|
|
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:( GE-Hitachi HITACHI Nuclear Energy David W. Turner Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA U.S. Nuclear Regulatory Commission T 925 862 4344 F 910 341 2577 Two White Flint North dovidw.turner@ge.com 11545 Rockville Pike Rockville, Maryland 20852-2738 Att: John Buckley May 2, 2008 | | {{#Wiki_filter:( HITACHI GE-Hitachi Nuclear Energy David W. Turner Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA U.S. Nuclear Regulatory Commission T925 862 4344 F 910 341 2577 Two White Flint North dovidw.turner@ge.com 11545 Rockville Pike Rockville, Maryland 20852-2738 Att: John Buckley May 2, 2008 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Vallecitos Boiling Water Reactor Incident Report | | Vallecitos Boiling Water Reactor Incident Report |
|
| |
|
| ==Reference:== | | ==Reference:== |
| | License DPR-1, Docket 50-18 The following report is submitted pursuant to the requirements of License Condition 5d(1) of GE Hitachi Nuclear Energy Americas LLC, Facility License DPR-1 for The Vallecitos Boiling Water Reactor (VBWR). License condition 5d(1) requires: "A report of any indication of or occurrence of a possible unsafe condition relating to the facility or public. For each occurrence, GE-Hitachi shall promptly notify by telephone or telegraph the Director of the appropriate AEC Regional Compliance Office listed in Appendix D of 10CFR20 and shall submit within 10 days a report in writing to the Director, Division of Reactor Licensing, with a copy to the Regional Compliance Office." |
| | On April 23rd at approximately 10 AM PDT while cutting steel shielding components inside the VBWR containment, hot slag contacted licensed material contained inside a 55 gallon drum located about 40 feet below the cutting location. This melted the plastic material inside the drum containing cloth filters. The material smoldered for several minutes before being extinguished. No open flames were observed. Clean up efforts determined the extent was confined to one 55 gallon drum containing - 108 filters. The bags surrounding 36 of the filters were damaged. The remainder of the filters were unaffected. The drum was undamaged.. Area and personnel air samples taken in the area indicate no abnormal radiological results; therefore there was no radiological release to the workers in the area or the public. |
| | The impacted material was sampled to determine the isotopic makeup to determine if the quantity of material involved was greater than five times the lowest annual limit on intake specified in 10CFR20 Appendix B. Conservative estimates indicate that quantity of licensed material affected was less than 5 times the Annual Limit on Intake of licensed material contained in the drum. More accurate analysis is in GE-Hitochi Nuclear Energy Americas, LLC File copy DWTr-2008-10 |
|
| |
|
| License DPR-1, Docket 50-18 The following report is submitted pursuant to the requirements of License Condition 5d(1) of GE Hitachi Nuclear Energy Americas LLC, Facility License DPR-1 for The Vallecitos Boiling Water Reactor (VBWR). License condition 5d(1) requires: "A report of any indication of or occurrence of a possible unsafe condition relating to the facility or public. For each occurrence, GE-Hitachi shall promptly notify by telephone or telegraph the Director of the appropriate AEC Regional Compliance Office listed in Appendix D of 10CFR20 and shall submit within 10 days a report in writing to the Director, Division of Reactor Licensing, with a copy to the Regional Compliance Office." On April 23rd at approximately 10 AM PDT while cutting steel shielding components inside the VBWR containment, hot slag contacted licensed material contained inside a 55 gallon drum located about 40 feet below the cutting location.
| | process, but has been delayed since the material is potential asbestos containing material. |
| This melted the plastic material inside the drum containing cloth filters. The material smoldered for several minutes before being extinguished.
| | Vallecitos Nuclear Center has initiated a formal incident investigation in accordance with the site procedures to determine the root cause and implement appropriate corrective actions. Ifyou need additional information, please contact me. |
| No open flames were observed.
| | Sincerely, |
| Clean up efforts determined the extent was confined to one 55 gallon drum containing
| | '"...David W. Turner 2008.05.02 13:22:37 |
| -108 filters. The bags surrounding 36 of the filters were damaged. The remainder of the filters were unaffected.
| | -07'00' David W. Turner, Manager Vallecitos Nuclear Center CC: USNRC Region IV Page 2 of 2}} |
| The drum was undamaged..
| |
| Area and personnel air samples taken in the area indicate no abnormal radiological results; therefore there was no radiological release to the workers in the area or the public.The impacted material was sampled to determine the isotopic makeup to determine if the quantity of material involved was greater than five times the lowest annual limit on intake specified in 1OCFR20 Appendix B. Conservative estimates indicate that quantity of licensed material affected was less than 5 times the Annual Limit on Intake of licensed material contained in the drum. More accurate analysis is in GE-Hitochi Nuclear Energy Americas, LLC File copy DWTr-2008-10 process, but has been delayed since the material is potential asbestos containing material.Vallecitos Nuclear Center has initiated a formal incident investigation in accordance with the site procedures to determine the root cause and implement appropriate corrective actions. If you need additional information, please contact me.Sincerely,'"...David W. Turner 2008.05.02 13:22:37-07'00'David W. Turner, Manager Vallecitos Nuclear Center CC: USNRC Region IV Page 2 of 2}}
| |
Latest revision as of 15:49, 14 November 2019
|
---|
Category:Letter
MONTHYEARIR 05000018/20240022024-10-29029 October 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2024-002, 05000070/2024002, 05000183/2024002, and 050-00073/2024002 ML24299A0682024-10-25025 October 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24284A1182024-10-10010 October 2024 GEH - Notification of GE Company Stock Beneficial Ownership Filing ML24271A1572024-09-27027 September 2024 Notification of Planned Closing, Trust Fund Balance at Transfer and Proof of Insurance ML24270A2242024-09-26026 September 2024 License Amendment Request - Historic and Cultural Resources Review Vallecitos Boiling Water Reactor and General Electric Test Reactor ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24165A2812024-06-13013 June 2024 Northstar Vallecitos, LLC, Documentary Evidence of Insurance Vallecitos Nuclear Center ML24157A0882024-06-0505 June 2024 GE-Hitachi Nuclear Energy Americas, LLC, Vallecitos Nuclear Center (Vnc) Organization Change ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000018/20240012024-05-29029 May 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2024-001, 050 00070/2024-001, 050-00183/2024-001, and 050-00073/2024-001 ML24039A0192024-04-25025 April 2024 Order Approving Transfer of the Vallecitos Nuclear Center Licenses and Conforming License Amendments ML24088A2392024-03-28028 March 2024 GE-Hitachi Nuclear Energy Americas, LLC, NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed - Step Two ML24051A1802024-02-22022 February 2024 Boiling Water Reactor License Termination Plan Request for Additional Information - Letter ML24032A1082024-02-0101 February 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24022A3232024-01-22022 January 2024 Geha/Northstar Response to NRC Request for Additional Information Regarding Direct Transfer of Vnc Licenses IR 05000018/20230022024-01-0909 January 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2023002, 05000070/2023002, and 05000183/2023002 ML23345A1222023-12-21021 December 2023 Request for Additional Information Regarding the Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23345A0812023-12-11011 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A1312023-12-0404 December 2023 GE-Hitachi Nuclear Energy Americas, LLC, Additional Information to Geha and GNF-A Application for Order Consenting to Indirect Transfer of Control (Reference 1) ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23279A1322023-11-13013 November 2023 GE Hitachi Nuclear Energy - Vallecitos Nuclear Center, Getr Decommissioning Plan – (License Number TR-1, Docket Number 50-70) ML23310A1132023-11-0909 November 2023 FRN-Notice of Consideration of Approval of Direct Transfer of Control of Vallecitos Nuclear Center Licenses Conforming License Amendments Opportunity for a Hearing Transmittal Letter ML23305A0522023-11-0101 November 2023 GE Hitachi Nuclear Energy Additional Supplemental Information - Revised Exhibit H ML23275A1742023-10-26026 October 2023 Acceptance Review of Application for Consent to Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23292A3362023-10-19019 October 2023 Northstar Vallecitos, LLC, Supplemental Information - Financial Qualifications ML23276B3952023-10-13013 October 2023 The U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML23269A1062023-09-26026 September 2023 GEH Description of Process for Decommissioning the Vallecitos Nuclear Center (Vnc) Shutdown Reactors - Getr Decommissioning Plan ML23261A5922023-09-15015 September 2023 GE-Hitachi Nuclear Energy Americas, LLC, License Termination Plan for the Vallecitos Boiling Water Reactor License DPR-1 ML23257A2492023-09-14014 September 2023 Cultural Resources Report ML23248A2322023-09-0505 September 2023 GE Hitachi Nuclear Energy - Supplemental Information - Proposed Conforming Amendments & License Conditions ML23244A2472023-09-0101 September 2023 GE-Hitachi Nuclear Energy Americas, LLC and Northstar Vallecitos, LLC, Application for Consent to Direct Transfers of Control of Licenses and Related Conforming License Amendments ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML23150A0962023-05-30030 May 2023 GE Hitachi Nuclear Energy, Nuclear Center (Vnc) Organization Change ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals IR 05000018/20230012023-05-0505 May 2023 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2023001, 05000070/2023001, and 05000183/2023001 ML23123A0752023-04-12012 April 2023 Response to NRC Request for Inspection Documents ML23104A4172023-03-31031 March 2023 GNF-AGEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML23090A1802023-03-31031 March 2023 GEH - Financial Assurance Status Reports ML23083B3402023-03-24024 March 2023 GEH Annual Shutdown Reactor Reports for the Year 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23054A3332023-02-23023 February 2023 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23018A2832023-01-19019 January 2023 GE-Hitachi Nuclear Energy Americas, LLC Response to NRC Inspection Report 050-00018/2022-002; 050-00070/2022-002; 050-00183/2022-002 and Notice of Violation ML22339A1742022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 IR 05000018/20220022022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 ML22335A5262022-12-0101 December 2022 (Vnc) Organization Change ML22326A3522022-11-22022 November 2022 Limited Post Shutdown Decommissioning Activities Report Update ML22300A2102022-10-27027 October 2022 GE-Hitachi Nuclear Energy Americas, LLC, Nuclear Center (Vnc) Submittal of Radiological Emergency Plan (REP) Revision 2 ML22265A0442022-09-26026 September 2022 GE Hitachi Vallecitos Nuclear Center, U.S. Nuclear Regulatory Commissions Analysis of GE Hitachis Decommissioning Funding Status Reports for the Shutdown Power Reactors Vallecitos Boiling Water Reactor (License No. DPR-1, Docket No. 50-18) 2024-09-27
[Table view] |
Text
( HITACHI GE-Hitachi Nuclear Energy David W. Turner Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA U.S. Nuclear Regulatory Commission T925 862 4344 F 910 341 2577 Two White Flint North dovidw.turner@ge.com 11545 Rockville Pike Rockville, Maryland 20852-2738 Att: John Buckley May 2, 2008
Subject:
Vallecitos Boiling Water Reactor Incident Report
Reference:
License DPR-1, Docket 50-18 The following report is submitted pursuant to the requirements of License Condition 5d(1) of GE Hitachi Nuclear Energy Americas LLC, Facility License DPR-1 for The Vallecitos Boiling Water Reactor (VBWR). License condition 5d(1) requires: "A report of any indication of or occurrence of a possible unsafe condition relating to the facility or public. For each occurrence, GE-Hitachi shall promptly notify by telephone or telegraph the Director of the appropriate AEC Regional Compliance Office listed in Appendix D of 10CFR20 and shall submit within 10 days a report in writing to the Director, Division of Reactor Licensing, with a copy to the Regional Compliance Office."
On April 23rd at approximately 10 AM PDT while cutting steel shielding components inside the VBWR containment, hot slag contacted licensed material contained inside a 55 gallon drum located about 40 feet below the cutting location. This melted the plastic material inside the drum containing cloth filters. The material smoldered for several minutes before being extinguished. No open flames were observed. Clean up efforts determined the extent was confined to one 55 gallon drum containing - 108 filters. The bags surrounding 36 of the filters were damaged. The remainder of the filters were unaffected. The drum was undamaged.. Area and personnel air samples taken in the area indicate no abnormal radiological results; therefore there was no radiological release to the workers in the area or the public.
The impacted material was sampled to determine the isotopic makeup to determine if the quantity of material involved was greater than five times the lowest annual limit on intake specified in 10CFR20 Appendix B. Conservative estimates indicate that quantity of licensed material affected was less than 5 times the Annual Limit on Intake of licensed material contained in the drum. More accurate analysis is in GE-Hitochi Nuclear Energy Americas, LLC File copy DWTr-2008-10
process, but has been delayed since the material is potential asbestos containing material.
Vallecitos Nuclear Center has initiated a formal incident investigation in accordance with the site procedures to determine the root cause and implement appropriate corrective actions. Ifyou need additional information, please contact me.
Sincerely,
'"...David W. Turner 2008.05.02 13:22:37
-07'00' David W. Turner, Manager Vallecitos Nuclear Center CC: USNRC Region IV Page 2 of 2