storage Tanks
- CNS Engineering Evaluation (EE)11-037 established a 20-year re-inspection interval recommended by vendor tank thickness and corrosion rate evaluations in 2004.
- Maintenance Plan 800000008796 implements the 20-year inspection frequency
- Inspection was last completed in 2004 Technical Specification Requirements
- This request will be performed during Refuel Outage 33 (October 2024) while in Modes 4 or 5
- 7 day supply of fuel oil required for Operability (per TS LCO 3.8.3)
System Design
- Two Diesel Generators (DG)
- Two Diesel Generator Fuel Oil (DGFO) Storage Tanks
- Two DGFO Transfer Pumps; One located in each tank
- DGs and Transfer Pumps are divisional
- Both DGFO Storage Tanks required to meet 7 day supply of fuel oil for one DG.
- DGDO fuel supply system is cross connected so that total capacity of both tanks can be directed to either DG System Drawing Purpose of Request
- Purpose of license amendment request is to take credit for the fuel oil volume stored in temporary tank(s) in meeting the Technical Specifications requirement of a 7 day supply of fuel oil.
Conduct of Maintenance
- Storage tank to be cleaned and inspected will be isolated from Diesel Generator being left in service
- Transfer pump for tank being cleaned will be deenergized and isolated from system
- DG associated with tank under maintenance will be danger tagged off and out-of-service for other planned engine preventive and corrective maintenance Permanent Equipment Lineup
- In-service Storage Tank will be maintained with at least 4 day supply of fuel oil
- Associated Transfer Pump will be maintained in automatic Use of Temporary Equipment
- Minimum 49,500 gallons (7 day supply) of diesel fuel will be available between one in-service permanent storage tank and above ground temporary storage tank(s)
- Contents of tank under maintenance will be off-loaded using filtration equipment to temporary storage tank(s)
- Temporary pump/filter equipment, independent of electrical power sources, will be pre-staged to transfer off-loaded fuel to the in-service permanent storage tank
- Special Procedures will be approved with instructions to restore off-loaded fuel to the in-service permanent storage tank Considerations
- Temporary equipment will be at site grade level (elevation 903 ft Mean Sea Level)
- Location is Type I Fill, or Structural Fill, consisting of highly compacted backfill down to site bedrock
- Temporary equipment will be located inside CNS Protected Area
- Security impacts will be evaluated using CNS Procedure 0-SEC-INTERFACE
- Temporary equipment impacts on FLEX travel paths and staging areas has been evaluated with no impacts noted.
Technical Specification Revision to LCO 3.8.3 (Sample)
TEMPORARY NOTE
Fuel oil in temporary storage tanks may be utilized to support OPERABILITY of a DG during tank cleaning and inspection maintenance activities. Equipment (temporary transfer pump, hoses, and appropriate fittings) capable of supplying the fuel oil in the temporary tanks to the DG must be available. The fuel oil in the temporary tanks, in conjunction with the fuel oil in the permanent tank, must be within the limits of Condition A and Condition C. This temporary note is applicable only to the DG aligned to the full permanent tank. This temporary note is applicable only during Refuel Outage 33 while in MODES 4 or 5. This allowance is contingent upon meeting the compensatory measures contained in Nebraska Public Power District letter NLS2023029.
Precedents
- Monticello Nuclear Generating Plant, Revise Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank, Amendment 209 Safety Evaluation dated December 27, 2022 (ADAMS Accession Number ML22318A215)
- Cooper Nuclear Station, One-Time Extension of Diesel Generator Allowed Outage Time from 7 Days to 14 Days, Amendment 207, Safety Evaluation dated October 15, 2004 (ADAMS Accession Numbers ML042920532 and ML042930375)
Submittal Timeline
- Estimated 1-yr NRC review time
- Implement within 60 days of NRC approval Stay connected with us.