IR 05000445/2007501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML080530188
| number = ML080530188
| issue date = 02/21/2008
| issue date = 02/21/2008
| title = Comanche Peak - Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000445/2007501 and 05000446/2007501
| title = Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000445/2007501 and 05000446/2007501
| author name = Lantz R E
| author name = Lantz R
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Blevins M
| addressee name = Blevins M
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NU CLE AR RE GU LATOR Y C O M M I S S I O N ary 21, 2008
[[Issue date::February 21, 2008]]


Mike Blevins, Executive Vice President and Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043
==SUBJECT:==
 
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000445/2007501 AND 05000446/2007501
SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000445/2007501 AND 05000446/2007501


==Dear Mr. Blevins:==
==Dear Mr. Blevins:==
On December 31, 2007, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Comanche Peak Steam Electric Station, Units 1 and 2. This inspection began on January 1, 2007. Issuance of this letter closes NRC Inspection Report 05000445/2007501 and 05000446/2007501. Observations and findings in these areas were provided in the quarterly integrated reports for your site.
On December 31, 2007, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Comanche Peak Steam Electric Station, Units 1 and 2. This inspection began on January 1, 2007. Issuance of this letter closes NRC Inspection Report 05000445/2007501 and 05000446/2007501. Observations and findings in these areas were provided in the quarterly integrated reports for your site.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely
/RA/
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89
 
Luminant Generation Company LLC -2-cc:
Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq.
 
Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 Anthony Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711 Somervell County Judge P.O. Box 851 Glen Rose, TX 76043 Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78711-3326 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087


Sincerely/RA/ Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 Luminant Generation Company LLC - 2 -
Luminant Generation Company LLC -3-Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209
cc: Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq. Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 Anthony Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711 Somervell County Judge P.O. Box 851 Glen Rose, TX 76043 Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78711-3326 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Luminant Generation Company LLC - 3 -
Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209 Luminant Generation Company LLC - 4 -
Electronic distribution by RIV: Regional Administrator (EEC) DRP Director (DDC) DRS Director (RJC1)
DRS Deputy Director (ACC) Senior Resident Inspector (DBA) Branch Chief, DRP/A (CEJ1) Senior Project Engineer, DRP/A (TRF) Team Leader, DRP/TSS (CJP)
RITS Coordinator (MSH3) DRS STA (DAP) D. Pelton, OEDO RIV Coordinator (DLP) ROPreports CP Site Secretary (ESS)


SUNSI Review Completed: ____Y__ ADAMS: Yes No Initials: __lmb____ Publicly Available Non-Publicly Available Sensitive Non-Sensitive Secretary/DRS C:OB LMBerger RELantz /RA/ /RA/ 2/21/08 2/21/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Luminant Generation Company LLC -4-Electronic distribution by RIV:
Regional Administrator (EEC)
DRP Director (DDC)
DRS Director (RJC1)
DRS Deputy Director (ACC)
Senior Resident Inspector (DBA)
Branch Chief, DRP/A (CEJ1)
Senior Project Engineer, DRP/A (TRF)
Team Leader, DRP/TSS (CJP)
RITS Coordinator (MSH3)
DRS STA (DAP)
D. Pelton, OEDO RIV Coordinator (DLP)
ROPreports CP Site Secretary (ESS)
SUNSI Review Completed: ____Y__ ADAMS: 6 Yes No Initials: __lmb____
6 Publicly Available Non-Publicly Available Sensitive 6 Non-Sensitive Secretary/DRS C:OB LMBerger RELantz
/RA/ /RA/
2/21/08 2/21/08 OFFICIAL RECORD COPY   T=Telephone E=E-mail F=Fax
}}
}}

Latest revision as of 20:14, 14 November 2019

Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000445/2007501 and 05000446/2007501
ML080530188
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/21/2008
From: Ryan Lantz
Operations Branch IV
To: Blevins M
Luminant Generation Co
References
IR-07-501
Download: ML080530188 (4)


Text

UNITED STATES NU CLE AR RE GU LATOR Y C O M M I S S I O N ary 21, 2008

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000445/2007501 AND 05000446/2007501

Dear Mr. Blevins:

On December 31, 2007, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Comanche Peak Steam Electric Station, Units 1 and 2. This inspection began on January 1, 2007. Issuance of this letter closes NRC Inspection Report 05000445/2007501 and 05000446/2007501. Observations and findings in these areas were provided in the quarterly integrated reports for your site.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely

/RA/

Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89

Luminant Generation Company LLC -2-cc:

Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq.

Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 Anthony Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711 Somervell County Judge P.O. Box 851 Glen Rose, TX 76043 Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78711-3326 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087

Luminant Generation Company LLC -3-Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209

Luminant Generation Company LLC -4-Electronic distribution by RIV:

Regional Administrator (EEC)

DRP Director (DDC)

DRS Director (RJC1)

DRS Deputy Director (ACC)

Senior Resident Inspector (DBA)

Branch Chief, DRP/A (CEJ1)

Senior Project Engineer, DRP/A (TRF)

Team Leader, DRP/TSS (CJP)

RITS Coordinator (MSH3)

DRS STA (DAP)

D. Pelton, OEDO RIV Coordinator (DLP)

ROPreports CP Site Secretary (ESS)

SUNSI Review Completed: ____Y__ ADAMS: 6 Yes No Initials: __lmb____

6 Publicly Available Non-Publicly Available Sensitive 6 Non-Sensitive Secretary/DRS C:OB LMBerger RELantz

/RA/ /RA/

2/21/08 2/21/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax