{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 July 20, 2007Mr. William Levis President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038SUBJECT:HOPE CREEK GENERATING STATION - NRC INSPECTION REPORT05000354/2007405
{{#Wiki_filter:UNITED STATES uly 20, 2007
 
==SUBJECT:==
HOPE CREEK GENERATING STATION - NRC INSPECTION REPORT 05000354/2007405


==Dear Mr. Levis:==
==Dear Mr. Levis:==
On June 26, 2007, the United States Nuclear Regulatory Commission completed an inspectionat your Hope Creek Generating Station. The enclosed inspection report documents the inspection results which were discussed on June 27, 2007, with Mr. Hal Trimble and other members of your staff.This inspection examined activities conducted under your license as they relate to safety,common defense and security, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was based upon Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC). The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection, no violations were identified. No reply to this letter isrequired.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component for the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
On June 26, 2007, the United States Nuclear Regulatory Commission completed an inspection at your Hope Creek Generating Station. The enclosed inspection report documents the inspection results which were discussed on June 27, 2007, with Mr. Hal Trimble and other members of your staff.
 
This inspection examined activities conducted under your license as they relate to safety, common defense and security, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was based upon Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC). The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
Based on the results of this inspection, no violations were identified. No reply to this letter is required.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component for the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely, Original signed by RLorsonRaymond Lorson, Chief Decommissioning Branch Division of Nuclear Materials SafetyDocket No.05000354 License No.NPF-57Enclosure:Inspection Report 05000354/2007405w/Attachment: Supplemental Information July 20, 2007Mr. William Levis President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038SUBJECT:HOPE CREEK GENERATING STATION - NRC INSPECTION REPORT05000354/2007405Dear M
Sincerely, Original signed by RLorson Raymond Lorson, Chief Decommissioning Branch uly 20, 2007
 
==SUBJECT:==
HOPE CREEK GENERATING STATION - NRC INSPECTION REPORT 05000354/2007405
 
Dear M


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
IR 05000354/2007405; Hope Creek Generating Station; Inspection of Additional SecurityMeasures for Radioactive Material Quantities of Concern (RAMQC)The report covered an announced one-day inspection related to safety, common defense andsecurity, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was conducted by two regional inspectors and was based upon Temporary Instruction (TI) 2201/001, "Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC).The inspectors determined that the licensee had developed an adequate program for the transportation of radioactive material and the handling of safeguards information.A.
IR 05000354/2007405; Hope Creek Generating Station; Inspection of Additional Security
 
Measures for Radioactive Material Quantities of Concern (RAMQC)
The report covered an announced one-day inspection related to safety, common defense and security, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was conducted by two regional inspectors and was based upon Temporary Instruction (TI) 2201/001, Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC). The inspectors determined that the licensee had developed an adequate program for the transportation of radioactive material and the handling of safeguards information.


===NRC Identified and Self-Revealing Findings===
===NRC Identified and Self-Revealing Findings===
Line 34: Line 51:
No findings of significance were identified.
No findings of significance were identified.


===B.Licensee-Identified Violations===
===Licensee-Identified Violations===


None Enclosure
None


=REPORT DETAILS=
=REPORT DETAILS=
4OA5Other Activities.1Temporary Instruction 2201/001 - Inspection of Additional Security Measures forRadioactive Material Quantities of Concern (RAMQC) - 1 sample
 
{{a|4OA5}}
==4OA5 Other Activities==
 
===.1 Temporary Instruction 2201/001 - Inspection of Additional Security Measures for===
 
Radioactive Material Quantities of Concern (RAMQC) - 1 sample


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the RAMQC program to assess the licensee'simplementation of the additional security measures (ASM) imposed by NRC Order EA-05-007, "Imposing Additional Security Measures on the Transportation of RAMQC," issued July 19, 2005. The inspectors also reviewed the implementation of the Safeguards Information-Modified Handling (SGI-M) protection requirements specified in NRC Order EA-04-0191, "Imposing Requirements for the Protection of Certain Safeguards Information," issued November 5, 2004.The inspectors reviewed each ASM and SGI-M requirement identified in the ordersreferenced above. The inspectors interviewed personnel and reviewed program documents and implementing procedures. The inspectors reviewed notifications 20328320 and 20328351 related to development of the site implementing procedures.b.Findings and ObservationsNo findings of significance were identified. The inspectors concluded that PSEGpersonnel developed an adequate RAMQC program.40A6Meetings, Including ExitExit Meeting SummaryOn June 27, 2007, the NRC inspectors presented the inspection results to Mr. Trimble and staff members. The inspectors confirmed that proprietary and safeguards information was not included in this inspection report.Attachment:Supplemental Information A-1Attachment
The inspectors reviewed the RAMQC program to assess the licensees implementation of the additional security measures (ASM) imposed by NRC Order EA-05-007, Imposing Additional Security Measures on the Transportation of RAMQC, issued July 19, 2005. The inspectors also reviewed the implementation of the Safeguards Information-Modified Handling (SGI-M) protection requirements specified in NRC Order EA-04-0191, Imposing Requirements for the Protection of Certain Safeguards Information, issued November 5, 2004.
 
The inspectors reviewed each ASM and SGI-M requirement identified in the orders referenced above. The inspectors interviewed personnel and reviewed program documents and implementing procedures. The inspectors reviewed notifications 20328320 and 20328351 related to development of the site implementing procedures.
 
====b. Findings and Observations====
No findings of significance were identified. The inspectors concluded that PSEG personnel developed an adequate RAMQC program.
 
40A6 Meetings, Including Exit
 
===Exit Meeting Summary===
 
On June 27, 2007, the NRC inspectors presented the inspection results to Mr. Trimble and staff members. The inspectors confirmed that proprietary and safeguards information was not included in this inspection report.
:     Supplemental Information


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==
PSEG Hope Creek
PSEG Hope Creek
: [[contact::D. Kelly]], Technical Support Manager
: [[contact::D. Kelly]], Technical Support Manager
Line 52: Line 88:
: [[contact::F. Possessky]], Regulatory Assurance
: [[contact::F. Possessky]], Regulatory Assurance
: [[contact::R. Proctor]], Security
: [[contact::R. Proctor]], Security
==LIST OF ITEMS==
==LIST OF ITEMS==
OPENED, CLOSED AND DISCUSSEDOPENTemporary Instruction (TI) 2201/001 - Inspection of Additional SecurityMeasures for Radioactive Material Quantities of Concern (RAMQC)CLOSEDTemporary Instruction (TI) 2201/001 - Inspection of Additional SecurityMeasures for Radioactive Material Quantities of Concern (RAMQC)
 
===OPENED, CLOSED AND DISCUSSED===
 
OPEN          Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC)
CLOSED        Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC)
 
==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
Section 4OA5 Other ActivitiesProceduresRP-AA-600, Rev.10, Radioactive Material/Waste ShipmentsRP-AA-600-1001, Rev.3, Exclusive Use and Emergency Response Information
 
}}
}}

Revision as of 05:22, 23 November 2019

IR 05000354-07-405 on 06/26/2007 for Hope Creek Generating Station; Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC)
ML072050515
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/20/2007
From: Ray Lorson
Decommissioning Branch I
To: Levis W
Public Service Enterprise Group
References
IR-07-405
Download: ML072050515 (8)


Text

UNITED STATES uly 20, 2007

SUBJECT:

HOPE CREEK GENERATING STATION - NRC INSPECTION REPORT 05000354/2007405

Dear Mr. Levis:

On June 26, 2007, the United States Nuclear Regulatory Commission completed an inspection at your Hope Creek Generating Station. The enclosed inspection report documents the inspection results which were discussed on June 27, 2007, with Mr. Hal Trimble and other members of your staff.

This inspection examined activities conducted under your license as they relate to safety, common defense and security, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was based upon Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC). The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no violations were identified. No reply to this letter is required.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component for the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Original signed by RLorson Raymond Lorson, Chief Decommissioning Branch uly 20, 2007

SUBJECT:

HOPE CREEK GENERATING STATION - NRC INSPECTION REPORT 05000354/2007405

Dear M

SUMMARY OF FINDINGS

IR 05000354/2007405; Hope Creek Generating Station; Inspection of Additional Security

Measures for Radioactive Material Quantities of Concern (RAMQC)

The report covered an announced one-day inspection related to safety, common defense and security, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was conducted by two regional inspectors and was based upon Temporary Instruction (TI) 2201/001, Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC). The inspectors determined that the licensee had developed an adequate program for the transportation of radioactive material and the handling of safeguards information.

NRC Identified and Self-Revealing Findings

Cornerstone: Physical Security

No findings of significance were identified.

Licensee-Identified Violations

None

REPORT DETAILS

4OA5 Other Activities

.1 Temporary Instruction 2201/001 - Inspection of Additional Security Measures for

Radioactive Material Quantities of Concern (RAMQC) - 1 sample

a. Inspection Scope

The inspectors reviewed the RAMQC program to assess the licensees implementation of the additional security measures (ASM) imposed by NRC Order EA-05-007, Imposing Additional Security Measures on the Transportation of RAMQC, issued July 19, 2005. The inspectors also reviewed the implementation of the Safeguards Information-Modified Handling (SGI-M) protection requirements specified in NRC Order EA-04-0191, Imposing Requirements for the Protection of Certain Safeguards Information, issued November 5, 2004.

The inspectors reviewed each ASM and SGI-M requirement identified in the orders referenced above. The inspectors interviewed personnel and reviewed program documents and implementing procedures. The inspectors reviewed notifications 20328320 and 20328351 related to development of the site implementing procedures.

b. Findings and Observations

No findings of significance were identified. The inspectors concluded that PSEG personnel developed an adequate RAMQC program.

40A6 Meetings, Including Exit

Exit Meeting Summary

On June 27, 2007, the NRC inspectors presented the inspection results to Mr. Trimble and staff members. The inspectors confirmed that proprietary and safeguards information was not included in this inspection report.

Supplemental Information

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

PSEG Hope Creek

D. Kelly, Technical Support Manager
R. Olson, Radiation Protection Supervisor
F. Possessky, Regulatory Assurance
R. Proctor, Security

LIST OF ITEMS

OPENED, CLOSED AND DISCUSSED

OPEN Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC)

CLOSED Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC)

LIST OF DOCUMENTS REVIEWED