ML092010364: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 07/20/2009 | | issue date = 07/20/2009 | ||
| title = Acceptance Review Email, License Amendment Request, Revise Technical Specification 5.5.6, Inservice Testing Program. | | title = Acceptance Review Email, License Amendment Request, Revise Technical Specification 5.5.6, Inservice Testing Program. | ||
| author name = Wang A | | author name = Wang A | ||
| author affiliation = NRC/NRR/DORL/LPLIV | | author affiliation = NRC/NRR/DORL/LPLIV | ||
| addressee name = Burmeister B | | addressee name = Burmeister B, Lorfing D | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000458 | | docket = 05000458 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:From: Wang, Alan Sent: Monday, July 20, 2009 2:03 PM To: BURMEISTER, BARRY M; LORFING, DAVID N Cc: Burkhardt, Janet; Lent, Susan | {{#Wiki_filter:From: Wang, Alan Sent: Monday, July 20, 2009 2:03 PM To: BURMEISTER, BARRY M; LORFING, DAVID N Cc: Burkhardt, Janet; Lent, Susan | ||
==Subject:== | ==Subject:== | ||
Acceptance Review of Entergy License Amendment Request 09-02 (ME1653) | Acceptance Review of Entergy License Amendment Request 09-02 (ME1653) | ||
Barry and David: | Barry and David: | ||
By letter dated June 29, 2009, Entergy Operations, Inc. (the licensee) requested an amendment to the Facility Operating License for the River Bend Station, Unit 1 (RBS). The proposed License Amendment Request will revise Technical Specification 5.5.6, | By letter dated June 29, 2009, Entergy Operations, Inc. (the licensee) requested an amendment to the Facility Operating License for the River Bend Station, Unit 1 (RBS). The proposed License Amendment Request will revise Technical Specification 5.5.6, Inservice Testing Program." The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. | ||
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. | ||
If you have any questions, please contact me at (301) 415-1445. | If you have any questions, please contact me at (301) 415-1445. | ||
Alan Wang Project Manager (Diablo Canyon) | Alan Wang Project Manager (Diablo Canyon) | ||
Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222 E-mail Properties Mail Envelope Properties (419623E8C7444444BF132DA3AE69EDA21AD447744A) | Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222 E-mail Properties Mail Envelope Properties (419623E8C7444444BF132DA3AE69EDA21AD447744A) | ||
==Subject:== | ==Subject:== | ||
Acceptance Review of Entergy License Amendment Request 09-02 (ME1653) | Acceptance Review of Entergy License Amendment Request 09-02 (ME1653) | ||
Sent Date: | Sent Date: 7/20/2009 2:02:35 PM Received Date: 7/20/2009 2:02:35 PM From: Wang, Alan Created By: Alan.Wang@nrc.gov Recipients: | ||
Created By: | |||
Recipients: | |||
BBURMEI@entergy.com (BURMEISTER, BARRY M) | BBURMEI@entergy.com (BURMEISTER, BARRY M) | ||
Tracking Status: None DLORFIN@entergy.com (LORFING, DAVID N) | Tracking Status: None DLORFIN@entergy.com (LORFING, DAVID N) | ||
Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet) | Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet) | ||
Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan) | Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan) | ||
Tracking Status: None | Tracking Status: None Post Office: | ||
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 6760 7/20/2009 Options Expiration Date: | |||
Post Office: | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} | ||
HQCLSTR02.nrc.gov | |||
Files | |||
MESSAGE | |||
Options Expiration Date: | |||
Priority: | |||
Sensitivity: |
Latest revision as of 04:04, 14 November 2019
ML092010364 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 07/20/2009 |
From: | Wang A Plant Licensing Branch IV |
To: | Burmeister B, Lorfing D Entergy Operations |
Wang, A B, NRR/DORL/LPLIV, 415-1445 | |
References | |
TAC ME1653 | |
Download: ML092010364 (2) | |
Text
From: Wang, Alan Sent: Monday, July 20, 2009 2:03 PM To: BURMEISTER, BARRY M; LORFING, DAVID N Cc: Burkhardt, Janet; Lent, Susan
Subject:
Acceptance Review of Entergy License Amendment Request 09-02 (ME1653)
Barry and David:
By letter dated June 29, 2009, Entergy Operations, Inc. (the licensee) requested an amendment to the Facility Operating License for the River Bend Station, Unit 1 (RBS). The proposed License Amendment Request will revise Technical Specification 5.5.6, Inservice Testing Program." The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1445.
Alan Wang Project Manager (Diablo Canyon)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222 E-mail Properties Mail Envelope Properties (419623E8C7444444BF132DA3AE69EDA21AD447744A)
Subject:
Acceptance Review of Entergy License Amendment Request 09-02 (ME1653)
Sent Date: 7/20/2009 2:02:35 PM Received Date: 7/20/2009 2:02:35 PM From: Wang, Alan Created By: Alan.Wang@nrc.gov Recipients:
BBURMEI@entergy.com (BURMEISTER, BARRY M)
Tracking Status: None DLORFIN@entergy.com (LORFING, DAVID N)
Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)
Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 6760 7/20/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: