| number = ML17199D690
| number = ML17199D690
| issue date = 07/18/2017
| issue date = 07/18/2017
| title = Ltr 07/18/17 Point Beach Requalification Program Inspection (Rkw)
| title = Requalification Program Inspection (Rkw)
| author name = Orlikowski R J
| author name = Orlikowski R
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Coffey R
| addressee name = Coffey R
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 July 18, 2017 Mr. Robert Coffey Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516
-4352 July 18, 2017 Mr. Robert Coffey Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
-9516  


==SUBJECT:==
==SUBJECT:==
Line 24: Line 22:


==Dear Mr. Coffey:==
==Dear Mr. Coffey:==
In a telephone conversation on July 12, 2017, Mr. Raymond Keith Walton, Senior Operations Engineer, and Mr. Randy Amundsen, Point Beach Exam Coordinator, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Point Beach Nuclear Plant. The inspection is planned for the week of September 18, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC
-approved requalification program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC request ed the facility licensee to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish a written examination from last year and the operating tests scheduled for the week of the inspection and the week previous to the inspection to the NRC by September 11, 2017
. Mr. Amundsen has been advised of this request and other information requested per Inspection Procedure 71111.11A, Appendix A, Items 1
- 6. Mr. Amundsen has been provided with the name and email address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
These information collections were approved by the Office of Management and Budget, under approval number 3150
-0018. The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T
-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NE OB-10202, (3150
-0018), Office of Management and Budget, Washington, DC 20503.


The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number
In a telephone conversation on July 12, 2017, Mr. Raymond Keith Walton, Senior Operations Engineer, and Mr. Randy Amundsen, Point Beach Exam Coordinator, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Point Beach Nuclear Plant. The inspection is planned for the week of September 18, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC requested the facility licensee to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish a written examination from last year and the operating tests scheduled for the week of the inspection and the week previous to the inspection to the NRC by September 11, 2017. Mr. Amundsen has been advised of this request and other information requested per Inspection Procedure 71111.11A, Appendix A, Items 1 - 6. Mr. Amundsen has been provided with the name and email address of the NRC lead inspector assigned to this inspection.
-rm/adams.html (the Public Electronic Reading Room).
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Raymond Keith Walton (Raymond.Walton@nrc.gov
) at 630-829-9 836, or me at 630
-829-9 834. Sincerely,
  /RA Michael Bielby Acting for/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No s. 50-266; 55-301 License No
: s. DPR-24; DPR-27 cc:  Distribution via LISTSERV


Letter to Robert Coffey from Robert Orlikowski dated July 18, 2017  
R. Coffey                                          The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Raymond Keith Walton (Raymond.Walton@nrc.gov) at 630-829-9836, or me at 630-829-9834.
Sincerely,
                                                /RA Michael Bielby Acting for/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 55-301 License Nos. DPR-24; DPR-27 cc: Distribution via LISTSERV
 
R. Coffey                                    Letter to Robert Coffey from Robert Orlikowski dated July 18, 2017


==SUBJECT:==
==SUBJECT:==
REQUALIFICATION PROGRAM INSPECTION DISTRIBUTION
REQUALIFICATION PROGRAM INSPECTION DISTRIBUTION:
: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado, NRR Colleen Schmidt, DRS
Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado, NRR Colleen Schmidt, DRS ADAMS Accession Number: ML17199D690 OFFICE     RIII           N RIII                       RIII   RIII NAME       RKWalton:jw       MBielby for ROrlikowski DATE       07/17/17           07/18/17 OFFICIAL RECORD COPY}}
 
ADAMS Accession Number: ML17199D690 OFFICE RIII N RIII RIII RIII NAME RKWalton:jw MBielby for ROrlikowski DATE 07/17/17 07/18/17   OFFICIAL RECORD COPY}}

Latest revision as of 10:36, 16 November 2019

Requalification Program Inspection (Rkw)
ML17199D690
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/18/2017
From: Robert Orlikowski
Operations Branch III
To: Coffey R
Point Beach
Shared Package
ML16319A327 List:
References
Download: ML17199D690 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 July 18, 2017 Mr. Robert Coffey Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Coffey:

In a telephone conversation on July 12, 2017, Mr. Raymond Keith Walton, Senior Operations Engineer, and Mr. Randy Amundsen, Point Beach Exam Coordinator, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Point Beach Nuclear Plant. The inspection is planned for the week of September 18, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC requested the facility licensee to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish a written examination from last year and the operating tests scheduled for the week of the inspection and the week previous to the inspection to the NRC by September 11, 2017. Mr. Amundsen has been advised of this request and other information requested per Inspection Procedure 71111.11A, Appendix A, Items 1 - 6. Mr. Amundsen has been provided with the name and email address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

R. Coffey The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Raymond Keith Walton (Raymond.Walton@nrc.gov) at 630-829-9836, or me at 630-829-9834.

Sincerely,

/RA Michael Bielby Acting for/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 55-301 License Nos. DPR-24; DPR-27 cc: Distribution via LISTSERV

R. Coffey Letter to Robert Coffey from Robert Orlikowski dated July 18, 2017

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado, NRR Colleen Schmidt, DRS ADAMS Accession Number: ML17199D690 OFFICE RIII N RIII RIII RIII NAME RKWalton:jw MBielby for ROrlikowski DATE 07/17/17 07/18/17 OFFICIAL RECORD COPY