| | number = ML080530188 | | | number = ML080530188 |
| | issue date = 02/21/2008 | | | issue date = 02/21/2008 |
| | title = Comanche Peak - Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000445/2007501 and 05000446/2007501 | | | title = Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000445/2007501 and 05000446/2007501 |
| | author name = Lantz R E | | | author name = Lantz R |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
| | addressee name = Blevins M | | | addressee name = Blevins M |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES NU CLE AR RE GU LATOR Y C O M M I S S I O N ary 21, 2008 |
| [[Issue date::February 21, 2008]]
| |
|
| |
|
| Mike Blevins, Executive Vice President and Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043
| | ==SUBJECT:== |
| | | COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000445/2007501 AND 05000446/2007501 |
| SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000445/2007501 AND 05000446/2007501
| |
|
| |
|
| ==Dear Mr. Blevins:== | | ==Dear Mr. Blevins:== |
| On December 31, 2007, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Comanche Peak Steam Electric Station, Units 1 and 2. This inspection began on January 1, 2007. Issuance of this letter closes NRC Inspection Report 05000445/2007501 and 05000446/2007501. Observations and findings in these areas were provided in the quarterly integrated reports for your site. | | On December 31, 2007, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Comanche Peak Steam Electric Station, Units 1 and 2. This inspection began on January 1, 2007. Issuance of this letter closes NRC Inspection Report 05000445/2007501 and 05000446/2007501. Observations and findings in these areas were provided in the quarterly integrated reports for your site. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| | Sincerely |
| | /RA/ |
| | Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 |
| | |
| | Luminant Generation Company LLC -2-cc: |
| | Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq. |
| | |
| | Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 Anthony Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711 Somervell County Judge P.O. Box 851 Glen Rose, TX 76043 Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78711-3326 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 |
|
| |
|
| Sincerely/RA/ Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 Luminant Generation Company LLC - 2 -
| | Luminant Generation Company LLC -3-Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209 |
| cc: Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq. Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 Anthony Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711 Somervell County Judge P.O. Box 851 Glen Rose, TX 76043 Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78711-3326 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Luminant Generation Company LLC - 3 -
| |
| Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209 Luminant Generation Company LLC - 4 - | |
| Electronic distribution by RIV: Regional Administrator (EEC) DRP Director (DDC) DRS Director (RJC1)
| |
| DRS Deputy Director (ACC) Senior Resident Inspector (DBA) Branch Chief, DRP/A (CEJ1) Senior Project Engineer, DRP/A (TRF) Team Leader, DRP/TSS (CJP)
| |
| RITS Coordinator (MSH3) DRS STA (DAP) D. Pelton, OEDO RIV Coordinator (DLP) ROPreports CP Site Secretary (ESS)
| |
|
| |
|
| SUNSI Review Completed: ____Y__ ADAMS: Yes No Initials: __lmb____ Publicly Available Non-Publicly Available Sensitive Non-Sensitive Secretary/DRS C:OB LMBerger RELantz /RA/ /RA/ 2/21/08 2/21/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | | Luminant Generation Company LLC -4-Electronic distribution by RIV: |
| | Regional Administrator (EEC) |
| | DRP Director (DDC) |
| | DRS Director (RJC1) |
| | DRS Deputy Director (ACC) |
| | Senior Resident Inspector (DBA) |
| | Branch Chief, DRP/A (CEJ1) |
| | Senior Project Engineer, DRP/A (TRF) |
| | Team Leader, DRP/TSS (CJP) |
| | RITS Coordinator (MSH3) |
| | DRS STA (DAP) |
| | D. Pelton, OEDO RIV Coordinator (DLP) |
| | ROPreports CP Site Secretary (ESS) |
| | SUNSI Review Completed: ____Y__ ADAMS: 6 Yes No Initials: __lmb____ |
| | 6 Publicly Available Non-Publicly Available Sensitive 6 Non-Sensitive Secretary/DRS C:OB LMBerger RELantz |
| | /RA/ /RA/ |
| | 2/21/08 2/21/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax |
| }} | | }} |
|
---|
Category:Inspection Report Correspondence
MONTHYEARML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML22346A0862022-12-13013 December 2022 Acknowledgment of Response to Inspection Report 05000445/2022003 and Notice of Violation ML20225A0932020-08-12012 August 2020 Notification of Inspection 05000445/2020004 and 05000446/2020004 and Request for Information ML19248B8282019-09-0505 September 2019 Response to Request to Consider Revision to Cross-Cutting Aspects for Two Findings ML18319A1502018-11-15015 November 2018 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000445/2019001 and 05000446/2019001) and Request for Information ML16239A1062016-08-26026 August 2016 Letter to Luminant - Response to Appeal of the Formal Disagreement with Adversary Characteristics, Attributes, or Tactics Employed or Prepared as Part of a U.S. NRC Evaluated Force-on-Force Exercise - Disputed Item 05000445,446/2016-01 (Com ML16197A0802016-07-15015 July 2016 Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection 05000445/2016007 and 05000446/2016007, and Request for Information IR 05000445/20154022016-03-0202 March 2016 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000445/2015402 and 05000446/2015402) IR 05000445/20114052011-06-28028 June 2011 IR 05000445-11-405 and 05000446-11-405, on 06/13/2011, Comanche Peak Nuclear Power Plant, Units 1 and 2 - Physical Security Requirements for Independent Spent Fuel Storage Installations Inspection Report IR 05000445/20105012011-01-10010 January 2011 IR 05000445-10-501, 05000446-10-501, on 12/31/2010, Comanche Peak Nuclear Power Plant, Units 1 & 2, NRC Emergency Preparedness Annual Inspection (Cover Letter) IR 05000445/20094012010-03-26026 March 2010 NRC Physical Security Annual Inspection Report 05000445-09-401 and 05000446-09-401 ML0920805702009-07-27027 July 2009 Comanche, Notification of Inspection (NRC Inspection Report 05000446-09-005) and Request for Information IR 05000445/20075012008-02-21021 February 2008 Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000445/2007501 and 05000446/2007501 ML0803701992008-02-0505 February 2008 Notification of Inspection (NRC Inspection Report 05000445-08-003 and 05000446-080-03) and Request for Information IR 05000445/20074052007-09-10010 September 2007 IR 05000445-07-405, 05000446-07-405, on 09/07/2007; Comanche Peak Steam Electric Station - Letter Only IR 05000445/20070032007-08-0505 August 2007 IR 05000445-07-003, 05000446-07-003, on 03/24/2007 - 06/22/2007, Comanche Peak Steam Electric Station, Units 1 and 2. Access Control to Radiologically Significant Areas; ALARA Planning and Controls; Problem Identification and Resolution IR 05000445/20074032007-07-30030 July 2007 IR 05000445-07-403, IR 05000446-07-403, on 06/25/2007 - 07/18/2007, Comanche Peak Steam Electric Station, Material Control and Accounting Program - Letter Only ML0705302812007-02-22022 February 2007 IR 05000445-07-402, IR 05000446-07-002, 01/22/2007 - 01/25/2007, Comanche Peak Steam Electric Station, Security Access Control - Letter Only IR 05000445/20074022007-02-22022 February 2007 IR 05000445-07-402, IR 05000446-07-002, 01/22/2007 - 01/25/2007, Comanche Peak Steam Electric Station, Security Access Control - Letter Only IR 05000445/20060062006-11-0909 November 2006 NRC Security Inspection Report 05000445-06-006 and 05000446-06-006 IR 05000445/20064012006-11-0303 November 2006 Commanche Peak Steam Electric Station - NRC Inspection Report 05000445/2006401 and 05000446/2006401 IR 05000445/20010052002-01-18018 January 2002 IR 05000445/2001-005; IR 05000446/2001-005; on 10/07/2001-12/29/2001; Txu Electric; Comanche Peak Steam Electric Station; Units 1 and 2. Integrated Resident & Regional Report 2024-01-25
[Table view] Category:Letter
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) ML24024A2102024-01-29029 January 2024 Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23159A2082023-12-20020 December 2023 Request for Withholding Information from Public Disclosure ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23291A4382023-11-30030 November 2023 Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica ML23325A0182023-11-30030 November 2023 Schedule Revision for the License Renewal Application Review IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation ML23308A0032023-11-17017 November 2023 Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement ML23308A0022023-11-17017 November 2023 Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement ML23317A3002023-11-13013 November 2023 Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2972023-11-13013 November 2023 Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2872023-11-13013 November 2023 Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2832023-11-13013 November 2023 Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2852023-11-13013 November 2023 Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23306A0302023-11-13013 November 2023 Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2902023-11-13013 November 2023 Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2982023-11-13013 November 2023 Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2842023-11-13013 November 2023 Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2822023-11-13013 November 2023 Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2962023-11-13013 November 2023 Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2812023-11-13013 November 2023 Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2862023-11-13013 November 2023 Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3032023-11-13013 November 2023 Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2882023-11-13013 November 2023 Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3012023-11-13013 November 2023 Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2792023-11-13013 November 2023 Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3022023-11-13013 November 2023 Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2892023-11-13013 November 2023 Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23360A6312023-10-26026 October 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23263A0242023-09-21021 September 2023 Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application 2024-01-31
[Table view] |
Text
UNITED STATES NU CLE AR RE GU LATOR Y C O M M I S S I O N ary 21, 2008
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000445/2007501 AND 05000446/2007501
Dear Mr. Blevins:
On December 31, 2007, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Comanche Peak Steam Electric Station, Units 1 and 2. This inspection began on January 1, 2007. Issuance of this letter closes NRC Inspection Report 05000445/2007501 and 05000446/2007501. Observations and findings in these areas were provided in the quarterly integrated reports for your site.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely
/RA/
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89
Luminant Generation Company LLC -2-cc:
Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq.
Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 Anthony Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711 Somervell County Judge P.O. Box 851 Glen Rose, TX 76043 Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78711-3326 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087
Luminant Generation Company LLC -3-Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209
Luminant Generation Company LLC -4-Electronic distribution by RIV:
Regional Administrator (EEC)
DRP Director (DDC)
DRS Director (RJC1)
DRS Deputy Director (ACC)
Senior Resident Inspector (DBA)
Branch Chief, DRP/A (CEJ1)
Senior Project Engineer, DRP/A (TRF)
Team Leader, DRP/TSS (CJP)
RITS Coordinator (MSH3)
DRS STA (DAP)
D. Pelton, OEDO RIV Coordinator (DLP)
ROPreports CP Site Secretary (ESS)
SUNSI Review Completed: ____Y__ ADAMS: 6 Yes No Initials: __lmb____
6 Publicly Available Non-Publicly Available Sensitive 6 Non-Sensitive Secretary/DRS C:OB LMBerger RELantz
/RA/ /RA/
2/21/08 2/21/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax